PTAB
Advanced fields
171 decisions · 427msnewest first
  • PTAB · Feb 9, 2026 · IPR2025-00933 · APJ Terrence W Mcmillin · IPR · Institution

    The Board instituted inter partes review of claims 1–12 on all three §103 grounds, finding a reasonable likelihood that Samsung would prevail.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “The standard for institution is set forth in 35 U.S.C. § 314(a), which provides that inter partes review may not be instituted unless “there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” After considering the Petition and the Preliminary Response, as well as the evidence of record, we institute an inter partes review as to claims 1–12 of the ’595 patent.3” slip op. at 2

    • Skill levelSkill level petitioner adoptedOther

      “B. Level of Ordinary Skill in the Art Petitioner contends that [A] person of ordinary skill in the art (“POSITA”) would have had a Bachelor’s degree in electrical engineering, computer engineering, computer science, or a related field, and at least 3 years of experience in the research, design or development of wireless communication devices, systems, and/or networks, or the equivalent. Pet. 3 (citing Ex. 1003 ¶ 26). Petitioner further contends that “[i]ncreased educational experience can make up for less work experience, and vice versa.” Id. Patent Owner objects to Petitioner’s proposed level of ordinary skill in the art only “[t]o the extent that Petitioner requires [] the required experience and/or education level to be acquired by December 24, 2015.” Prelim. Resp. 8. Determining the level of ordinary skill in the art involves various factors, including the “type of problems encountered in the art; prior art solutions to those problems; rapidity with which innovations are made; sophistication of the technology; and educational level of active workers in the field.” In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995) (citation omitted). The prior art of record also reflects the level of ordinary skill in the art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001). For purposes of this institution decision, with the exception of the openended language “at least,” we adopt the assessment offered by Petitioner.11 11 No matter how designated in this decision, any determination (except our determination to institute trial) is preliminary and non-binding. We wish to have the full record as developed during trial before rendering any binding determination, finding, or conclusion. It is not materially disputed by the Patent Owner and is consistent with the ’595 patent and the asserted prior art.” slip op. at 9

    • Claim Construction › Intrinsic evidence (Phillips canons) › Preamble limiting or notPreamble not limitingOther

      “[7.pre] A wireless communication method of a wireless communication terminal, the method comprising:13 Petitioner relies on Josiam “disclos[ing] ‘methods for efficient signaling and addressing in WLAN [wireless local area network] systems.’” Pet. 11 (citing Ex. 1003 ¶ 112; Ex. 1005 ¶ 4).14 The Petition states that “Josiam’s methods describe at least one station (i.e., a wireless communication terminal).” Id. 13 Petitioner does not address whether the preamble of claim 7 is limiting. See Pet. 1. We determine that the preamble of claim 7 is not limiting because it does not recite essential steps or structure and is not necessary to give life, meaning, and vitality to the claim. See Shoes by Firebug LLC v. Stride Rite Children’s Group, LLC, 962 F.3d 1362, 1367 (Fed. Cir. 2020). 14 Petitioner provides parallel citations to Exhibit 1006, the earliest provisional application to which Josiam claims priority (see Ex. 1005, code (60), in order to show that “the relevant subject matter relied upon herein is fully supported by respective provisional applications filed before the [filing date (December 24, 2015) of the earliest foreign application to which the ’595 patent claims priority (see Ex. 1001, code (30)].” Pet. 2. At least at this stage, there is no dispute between the parties as to whether Josiam or the ’595 patent are entitled to the claimed priority. See Prelim. Resp. 1 fn.1, 12 fn. 2. Therefore, unless deemed necessary to Petitioner’s showing, we do not include references to the Petition’s citations to Exhibit 1006 or discussion of Exhibit 1006 in our analysis. However, if Petitioner cites to Exhibit 1006 in a passage that we quote, we maintain these citations so that our quotation is accurate and complete.” slip op. at 13

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundInstituted

      “combination of the disclosures of Chen and Wu and articulates reasons why a skilled artisan would be motivated to combine the relevant teachings of Chen and Wu. See Pet. 42–85. This challenge to the patentability of the claims of the ’595 patent (Ground 2 of the Petition) is detailed and supported by the cited evidence. With regard to this ground and the asserted combination of art, Patent Owner argues that “[s]imilar to Grounds 1A and 1B, Chen and Wu do not show that ‘the bandwidth field of HE-SIG-A is used to obtain information of the unassigned resource unit’ as both the bandwidth field in HE-SIG-A and a subfield in HESIG-B need to be used for explicitly indicating the unassigned resource unit.” Prelim. Resp. 15. The quoted passage is limitation 7.5 and the “explicitly indicat[ing]” element is in limitation 7.7.16 See Ex. 1001, 54:3–4, 54:9–12; see also Pet. vii (showing claim 7 with limitations numbered and labeled). Thus, Patent Owner disputes the same limitations with a similar argument as for the earlier grounds in disputing the showing in the Petition for this ground. With regard to the disputed limitations, the Petition provides that, from a combination of the teachings and suggestions of Chen and Wu, a skilled artisan would understand that “the bandwidth field of HE-SIG-A indicates where in the overall bandwidth the non-allocated RU is located by defining the number of 20MHz channels and the arrangement and length of the HE-SIG-B content channels.” Pet. 60 (citing Ex. 1003 ¶ 178). The Declaration of Dr. Buehrer provides: 16 Limitation 7.7 recites: “the unassigned resource unit is explicitly indicated with the information of the unassigned resource unit based on the bandwidth field and the at least one subfield.” Ex. 1001, 54:9–12; Pet. vii (emphasis added). 178. Chen-Wu renders obvious using the bandwidth field of HE-SIG-A to obtain the information of the unassigned resource unit. As one example, a POSITA would have understood the Chen-Wu combination as rendering obvious that RU non-allocation information in HE-SIG-B indicates the location of a non-allocated RU within a 20MHz channel, while the bandwidth field of HE-SIG-A indicates where in the overall bandwidth the non-allocated RU is located by defining the number of 20MHz channels and the arrangement and length of the HE-SIG-B content channels. SAMSUNG-1008, [0101], [0098]; SAMSUNG-1009, [0036]; SAMSUNG-1010, 10. 179. Chen teaches that “RU allocation may be determined based at least in part on the PAID, channel bandwidth, and the HE-SIG-B.” SAMSUNG-1008, [0101], [0098]. I note that the Applicant did not dispute the Examiner’s finding that Chen teaches this limitation. See SAMSUNG- 1002, 68, 102 (citing SAMSUNG-1008, [0093], [0098], [0103], Fig. 14). 180. Moreover, Wu teaches “a fixed format common field in the HE-SIGB is defined for each operation bandwidth. Therefore, the length and format of the common field are predefined [based on the bandwidth]. In this approach, there is no [additional] indication needed in the HE-SIG-A.” SAMSUNG-1009, [0036]; SAMSUNG-1010, 10. As I explained above for [7.2] and [7.4], a POSITA would have understood Chen’s HE-SIG-A as including a bandwidth field that indicates the operation bandwidth of the PPDU. See [7.2], [7.4]. 181. For example, if the bandwidth field of HE-SIG-A indicates a PPDU bandwidth of 80 MHz, and the resource unit allocation field of the common field of HE-SIG-B indicates that the 20 MHz corresponding to the fourth channel is partitioned into 106, 26, and 106-tone resource units, the resource unit non-allocation information may indicate that the 26-tone resource unit is not assigned to any user through, e.g., a bitmap per Chen. SAMSUNG-1008, [0075], [0089]-[0093], Figs. 4, 12- 14; SAMSUNG-1009, [0035]-[0043], Figs. 2-4; SAMSUNG- 1010, 2-6, 10-14. Ex. 1003 ¶¶ 178–181 (alterations in original) (footnote omitted). We determine that this testimony of Dr. Buehrer is supported and reasonable and sufficiently persuasive and credible to support institution. We also note that Patent Owner does not, at least at this stage, provide any contradictory expert testimony.17 We have considered Patent Owner’s arguments relating to the disputed limitations and this ground and found them not to be as well-supported as the Petitioner’s showing for essentially the same reasons as discussed above with regard to Ground 1A. Based on the current record, we determine that there is a reasonable likelihood that Petitioner will prevail with respect to the unpatentability of claims 1–12 of the ’595 patent based on a combination of the teachings and suggestions of Chen and Wu.” slip op. at 29

    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,470,595
  • PTAB · Feb 6, 2026 · IPR2025-00988 · APJ Terrence W Mcmillin · IPR · Institution

    The Board instituted IPR on claims 1–14 and all petition grounds; it found a reasonable likelihood of success on the Josiam-based grounds, while the Bharadwaj grounds lacked established prior-art status.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “review. 35 U.S.C. § 314 (2018); 37 C.F.R. § 42.4(a) (2020) (“The Board institutes the trial on behalf of the Director.”). The standard for institution is set forth in 35 U.S.C. § 314(a), which provides that inter partes review may not be instituted unless “there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” After considering the Petition and the Preliminary Response, as well as the evidence of record, we institute an inter partes review as to claims 1–14 of the ’281 patent.3” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Determining the level of ordinary skill in the art involves various factors, including the “type of problems encountered in the art; prior art solutions to those problems; rapidity with which innovations are made; sophistication of the technology; and educational level of active workers in the field.” In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995) (citation omitted). The prior art of record also reflects the level of ordinary skill in the art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001). For purposes of this institution decision, we adopt the assessment offered by Petitioner.11 It is not materially disputed by the Patent Owner and is consistent with the ’281 patent and the asserted prior art.” slip op. at 10

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “Petitioner asserts “that no formal claim constructions are necessary.” Pet. 3. “Patent Owner applies the plain and ordinary meaning of the challenged claims.” Prelim. Resp 11. At this stage, no need exists to expressly construe any claim terms to resolve any dispute between the parties.12 See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))). D.” slip op. at 11

    • Novelty / Anticipation (§102) › Priority / effective filing date / continuation supportPriority date, deniedReference is prior artDecided for petitioner

      “contention that either of the cited documents alone discloses all the elements of these limitations. And, the disclosure relied on in Exhibit 1007 is not alleged to be found in Exhibit 1009 and vice-versa. Patent Owner has not shown that any of the pre-May 14, 2016, Korean applications from which the ’281 claims priority includes disclosure of all the elements recited in limitations 1.9 and 8.6. At least at this stage, we determine that Petitioner has sufficiently shown, for the purpose of institution that Josiam is prior art.16 We credit the testimony of Dr. Buehrer cited in the Petition that none of the Korean applications to which the ’281 patent claims priority filed earlier than May 14, 2016, “explicitly, implicitly, or inherently discloses using both the bandwidth field of the HE-SIG-A and the resource unit allocation field of the HE-SIG-B to indicate channel puncturing information as the claim elements require. . . . At best, these documents discuss indicating unused channels using either HE-SIG-A or HE-SIGB fields—but not both.” Pet. 7 (citing Ex. 1003 (Buehrer Decl.) ¶¶ 90–91). Dr. Buehrer’s testimony has not been shown by Patent Owner to be inaccurate.” slip op. at 20

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR
    Patents in suitUS 10,687,281
  • PTAB · Dec 10, 2025 · IPR2025-01069 · APJ Daniel J Galligan · IPR · Institution

    The Board instituted IPR on claims 1–14 and all asserted grounds, finding a reasonable likelihood of prevailing based on Bharadwaj alone and Bharadwaj with Yu.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “institute review. Paper 11. The standard for instituting an inter partes review is set forth in 35 U.S.C. § 314(a), which provides that an inter partes review may not be instituted unless the information presented in the Petition and the Preliminary Response shows “there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” For the reasons explained below, we institute an inter partes review of all challenged claims on all grounds raised in the Petition.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “To the extent Patent Owner contends that a person of ordinary skill in the art need not be defined as of the critical date, we disagree. Under Section 103, we must determine “if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains” (emphasis added). “Obviousness is determined from the vantage point of a hypothetical person having ordinary skill in the art to which the patent pertains.” In re Rouffet, 149 F.3d 1350, 1357 (Fed. Cir. 1998). Thus, we define the hypothetical person of ordinary skill in the art as of a time before the effective filing date. To the extent Patent Owner’s argument is that, to testify from the perspective of a person of ordinary skill in the art, one need not have been a person of ordinary skill in the art as of the critical date, we agree. Although one must at least possess ordinary skill in the art to testify from the perspective of a person of ordinary skill, [a]n expert need not have acquired that skill level prior to the time of the invention to be able to testify from the vantage point of a person of ordinary skill in the art. Rather, an expert can acquire the necessary skill level later and develop an understanding of what a person of ordinary skill knew at the time of the invention. Osseo Imaging, LLC v. Planmeca USA Inc., 116 F.4th 1335, 1341 (Fed. Cir. 2024). the uncontested assessment offered by Petitioner, which appears consistent with the ’077 patent and the asserted prior art, except that we delete the qualifier “at least” to eliminate vagueness as to the amount of experience.” slip op. at 6

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “C. Claim Construction The parties agree that no claim terms require express construction. Pet. 10; Prelim. Resp. 2–4. Patent Owner, however, notes that, in related district court litigation, Petitioner has asserted that some claims terms are indefinite. Patent Owner argues that the Petition should be denied because Petitioner has taken inconsistent claim construction positions between the district court and the Board. Paper 14 at 1–3 (citing Tesla, Inc. v. Intellectual Ventures II LLC, IPR2025-00340, Paper 18 at 4 (PTAB Nov. 5, 2025) (informative); Revvo Techs., Inc. v. Cerebrum Sensor Techs., Inc., IPR2025-00632, Paper 20 at 4–5 (PTAB Nov. 3, 2025) (precedential)). Petitioner responds that, in the related district court litigation, the parties have narrowed the claim construction disputes and that Petitioner accords the plain and ordinary meaning to claim terms and no longer asserts that any claim term of the ’077 patent is indefinite. Paper 15 (citing, inter alia, Ex. 1126 (Defendants’ Responsive Claim Construction Brief)). The evidence supports Petitioner’s position because, in the related district court litigation, the defendants agree with the plaintiff (Patent Owner) that certain phrases in the ’077 patent claims should be given their “[p]lain and ordinary meaning” and are “not indefinite.” Ex. 1126, 6 (native page 1). Thus, the record does not show inconsistent claim construction positions that warrant denial under PTAB precedent. See Revvo, Paper 20 at 5 (addressing a situation in which a petitioner advances “different claim construction positions” in district court and at the PTAB). See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 7

    • Novelty / Anticipation (§102) › Prior-art status of a reference › Patents / published applications (effective date, provisional support)Reference is prior artDecided for petitioner

      “We agree with Patent Owner that Bharadwaj includes subject matter that is not in Bharadwaj-Prov59, namely the change from adding the value Resp. 20; Ex. 1007 ¶ 51 (adding m); Ex. 1006 ¶ 50 (subtracting m); Prelim. Resp. 20. Petitioner, however, points out this change in the Petition and acknowledges that it is after the identified critical date of August 20, 2015. See Pet. 28. Thus, we do not understand Petitioner to be relying on Bharadwaj’s disclosure of subtracting m to determine length, as disclosed in the publication of the non-provisional application, as a prior art disclosure. We understand Petitioner to be relying on disclosures in Bharadwaj-Prov059 for prior art teachings for its obviousness contentions. Patent Owner does not appear to dispute that Bharadwaj-Prov59’s disclosures are prior art, arguing instead that it is improper to rely “on matters in Bharadwaj beyond ‘incorporation by reference’ of the Bharadwaj-Prov59.” See Prelim. Resp. 20–21. On this record, we determine that Bharadwaj-Prov59’s disclosures are prior art as of its June 2, 2015, filing date by virtue of its incorporation by reference into Bharadwaj, a published US patent application. Ex. 1006 ¶ 1; see Pet. 12–13.” slip op. at 8

    Claim construction§ 102 anticipation§ 103 obviousnesscites KSR · Graham
    Patents in suitUS 10,313,077
  • PTAB · Dec 4, 2025 · IPR2025-01103 · APJ Brian P Murphy · IPR · Institution

    The Board instituted IPR on claims 7–12 on all grounds, finding a reasonable likelihood that Lamkin and the asserted combinations render the claims obvious.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “We have jurisdiction under 35 U.S.C. § 314, which provides that an inter partes review may not be instituted “unless . . . there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” Under § 314, the Board may not institute review on fewer than all claims challenged in the petition. SAS Inst., Inc. v. Iancu, 138 S. Ct. 1348, 1359–60 (2018). If the Board institutes a review, it unpatentability asserted for each claim.” 37 C.F.R. § 42.108(a). Upon consideration of the Petition, the Preliminary Response, and the evidence of record, for the reasons set forth below, we conclude the Petition demonstrates a reasonable likelihood that Petitioner would prevail in showing the unpatentability of at least one challenged claim in the ’101 patent. Accordingly, we institute an inter partes review of claims 7–12 of the ’101 patent.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “(“POSITA”), various factors may be considered, including the “type of problems encountered in the art; prior art solutions to those problems; rapidity with which innovations are made; sophistication of the technology; and educational level of active workers in the field.” In re GPAC, Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995) (citing Custom Accessories, Inc. v. Jeffrey- not exhaustive but are merely a guide to determining the level of ordinary skill in the art.” Daiichi Sankyo Co. v. Apotex, Inc., 501 F.3d 1254, 1256 (Fed. Cir. 2007). There is uncontested evidence in the record before us that reflects the knowledge and experience of a POSITA. For purposes of this Decision, we adopt the Petition’s formulation of the level of ordinary skill in the art, which is consistent with the description in the ’101 patent, the prior art of record, and the testimony of Dr. Zadok.” slip op. at 9

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)Other

      “Petitioner contends that no claim terms need construction, but also contends that “claim interpretations on which this Petition depends are incorporated in and apparent from the prior art mapping analysis below.” Pet. 5. Patent Owner contends that Petitioner’s position contradicts the position Petitioner took in related district court litigation, particularly Petitioner’s district court constructions of means-plus-function limitations” slip op. at 10

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundInstituted

      “Fiechter (Ground 1B) in the manner claimed in the ’101 patent with a reasonable expectation of success, which we find sufficient to satisfy the reasonable likelihood standard on the present record. Pet. 42–45 (citing Ex. 1003 ¶¶ 360–362, 372–382). The Petition also offers several motivations to combine Lamkin and Ito (Ground 1C) in the manner claimed in the ’101 patent with a reasonable expectation of success, which we also find sufficient on the present record. Pet. 49–52 (citing Ex. 1003 ¶¶ 383–401). The Preliminary Response does not challenge the Petition’s asserted motivations to combine Lamkin-Fiechter or Lamkin-Ito. Prelim. Resp. generally. On the present record at this stage of the proceeding, we determine the Petition sufficiently supports a motivation to combine Lamkin-Fiechter and Lamkin-Ito with a reasonable expectation of success for the reasons articulated in the Petition and Dr. Zadok’s cited declaration paragraphs.” slip op. at 21

    Claim construction§ 103 obviousnesscites KSR · Graham
    Patents in suitUS 8,230,101
  • PTAB · Dec 3, 2025 · IPR2025-01026 · APJ Steven M Amundson · IPR · Institution

    The Board instituted review of claims 1–20 on all petition challenges because the Baliarda-543 challenges met the reasonable-likelihood threshold.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “to institute an inter partes review. We may institute an inter partes review only if “the information presented in the petition filed under section 311 and any response filed under section 313 shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). The “reasonable likelihood” standard is “a higher standard than mere notice pleading” but “lower than the ‘preponderance’ standard to prevail in a final written decision.” Hulu, LLC v. Sound View Innovations, LLC, IPR2018- 01039, Paper 29 at 13 (PTAB Dec. 20, 2019) (precedential). Based on the current record and for the reasons explained below, Petitioner has shown that there is a reasonable likelihood that it would prevail with respect to at least one of the challenged claims. Thus, we 1 Petitioner filed a confidential version of the Petition as Paper 3 and a public version of the Petition as Paper 4. We cite to the public version of the Petition. institute an inter partes review of claims 1–20 in the ’677 patent on all challenges included in the Petition.” slip op. at 2

    • Skill levelSkill level petitioner adoptedOther

      “Petitioner asserts that a person of ordinary skill as of the ’677 patent’s effective filing date would have had “at least a bachelor’s degree in electrical engineering, computer science, or a similar degree and at least four years of experience in applied electromagnetics with an emphasis on antennas.” Pet. 11 (quoting Ex. 1018 ¶ 32). Petitioner also asserts that “[a]lternatively, the person of ordinary skill in the art would have a master’s degree in electrical engineering (or similar discipline) and at least two years of similar experience.” Id. (quoting Ex. 1018 ¶ 32). Dr. van der Weide’s testimony supports Petitioner’s assertions. See Ex. 1007 ¶ 40. For purposes of the Preliminary Response only, Patent Owner employs Petitioner’s description of an ordinarily skilled artisan. Prelim. Resp. 17. Based on the current record and for purposes of this decision, we accept Petitioner’s description of an ordinarily skilled artisan because it comports with the technology and claims of the ’677 patent as well as the asserted references. See, e.g., Ex. 1001, 1:26–6:47, 42:47–44:61, code (57); infra §§ III.E.1–III.E.2.” slip op. at 23

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “4. DISCUSSION “[O]nly those terms need be construed that are in controversy, and only to the extent necessary to resolve the controversy.” Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999); see Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017). Based on the current record, we determine that no claim term, phrase, or limitation requires an explicit construction to decide whether Petitioner satisfies the “reasonable likelihood” standard for instituting trial.” slip op. at 26

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation not foundNot shown unpatentableNot shown unpatentable

      “Although “Dou does not require its ‘diversity antenna architecture’ to provide spatial diversity,” Dou nevertheless requires a wireless device with some type of diversity antenna architecture. See, e.g., Ex. 1013 ¶¶ 14, 17–18, 22–24, 30, 32–34, codes (54), (57), claims 1 and 16. As an example, Dou’s independent claim 1 covering a “wireless device” requires a “first diversity antenna” and a “second diversity antenna.” Id. at claim 1. As another example, Dou’s independent claim 16 covering a “wireless device” also requires a “first diversity antenna” and a “second diversity antenna.” Id. at claim 16. As yet another example, Dou’s Abstract describes a “wireless device” including a “first diversity antenna” and a “second diversity antenna.” Id. at code (57). Petitioner does not explain how the proposed combination provides anything other than spatial diversity. See Pet. 33–35; Prelim. Reply 1–3; Ex. 1007 ¶¶ 118–124. Based on the current record, we agree with Patent Owner that with Ciais-Quadband’s antenna used for Dou’s two antennas 206 and 208, the two identical quadband antennas would have:” slip op. at 46

    Claim construction§ 102 anticipation§ 103 obviousness§ 112 disclosurecites Phillips · KSR · Graham
    Patents in suitUS 11,031,677
  • PTAB · Dec 3, 2025 · IPR2025-01027 · APJ Steven M Amundson · IPR · Institution

    The Board instituted IPR of claims 1–20 on all petition challenges, finding a reasonable likelihood that Baliarda-543 anticipates or renders obvious those claims.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “to institute an inter partes review. We may institute an inter partes review only if “the information presented in the petition filed under section 311 and any response filed under section 313 shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). The “reasonable likelihood” standard is “a higher standard than mere notice pleading” but “lower than the ‘preponderance’ standard to prevail in a final written decision.” Hulu, LLC v. Sound View Innovations, LLC, IPR2018- 01039, Paper 29 at 13 (PTAB Dec. 20, 2019) (precedential).” slip op. at 2

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation not foundNot shown unpatentableNot shown unpatentable

      “Regarding spatial diversity, Dou explains that a first internal antenna and a second internal antenna “may be separated by a distance (D) that is no less than the quarter wavelength (>=λ/4) of the lowest frequency.” Ex. 1013 ¶ 24; see Ex. 2010 ¶¶ 35, 44. Consistent with Dou’s preference for at least a quarter-wavelength spacing between antennas at the lowest frequency, “a commonly accepted rule of thumb is that at least a quarter-wavelength spacing between antennas is necessary to provide effective spatial diversity.” Ex. 2010 ¶¶ 33, 35, 47. Effective spatial diversity requires sufficient spacing between antennas because that technique “uses multiple antennas to improve signal reliability and performance by mitigating the effects of multipath fading and other interference.” Ex. 2010 ¶ 33. “Multipath fading occurs when a wireless signal propagates along multiple different paths of differing lengths because of interactions with obstacles, resulting in portions of the signal energy arriving at a receiver with different phases slightly offset in time.” Id. Locations insufficiently separated in terms of wavelength “tend to experience similar fading and interference characteristics.” Id. Thus, closely spaced antennas “cannot provide effective spatial diversity.” Id. By providing sufficient spacing between antennas, however, “the likelihood increases that at least one of the antennas will be positioned at a location where the multipath or other interference is relatively low, thereby improving overall signal quality and reliability.” Id. As Patent Owner contends, the proposed combination modifies Dou’s ground plane 310 to replicate Jing’s ground plane with dimensions of 36 mm × 60 mm and limits “the extent of Dou’s ground plane 310 so that it [does] not extend behind Jing’s antenna at 306, just like Dou does not extend it behind antenna 308.” See Pet. 35–36; Prelim. Resp. 20 (quoting Pet. 35); Prelim. Sur-reply 1; Ex. 1007 ¶ 120; Ex. 2010 ¶ 45. The lowest frequency of Jing’s antenna is 900 MHz. Ex. 1011, 2657–58; see Ex. 1007 ¶¶ 118, 154; Ex. 2010 ¶¶ 37, 44. The wavelength (λ) corresponding to a frequency of 900 MHz is 333.3 mm, and a quarter wavelength (λ/4) is 83.3 mm. Ex. 2010 ¶ 44. In the proposed combination, a distance of 60 mm separates the” slip op. at 49

    • Disclosure Requirements (§112) › Written description (Ariad)Written description inadequateNot entitled to earlier dateDecided for petitioner

      “To satisfy the written-description requirement, the inventor must have possession of the claimed invention as interpreted to encompass an allegedly infringing product. See Rivera, 857 F.3d at 1319–22; ICU Med., 558 F.3d at 1372–73, 1377–79. For purposes of the written-description requirement, the “invention” is “whatever is now claimed.” Vas-Cath, 935 F.2d at 1564 (emphasis omitted). Based on the current record, and as Petitioner asserts, LTE band 12 was not available for “use with mobile communications” or “use in any cellular communication, let alone LTE or 4G communication,” as of the ’429 application’s December 21, 2006, filing date. See Ex. 1007 ¶¶ 229, 231; Pet. 76–77. For instance, a Federal Communications Commission report adopted on July 31, 2007, notes that the 698-806 MHz spectrum “currently is occupied by television broadcasters in TV Channels 52-69.” Ex. 1045, 1, 3; see Ex. 1007 ¶ 231. The 698-806 MHz spectrum includes LTE band 12 with 698-716 MHz for uplink and 728-746 MHz for downlink. See Ex. 1026, 11 (Table 1); Ex. 1039, 498 (Table 20.1). At this stage of the proceeding, Patent Owner does not dispute that as of July 31, 2007, the 698-806 MHz spectrum was “occupied by television broadcasters in TV Channels 52-69.” See Prelim. Resp. 2–3, 23–30; Prelim. Sur-reply 5. Thus, based on the current record, Petitioner demonstrates a reasonable likelihood that as of the ’429 application’s December 21, 2006, filing date, the ’429 application did not “reasonably convey[] to those skilled in the art that the inventor had possession” of “an antenna configured to send or receive signals in the 698-806 MHz spectrum,” including LTE band 12 that Patent Owner relies on in the Geotab litigation, for “communication with any ‘4G communication standard’ because those frequencies were not usable for any mobile device communications at the time of filing.” See Pet. 78 (emphasis omitted); Ex. 1007 ¶¶ 231, 233–234, 236–237; Ex. 1045, 1, 3; Ariad, 598 F.3d at 1351. Accordingly, based on the current record, Petitioner demonstrates a” slip op. at 63

    • Novelty / Anticipation (§102) › Priority / effective filing date / continuation supportReference is prior artDecided for petitioner

      “To satisfy the written-description requirement, the inventor must have possession of the claimed invention as interpreted to encompass an allegedly infringing product. See Rivera, 857 F.3d at 1319–22; ICU Med., 558 F.3d at 1372–73, 1377–79. For purposes of the written-description requirement, the “invention” is “whatever is now claimed.” Vas-Cath, 935 F.2d at 1564 (emphasis omitted). Based on the current record, and as Petitioner asserts, LTE band 12 was not available for “use with mobile communications” or “use in any cellular communication, let alone LTE or 4G communication,” as of the ’429 application’s December 21, 2006, filing date. See Ex. 1007 ¶¶ 229, 231; Pet. 76–77. For instance, a Federal Communications Commission report adopted on July 31, 2007, notes that the 698-806 MHz spectrum “currently is occupied by television broadcasters in TV Channels 52-69.” Ex. 1045, 1, 3; see Ex. 1007 ¶ 231. The 698-806 MHz spectrum includes LTE band 12 with 698-716 MHz for uplink and 728-746 MHz for downlink. See Ex. 1026, 11 (Table 1); Ex. 1039, 498 (Table 20.1). At this stage of the proceeding, Patent Owner does not dispute that as of July 31, 2007, the 698-806 MHz spectrum was “occupied by television broadcasters in TV Channels 52-69.” See Prelim. Resp. 2–3, 23–30; Prelim. Sur-reply 5. Thus, based on the current record, Petitioner demonstrates a reasonable likelihood that as of the ’429 application’s December 21, 2006, filing date, the ’429 application did not “reasonably convey[] to those skilled in the art that the inventor had possession” of “an antenna configured to send or receive signals in the 698-806 MHz spectrum,” including LTE band 12 that Patent Owner relies on in the Geotab litigation, for “communication with any ‘4G communication standard’ because those frequencies were not usable for any mobile device communications at the time of filing.” See Pet. 78 (emphasis omitted); Ex. 1007 ¶¶ 231, 233–234, 236–237; Ex. 1045, 1, 3; Ariad, 598 F.3d at 1351. Accordingly, based on the current record, Petitioner demonstrates a” slip op. at 63

    § 102 anticipation§ 103 obviousness§ 112 disclosurecites Phillips · KSR · Graham
    Patents in suitUS 11,349,200
  • PTAB · Nov 7, 2025 · IPR2025-01044 · APJ Daniel J Galligan · IPR · Institution

    The Board instituted IPR of claims 1–10 on all asserted grounds, finding a reasonable likelihood that Samsung would prevail on at least claim 1 under §103.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “institute review. Paper 11. The standard for instituting an inter partes review is set forth in 35 U.S.C. § 314(a), which provides that an inter partes review may not be instituted unless the information presented in the Petition and the Preliminary Response shows “there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” For the reasons explained below, we institute an inter partes review of all challenged claims on all grounds raised in the Petition.” slip op. at 2

    • Skill levelSkill level board ownDecided for petitioner

      “had a bachelor’s degree in electrical engineering, computer engineering, computer science, or a related field, and at least 3 years of experience in the research, design or development of wireless communication devices, systems, and/or networks, or the equivalent, as of the Critical Date,” which we understand Petitioner identifies as September 7, 2016. Pet. 2, 4 (citing Ex. 1003 ¶¶ 26–28). Petitioner also contends that “[i]ncreased educational experience can make up for less work experience, and vice versa.” Pet. 4. Patent Owner does not object to Petitioner’s definition at this stage. Prelim. Resp. 11. To the extent necessary, and for purposes of this Decision, we accept the uncontested assessment offered by Petitioner, which appears consistent with the ’879 patent and the asserted prior art, except that we delete the qualifier “at least” to eliminate vagueness as to the amount of experience.” slip op. at 5

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “C. Claim Construction The parties agree that no claim terms require express construction. Pet. 4; Prelim. Resp. 11. On this record, we determine that no terms need express construction. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve” slip op. at 5

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundOther
    Claim construction§ 103 obviousnesscites KSR · Graham
    Patents in suitUS 11,516,879
  • PTAB · Nov 7, 2025 · IPR2025-01043 · APJ Daniel J Galligan · IPR · Institution

    The Board instituted IPR of claims 1–10 on all petition grounds, finding a reasonable likelihood that Samsung would prevail on at least claim 1 as obvious over Zhou, Cherian, and Kim.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “institute review. Paper 11. The standard for instituting an inter partes review is set forth in 35 U.S.C. § 314(a), which provides that an inter partes review may not be instituted unless the information presented in the Petition and the Preliminary Response shows “there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” For the reasons explained below, we institute an inter partes review of all challenged claims on all grounds raised in the Petition.” slip op. at 2

    • Skill levelSkill level board ownOther

      “had a bachelor’s degree in electrical engineering, computer engineering, computer science, or a related field, and at least 3 years of experience in the research, design or development of wireless communication devices, systems, and/or networks, or the equivalent, as of the Critical Date,” which we understand Petitioner identifies as September 7, 2016. Pet. 2, 4 (citing Ex. 1003 ¶¶ 26–28). Petitioner also contends that “[i]ncreased educational experience can make up for less work experience, and vice versa.” Pet. 4. Patent Owner does not object to Petitioner’s definition at this stage. Prelim. Resp. 11. To the extent necessary, and for purposes of this Decision, we accept the uncontested assessment offered by Petitioner, which appears consistent with the ’035 patent and the asserted prior art, except that we delete the qualifier “at least” to eliminate vagueness as to the amount of experience.” slip op. at 5

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “C. Claim Construction The parties agree that no claim terms require express construction. Pet. 4; Prelim. Resp. 11. On this record, we determine that no terms need express construction. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve” slip op. at 5

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundOther

      “expressly discloses multiple options for resetting the timer, including “after the STA 106 transmits a scheduled UL transmission, or transmits a scheduled UL transmission and gets an ACK message.” Ex. 1005 ¶ 81. We find sufficiently persuasive Petitioner’s explanation that “after” in Zhou means after the transmission ends if an ACK is not requested; in the case of an ACK, Zhou expressly discloses starting the timer after receiving the ACK. See Pet. 46–49. Petitioner’s declarant, Dr. Valenti, testifies that “[a] STA measures the ‘completion’ of the transmission by receiving an ACK— if an ACK is requested—or upon completion of the physical transmission.” Ex. 1003 ¶ 152 (citing Ex. 1018 ¶ 9). On this record, we find this testimony to be sufficiently credible based on the evidence cited. See Ex. 1018 ¶ 9 (“A successful transmission occurs when the node either receives an expected acknowledgment correctly, or transmits a frame that does not require an acknowledgement.”).” slip op. at 13

    Claim construction§ 103 obviousnesscites KSR · Graham
    Patents in suitUS 11,116,035
  • PTAB · Nov 3, 2025 · IPR2025-00934 · APJ Terrence W Mcmillin · IPR · Institution

    The Board instituted IPR on claims 1–9 and all asserted grounds, finding a reasonable likelihood that claims 1–9 are obvious over Bharadwaj and Sun.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “institute review. Paper 11. The standard for institution is set forth in 35 U.S.C. § 314(a), which provides that inter partes review may not be instituted unless “there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” After considering the Petition and the Preliminary Response, as well as the evidence of record, we institute an inter partes review as to claims 1–9 of the ’210 patent.” slip op. at 2

    • Novelty / Anticipation (§102) › Prior-art status of a reference › Printed publication / public accessibilityPrinted publication establishedNot reached

      “We are aware, however, that we must not confuse access with accessibility. See Samsung Elecs. Co. v. Infobridge Pte. Ltd., 929 F.3d 1363, 1374 (Fed. Cir. 2019) (“[A] petitioner need not establish that specific persons actually accessed or received a work to show that the work was publicly accessible.”). Dr. Hansen notes that the cover of 802.11ax_D1.0 grants permission to reproduce the document to others for consideration. Ex. 1026 ¶ 72; see Ex. 1004, 1 (“Permission is hereby granted for IEEE Standards Committee participants to reproduce this document for purposes of international standardization consideration.”). Dr. Hansen also testifies that meetings to discuss 802.11ax_D1.0 were open to the public. Ex. 1026 ¶ 58 (citing Appendix J to declaration). Thus, it appears, on the current record, that the purpose of 802.11ax_D1.0 was to promote dialogue with interested artisans, which indicates public accessibility. See Valve Corp. v. Ironburg Inventions Ltd., 8 F.4th 1364, 1374 (Fed. Cir. 2021) (“We have previously held that where a publication’s purpose is ‘dialogue with the intended audience,’ that purpose indicates public accessibility.” (citation omitted)). After having reviewed all the arguments and evidence presented by the parties, we would like to see further development of this issue during trial. The current record is not well-developed on this issue either factually or legally. With regard to the factual record, Patent Owner has not yet had the opportunity to depose Dr. Hansen or been given a full opportunity to marshal its own evidence on this issue. With regard to the law, we would like to see the parties apply the relevant case law to the developed facts as to the public accessibility and prior art status of 802.11ax_D1.0. We will determine, if necessary and appropriate, whether 802.11ax_D1.0 is prior art to the challenged claims of the ’210 patent based on the full record as developed during trial.” slip op. at 14

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundDecided for petitioner

      “As an initial matter, Bharadwaj and Sun are both analogous art to the ’210 Patent in that that they are both concerned with the design of the PHY data unit for supporting MU-MIMO transmissions in the downlink. SAMSUNG-1003, ¶¶153- 158. . . . In addition, both Bharadwaj and Sun describe MU- MIMO downlink PHY data unit structures in the context of 802.11ax. SAMSUNG-1013, ¶[0064]; SAMSUNG-1015, ¶[0031]; SAMSUNG-1003, ¶¶153-158. . . . . [A] POSITA implementing Bharadwaj’s preamble designs would have been motivated to look to another reference, like Sun, for an understanding of the format of the user field that would support non-MU-MIMO allocations and the single-user transmission scenario. A POSITA would have combined the teachings of Bharadwaj with Sun to realize implementation details for the HE-SIG-A and HE-SIG-B fields of the HE MU PPDU to better support both MU-MIMO and non-MU-MIMO allocations. SAMSUNG-1003, ¶¶153-158. . . . . A POSITA would have found it obvious to look to Sun for modifying Bharadwaj to include the user field format for SU (non-MU-MIMO) allocation to complement Bharadwaj’s disclosure of the MU-MIMO user field format and to provide a more complete system that would allow HE MU PPDUs to support both MU-MIMO allocations for multiple users and non-MU-MIMO allocations for a single user. SAMSUNG- 1003, ¶¶153-158. The combination also would have been obvious and predictable for at least the following reasons: 1) both Bharadwaj and Sun describe designs for a PHY data unit (or PPDU) to support communications between an AP and a station within a high-efficiency Wi-Fi network, consistent with 802.11ax; 2) both Bharadwaj and Sun describe the PPDU design for supporting MU-MIMO downlink transmission as including HE- SIG-A and HE-SIG-B fields; and 3) Bharadwaj already describes the format for the user field for the MU-MIMO allocation, while also recognizing the single-user scenario, and the combination merely involves the addition to Bharadwaj of the user field format for the single-user allocation, as taught by Sun. SAMSUNG-1003, ¶¶153- 158. The combination is obvious also because elements of the combined system would each perform similar functions they had been known to perform in similar contexts outside the combination. SAMSUNG-1003, ¶¶153-158. . . . . A POSITA would have reasonably expected success implementing the combination, especially considering the substantially similar 802.11ax techniques described in each reference. SAMSUNG-1003, ¶¶153-158. Additionally, combining the teachings of Bharadwaj with Sun would have merely involved combining prior art elements according to known methods to yield predictable results. SAMSUNG-1003, ¶¶153-158.” slip op. at 31

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededDecided for petitioner

      “Petitioner asserts that “no formal claim constructions are necessary.” Pet. 2. Patent Owner notes that “both parties have submitted terms for construction in the district court for this Patent” (Prelim. Resp. 6), but that “for purposes of [the] Preliminary Response, Patent Owner applies the plain and ordinary meaning of the challenged claims” (id. at 8). Accordingly, at this stage, no need exists to expressly construe any claim terms to resolve the parties’ disputes.9 See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 9

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,159,210
  • PTAB · Jul 29, 2025 · IPR2025-00404 · APJ Russell E Cass · IPR · Institution

    The Board instituted IPR on claims 1–17, 19, 26, 28–41, and 43–46 on both obviousness grounds because Petitioner showed a reasonable likelihood of prevailing.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “review, under 35 U.S.C. § 314 and 37 C.F.R. § 42.4. An inter partes review may not be instituted unless it is determined that “the information presented in the petition filed under section 311 and any response filed under section 313 shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314 (2018); see also 37 C.F.R § 42.4(a) (2024) (“The Board institutes the trial on behalf of the Director.”). The reasonable likelihood standard is “a higher standard than mere notice pleading,” but “lower than the ‘preponderance’ standard to prevail in a final written decision.” Hulu, LLC v. Sound View Innovations, LLC, IPR2018-01039, Paper 29 at 13 (PTAB Dec. 20, 2019) (precedential). For the reasons provided below and based on the record before us, we determine that Petitioner has demonstrated a reasonable likelihood that it would prevail in showing the unpatentability of at least one of the challenged claims. Accordingly, we institute an inter partes review on all grounds set forth in the Petition.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “ordinary skill in the art at the time of the alleged invention “would have been someone with at least (1) a bachelor’s degree in electrical engineering, computer engineering/science, or a related scientific field, and (2) either (a) a master’s degree in electrical engineering, computer engineering/science, or a related field, or (b) two or more years of work or research experience in wireless networking and/or computing.” Pet. 13” slip op. at 9

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “standard that would be used to construe the claim in a civil action under 35 U.S.C. § 282(b).” 37 C.F.R. § 42.100(b) (2020). Petitioner identifies the term “client side modem functionality” in claim 5 for construction. Pet. 14. Patent Owner does not address the construction of this term. See Prelim. Resp. 4–6. We determine that we do not need to construe the term “client side modem functionality” for purposes of this decision. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed.” slip op. at 7

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner

      “Patent Owner argues that the terms “first communication technology,” “second communication technology,” and “third communication technology” should “be understood to have their plain meaning wherein each of these recited communication technologies is a different communication technology.” Prelim. Resp. 5. For purposes of this decision, we will apply Patent Owner’s understanding of these terms. However, we note that Patent Owner does not explain what it means by a “different” communication technology, or how to determine whether two communication technologies qualify as “different.” Id. at 5–6. The parties may wish to explore the meaning of this term further during the trial.” slip op. at 8

    Claim construction§ 103 obviousnesscites KSR · Graham
    Patents in suitUS 9,413,502
Page 1 of 18
← Previous12345…Next →

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.