  • Medivis, Inc. v. Novarad Corp.Some claims unpatentable
    PTAB · Oct 1, 2026 · IPR2023-00042 · APJ Scott Raevsky · IPR · Remand

    Claims 1–6, 11, and 20 are unpatentable as obvious over Doo and Amira; claims 12–19 were not shown unpatentable because the asserted tissue properties were not shown in Amira.

    RulingsRemand decision
    • RemandOther

      “Federal Circuit. The court issued its decision in Medivis, Inc. v. Novarad Corp., No. 2024-1794, 2026 WL 587294 (Fed. Cir. Mar. 3, 2026) (“Medivis”) (Paper 40),1 affirming-in-part, reversing-in-part, and remanding our Final Written Decision (Paper 35) for further proceedings. In its opinion, the Federal Circuit reversed our “determination of no motivation to combine Doo and Amira” and remanded for further proceedings to evaluate whether claims 1–6 and 11–20 (“the Remanded Claims”) of U.S. Patent No. 11,004,271 B2 (“the ’271 patent,” Ex. 1001) are unpatentable in view of Petitioner’s obviousness challenge over Doo and Amira. Medivis, slip op. at 9–10. We have jurisdiction under 35 U.S.C. § 6(b). We issue this Final Written Decision on Remand pursuant to 35 U.S.C. §§ 144, 318 and 37 C.F.R. § 42.73 in an inter partes review involving Medivis, Inc. (“Petitioner”) and Novarad Corp. (“Patent Owner”). For the reasons discussed below, after considering the entirety of the record in light of the Federal Circuit’s directives in Medivis, we hold that Petitioner has demonstrated, by a preponderance of the evidence, that claims 1–6, 11, and 20 are unpatentable; however, Petitioner has not demonstrated, by a preponderance of the evidence, that claims 12–19 are unpatentable.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “We adopt Petitioner’s proposed level of skill, except that we excise part of Petitioner’s definition to produce the following modified version: 4 Throughout this decision, we eliminate the parties’ italicization of reference names from quotations without noting “emphasis omitted.” 5 Doo, WO 2015/164402 A1, published October 29, 2015 (Ex. 1008). 6 Excerpt of Amira 5 User’s Guide, title through Chapter 2 (Visual Imaging 2009) (Ex. 1005). engineering, or a related field with several years of experience in the design, development, and study of augmented reality devices and . . . familiarity with conventional medical imaging data and visualization of data for medical procedures . . . . Our edit removes the alternative of “working with a team including someone with such familiarity” because one’s role in a team may be tangential to their personal experience with medical imaging. Regardless, had we adopted Petitioner’s original definition, our decision would not have changed.” slip op. at 6

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed petitioner constructionDecided for petitioner

      “We agree with Petitioner that the term “3D slices” has no apparent connection to the phrase “direct volume rendering.” Patent Owner’s argument appears to be that DVR “requires an image of the entire anatomical volume that is neither feature-specific nor segmented, [which] would seemingly require that all inner layers be displayed.” Reply 4; see Sur-reply 6–10 (not disputing Petitioner’s characterization). But, as Petitioner notes, the specification directly undermines this by teaching “display [of] a slice of the 3D data instead of a volume of the 3D data.” See Reply 4 n.2 (quoting Ex. 1001, 5:34–35). In other words, to the extent DVR would depict an image of the entire anatomical volume, displaying 3D slices “instead of a volume of the 3D data” implies the opposite of DVR. Even if “3D slices” somehow implied DVR, Patent Owner’s position is still untenable. Claim 1 does not recite “3D slices.” Instead, claim 1 recites “3D data” and “inner layers.” Ex. 1001, 18:54–65. Patent Owner fails to clarify the relationship between “slices,” “3D data,” and “layers,” and its expert even admits that slices and layers are two different things. See PO Resp. 13; Ex. 1022, 32:7–16 (agreeing that the words “slice” and “layer” are not “synonyms”), cited in Reply 4. We also agree with Petitioner that dependent claim 3 distinguishes slices and layers by reciting “slices of the projected inner layer.” Reply 4 (quoting Ex. 1001, 19:3–10). Thus, even if 3D slices somehow implied DVR, the language of claim 1 does not support limiting the claim this way.” slip op. at 12

    • Novelty / Anticipation (§102) › Prior-art status of a reference › Printed publication / public accessibilityPrinted publication establishedDecided for petitioner

      “The determination of whether a document was publicly accessible “involves a case-by-case inquiry into the facts and circumstances surrounding the reference’s disclosure to members of the public.” Medtronic, Inc. v. Barry, 891 F.3d 1368, 1380 (Fed. Cir. 2018). For instance, courts routinely rely on the Wayback Machine to determine when a reference was first made available to the public. Valve Corp. v. Ironburg Inventions Ltd., 8 F.4th 1364, 1374 (Fed. Cir. 2021) (“District courts have taken judicial notice of the contents of webpages available through the Wayback Machine ‘as facts that can be accurately and readily determined from sources whose accuracy cannot reasonably be questioned.’”). We disagree with Patent Owner’s argument that “Medivis cannot rely on additional prior art”—Exhibits 1023 and 1024—“that was submitted after its Petition to carry its burden without leave from the Board.” Sur-reply 4. As Patent Owner did not file a motion to exclude these exhibits, we decline Patent Owner’s invitation to disregard them. We also find Petitioner’s Reply argument proper because it directly responds to Patent Owner’s contention that Petitioner did not prove the public accessibility of Amira. See Chamberlain Grp., Inc. v. One World Techs., Inc., 944 F.3d, 919, 925 on issues previously raised.”). Petitioner’s Reply argument appropriately elaborates on the Petition’s contention that Amira was publicly accessible. Patent Owner also does not dispute the substance of Petitioner’s evidence. For example, Patent Owner does not address the substance of Mr. Frank-White’s declaration. We find that this evidence, including Mr. Frank- White’s declaration testimony, persuasively supports the public availability of Amira as of the date shown in the Wayback Machine URL. See Ex. 1024.” slip op. at 22

    Patent outcomesUS 11,004,271 mixed
    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips
    Patents in suitUS 11,004,271
  • PTAB · Sep 25, 2026 · IPR2025-00775 · APJ Justin T Arbes · IPR · Final written decision

    Claims 1–9 are unpatentable as obvious over each of the five asserted §103 grounds, including Carmel with Mattavelli and Carmel with Wang.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Petitioner argues that at the relevant time of the invention claimed in the ’849 patent (April 2005),2 a person of ordinary skill in the art would have had “at least a bachelor’s degree in computer science, computer engineering, electrical engineering, or an equivalent field requiring learning computation principles, and two years of work experience in networking or streaming media systems, particularly audio and video, over the Internet,” where “[a]dditional education could compensate for less practical experience and vice versa.” Pet. 5–6 (citing Ex. 1002 ¶¶ 18–23). In the Decision on Institution, the Board agreed with and applied Petitioner’s proposed definition. Dec. on Inst. 9–11. Patent Owner proposes a very similar definition of “a bachelor’s degree in electrical engineering, computer engineering, computer science, or a related field, and two to three years of experience in the design or development of (1) video processing systems, audio processing systems, and/or the equivalent; and (2) networking and communications systems, or the equivalent,” where “[a]dditional graduate education could substitute for professional experience, or significant experience in the field could substitute for formal education.” PO Resp. 23 2 Petitioner states that it “uses [the earliest possible priority date of April 18, 2005] as the priority date of the challenged claims.” Pet. 6. Patent Owner agrees that the “earliest effective filing date” of the challenged claims is April 18, 2005. PO Resp. 19. The ’849 patent is expired. See Ex. 1001, codes (63), (*); Paper 8, 33. would be the same under either level” of ordinary skill in the art. Id. Based on the full record developed during trial, including our review of the ’849 patent and the types of problems and solutions described in the ’849 patent and cited prior art, we maintain the previously adopted definition of the level of ordinary skill in the art, but remove the term “at least” to avoid unnecessary ambiguity. Our analysis herein, however, would be the same under either party’s proposed definition.” slip op. at 7

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “37 C.F.R. § 42.100(b). Petitioner states in the Petition that it “does not presently contend that any term requires express construction.” Pet. 6. Patent Owner “does not believe any terms of the ’849 [p]atent require express constructions for purposes of” this proceeding. PO Resp. 24; Sur-Reply 11. The Board did not interpret any terms in the Decision on Institution. Dec. on Inst. 8. We agree that no terms require express interpretation to determine whether Petitioner has met its burden to prove unpatentability of the challenged claims. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“Because we need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy,’ we need not construe” slip op. at 8

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundUnpatentable

      “Finally, Petitioner explains in detail why and how a person of ordinary skill in the art would have had reason to combine the teachings of Carmel and Mattavelli, with a reasonable expectation of success. See Pet. 50–55. Specifically, an ordinarily skilled artisan would have modified Carmel’s system to use “Mattavelli’s CGD techniques to optimize the decoding of in more efficient network bandwidth usage and improved playback of multimedia data streams. Id. at 50, 52–53, 55. Petitioner contends that Carmel and Mattavelli are both directed to processing multimedia data playback “for the appreciation of a user,” while providing the highest perceived audio and video output quality possible in view of system constraints to ensure playback continuity. Id. at 50–51 (citing Ex. 1003, 7:35–49, 10:48–54, 11:9–18, Figs. 3D, 6B; Ex. 1004, 2309–10). Petitioner argues that Carmel and Mattavelli both pertain to compression of multimedia data using well-known coding and compression standards for video streaming. Id. at 51 (citing Ex. 1003, 7:25–26, 11:24–52; Ex. 1004, 2309–11). Petitioner further asserts that a person of ordinary skill in the art would have appreciated that Carmel and Mattavelli “complement[]” each other because Carmel addresses constraints on available network bandwidth and Mattavelli addresses limits on available processing resources at the client/multimedia player. Pet. 52 (citing Ex. 1003, code (57), 7:36–41; Ex. 1004, 2309–2312). According to Petitioner, an ordinarily skilled artisan would have been motivated to combine the complementary teachings in Carmel and Mattavelli to create a more robust streaming system that addresses both bandwidth constraints and client processing limits to provide the best possible playback experience. Id. (citing Ex. 1002 ¶¶ 212–215). Petitioner also contends that Mattavelli teaches that merely optimizing transmission bandwidth is not sufficient and is potentially harmful, which provides an express motivation to combine Carmel’s and Mattavelli’s complementary teachings to ensure that different, related links in the streaming playback chain are optimized together. Id. at 53 (citing Ex. 1002 express disclosure that would have motivated a person of ordinary skill in the art to incorporate Mattavelli’s complementary teachings regarding decoding because Carmel states that multimedia playback is achieved “preferably with only a minimal necessary transmission and decoding delay.” Id. at 53–54 (quoting Ex. 1003, 10:50–54; citing Ex. 1002 ¶ 218). Patent Owner in its Response does not dispute that Carmel and Mattavelli teach the preamble and limitations 1[a.i]–1[c.i], or that a person of ordinary skill in the art would have been motivated to combine the references’ teachings in the manner asserted by Petitioner.6 Nonetheless, the burden remains on Petitioner to demonstrate unpatentability. Dynamic Drinkware, 800 F.3d at 1378 (discussing the burden of proof in inter partes review). Having reviewed Carmel and Mattavelli, on the complete trial record, we agree with Petitioner’s analysis, as supported by the testimony of” slip op. at 22

    Patent outcomesUS 10,771,849 unpatentable
    Claim construction§ 103 obviousnesscites KSR · Graham
    Patents in suitUS 10,771,849
  • PTAB · Sep 3, 2026 · IPR2025-00673 · APJ Michael R Zecher · IPR · Final written decision

    Claims 1–7 are unpatentable as obvious over the combined teachings of the asserted references, including Shin and Aoyama and Shimomura and Iwase.

    RulingsFinal written decision
    • PTAB / AIA Trials › Motions to amend / substitute claimsOther

      “1 SoundClear also filed a Contingent Motion to Amend that proposed to replace originally challenged claim 5 of the ’675 patent with proposed substitute claim 8. Paper 21. We, however, granted SoundClear’s request to withdraw its Contingent Motion to Amend and, as a result, the Contingent Motion to Amend will no longer be considered in this proceeding. Paper 30.” slip op. at 2

    • Skill levelOther

      “2. Level of Skill in the Art In determining whether an invention would have been obvious, we” slip op. at 21

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundMotivation not foundMixed

      “combination because (1) configuring Shin’s processor 120 accordingly “would have been trivial, involving straightforward changes to enhance the processor’s approach to simplifying and abbreviating its output”; and (2) this approach was well-known as evidenced by Ha’s disclosure of replacing “team meeting” and “date” with “schedules” based on the user’s environment.6 Id. at 27–28 (first quoting Ex. 1011 ¶ 97, then quoting Ex. 1011 ¶ 98) (citing Ex. 1002 ¶ 102; Ex. 1011, Fig. 7).” slip op. at 33

    • Expert testimonyPetitioner expert creditedDecided for petitioner

      “4. Dr. Stern’s Testimony is Reliable In its Patent Owner Response, SoundClear contends that “Dr. Stern’s” slip op. at 125

    Patent outcomesUS 11,244,675 unpatentable
    § 103 obviousnesscites KSR · Graham
    Patents in suitUS 11,244,675
  • PTAB · Jul 27, 2026 · IPR2025-00565 · APJ Michael R Zecher · IPR · Final written decision

    Claims 1–5 are unpatentable because Amazon showed they are anticipated by Shin; the Board did not reach Amazon’s contingent obviousness ground over Shin.

    RulingsFinal written decision
    • BurdenOther

      “Written Decision under 35 U.S.C. § 318(a) as to the patentability of claims 1–5 of the ’337 patent. For the reasons we identify below, we hold that Amazon has demonstrated by a preponderance of the evidence that these claims are unpatentable.” slip op. at 2

    • Skill levelOther

      “2. Level of Skill in the Art In determining whether an invention would have been obvious, we” slip op. at 18

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)UnpatentableUnpatentable

      “1. Principles of Law To establish anticipation, “all of the elements and limitations of the” slip op. at 17

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successUnpatentableNot shown unpatentableMixed

      “1. Principles of Law To establish anticipation, “all of the elements and limitations of the” slip op. at 17

    Patent outcomesUS 11,069,337 unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites KSR · Graham
    Patents in suitUS 11,069,337
  • PTAB · Jan 15, 2026 · IPR2025-01231 · APJ Mary C Hoffman · IPR · Institution

    The Board instituted IPR on claims 1–13 on all asserted grounds, finding a reasonable likelihood that at least one challenged claim is unpatentable.

    RulingsInstitution decision
    • PTAB / AIA Trials › Real party in interest / privityRpi dispute resolved for petitionerDecided for petitioner

      “petition identifies all real parties in interest. 35 U.S.C. § 312(a)(2). Whether an unnamed party is a real party in interest “is a highly fact-dependent question.” See Applications in Internet Time, LLC v. RPX Corp., 897 F.3d 1336, 1351, 1360 (Fed. Cir. 2018) (“AIT”); Ventex Co., Ltd. v. Columbia Sportswear N. Am., Inc., IPR2017-00651, Paper 152 at 4–5 (PTAB Jan. 24, 2019) (precedential) (citing Worlds Inc. v. Bungie, Inc., 903 F.3d 1237, 1242 (Fed. Cir. 2018)); Consolidated Trial Practice Guide, 13 (2019), https://www.uspto.gov/sites/default/files/documents/tpgnov.pdf (CTPG). “A common consideration is whether the non-party exercised or could have exercised control over a party’s participation in a proceeding.” CTPG at 16. Other considerations include whether the non-party is funding or directing the proceeding; the non-party’s relationship with the petitioner; the non-party’s relationship to the petition itself, including the nature and/or degree of involvement in the filing; and the nature of the entity filing the petition. Id. at 17–18.” slip op. at 8

    • Skill levelSkill level board ownOther

      “person of ordinary skill in the art (“POSITA”) “would have at least a bachelor’s degree in electrical engineering or a related field and at least two years of experience with lighting technology.” Pet. 2 (citing Ex. 1017 ¶ 35). Petitioner makes additional contentions about what a POSITA would have understood. Id. (“A POSITA would understand that all types of cameras (e.g., analog and digital, photo and video) generally involve the same lighting considerations . . . . [and] that it is important to provide light that evenly illuminates the target subject or object to minimize reflected glare and shadows.”). Patent Owner contends that a POSITA would have at least: (a) a bachelor’s degree in electrical engineering, optical engineering, or a related field; (b) two years of practical experience in designing and developing lighting systems, particularly those integrated with electronic devices such as webcams or computer monitors; and (c) knowledge of user-interface considerations for consumer electronics . . . . Additional experience can substitute for education and vice versa. Prelim. Resp. 12 (citing Ex. 2036 ¶ 48). Patent Owner disputes Petitioner’s contentions regarding what a POSITA would have understood. Prelim. Resp. 12–13 (“[O]ne of ordinary skill in the art would have understood that analog and digital cameras have different operating principles and lighting requirements [and] Petitioner’s lack of appreciation for the suitability and unsuitability of different lights for different applications infects and dooms its invalidity analysis.” (citing Ex. 2036 ¶¶ 36–47)). and years of experience required for a POSITA. Pet. 2; Prelim. Resp. 12. For purposes of this Decision, we consider a person of ordinary skill in the art to have a bachelor’s degree in electrical engineering or related field and two years of practical experience in lighting technology, and that additional experience may substitute for education and vice versa, which is consistent with the level of skill reflected in the ’729 patent and prior art of record. See Exs. 1001, 1005–1010, 1012–1015; see also Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (explaining that specific findings regarding ordinary skill level are not required “where the prior art itself reflects an appropriate level and need for testimony is not shown” (quoting Litton Indus. Prods., Inc. v. Solid State Sys. Corp., 755 F.2d 158, 163 (Fed. Cir. 1985))).” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Patent Owner agrees that the Board need not formally construe any claim terms in order to adjudicate the merits of the Petition and argues Petitioner fails to show unpatentability of any claim under any reasonable construction of the claims. Prelim. Resp. 13 (citing Ex. 2036 ¶ 51). We determine that no express claim construction is necessary to determine whether institution is warranted in this proceeding. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (holding that only terms in controversy must be construed “and only to the extent necessary to resolve the controversy”) (citing Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)).” slip op. at 14

    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “claimed subject matter and the prior art are “such that the subject matter as a whole would have been obvious at the time the invention was made to a person having ordinary skill in the art to which said subject matter pertains.” KSR Int’l Co. v. Teleflex Inc., 550 U.S. 398, 406 (2007). When a ground in a petition is based on a combination of references, we consider “whether there was an apparent reason to combine the known elements in the fashion claimed by the patent at issue.” Id. at 418 (citing In re Kahn, 441 F.3d 977, 988 (Fed. Cir. 2006)). We base our obviousness inquiry on factual considerations including (1) the scope and content of the prior art, (2) any differences between the claimed subject matter and the prior art, (3) the level of skill in the art, and (4) any objective indicia of obviousness or non-obviousness that may be in evidence.14 See Graham, 383 U.S. at 17–18.” slip op. at 24

    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 7,841,729
  • PTAB · Oct 28, 2025 · IPR2024-00850 · APJ Arthur M Peslak · IPR · Final written decision

    Claims 1, 3–12, 14, and 23–27 are unpatentable as obvious over Raizer and Hangzhou.

    RulingsFinal written decision
    • Skill levelOther

      “B. Level of Ordinary Skill in the Art We consider the asserted grounds of unpatentability in view of the” slip op. at 9

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “C. Claim Construction Neither Petitioner nor Patent Owner proposes an express construction” slip op. at 10

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successUnpatentableMotivation foundUnpatentable

      “that it would improve similar devices in the same way, using the technique is obvious unless its actual application is beyond his or her skill.” KSR, 550 U.S. at 417. In this case, we must determine whether one of ordinary skill in the art would recognize that Hangzhou’s disclosure of driving its auto-guided trolleys 200 under shelves 100 would improve the operation of Raizer’s system in the same way. For us to resolve this question in Petitioner’s favor, Petitioner must provide “some articulated reasoning with some rational underpinning to support the legal conclusion of obviousness.” Id. at 418 (citing In re Kahn, 441 F.3d 977, 988 (Fed. Cir. 2006)). However, bodily incorporation, i.e., “an actual physical substitution of” Hangzhou’s auto-guided trolleys or operating software into Raizer’s system, is not required. See In re Mouttet, 686 F.3d 1322, 1332 (Fed. Cir. 2012) (“It is well-established that a determination of obviousness based on teachings from multiple references does not require an actual, physical substitution of elements.”); In re Nievelt, 482 F.2d 965, 968 (CCPA 1973) (“Combining the teachings of references does not involve an ability to combine their specific structures.”).” slip op. at 23

    Patent outcomesUS 11,472,632 unpatentable
    Claim construction§ 103 obviousnesscites KSR · Graham
    Patents in suitUS 11,472,632
  • PTAB · Oct 10, 2025 · IPR2025-00653 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution on all claims because the Petition did not show a reasonable likelihood that any challenged claim was unpatentable over the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “An inter partes review may be instituted only if “the information presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’504 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Additionally, only terms that are in controversy need to be construed, and these need be construed only to the extent necessary to resolve the controversy. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 9; Prelim. Resp. 4 (citing Ex. 2009 ¶ 72); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13

    • Expert testimonyPetitioner expert discountedDecided for patent owner

      “Ex. 1002 ¶ 47. As reflected above, Dr. Wooley’s testimony as to element [1.2] does not even assert that Cardamone discloses a tank, let alone one or more sensors disposed at a tank as recited in element [1.2]. Thus, Dr. Wooley’s testimony does not support Petitioner’s argument on this issue.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,726,504
  • PTAB · Oct 10, 2025 · IPR2025-00652 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–23 and 25–30 were unpatentable over the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’403 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 10; Prelim. Resp. 4 (citing Ex. 2009 ¶ 73); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses element [1.2] because the evidence cited does not disclose a “first computer system being configured to provide remote control of the first pump or first valve” (i.e., a fluid-handling device). Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but Petitioner has not identified any disclosure of the capability to remotely control fluid-handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, Kahn’s disclosures that Petitioner relies on for allegedly teaching remote control are deficient. We discuss each. First, Petitioner points to the following, “[f]or instance, as illustrated in FIG. 1C, a fluid control device such as a valve 15A is located on the input side of a sen[s]or unit 110.” Ex. 1005, 8:19–21, cited in Pet. 13. This portion of Kahn, however, does not disclose remote control. Second, Petitioner cites to the following: Finally, or in addition to, the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance. Pet. 13 (citing Ex. 1005, 10:62–67). We agree with Patent Owner that this portion of Kahn teaches on-site alerts and local control of the fluid-handling device. See Prelim. Resp. 7. This portion of Kahn does not disclose remote control.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,294,403
  • Tanklogix, LLC v. SiteproInstitution denied
    PTAB · Oct 10, 2025 · IPR2025-00650 · APJ Sheila F Mcshane · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 18–32 and 34 were unpatentable over Kahn or Kahn and Gutierrez.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). Upon consideration of the Petition, the Preliminary Response, and the evidence of record, we determine that Petitioner has not established a reasonable likelihood of prevailing with respect to the unpatentability of at least one claim of the ’871 patent. Accordingly, for the reasons that follow, we decline to institute an inter partes review of claims 18–32 and 34 of the ’871 patent.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The respective proposed levels of qualifications for a person of ordinary skill in the art are similar, with Patent Owner proposing two years of experience compared to Petitioner proposing significant experience with remotely controlling fluid-handling devices, like SCADA systems. Patent Owner also proposes more extensive experience in lieu of educational experience. While we find Petitioner’s proposed qualifications to be acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of skill necessary to understand and implement the teachings of the ’871 patent and the asserted prior art. Our analysis and findings herein, however, do not turn on any differences in the qualifications adopted.” slip op. at 8

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “We determine that we need not expressly construe any claim terms to resolve the parties’ disputes on the current record. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 10

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “actuators and the remote control of fluid handling devices, including the receipt with the user-interface module of “a user command to actuate an actuator via a presented control interface” (limitation [18.7]) and “account authorized to send commands to remotely control fluid handling devices” (limitation [18.11]). We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses or teaches these limitations because the evidence does not provide support that there is remote control of fluid handling devices or the use of a user command on a control interface to send a command to a fluid handling device, for instance. Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but we do not discern that it teaches or discloses the capability to remotely control fluid handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, the Kahn disclosures that Petitioner repeatedly relies upon for allegedly teaching this control are deficient. See Ex. 1005, 10:62–67, 14:35– 15:2, 15:62–16:32; see also Pet. 12–14, 16–18. Kahn discloses that “the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance.” Ex. 1005, 10:62–67. Communication unit 112B is part of the local “sensor unit,” wherein the detection conditions determined by the sensor are communicated to remote devices by communication unit 112B. See id. at 3:31–33, 5:62–6:2, 6:27–35, 7:33–37, 13:7–12, Figs. 1A–1C. Kahn discloses that the sensor units, which include communication units 112B, can be located near shut-off valves and can communicate with distant locations. See id. at 11:1–13. There are no disclosures, however, in the above passages that there is remote control of fluid handling devices, that there is a user command on a control interface that actuates an actuator, or that there is a command sent to the facility actuators via a network connection, as required in limitations [18.5]–[18.7] and [18.9]–[18.12], respectively. Rather, the disclosure indicates that the communication unit 112B includes on-site alerts and that the local (non-remote) communication unit 112B can be interfaced with the control valve.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 10,488,871
  • PTAB · Oct 8, 2025 · IPR2025-00629 · APJ Scott C Moore · IPR · Institution

    The Board instituted IPR of claims 1–20 on all asserted grounds, finding a reasonable likelihood that claim 1 is obvious over Beard and Laufer.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “We may institute an inter partes review when “the information presented in the petition . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). If we institute an inter partes review, the trial must encompass all claims and grounds identified in the Petition. 37 C.F.R. § 42.108(a) (“When instituting inter partes review, the Board will authorize the review to proceed on all of the challenged claims and on all grounds of unpatentability asserted for each claim.”). For the reasons set forth below, we conclude that there is a reasonable likelihood that Petitioner will prevail in establishing the unpatentability of one or more claims of the ’711 Patent. We, therefore, institute inter partes review of claims 1–20 on the grounds identified in the Petition. B.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Petitioner contends that one of ordinary skill in the art would have had the following qualifications: [E]ither (1) a Bachelor of Science in Mechanical Engineering, Electrical Engineering, Aerospace engineering, or an equivalent field, as well as at least 2 years of academic or industry experience in the aerospace or avionics fields, or (2) at least four years of experience in any of the above industries. 1 The Leahy-Smith America Invents Act (“AIA”) included revisions to 35 U.S.C. §§ 102 and 103 that became effective on March 16, 2013. Because the applications from which the ’711 Patent claims priority were all filed after this date, the post-AIA version of §103 applies. See Ex. 1001, codes (60), (63). 2 U.S. Patent No. 9,769,387 B1, iss. Sept. 19, 2017 (Ex. 1009). 3 U.S. Patent App. Pub. No. 2017/0059692 A1, pub. Mar. 2, 2017 (Ex. 1010). 4 U.S. Patent App. Pub. No. 2012/0106800 A1, pub. May 3, 2012 (Ex. 1021). 5 U.S. Patent App. Pub. No. 2017/0161911 A1, pub. June 8, 2017 (Ex. 1007). 6 U.S. Patent App. Pub. No. 2013/0301905 A1, pub. Nov. 14, 2013 (Ex. 1024). 7 U.S. Patent App. Pub. No. 2012/0004844 A1, pub. Jan. 5, 2012 (Ex. 1025). 8 PCT App. Pub. No. WO 2017/123477 A1, pub. July 20, 2017 (Ex. 1022). 9 U.S. Patent App. Pub. No. 2017/0160751 A1, pub. June 8, 2017 (Ex. 1005). Pet. 8 (citing Ex. 1003 ¶¶ 50–54). Patent Owner does not presently dispute Petitioner’s proposed formulation. See generally Prelim. Resp. For purposes of this Decision, we adopt and apply Petitioner’s formulation regarding the level of ordinary skill in the art because it is (1) consistent with the ’711 Patent and the asserted prior art; and (2) it is supported by the testimony of Dr. Singhose. B.” slip op. at 6

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITAPlain and ordinary meaningDecided for petitioner

      “But the Detecting Limitations of claims 1, 19, and 20, merely require that a target be “detected.” The Detecting Limitations do not require that target detection be performed “aboard the reference UAV,” and claim 19 does not recite or require “machine learning.” Moreover, the Specification makes clear that the claims should not be limited to aspects of the disclosed embodiments, as Patent Owner proposes to do here. See, e.g., Ex. 1001, 2:56–59 (“The invention is described in connection with such embodiments, but the invention is not limited to any embodiment. The scope of the invention is limited only by the claims . . . .”) Patent Owner additionally fails to cite any lexicographic definition or clear and unambiguous disclaimer of claim scope sufficient to limit the claims in the manner it proposes. We, thus, are not persuaded that the Detecting Limitations require “applying aboard the reference UAV a machine learning model to the capture image for: (i) identifying a target in the captured image.”” slip op. at 8

    • Disclosure Requirements (§112) › Written description (Ariad)Not entitled to earlier dateDecided for petitioner

      “Priority Date of the Challenged Claims Petitioner contends that claims 1–20 of the ’711 Patent “should not have priority to the October 9, 2016 filing date of U.S. provisional [patent] application 62/405,972 due to a lack of written description support.” Pet. 3. Petitioner thus “assumes” a priority date of October 1, 2017 (the filing date of U.S. Provisional Patent Application No. 62/556,449) for purposes of this proceeding. Id. at n.2; see also Ex. 1003, code (60). Patent Owner does not presently dispute Petitioner’s contention that the ’711 Patent is not entitled to a priority date earlier than October 1, 2017. See generally Prelim. Resp. For purposes of this decision, we accept Petitioner’s undisputed contention that the ’711 Patent is not entitled to a priority date prior to 10 Any determination, no matter how designated in this Institution Decision (except our ultimate decision to institute), is preliminary and non-binding. Our Final Written Decision, based on a fully developed record of arguments and evidence, will state our binding determinations, findings, and conclusions. If a party disagrees with this preliminary construction, or any other determination set forth in this Institution Decision, that party should present its arguments at trial. The parties are reminded that any arguments not made during trial will be considered waived. Patent Owner is further reminded that arguments in the Preliminary Response are not preserved and will be considered waived at trial unless those arguments are re-raised in the Patent Owner Response. The parties are additionally reminded that arguments raised in subsequent briefing must be set forth in full in the briefs themselves, and may not be incorporated by reference from prior filings such as the Preliminary Response. See 37 C.F.R. § 42.6(a)(3). October 1, 2017.11 Accordingly, Petitioner has made a sufficient showing that all of the cited references qualify as prior art. See Pet. 4–6. D.” slip op. at 11

    Claim construction§ 103 obviousness§ 112 disclosurecites Phillips · KSR · Graham
    Patents in suitUS 10,514,711
Page 1 of 41
← Previous12345…Next →

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.