  • PTAB · Feb 6, 2026 · IPR2025-00988 · APJ Terrence W Mcmillin · IPR · Institution

    The Board instituted IPR on claims 1–14 and all petition grounds; it found a reasonable likelihood of success on the Josiam-based grounds, while the Bharadwaj grounds lacked established prior-art status.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “review. 35 U.S.C. § 314 (2018); 37 C.F.R. § 42.4(a) (2020) (“The Board institutes the trial on behalf of the Director.”). The standard for institution is set forth in 35 U.S.C. § 314(a), which provides that inter partes review may not be instituted unless “there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” After considering the Petition and the Preliminary Response, as well as the evidence of record, we institute an inter partes review as to claims 1–14 of the ’281 patent.3” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Determining the level of ordinary skill in the art involves various factors, including the “type of problems encountered in the art; prior art solutions to those problems; rapidity with which innovations are made; sophistication of the technology; and educational level of active workers in the field.” In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995) (citation omitted). The prior art of record also reflects the level of ordinary skill in the art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001). For purposes of this institution decision, we adopt the assessment offered by Petitioner.11 It is not materially disputed by the Patent Owner and is consistent with the ’281 patent and the asserted prior art.” slip op. at 10

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “Petitioner asserts “that no formal claim constructions are necessary.” Pet. 3. “Patent Owner applies the plain and ordinary meaning of the challenged claims.” Prelim. Resp 11. At this stage, no need exists to expressly construe any claim terms to resolve any dispute between the parties.12 See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))). D.” slip op. at 11

    • Novelty / Anticipation (§102) › Priority / effective filing date / continuation supportPriority date, deniedReference is prior artDecided for petitioner

      “contention that either of the cited documents alone discloses all the elements of these limitations. And, the disclosure relied on in Exhibit 1007 is not alleged to be found in Exhibit 1009 and vice-versa. Patent Owner has not shown that any of the pre-May 14, 2016, Korean applications from which the ’281 claims priority includes disclosure of all the elements recited in limitations 1.9 and 8.6. At least at this stage, we determine that Petitioner has sufficiently shown, for the purpose of institution that Josiam is prior art.16 We credit the testimony of Dr. Buehrer cited in the Petition that none of the Korean applications to which the ’281 patent claims priority filed earlier than May 14, 2016, “explicitly, implicitly, or inherently discloses using both the bandwidth field of the HE-SIG-A and the resource unit allocation field of the HE-SIG-B to indicate channel puncturing information as the claim elements require. . . . At best, these documents discuss indicating unused channels using either HE-SIG-A or HE-SIGB fields—but not both.” Pet. 7 (citing Ex. 1003 (Buehrer Decl.) ¶¶ 90–91). Dr. Buehrer’s testimony has not been shown by Patent Owner to be inaccurate.” slip op. at 20

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR
    Patents in suitUS 10,687,281
  • PTAB · Dec 10, 2025 · IPR2025-01069 · APJ Daniel J Galligan · IPR · Institution

    The Board instituted IPR on claims 1–14 and all asserted grounds, finding a reasonable likelihood of prevailing based on Bharadwaj alone and Bharadwaj with Yu.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “institute review. Paper 11. The standard for instituting an inter partes review is set forth in 35 U.S.C. § 314(a), which provides that an inter partes review may not be instituted unless the information presented in the Petition and the Preliminary Response shows “there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” For the reasons explained below, we institute an inter partes review of all challenged claims on all grounds raised in the Petition.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “To the extent Patent Owner contends that a person of ordinary skill in the art need not be defined as of the critical date, we disagree. Under Section 103, we must determine “if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains” (emphasis added). “Obviousness is determined from the vantage point of a hypothetical person having ordinary skill in the art to which the patent pertains.” In re Rouffet, 149 F.3d 1350, 1357 (Fed. Cir. 1998). Thus, we define the hypothetical person of ordinary skill in the art as of a time before the effective filing date. To the extent Patent Owner’s argument is that, to testify from the perspective of a person of ordinary skill in the art, one need not have been a person of ordinary skill in the art as of the critical date, we agree. Although one must at least possess ordinary skill in the art to testify from the perspective of a person of ordinary skill, [a]n expert need not have acquired that skill level prior to the time of the invention to be able to testify from the vantage point of a person of ordinary skill in the art. Rather, an expert can acquire the necessary skill level later and develop an understanding of what a person of ordinary skill knew at the time of the invention. Osseo Imaging, LLC v. Planmeca USA Inc., 116 F.4th 1335, 1341 (Fed. Cir. 2024). the uncontested assessment offered by Petitioner, which appears consistent with the ’077 patent and the asserted prior art, except that we delete the qualifier “at least” to eliminate vagueness as to the amount of experience.” slip op. at 6

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “C. Claim Construction The parties agree that no claim terms require express construction. Pet. 10; Prelim. Resp. 2–4. Patent Owner, however, notes that, in related district court litigation, Petitioner has asserted that some claims terms are indefinite. Patent Owner argues that the Petition should be denied because Petitioner has taken inconsistent claim construction positions between the district court and the Board. Paper 14 at 1–3 (citing Tesla, Inc. v. Intellectual Ventures II LLC, IPR2025-00340, Paper 18 at 4 (PTAB Nov. 5, 2025) (informative); Revvo Techs., Inc. v. Cerebrum Sensor Techs., Inc., IPR2025-00632, Paper 20 at 4–5 (PTAB Nov. 3, 2025) (precedential)). Petitioner responds that, in the related district court litigation, the parties have narrowed the claim construction disputes and that Petitioner accords the plain and ordinary meaning to claim terms and no longer asserts that any claim term of the ’077 patent is indefinite. Paper 15 (citing, inter alia, Ex. 1126 (Defendants’ Responsive Claim Construction Brief)). The evidence supports Petitioner’s position because, in the related district court litigation, the defendants agree with the plaintiff (Patent Owner) that certain phrases in the ’077 patent claims should be given their “[p]lain and ordinary meaning” and are “not indefinite.” Ex. 1126, 6 (native page 1). Thus, the record does not show inconsistent claim construction positions that warrant denial under PTAB precedent. See Revvo, Paper 20 at 5 (addressing a situation in which a petitioner advances “different claim construction positions” in district court and at the PTAB). See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 7

    • Novelty / Anticipation (§102) › Prior-art status of a reference › Patents / published applications (effective date, provisional support)Reference is prior artDecided for petitioner

      “We agree with Patent Owner that Bharadwaj includes subject matter that is not in Bharadwaj-Prov59, namely the change from adding the value Resp. 20; Ex. 1007 ¶ 51 (adding m); Ex. 1006 ¶ 50 (subtracting m); Prelim. Resp. 20. Petitioner, however, points out this change in the Petition and acknowledges that it is after the identified critical date of August 20, 2015. See Pet. 28. Thus, we do not understand Petitioner to be relying on Bharadwaj’s disclosure of subtracting m to determine length, as disclosed in the publication of the non-provisional application, as a prior art disclosure. We understand Petitioner to be relying on disclosures in Bharadwaj-Prov059 for prior art teachings for its obviousness contentions. Patent Owner does not appear to dispute that Bharadwaj-Prov59’s disclosures are prior art, arguing instead that it is improper to rely “on matters in Bharadwaj beyond ‘incorporation by reference’ of the Bharadwaj-Prov59.” See Prelim. Resp. 20–21. On this record, we determine that Bharadwaj-Prov59’s disclosures are prior art as of its June 2, 2015, filing date by virtue of its incorporation by reference into Bharadwaj, a published US patent application. Ex. 1006 ¶ 1; see Pet. 12–13.” slip op. at 8

    Claim construction§ 102 anticipation§ 103 obviousnesscites KSR · Graham
    Patents in suitUS 10,313,077
  • PTAB · Nov 7, 2025 · IPR2025-00988 · APJ Terrence W Mcmillin · IPR · Institution

    The Board denied institution of IPR on claims 1–14 because Samsung took alternative claim-construction positions in the Board and district court without explaining why.

    RulingsInstitution decision
    • Other 314aInstitution denied discretionary otherInstitution denied

      “decision in Revvo Technologies, Inc. v. Cerebrum Sensor Technologies, Inc., IPR2025-00632, Paper 20 (Nov. 3, 2025 (“Revvo”)).12 Revvo provides that “when a petitioner takes alternative positions [on claim construction] before the Board and a district court, that petitioner should, at a minimum, explain why alternative positions are warranted.” Revvo at 3–4. On November 5, 2025, the Director of the Office issued an informative decision in Tesla, Inc. v. Intellectual Ventures II LLC, IPR2025- 00340, Paper 18 (Nov. 5, 2025) (“Tesla”)). Tesla provides that: “Allowing a petitioner to advance a claim construction before the Board when that petitioner has made inconsistent indefiniteness arguments in district court fails to further, but instead detracts from, the Office’s goal of ‘providing greater predictability and certainty in the patent system.’” Id. at 4 (citing Revvo at 4–5). Tesla further provides that when a petitioner raises inconsistent invalidity challenges in two forums, “that petitioner is required to explain why those different positions are warranted.” Id. at 3 (citing Revvo at 3–5). In this proceeding, Petitioner takes alternative positions on claim construction before the Board and a district court, but fails to explain why alternative positions are warranted. Therefore, in accordance with Revvo and Tesla, we deny institution.” slip op. at 6

    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied

      “CONCLUSION For the foregoing reason, we determine that trial should not be instituted on claims 1–14 of the ’281 patent. ORDER Upon consideration of the record before us, it is ORDERED that an inter partes review is not instituted.” slip op. at 7

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)Not reached

      “In the Petition, “Petitioner submits that no formal claim constructions are necessary.” Pet. 3. Petitioner does not discuss its position on claim construction in district court nor why alternative positions before the Board and the district court are warranted. See id.” slip op. at 7

    Claim constructionDiscretionary denial
    Patents in suitUS 10,687,281
  • PTAB · Nov 3, 2025 · IPR2025-00934 · APJ Terrence W Mcmillin · IPR · Institution

    The Board instituted IPR on claims 1–9 and all asserted grounds, finding a reasonable likelihood that claims 1–9 are obvious over Bharadwaj and Sun.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “institute review. Paper 11. The standard for institution is set forth in 35 U.S.C. § 314(a), which provides that inter partes review may not be instituted unless “there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” After considering the Petition and the Preliminary Response, as well as the evidence of record, we institute an inter partes review as to claims 1–9 of the ’210 patent.” slip op. at 2

    • Novelty / Anticipation (§102) › Prior-art status of a reference › Printed publication / public accessibilityPrinted publication establishedNot reached

      “We are aware, however, that we must not confuse access with accessibility. See Samsung Elecs. Co. v. Infobridge Pte. Ltd., 929 F.3d 1363, 1374 (Fed. Cir. 2019) (“[A] petitioner need not establish that specific persons actually accessed or received a work to show that the work was publicly accessible.”). Dr. Hansen notes that the cover of 802.11ax_D1.0 grants permission to reproduce the document to others for consideration. Ex. 1026 ¶ 72; see Ex. 1004, 1 (“Permission is hereby granted for IEEE Standards Committee participants to reproduce this document for purposes of international standardization consideration.”). Dr. Hansen also testifies that meetings to discuss 802.11ax_D1.0 were open to the public. Ex. 1026 ¶ 58 (citing Appendix J to declaration). Thus, it appears, on the current record, that the purpose of 802.11ax_D1.0 was to promote dialogue with interested artisans, which indicates public accessibility. See Valve Corp. v. Ironburg Inventions Ltd., 8 F.4th 1364, 1374 (Fed. Cir. 2021) (“We have previously held that where a publication’s purpose is ‘dialogue with the intended audience,’ that purpose indicates public accessibility.” (citation omitted)). After having reviewed all the arguments and evidence presented by the parties, we would like to see further development of this issue during trial. The current record is not well-developed on this issue either factually or legally. With regard to the factual record, Patent Owner has not yet had the opportunity to depose Dr. Hansen or been given a full opportunity to marshal its own evidence on this issue. With regard to the law, we would like to see the parties apply the relevant case law to the developed facts as to the public accessibility and prior art status of 802.11ax_D1.0. We will determine, if necessary and appropriate, whether 802.11ax_D1.0 is prior art to the challenged claims of the ’210 patent based on the full record as developed during trial.” slip op. at 14

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundDecided for petitioner

      “As an initial matter, Bharadwaj and Sun are both analogous art to the ’210 Patent in that that they are both concerned with the design of the PHY data unit for supporting MU-MIMO transmissions in the downlink. SAMSUNG-1003, ¶¶153- 158. . . . In addition, both Bharadwaj and Sun describe MU- MIMO downlink PHY data unit structures in the context of 802.11ax. SAMSUNG-1013, ¶[0064]; SAMSUNG-1015, ¶[0031]; SAMSUNG-1003, ¶¶153-158. . . . . [A] POSITA implementing Bharadwaj’s preamble designs would have been motivated to look to another reference, like Sun, for an understanding of the format of the user field that would support non-MU-MIMO allocations and the single-user transmission scenario. A POSITA would have combined the teachings of Bharadwaj with Sun to realize implementation details for the HE-SIG-A and HE-SIG-B fields of the HE MU PPDU to better support both MU-MIMO and non-MU-MIMO allocations. SAMSUNG-1003, ¶¶153-158. . . . . A POSITA would have found it obvious to look to Sun for modifying Bharadwaj to include the user field format for SU (non-MU-MIMO) allocation to complement Bharadwaj’s disclosure of the MU-MIMO user field format and to provide a more complete system that would allow HE MU PPDUs to support both MU-MIMO allocations for multiple users and non-MU-MIMO allocations for a single user. SAMSUNG- 1003, ¶¶153-158. The combination also would have been obvious and predictable for at least the following reasons: 1) both Bharadwaj and Sun describe designs for a PHY data unit (or PPDU) to support communications between an AP and a station within a high-efficiency Wi-Fi network, consistent with 802.11ax; 2) both Bharadwaj and Sun describe the PPDU design for supporting MU-MIMO downlink transmission as including HE- SIG-A and HE-SIG-B fields; and 3) Bharadwaj already describes the format for the user field for the MU-MIMO allocation, while also recognizing the single-user scenario, and the combination merely involves the addition to Bharadwaj of the user field format for the single-user allocation, as taught by Sun. SAMSUNG-1003, ¶¶153- 158. The combination is obvious also because elements of the combined system would each perform similar functions they had been known to perform in similar contexts outside the combination. SAMSUNG-1003, ¶¶153-158. . . . . A POSITA would have reasonably expected success implementing the combination, especially considering the substantially similar 802.11ax techniques described in each reference. SAMSUNG-1003, ¶¶153-158. Additionally, combining the teachings of Bharadwaj with Sun would have merely involved combining prior art elements according to known methods to yield predictable results. SAMSUNG-1003, ¶¶153-158.” slip op. at 31

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededDecided for petitioner

      “Petitioner asserts that “no formal claim constructions are necessary.” Pet. 2. Patent Owner notes that “both parties have submitted terms for construction in the district court for this Patent” (Prelim. Resp. 6), but that “for purposes of [the] Preliminary Response, Patent Owner applies the plain and ordinary meaning of the challenged claims” (id. at 8). Accordingly, at this stage, no need exists to expressly construe any claim terms to resolve the parties’ disputes.9 See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 9

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,159,210
  • PTAB · Oct 31, 2025 · IPR2024-00777 · APJ Jameson Lee · IPR · Final written decision

    Claims 16–27 were not shown unpatentable because Petitioner failed to account for limitations 16[b] and 16[i] and their counterparts across the asserted obviousness grounds.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Patent Owner proposes that a person of ordinary skill in the art “would have a Bachelor of Science degree in Electrical Engineering, Computer Engineering, Computer Science, Human Computer Interaction, or a related technical field, with at least one year of experience working in the field of user interfaces and/or content management.” PO Resp. 11 (citing Ex. 2040 ¶ 53). The Decision on Institution adopted Petitioner’s proposed level of ordinary skill in the art. Inst. Dec. 10. We find Patent Owner’s stated level to be less precise than that proposed by Petitioner in that the modifier “at least” used by Patent owner imposes no upper bound on the amount of experience possessed by one of ordinary skill in the art. Also, Patent Owner states: “The difference between the Board’s definition and Patent Owner’s (EX2040. ¶53) does not change the arguments set forth herein.” PO Resp. 11. Thus, we continue to adopt Petitioner’s stated level of ordinary skill in the art.4 4 All of our findings and conclusions would still be the same, however, had we applied Patent Owner’s articulation of the level of ordinary skill in the art.” slip op. at 8

    • Prior constructionPrior construction adoptedDecided for patent owner

      “In its Reply, Petitioner does not assert that the district court’s construction is incorrect. We agree with Patent Owner that the district court’s construction is better than Petitioner’s proposed construction, because for reasons indicated by Patent Owner, which are not disputed by Petitioner, settings in the computer, e.g., dedicated folders for each user are the user profiles, rather than simply data alone of any kind. Further, when asked about the appropriateness of the district court’s construction, counsel for Petitioner expressed that Petitioner has no objection to the Board’s adopting the district court’s construction for “user profile”: JUDGE LEE: So, you’d be fine with just going with the District Court’s construction? MR. HEINTZ: Yes, Your Honor. Tr. 15:22–24. For the foregoing reasons, we adopt the district court’s construction for “user profile,” i.e., “a collection of settings and information associated with a user.”” slip op. at 13

    • BurdenNot shown unpatentable

      “PO Resp. 30–31 (Figure 26 omitted). In its Reply, Petitioner still does not provide an articulated reason for placing user profile selection buttons, labeled with user names, within Horn’s panes 2601 or 2602. Reply 12–14. Although Horn does describe personalized profile, Petitioner points to no disclosure of Horn as to how a user would have selected his or her own profile from among a plurality of user profiles. Petitioner presents no reason for placing these user profile selection buttons, labeled with user names, gleaned from or suggested by Baumgartner, within either pane 2601 or pane 2602 in Horn’s workspace view. Further, pane 2602 contains “a list of all collections defined by MFS and the user,” and pane 2601 lists the source examined by the user to create his or her collections. Ex. 1005, 19:41–46. That disclosure suggests the contents of panes 2601 and 2602 are tied to one particular user. No rational basis is articulated by Petitioner to place user profile selection buttons within these panes which appear to be in the profile space of one user. For the foregoing reasons, Petitioner has not adequately accounted for limitation 16[b].” slip op. at 22

    • Disclosure Requirements (§112) › Written description (Ariad)Not entitled to earlier dateDecided for petitioner

      “The test for sufficiency of a written description under 35 U.S.C. § 112 is whether the earlier application’s disclosure “reasonably conveys to those skilled in the art that the inventor had possession of the claimed subject matter as of the filing date.” Ariad Pharms., Inc. v. Eli Lilly & Co., 598 F.3d 1336, 1351 (Fed. Cir. 2010) (en banc). The specification must “clearly allow persons of ordinary skill in the art to recognize that [the inventor] invented what is claimed.” Id. The Court of Appeals for the Federal Circuit has explained: One shows that one is “in possession” of the invention by describing the invention, with all its claimed limitations, not that which makes it obvious. Id. (“[T]he applicant must also convey to those skilled in the art that, as of the filing date sought, he or she was in possession of the invention. The invention is, for purposes of the ‘written description’ inquiry, whatever is now claimed.”) (emphasis in original). One does that by such descriptive means as words, structures, figures, diagrams, formulas, etc., that fully set forth the claimed invention. Although the exact terms need not be used in haec verba, see Eiselstein v. Frank, 52 F.3d 1035, 1038, 34 USPQ2d 1467, 1470 (Fed.Cir.1995) (“[T]he prior application need not describe the claimed subject matter in exactly the same terms as used in the claims. . . .”), the specification must contain an equivalent description of the claimed subject matter. A description which renders obvious the invention for which an earlier filing date is sought is not sufficient. Lockwood v. American Airlines, Inc., 107 F.3d 1565 (Fed. Cir. 1997).” slip op. at 31

    Patent outcomesUS 11,017,815 not shown unpatentable
    Claim construction§ 103 obviousness§ 112 disclosurecites Phillips · KSR · Graham
    Patents in suitUS 11,017,815
  • Tanklogix, LLC v. SiteproInstitution denied
    PTAB · Oct 10, 2025 · IPR2025-00650 · APJ Sheila F Mcshane · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 18–32 and 34 were unpatentable over Kahn or Kahn and Gutierrez.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). Upon consideration of the Petition, the Preliminary Response, and the evidence of record, we determine that Petitioner has not established a reasonable likelihood of prevailing with respect to the unpatentability of at least one claim of the ’871 patent. Accordingly, for the reasons that follow, we decline to institute an inter partes review of claims 18–32 and 34 of the ’871 patent.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The respective proposed levels of qualifications for a person of ordinary skill in the art are similar, with Patent Owner proposing two years of experience compared to Petitioner proposing significant experience with remotely controlling fluid-handling devices, like SCADA systems. Patent Owner also proposes more extensive experience in lieu of educational experience. While we find Petitioner’s proposed qualifications to be acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of skill necessary to understand and implement the teachings of the ’871 patent and the asserted prior art. Our analysis and findings herein, however, do not turn on any differences in the qualifications adopted.” slip op. at 8

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “We determine that we need not expressly construe any claim terms to resolve the parties’ disputes on the current record. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 10

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “actuators and the remote control of fluid handling devices, including the receipt with the user-interface module of “a user command to actuate an actuator via a presented control interface” (limitation [18.7]) and “account authorized to send commands to remotely control fluid handling devices” (limitation [18.11]). We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses or teaches these limitations because the evidence does not provide support that there is remote control of fluid handling devices or the use of a user command on a control interface to send a command to a fluid handling device, for instance. Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but we do not discern that it teaches or discloses the capability to remotely control fluid handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, the Kahn disclosures that Petitioner repeatedly relies upon for allegedly teaching this control are deficient. See Ex. 1005, 10:62–67, 14:35– 15:2, 15:62–16:32; see also Pet. 12–14, 16–18. Kahn discloses that “the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance.” Ex. 1005, 10:62–67. Communication unit 112B is part of the local “sensor unit,” wherein the detection conditions determined by the sensor are communicated to remote devices by communication unit 112B. See id. at 3:31–33, 5:62–6:2, 6:27–35, 7:33–37, 13:7–12, Figs. 1A–1C. Kahn discloses that the sensor units, which include communication units 112B, can be located near shut-off valves and can communicate with distant locations. See id. at 11:1–13. There are no disclosures, however, in the above passages that there is remote control of fluid handling devices, that there is a user command on a control interface that actuates an actuator, or that there is a command sent to the facility actuators via a network connection, as required in limitations [18.5]–[18.7] and [18.9]–[18.12], respectively. Rather, the disclosure indicates that the communication unit 112B includes on-site alerts and that the local (non-remote) communication unit 112B can be interfaced with the control valve.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 10,488,871
  • PTAB · Jul 14, 2025 · IPR2024-00465 · APJ Bart A Gerstenblith · IPR · Final written decision

    Claims 1–24 are unpatentable: claims 1–10 and 12–24 as obvious over Szrek and Llach, and claim 11 as obvious over Szrek, Llach, and Gilmore.

    RulingsFinal written decision
    • Skill levelSkill level board ownDecided for petitioner

      “B. Level of Ordinary Skill in the Art Petitioner proposes that the level of ordinary skill in the art is an artisan with a working knowledge of POS activation systems and lottery systems that was gained through a mixture of training and work experience in the relevant field such as (i) having a Bachelor’s degree in computer science, computer communications, electrical engineering, or equivalent degree, coupled with at least three years of work experience; (ii) having a Master’s degree in computer science, computer communications, or electrical engineering, but having less work experience; or (iii) having no formal degree, but having experience in the relevant field of at least six years of work experience. Pet. 2–3 (citing Ex. 1003 ¶¶ 13–14).9 Patent Owner states that, “[f]or the purpose of this proceeding, Patent Owner adopts the Petition’s proposed definition of the level of ordinary skill in the art.” PO Resp. 19 (citing Pet. 2–3). We find that the parties’ agreed-upon level of ordinary skill in the art is consistent with the level of ordinary skill in the art reflected by the ’451 patent and the prior art of record. See Inst. Dec. 14; see Okajima v. 9 Petitioner proposes the same level of ordinary skill in the art that the Board adopted in PGR2020-00084 (Pet. 2–3 (citing Ex. 1008, 11)), and IPR2023- 01235 (see IPR2023-01235, Paper 34 at 12–13). Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Therefore, we adopt the parties’ agreed-upon level of ordinary skill in the art, as articulated above, in our consideration of the issues presently before us.” slip op. at 13

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “We need not construe “transaction processor” expressly because its meaning is not in dispute and its construction is not necessary to resolve the controversy before us.” slip op. at 16

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundDecided for petitioner

      “On balance, we find that even with the alleged disadvantages identified by Patent Owner, one of ordinary skill in the art would have been motivated to modify Szrek with Llach’s third-party transaction processor because the advantage of having a “centralized intermediary” allows Szrek’s system to support different game providers, such as different lottery companies, which would reduce some implementation costs and allow the system to be more easily and cheaply extended. Pet. 47 (citing Ex. 1003 ¶ 181); see Medichem, S.A. v. Rolabo, S.L., 437 F.3d 1157, 1165 (Fed. Cir. 2006) (“a given course of action often has simultaneous advantages and disadvantages, and this does not necessarily obviate motivation to combine”) (citing Winner Int’l Royalty Corp. v. Wang, 202 F.3d 1340, 1349 n.8 (Fed. Cir. 2000)); see also Intel Corp. v. Qualcomm Inc., 21 F.4th 784, 795 (Fed. Cir. 2021) (stating the same). We acknowledge that the combination comes with some disadvantages, including “add[ed] delay, reduce[d] efficiency, and . . . implementation complexities by converting a simple, direct communication exchange into an exchange that traverses multiple systems.” PO Resp. 52 (citing Ex. 2052 ¶ 163). But, “[t]he fact that the motivating benefit comes at the expense of another benefit, however, should not nullify its use as a basis to modify the disclosure of one reference with the teachings of another. Instead, the benefits, both lost and gained, should be weighed against one another.” Winner, 202 F.3d at 1349 n.8. Here, Szrek expressly teaches indirect communication as a possible implementation of its system and Petitioner’s combination—employing Llach’s third-party transaction processor as part of the indirect communication channel—offers the attractive benefit of allowing Szrek’s system to support different game providers, which would reduce some implementation costs even if it might increase other costs, e.g., by having to program certain components (e.g., the cash registers) differently. Specifically, we find that the ability to expand Szrek’s system to support different game providers provides advantages that outweigh the disadvantages discussed above in the circumstance where one desires a more robust and comprehensive system. See Pet. Reply 23 (noting three advantages of the combination— (1) “allow[ing] Szrek’s system to use ‘a centralized system for activating lottery tickets from different retailers and different locations,’” (2) “allow[ing] support for different game providers, such as different lottery companies,” “reduc[ing] implementation costs,” and (3) “allow[ing] Szrek’s system to ‘communicate with individual card” slip op. at 37

    • Obviousness (§103) › Motivation to combine / reasonable expectation of success › HindsightMotivation foundDecided for petitioner

      “On balance, we find that even with the alleged disadvantages identified by Patent Owner, one of ordinary skill in the art would have been motivated to modify Szrek with Llach’s third-party transaction processor because the advantage of having a “centralized intermediary” allows Szrek’s system to support different game providers, such as different lottery companies, which would reduce some implementation costs and allow the system to be more easily and cheaply extended. Pet. 47 (citing Ex. 1003 ¶ 181); see Medichem, S.A. v. Rolabo, S.L., 437 F.3d 1157, 1165 (Fed. Cir. 2006) (“a given course of action often has simultaneous advantages and disadvantages, and this does not necessarily obviate motivation to combine”) (citing Winner Int’l Royalty Corp. v. Wang, 202 F.3d 1340, 1349 n.8 (Fed. Cir. 2000)); see also Intel Corp. v. Qualcomm Inc., 21 F.4th 784, 795 (Fed. Cir. 2021) (stating the same). We acknowledge that the combination comes with some disadvantages, including “add[ed] delay, reduce[d] efficiency, and . . . implementation complexities by converting a simple, direct communication exchange into an exchange that traverses multiple systems.” PO Resp. 52 (citing Ex. 2052 ¶ 163). But, “[t]he fact that the motivating benefit comes at the expense of another benefit, however, should not nullify its use as a basis to modify the disclosure of one reference with the teachings of another. Instead, the benefits, both lost and gained, should be weighed against one another.” Winner, 202 F.3d at 1349 n.8. Here, Szrek expressly teaches indirect communication as a possible implementation of its system and Petitioner’s combination—employing Llach’s third-party transaction processor as part of the indirect communication channel—offers the attractive benefit of allowing Szrek’s system to support different game providers, which would reduce some implementation costs even if it might increase other costs, e.g., by having to program certain components (e.g., the cash registers) differently. Specifically, we find that the ability to expand Szrek’s system to support different game providers provides advantages that outweigh the disadvantages discussed above in the circumstance where one desires a more robust and comprehensive system. See Pet. Reply 23 (noting three advantages of the combination— (1) “allow[ing] Szrek’s system to use ‘a centralized system for activating lottery tickets from different retailers and different locations,’” (2) “allow[ing] support for different game providers, such as different lottery companies,” “reduc[ing] implementation costs,” and (3) “allow[ing] Szrek’s system to ‘communicate with individual card” slip op. at 37

    Patent outcomesUS 11,488,451 unpatentable
    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,488,451
  • PTAB · May 28, 2025 · IPR2025-00301 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution of review for claims 1–11, 16, and 21 under § 314(a), finding the Fintiv factors favored discretionary denial, and denied joinder.

    RulingsInstitution decision
    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Institution denied fintivInstitution denied

      “2026. This date is nearly five months prior to the date on which the final written decision would be due if trial were instituted in this proceeding. And, even if we assume Petitioner’s alleged February–March 2026 trial date, this date too is several months prior to the projected final written decision deadline. As such, it is unlikely that a final written decision in this proceeding would issue before trial in the district court, unless the trial was delayed or rescheduled for a later time. Thus, we find this factor weighs in favor of exercising our discretion to deny institution. See ARM Ltd. v. Daedalus Prime LLC, IPR2025-00207, Paper 10 at 2 (May 16, 2025) (Before the Office of the Under Secretary of Commerce for Intellectual Property and Director of the United States Patent and Trademark Office) (exercising discretion to deny institution with the same relative timing between district court trial and final written decision deadline).” slip op. at 13

    • PTAB / AIA Trials › Motions to amend / substitute claimsNot reached
    • PTAB / AIA Trials › Joinder §315(c) / SAS all-or-nothingJoinder, deniedDenied
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied discretionary otherInstitution denied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). Institution of inter partes review, however, is discretionary. See Harmonic Inc. v. Avid Tech., Inc., 815 F.3d 1356, 1367 (Fed. Cir. 2016) (“[T]he PTO is permitted, but never compelled, to institute an IPR proceeding.”). For the reasons discussed below, we exercise discretion pursuant to 35 U.S.C. § 314(a) not to institute inter partes review. Additionally, for the same reasons and because institution was denied in IPR2024-01248, we deny Petitioner’s Motion for Joinder. See 35 U.S.C. § 315(c) (“[T]he Director . . . may join as a party . . . any person who properly files a petition under section 311 that the Director . . . determines warrants the institution of an inter partes review under section 314.”).” slip op. at 3

    Discretionary denial
    Patents in suitUS 9,814,071
  • PTAB · May 20, 2025 · IPR2025-00135 · APJ John A Hudalla · IPR · Institution

    The Board denied institution of IPR on all challenged claims, exercising § 314(a) discretion under Fintiv because the parallel litigation was advanced and trial would precede a final written decision.

    RulingsInstitution decision
    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Institution denied fintivInstitution denied

      “Under the latest applicable guidance, Petitioner’s Sotera stipulation “is highly relevant, but [is] not . . . dispositive by itself.” CAPJ Memo at 2– 3. Accordingly, we consider Petitioner’s stipulation “as part of [our] holistic analysis under Fintiv.” Id. at 2. In theory, Petitioner’s stipulation could “mitigate[] any concerns of duplicative efforts between the district court and the Board, as well as concerns of potentially conflicting decisions” regarding unpatentability/ invalidity. Sotera, Paper 12 at 19. We note that Petitioner’s initial invalidity contentions included the two asserted references here, Bennett and Nashida. Although Petitioner served those contentions before the filing of the instant Petition—in which it proffered its stipulation—we cannot discern from the instant record whether Petitioner’s present invalidity positions in the underlying litigation incorporate any aspects of its grounds here based on Bennett and Nashida. Still, we view Petitioner’s stipulation as significantly mitigating potential conflict given the likelihood that the court would hold Petitioner (and its privies) to Petitioner’s representations made here.5” slip op. at 18

    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied discretionary otherInstitution denied

      “review. See 35 U.S.C. § 314 (2018); 37 C.F.R. § 42.4(a) (2022). Under 35 U.S.C. § 314(a), we may not authorize an inter partes review unless the information in the petition and the preliminary response “shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” The Board, however, has discretion to deny a petition even when a petitioner meets that threshold. Id.; see, e.g., Cuozzo Speed Techs., LLC v. Lee, 136 S. Ct. 2131, 2140 (2016) (“[T]he agency’s decision to deny a petition is a matter committed to the Patent Office’s discretion.”); NHK Spring Co. v. Intri-Plex Techs., Inc., IPR2018-00752, Paper 8 (PTAB Sept. 12, 2018) (precedential) (“NHK”). For the reasons that follow, we exercise our discretion under 35 U.S.C. § 314(a) to deny institution of inter partes review.” slip op. at 2

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successNot reached

      “controller” that “receive[s] an identifier for identifying a second video content from [an] external mobile terminal” and “acquire[s] the second video content via the internet using said identifier.” Ex. 1001, 20:29–31, 20:46–47, 20:52–55 (alterations and emphasis added). In the Bennett obviousness ground, Petitioner cites Bennett’s control signal that directs display of a video stream on a television screen for teaching the recited “identifier.” Pet. 32 (citing Ex. 1004 ¶ 32). Petitioner further cites Bennett’s teaching of an Internet server as a media source for teaching the “acquire[s]” limitation. Id. at 34 (citing Ex. 1004 ¶ 55). Petitioner alternatively cites its declarant’s testimony and contends that it would have been obvious “to use an identifier such as URL in Bennett’s system to retrieve video content from the Internet.” Id. at 35 (citing Ex. 1003 ¶ 87). Yet Patent Owner’s arguments (see Prelim. Resp. 59–64) call into question whether Bennett teaches or suggests the use of either Bennett’s control signal or a URL to “acquire the second video content via the internet.” In addition, we preliminarily agree with Patent Owner that Petitioner’s arguments regarding the URL “focus on justifying an example of what an identifier could be, and fail[] to address a scenario that would justify the receipt of a URL from a phone/remote” in Bennett’s system. Id. at 63. Petitioner’s further contentions for these limitations in the Bennett– Nashida obviousness ground (see Pet. 73–75) do not necessarily cure the deficiencies mentioned by Patent Owner. Petitioner contends that “Nashida discloses the use of identifiers, such as URLs, for retrieving internet content” and cites Nashida’s teaching of “‘controller 1010 transmit[ting] a command of requesting a transmission of a URL’ for retrieving and displaying web content on a display apparatus.” Id. at 73 (quoting Ex. 1005 ¶ 120). Yet, according to Patent Owner, Nashida appears to show the URL moving in the opposite direction of Petitioner’s intended mapping: “It is therefore the image display apparatus (the alleged ‘display apparatus’) that sends the URL to the remote controller . . . , and not the other way around, as claimed by Petitioner.” Prelim. Resp. 67 (citing Ex. 1005 ¶ 1216). At the very least, these issues preclude a finding of “particularly” slip op. at 20

    § 103 obviousnessDiscretionary denial
    Patents in suitUS 10,219,020
  • PTAB · May 20, 2025 · IPR2025-00134 · APJ Jason W Melvin · IPR · Institution

    The Board denied institution of IPR challenging claims 1–11, 13, and 15–20, finding that the advanced Texas litigation and trial timing outweighed the Petition’s Sotera stipulation.

    RulingsInstitution decision
    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Institution denied fintivInstitution denied

      “September 22, 2025, which is less than four months after the statutory deadline for this Decision and “almost eight months before the projected statutory deadline for a final written decision.” Prelim. Resp. 25 (citing Ex. 2004). Accordingly, the trial is currently set to occur several months before any Final Written Decision in this case will issue. Although trial delays are a possibility, there is no evidence before us that would indicate the likelihood of a trial postponement. Thus, this factor strongly favors discretionary denial.” slip op. at 6

    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied fintivInstitution denied

      “transmits, over the USB cable, a first signal to the digital camera for causing the digital camera to output compressed first image information.” Petitioner addresses that requirement by asserting Lawther’s interface circuit “can also be adapted to enable exchange data with a connected external device.” Pet. 39 (quoting Ex. 1004 ¶ 50). Although Lawther may “exchange data,” supporting that signals may be sent to a connected camera, Petitioner does not establish that such a signal would have been used as claimed. It may be that such a signal is inherently present in the interactions Lawther describes, but Petitioner does not assert or establish so, only that Lawther has the capability to “exchange data” with a connected camera. Because of this potential weakness in Petitioner’s showing, we cannot conclude that the Petition presents a particularly strong challenge.” slip op. at 9

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successNot reached

      “the Petition does not present a particularly strong challenge, because it inadequately addresses at least one claim limitation. In particular, limitation [1F] requires “USB interface circuitry [that] transmits, over the USB cable, a first signal to the digital camera for causing the digital camera to output compressed first image information.” Petitioner addresses that requirement by asserting Lawther’s interface circuit “can also be adapted to enable exchange data with a connected external device.” Pet. 39 (quoting Ex. 1004 ¶ 50). Although Lawther may “exchange data,” supporting that signals may be sent to a connected camera, Petitioner does not establish that such a signal would have been used as claimed. It may be that such a signal is inherently present in the interactions Lawther describes, but Petitioner does not assert or establish so, only that Lawther has the capability to “exchange data” with a connected camera. Because of this potential weakness in Petitioner’s showing, we cannot conclude that the Petition presents a particularly strong challenge.” slip op. at 9

    § 103 obviousnessDiscretionary denial
    Patents in suitUS 10,650,780
Page 1 of 16
← Previous12345…Next →

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.