PTAB
Advanced fields
233 decisions · 608msnewest first
  • Uatp IP LLC v. Slick Slide LLCSome claims unpatentable
    PTAB · Oct 2, 2026 · PGR2024-00054 · APJ Brian D Range · PGR · Final written decision

    Claims 22–26 are unpatentable based on obviousness; claims 1–17, 27, and 28 were not shown unpatentable. Patent Owner’s motion to terminate was denied.

    RulingsFinal written decision
    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)Term construed board ownDecided for patent owner

      “1. Mesh Layer Petitioner contends “no formal claim construction is necessary in this” slip op. at 13

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “5. Analysis On this complete record, we determine that Petitioner’s arguments do” slip op. at 31

    • Obviousness (§103) › Graham factors (scope of art, differences, level of skill)Not shown unpatentableNot shown unpatentable

      “form of nylon and some form of Teflon (and possible combinations thereof) having the specific coefficient of friction range given in limitation [1c] breaks down, because the building blocks of the obviousness argument are not sufficiently identified in Phillips alone, nor in the supporting testimony. Accordingly, we determine that Petitioner’s arguments and evidence fail to show that Phillips renders the challenged claims obvious. 6. Conclusion Based on the foregoing, we determine that Petitioner has not established by a preponderance of the evidence that claims 1–4, 6, and 7 would have been anticipated by or obvious in view of Phillips.” slip op. at 33

    • Obviousness (§103) › Objective indicia / secondary considerations › NexusObjective indicia no nexusDecided for petitioner

      “2. Products and Nexus We first consider the issue of whether certain evidence relied upon by” slip op. at 20

    Patent outcomesUS 11,998,854 mixed
    Claim construction§ 102 anticipation§ 103 obviousness§ 112 disclosurecites Phillips · Graham · Nautilus
    Patents in suitUS 11,998,854
  • PTAB · Jun 11, 2026 · IPR2022-01199 · APJ Kevin F Turner · IPR · Remand

    On remand, the Board held claims 1, 24, and 25 unpatentable as obvious over Buruganahalli; the copying evidence did not outweigh the strong obviousness showing.

    RulingsRemand decision
    • RemandOther

      “Scope on Remand On remand, the panel here will not address issues outside the scope of the Federal Circuit’s mandate. See Hayward Indus., Inc. v. Pentair Water Pool & Spa, Inc., 814 F. App’x 592, 597 (Fed. Cir. 2020) (“The Board is bound by the terms of a mandate issued by an appellate court. Aydin Corp. v. Widnall, 121 F.3d 726, 1997 WL 413329, at *3 (Fed. Cir. 1997). ‘Unless remanded by [an appellate] court, all issues within the scope of the appealed judgment are deemed incorporated within the mandate and thus are precluded from further adjudication.’ Engel Indus., Inc. v. Lockformer Co., 166 F.3d 1379, 1383 (Fed. Cir. 1999).”). The sole issue on remand is whether “the evidence of copying” is sufficient to overcome the obviousness ground of unpatentability over Buruganahalli. Centripetal Networks, 19–20. We restate portions of the former Final Written Decision, as an aid to the reader, but substantially incorporate the analysis of the prior Decision below. C.” slip op. at 4

    • Director reviewDirector review, deniedDenied

      “not object to a new panel of APJs hearing this case if remanded.” Id. at 20. As such, Patent Owner requested Director Review (Paper 74), asking that the Director “de-institute,” based on an abuse of discretion. The Director (Paper 75) denied the request and directed the Board to assign a new panel on remand (see Papers 76, 77). B.” slip op. at 3

    • Skill levelOther

      “Level of Ordinary Skill in The Art We adopt the level of ordinary skill in the art adopted in the prior Decision. See Decision 25. F.” slip op. at 13

    • Obviousness (§103) › Graham factors (scope of art, differences, level of skill)UnpatentableUnpatentable

      “This argument is unpersuasive because Buruganahalli uses rules/policies to filter encrypted packets by correlating them with handshaking packets that have unencrypted data, in the same way that is done in the ‘856 Patent. The only “filtering step” in the patent that “use[s] rules to filter encrypted packets without decryption” (PO Resp. 20) is the hello message approach used, for example, at steps 19 and 23 (see id.), which is clearly disclosed in Buruganahalli.7 As explained above, the ‘856 Patent does not describe applying rules to encrypted packets. Instead, it describes (a) filtering encrypted packets by correlating them with unencrypted data in other packets and (b) by decrypting the packets and applying the rules that are recited in the claims to unencrypted data. As also explained above, the amendment added the rules of step 22, which are applied to decrypted data, to a claim that was drafted to cover filtering of encrypted packets. However, among the criteria used in the filtering performed at step 22 is a “uniform resource identifier (URI),” which, we conclude, covers Buruganahalli’s “domain name.” Thus, despite the error made during prosecution, the claims that issued cover Buruganahalli’s method of determining that a session should be filtered based on a domain name in unencrypted handshake data.” slip op. at 28

    Patent outcomesUS 9,917,856 unpatentable
    § 103 obviousness
    Patents in suitUS 9,917,856
  • PTAB · Jun 11, 2026 · IPR2022-00182 · APJ Kevin F Turner · IPR · Remand

    On remand, claims 1, 24, and 25 are unpatentable under § 103 over Buruganahalli; the evidence of copying does not outweigh the strong obviousness showing.

    RulingsRemand decision
    • RemandOther

      “Scope on Remand On remand, the panel here will not address issues outside the scope of the Federal Circuit’s mandate. See Hayward Indus., Inc. v. Pentair Water Pool & Spa, Inc., 814 F. App’x 592, 597 (Fed. Cir. 2020) (“The Board is bound by the terms of a mandate issued by an appellate court. Aydin Corp. v. Widnall, 121 F.3d 726, 1997 WL 413329, at *3 (Fed. Cir. 1997). ‘Unless remanded by [an appellate] court, all issues within the scope of the appealed judgment are deemed incorporated within the mandate and thus are precluded from further adjudication.’ Engel Indus., Inc. v. Lockformer Co., 166 F.3d 1379, 1383 (Fed. Cir. 1999).”). The sole issue on remand is whether “the evidence of copying” is sufficient to overcome the obviousness ground of unpatentability over Buruganahalli. Centripetal Networks, 19–20. We restate portions of the former Final Written Decision, as an aid to the reader, but substantially incorporate the analysis of the prior Decision below. C.” slip op. at 4

    • Obviousness (§103) › Objective indicia / secondary considerations › CopyingObjective indicia outweighedNot shown unpatentable

      “given to the Eastern District of Virginia court’s opinion because it was later vacated. The district court considered all of the Read factors (applying Read Corp. v. Portec, Inc., 970 F.2d 816, 826-827 (Fed. Cir. 1992)), of which only the first factor is directed to deliberate copying, although factors 2 and 9 bear indirectly on the issue of copying. The district court determined that “[t]he fact that Cisco released products with Centripetal’s functionality within a year of these meetings goes beyond mere coincidence. Therefore, the fact that Cisco’s system mirrors the functionality of the Centripetal patents is compelling evidence that damages should be enhanced for copying.” Ex. 1027, 157. Without more, it is difficult to evaluate the processes that the district court employed to reach its determination. As the Federal Circuit instructed, we need “not [] go searching throughout the entire litigation record to find the evidence of copying, but [we have] an obligation to consider the specific evidence that was put before” us. Centripetal Networks, 19. We continue to determine that the vacated finding of the district court should be provided little weight, especially in view of the strong case of obviousness discussed above. Examination of Aaron Striegel We also do not find the Aaron Striegel’s testimony to be particularly persuasive. The testimony provides statements such as “I found evidence that it could be plausible,” “[s]o we can see the timeline is very plausible,” and “I found it very plausible that indeed that this technology could have made its way into these respective accused products.” Ex. 1029, 31:12–32:3. This testimony suggests the possibility of copying but does not demonstrate actual evidence of copying. At most, this testimony indicates that further consideration of the underlying evidence is warranted, but does little to support an ultimate finding of copying. Again, even taking this testimony as evidence of copying, it still must stand up against the strong case of obviousness discussed above.” slip op. at 40

    • Obviousness (§103) › Objective indicia / secondary considerations › NexusObjective indicia no nexusDecided for petitioner

      “The District Court did not provide an element-by-element analysis of how the claims of the ‘856 Patent cover this description. See Ex. 1027, 41. However, from the description, we understand the Court to have concluded that the system receives rules, identifies a set of packets as part of a flow using the NetFlow logs, “determines” that encrypted packets in the flow match known malicious signatures based on unencrypted data in other packets (e.g., data in the SNI), and then filters the flow based in a URI (e.g., that from the SNI), routing it to the null interface. The Court does not describe how the system “determines” that encrypted packets match known malicious signatures based on information in unencrypted packets, but we assume that is done as in the ‘856 Patent, by correlation, i.e., an encrypted packet is “determined” to match a threat indicator if it is in the same flow as a packet with unencrypted information that matches the threat indicator.10 With that understanding, we conclude that the allegedly infringing system operates, as least at the level described in the court’s decision, in the same way Buruganahalli’s system operates, filtering encrypted packets due to their presence in a flow that includes packets with unencrypted data, such as in a handshaking packet. It follows that Patent Owner is unable to establish a nexus, because “[w]here the offered secondary consideration actually results from something other than what is both claimed and novel in the claim, there is no nexus to the merits of the claimed invention.” Novartis AG v. Torrent Pharms. Ltd., 853 F.3d 1316, 1330” slip op. at 38

    • Obviousness (§103) › Objective indicia / secondary considerations › Long-felt need / failure of othersDecided for petitioner

      “need and industry recognition for the technology claimed in the ‘856 Patent because it describes the problem of detecting threats in encrypted traffic as ‘unsolvable.’” PO Resp. 68 (citing Ex. 1027, 64). Given that this is a press release by a company announcing that company’s new commercial product, however, we 8 The concurrence reevaluates Patent Owner’s evidence of industry praise and nexus, but we deem such considerations outside the remit of the Federal Circuit’s remand. are reluctant to give the “unsolvable” characterization much weight, as it may amount to puffery. But beyond that, it appears that the problem identified as “unsolvable” in the press release––“detect[ing] known attack signatures even in encrypted traffic”––had, in fact, already been solved in Buruganahalli, using the very same hello message, flow correlation, and man-in-the-middle techniques described in the ‘856 Patent. We thus cannot say that the press release identifies a long-felt need that was actually unsolved. See ZUP, 896 F.3d at 1374 (explaining that “[w]here the differences between the prior art and the claimed invention are . . . minimal . . . it cannot be said that any long-felt need was unsolved”) (quoting Geo. M. Martin Co. v. All. Mach. Sys. Int’l LLC, 618 F.3d 1294, 1304–05 (Fed. Cir. 2010) (first alteration in original)).” slip op. at 35

    Patent outcomesUS 9,917,856 unpatentable
    § 103 obviousness
    Patents in suitUS 9,917,856
  • PTAB · Apr 16, 2026 · IPR2025-00172 · APJ Brian P Murphy · IPR · Final written decision

    Claims 1–20 are unpatentable as obvious over Suga and Gorsuch; the Board denied Patent Owner’s motion to exclude.

    RulingsFinal written decision
    • ExcludeMotion to exclude, deniedDenied

      “Patent Owner also asserts prejudice for “not knowing” which Suga Exhibit “the Petitioner and Petitioner’s expert is relying on (see Exhibit 1021 and 1022),” without further explanation. Mot. Reply 6. Exhibit 1022 is a dictionary definition of “node.” How this relates to Patent Owner’s argument of prejudice is not explained. Id. at 5–6. The Board perceives no difficulty following Petitioner’s arguments and evidence, which cite Suga Exhibit 1005, including the testimony of Dr. Buehrer regarding the English language translation of Suga, which is identical in Exhibits 1005 and 1017. Patent Owner, moreover, opted not to depose Dr. Buehrer, did not file a deposition transcript of Dr. Buehrer in this proceeding, and does not allege any difference or substantive deficiency in the English language translation in Suga Exhibits 1005 and 1017, which are identical. We fail to see any prejudice to Patent Owner.” slip op. at 84

    • Obviousness (§103) › Graham factors (scope of art, differences, level of skill)UnpatentableUnpatentable

      “d. Conclusion for Claim 1 For the reasons given above, we determine the Petition establishes by” slip op. at 60

    Patent outcomesUS 9,022,294 unpatentable
    § 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 9,022,294
  • PTAB · Feb 10, 2026 · IPR2024-01322 · APJ Brian P Murphy · IPR · Final written decision

    Claims 1–20 are unpatentable as obvious over Mooney; the Board also found Mooney combined with Lee renders the disputed limitations obvious.

    RulingsFinal written decision
    • Skill levelSkill level board ownDecided for petitioner

      “A person of ordinary skill in the art (“POSITA”) at the time of the alleged invention of the ’294 patent would have had at least a bachelor’s degree in electrical engineering, or a related field, and at least two years of experience in design, development, and/or testing of network-enabled consumer devices, and familiarity with payment cards, or the equivalent, with additional education substituting for experience and vice versa. Pet. 2 (citing Lipoff Decl. Ex. 1003 ¶ 57). “Patent Owner agrees with the Petitioner on the level of ordinary skill in the art.” Resp. 4. Patent Owner adds that a POSITA would have had “at least three years of relevant industry or research experience in wireless communication between devices.” Id. (citing Ex. 2001 ¶¶ 26–29). Mr. Zaheer testifies that a POSITA “would” slip op. at 9

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed board ownDecided for petitioner

      “The claim language and specification define and describe an “activation cue” in functional terms: a data communication from an external source is received by the cell phone and recognized as an activation cue if it causes the switching element to be assigned its first (activated) state. Ex. 1001, 9:28–31, 9:42–46, 10:14–16, 13:55–60, 14:53–59, 15:4–6, 19:20–26. Patent Owner agrees that “upon an activation cue being received by portable electronic device 10, switching element 44b switches to its activated state.” Resp. 19 (quoting Ex. 1001, 10:14–16). The activation cue may be a predetermined bit sequence, a predetermined contactless data transmission, continuously emitted, pulsed, or punctual, but these are unclaimed non-limiting embodiments of the preferred form of data transmission. Id. at 9:25–26 (“for example a predetermined bit sequence”), 11:20–22 (“One example . . . emit an activation cue in the form of a predetermined contactless data transmission”), 14:65–15:3 (continuously emitted, pulsed or punctual cue). We will not read such preferred embodiments from the specification into claim language that is not so limited. See SuperGuide Corp. v. DirecTV Enterprises, Inc., 358 F.3d 870, 875 (Fed. Cir. 2004) (care should be taken “not to import into a claim limitations that are not part of the claim”); see also In re Van Geuns, 988 F.2d 1181, 1184 (Fed. Cir. 1993) (“limitations are not to be read into the claims from the specification”); see also IQRIS Techns. LLC v. Point Blank Enterprises, Inc., 2025 WL 727717, *4 (Fed. Cir. 2025) (“It is the claims, not the preferred embodiments, that” slip op. at 15

    • Claim Construction › Functional claiming / §112(f) means-plus-function › Whether §112(f) applies (Williamson, nonce words)§112(f) does not applyDecided for petitioner

      “operatively linked to said electronic circuit” under 35 U.S.C. Section 112, sixth paragraph or not, the result is the same. We note there is no presumption of applying means-plus-function analysis to the switching element, because the limitation does not use the words “means for” that would mandate such claim construction treatment, and “switching” may invoke structure as well as function. See Williamson v. Citrix Online, LLC, 792 F.3d 1339, 1349–1350 (Fed. Cir. 2015) (en banc) (holding that “use of the word ‘means’ creates a presumption that § 112, ¶ 6 applies”). Regardless, we look to the meaning of the claim phrase at issue in view of the specification. We determine that the ’294 patent provides a clear, concise meaning for the switching element upon which both parties rely for construction. Patent Owner’s express agreement with Petitioner, that the claimed switching element is described in the ’294 patent as “any type of device allowing data to be conveyed according to alternate data conveyance operations in response to an activation cue being received by transceiver 18 or not,’” is particularly telling because it is not consistent with Patent Owner’s argument that the switching element means “switching of the data.” Resp. 7, 31 (citing Ex. 1001, 9:28–318). The claim language does not recite, and the specification does not describe, the switching element as a device that switches the data. Therefore, we determine the claimed “data conveyance switching element” means any type of switching device that allows data to be 8 We presume Patent Owner’s citation to “Exh. 2001, 9:28-31” on page 7 was intended to be a citation to the ’294 patent (Ex. 1001), as cited on page 31. whether or not an “activation cue” is received by the cell phone “cue receiver.”” slip op. at 21

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)Plain and ordinary meaningDecided for petitioner

      “[external] data exchange device” as a device with a data transceiver coupled to a circuit that carries out the function of exchanging data. Pet. 7–8 (citing Ex. 1001, 2:14–17, 4:7–14, 9:3–6; Ex. 1003 ¶¶ 67–68). As above, whether we construe the “[external] data exchange device” under 35 U.S.C. Section 112, sixth paragraph or not, the result is the same. Patent Owner, quoting the description of a data exchange device in the ’294 patent, contends that a “[external] data exchange device” “can be any sort of data exchange device comprising an electronic circuit (not shown) therein and a data transceiver 9a.” Resp. 8 (quoting Ex. 1001, 9:4–6). Patent Owner also responds to the Petition by clarifying that “[a]n external data exchange device is not a transceiver but a device with a transceiver.” Id. (citing Ex. 2001 ¶ 48). Petitioner argues in reply that Patent Owner does not contest Petitioner’s mappings of Mooney’s “cordless telephone base unit” or “cellular network infrastructure” to the claimed data exchange devices, such that no construction is necessary to resolve the dispute. Reply 5 (citing Resp. 16–37; Wellman, Inc. v. Eastman Chem. Co., 642 F.3d 1355, 1361 (Fed. Cir. 2011)). Limitations [1.c] and [1.d] recite “a first [second] data transceiver operatively linked to said electronic circuit [in the cell phone],” both of which are defined functionally as “for exchanging data between said electronic circuit [in the cell phone] and a first [second] external data exchange device over a first [second] communication link.” Nothing in the the other independent claims, further limits the form or function of the “[external] data exchange device,” although a device external to the cell phone may invoke additional structure. We determine the plain meaning of “[external] data exchange device” as claimed and described in the ’294 patent governs: any [external] device that comprises an electronic circuit and data transceiver for exchanging data with the electronic circuit in the cell phone over a communication link. slip op. at 22

    Patent outcomesUS 9,022,294 unpatentable
    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 9,022,294
  • PTAB · Dec 10, 2025 · IPR2024-01186 · APJ Brian D Range · IPR · Final written decision

    Claims 1–20 were not shown unpatentable because Kwatra does not teach or suggest minimizing rotational velocity and acceleration as required by the claims.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Petitioner contends that a person of ordinary skill in the art (POSITA) would have the following characteristics: “a bachelor’s degree in engineering or computer science, or equivalent field, and two years of experience working on image or video processing or digital cameras.” Pet. 6 (citing Ex. 1002 ¶¶ 36–37). Petitioner states that, “[a]lternatively, a POSITA would have four years of experience working on image or video processing 6 Patent Owner asserts objective evidence of nonobviousness. Prelim. Resp. 19–27. or digital cameras.” Id. Petitioner further contends “[a]n advanced graduate degree in the disciplines cited above may make up for the work experience indicated above.” Id. Patent Owner does not dispute the level of ordinary skill in the art. Prelim Resp. 14–15. For purposes of this Decision, we adopt Petitioner’s proposal as reasonable and consistent with the ’894 patent specification and the prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (the prior art may reflect an appropriate level of skill in the art).” slip op. at 10

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededDecided for patent owner

      “Petitioner “does not believe any terms require a formal construction.” Pet. 6. Patent Owner agrees “no claim terms presently require construction to resolve any current dispute between the parties.” PO Resp. 15. We do not discern a need to construe explicitly any claim language at this juncture because doing so would have no effect on our analyses below of Petitioner’s asserted grounds and will not assist in resolving the present controversy between the parties. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)).” slip op. at 11

    • Obviousness (§103) › Graham factors (scope of art, differences, level of skill)Not shown unpatentableNot shown unpatentable

      “Kwatra teaches, at Equation 7, minimizing velocity and acceleration of a function representing camera path (P). FF ¶¶ 6, 8–9. Kwatra does not state that this camera path function considers rotation. Rather, the words “camera path” suggest x, y, z movement of the camera rather than rotation of the camera. Dr. Foroosh’s testimony that Kwatra’s minimization of a smoothed camera path does not result in minimizing rotational velocity and acceleration is credible because this testimony is consistent with Kwatra as a whole and consistent with the other evidence of record. Id. ¶ 10. Kwatra recognizes that image rotation angle (“θ”) may not remain smooth. Id. ¶ 12. But rather than attempting to minimize velocity and acceleration of rotation of the camera housing, Kwatra states that applying a smoothness constraint on rotation angle “may be non-linear.” Id. ¶ 13. Consistent with Kwatra, Dr. Foroosh credibly explains the difficulty of applying linear techniques to rotation. Id. Thus, Kwatra proposes instead constraining the sine and cosine of theta. Id. ¶ 14. The Kwatra provisional application is part of the Kwatra reference (id. ¶ 15), and it similarly opts for simpler schemes rather than estimating all parameters for all frames jointly. Id. ¶ 16. The provisional explains that the rotational component is relatively small such that non-linear computations minimizing velocity and rotation can be avoided. Id. ¶¶ 17–18. The testimony of Patent Owner’s witness, Dr. Foroosh, explaining the provisional is credible (Ex. 2018 ¶ 72) because it is consistent with Kwatra’s complete disclosure. Dr. Foroosh’s testimony is more credible than the testimony of Petitioner’s witness, Dr. Katsaggelos, because Dr. Katsaggelos did not review the Kwatra provisional application and, thus, did not review the entire disclosure of Kwatra. Id. ¶ 19; see also In re Etter, 756 F.2d 852, 859 (Fed. Cir. 1985) (en banc) (obviousness analysis considers whether “the claimed inventions are rendered obvious by the teachings of the prior art as a whole” (emphasis added)).” slip op. at 28

    • Expert testimonyPatent owner expert creditedPetitioner expert discountedDecided for patent owner

      “(id. ¶ 15), and it similarly opts for simpler schemes rather than estimating all parameters for all frames jointly. Id. ¶ 16. The provisional explains that the rotational component is relatively small such that non-linear computations minimizing velocity and rotation can be avoided. Id. ¶¶ 17–18. The testimony of Patent Owner’s witness, Dr. Foroosh, explaining the provisional is credible (Ex. 2018 ¶ 72) because it is consistent with Kwatra’s complete disclosure. Dr. Foroosh’s testimony is more credible than the testimony of Petitioner’s witness, Dr. Katsaggelos, because Dr. Katsaggelos did not review the Kwatra provisional application and, thus, did not review the entire disclosure of Kwatra. Id. ¶ 19; see also In re Etter, 756 F.2d 852, 859 (Fed. Cir. 1985) (en banc) (obviousness analysis considers whether “the claimed inventions are rendered obvious by the teachings of the prior art as a whole” (emphasis added)).” slip op. at 28

    Patent outcomesUS 10,574,894 not shown unpatentable
    Claim construction§ 103 obviousnesscites KSR · Graham
    Patents in suitUS 10,574,894
  • PTAB · Dec 5, 2025 · IPR2025-00348 · APJ Karl D Easthom · IPR · Final written decision

    Claims 1–21 are unpatentable: claims 1–16 and 18–21 as obvious over Leaning, and claims 2 and 9 as obvious over Leaning and Gamble.

    RulingsFinal written decision
    • Obviousness (§103) › Motivation to combine / reasonable expectation of successUnpatentableMotivation foundUnpatentable

      “This argument is misplaced. Petitioner does not propose modifying any of Leaning’s teachings. Rather, Petitioner relies on Leaning’s alternative embodiment (i.e., “employ[ing] a criterion which anticipates underflow and avoids it”). See Ex. 1004, 15:3–6; Pet. 38 (citing and quoting same). Patent Owner acknowledges this fact. See PO Sur-reply 12 (“Leaning proposes an alternative embodiment.”) (citing Ex. 1004, 14:25–15:8)). Accordingly, Petitioner need not show a reasonable expectation of success for implementing an alternative embodiment expressly disclosed in Leaning.10” slip op. at 28

    • Obviousness (§103) › Objective indicia / secondary considerations › NexusObjective indicia no nexusDecided for petitioner

      “Accordingly, we accord Patent Owner’s evidence little to no weight. v. Unexpected Results Patent Owner argues that the MOVE Media Player “achieved what” slip op. at 65

    • ExcludeMotion to exclude, deniedDenied
    Patent outcomesUS 8,868,772 unpatentable
    § 103 obviousnesscites KSR · Graham
    Patents in suitUS 8,868,772
  • PTAB · Dec 5, 2025 · IPR2025-00347 · APJ Karl D Easthom · IPR · Final written decision

    Claims 1–16 are unpatentable as obvious over Leaning or Leaning and Gamble, because Petitioner proved the asserted grounds by a preponderance of the evidence.

    RulingsFinal written decision
    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundUnpatentable

      “argue, that a POSITA would have had a reasonable expectation of success in implementing any of its proposed modifications.” PO Sur-reply 9. This argument is misplaced. Petitioner does not propose modifying any of Leaning’s teachings. Rather, Petitioner relies on Leaning’s alternative embodiment (i.e., “employ[ing] a criterion which anticipates underflow and avoids it”). See Ex. 1004, 15:3–6; Pet. 35–36 (citing same). Patent Owner acknowledges this fact. See PO Sur-reply 11 (“Leaning proposes an alternative embodiment.”) (citing Ex. 1004, 15:3–6). Accordingly,” slip op. at 26

    • Obviousness (§103) › Objective indicia / secondary considerations › NexusObjective indicia no nexusDecided for petitioner

      “Accordingly, we accord Patent Owner’s evidence little to no weight. v. Unexpected Results Patent Owner argues that the MOVE Media Player “achieved what” slip op. at 58

    • Strike new argumentNew argument consideredDenied

      “E. Summary on Motion to Strike For the foregoing reasons, we determine that the Motion is partly” slip op. at 107

    Patent outcomesUS 9,407,564 unpatentable
    § 103 obviousnesscites KSR · Graham
    Patents in suitUS 9,407,564
  • PTAB · Aug 29, 2025 · IPR2025-00479 · APJ Justin T Arbes · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–20 were obvious over Erskine, Scherzer, or Scherzer and Gillett.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “III. CONCLUSION Based on the arguments and evidence presented by the parties, we conclude that Petitioner has not demonstrated a reasonable likelihood of prevailing with respect to at least one claim of the ’634 patent challenged in the Petition. Therefore, we do not institute an inter partes review. IV. ORDER In consideration of the foregoing, it is hereby: ORDERED that the Petition is denied and no inter partes review is instituted.” slip op. at 25

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “B. Level of Ordinary Skill in the Art Petitioner argues that at the time of the ’634 patent (July 2018), a person of ordinary skill in the art would have had “a bachelor’s degree in electrical engineering, computer science, computer engineering, or a similar major with at least two years of experience in the field; or a master’s degree with specialization in the field,” where “[a] person with less education but more relevant practical experience may also meet this standard.” Pet. 7 (citing Ex. 1003 ¶¶ 12–13). Petitioner further argues that a person of ordinary skill in the art would have had knowledge of “[d]esigning and using systems that include endpoint devices (e.g., client devices) and servers for establishing network connections and data transfer,” “[r]ecognizing and applying the client-server architecture,” and “[u]sing and applying concepts from known telecommunication and networking frameworks, protocols and standards, including TCP/IP, IEEE 802.11, VoIP, cellular systems and other known frameworks and standards.” Id. (citing Ex. 1003 ¶ 14). Patent Owner does not address the level of ordinary skill in the art in its Preliminary Response. Based on the record presented, including our review of the ’634 patent and the types of problems and solutions described in the ’634 patent and cited prior art, we agree with Petitioner’s definition and apply it for purposes of this Decision. See, e.g., Ex. 1001, col. 1, ll. 4–29 (describing in the “Background” section of the ’634 patent a “network connection between two endpoints” and known methods of reaching “full effective bandwidth capacity” in a network).” slip op. at 8

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “C. Claim Interpretation We interpret each challenged claim using the same claim construction standard that would be used to construe the claim in a civil action under 35 U.S.C. 282(b), including construing the claim in accordance with the ordinary and customary meaning of such claim as understood by one of ordinary skill in the art and the prosecution history pertaining to the patent. 37 C.F.R. § 42.100(b). Petitioner notes that it proposed a construction for the claim term “geographical area” in the district court case, but states that it “do[es] not believe proposing a construction for the term is necessary in this proceeding because the relied upon teachings of the prior art references are consistent with examples of ‘geographical area’ included in the ’634 patent [S]pecification.” Pet. 8. Patent Owner argues that “[t]he Board need not engage in express claim construction at this stage of the proceeding.” Prelim. Resp. 5. We conclude that no express interpretation of any claim term is necessary to determine whether to institute an inter partes review in this proceeding. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“Because we need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy,’ we need not construe [a particular claim limitation] where the construction is not ‘material to the . . . dispute.’” (citation omitted) (emphasis added)).” slip op. at 9

    • BurdenNot shown unpatentable

      “Petitioner has not shown sufficiently that Erskine teaches or suggests the second requirement of limitation [1c], i.e., “initiating the next network connection . . . with a transmission bandwidth based on the parameter values for the past network connection.” Petitioner’s theory is that (1) the QoS parameters in Erskine are for a “past” connection from one zone to another, (2) the sliding maximum interzone bandwidth is “based on” the QoS parameters, and (3) a new call only proceeds if the transmission bandwidth needed for the call added to the current bandwidth being used over the interzone link is less than the sliding maximum interzone bandwidth, so Erskine therefore teaches a call with a transmission bandwidth determined “based on” the sliding maximum interzone bandwidth (which in turn is determined “based on” the QoS parameters). See Pet. 27–28; Ex. 1003 ¶¶ 59–60 (similar testimony from Dr. Crovella). As Patent Owner points out, however, Erskine only makes “a binary, accept/reject decision as to whether to allow a new call to proceed based on a comparison between the bandwidth needed for the call and a predetermined ‘sliding maximum interzone bandwidth value.’” See Prelim. Resp. 6–7. Specifically, the additional bandwidth that would be needed for the call is added to the current bandwidth being used on the interzone link; if the sum of those values is less than the sliding maximum interzone bandwidth for the link, the call “proceeds”; otherwise, it is “blocked.” Ex. 1004, col. 4, ll. 36–40, col. 6, l. 55–col. 7, l. 10, col. 8, ll. 36–43, col. 9, ll. 9–26, col. 10, ll. 23–25 (the sum is compared to the sliding maximum interzone bandwidth “to determine whether enough bandwidth is available to proceed with the new call”), Fig. 3 (steps 308, 310, and 312). Erskine repeatedly refers to the bandwidth for the new call as the amount of bandwidth that is “necessary” or “required” to handle the call. See, e.g., id. at col. 1, ll. 43–57 (“an amount of bandwidth necessary to handle the new call”), col. 6, ll. 61–64 (“the additional bandwidth required (of the new call)”), col. 8, ll. 36–40 (“the bandwidth necessary for the new call”), col. 9, ll. 16–21 (“the anticipated additional bandwidth necessary for the new call”), 54–56 (“the bandwidth amount the new call will utilize (if connected)”), col. 10, ll. 21–23 (same), 41–43 (same), col. 12, ll. 1–2 (“an amount of bandwidth necessary to handle the new call”). It is that value—determined prior to the addition and comparison to the sliding maximum interzone bandwidth—that will be used for the new call if it is allowed to “proceed[].” Id. at col. 6, ll. 64–67 (if the sum is less than the sliding maximum interzone bandwidth, the call “proceeds” and “the QoS table is updated with the additional bandwidth used by that call”). Erskine does not describe the transmission bandwidth for the new call as being based on any parameter values for a past network connection, but rather as “whatever bandwidth the system determined is necessary for the additional call.” See Prelim. Resp. 8–9. In other words, the transmission bandwidth needed for a new call is predetermined and independent of whatever the sliding maximum interzone bandwidth is currently. See id.” slip op. at 15

    Claim construction§ 103 obviousnesscites KSR · Graham
    Patents in suitUS 10,944,634
  • PTAB · Aug 26, 2025 · IPR2024-00710 · APJ Brian P Murphy · IPR · Final written decision

    Claims 13–15 and 17–20 are unpatentable: claims 13–15 and 20 as anticipated by Fegan, claim 17 as obvious over Fegan and Sull, and claims 13–14 and 17–20 as obvious over Vasilevsky and Logan.

    RulingsFinal written decision
    • ExcludeMotion to exclude, deniedDenied

      “afforded experts in forming opinions in reliance on hypotheticals and “presentation of data to the expert outside of court and other than by his own perception,” i.e., hearsay. Id. (Adv. Comm. Notes). And where a court acts as fact finder, rather than a jury, the danger of unfair prejudice to the objecting party is substantially diminished. See Science Applications Int’l Corp. v. United States, 175 Fed. Cl. 389, 395 (2025) (“bench trials limit the ‘concern for juror confusion or potential prejudice’”) (citations omitted). The Board, sitting as a non-jury tribunal with administrative expertise, is well-positioned to determine and assign appropriate weight to evidence presented, as we have done in the present case. See Gnosis S.p.A. v. S. Alabama Med. Sci. Found., Case IPR2013-00118, slip op. at 43 (PTAB June 20, 2014) (Paper 64); see also Donnelly, 123 F.2d at 224 (“One who is capable of ruling accurately upon the admissibility of evidence is equally capable of sifting it accurately after it has been received.”). In rendering our Decision, we have assigned appropriate weight to Exhibit 2022 in view of the entire record before us. For the reasons given above, we deny Petitioner’s motion to exclude Exhibit 2022.” slip op. at 78

    Patent outcomesUS 8,307,286 unpatentable
    Nonecites KSR
    Patents in suitUS 8,307,286
Page 1 of 24
← Previous12345…Next →

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.