  • PTAB · Sep 25, 2025 · IPR2025-00207 · APJ Gregg I Anderson · IPR · Director review

    The Board instituted inter partes review of claims 1–7, 11–14, and 16–19 on all asserted grounds, finding a reasonable likelihood of success on at least one challenged claim.

    RulingsDirector review decision
    • Director reviewDirector review, grantedGranted

      “Petitioner filed a request for Director Review of the Decision granting Patent Owner’s request for discretionary denial and denying institution (“Decision,” Paper 10) and Patent Owner filed an authorized response. See Paper 121 (“DR Request”); Paper 13 (“Patent Owner Response”). The Director granted the DR Request and referred the Petition to the Board “to handle the case in the normal course, including by issuing a decision on institution addressing the merits and other non-discretionary considerations, as appropriate.” Paper 14 (“Order Granting Director Review”).” slip op. at 2

    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “For the reasons stated below, we determine that Petitioner has established a reasonable likelihood that it would prevail with respect to at least one claim. See 35 U.S.C. § 314(a) (inter partes review may not be instituted unless “there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.”) We therefore institute inter partes review as to all of the challenged claims of the ’228 patent and all of the asserted grounds of unpatentability. See SAS Inst. Inc. v Iancu, 584 U.S. 357, 364–65 (2018); 37 C.F.R. § 42.108 (a)” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “As noted above, Patent Owner did not file a Preliminary Response and thus does not respond at this time. Petitioner’s description is consistent with the prior art before us. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (prior art itself may reflect an appropriate level of skill). For the purpose of our Decision, we adopt Petitioner’s proposal.” slip op. at 13

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed board ownDecided for petitioner

      “a “single caching agent,” which is recited in claim 1 here. ’1344 IPR, Paper 31 (“Final Written Decision”), 16–18. We concluded that a “‘single caching agent’ means ‘one caching agent for the processor, which may be formed from distributed portions.’” Id. at 18.” slip op. at 14

    Claim constructioncites KSR · Nautilus
    Patents in suitUS 8,984,228
  • PTAB · Jun 23, 2025 · IPR2025-00260 · APJ Thomas L Giannetti · IPR · Institution

    The Board instituted inter partes review of claims 1 and 11–14 on all asserted grounds and consolidated the proceeding with IPR2024-01357.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “In our Institution Decision in IPR2024-01357, we analyzed claim 1 of the ’678 patent in light of Basin-2007 and Basin-2005. ’1357 IPR, Paper 17, 23–28. We concluded, after reviewing the arguments presented there, that “Petitioner has demonstrated a reasonable likelihood of proving that the combined teachings of Basin-2005 and Basin-2007 render claim 1 unpatentable as obvious.” Id. at 28. In this proceeding, Petitioner has presented a challenge to claim 1 based on those same references that it represents is a “verbatim” copy of its previous challenge to claim 1 in the ’1357 IPR. Pet. 1–2, 28–35. Petitioner supports its challenge with expert testimony. Ex. 1002 ¶¶ 107–125.7 Patent Owner has not submitted a response on the merits of this challenge. For the purposes of this Decision, and for the reasons given in the Petition, we adopt the analysis in our Institution Decision in the ’1357 IPR (at pp. 23–28), where we determined that Petitioner has demonstrated a reasonable likelihood of prevailing on its obviousness challenge to claim 1 based on Basin-2005 and Basin-2007. Turning now to Petitioner’s challenge to claim 11, Petitioner relies on Basin-2007 and Stokes for the particle size limitations added to claim 1 by that dependent claim. Pet. 35–39. Thus, Petitioner asserts that “Basin-2007 discloses a light scattering material with an average TiO2 particle size that is ‘sub-micron’ (less than 1000 nm).” Id. at 37 (citing Ex. 1005 ¶ 5). 7 Exhibit 1002 appears to be a duplicate copy of Dr. Doolittle’s declaration from the ’1357 IPR. Petitioner concludes, “Basin-2007 renders obvious claim 11 by literally disclosing the selection of average particle sizes that preferentially scatter blue light.” Id. Further, “to the extent that the claim language ‘an average particle size that is selected such that [it preferentially scatters blue light]’ requires an average particle size selected for that reason (rather than an average particle size that leads to that outcome), this claim element is rendered obvious by Stokes.” Id. at 38 (citing Doolittle Decl. ¶ 45) (alterations in original). Petitioner explains that “Stokes explicitly discloses the selection of an average particle size ‘such that the particles preferentially scatter blue . . . LED light as compared to yellow . . . light from the luminescent material.’” Id. at 38 (citing Ex. 1008, 7:1–4) (alterations in original). Petitioner provides a motivation for combining Stokes with Basin- 2007 with a reasonable expectation of success. Pet. 38–39. Petitioner explains that “[t]o the extent that claim 11 is understood to also claim the basis for selecting a particular average particle size, a [person of ordinary skill] would have had reason to use such a basis for selecting average particle size as taught by Stokes.” Id. at 38 (citing Doolittle Decl. ¶¶ 46–48). Further, “a [person of ordinary skill] would have been motivated to apply this principle to Basin-2007, because it would increase the conversion of blue light to yellow light and improve the uniformity of the light source.” Id. at 39 (citing Doolittle Decl. ¶ 48). At this stage, Patent Owner does not provide an opposition to Petitioner’s evidence or arguments on the merits. For the reasons given by Petitioner, including those summarized above, we determine that Petitioner” slip op. at 6

    • Director reviewOther

      “On June 12, 2025, the Acting Director issued a decision denying the request and referring the Petition to the Board “to handle the case in the normal course, including by issuing a decision on institution addressing the merits and other nondiscretionary considerations, as appropriate.” Paper 16, 3. The Acting Director further instructed the Board, “[a]bsent extraordinary circumstances, the Board shall consolidate this proceeding with IPR2024-01357.” Id.” slip op. at 5

    • PTAB / AIA Trials › Joinder §315(c) / SAS all-or-nothingJoinder, grantedGranted

      “As noted supra, the Acting Director of the USPTO has instructed the Board, “[a]bsent extraordinary circumstances, the Board shall consolidate this proceeding with IPR2024-01357.” Paper 16, 3. Due to the similarity of the parties, counsel, subject matter, and asserted prior art between IPR2024- 01357 and this proceeding, and in view of the Acting Director’s guidance, we exercise our discretion to consolidate this proceeding with IPR2024- 01357. See 37 C.F.R. § 42.122(a).” slip op. at 8

    None
    Patents in suitUS 8,604,678
  • PTAB · Jun 11, 2025 · IPR2025-00297 · APJ Thomas L Giannetti · IPR · Institution

    The Board instituted review of claims 1–18 on all petition grounds and granted Microsoft’s motion to join IPR2024-00856.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “III. DECISION ON INSTITUTION Petitioner represents that the challenges to the claims of the’109 patent in the Petition are “intentionally identical . . . in all substantive aspects” to the challenges in the ’856 IPR. See Joinder Motion 2; compare ’856 IPR, Paper 1, 2–4, with Pet. 2–3. Petitioner further represents that this proceeding and the ’856 IPR “rely upon the same analytical framework (e.g., same expert declarant and prior art) in addressing the Challenged Claims.” Joinder Motion 2. Additionally, Patent Owner does not present an opposition to the Petition on the merits and does not oppose joinder. See, e.g., Notice, 1. In view of the foregoing, for the reasons given above and in the ’856 Institution Decision, we determine that Petitioner has demonstrated a reasonable likelihood of prevailing on its challenge to at least one claim of the ’109 patent. We therefore institute inter partes review of all challenges in the Petition. See 35 U.S.C. § 314(a).” slip op. at 5

    • PTAB / AIA Trials › Joinder §315(c) / SAS all-or-nothingJoinder, grantedGranted

      “Joinder is a matter within the Board’s discretion based on the particular circumstances of each proceeding. For the reasons given above, we are persuaded that Petitioner has demonstrated that permitting Petitioner to join the ’856 IPR would avoid duplication and promote the efficient resolution of both proceedings and is therefore in the interests of justice.” slip op. at 6

    • BurdenInstituted

      “III. DECISION ON INSTITUTION Petitioner represents that the challenges to the claims of the’109 patent in the Petition are “intentionally identical . . . in all substantive aspects” to the challenges in the ’856 IPR. See Joinder Motion 2; compare ’856 IPR, Paper 1, 2–4, with Pet. 2–3. Petitioner further represents that this proceeding and the ’856 IPR “rely upon the same analytical framework (e.g., same expert declarant and prior art) in addressing the Challenged Claims.” Joinder Motion 2. Additionally, Patent Owner does not present an opposition to the Petition on the merits and does not oppose joinder. See, e.g., Notice, 1. In view of the foregoing, for the reasons given above and in the ’856 Institution Decision, we determine that Petitioner has demonstrated a reasonable likelihood of prevailing on its challenge to at least one claim of the ’109 patent. We therefore institute inter partes review of all challenges in the Petition. See 35 U.S.C. § 314(a).” slip op. at 5

    None
    Patents in suitUS 8,982,109
  • PTAB · May 28, 2025 · IPR2025-00296 · APJ Neil T Powell · IPR · Institution

    The Board instituted review of claims 1–18 on all petition grounds and granted Microsoft’s motion to join IPR2025-00296 with IPR2024-00810.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “II. DECISION The challenges to the ’110 patent’s claims in this Petition are identical to the challenges in the ’810 IPR’s petition. See, e.g., Pet. 6; ’810 IPR, Paper 1, 8. Additionally, in this proceeding, Patent Owner has not argued that the Petition’s challenges lack sufficient merit to institute trial. See, e.g., Notice 1. For the same reasons we explained in the ’810 Institution Decision, we institute inter partes review of all challenges in the Petition.” slip op. at 4

    • PTAB / AIA Trials › Joinder §315(c) / SAS all-or-nothingJoinder, grantedGranted

      “Joinder is a matter within the Board’s discretion based on the particular circumstances of each proceeding. In this proceeding, we are persuaded that Petitioner has demonstrated that joinder with the ʼ810 IPR would avoid duplication and promote the efficient resolution of both proceedings.” slip op. at 5

    None
    Patents in suitUS 8,982,110
  • PTAB · Apr 1, 2025 · IPR2024-00565 · APJ Brian J Mcnamara · IPR · Adverse judgment

    The Board granted Patent Owner’s unopposed motion for adverse judgment after claims 1 and 5-8 were cancelled in reexamination, and terminated the IPR.

    RulingsAdverse judgment
    • Adverse judgmentAdverse judgmentGranted

      “When all claims at issue in an IPR are cancelled in a concurrent reexamination, the Board “construe[s] [the] cancellation of all claims . . . as a request for adverse judgment.” Mercedes-Benz USA, LLC v. Signal IP, Inc., IPR2015-00941, Paper 21 at 2-3 (PTAB Apr. 14, 2016). ORDER In consideration of the foregoing, it is hereby: ORDERED that Patent Owner’s Motion for Adverse Judgment is GRANTED; FURTHER ORDERED that Adverse Judgment is entered; and FURTHER ORDERED that this inter partes review is terminated.” slip op. at 2

    None
    Patents in suitUS 8,451,845
  • PTAB · Jan 8, 2025 · IPR2023-01343 · APJ Thomas L Giannetti · IPR · Final written decision

    Claims 1–7, 13–15, 17, and 18 were not shown unpatentable because Bose and White, alone or in the asserted combinations, failed to teach claimed workload comparisons or workload monitoring.

    RulingsFinal written decision
    • Expert testimonyPatent owner expert creditedPetitioner expert discountedDecided for patent owner

      “We are persuaded and find for the reasons given that Petitioner fails to prove by a preponderance of the evidence that White teaches or suggests “receiving a bus workload for a communication bus and a first processing element workload for a first processing element based on an integrated circuit reaching a limit.” Patent Owner’s expert Dr. Brogioli testifies that “[t]he workload is a function of the demands imposed by, e.g., applications running on the system, and may or may not be subject to direct control, whereas the conditions under which that workload is processed are controlled directly.” Brogioli Decl. ¶ 66. We agree with Dr. Brogioli and find that White’s frequency and voltage monitoring and adjustments do not result in the power management logic receiving the bus workload as recited in claim element 4[a]. Id. ¶¶ 64–66. We find the testimony of Mr. Wyatt on this issue unconvincing. Wyatt Decl. ¶ 103. In support of his opinion that “monitoring the operating voltages and frequencies of the logic core 120A and common logic bridge 110 is monitoring the workload of those components,” he states: “It was well understood that operating frequency and voltage of a component reflect the activity and use, or workload, of that component.” Id. However, he does not provide any evidentiary support for this statement. We, therefore, give it little weight. See PTAB Consolidated Trial Practice Guide 40 (Nov. 2019)5 (“Opinions expressed without disclosing the underlying facts or data may be given little or no weight.”) (citing Rohm & Haas Co. v. Brotech Corp., 127 F.3d 1089, 1092 (Fed. Cir. 1997)).” slip op. at 30

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “response. Paper 9. At the institution stage, therefore, Patent Owner did not dispute Petitioner’s description of a person of ordinary skill in the art or provide its own description. We regarded Petitioner’s description as consistent with the prior art before us. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (prior art itself may reflect an appropriate level of skill). Thus, for the purpose of our Institution Decision, we adopted Petitioner’s proposal. Institution Dec. 12–13. In its Response, Patent Owner states that it “uses this definition” in its analysis. PO Resp. 15 (citing Brogioli Decl. ¶ 25). In view of the foregoing, for this Decision, we adopt the description of the person of ordinary skill articulated by Petitioner and used in our Institution Decision. In light of our review of the complete record, we find that this formulation is consistent with the ’494 patent and the prior art of record, and is supported by the testimony of Mr. Wyatt. See Wyatt Decl. ¶ 21.” slip op. at 14

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)Term construed patent owner constructionGranted

      “Post-institution, Patent Owner proposes a construction for the term “workload.” PO Resp. 15–16. Patent Owner contends that “[a] person of ordinary skill in the art would understand that in the ’494 patent, the term ‘workload’ means ‘an amount of activity over a quantum or period of time.’” Id. at 15. Dr. Brogioli’s testimony supports this construction, as does Mr. Wyatt’s. Brogioli Decl. ¶¶ 36–38; Wyatt Dep. 34:14–36:9. The ’494 patent also supports this construction. Ex. 1001, 8:20–22, 9:60–63. Petitioner does not dispute this proposed construction in its Reply. For the reasons given, we adopt Patent Owner’s construction for “workload.”” slip op. at 15

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “Nowhere does Petitioner or its expert point to an explicit disclosure in Bose of making a comparison of the claimed “bus workload and a bus workload threshold.” Instead, Petitioner relies on its expert’s opinion as to what a person of ordinary skill might have known, without any additional supporting evidence. See, e.g., Pet. 26 (“[A person of ordinary skill] would have understood global PMCU compares a workload threshold as exemplified by the predicted power and performance of each power mode and the monitored workload to select and adjust the power mode of a component” (citing Wyatt Decl. ¶¶ 54–55)). This opinion is not supported by the record. The only disclosure of a comparison in Bose that we have been shown is the comparison of PowerTotal to PowerMax in step 303 of Figure 3, which Petitioner does not rely on to meet the “comparison” limitation in the claim. Hearing Tr. 17:16–20. Also without proper support is Petitioner’s assertion that “a [person of ordinary skill] would have understood that in Bose, selecting or adjusting power mode for a component entails comparing a workload threshold, such as predicted power and performance associated with each power mode with real time statistics, such as the monitored workload of a component.” Pet. 26 (citing Wyatt Decl. ¶¶ 55–56). We determine that for the reasons given, Petitioner fails to demonstrate by a preponderance of the evidence that the claimed comparison element 1[g] of claim 1 is taught or suggested by Bose. We find, therefore, that Petitioner has not demonstrated that claim 1 is anticipated by Bose, nor has Petitioner demonstrated that to a person of ordinary skill, claim 1 would have been obvious in light of Bose.” slip op. at 25

    Patent outcomesUS 8,898,494 not shown unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites KSR
    Patents in suitUS 8,898,494
  • PTAB · Jan 8, 2025 · IPR2023-01333 · APJ Thomas L Giannetti · IPR · Final written decision

    Claims 1–24 are unpatentable as obvious over Sutardja, Sutardja and Rychlik, or Sutardja and Carmack; the Board did not reach the Mathieson-based grounds.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “We regarded Petitioner’s description as consistent with the prior art before us. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (prior art itself may reflect an appropriate level of skill). Thus, for the purpose of our Institution Decision, we adopted Petitioner’s proposal. Institution Dec. 14–15.” slip op. at 14

    • Expert testimonyPetitioner expert creditedDecided for petitioner

      “We decline to “throw out” Dr. Horst’s testimony for several reasons. First and foremost, Patent Owner has not moved or otherwise sought to exclude his testimony, or even filed an objection. Hearing Tr. 46:19–47:1. Thus, the issue of whether the testimony should be excluded is not properly before us. Further, Petitioner asserts that “[t]his distinction is irrelevant.” Pet. Reply 2. We agree. Patent Owner has not pointed to any opinion by Dr. Horst that turns on the alleged “flaw” in the definition of the person of ordinary skill. Id. at 46:19–48:3. Finally, there is no prejudice. Patent Owner’s expert used the definition proposed by Patent Owner in his analysis. See Brogioli Decl. ¶ 25. Nor could Patent Owner show us with specificity any place in the record where resolving this dispute would make a difference in this case. Hearing Tr. 46:3–47:3. For the reasons given, we do not see the need to modify our definition of a person of ordinary skill or to exclude or give little weight to Dr. Horst’s opinions.” slip op. at 15

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)Term construed patent owner constructionGranted

      “operating system.” PO Resp. 12–13. Relying on the Microsoft Computer Dictionary, Patent Owner contends that “[a]n ‘operating system’ is, and would be understood by a person of ordinary skill in the art to be, ‘The software that controls the allocation and usage of hardware resources such as memory, central processing unit (CPU) time, disk space, and peripheral devices.’” PO Resp. 13 (citing Ex. 2007, 378). Dr. Brogioli’s testimony generally supports this construction, as does Dr. Horst’s. See Brogioli Dep. 8:17–22; Horst Dep. 32:3–8. Petitioner responds that the term “should be understood in accordance with its plain meaning,” and therefore does not require construction, but does not dispute Patent Owner’s proposed construction. Pet. Reply 2. For the reasons given, we adopt Patent Owner’s construction for “operating system.” However, we do not see this construction as dispositive of the central issue of whether the operating system in Sutardja controls the transition of the cores. See Section II.D.1, infra. slip op. at 16

    • Obviousness (§103) › Graham factors (scope of art, differences, level of skill)UnpatentableUnpatentable

      “PMS module do not ‘control’ the core switching module or the hardware on which it runs. Instead, the kernel and the PMS module only make system calls to the core switching module.” PO Resp. 27. We disagree that this is not sufficient control to meet this claim limitation. As Dr. Horst’s testimony (quoted supra) explains, the PMS module and kernel modules “trigger a transition” by generating a call to the hypervisor module or a core switching module. Horst Decl. ¶ 124. Patent Owner’s argument fails because it assumes the claims require direct control, when the claims recite no such restriction (nor have we been asked by either party to construe the claims as such).” slip op. at 28

    Patent outcomesUS 10,049,080 unpatentable
    Claim construction§ 103 obviousnesscites KSR
    Patents in suitUS 10,049,080
  • PTAB · Oct 23, 2024 · IPR2024-00823 · APJ Carl W Whitehead Jr · IPR · Institution

    Instituted IPR on claims 1–8 and 13–22 over Bigbee and Nguyen, finding a reasonable likelihood of obviousness, and granted Valeo’s motion to join IPR2023-01373.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “Having considered the arguments presented in the Petition, the Preliminary Response, and the evidence of record, we determine that Petitioner has demonstrated a reasonable likelihood of success in proving that at least one claim of the ’958 patent is unpatentable as obvious over the combination of Bigbee and Nguyen. Accordingly, we institute an inter partes review of all challenged claims (i.e., claims 1–8 and 13–22) on all grounds set forth in the Petition. Our determinations at this stage of the proceeding are based on the evidentiary record currently before us. This decision to institute trial is not a final decision as to the patentability of any claim for which we have instituted an inter partes review. See TriVascular, Inc. v. Samuels, 812 F.3d 1056, 1068 (Fed. Cir. 2016) (noting that “there is a significant difference between a Petitioner’s burden to establish a ‘reasonable likelihood of” slip op. at 12

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Patent Owner asserts: A person of ordinary skill in the art of the subject matter of the ’958 patent would have the equivalent of a bachelor’s degree in Computer Science, Computer Engineering (or a related field) and approximately two years of work experience with computer architecture design. Additional education in the field could be substituted for industry experience, and vice versa. See Prelim. Resp. 3. The parties’ positions appear to be more or less the same. Based on the current record, we adopt Petitioner’s proposed level of ordinary skill in the art for purposes of this Decision, as it is consistent with the level of ordinary skill in the art reflected by the prior art of record. We note that our Decision would be the same under either party’s proposed construction.” slip op. at 9

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededDecided for patent owner

      “At this stage of the proceeding, only terms that are in controversy need to be construed, and then only to the extent necessary to determine whether to institute inter partes review. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F. 3d 795, 803 (Fed. Cir. 1999))). After reviewing the parties’ evidence and contentions, we do not observe a dispute over the meaning of these terms that is necessary to resolve at this stage. Accordingly, we determine that we do not need to expressly construe any term for purposes of this Decision.” slip op. at 10

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundInstituted

      “Based on our review and consideration of the current record, we determine that Petitioner has sufficiently shown that the combination of Bigbee and Nguyen teaches the recited elements of limitation 19a for purposes of institution and has provided reasons sufficiently supported by factual underpinnings to combine the references with a reasonable expectation of success. Nguyen discloses, “[t]he present invention addresses mechanisms for combining recoverable and non-recoverable error handling mechanisms efficiently in FRC-enabled processors.” Ex. 1006 ¶ 9. Subsequently, Nguyen distinguishes recoverable from non-recoverable errors by treating non-recoverable errors differently from recoverable errors. Nguyen discloses, “If an error reaches error detector 140 from either core 120, recovery module 150 is activated to implement a recovery routine. Recovery can be implemented with relatively low latency by hardware, software, firmware or some combination of these.” Id. ¶ 22, Fig. 1. “However, an FRC error will be triggered if the corrupted data from one execution core and an uncorrupted version of the data from the other execution are allowed to reach FRC checker 130 before recovery module 150 is activated.” Id. Nguyen recognizes, “[s]ince FRC errors are not recoverable, reset module 160 resets the system, if FRC checker 130 signals an FRC error before the underlying parity/ECC error is detected.” Id. Nguyen further recognizes that, “[n]ot all FRC-errors are traceable to underlying parity/ECC or other correctible soft errors. For those that are, it is faster for error detector 140 to address the under lying soft error than for FRC-checker to address the FRC error that results when the corrupted data reaches FRC boundary 104.” Id. ¶ 23 (emphasis added). In this instance instead of the FRC-error being processed by the FRC checker 130 and the Reset module 160, the FRC error is directed to the Error detector 140 and eventually recovery module 150. See id. at Fig. 1. Nguyen also discloses, “the recovery routine triggered by error detector 140 provides greater system availability than the reset routine triggered by FRC checker 130” and “[e]xpanding the FRC boundary thus increases both the amount of logic that is duplicated for execution cores 120 and the flight time, during which detectable errors may be identified.” Id. ¶ 30, Fig 1; see Pet. 37. Nguyen further discloses, “[t]he former increases FRC protection, albeit through a reset mechanism” as shown in Figure 1, elements FRC Checker 130 and Reset Module 160. Ex. 1006 ¶ 30. “The latter increases the likelihood that errors identifiable through parity, ECC [error correction code] or similar core-specific protections are handled through recovery rather than reset” as shown in Figure 1, elements Error Detector, 140 and Recovery Module 150. Id. Additionally, Nguyen’s Figure 7, as discussed above, “is a block” slip op. at 33

    Claim construction§ 103 obviousnesscites KSR · Graham
    Patents in suitUS 7,502,958
  • PTAB · May 21, 2024 · IPR2024-00131 · APJ Arthur M Peslak · IPR · Institution

    The Board instituted review of claims 1, 3–8, 14, 15, and 18 on all petitioned grounds and granted ecobee’s motion to join the Copeland IPR.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “Copeland IPR. Copeland IPR, Paper 12, 2 (PTAB Oct. 2, 2023). Petitioner challenges the same claims and asserts the same grounds of unpatentability as those on which we instituted the Copeland IPR. Mot. 1 (The Petition and” slip op. at 7

    • PTAB / AIA Trials › Joinder §315(c) / SAS all-or-nothingJoinder, grantedGranted

      “Practice Guide (“CTPG”) for evaluating a joinder motion.8 CTPG 76 (citing Kyocera Corp. v. Softview, LLC, IPR2013-00004, Paper 15, 4 (PTAB April 24, 2013)) and contends the factors weigh in favor of exercising our discretion to join Petitioner as a party to the Copeland IPR. Mot. 4. In evaluating the Motion, we consider the reasons why joinder may be appropriate, whether the Petition presents any new grounds of patentability, the impact, if any, joinder would have on the trial schedule in the Copeland IPR, and how briefing and discovery may be simplified. CTPG 76.” slip op. at 9

    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Decided for petitioner

      “For this factor, our concerns are the “inefficiency” of addressing “substantially identical prior art arguments that were at issue in the district court” and the resulting “possibility of conflicting decisions.” Fintiv, IPR2020-00019, Paper 11, 12. The Director’s Fintiv Memo is in accord with these concerns. Fintiv Memo at 7 (“[T]he PTAB will not discretionarily deny institution of an IPR . . . in view of parallel district court litigation where a petitioner stipulates not to pursue in a parallel district court proceeding the same grounds as in the petition or any grounds that could have reasonably been raised in the petition.”). Because there is no possibility of our Final Written Decision in the joined proceeding conflicting with the judgment of the district court, and there will be little, if any, inefficiency or burden on the Board in proceeding with joinder, we find that this factor weighs heavily against exercising our discretion to deny institution/joinder.” slip op. at 14

    • PTAB / AIA Trials › Discretionary denial › General Plastic (serial petitions)Decided for petitioner

      “Patent Owner admits that Petitioner has not previously filed a petition for inter partes review of the ’887 patent. Opp. 12. Under Valve Corp. v. Electronic Scripting Products, Inc., IPR2019-00062, Paper 11 (PTAB April 2, 2019) (precedential), General Plastic may apply when parties that have a “significant relationship” file successive petitions against the same patent. Valve Corp., Paper 11 at 10. In Valve, the successive petitioners were found to have a significant relationship because they were “co-defendants in the District Court litigation and were accused of infringing” the patent being challenged before the Board. Id. Patent Owner admits it “is not aware of a close relationship between Petitioner and Copeland Comfort Control LP.” Prelim. Sur-reply 4. In fact, Copeland and Petitioner are not co-defendants. Consequently, there is no “significant relationship” between Petitioner and Copeland. Patent Owner argues that General Plastic Factors 2, 4, and 6 weigh against joinder. Opp. 14. The Director, however, recently determined that where “the first and second petitioners are neither the same party, nor possess a significant relationship under Valve, General Plastic factor one necessarily outweighs the other General Plastic factors” and that “exercising discretion to deny the Petition is not justified.” Videndum Production Solutions, Inc. v. Rotolight Limited, IPR2023-01218, Paper 12, 6–7 (PTAB April 19, 2024) (Decision Granting Director Review). Regardless of whether the other factors weigh against joinder or not, factor one “necessarily outweighs” the other factors. Consequently, we do not exercise discretion to deny institution or joinder in this case based on General Plastic.” slip op. at 17

    Discretionary denial
    Patents in suitUS 7,746,887
  • PTAB · Mar 14, 2024 · PGR2022-00061 · APJ Thomas L Giannetti · PGR · Final written decision

    The Board granted Patent Owner’s non-contingent motion to amend, cancelling claims 1–34 and replacing them with substitute claims 35–66 supported by the written description.

    RulingsFinal written decision
    • PTAB / AIA Trials › Motions to amend / substitute claimsMotion to amend, grantedGranted

      “complies with the legal requirements set forth in 35 U.S.C. § 326(d) and 37 C.F.R. § 42.221. Lectrosonics, Paper 15 at 4, 7–8. Specifically, Patent Owner must show that the amendments do not enlarge the scope of the claims or introduce “new matter.” See 35 U.S.C. § 326(d)(3); 37 C.F.R. § 42.221(a)(2)(ii)). Lectrosonics describes “new matter” as follows:” slip op. at 4

    • 112 supportGranted

      “description support for the proposed substitute claims. See 35 U.S.C. § 326(a)(9); 37 C.F.R. § 42.221; Lectrosonics, Paper 15 at 7–8. The written description test is met when the original disclosure of the application relied upon reasonably conveys to a person of ordinary skill in the art that the inventor had possession of the claimed subject matter as of the filing date. Ariad Pharms., Inc. v. Eli Lilly & Co., 598 F.3d 1336, 1351 (Fed. Cir. 2010) (en banc).” slip op. at 5

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITAPlain and ordinary meaningDecided for patent owner

      “We disagree with this argument because it is not consistent with the ’953 patent specification or the plain meaning of “replace.” Neither party requested a special construction of the term “replace.” We see no merit in Petitioner’s contention that the plain meaning of “replace” in Figure 32 does not require removal of the device being replaced. The contention that the plain meaning of “replace” does not require “removing” was explored with Petitioner’s counsel at the oral argument: THE BOARD: If you replace a player in a football game or baseball game, a new player goes in and replaces that player. You don't add a 12th, a 12th player or a 10th player to a baseball team. You replace the player that’s there with a different player. Isn’t that what replacement is all about? COUNSEL FOR PETITIONER: Your Honor, in that context, it absolutely is. Because there’s no other way to understand that. You know, but we’re not talking about baseball or people here obviously. Hearing Tr. 18:23–19:3 (emphasis added).” slip op. at 15

    Claim construction
    Patents in suitUS 11,349,953
Page 1 of 10
← Previous12345…Next →

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.