PTAB
Advanced fields
251 decisions · 1008msnewest first
  • PTAB · Feb 6, 2026 · IPR2025-00988 · APJ Terrence W Mcmillin · IPR · Institution

    The Board instituted IPR on claims 1–14 and all petition grounds; it found a reasonable likelihood of success on the Josiam-based grounds, while the Bharadwaj grounds lacked established prior-art status.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “review. 35 U.S.C. § 314 (2018); 37 C.F.R. § 42.4(a) (2020) (“The Board institutes the trial on behalf of the Director.”). The standard for institution is set forth in 35 U.S.C. § 314(a), which provides that inter partes review may not be instituted unless “there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” After considering the Petition and the Preliminary Response, as well as the evidence of record, we institute an inter partes review as to claims 1–14 of the ’281 patent.3” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Determining the level of ordinary skill in the art involves various factors, including the “type of problems encountered in the art; prior art solutions to those problems; rapidity with which innovations are made; sophistication of the technology; and educational level of active workers in the field.” In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995) (citation omitted). The prior art of record also reflects the level of ordinary skill in the art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001). For purposes of this institution decision, we adopt the assessment offered by Petitioner.11 It is not materially disputed by the Patent Owner and is consistent with the ’281 patent and the asserted prior art.” slip op. at 10

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “Petitioner asserts “that no formal claim constructions are necessary.” Pet. 3. “Patent Owner applies the plain and ordinary meaning of the challenged claims.” Prelim. Resp 11. At this stage, no need exists to expressly construe any claim terms to resolve any dispute between the parties.12 See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))). D.” slip op. at 11

    • Novelty / Anticipation (§102) › Priority / effective filing date / continuation supportPriority date, deniedReference is prior artDecided for petitioner

      “contention that either of the cited documents alone discloses all the elements of these limitations. And, the disclosure relied on in Exhibit 1007 is not alleged to be found in Exhibit 1009 and vice-versa. Patent Owner has not shown that any of the pre-May 14, 2016, Korean applications from which the ’281 claims priority includes disclosure of all the elements recited in limitations 1.9 and 8.6. At least at this stage, we determine that Petitioner has sufficiently shown, for the purpose of institution that Josiam is prior art.16 We credit the testimony of Dr. Buehrer cited in the Petition that none of the Korean applications to which the ’281 patent claims priority filed earlier than May 14, 2016, “explicitly, implicitly, or inherently discloses using both the bandwidth field of the HE-SIG-A and the resource unit allocation field of the HE-SIG-B to indicate channel puncturing information as the claim elements require. . . . At best, these documents discuss indicating unused channels using either HE-SIG-A or HE-SIGB fields—but not both.” Pet. 7 (citing Ex. 1003 (Buehrer Decl.) ¶¶ 90–91). Dr. Buehrer’s testimony has not been shown by Patent Owner to be inaccurate.” slip op. at 20

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR
    Patents in suitUS 10,687,281
  • PTAB · Dec 10, 2025 · IPR2025-01069 · APJ Daniel J Galligan · IPR · Institution

    The Board instituted IPR on claims 1–14 and all asserted grounds, finding a reasonable likelihood of prevailing based on Bharadwaj alone and Bharadwaj with Yu.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “institute review. Paper 11. The standard for instituting an inter partes review is set forth in 35 U.S.C. § 314(a), which provides that an inter partes review may not be instituted unless the information presented in the Petition and the Preliminary Response shows “there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” For the reasons explained below, we institute an inter partes review of all challenged claims on all grounds raised in the Petition.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “To the extent Patent Owner contends that a person of ordinary skill in the art need not be defined as of the critical date, we disagree. Under Section 103, we must determine “if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains” (emphasis added). “Obviousness is determined from the vantage point of a hypothetical person having ordinary skill in the art to which the patent pertains.” In re Rouffet, 149 F.3d 1350, 1357 (Fed. Cir. 1998). Thus, we define the hypothetical person of ordinary skill in the art as of a time before the effective filing date. To the extent Patent Owner’s argument is that, to testify from the perspective of a person of ordinary skill in the art, one need not have been a person of ordinary skill in the art as of the critical date, we agree. Although one must at least possess ordinary skill in the art to testify from the perspective of a person of ordinary skill, [a]n expert need not have acquired that skill level prior to the time of the invention to be able to testify from the vantage point of a person of ordinary skill in the art. Rather, an expert can acquire the necessary skill level later and develop an understanding of what a person of ordinary skill knew at the time of the invention. Osseo Imaging, LLC v. Planmeca USA Inc., 116 F.4th 1335, 1341 (Fed. Cir. 2024). the uncontested assessment offered by Petitioner, which appears consistent with the ’077 patent and the asserted prior art, except that we delete the qualifier “at least” to eliminate vagueness as to the amount of experience.” slip op. at 6

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “C. Claim Construction The parties agree that no claim terms require express construction. Pet. 10; Prelim. Resp. 2–4. Patent Owner, however, notes that, in related district court litigation, Petitioner has asserted that some claims terms are indefinite. Patent Owner argues that the Petition should be denied because Petitioner has taken inconsistent claim construction positions between the district court and the Board. Paper 14 at 1–3 (citing Tesla, Inc. v. Intellectual Ventures II LLC, IPR2025-00340, Paper 18 at 4 (PTAB Nov. 5, 2025) (informative); Revvo Techs., Inc. v. Cerebrum Sensor Techs., Inc., IPR2025-00632, Paper 20 at 4–5 (PTAB Nov. 3, 2025) (precedential)). Petitioner responds that, in the related district court litigation, the parties have narrowed the claim construction disputes and that Petitioner accords the plain and ordinary meaning to claim terms and no longer asserts that any claim term of the ’077 patent is indefinite. Paper 15 (citing, inter alia, Ex. 1126 (Defendants’ Responsive Claim Construction Brief)). The evidence supports Petitioner’s position because, in the related district court litigation, the defendants agree with the plaintiff (Patent Owner) that certain phrases in the ’077 patent claims should be given their “[p]lain and ordinary meaning” and are “not indefinite.” Ex. 1126, 6 (native page 1). Thus, the record does not show inconsistent claim construction positions that warrant denial under PTAB precedent. See Revvo, Paper 20 at 5 (addressing a situation in which a petitioner advances “different claim construction positions” in district court and at the PTAB). See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 7

    • Novelty / Anticipation (§102) › Prior-art status of a reference › Patents / published applications (effective date, provisional support)Reference is prior artDecided for petitioner

      “We agree with Patent Owner that Bharadwaj includes subject matter that is not in Bharadwaj-Prov59, namely the change from adding the value Resp. 20; Ex. 1007 ¶ 51 (adding m); Ex. 1006 ¶ 50 (subtracting m); Prelim. Resp. 20. Petitioner, however, points out this change in the Petition and acknowledges that it is after the identified critical date of August 20, 2015. See Pet. 28. Thus, we do not understand Petitioner to be relying on Bharadwaj’s disclosure of subtracting m to determine length, as disclosed in the publication of the non-provisional application, as a prior art disclosure. We understand Petitioner to be relying on disclosures in Bharadwaj-Prov059 for prior art teachings for its obviousness contentions. Patent Owner does not appear to dispute that Bharadwaj-Prov59’s disclosures are prior art, arguing instead that it is improper to rely “on matters in Bharadwaj beyond ‘incorporation by reference’ of the Bharadwaj-Prov59.” See Prelim. Resp. 20–21. On this record, we determine that Bharadwaj-Prov59’s disclosures are prior art as of its June 2, 2015, filing date by virtue of its incorporation by reference into Bharadwaj, a published US patent application. Ex. 1006 ¶ 1; see Pet. 12–13.” slip op. at 8

    Claim construction§ 102 anticipation§ 103 obviousnesscites KSR · Graham
    Patents in suitUS 10,313,077
  • PTAB · Nov 7, 2025 · IPR2025-00988 · APJ Terrence W Mcmillin · IPR · Institution

    The Board denied institution of IPR on claims 1–14 because Samsung took alternative claim-construction positions in the Board and district court without explaining why.

    RulingsInstitution decision
    • Other 314aInstitution denied discretionary otherInstitution denied

      “decision in Revvo Technologies, Inc. v. Cerebrum Sensor Technologies, Inc., IPR2025-00632, Paper 20 (Nov. 3, 2025 (“Revvo”)).12 Revvo provides that “when a petitioner takes alternative positions [on claim construction] before the Board and a district court, that petitioner should, at a minimum, explain why alternative positions are warranted.” Revvo at 3–4. On November 5, 2025, the Director of the Office issued an informative decision in Tesla, Inc. v. Intellectual Ventures II LLC, IPR2025- 00340, Paper 18 (Nov. 5, 2025) (“Tesla”)). Tesla provides that: “Allowing a petitioner to advance a claim construction before the Board when that petitioner has made inconsistent indefiniteness arguments in district court fails to further, but instead detracts from, the Office’s goal of ‘providing greater predictability and certainty in the patent system.’” Id. at 4 (citing Revvo at 4–5). Tesla further provides that when a petitioner raises inconsistent invalidity challenges in two forums, “that petitioner is required to explain why those different positions are warranted.” Id. at 3 (citing Revvo at 3–5). In this proceeding, Petitioner takes alternative positions on claim construction before the Board and a district court, but fails to explain why alternative positions are warranted. Therefore, in accordance with Revvo and Tesla, we deny institution.” slip op. at 6

    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied

      “CONCLUSION For the foregoing reason, we determine that trial should not be instituted on claims 1–14 of the ’281 patent. ORDER Upon consideration of the record before us, it is ORDERED that an inter partes review is not instituted.” slip op. at 7

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)Not reached

      “In the Petition, “Petitioner submits that no formal claim constructions are necessary.” Pet. 3. Petitioner does not discuss its position on claim construction in district court nor why alternative positions before the Board and the district court are warranted. See id.” slip op. at 7

    Claim constructionDiscretionary denial
    Patents in suitUS 10,687,281
  • PTAB · Nov 3, 2025 · IPR2025-00934 · APJ Terrence W Mcmillin · IPR · Institution

    The Board instituted IPR on claims 1–9 and all asserted grounds, finding a reasonable likelihood that claims 1–9 are obvious over Bharadwaj and Sun.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “institute review. Paper 11. The standard for institution is set forth in 35 U.S.C. § 314(a), which provides that inter partes review may not be instituted unless “there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” After considering the Petition and the Preliminary Response, as well as the evidence of record, we institute an inter partes review as to claims 1–9 of the ’210 patent.” slip op. at 2

    • Novelty / Anticipation (§102) › Prior-art status of a reference › Printed publication / public accessibilityPrinted publication establishedNot reached

      “We are aware, however, that we must not confuse access with accessibility. See Samsung Elecs. Co. v. Infobridge Pte. Ltd., 929 F.3d 1363, 1374 (Fed. Cir. 2019) (“[A] petitioner need not establish that specific persons actually accessed or received a work to show that the work was publicly accessible.”). Dr. Hansen notes that the cover of 802.11ax_D1.0 grants permission to reproduce the document to others for consideration. Ex. 1026 ¶ 72; see Ex. 1004, 1 (“Permission is hereby granted for IEEE Standards Committee participants to reproduce this document for purposes of international standardization consideration.”). Dr. Hansen also testifies that meetings to discuss 802.11ax_D1.0 were open to the public. Ex. 1026 ¶ 58 (citing Appendix J to declaration). Thus, it appears, on the current record, that the purpose of 802.11ax_D1.0 was to promote dialogue with interested artisans, which indicates public accessibility. See Valve Corp. v. Ironburg Inventions Ltd., 8 F.4th 1364, 1374 (Fed. Cir. 2021) (“We have previously held that where a publication’s purpose is ‘dialogue with the intended audience,’ that purpose indicates public accessibility.” (citation omitted)). After having reviewed all the arguments and evidence presented by the parties, we would like to see further development of this issue during trial. The current record is not well-developed on this issue either factually or legally. With regard to the factual record, Patent Owner has not yet had the opportunity to depose Dr. Hansen or been given a full opportunity to marshal its own evidence on this issue. With regard to the law, we would like to see the parties apply the relevant case law to the developed facts as to the public accessibility and prior art status of 802.11ax_D1.0. We will determine, if necessary and appropriate, whether 802.11ax_D1.0 is prior art to the challenged claims of the ’210 patent based on the full record as developed during trial.” slip op. at 14

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundDecided for petitioner

      “As an initial matter, Bharadwaj and Sun are both analogous art to the ’210 Patent in that that they are both concerned with the design of the PHY data unit for supporting MU-MIMO transmissions in the downlink. SAMSUNG-1003, ¶¶153- 158. . . . In addition, both Bharadwaj and Sun describe MU- MIMO downlink PHY data unit structures in the context of 802.11ax. SAMSUNG-1013, ¶[0064]; SAMSUNG-1015, ¶[0031]; SAMSUNG-1003, ¶¶153-158. . . . . [A] POSITA implementing Bharadwaj’s preamble designs would have been motivated to look to another reference, like Sun, for an understanding of the format of the user field that would support non-MU-MIMO allocations and the single-user transmission scenario. A POSITA would have combined the teachings of Bharadwaj with Sun to realize implementation details for the HE-SIG-A and HE-SIG-B fields of the HE MU PPDU to better support both MU-MIMO and non-MU-MIMO allocations. SAMSUNG-1003, ¶¶153-158. . . . . A POSITA would have found it obvious to look to Sun for modifying Bharadwaj to include the user field format for SU (non-MU-MIMO) allocation to complement Bharadwaj’s disclosure of the MU-MIMO user field format and to provide a more complete system that would allow HE MU PPDUs to support both MU-MIMO allocations for multiple users and non-MU-MIMO allocations for a single user. SAMSUNG- 1003, ¶¶153-158. The combination also would have been obvious and predictable for at least the following reasons: 1) both Bharadwaj and Sun describe designs for a PHY data unit (or PPDU) to support communications between an AP and a station within a high-efficiency Wi-Fi network, consistent with 802.11ax; 2) both Bharadwaj and Sun describe the PPDU design for supporting MU-MIMO downlink transmission as including HE- SIG-A and HE-SIG-B fields; and 3) Bharadwaj already describes the format for the user field for the MU-MIMO allocation, while also recognizing the single-user scenario, and the combination merely involves the addition to Bharadwaj of the user field format for the single-user allocation, as taught by Sun. SAMSUNG-1003, ¶¶153- 158. The combination is obvious also because elements of the combined system would each perform similar functions they had been known to perform in similar contexts outside the combination. SAMSUNG-1003, ¶¶153-158. . . . . A POSITA would have reasonably expected success implementing the combination, especially considering the substantially similar 802.11ax techniques described in each reference. SAMSUNG-1003, ¶¶153-158. Additionally, combining the teachings of Bharadwaj with Sun would have merely involved combining prior art elements according to known methods to yield predictable results. SAMSUNG-1003, ¶¶153-158.” slip op. at 31

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededDecided for petitioner

      “Petitioner asserts that “no formal claim constructions are necessary.” Pet. 2. Patent Owner notes that “both parties have submitted terms for construction in the district court for this Patent” (Prelim. Resp. 6), but that “for purposes of [the] Preliminary Response, Patent Owner applies the plain and ordinary meaning of the challenged claims” (id. at 8). Accordingly, at this stage, no need exists to expressly construe any claim terms to resolve the parties’ disputes.9 See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 9

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,159,210
  • PTAB · Oct 31, 2025 · IPR2024-00777 · APJ Jameson Lee · IPR · Final written decision

    Claims 16–27 were not shown unpatentable because Petitioner failed to account for limitations 16[b] and 16[i] and their counterparts across the asserted obviousness grounds.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Patent Owner proposes that a person of ordinary skill in the art “would have a Bachelor of Science degree in Electrical Engineering, Computer Engineering, Computer Science, Human Computer Interaction, or a related technical field, with at least one year of experience working in the field of user interfaces and/or content management.” PO Resp. 11 (citing Ex. 2040 ¶ 53). The Decision on Institution adopted Petitioner’s proposed level of ordinary skill in the art. Inst. Dec. 10. We find Patent Owner’s stated level to be less precise than that proposed by Petitioner in that the modifier “at least” used by Patent owner imposes no upper bound on the amount of experience possessed by one of ordinary skill in the art. Also, Patent Owner states: “The difference between the Board’s definition and Patent Owner’s (EX2040. ¶53) does not change the arguments set forth herein.” PO Resp. 11. Thus, we continue to adopt Petitioner’s stated level of ordinary skill in the art.4 4 All of our findings and conclusions would still be the same, however, had we applied Patent Owner’s articulation of the level of ordinary skill in the art.” slip op. at 8

    • Prior constructionPrior construction adoptedDecided for patent owner

      “In its Reply, Petitioner does not assert that the district court’s construction is incorrect. We agree with Patent Owner that the district court’s construction is better than Petitioner’s proposed construction, because for reasons indicated by Patent Owner, which are not disputed by Petitioner, settings in the computer, e.g., dedicated folders for each user are the user profiles, rather than simply data alone of any kind. Further, when asked about the appropriateness of the district court’s construction, counsel for Petitioner expressed that Petitioner has no objection to the Board’s adopting the district court’s construction for “user profile”: JUDGE LEE: So, you’d be fine with just going with the District Court’s construction? MR. HEINTZ: Yes, Your Honor. Tr. 15:22–24. For the foregoing reasons, we adopt the district court’s construction for “user profile,” i.e., “a collection of settings and information associated with a user.”” slip op. at 13

    • BurdenNot shown unpatentable

      “PO Resp. 30–31 (Figure 26 omitted). In its Reply, Petitioner still does not provide an articulated reason for placing user profile selection buttons, labeled with user names, within Horn’s panes 2601 or 2602. Reply 12–14. Although Horn does describe personalized profile, Petitioner points to no disclosure of Horn as to how a user would have selected his or her own profile from among a plurality of user profiles. Petitioner presents no reason for placing these user profile selection buttons, labeled with user names, gleaned from or suggested by Baumgartner, within either pane 2601 or pane 2602 in Horn’s workspace view. Further, pane 2602 contains “a list of all collections defined by MFS and the user,” and pane 2601 lists the source examined by the user to create his or her collections. Ex. 1005, 19:41–46. That disclosure suggests the contents of panes 2601 and 2602 are tied to one particular user. No rational basis is articulated by Petitioner to place user profile selection buttons within these panes which appear to be in the profile space of one user. For the foregoing reasons, Petitioner has not adequately accounted for limitation 16[b].” slip op. at 22

    • Disclosure Requirements (§112) › Written description (Ariad)Not entitled to earlier dateDecided for petitioner

      “The test for sufficiency of a written description under 35 U.S.C. § 112 is whether the earlier application’s disclosure “reasonably conveys to those skilled in the art that the inventor had possession of the claimed subject matter as of the filing date.” Ariad Pharms., Inc. v. Eli Lilly & Co., 598 F.3d 1336, 1351 (Fed. Cir. 2010) (en banc). The specification must “clearly allow persons of ordinary skill in the art to recognize that [the inventor] invented what is claimed.” Id. The Court of Appeals for the Federal Circuit has explained: One shows that one is “in possession” of the invention by describing the invention, with all its claimed limitations, not that which makes it obvious. Id. (“[T]he applicant must also convey to those skilled in the art that, as of the filing date sought, he or she was in possession of the invention. The invention is, for purposes of the ‘written description’ inquiry, whatever is now claimed.”) (emphasis in original). One does that by such descriptive means as words, structures, figures, diagrams, formulas, etc., that fully set forth the claimed invention. Although the exact terms need not be used in haec verba, see Eiselstein v. Frank, 52 F.3d 1035, 1038, 34 USPQ2d 1467, 1470 (Fed.Cir.1995) (“[T]he prior application need not describe the claimed subject matter in exactly the same terms as used in the claims. . . .”), the specification must contain an equivalent description of the claimed subject matter. A description which renders obvious the invention for which an earlier filing date is sought is not sufficient. Lockwood v. American Airlines, Inc., 107 F.3d 1565 (Fed. Cir. 1997).” slip op. at 31

    Patent outcomesUS 11,017,815 not shown unpatentable
    Claim construction§ 103 obviousness§ 112 disclosurecites Phillips · KSR · Graham
    Patents in suitUS 11,017,815
  • PTAB · Oct 21, 2025 · IPR2024-00745 · APJ Russell E Cass · IPR · Final written decision

    Claims 45–47, 51, 59, 60, 68, and 69 are unpatentable; claims 56 and 57 are not shown unpatentable. Substitute claims 85–88 and 91 are unpatentable; amendment is granted for claims 92 and 93.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “technical field, and the asserted prior art, we agree with Petitioner’s proposed qualifications for the person of ordinary skill in the art, except we decline to adopt “at least,” as that language is vague and open-ended. Otherwise, Petitioner’s proposed definition is consistent with the level of 3 Patent Owner does not present objective evidence of nonobviousness. skill reflected in the specification of the ’474 patent and the asserted prior art references. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001). Accordingly, we adopt Petitioner’s assessment of the level of skill for one of ordinary skill in the art.” slip op. at 11

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Petitioner states that “no formal constructions are presently necessary,” and that it “maps [the] prior art in this Petition in a manner consistent with Patent Owner’s allegations of infringement before the district court.” Pet. 8 (citing Ex. 1017; Ex. 1003 ¶¶ 21–25). Patent Owner states that it believes there is no need to construe any terms of the challenged original claims because there is no underlying controversy regarding any claim terms. PO Resp. 10. For purposes of this Decision, we determine that it is not necessary to provide an express construction of any claim terms. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017); Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999) (“[O]nly those terms need be construed that are in controversy, and only to the extent necessary to resolve the controversy.”).” slip op. at 12

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundDecided for petitioner

      “3. Motivation to Combine Buibas and Sinyavskiy Petitioner argues that “it would have been obvious to partition Buibas’[s] spiking networks according to the specific techniques disclosed in Sinyavskiy” for multiple reasons. Pet. 13 (citing Ex. 1005 ¶¶ 71–72, 85, 92, 179–203; Ex. 1006 ¶¶ 12, 185, 188, 191, Fig. 6A; Ex. 1003 ¶ 63). First, Petitioner asserts, one of ordinary skill “would have been motivated to partition Buibas’[s] spiking neural network as suggested by Sinyavskiy to parallelize task execution on the robot and improve learning capabilities (e.g., through faster learning, greater computing efficiency, and task-specific learning models) of the Buibas mobile robotic apparatus as described by Sinyavskiy and discussed by Dr. Janet.” Id. (citing Ex. 1003 ¶ 64). Second, Petitioner contends, “partitioning Buibas’[s] robotic brain as suggested by Sinyavskiy would have beneficially expanded the range of tasks that the robot could perform by dedicating partitions to specialized tasks.” Id. at 13– 14 (citing Ex. 1006 ¶¶ 12, 185, 188, Fig. 6A; Ex. 1005 ¶¶ 71–72, 85, 92, 179–205; Ex. 1003 ¶ 65). Third, Petitioner argues, one of ordinary skill “would have been motivated to partition Buibas’[s] spiking neural network as suggested by Sinyavskiy to permit unused partitions or unused resources in the partitions to be reassigned for different tasks,” which would allow for a network processing apparatus that has increased processing capability for the same network capacity while also having a lower cost, size and power consumption. Id. at 14 (citing Ex. 1006 ¶¶ 190–192, 105, 34, code (57); Ex. 1003 ¶ 66). Fourth, Petitioner argues that “Buibas briefly mentions that its spiking neural networks can be partitioned but discloses little detail about the partitioning,” which would invite one of ordinary skill to turn to other references, such as Sinyavskiy, for additional detail on how to implement partitioning. Pet. 14–15 (citing Ex. 1005 ¶ 92; Ex. 1003 ¶ 67). Fifth, Petitioner asserts, combining Buibas and Sinyavskiy would merely “involve[] the application of known techniques (e.g., Sinyavskiy’s partitioned neural network) to a known system (e.g., Buibas’[s] mobile robot and robotic brain) to yield predictable results (e.g., Buibas’[s] robot using a spiking neural network partitioned as taught in Sinyavskiy),” particularly because “the partitioning of the Buibas neural network is reminiscent of Recurrent Fuzzy Neural Networks (RFNNs) that were already commonplace at the end of the 1990’s.” Id. at 15 (citing Ex. 1003 ¶ 68). Finally, Petitioner contends, the proposed combination merely involves “use of known techniques (e.g., Sinyavskiy’s partitioned neural network) to improve a similar system (e.g., Buibas’[s] mobile robot and robotic brain).” Id. (citing Ex. 1003 ¶ 69). Petitioner further argues that one of ordinary skill “would have reasonably expected success implementing the combination, especially as Buibas and Sinyavskiy describe highly similar systems involving spiking neural networks used for training/operating robots.” Pet. 15–16 (citing Ex. 1005 ¶ 92; Ex. 1003 ¶ 70). Indeed, Petitioner contends, “Buibas itself confirms that its spiking neural network can be partitioned, while Sinyavskiy provides the details for doing so.” Id. at 16 (citing Ex. 1005 ¶ 92; Ex. 1003 ¶ 70).” slip op. at 14

    • Obviousness (§103) › Graham factors (scope of art, differences, level of skill)UnpatentableNot shown unpatentableMixed

      “We agree with Patent Owner and Dr. Saber that these “weights” are numerical values associated with connections among neurons, and the “weight vectors” are merely lists of weights. PO Resp. 13–14; Ex. 2001 ¶¶ 66–67. When input is provided to the neural network, the network uses the weights of its connections in a feedforward calculation manner to provide an output that can include an instruction for operating a device. Ex. 2001 ¶ 66. We agree with and find credible Dr. Saber’s testimony that Buibas’s merging of weights or weight vectors results in updated network weights, and does not, by itself, disclose the merging of instruction sets for operating a device, or the correlation of the same set of inputs for all or a portion of a circumstance representation with instruction sets for operating two different devices. Ex. 2001 ¶¶ 65, 67, 69–71.” slip op. at 39

    Patent outcomesUS 11,663,474 mixed
    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,663,474
  • PTAB · Oct 10, 2025 · IPR2025-00652 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–23 and 25–30 were unpatentable over the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’403 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 10; Prelim. Resp. 4 (citing Ex. 2009 ¶ 73); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses element [1.2] because the evidence cited does not disclose a “first computer system being configured to provide remote control of the first pump or first valve” (i.e., a fluid-handling device). Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but Petitioner has not identified any disclosure of the capability to remotely control fluid-handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, Kahn’s disclosures that Petitioner relies on for allegedly teaching remote control are deficient. We discuss each. First, Petitioner points to the following, “[f]or instance, as illustrated in FIG. 1C, a fluid control device such as a valve 15A is located on the input side of a sen[s]or unit 110.” Ex. 1005, 8:19–21, cited in Pet. 13. This portion of Kahn, however, does not disclose remote control. Second, Petitioner cites to the following: Finally, or in addition to, the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance. Pet. 13 (citing Ex. 1005, 10:62–67). We agree with Patent Owner that this portion of Kahn teaches on-site alerts and local control of the fluid-handling device. See Prelim. Resp. 7. This portion of Kahn does not disclose remote control.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,294,403
  • PTAB · Oct 10, 2025 · IPR2025-00651 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–3, 6, 7, and 9–20 were unpatentable over any asserted ground.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’680 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 11

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner

      “target value” is part of a command that is sent from a computing device to a server and then to a controller. The controller then receives a measurement of the fluid by a sensor and determines whether the measurement satisfies the “target value.” If the measurement does not satisfy the “target value,” further operations are undertaken. The recited operation sequence makes clear that the plain and ordinary meaning of “target value” is not as Dr. Wooley opines because the particular operating condition that a device is in at a particular time is represented by the measurement taken by the sensor, 11 Some claim language less relevant to construing “target value” was omitted for ease of reference. which the controller then uses to determine whether the measurement satisfies the “target value.” Additionally, claim 1 recites that the “target value” is sent as part of a command to the controller. The “target value” is not sent to the controller from the sensor, as might be expected if the plain and ordinary meaning of “target value” were as Dr. Wooley opines. Petitioner and Dr. Wooley’s construction would also result in “target value” meaning effectively the same thing as the measurement of the fluid by the sensor, a concept that is separately recited in claim 1 and to which the “target value” is compared. The Specification of the ’680 patent does not support Petitioner’s understanding of the plain and ordinary meaning of “target value.” Although the Specification does not recite “target value,” it recites “target state,” and describes “target state” sufficiently to understand the plain and ordinary meaning of “target” as used in “target value” and “target state.” In particular, the ’680 patent explains that “[i]n some embodiments, the process 104 includes receiving, via a network interface, from a remote user device, (e.g., via a command-center server) a command to change a state of a fluid-handling device to a target state.” Ex. 1001, 11:48–51. This portion reflects that the command is seeking to change a state of a fluid-handling device to a target state. In other words, the “target value” or “target state” is not generally “the particular operating condition that a device is in at a particular time”; rather, it is a value or state that the fluid-handling device is desired to be in, as Patent Owner and Dr. Durham explain. Additionally, just as claim 1 recites a directional component for the “target value” to be sent to the controller in a command, so too does the Specification describe a “target state” as being sent in a command from a remote user device. Thus, the Specification clearly supports the plain and ordinary meaning proposed by Patent Owner and Dr. Durham and not the plain and ordinary meaning proposed by Petitioner and Dr. Wooley. slip op. at 14

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “time-stamped process data, report exception therein to the remote host, and extract and transmit time-stamped process data to the remote host.” Ex. 1005, Abst. (emphases added). Almadi explains that its remote field systems must include a plurality of controller units “to issue commands to, and gather and process data from a plurality of field devices, including remote systems and instruments, . . . [and] a database server for the storage of process data retrieved from the remote subsystems and instruments.” Id. at 2:22–30 (emphases added). Based on these disclosures, we agree with Patent Owner that Petitioner has not established that Almadi discloses element [1.4]. Specifically, the teachings from Almadi identified by Petitioner refer to process data, which is data retrieved from the remote subsystems/field devices. Thus, we understand that Almadi’s teaching—of using an Ethernet switch to transmit “process data”—describes transmitting data from the remote subsystems/field devices. See Ex. 1005, 3:13–17, cited in Pet. 15. But claim 1 and particularly element [1.4], recites “sending, with the server, the target value to the network address [which identifies a controller of the fluid-handling device13] via the network,” which is different than sending process data from the field devices to the remote host or database server for storage.” slip op. at 19

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,175,680
  • PTAB · Aug 18, 2025 · IPR2024-00495 · APJ Terrence W Mcmillin · IPR · Final written decision

    Claims 13 and 14 are unpatentable as obvious over Chang and Chang II; claims 18–20 were not shown unpatentable.

    RulingsFinal written decision
    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundDecided for petitioner

      “Accordingly, in the context of Chang, a POSITA would have been motivated to implement dual-role ports by including a switch (e.g., multiplexer or crossbar) that connects the dual-role port(s) directly to the hub’s upstream port (when the consumer product is configured as a device, i.e., path 48) or to the hub through the bridge (when the consumer product is configured as host, i.e., path 54. Id. at 40–41 (citing Ex. 1013 ¶¶ 182–187). Petitioner’s argument that a skilled artisan would have been motivated to modify Chang to include switching functionality as taught by Chang II and supported by other substantial evidence appears well-reasoned and well-supported. Petitioner argues that “[a] POSITA would have been further motivated to improve Chang in view of Chang II, because Chang II expressly states its relevance to USB hubs.” Pet. 41 (citing Ex. 1013 ¶ 181; Ex. 1015 ¶¶ 27, 40). And, Petitioner argues that “while Chang discloses little regarding its bridge (EX1014, [0020]), Chang II details various aspects of its bridge (EX1015, Title, Figs. 1-2 and 5).” Id. In support of this argument, the Petition provides: Importantly, Chang II further details exemplary switching for either a host- or device-product: “the main feature is the provision of two different transmission paths, so that by automatically detecting the type of device connected (host or slave) the present invention can switch to the proper transmission path.” EX1015, [0021]. In other words, Chang II describes “switch[ing]” to connect a “bridge” transmission path (when the product is host) or “bypass” path (when the product is device). Id., Figs. 1, 5, [0013]. And Chang II further discloses “detection unit 134” for detecting whether the consumer product is host or device. Id., [0038]. Id. (bracketed material in original, footnote omitted). Petitioner contends that “[a]ccordingly, a POSITA would have been motivated, with a high expectation of success, to route the dual-role ports (and products attached thereto) to the appropriate path using a switch.” Id. at 41–42. We determine that this contention is well-reasoned and well-supported. Patent Owner challenges on several grounds the showing regarding” slip op. at 51

    • Obviousness (§103) › Objective indicia / secondary considerations › NexusObjective indicia no nexusDecided for petitioner

      “Id. As discussed above, we determine that any alleged commercial success secondary consideration evidence has not been established to have a nexus to the claimed invention. Accordingly, we consider the evidence of commercial success but accord it little weight in our overall obviousness determination.” slip op. at 60

    • Obviousness (§103) › Objective indicia / secondary considerationsNot shown unpatentableDecided for petitioner

      “Id. As discussed above, we determine that any alleged commercial success secondary consideration evidence has not been established to have a nexus to the claimed invention. Accordingly, we consider the evidence of commercial success but accord it little weight in our overall obviousness determination.” slip op. at 60

    • Strike new argumentDenied

      “because the Reply improperly presents new theories of unpatentability with belated supporting evidence that could have been present in the Petition itself.” Paper 37, 1. Patent Owner contends that, in response to an argument Patent Owner made in the Response that “Petitioner’s proposed prior art combination features a structural flaw” (id. at 2), Petitioner’s Reply improperly presents a new argument not found in the Petition (id. at 3–6). As discussed supra (section II.E.3.a.), we determine that, because Patent Owner’s structural flaw argument fails, we do not reach the alleged new argument and evidence that Patent Owner seeks to strike. Accordingly, this motion is moot.” slip op. at 77

    Patent outcomesUS 9,619,420 mixed
    § 103 obviousnesscites Phillips · Graham
    Patents in suitUS 9,619,420
  • PTAB · Jul 30, 2025 · IPR2024-00230 · APJ John D Hamann · IPR · Final written decision

    Claim 1 is unpatentable as obvious over Chang and Chang II; the Board did not reach the Chang, Chang II, and Chutorash ground.

    RulingsFinal written decision
    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “We agree with Patent Owner and find that “computer network protocols” is correct in light of the ’072 patent’s disclosure and claim 1. In particular, the ’072 patent teaches that it “generally relates to [USB] connectivity between, for example, mobile consumer devices and vehicle electronic systems.” Ex. 1009, 1:21–23. And the ’072 patent’s teachings focus on common network components (e.g., hub, bridge, ports) and common networking concepts (e.g., master/slave network architecture and bridging) which are used in the USB context, rather than detailed aspects (e.g., signal timing, signal levels, power levels) of the USB protocol. See generally Ex. 1009; see also Ex. 1084, 103:21–104:2, 104:24–105:4; Pet. Reply 4 (citing Ex. 1084,7 100:17–101:12 (acknowledging that Dr. Houh testifies that one of ordinary skill in the art “would know basic USB concepts like bridging, master/slave architecture, etc.”), 102:3–8, 103:21– 104:2, 104:24–105:4). Likewise, claim 1 repeatedly recites “USB,” but does so to identify that all of the components of the data system (i.e., USB ports, USB hub, USB bridge, USB host, USB multiplexing switches) employ the USB protocol. Ex. 1009, 9:15–10:18. As the ’072 patent teaches, “USB 7 Houh Deposition Tr. (2024/12/18, Day 1). technology . . . [wa]s commonly available, familiar to the end user, cost effective and ubiquitous.” Id. at 1:35–37. Thus, although the ’072 patent is taught in the USB context, “computer network protocols” concepts are the focus. For these same reasons, we find unavailing Petitioner’s argument that one of ordinary skill in the art “would have been well-versed in USB standards (including the USB 2.0 and 3.0 Specifications and the OTG Supplement) and the design/deployment of USB hosts, USB devices, and USB hubs, including suitable environments for USB systems.” Pet. 26.” slip op. at 11

    • Expert testimonyPetitioner expert discountedOther

      “Lastly, we give little weight to Mr. Welch’s testimony regarding the level of one of ordinary skill as he does not indicate what precisely constitutes the basis of his testimony on this issue. See Ex. 1013 ¶ 47.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Here, Petitioner argues that “embedded USB host” means “USB host physically embedded in a vehicle.” See Pet. 27–28. “Patent Owner does not contend that any claim construction is required.” PO Resp. 5. We agree with Patent Owner that we do not need to construe any term to resolve the disputes between the parties. See, e.g., Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’”). And we afford the claim terms their plain and ordinary meaning.” slip op. at 13

    • Obviousness (§103) › Objective indicia / secondary considerations › NexusObjective indicia no nexusDecided for petitioner

      “that the asserted objective evidence is tied to a specific product that ‘embodies the claimed features, and is coextensive with them.’” Id. (quoting Brown & Williamson Tobacco Corp. v. Philip Morris, Inc., 229 F.3d 1120, 1130 (Fed. Cir. 2000)). In other words, “[a] presumption of nexus requires both that the product embodies the invention and is coextensive with it.” Id. at 1211 (citing Brown, 229 F.3d at 1130). Patent Owner fails to show either of these requirements. First, Patent Owner argues that in his Supplemental Declaration, Dr. Houh “provides on a per limitation basis how [Patent Owner]’s dual role hub meets all limitations of claim 1.” PO Resp. 73 (citing Ex. 2019 ¶ 136). Notably, Patent Owner cites to a single paragraph in this declaration, without providing any specific arguments in its Response that its product practices claim 1. Id. Rather, Patent Owner incorporates its arguments by reference, which is not permitted. See 37 C.F.R. § 42.6(a)(3) (“Arguments must not be incorporated by reference from one document into another document.”). Thus, we do not consider these arguments, and we are not persuaded that Patent Owner’s product practices claim 1. Consolidated Trial Practice Guide November 2019,8 35–36 (citing Cisco Systems, Inc. v. C-Cation Techs., LLC, IPR2014-00454, Paper 12 (PTAB Aug. 29, 2014) (informative)) (“[P]arties that incorporate expert testimony by reference in their petitions . . . without providing explanation of such testimony risk having the testimony not considered by the Board.”).” slip op. at 16

    Patent outcomesUS 11,176,072 unpatentable
    Claim construction§ 103 obviousnesscites Phillips · Graham
    Patents in suitUS 11,176,072
Page 1 of 26
← Previous12345…Next →

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.