- US Conec Ltd. v. Senko Advanced Components, Inc.Rehearing grantedPTAB · Sep 16, 2024 · IPR2024-00122 · APJ Barbara A Parvis · IPR · Rehearing
The Board granted the petitioner's request to withdraw its rehearing request and granted the joint motion to terminate the proceeding.
RulingsRehearing decision- RehearingRehearing, grantedGranted
“agreement to jointly seek termination of this proceeding, and “[b]ased on the settlement, Petitioner hereby requests withdrawal of its Request for Rehearing.” Joint Motion 1. We “may enter non-final orders to administer the proceeding.” 37 C.F.R. § 42.5. Here, the Board has not decided the merits of Petitioner’s Request for Rehearing. Additionally, we stated in our Decision Denying Institution that “the Petition is denied, and no trial is instituted.” Paper 7, 22. Under these circumstances, therefore, we determine that it is appropriate to grant the request to withdraw Petitioner’s Request for Rehearing and terminate this proceeding as to the Parties. III. ORDER Accordingly, for the reasons discussed above, it is: ORDERED that Petitioner’s request for withdrawal of its Request for Rehearing (Paper 8) is granted; and” slip op. at 2
- PTAB / AIA Trials › Other PTAB motions (exclude, strike, seal, additional discovery, rehearing)Granted
“agreement to jointly seek termination of this proceeding, and “[b]ased on the settlement, Petitioner hereby requests withdrawal of its Request for Rehearing.” Joint Motion 1. We “may enter non-final orders to administer the proceeding.” 37 C.F.R. § 42.5. Here, the Board has not decided the merits of Petitioner’s Request for Rehearing. Additionally, we stated in our Decision Denying Institution that “the Petition is denied, and no trial is instituted.” Paper 7, 22. Under these circumstances, therefore, we determine that it is appropriate to grant the request to withdraw Petitioner’s Request for Rehearing and terminate this proceeding as to the Parties.” slip op. at 2
NonePatents in suitUS 11,061,190 - Infineon Technologies AG v. Amatech Group LimitedRehearing grantedPTAB · Apr 3, 2024 · IPR2022-00951 · APJ Stacey G White · IPR · Rehearing
On rehearing, the Board held claim 3 unpatentable as obvious over Eray-WO799, revising the final written decision’s outcome for that claim.
RulingsRehearing decision- RehearingRehearing, grantedGranted
“unrebutted expert testimony corroborated by two prior art patents describing RFID smart cards” and that this evidence “demonstrated that a conventional and obvious way to manufacture Eray-WO799’s smart card was by forming a card antenna on a card body before adding the chip.” Req. Reh’g 2 (citing Pet. 39–40; Paper 20 (“Reply”) at 31). Thus, Petitioner argues a person of ordinary skill in the art would have understood that an obvious and conventional way of manufacturing the card body of Eray- WO799 would have had unconnected ends as required by our construction. Id. Paragraph 149 of Dr. van der Weide’s declaration states that a person of ordinary skill in the art “would have understood that an obvious and conventional way to construct the smart card as shown in Eray-WO799 FIG. 12 would have been to form the turns S1, S2, SC3 and SC4 on or in the card body (e.g., by laying wire) before connecting the wire to (or forming) access terminals and connecting module M.” Ex. 1003 ¶ 149. In support of that because it was “directed to solving problems that occur during the manufacture of cards.” Dec. 42 (citing Ex. 1028, 1:25–2:53). Petitioner points out that “[w]hile Ryu discloses manufacturing techniques, Ryu also describes and claims a ‘communication system’ with a smart card and a reader.” Reh’g Req. 9 (citing Ex. 1028, code (57), claims 1–2). Petitioner is correct in noting that Ryu’s disclosures are not so narrow as we described in the Decision. As to Finn-089, we found that reference unhelpful because it was “directed to a process for the contacting of a wire conductor in the course of manufacture of a transponder unit.” Dec. 41–42 (citing Ex. 1015, 1:15–17). Petitioner asserts that we failed to acknowledge to the fact that Finn-089 was incorporated by reference in the ’240 patent noting that “[p]atents incorporated by reference ‘are effectively part of the host [patents] as if [they] were explicitly contained therein.’” Reh’g Req. 9 (citing X2Y Attenuators, LLC v. U.S. Int’l Trade Comm’n, 757 F.3d 1358, 1362–63 (Fed. Cir. 2014) (alterations in Rehearing Request)). On this record, we agree that we overlooked and misapprehended the import of Ryu and Finn-089 and if those references are given appropriate weight, they lend further credence to Dr. van der Weide’s testimony that one of ordinary skill in the art would have known that an obvious way to manufacture Eray-WO799 would have created an intermediate product with requisite free ends. Further, we adopt the full reasoning stated in the Dissent as to the unpatentability of claim 3 (Dec. 53–57). Therefore, we GRANT Petitioner’s Request for Rehearing slip op. at 6
- Skill levelSkill level petitioner adoptedOther
“As stated in our Final Written Decision, we adopted Petitioner’s definition of the person of ordinary skill in the art and found that the person of ordinary skill in the art would have possessed “a Bachelor’s degree in electrical engineering or a similar field, and 1–2 years of experience researching and developing antennas used in RFID applications.” Dec. 6–7 (citing Pet. 8; PO Resp. 18). Petitioner’s declarant, Dr. Daniel van der Weide, supported Petitioner’s definition, which was adopted for this proceeding. Ex. 1003 ¶ 25. Dr. van der Weide defined himself as “a person of more than ordinary skill in the art during the relevant timeframe” because “[b]y 2010, [he] held a Ph.D. in electrical engineering, and [he] had at least” slip op. at 4
- Obviousness (§103) › Motivation to combine / reasonable expectation of successUnpatentableMotivation foundUnpatentable
“unrebutted expert testimony corroborated by two prior art patents describing RFID smart cards” and that this evidence “demonstrated that a conventional and obvious way to manufacture Eray-WO799’s smart card was by forming a card antenna on a card body before adding the chip.” Req. Reh’g 2 (citing Pet. 39–40; Paper 20 (“Reply”) at 31). Thus, Petitioner argues a person of ordinary skill in the art would have understood that an obvious and conventional way of manufacturing the card body of Eray- WO799 would have had unconnected ends as required by our construction. Id. Paragraph 149 of Dr. van der Weide’s declaration states that a person of ordinary skill in the art “would have understood that an obvious and conventional way to construct the smart card as shown in Eray-WO799 FIG. 12 would have been to form the turns S1, S2, SC3 and SC4 on or in the card body (e.g., by laying wire) before connecting the wire to (or forming) access terminals and connecting module M.” Ex. 1003 ¶ 149. In support of that because it was “directed to solving problems that occur during the manufacture of cards.” Dec. 42 (citing Ex. 1028, 1:25–2:53). Petitioner points out that “[w]hile Ryu discloses manufacturing techniques, Ryu also describes and claims a ‘communication system’ with a smart card and a reader.” Reh’g Req. 9 (citing Ex. 1028, code (57), claims 1–2). Petitioner is correct in noting that Ryu’s disclosures are not so narrow as we described in the Decision. As to Finn-089, we found that reference unhelpful because it was “directed to a process for the contacting of a wire conductor in the course of manufacture of a transponder unit.” Dec. 41–42 (citing Ex. 1015, 1:15–17). Petitioner asserts that we failed to acknowledge to the fact that Finn-089 was incorporated by reference in the ’240 patent noting that “[p]atents incorporated by reference ‘are effectively part of the host [patents] as if [they] were explicitly contained therein.’” Reh’g Req. 9 (citing X2Y Attenuators, LLC v. U.S. Int’l Trade Comm’n, 757 F.3d 1358, 1362–63 (Fed. Cir. 2014) (alterations in Rehearing Request)). On this record, we agree that we overlooked and misapprehended the import of Ryu and Finn-089 and if those references are given appropriate weight, they lend further credence to Dr. van der Weide’s testimony that one of ordinary skill in the art would have known that an obvious way to manufacture Eray-WO799 would have created an intermediate product with requisite free ends. Further, we adopt the full reasoning stated in the Dissent as to the unpatentability of claim 3 (Dec. 53–57). Therefore, we GRANT Petitioner’s Request for Rehearing slip op. at 6
§ 103 obviousnessPatents in suitUS 9,165,240 - Code200, Uab / Teso LT, Uab et al. v. Bright Data Ltd.Rehearing grantedPTAB · Oct 19, 2022 · IPR2022-00862 · APJ Sheila F Mcshane · IPR · Rehearing
On Director remand, the Board instituted inter partes review of claims 1, 2, 6–11, 13, and 15–24 on all petitioned grounds and granted joinder with IPR2021-01493.
RulingsRehearing decision- RehearingRehearing, grantedGranted
“Commerce for Intellectual Property and Director of the United States Patent and Trademark Office vacating our previous decision denying institution, remanding for further proceedings, and ordering us to reconsider joinder after reconsidering the decision denying institution. Paper 18 (“Remand Dec.”).” slip op. at 2
- PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Decided for petitioner
“We consider the Director’s Memorandum, which directs that “the PTAB will not rely on the Fintiv factors to discretionarily deny institution in view of parallel district court litigation where a petition presents compelling evidence of unpatentability.” Memorandum 2. The Memorandum explains that “where the PTAB determines that the information presented at the institution stage presents a compelling unpatentability challenge, that determination alone demonstrates that the PTAB should not discretionarily deny institution under Fintiv.” Id. at 4–5 (emphasis added). The Memorandum further explains that “[c]ompelling, meritorious challenges are those in which the evidence, if unrebutted in trial, would plainly lead to a conclusion that one or more claims are unpatentable by a preponderance of the evidence.” Id. at 4. On the current record, we determine that Petitioner’s invalidity grounds present compelling unpatentability challenges. See infra Sections IV, D–I. In particular, in our view at this stage of the proceeding, the Petition presents compelling evidence that three prior art references, including Border, which was not before the jury in the Teso litigation, anticipate many of the claims of the ’510 patent. We determine that instituting inter partes review under these circumstances “strikes a balance among the competing concerns of avoiding potentially conflicting outcomes, avoiding overburdening patent owners, and strengthening the patent system by eliminating patents that are not robust and reliable.” Memorandum 5. Accordingly, based upon our consideration of the evidence and arguments presented in the Petition, and pursuant to the directive in the Memorandum concerning compelling, meritorious challenges, we decline to exercise our discretion under § 314(a) to deny institution of inter partes review as Patent Owner requests.” slip op. at 13
- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“PTAB will not rely on the Fintiv factors to discretionarily deny institution in view of parallel district court litigation where a petition presents compelling evidence of unpatentability.” Memorandum 2. The Memorandum explains that “where the PTAB determines that the information presented at the institution stage presents a compelling unpatentability challenge, that determination alone demonstrates that the PTAB should not discretionarily deny institution under Fintiv.” Id. at 4–5 (emphasis added). The Memorandum further explains that “[c]ompelling, meritorious challenges are those in which the evidence, if unrebutted in trial, would plainly lead to a conclusion that one or more claims are unpatentable by a preponderance of the evidence.” Id. at 4. On the current record, we determine that Petitioner’s invalidity grounds present compelling unpatentability challenges. See infra Sections IV, D–I. In particular, in our view at this stage of the proceeding, the Petition presents compelling evidence that three prior art references, including Border, which was not before the jury in the Teso litigation, anticipate many of the claims of the ’510 patent. We determine that instituting inter partes review under these circumstances “strikes a balance among the competing concerns of avoiding potentially conflicting outcomes, avoiding overburdening patent owners, and strengthening the patent system by eliminating patents that are not robust and reliable.” Memorandum 5. Accordingly, based upon our consideration of the evidence and arguments presented in the Petition, and pursuant to the directive in the Memorandum concerning compelling, meritorious challenges, we decline to exercise our discretion under § 314(a) to deny institution of inter partes review as Patent Owner requests.” slip op. at 13
- PTAB / AIA Trials › Joinder §315(c) / SAS all-or-nothingJoinder, grantedGranted
“As discussed above, we determine that the merits of this action present a compelling unpatentability challenge. Absent joinder, a one-year bar would apply to Petitioner, and, again, the merits presented in this challenge would not be reached by the Board in a final written decision. Under these specific circumstances, we determine joinder is appropriate in the interests of justice. Because NetNut has been dismissed from the 1493 IPR, there are no longer issues of cooperation and duplication that would have to be addressed between petitioners. Additionally, pursuant to 35 U.S.C. § 316(11), maintaining the previously-set trial schedule in the 1493 IPR is not necessary when joinder is granted. See also 37 C.F.R. § 42.100(c). Thus, the schedule will be adjusted in accordance with a Revised Scheduling Order, entered concurrently with this Decision.” slip op. at 37
Claim construction§ 102 anticipation§ 103 obviousnessDiscretionary denialcites Phillips · KSR · GrahamPatents in suitUS 10,484,510 - Code200, Uab / Teso LT, Uab et al. v. Bright Data Ltd.Rehearing grantedPTAB · Oct 19, 2022 · IPR2022-00861 · APJ Sheila F Mcshane · IPR · Rehearing
On remand, the Board instituted review of claims 1, 2, 12, 14, 15, 17–19, and 21–29 on all petitioned grounds and granted joinder with IPR2021-01492.
RulingsRehearing decision- RehearingRehearing, grantedGranted
“General Plastic, and clarified General Plastic by stating that, “[w]here the first-filed petition . . . was discretionarily denied or otherwise was not evaluated on the merits,” a finding favoring discretionary denial under General Plastic’s factors 1–3 is limited to “when there are ‘road-mapping’ concerns under factor 3 or other concerns under factor 2.” Remand Dec. 5. The Director noted that in this case, the Board had found “no evidence of road-mapping.” Id. at 5 (citing Dec. 13). The Director added that “‘road-mapping’ concerns are minimized when, as in this case, a petitioner files a later petition that raises unpatentability challenges substantially overlapping with those in the previously-filed petition and the later petition is not refined based on lessons learned from later developments.” Id. at 5. The Director agreed with the panel’s finding that General Plastic’s factors 2, 4, and 5 “have limited relevance.” Id. at 6. The Director similarly found factor 7 to “have limited relevance” because the one-year statutory time period may be adjusted for a joined case under 35 U.S.C. § 316(a)(11). Id. (citing Dec. 16). Further, the Director disagreed with the panel’s determination on factor 6 in view of potential inefficiencies, with the Director determining that “the Board’s mission ‘to improve patent quality and restore confidence in the presumption of validity that comes with issued patents’ outweighs the impact on Board resources needed to evaluate the merits of a petition.” Id. In accordance with the evaluation of the factors, the Director found that “the Patent Owner’s concerns of fairness are outweighed by the benefits to the patent system of improving patent quality by reviewing the merits of the challenges raised in the petitions, which have not been addressed to date.” Id. The Director remanded the case to the panel for further proceedings, with direction to reconsider the institution decision and joinder. Remand Dec. 7. The Director directed that the panel “consider the Patent Owner’s remaining arguments, including those for discretionary denial under Fintiv and against the merits of the Petitioner’s patentability challenges.” Id.” slip op. at 3
- PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Institution denied fintivDenied
“We consider the Director’s Memorandum, which directs that “the PTAB will not rely on the Fintiv factors to discretionarily deny institution in view of parallel district court litigation where a petition presents compelling evidence of unpatentability.” Memorandum 2. The Memorandum explains that “where the PTAB determines that the information presented at the institution stage presents a compelling unpatentability challenge, that determination alone demonstrates that the PTAB should not discretionarily deny institution under Fintiv.” Memorandum, 4–5 (emphasis added). The Memorandum further explains that “[c]ompelling, meritorious challenges are those in which the evidence, if unrebutted in trial, would plainly lead to a conclusion that one or more claims are unpatentable by a preponderance of the evidence.” Memorandum 4. On the current record, we determine that Petitioner’s invalidity grounds present compelling unpatentability challenges. See infra Sections IV, D–H. In particular, in our view at this stage of the proceeding, the Petition presents compelling evidence that three prior art references, including Border, which was not before the jury in the Teso litigation, anticipate many of the claims of the ’319 patent. We determine that instituting inter partes review under these circumstances “strikes a balance among the competing concerns of avoiding potentially conflicting outcomes, avoiding overburdening patent owners, and strengthening the patent system by eliminating patents that are not robust and reliable.” Memorandum 5. Accordingly, based upon our consideration of the evidence and arguments presented in the Petition, and pursuant to the directive in the Memorandum concerning compelling, meritorious challenges, we decline to exercise our discretion under § 314(a) to deny institution of inter partes review as Patent Owner requests.” slip op. at 13
- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“On the current record, we determine that Petitioner’s invalidity grounds present compelling unpatentability challenges. See infra Sections IV, D–H. In particular, in our view at this stage of the proceeding, the Petition presents compelling evidence that three prior art references, including Border, which was not before the jury in the Teso litigation, anticipate many of the claims of the ’319 patent. We determine that instituting inter partes review under these circumstances “strikes a balance among the competing concerns of avoiding potentially conflicting outcomes, avoiding overburdening patent owners, and strengthening the patent system by eliminating patents that are not robust and reliable.” Memorandum 5. Accordingly, based upon our consideration of the evidence and arguments presented in the Petition, and pursuant to the directive in the Memorandum concerning compelling, meritorious challenges, we decline to exercise our discretion under § 314(a) to deny institution of inter partes review as Patent Owner requests.” slip op. at 14
- PTAB / AIA Trials › Joinder §315(c) / SAS all-or-nothingJoinder, grantedGranted
“Petitioner is correct that its previously-filed 1266 IPR was not considered on the merits, and we note that this previous IPR challenged claims of the ’319 patent based on the same primary prior art—Crowds, Border, and MorphMix—as that asserted in the instant action. See Code200, UAB v. Luminati Networks Ltd., IPR2020-01266, Paper 5, 5–6. We agree with Petitioner that Uniloc is distinguishable from this case here because Uniloc addressed a situation after a denial of an earlier petition on the merits. Reply 2; Uniloc, 6. As discussed above, we determine that the merits of this action present a compelling unpatentability challenge. Absent joinder, a one-year bar would apply to Petitioner, and, again, the merits presented in this challenge would not be reached by the Board in a final written decision. Under these specific circumstances, we determine joinder is appropriate in the interests of justice. Because NetNut has been dismissed from the 1492 IPR, there are no longer issues of cooperation and duplication that would have to be addressed between petitioners. Additionally, pursuant to 35 U.S.C. § 316(11), maintaining the previously-set trial schedule in the 1492 IPR is not necessary when joinder is granted. See also 37 C.F.R. § 42.100(c). Thus, the schedule will be adjusted in accordance with a Revised Scheduling Order, entered concurrently with this Decision.” slip op. at 39
Claim constructionDiscretionary denialcites Phillips · KSR · GrahamPatents in suitUS 10,257,319 - Proppant Express Investments, LLC / Proppant Express Solutions, LLC v. Oren Technologies, LLCRehearing grantedPTAB · May 20, 2020 · IPR2017-02103 · APJ Kevin W Cherry · IPR · Rehearing
Petitioner’s rehearing request was granted in part: claims 7, 10, 12, 15, 18, and 19 were held unpatentable; claim 4 was not shown unpatentable.
RulingsRehearing decision- RehearingRehearing, grantedGranted in part
“the burden of showing a decision should be modified, and the request for rehearing must specifically identify all matters the party believes the Board misapprehended or overlooked and the place where each matter was previously addressed in its papers. 37 C.F.R. § 42.71(d). Therefore, Petitioner bears the burden of establishing that we misapprehended or overlooked the matters that it requests that we review.” slip op. at 4
- Expert testimonyPetitioner expert creditedDecided for petitioner
“evidence quantifying how much additional weight Smith’s container could hold if reinforced as Petitioners proposed,” Opp. 3, we also find it unpersuasive. We determine that Dr. Wooley’s testimony, by itself, supports our conclusion that Smith’s container, as Petitioner proposes to modify and combine it with the other pieces of prior art, would meet the “at least 30,000 pounds” limitation. Ex. 1001 ¶¶ 132–141. In this testimony, Dr. Wooley provided a detailed explanation of how much proppant the modified Smith container could hold. See id. We have reviewed that testimony and agree with Dr. Wooley’s conclusion and reasoning. Thus, we disagree with Patent Owner’s argument that Petitioner has failed to provide “any” evidence to support our conclusion that Smith’s modified container can hold “at least 30,000 pounds” as required by claims 4, 7, 10, 12, 15, 18, and 19.” slip op. at 7
- Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundDecided for petitioner
“however, the failure to show the “at least 30,000 pounds” limitation was the sole basis for our finding that Petitioner had failed to prove that claims 7, 10, 12, 15, 18, and 19 were unpatentable. See Final Dec. 33–36, 42–43, 59. We find that the Petitioner has shown all of the limitations of these claims are accounted for in the proposed combinations and that Petitioner has provided an adequate rationale for why a person of ordinary skill would have been motivated to combine the references in the manner proposed with a reasonable expectation of success. See generally Final Dec. (addressing all of Patent Owner’s remaining arguments); Pet. 34–58 (providing mapping for claims 7, 10, 12), 69–70 (claim 15), 79–82 (claims 18 and 19). Accordingly, we modify our Final Decision and find that claims 7, 10, 12, 15, 18, 19 have been shown to be unpatentable.” slip op. at 9
§ 103 obviousnessPatents in suitUS 9,511,929 - Palo Alto Networks, Inc. v. Finjan, Inc.Rehearing grantedPTAB · May 19, 2017 · IPR2016-00151 · APJ Miriam L Quinn · IPR · Rehearing
The Board clarified the construction of “a call to a first function” but left unchanged its determination that claims 1–8, 10, and 11 were not shown unpatentable over Ross.
RulingsRehearing decision- RehearingRehearing, grantedGranted in part
“proceeding. Paper 51 (“Final Dec.”). On April 14, 2017, Palo Alto Networks, Inc. (“Petitioner”) filed a Request for Rehearing. Paper 52 (Req. Reh’g.). Petitioner’s Request urges the Board to review the construction of “a call to a first function” for consistency with the construction given to the same term in our Final Written Decision in IPR2015-01979.2 We agree with Petitioner that the construction of “a call to a first function” must be consistent with our determination in IPR2015-01979. Accordingly, we hereby modify our Final Written Decision in this proceeding to reflect that the construction for the term “a call to a first function” means “a statement or instruction in the content, the execution of which causes the function to provide a service.” That construction remains, however, consistent with our analysis and determinations made in our Final Written Decision, and therefore requires no modification of our conclusions. For example, at page 8 of that Decision we stated that “we determine that the ‘call’ is a statement or instruction in the content, the execution of which causes the function to provide a service.” Final Dec. 8. Accordingly, the last sentence of the first paragraph in page 9 of the Final Written Decision is modified to repeat what we stated earlier in page 8 of the Decision: “we determine that a ‘call to a first function’ means a statement or instruction in the content, the execution of which causes the function to provide a service.”” slip op. at 2
- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed board ownDecided for patent owner
“Petitioner advocates. The word “call” is recited in claim 1 as a noun, and is the statement or instruction included in the content that causes the first function to provide a service. Final Dec. 7; Ex. 1001, 17:34−36. The word “invoking” appears elsewhere in the claim in connection with the transmission of the call’s input, which occurs “when the first function is invoked.” Ex. 1001, 17:39−40. The claim language is straightforward: the received content includes a call to a first function, and when that same first function is invoked, the function’s input is transmitted to the security computer. In summary, Petitioner’s request urges us to view the claim construction as allowing the call included in the received content to request the services of a function different from the function in the call statement or instruction. To illustrate, if the content states “call function X” but instead, during runtime, function Y is invoked, Petitioner asserts that this scenario would be a “call” to function Y, and therefore meet the claim. As stated above, however, the claim language does not support this reading. The call to the first function must be included in the content, and it is the same first function that is invoked later in the claim. Our claim construction does not change the plain reading of the claim language. Therefore, the execution of the statement or instruction included in the content must cause the function identified in the statement or instruction to provide a service. To illustrate, if the content states “call function X,” during runtime, function X must be invoked. Ross,3 as we discuss in our Final Written Decision, does not do this. See Final Dec. 17−19 (concluding that Ross invokes indirectly the hook function without any need to include a call to that hook function).” slip op. at 4
- Obviousness (§103) › Motivation to combine / reasonable expectation of successNot shown unpatentableNot shown unpatentable
“construction as allowing the call included in the received content to request the services of a function different from the function in the call statement or instruction. To illustrate, if the content states “call function X” but instead, during runtime, function Y is invoked, Petitioner asserts that this scenario would be a “call” to function Y, and therefore meet the claim. As stated above, however, the claim language does not support this reading. The call to the first function must be included in the content, and it is the same first function that is invoked later in the claim. Our claim construction does not change the plain reading of the claim language. Therefore, the execution of the statement or instruction included in the content must cause the function identified in the statement or instruction to provide a service. To illustrate, if the content states “call function X,” during runtime, function X must be invoked. Ross,3 as we discuss in our Final Written Decision, does not do this. See Final Dec. 17−19 (concluding that Ross invokes indirectly the hook function without any need to include a call to that hook function).” slip op. at 4
Claim construction§ 103 obviousnessPatents in suitUS 8,141,154 - Milwaukee Electric Tool Corporation / Techtronic Industries Co. Ltd. et al. v. Irwin Industrial Tool CompanyRehearing grantedPTAB · Jan 15, 2016 · IPR2015-01462 · APJ Michael L Woods · IPR · Rehearing
The Board granted rehearing and instituted trial on claims 21–30 under Ground 2, as obvious over Redford, alongside the grounds previously instituted.
RulingsRehearing decision- RehearingRehearing, grantedGranted
“Specifically, Petitioner acknowledges that the Petition (Paper 2, “Petition”) included a “typo[graphical error] in the heading [that] might have caused the Board to overlook claims 21–30 in Ground 2 of the Petition.” Id. at 2–3; Paper 2, 26 (listing claims 1–5, 14–20, and 32–34 in the heading of Ground 2 of the Petition). Upon reviewing the record before us, we agree with Petitioner that the typographical error in the Petition caused us to “overlook the fact that claims 21–30 were included in Ground 2 of the Petition.” Req. Reh’g 2. Furthermore, based on our review of Petitioner’s explanations and supporting evidence, we are also persuaded that Petitioner has established a reasonable likelihood of prevailing in its challenge of claims 21–30 under Ground 2, in addition to claims 1–5, 14–20, and 32–34, as obvious over Redford. See Paper 2, 4, 26–31; see also Paper 7, 19–20 (instituting review of claims 1–5, 14–20, and 32–34 under Ground 2 in the Decision).” slip op. at 2
- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“Upon reviewing the record before us, we agree with Petitioner that the typographical error in the Petition caused us to “overlook the fact that claims 21–30 were included in Ground 2 of the Petition.” Req. Reh’g 2. Furthermore, based on our review of Petitioner’s explanations and supporting evidence, we are also persuaded that Petitioner has established a reasonable likelihood of prevailing in its challenge of claims 21–30 under Ground 2, in addition to claims 1–5, 14–20, and 32–34, as obvious over Redford. See Paper 2, 4, 26–31; see also Paper 7, 19–20 (instituting review of claims 1–5, 14–20, and 32–34 under Ground 2 in the Decision).” slip op. at 2
NonePatents in suitUS 8,579,555 - Marvell Semiconductor, Inc. v. Intellectual Ventures I LLCRehearing grantedPTAB · Feb 20, 2015 · IPR2014-00553 · APJ Patrick M Boucher · IPR · Rehearing
Rehearing was granted in part; review was instituted on four §103 grounds for claims 1–23, while the Boer-based challenge did not meet the institution threshold.
RulingsRehearing decision- RehearingRehearing, grantedGranted in part
“patent in IPR2014-00553 (“this proceeding”). Paper 17 (“Dec.”). We observed that the grounds advanced in this proceeding “rely on teachings from Boer[1] and Wu[2] that Petitioner already identifies as disclosed by Webster” and that “Petitioner [had] not shown, and we [were] not convinced, that any of the additional grounds add substantively to the grounds on which we institute[d] inter partes review [in the related proceeding].” Dec. 16, 18. On January 2, 2015, Petitioner filed a Request for Rehearing (Paper 18, “Req. Reh’g”) that notes Patent Owner now raises an issue under 35 U.S.C. § 103(c) with respect to Webster in the related proceeding that it had not raised in its Preliminary Response. Req. Reh’g 1. Specifically, Patent Owner contends that Webster is not prior art to the ʼ195 patent because Webster and the ʼ195 patent “were, at the time the claimed invention was made, owned by the same person or subject to an obligation of assignment to the same person.” 35 U.S.C. § 103(c)(1). In view of Patent Owner’s new contention, which was not advanced until after institution, Petitioner requests rehearing of our denial of institution in this proceeding. See Req. Reh’g 4–5. We agree that, under these circumstances, rehearing is appropriate and we therefore reconsider our decision not to proceed on Petitioner’s challenges based on Boer and Wu.” slip op. at 2
- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedMixed
“We agree with Patent Owner that Boer lacks sufficient detail, even in combination with the other cited art, to support Petitioner’s challenge. See Prelim. Resp. 20. Consequently, we conclude that Petitioner has not established a reasonable likelihood of prevailing on its challenge of claims 1–23 as obvious over Boer and other art.” slip op. at 3
- Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundInstituted
“Although each of the modulation schemes in this structure is a single- carrier modulation scheme, Petitioner contends that a person of ordinary skill in the art “would have appreciated the benefit of including multi-carrier modulation in the Wu system,” observing that Wu references the 802.11a standard as a multi-carrier OFDM scheme able to achieve data rates faster than the 802.11b transmission rates. Pet. 48. Petitioner supports this contention with testimony by Dr. Almeroth, which we credit. See Ex. 1103 ¶ 66. Petitioner further reasons that the addition of the multi-carrier 802.11a modulation scheme “would have been a simple addition, if a technique was available for using a channel estimate obtained from data modulated according to a single carrier modulation scheme for acquisition of data modulated according to a multi-carrier modulation scheme.” Pet. 48 (citing Ex. 1103 ¶¶ 43–47, 65–68). Petitioner cites Böhnke for such a technique. Pet. 49. We are persuaded by Petitioner’s analysis on the present record.” slip op. at 5
- Expert testimonyPetitioner expert creditedDecided for petitioner
“carrier modulation scheme, Petitioner contends that a person of ordinary skill in the art “would have appreciated the benefit of including multi-carrier modulation in the Wu system,” observing that Wu references the 802.11a standard as a multi-carrier OFDM scheme able to achieve data rates faster than the 802.11b transmission rates. Pet. 48. Petitioner supports this contention with testimony by Dr. Almeroth, which we credit. See Ex. 1103 ¶ 66. Petitioner further reasons that the addition of the multi-carrier 802.11a modulation scheme “would have been a simple addition, if a technique was available for using a channel estimate obtained from data modulated according to a single carrier modulation scheme for acquisition of data modulated according to a multi-carrier modulation scheme.” Pet. 48 (citing Ex. 1103 ¶¶ 43–47, 65–68). Petitioner cites Böhnke for such a technique. Pet. 49. We are persuaded by Petitioner’s analysis on the present record.” slip op. at 5
§ 103 obviousnessPatents in suitUS 6,754,195 - Target Corporation v. Destination Maternity CorporationRehearing grantedPTAB · Feb 12, 2015 · IPR2014-00509 · APJ Lora M Green · IPR · Rehearing
The Board granted Target’s request for rehearing of the denial of institution, for the reasons given in the related IPR2014-00508 decision.
RulingsRehearing decision- RehearingRehearing, grantedGranted
“our Decision Denying Joinder of the instant proceeding with IPR2013-00533 (Paper 18), as well as our Decision Denying Institution of Inter Partes Review (Paper 19). Paper 20 (“Request for Rehearing”). Patent Owner, Destination Maternity Corporation, was authorized to file an Opposition (Paper 22), to which Petitioner was authorized to file a Reply (Paper 23). For the reasons discussed in the Decision Granting Petitioner’s Request for Rehearing in related IPR2014-00508 (Paper 28), we grant the Request for Rehearing.” slip op. at 2
None
Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.