PTAB
Advanced fields
48 decisions · 754msnewest first
  • PTAB · Dec 2, 2025 · IPR2025-00894 · APJ Scott A Daniels · IPR · Institution

    The Board instituted IPR on claims 1–20 and all petitioned grounds, finding a reasonable likelihood that Yeo and TS36 render at least claim 1 obvious.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “unless . . . there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” Upon consideration of the arguments and evidence presented by Petitioner and Patent Owner, we are persuaded that Petitioner has demonstrated a reasonable likelihood that it would prevail in showing the unpatentability of at least one of the challenged claims. See 35 U.S.C. § 314(a). Accordingly, we institute an inter partes review of the challenged claims. slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Patent Owner does not dispute Petitioner’s proposed level of ordinary skill in the art stating that “[f]or the purposes of this Preliminary Response only, Patent Owner utilizes Petitioner’s proposed level of skill in the art.” Prelim. Resp. 2. On this record, Petitioner’s proposed level of ordinary skill in the art is not disputed and is consistent with our review and understanding of the technology and descriptions in the ’767 patent and the asserted prior art references. Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001). For purposes of this Decision, we rely on Petitioner’s proposed level of ordinary skill in the art.” slip op. at 9

    • Claim Construction › Functional claiming / §112(f) means-plus-function › Whether §112(f) applies (Williamson, nonce words)No construction neededNot reached

      “under 112(f) pointing out the respective functions and structure disclosed in the ’767 patent specification. Pet. 18–20. Patent Owner does not dispute the construction of these terms, stating only “that claim construction is not required to resolve any issues.” PO Resp. 2 (citing Pet. 18–20). Where there is no dispute and our Decision does not turn on any particular construction of these terms, we need not decide at this point whether “receiver module” and “transmitter module” invoke means-plus-function under 112(f). Pet. 13; Prelim. Resp. 5. And, because there is no dispute, we conclude that no express interpretation of any claim term is necessary to determine whether to institute an inter partes review in this proceeding. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the” slip op. at 10

    • BurdenInstituted

      “In an [inter partes review], the petitioner has the burden from the onset to show with particularity why the patent it challenges is unpatentable.” Harmonic Inc. v. Avid Tech., Inc., 815 F.3d 1889, 1363 (Fed. Cir. 2016) (citing 35 U.S.C. § 312(a)(3) (requiring inter partes review petitions to identify “with particularity . . . the evidence that supports the grounds for the challenge to each claim”)). This burden of persuasion never shifts to Patent Owner. See Dynamic Drinkware, LLC v. Nat’l Graphics, Inc., 800 F.3d 1375, 1378 (Fed. Cir. 2015) (discussing the burden of proof in inter partes review). slip op. at 8

    Claim construction§ 103 obviousnesscites KSR · Graham
    Patents in suitUS 10,462,767
  • PTAB · Nov 5, 2025 · IPR2025-00895 · APJ Scott Raevsky · IPR · Institution

    The Board instituted IPR on claims 1–20 and all asserted challenges after finding a reasonable likelihood that at least one challenged claim would be unpatentable.

    RulingsInstitution decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “A person of ordinary skill in the art (POSITA) would have had at least [a bachelor’s degree in] electrical engineering, computer engineering, computer science, or a similar field, along with two years of experience designing or developing wireless networks. Additional education might substitute for some of the experience, and additional substantial experience might substitute for some of the educational background. . . . A POSITA would also have familiarity with the 3GPP LTE standards, and would have understood how to search through the available Technical Specifications for implementing RAN technologies. Pet. 21–22 (citing Ex. 1003 ¶¶ 50–53). Patent Owner uses Petitioner’s proposed level of skill in the art at this stage, with a proposed modification to insert “a bachelor’s degree in” to Petitioner’s statement. Prelim. Resp. 12–13; id. at 12, n.1. We have inserted this proposed modification in brackets in the above block quotation. We are persuaded, on the present record, that Petitioner’s proposal, as modified by Patent Owner, is consistent with the problems and solutions in the ’113 patent and prior art of record. We adopt Petitioner’s skill definition at this stage.” slip op. at 7

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “The parties do not propose any claim constructions. See Pet. 11–12; Prelim. Resp. 8. As no terms are in dispute, we determine that no terms require construction at this stage.” slip op. at 8

    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “IV. CONCLUSION At this stage of the proceeding, we determine that Petitioner has demonstrated a reasonable likelihood of prevailing on its challenges as to at least one challenged claim. At this preliminary stage, we have not made a final determination as to the patentability of the challenged claims or any underlying factual and legal issues. V. ORDER It is, therefore, ORDERED that, pursuant to 35 U.S.C. § 314(a), an inter partes review of all challenged claims of the ’113 patent is instituted with respect to all challenges of unpatentability set forth in the Petition; and FURTHER ORDERED that pursuant to 35 U.S.C. § 314(c) and 37 C.F.R. § 42.4, notice is hereby given of the institution of a trial commencing on the entry date of this Decision.” slip op. at 18

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundInstituted

      “measurement value, as Jover teaches.” Id. (citing Ex. 1005 ¶¶ 39–40; Ex. 1003 ¶¶ 115–30). Among other reasons, Petitioner contends that a POSITA would have been motivated to combine “to improve the accuracy and reliability of the beam failure determination.” Id. at 37 (citing Ex. 1003 ¶¶ 115–30). Petitioner further contends that a POSITA would have had a reasonable expectation of success because “it would have been straightforward for a POSITA to implement Jover’s triggering condition in Xia’s method.” Id. at 38 (citing Ex. 1003 ¶¶ 115–30). After considering Patent Owner’s arguments, which we address below, we agree with Petitioner at this stage that the combination of Xia and Jover renders obvious limitation [1e]. Patent Owner first argues that Jover “does not cure the deficiencies of Xia because Jover’s threshold condition for an increase in BER is not used for triggering a transmission of the first and second radio signal.” Prelim. Resp. 20. Just like Xia, Patent Owner contends, Jover discloses no “causality between the threshold being exceeded and transmitting the first and second radio signal.” Id. at 21. This argument does not undermine Petitioner’s showing at this stage because Petitioner relies on Xia, not Jover, for the claimed “triggering the transmission,” or “causality,” as Patent Owner calls it. See Pet. 36–38. That is, Petitioner relies on Jover for the triggering condition and on Xia for the actual triggering. See id. Patent Owner’s argument attacking the references individually is unpersuasive. See In re Merck & Co., Inc., 800 F.2d 1091, 1097 (Fed. Cir. 1986) (“Non-obviousness cannot be established by attacking references individually where the rejection is based upon the teachings of a combination of refences.”). Patent Owner next contends that one of ordinary skill in the art would not have combined Xia and Jover “since Jover is directed to the opposite objective of the ’113 Patent or Xia.” Prelim. Resp. 21. That is, Patent Owner asserts, Jover teaches away from the disclosed methods. Id. at 22. Patent Owner explains, “Jover provides no attempt to improve the beam strength, but rather ignores it through beam sweeping or nullif[ies] it, in contrast to the purpose of the ’113 Patent.” Id. at 22–23. At this stage, Patent Owner’s argument is insufficient to undermine” slip op. at 15

    Claim construction§ 103 obviousness
    Patents in suitUS 10,568,113
  • PTAB · Feb 13, 2025 · IPR2024-00978 · APJ Bart A Gerstenblith · IPR · Institution

    The Board instituted IPR on claims 1–17 on all petition grounds, finding a reasonable likelihood that Dolan renders at least one challenged claim obvious.

    RulingsInstitution decision
    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Denied

      “letter stipulating that if the Board institutes this IPR petition on the grounds presented therein, then Samsung will not pursue in the above-captioned litigation any grounds that were raised or reasonably could have been raised in the IPR. For the sake of clarity, this stipulation does not extend to co-petitioner Google, which is not a party to the above-referenced litigation.” slip op. at 7

    • PTAB / AIA Trials › Real party in interest / privityNot reached

      “Electronics, America, Inc.; and Google LLC as real parties in interest. Pet. 61. Petitioner explains that “Google LLC is a subsidiary of XXVI Holdings Inc., which is a subsidiary of Alphabet Inc.” Id. at 61 n.10. Petitioner asserts that “XXVI Holdings Inc. and Alphabet Inc. are not real parties-in-interest to this proceeding.” Id. Patent Owner identifies Cerence Operating Co. and Cerence, Inc. as real parties in interest. Paper 5, 1. Patent Owner disagrees with Petitioner, contending Alphabet Inc. is also a real party in interest. Id. At this stage of the proceeding, we need not determine whether Alphabet Inc. is a real party in interest to Petitioner since neither Petitioner nor Patent Owner has identified any effect that determination would have on the outcome of this proceeding. To the extent Patent Owner seeks to maintain this contention, it should raise the issue in its Patent Owner response.” slip op. at 3

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Patent Owner does not currently take a position on the relevant level of ordinary skill in the art, but believes that “the Board could assume Petitioner’s proposed level of ordinary skill for purposes of deciding whether to institute.” Prelim. Resp. 3. At this stage of the proceeding and on the present record, we adopt Petitioner’s uncontested, proposed level of ordinary skill in the art, which we find consistent with the level of ordinary skill in the art reflected by the ’078 patent and the prior art of record. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978).” slip op. at 10

    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “An inter partes review may be instituted only if “the information presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). For the reasons given below, on this record, Petitioner has established a reasonable likelihood that it would prevail in showing the unpatentability of at least one of the Challenged Claims. Accordingly, we institute an inter partes review of the Challenged Claims on all grounds raised in the Petition.” slip op. at 2

    § 103 obviousnessDiscretionary denialcites Phillips · KSR · Graham
    Patents in suitUS 7,395,078
  • PTAB · Jan 31, 2025 · IPR2024-01267 · APJ Lisa A Murray · IPR · Institution

    The Board instituted IPR on claims 1–3, 7–9, 12, and 13 on all petitioned grounds, finding a reasonable likelihood that claim 1 is obvious over Arai and Fenwick.

    RulingsInstitution decision
    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Denied

      “the PTAB will not discretionarily deny institution of an IPR . . . in view of parallel district court litigation where a petitioner stipulates not to pursue in a parallel district court proceeding the same grounds as in the petition or any grounds that could have reasonably been raised in the petition. Petitioner’s stipulation in Exhibit 1020 satisfies the language from the Director’s Memorandum quoted above. Therefore, we need not analyze each Fintiv factor before determining that we will not exercise our discretion to deny institution in view of the parallel Eastern District of Texas Litigation. In light of Petitioner’s stipulation, Patent Owner’s request is denied.” slip op. at 6

    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “any evidence of objective indicia of nonobviousness. We conclude that on balance, considering the record presently before us, Petitioner has established a reasonable likelihood of showing that the differences between the subject matter of claim 1 and the teachings of Arai and Fenwick are such that the subject matter, as a whole, would have been obvious at the time of the invention to a person having ordinary skill in the art. e. Summary as to Claim 1 For the reasons discussed above, on the present record we find that Petitioner has established a reasonable likelihood that it would prevail in showing that the combination of Arai and Fenwick teaches or suggests each element of claim 1 of the ’428 patent. See 35 U.S.C. § 314(a).” slip op. at 27

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “At this stage of the proceeding and on the present record, we adopt Petitioner’s uncontested, proposed level of ordinary skill in the art, which we find consistent with the level of ordinary skill in the art reflected by the ’428 patent and the prior art of record. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978).” slip op. at 9

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundInstituted

      “Relying on the Declaration of Jean Renard Ward, Petitioner contends that “[a] POSITA would have been motivated to incorporate[] Fenwick’s teachings regarding automatically sending recognized words to an application into Arai because this would have furthered Arai’s purpose of having a natural, uninterrupted flow in entering characters without having to press extra keys.” Pet. 31–32 (citing Ex. 1002 ¶ 139). Petitioner concludes that the combination would have been obvious in that it would apply Fenwick’s known technique for recognizing words without additional user confirmation to Arai’s known method of performing handwriting recognition, ready for improvement, to yield the predictable result of the Arai/Fenwick combination: “recognition results are sent to an application without further user confirmation—e.g., pressing the Enter Key—and handwritten character recognition results are removed from the temporary memory such as RAM when the recognition results are sent to the application.” Id. at 32 (citing Ex. 1002 ¶ 140).” slip op. at 18

    § 103 obviousnessDiscretionary denialcites Phillips · KSR · Graham
    Patents in suitUS 9,026,428
  • PTAB · Jan 31, 2025 · IPR2024-00979 · APJ Lisa A Murray · IPR · Institution

    The Board instituted inter partes review of claims 1–18 on all four asserted obviousness grounds, finding a reasonable likelihood that Dolan renders at least one challenged claim unpatentable.

    RulingsInstitution decision
    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Denied

      “As set forth in the Director’s Memorandum, Interim Procedure for Discretionary Denials in AIA Post-Grant Proceedings with Parallel District Court Litigation (dated June 21, 2022), at 7, available at https://www.uspto. gov/sites/default/files/documents/interim_proc_discretionary_denials_aia_ parallel_district_court_litigation_memo_20220621_.pdf, the PTAB will not discretionarily deny institution of an IPR . . . in view of parallel district court litigation where a petitioner stipulates not to pursue in a parallel district court proceeding the same grounds as in the petition or any grounds that could have reasonably been raised in the petition. Petitioner’s stipulation (Ex. 1018) satisfies the language from the Director’s Memorandum quoted above. Therefore, we need not analyze each Fintiv factor to reach the determination that we will not exercise our discretion to deny institution in view of the parallel Eastern District of Texas Litigation.” slip op. at 7

    • PTAB / AIA Trials › Real party in interest / privityNot reached

      “Electronics, America, Inc.; and Google LLC as real parties in interest. Pet. 57. Petitioner explains that “Google LLC is a subsidiary of XXVI Holdings Inc., which is a subsidiary of Alphabet Inc.” Id. at 57 n.10. Petitioner asserts that “XXVI Holdings Inc. and Alphabet Inc. are not real parties-in-interest to this proceeding.” Id. Patent Owner identifies Cerence Operating Co., a subsidiary of Cerence, Inc., as a real party in interest. Paper 5, 1. Patent Owner disagrees with Petitioner, contending that Alphabet Inc. is also a real party in interest. Id. At this stage of the proceeding, we need not determine whether Alphabet Inc. is a real party in interest to Petitioner since neither Petitioner nor Patent Owner has identified any effect that determination would have on the outcome of this proceeding. To the extent Patent Owner seeks to maintain this contention, it should raise the issue in its Patent Owner response.” slip op. at 3

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Patent Owner does not currently take a position on the relevant level of ordinary skill in the art and believes that “the Board could assume Petitioner’s proposed level of ordinary skill for the purposes of deciding whether to institute.” Prelim. Resp. 3. At this stage of the proceeding and on the present record, we adopt Petitioner’s uncontested, proposed level of ordinary skill in the art, which we find consistent with the level of ordinary skill in the art reflected by the ’993 patent and the prior art of record. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978).” slip op. at 10

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)Plain and ordinary meaningOther

      “Additionally, only terms that are in controversy need to be construed, and these need to be construed only to the extent necessary to resolve the controversy. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). At this time, neither party proposes a specific construction of any given claim term, instead requesting that the claims be given their plain and ordinary meaning. Pet. 10–11; Prelim. Resp. 5.” slip op. at 11

    Claim construction§ 103 obviousnessDiscretionary denialcites Phillips · KSR · Graham
    Patents in suitUS 8,081,993
  • PTAB · Jan 15, 2025 · IPR2024-01108 · APJ Kevin W Cherry · IPR · Institution

    The Board instituted IPR on claims 1, 2, 5–8, 10–15, 17, 18, 20, and 21 under § 103 and granted BRP’s motion to join the Foil Boarding IPR.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “At this stage of the proceeding and based on our preliminary review, we find Petitioner has demonstrated a reasonable likelihood of showing the unpatentability of the Challenged Claims for the same reasons discussed in our Decision on Institution in the Foil Boarding IPR. Granting the Petition and joining Petitioner to the Foil Boarding IPR will provide us with the opportunity to more fully consider Patent Owner’s arguments—first raised in response to the petition in the Foil Boarding IPR—in the context in which they were first raised. Those common arguments will be fully considered in the Foil Boarding IPR, with the benefit of a complete record.8 Accordingly, for the reasons discussed above, we are persuaded Petitioner has demonstrated a reasonable likelihood of showing the unpatentability of the Challenged Claims of the ’044 patent. We therefore grant the Petition, and institute inter partes review of the Challenged Claims.” slip op. at 6

    • PTAB / AIA Trials › Joinder §315(c) / SAS all-or-nothingJoinder, grantedGranted

      “challenges the same claims on the same grounds using the same prior art, Kyocera factor (2) favors joinder. See Kyocera, IPR2013-00004, Paper 15 at 4. Indeed, the Board “routinely grants motions for joinder where the party seeking joinder introduces identical arguments and the same grounds raised in the existing proceeding.” Samsung Elecs. Co. v. Raytheon Co., IPR2016- 00962, Paper 12 at 9 (PTAB Aug. 24, 2016). Moreover, because the issues to be decided are the same and Petitioner avers that it will take an “understudy” role to Foil Boarding in the Foil Boarding IPR by consolidating all filings, refraining from advancing new arguments, binding itself to any discovery agreements, and limiting its deposition time to the time already allotted, Kyocera factors (3) and (4) also favor joinder. See Mot. 4–6; Kyocera, IPR2013-00004, Paper 15 at 4. For the reasons explained above, we find that joining Petitioner to the Foil Boarding IPR is appropriate under the present circumstances. We, therefore, grant Petitioner’s Motion.” slip op. at 8

    None
    Patents in suitUS 9,359,044
  • PTAB · Jan 15, 2025 · IPR2024-01107 · APJ Kevin W Cherry · IPR · Institution

    The Board instituted IPR on claims 1, 2, 4, 5, 7–11, 13, and 15 under § 103 and granted BRP’s motion to join IPR2024-00085.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “At this stage of the proceeding and based on our preliminary review, we find Petitioner has demonstrated a reasonable likelihood of showing the unpatentability of the Challenged Claims for the same reasons discussed in our Decision on Institution in the Foil Boarding IPR. Granting the Petition and joining Petitioner to the Foil Boarding IPR will provide us with the opportunity to more fully consider Patent Owner’s arguments—first raised in response to the petition in the Foil Boarding IPR—in the context in which they were first raised. Those common arguments will be fully considered in the Foil Boarding IPR, with the benefit of a complete record.8 Accordingly, for the reasons discussed above, we are persuaded Petitioner has demonstrated a reasonable likelihood of showing the unpatentability of the Challenged Claims of the ’659 patent. We therefore grant the Petition, and institute inter partes review of the Challenged Claims.” slip op. at 6

    • PTAB / AIA Trials › Joinder §315(c) / SAS all-or-nothingJoinder, grantedGranted

      “Patent Owner does not oppose Petitioner’s Motion. We are persuaded by Petitioner’s arguments. Because the Petition challenges the same claims on the same grounds using the same prior art, Kyocera factor (2) favors joinder. See Kyocera, IPR2013-00004, Paper 15 at 4. Indeed, the Board “routinely grants motions for joinder where the party seeking joinder introduces identical arguments and the same grounds raised in the existing proceeding.” Samsung Elecs. Co. v. Raytheon Co., IPR2016- 00962, Paper 12 at 9 (PTAB Aug. 24, 2016). Moreover, because the issues to be decided are the same and Petitioner avers that it will take an “understudy” role to Foil Boarding in the Foil Boarding IPR by consolidating all filings, refraining from advancing new arguments, binding itself to any discovery agreements, and limiting its deposition time to the time already allotted, Kyocera factors (3) and (4) also favor joinder. See Mot. 4–6; Kyocera, IPR2013-00004, Paper 15 at 4. For the reasons explained above, we find that joining Petitioner to the Foil Boarding IPR is appropriate under the present circumstances. We, therefore, grant Petitioner’s Motion.” slip op. at 8

    None
    Patents in suitUS 9,586,659
  • PTAB · Jan 6, 2025 · IPR2024-01069 · APJ Sean P O’Hanlon · IPR · Institution

    The Board instituted IPR on claims 1–21 and all asserted grounds after finding a reasonable likelihood of success on at least one challenged claim.

    RulingsInstitution decision
    • PTAB / AIA Trials › Discretionary denial › §325(d) same art / argumentsInstitution denied 325dDenied

      “Thus, under § 325(d), the Board uses the following two-part framework: (1) whether the same or substantially the same art previously was presented to the Office or whether the same or substantially the same arguments previously were presented to the Office; and (2) if either condition of [the] first part of the framework is satisfied, whether the petitioner has demonstrated that the Office erred in a manner material to the patentability of [the] challenged claims.” slip op. at 9

    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “Institution of an inter partes review is authorized by statute only when “the information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). A decision to institute may not institute on fewer than all claims challenged in the petition. SAS Inst. Inc. v. Iancu, 138 S. Ct. 1348, 1354, 1359–60 (2018). If the Board institutes a trial, the Board will institute on all challenges raised in the petition. See 37 C.F.R. § 42.108(a) (“When instituting . . . review, the Board will authorize the review to proceed on all of the challenged claims and on all grounds of unpatentability asserted for each claim.”). We have authority, acting on the designation of the Director, to determine whether to institute an inter partes review under 35 U.S.C. § 314 and 37 C.F.R. § 42.4(a). For the reasons set forth below, upon considering the parties’ briefs and evidence of record, we conclude that the information presented shows that there is a reasonable likelihood that Petitioner would prevail in establishing the unpatentability of at least one of the challenged claims. Thus, we institute inter partes review of all challenged claims based on all asserted grounds.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Petitioner contends that a person having ordinary skill in the art at the time of the invention would have had “at least a bachelor’s degree in mechanical or manufacturing engineering; mechatronics; electrical engineering plus coursework in mechanical engineering, manufacturing engineering, or mechatronics; or a similar technical degree,” and “would have also had at least 2 years of experience designing consumer electronics, such as eyewear with electronics.” Pet. 15–16 (citing Ex. 1002 ¶ 32). Petitioner contends that “[w]ork experience could substitute for formal education and additional formal education could substitute for work experience.” Id. at 16 (citing Ex. 1002 ¶ 32). Patent Owner does not contest Petitioner’s proposed definition or proffer a definition of its own. See generally Prelim. Resp. We find Petitioner’s definition to be consistent with the problems and solutions disclosed in the ’355 patent and prior art of record, and adopt it as our own for purposes of this Decision. See, e.g., GPAC, 57 F.3d at 1579 (approving the determination of the level of ordinary skill in the art by appeal to the references of record).” slip op. at 18

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’” Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (alteration in original) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). slip op. at 19

    Claim construction§ 103 obviousnessDiscretionary denialcites KSR · Graham
    Patents in suitUS 10,613,355
  • PTAB · Dec 19, 2024 · IPR2024-01068 · APJ Bart A Gerstenblith · IPR · Institution

    The Board instituted IPR on claims 1–5, 8, 9, 11–23, 26, 27, and 29–36 on all petitioned grounds and granted NXP's conditional motion to join the TI IPR.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “An inter partes review may be instituted only if “the information presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2018). For the reasons given below, we institute inter partes review of the Challenged Claims of the ’528 patent. We also grant Petitioner’s Conditional Motion for Joinder and join Petitioner to IPR2024-00936.” slip op. at 3

    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Institution denied fintivDenied

      “As set forth in the Director’s Memorandum, Interim Procedure for Discretionary Denials in AIA Post-Grant Proceedings with Parallel District Court Litigation (dated June 21, 2022), at 7, available at https://www.uspto.gov/sites/default/files/documents/interim_proc_discretion ary_denials_aia_parallel_district_court_litigation_memo_20220621_.pdf, the [Patent Trial and Appeal Board] will not discretionarily deny institution of an IPR . . . in view of parallel district court litigation where a petitioner stipulates not to pursue in a parallel district court proceeding the same grounds as in the petition or any grounds that could have reasonably been raised in the petition. Petitioner’s stipulation (Ex. 1041) satisfies the language from the Director’s Memorandum quoted above. Additionally, we do not see an issue with ambiguity in Petitioner’s stipulation. Specifically, following joinder, this IPR (i.e., IPR2024-01068), which is based on the Petition at issue here (i.e., the Petition filed by NXP), will still be pending even though Petitioner will be joined to IPR2024-00936. Thus, the “IPR from this [P]etition” will be “pending,” which satisfies the language of Petitioner’s stipulation and precludes the actions stated therein. Further, to the extent there was any potential ambiguity, that ambiguity is resolved by Petitioner’s representations in e-mail correspondence (Exhibit 3001), as noted above. Therefore, we need not analyze each Fintiv factor to reach the determination that we will not exercise our discretion to deny institution in view of the parallel litigation.” slip op. at 8

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successInstituted

      “Compare Pet. with TI IPR, Paper 2 (petition); see also Motion 2 (stating that “NXP’s petition challenges the same claims on the same grounds, relies on the same prior art, and includes the exact same substantive arguments as the TI IPR”). Patent Owner raises the same arguments that it presented in the TI IPR. Regarding the first ground, Patent Owner asserts that (1) Petitioner has not shown that one of ordinary skill in the art would have been motivated to combine Tayloe, TI Datasheet, and Macnally (Prelim. Resp. 5– 9) and (2) Petitioner fails to provide a sufficient reasonable expectation of success in combining Macnally and Tayloe (id. at 9–12). Additionally, Patent Owner contends we should exercise our discretion to deny institution” slip op. at 6

    • PTAB / AIA Trials › Joinder §315(c) / SAS all-or-nothingJoinder, grantedGranted

      “35 U.S.C. § 315(c). We have explained that a motion for joinder should: (1) set forth reasons why joinder is appropriate; (2) identify any new grounds of unpatentability asserted in the petition; (3) explain what impact, if any, joinder would have on the trial schedule for the existing review; and (4) address specifically how briefing and discovery may be simplified. Kyocera Corp. v. Softview LLC, IPR2013-00004, Paper 15 at 4 (PTAB Apr. 24, 2013).” slip op. at 10

    § 103 obviousnessDiscretionary denial
    Patents in suitUS 9,118,528
  • PTAB · Dec 19, 2024 · IPR2024-01066 · APJ Bart A Gerstenblith · IPR · Institution

    The Board instituted IPR on claim 14 under all three obviousness grounds and granted NXP’s conditional motion to join the Texas Instruments IPR.

    RulingsInstitution decision
    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Decided for petitioner

      “the [Patent Trial and Appeal Board] will not discretionarily deny institution of an IPR . . . in view of parallel district court litigation where a petitioner stipulates not to pursue in a parallel district court proceeding the same grounds as in the petition or any grounds that could have reasonably been raised in the petition. Petitioner’s stipulation (Ex. 1041) satisfies the language from the Director’s Memorandum quoted above. Additionally, we do not see an issue with ambiguity in Petitioner’s stipulation. Specifically, following joinder, this IPR (i.e., IPR2024-01066), which is based on the Petition at issue here (i.e., the Petition filed by NXP), will still be pending even though Petitioner will be joined to IPR2024-00935. Thus, the “IPR from this [P]etition” will be “pending,” which satisfies the language of Petitioner’s stipulation and precludes the actions stated therein. Further, to the extent there was any potential ambiguity, that ambiguity is resolved by Petitioner’s representations in e-mail correspondence (Exhibit 3001), as noted above. Therefore, we need not analyze each Fintiv factor to reach the determination that we will not exercise our discretion to deny institution in view of the parallel litigation.” slip op. at 6

    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2018). For the reasons given below, we institute inter partes review of the Challenged Claim of the ’177 patent. We also grant Petitioner’s Conditional Motion for Joinder and join Petitioner to IPR2024-00935.” slip op. at 2

    • PTAB / AIA Trials › Joinder §315(c) / SAS all-or-nothingJoinder, grantedGranted

      “join as a party to [an instituted] inter partes review any person who properly files a petition under section 311 that . . . after receiving a preliminary response under section 313 or the expiration of the time for filing such a response . . . warrants the institution of an inter partes review under section 314. 35 U.S.C. § 315(c). We have explained that a motion for joinder should: (1) set forth reasons why joinder is appropriate; (2) identify any new grounds of unpatentability asserted in the petition; (3) explain what impact, if any, joinder would have on the trial schedule for the existing review; and (4) address specifically how briefing and discovery may be simplified.” slip op. at 7

    Discretionary denial
    Patents in suitUS 7,865,177
Page 1 of 5
← Previous12345Next →

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.