  • PTAB · Oct 10, 2025 · IPR2025-00653 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution on all claims because the Petition did not show a reasonable likelihood that any challenged claim was unpatentable over the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “An inter partes review may be instituted only if “the information presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’504 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Additionally, only terms that are in controversy need to be construed, and these need be construed only to the extent necessary to resolve the controversy. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 9; Prelim. Resp. 4 (citing Ex. 2009 ¶ 72); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13

    • Expert testimonyPetitioner expert discountedDecided for patent owner

      “Ex. 1002 ¶ 47. As reflected above, Dr. Wooley’s testimony as to element [1.2] does not even assert that Cardamone discloses a tank, let alone one or more sensors disposed at a tank as recited in element [1.2]. Thus, Dr. Wooley’s testimony does not support Petitioner’s argument on this issue.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,726,504
  • Tanklogix, LLC v. SiteproInstitution denied
    PTAB · Oct 10, 2025 · IPR2025-00650 · APJ Sheila F Mcshane · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 18–32 and 34 were unpatentable over Kahn or Kahn and Gutierrez.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). Upon consideration of the Petition, the Preliminary Response, and the evidence of record, we determine that Petitioner has not established a reasonable likelihood of prevailing with respect to the unpatentability of at least one claim of the ’871 patent. Accordingly, for the reasons that follow, we decline to institute an inter partes review of claims 18–32 and 34 of the ’871 patent.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The respective proposed levels of qualifications for a person of ordinary skill in the art are similar, with Patent Owner proposing two years of experience compared to Petitioner proposing significant experience with remotely controlling fluid-handling devices, like SCADA systems. Patent Owner also proposes more extensive experience in lieu of educational experience. While we find Petitioner’s proposed qualifications to be acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of skill necessary to understand and implement the teachings of the ’871 patent and the asserted prior art. Our analysis and findings herein, however, do not turn on any differences in the qualifications adopted.” slip op. at 8

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “We determine that we need not expressly construe any claim terms to resolve the parties’ disputes on the current record. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 10

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “actuators and the remote control of fluid handling devices, including the receipt with the user-interface module of “a user command to actuate an actuator via a presented control interface” (limitation [18.7]) and “account authorized to send commands to remotely control fluid handling devices” (limitation [18.11]). We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses or teaches these limitations because the evidence does not provide support that there is remote control of fluid handling devices or the use of a user command on a control interface to send a command to a fluid handling device, for instance. Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but we do not discern that it teaches or discloses the capability to remotely control fluid handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, the Kahn disclosures that Petitioner repeatedly relies upon for allegedly teaching this control are deficient. See Ex. 1005, 10:62–67, 14:35– 15:2, 15:62–16:32; see also Pet. 12–14, 16–18. Kahn discloses that “the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance.” Ex. 1005, 10:62–67. Communication unit 112B is part of the local “sensor unit,” wherein the detection conditions determined by the sensor are communicated to remote devices by communication unit 112B. See id. at 3:31–33, 5:62–6:2, 6:27–35, 7:33–37, 13:7–12, Figs. 1A–1C. Kahn discloses that the sensor units, which include communication units 112B, can be located near shut-off valves and can communicate with distant locations. See id. at 11:1–13. There are no disclosures, however, in the above passages that there is remote control of fluid handling devices, that there is a user command on a control interface that actuates an actuator, or that there is a command sent to the facility actuators via a network connection, as required in limitations [18.5]–[18.7] and [18.9]–[18.12], respectively. Rather, the disclosure indicates that the communication unit 112B includes on-site alerts and that the local (non-remote) communication unit 112B can be interfaced with the control valve.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 10,488,871
  • PTAB · Jul 14, 2025 · IPR2024-00465 · APJ Bart A Gerstenblith · IPR · Final written decision

    Claims 1–24 are unpatentable: claims 1–10 and 12–24 as obvious over Szrek and Llach, and claim 11 as obvious over Szrek, Llach, and Gilmore.

    RulingsFinal written decision
    • Skill levelSkill level board ownDecided for petitioner

      “B. Level of Ordinary Skill in the Art Petitioner proposes that the level of ordinary skill in the art is an artisan with a working knowledge of POS activation systems and lottery systems that was gained through a mixture of training and work experience in the relevant field such as (i) having a Bachelor’s degree in computer science, computer communications, electrical engineering, or equivalent degree, coupled with at least three years of work experience; (ii) having a Master’s degree in computer science, computer communications, or electrical engineering, but having less work experience; or (iii) having no formal degree, but having experience in the relevant field of at least six years of work experience. Pet. 2–3 (citing Ex. 1003 ¶¶ 13–14).9 Patent Owner states that, “[f]or the purpose of this proceeding, Patent Owner adopts the Petition’s proposed definition of the level of ordinary skill in the art.” PO Resp. 19 (citing Pet. 2–3). We find that the parties’ agreed-upon level of ordinary skill in the art is consistent with the level of ordinary skill in the art reflected by the ’451 patent and the prior art of record. See Inst. Dec. 14; see Okajima v. 9 Petitioner proposes the same level of ordinary skill in the art that the Board adopted in PGR2020-00084 (Pet. 2–3 (citing Ex. 1008, 11)), and IPR2023- 01235 (see IPR2023-01235, Paper 34 at 12–13). Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Therefore, we adopt the parties’ agreed-upon level of ordinary skill in the art, as articulated above, in our consideration of the issues presently before us.” slip op. at 13

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “We need not construe “transaction processor” expressly because its meaning is not in dispute and its construction is not necessary to resolve the controversy before us.” slip op. at 16

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundDecided for petitioner

      “On balance, we find that even with the alleged disadvantages identified by Patent Owner, one of ordinary skill in the art would have been motivated to modify Szrek with Llach’s third-party transaction processor because the advantage of having a “centralized intermediary” allows Szrek’s system to support different game providers, such as different lottery companies, which would reduce some implementation costs and allow the system to be more easily and cheaply extended. Pet. 47 (citing Ex. 1003 ¶ 181); see Medichem, S.A. v. Rolabo, S.L., 437 F.3d 1157, 1165 (Fed. Cir. 2006) (“a given course of action often has simultaneous advantages and disadvantages, and this does not necessarily obviate motivation to combine”) (citing Winner Int’l Royalty Corp. v. Wang, 202 F.3d 1340, 1349 n.8 (Fed. Cir. 2000)); see also Intel Corp. v. Qualcomm Inc., 21 F.4th 784, 795 (Fed. Cir. 2021) (stating the same). We acknowledge that the combination comes with some disadvantages, including “add[ed] delay, reduce[d] efficiency, and . . . implementation complexities by converting a simple, direct communication exchange into an exchange that traverses multiple systems.” PO Resp. 52 (citing Ex. 2052 ¶ 163). But, “[t]he fact that the motivating benefit comes at the expense of another benefit, however, should not nullify its use as a basis to modify the disclosure of one reference with the teachings of another. Instead, the benefits, both lost and gained, should be weighed against one another.” Winner, 202 F.3d at 1349 n.8. Here, Szrek expressly teaches indirect communication as a possible implementation of its system and Petitioner’s combination—employing Llach’s third-party transaction processor as part of the indirect communication channel—offers the attractive benefit of allowing Szrek’s system to support different game providers, which would reduce some implementation costs even if it might increase other costs, e.g., by having to program certain components (e.g., the cash registers) differently. Specifically, we find that the ability to expand Szrek’s system to support different game providers provides advantages that outweigh the disadvantages discussed above in the circumstance where one desires a more robust and comprehensive system. See Pet. Reply 23 (noting three advantages of the combination— (1) “allow[ing] Szrek’s system to use ‘a centralized system for activating lottery tickets from different retailers and different locations,’” (2) “allow[ing] support for different game providers, such as different lottery companies,” “reduc[ing] implementation costs,” and (3) “allow[ing] Szrek’s system to ‘communicate with individual card” slip op. at 37

    • Obviousness (§103) › Motivation to combine / reasonable expectation of success › HindsightMotivation foundDecided for petitioner

      “On balance, we find that even with the alleged disadvantages identified by Patent Owner, one of ordinary skill in the art would have been motivated to modify Szrek with Llach’s third-party transaction processor because the advantage of having a “centralized intermediary” allows Szrek’s system to support different game providers, such as different lottery companies, which would reduce some implementation costs and allow the system to be more easily and cheaply extended. Pet. 47 (citing Ex. 1003 ¶ 181); see Medichem, S.A. v. Rolabo, S.L., 437 F.3d 1157, 1165 (Fed. Cir. 2006) (“a given course of action often has simultaneous advantages and disadvantages, and this does not necessarily obviate motivation to combine”) (citing Winner Int’l Royalty Corp. v. Wang, 202 F.3d 1340, 1349 n.8 (Fed. Cir. 2000)); see also Intel Corp. v. Qualcomm Inc., 21 F.4th 784, 795 (Fed. Cir. 2021) (stating the same). We acknowledge that the combination comes with some disadvantages, including “add[ed] delay, reduce[d] efficiency, and . . . implementation complexities by converting a simple, direct communication exchange into an exchange that traverses multiple systems.” PO Resp. 52 (citing Ex. 2052 ¶ 163). But, “[t]he fact that the motivating benefit comes at the expense of another benefit, however, should not nullify its use as a basis to modify the disclosure of one reference with the teachings of another. Instead, the benefits, both lost and gained, should be weighed against one another.” Winner, 202 F.3d at 1349 n.8. Here, Szrek expressly teaches indirect communication as a possible implementation of its system and Petitioner’s combination—employing Llach’s third-party transaction processor as part of the indirect communication channel—offers the attractive benefit of allowing Szrek’s system to support different game providers, which would reduce some implementation costs even if it might increase other costs, e.g., by having to program certain components (e.g., the cash registers) differently. Specifically, we find that the ability to expand Szrek’s system to support different game providers provides advantages that outweigh the disadvantages discussed above in the circumstance where one desires a more robust and comprehensive system. See Pet. Reply 23 (noting three advantages of the combination— (1) “allow[ing] Szrek’s system to use ‘a centralized system for activating lottery tickets from different retailers and different locations,’” (2) “allow[ing] support for different game providers, such as different lottery companies,” “reduc[ing] implementation costs,” and (3) “allow[ing] Szrek’s system to ‘communicate with individual card” slip op. at 37

    Patent outcomesUS 11,488,451 unpatentable
    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,488,451
  • PTAB · May 28, 2025 · IPR2025-00301 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution of review for claims 1–11, 16, and 21 under § 314(a), finding the Fintiv factors favored discretionary denial, and denied joinder.

    RulingsInstitution decision
    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Institution denied fintivInstitution denied

      “2026. This date is nearly five months prior to the date on which the final written decision would be due if trial were instituted in this proceeding. And, even if we assume Petitioner’s alleged February–March 2026 trial date, this date too is several months prior to the projected final written decision deadline. As such, it is unlikely that a final written decision in this proceeding would issue before trial in the district court, unless the trial was delayed or rescheduled for a later time. Thus, we find this factor weighs in favor of exercising our discretion to deny institution. See ARM Ltd. v. Daedalus Prime LLC, IPR2025-00207, Paper 10 at 2 (May 16, 2025) (Before the Office of the Under Secretary of Commerce for Intellectual Property and Director of the United States Patent and Trademark Office) (exercising discretion to deny institution with the same relative timing between district court trial and final written decision deadline).” slip op. at 13

    • PTAB / AIA Trials › Motions to amend / substitute claimsNot reached
    • PTAB / AIA Trials › Joinder §315(c) / SAS all-or-nothingJoinder, deniedDenied
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied discretionary otherInstitution denied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). Institution of inter partes review, however, is discretionary. See Harmonic Inc. v. Avid Tech., Inc., 815 F.3d 1356, 1367 (Fed. Cir. 2016) (“[T]he PTO is permitted, but never compelled, to institute an IPR proceeding.”). For the reasons discussed below, we exercise discretion pursuant to 35 U.S.C. § 314(a) not to institute inter partes review. Additionally, for the same reasons and because institution was denied in IPR2024-01248, we deny Petitioner’s Motion for Joinder. See 35 U.S.C. § 315(c) (“[T]he Director . . . may join as a party . . . any person who properly files a petition under section 311 that the Director . . . determines warrants the institution of an inter partes review under section 314.”).” slip op. at 3

    Discretionary denial
    Patents in suitUS 9,814,071
  • PTAB · May 16, 2025 · IPR2024-00215 · APJ Jason M Repko · IPR · Final written decision

    Claims 1–10 are unpatentable as obvious over Foster and Hayhurst; the Board did not reach the anticipation and obviousness grounds based on Orsini.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “had at least a bachelor’s degree in computer science, computer engineering, or a related field, with three years of experience in the area of securing data from unauthorized access or use.” Pet. 6 (citing Ex. 1003 ¶¶ 37–38). Petitioner also asserts that a “higher level of education may substitute for less experience.” Id. 2 Available at https://www.uspto.gov/TrialPracticeGuideConsolidated. Patent Owner submitted the Declaration of Dr. Rubin in support of its Response, and in that Declaration, Dr. Rubin accepted Petitioner’s definition. Ex. 2033 ¶¶ 20–21. For the reasons given, we apply the same level of ordinary skill in the art that we did in the Institution Decision. Inst. Dec. 4.” slip op. at 6

    • Expert testimonyPetitioner expert creditedPatent owner expert discountedMixed

      “See Section II.C.3.a.ii supra. Although Dr. Rubin calls Hayhurst’s security benefits “ancillary” (Ex. 2033 ¶¶ 108–109, quoted in PO Resp. 40), this does not align with Hayhurst (see Ex. 1007 ¶¶ 2, 7, 8, 21). For example, Hayhurst describes the security measures in the Technical Field section (id. ¶ 2) and the Summary of the Invention section (id. ¶¶ 7, 8). Hayhurst also discusses piracy deterrence in both the Summary of the Invention section (id. ¶ 8) and the invention’s detailed description (id. ¶ 21). Because Dr. Rubin does not give sufficient weight to Hayhurst’s discussion of piracy deterrence and security, we do not credit Dr. Rubin’s testimony on this issue. See Ex. 2033 ¶¶ 108–109. Thus, we agree with Petitioner that Hayhurst is reasonably pertinent to the network-security problem that the inventors were trying to solve. See Reply 5–6.” slip op. at 15

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction needed

      “Neither party explicitly proposed constructions during trial, and we do not see the need for construing any terms in this Decision.” slip op. at 8

    • Obviousness (§103) › Analogous artAnalogous artDecided for petitioner

      “3. Claim 1 a. Analogous Art “To be considered within the prior art for purposes of the obviousness analysis, a reference must be analogous.” Circuit Check Inc. v. QXQ Inc., 795 F.3d 1331, 1335 (Fed. Cir. 2015) (citing Wang Lab. v. Toshiba Corp., 993 F.2d 858, 864 (Fed. Cir. 1993)). “Two separate tests define the scope of analogous prior art: (1) whether the art is from the same field of endeavor, regardless of the problem addressed and, (2) if the reference is not within the pertinent to the particular problem with which the inventor is involved.” Sanofi-Aventis Deutschland Gmbh v. Mylan Pharms. Inc., 66 F.4th 1373, 1377 (Fed. Cir. 2023) (quoting In re Bigio, 381 F.3d 1320, 1325 (Fed. Cir. 2004) (citations omitted)).” slip op. at 9

    Patent outcomesUS 10,452,854 unpatentable
    Claim construction§ 103 obviousnesscites Phillips
    Patents in suitUS 10,452,854
  • PTAB · Apr 24, 2025 · IPR2024-01480 · APJ Sharon Fenick · IPR · Institution

    The Board denied institution under § 314(a), citing the Fintiv factors, including the earlier trial date and the petition’s not particularly strong merits, for claims 1–3, 10–13, 17, and 20–22.

    RulingsInstitution decision
    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Institution denied fintivDenied

      “is our focus here. As stated, that trial is set to occur about six months before a final written decision would issue in this proceeding. The district court has stated that this trial date setting “cannot be changed without an acceptable showing of good cause.” Prelim. Resp. 4, 8 (quoting Ex. 2001, 5). We are not persuaded by Petitioner’s unsupported argument that the trial date is speculative. We also consider the fact that the median time-to-trial statistic projects a trial date of July 2025, earlier than the actual date set by the district court. Ex. 2001; Ex. 2007; Prelim. Resp. 8–9. The fact that the time-to-trial statistic is earlier than the scheduled trial date confirms that the scheduled trial date is credible and should be given weight. From this evidence, we are persuaded that we should rely on the scheduled trial date in the Lenovo Group litigation as the main indicator of a trial court reaching the merits of the invalidity of the patent-at-issue before we issue a final written decision. Accordingly, this factor strongly favors exercising discretionary denial. C.” slip op. at 9

    • Skill levelSkill level petitioner adoptedOther

      “1. Analysis of Petitioner’s Challenges a) Level of Ordinary Skill in the Art Petitioner asserts that one of ordinary skill in the art would have had a bachelor’s degree in electrical engineering, computer engineering, computer science, or equivalent training, and three years of experience with data communications systems or interfaces, including at least some experience with serial or display data communications systems or interfaces. Additional education can substitute for less work experience, and vice versa. Pet. 14; see Ex. 1003 ¶ 41. Patent Owner does not dispute or comment on this proposal or propose an alternate level of ordinary skill in the art. Based on a review of the record, we adopt Petitioner’s proposed level of ordinary skill in the art, which is consistent with the evidence of record, including the asserted prior art and ’103 patent.” slip op. at 14

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “same standard used in district courts, as described in Phillips v. AWH Corp., 415 F.3d 1303 (Fed. Cir. 2005) (en banc). See 37 C.F.R. § 42.100(b) (2023). Under this standard, claim terms have their ordinary and customary meaning, as would be understood by a person of ordinary skill in the art at the time of the invention, in light of the language of the claims, the specification, and the prosecution history. See Phillips, 415 F.3d at 1313–14. Neither Petitioner nor Patent Owner asserts that any claim term requires claim construction (Pet. 14–15; Prelim. Resp.) and we do not discern that any claim term requires construction to arrive at our conclusions herein. c)” slip op. at 14

    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied

      “2. Conclusion Regarding the Merits The discussion above identifies weaknesses in the Petition that we have considered in our evaluation of Fintiv factors. While we do not make a determination regarding whether the Petition shows that there is a reasonable likelihood of prevailing were we to institute, for the reasons given, we determine that this Petition does not present particularly strong merits. G. Weighing the Fintiv Factors We have considered the circumstances and facts before us in view of the Fintiv factors. We take “a holistic view of whether efficiency and integrity of the system are best served by denying or instituting review” when evaluating these factors. Fintiv at 6. Because of the Sotera stipulation, factor 4 weighs strongly in favor of not exercising discretion. However, two other factors weigh in favor of exercising discretion, especially the trial date factor. The merits of Petitioner’s challenge are not particularly strong. A balanced assessment of the factors leads us to exercise discretion to deny the Petition. Therefore, we conclude that the evidence of record favors exercising our discretion under 35 U.S.C. § 314(a) to deny institution of an inter partes review.” slip op. at 22

    Claim constructionDiscretionary denialcites Phillips
    Patents in suitUS 9,852,103
  • PTAB · Apr 17, 2025 · IPR2024-01482 · APJ Thomas L Giannetti · IPR · Institution

    The Board denied institution on claims 1, 2, 4, 8–10, 12, 13, 15, 18–20, and 25, exercising § 314(a) discretion after balancing the Fintiv factors and finding the merits not particularly strong.

    RulingsInstitution decision
    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Institution denied

      “partes review “allays concerns about inefficiency and duplication of efforts,” and strongly weighs against exercising our authority to deny institution. Fintiv, Paper 11 at 6. Of the three district court proceedings, the Lenovo Group case, pending in the Eastern District of Texas, is the most significant to our analysis here. In the Lenovo Group case, Lenovo Group has not requested a stay. Prelim. Resp. 16. Patent Owner argues that the Lenovo Group case is not likely to be stayed based on that court’s low grant rate in other cases and the progress of that case in particular. Id. at 17. The district court in the HP case denied a stay without prejudice and stated that a stay could be reconsidered in the future depending on the outcome at the PTAB. Prelim. Reply 3. The Dell case has been stayed. Id. On this record, we decline to speculate as to how any of the involved district courts where no stay is pending might rule on any future motion to stay. Thus, we determine that, while one stay has been granted, the lack of a stay in the other underlying district court cases, especially the Lenovo Group case, is not sufficiently persuasive to weigh this factor against exercising discretion. Apple Inc. v. Fintiv, Inc., IPR2020-00019, Paper 15 at 12 (PTAB May 13, 2020) (informative), cautions against speculating whether the district court would grant a stay if one were requested. Therefore, this factor has a neutral effect on the overall balancing of the Fintiv factors. B. Proximity of Trial Date to Projected Statutory Deadline (Factor 2) The scheduled trial date for the Lenovo Group case is November 3, 2025, which is about six months prior to the expected date for the final written decision here (i.e., late April 2026). See Prelim. Resp. 20; IPR2024- 01429, Ex. 2002 (Lenovo Group case Docket Control Order), 1. Petitioner argues this trial date is uncertain. Prelim. Reply 3. Further, Petitioner focuses its argument on what it terms a “growing backlog” in the Eastern District of Texas and “associated scheduling uncertainty.” Id. at 4. Petitioner refers to the status of the HP case, which is currently set for trial on September 21, 2026, and the stay in the Dell case. Id. Patent Owner responds that “[b]oth the scheduled trial date and the date of trial [in the Lenovo Group case] based on median time-to-trial statistics occur months before a final written decision would be expected here.” Prelim. Sur-reply 4. Patent Owner asserts that the time-to-trial statistics for the Eastern District of Texas project a median time-to-trial of 21.9 months. Prelim. Resp. 20–21 (citing Ex. 2007, U.S. District Courts Federal Court Management Statistics–Profiles—September 30, 2024). This projection yields a trial date that is prior to the expected final written decision date of April 2026. Prelim. Sur-reply 4. As with the previous factor, the status of the Lenovo Group case is our focus here. As stated, that trial is set to occur about six months before a final written decision would issue in this proceeding. The district court has stated that this trial date setting “cannot be changed without an acceptable showing of good cause.” Prelim. Resp. 20. We are not persuaded by Petitioner’s unsupported argument that the trial date is uncertain. We also consider the fact that the median time-to-trial statistic discussed by both parties projects a trial date earlier than the actual date set by the district court. Ex. 2007; Prelim. Sur-reply 1. The fact that the time-to-trial statistic is earlier than the trial date set in the Lenovo Group case confirms that the schedule set by the district court is credible and should be given weight. From this evidence, we are persuaded that we should rely on the trial” slip op. at 9

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successNot reached

      “E. Conclusion Regarding the Merits Petitioner does not present particularly strong merits. Petitioner’s arguments on the “bus limitation,” to succeed at trial, would require addressing a claim construction issue that was never addressed in the Petition and is arguably contradicted by the ’520 patent, which discloses transmitting packets representing a plurality of different control signals on a single bus. See Prelim. Sur-reply 2 (citing Ex. 1001, 7:34–38, 9:23–25, 9:50–54). Similarly, prevailing on the “modified protocol” issue would require proving that the HDMI–C protocol, which uses the same separate channel arrangement for CEC and DDC as standard HDMI, is sufficiently “modified” to meet the claim. Taking into account Patent Owner’s persuasive arguments supra in response, and for the reasons given, we do not find the merits of Petitioner’s position on either of these dispositive issues to be particularly strong.” slip op. at 20

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “and only to the extent necessary to resolve the issues in dispute. See Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999); Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017). Neither party proposes claim constructions for our consideration. Petitioner submits that it “for the purposes of this proceeding, the terms of the challenged claims should be given their plain and ordinary meaning, and no terms require specific construction.” Pet. 8. Patent Owner does not dispute Petitioner’s position that no terms require construction. Prelim. Resp. 11–12. We determine there are no claim terms that need to be expressly construed for this Decision.” slip op. at 15

    • Skill levelDecided for patent owner

      “Patent Owner states that a person of ordinary skill “would have the equivalent of a bachelor’s degree in electrical engineering, computer engineering, computer science, or equivalent training and three years of work experience with data communications systems or interfaces, including at least some experience with serial or display data communications systems or interfaces .” Prelim. Resp. 12. The differences between these nearly-identical definitions are minor and immaterial to our decision. We regard either description as consistent with the challenged patent and the prior art before us. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (prior art itself may reflect an appropriate level of skill).” slip op. at 16

    Claim construction§ 103 obviousnessDiscretionary denial
    Patents in suitUS 7,856,520
  • PTAB · Apr 17, 2025 · IPR2024-01481 · APJ Thomas L Giannetti · IPR · Institution

    The Board denied institution on all challenged claims under § 314(a), based on its Fintiv analysis, including the earlier district court trial date and weakness in the merits.

    RulingsInstitution decision
    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Institution denied fintivInstitution denied

      “date in the Lenovo Group case as the main indicator of a trial court reaching the merits of the invalidity of the patent-at-issue before we issue a final written decision. Accordingly, this factor strongly favors discretionary denial of the Petition.” slip op. at 11

    • Skill levelSkill level board ownOther

      “patent “would have had a bachelor’s degree in electrical engineering, computer engineering, computer science, or equivalent training, and three years of experience with data communications systems or interfaces, including at least some experience with serial or display data communications systems or interfaces.” Pet. 6. Patent Owner states that a person of ordinary skill “would have the equivalent of a bachelor’s degree in electrical engineering, computer engineering, computer science, or equivalent training and three years of work experience with data communications.” Prelim. Resp. 6–7. The differences between the definitions are minor and immaterial to our decision. We regard either description as consistent with the challenged patent and the prior art before us. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (prior art itself may reflect an appropriate level of skill).” slip op. at 16

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction needed

      “and only to the extent necessary to resolve the issues in dispute. See Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999); Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017). Neither party proposes claim constructions for our consideration. Petitioner reports that it “does not believe that any specialized constructions are necessary.” Pet. 6. Patent Owner “does not disagree.” Prelim. Resp. 6. However, Petitioner’s challenge raises an implicit claim construction issue not addressed in the Petition that we discuss in our analysis below.” slip op. at 15

    • BurdenNot reached

      “example, claim 11 recites “receiving a synchronization symbol by a receiver indicating a packet type, each packet type having a different synchronization symbol.” Ex. 1001, 37:53–55. The other independent claims challenged in the Petition are similar in their recitation of a “synchronization symbol.” See id. at 37:9 (claim 1), 38:26–27 (claim 19). Petitioner argues this limitation is disclosed by Auld in view of MPEG-2 Part. 1. Pet. 15–16. Citing Figure 5 of Auld, reproduced in Section IV.C.1, supra, Petitioner asserts that “[t]he ‘sync codes’ in Auld consist of sequences of symbols that are used for synchronization, and therefore qualify as synchronization symbols.” Id. at 17. Patent Owner responds that “what the Petitioners identified as a ‘synchronization symbol’ [in Auld] is in what they have identified as a ‘packet of (or having) symbols.’” Prelim. Resp. 1. In contrast, “[i]n the specification and claims of the ’798 Patent, the claimed ‘synchronization symbol’ is separate from, and precedes, the claimed ‘packet of (or having) symbols.’” Prelim. Resp. 1. In disputing Petitioner’s identification in Auld of a synchronization symbol as claimed, Patent Owner points to Figure 9A of the ’798 patent (reproduced in Section II.C, supra), showing synchronization primitives 901 and 905 as separate from and transmitted before packets 902 and 907, respectively. Id. at 4. Patent Owner also relies on the description of the Figure 9A embodiment in the ’798 patent specification. Id. at 3–5. That description places transmission of the synchronization primitive encoded with the patent type before the control packet in the transmission sequence:” slip op. at 18

    Claim constructionDiscretionary denial
    Patents in suitUS 7,746,798
  • PTAB · Apr 16, 2025 · IPR2024-01429 · APJ Karl D Easthom · IPR · Institution

    The Board denied institution on all challenged claims, exercising § 314(a) discretion based on the Fintiv factors, especially the earlier district court trial date and weaknesses in the merits.

    RulingsInstitution decision
    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Denied

      “is our focus here. As stated, that trial is set to occur about six months before a final written decision would issue in this proceeding. The District Court has stated that this trial date setting “cannot be changed without an acceptable showing of good cause.” Prelim. Resp. 17. We are not persuaded by Petitioner’s unsupported argument that the trial date is speculative. We also consider the fact that the median time-to-trial statistic projects a trial date of July 2025, earlier than the actual date set by the District Court. Ex. 2002; Ex. 2008; Prelim. Resp. 17–18. The fact that the time-to-trial statistic is earlier than the trial date set by Judge Gilstrap confirms that the schedule set by the District Court is credible and should be given weight. From this evidence, we are persuaded that we should rely on the trial date in the Lenovo Group litigation as the main indicator of a trial court reaching the merits of the invalidity of the patent-at-issue before we issue a final written decision. Accordingly, this factor strongly favors exercising discretionary denial. C.” slip op. at 8

    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied

      “integrity of the system are best served by denying or instituting review” when evaluating these factors. Fintiv at 6. Because of the Sotera stipulation, factor 4 weighs strongly in favor of not exercising discretion. However, two other factors weigh in favor of exercising discretion, especially the trial date factor. The merits of Petitioner’s challenge are not particularly strong. A balanced assessment of the factors leads us to exercise discretion to deny the Petition. Therefore, we conclude that the evidence of record favors exercising our discretion under 35 U.S.C. § 314(a) to deny institution of an inter partes review challenging claims 1, 2, 6, 7, 23, 25, 31, 53, 68, 70–72, 74, and 75. IV. CONCLUSION Upon consideration of the Petition, the Preliminary Response, and the evidence presented, we exercise our discretion under 35 U.S.C. § 314(a) to deny institution of an inter partes review challenging claims 1, 2, 6, 7, 23, 25, 31, 53, 68, 70–72, 74, and 75 of the ’307 patent. V. ORDER In consideration of the foregoing, it is hereby ORDERED that the Petition is denied, and no trial is instituted.” slip op. at 29

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “The parties each raise facially valid points based on the claim language. Petitioner has the burden to show “[h]ow the challenged claim is to be construed.” 37 C.F.R. § 42.104 b(3). Petitioner does not explain how, under its broad construction, the decoder “decodes the encoded data to recover application and control bits in accordance with a line code.” That is, if the encoding does not encode both “application and control bits,” then how can decoding “recover” both under Petitioner’s claim construction? It is not clear on this preliminary record whether the specification supports Petitioner’s broad claim construction. For this reason, Petitioner’s showing based upon the broad claim construction outlined above is not “particularly strong.” See Fintiv at 14–15. As discussed further below, Petitioner also presents a showing under Patent Owner’s more narrow construction. 3.” slip op. at 15

    • Skill levelSkill level board ownOther

      “Prelim. Resp. 6 (citing Ex. 2001 ¶ 15). Relying on its declarant, Dr. Wolfe, Petitioner proposes materially the same level. Pet. 5 (citing Ex. 1003 ¶¶ 26– 29). Based on a review of the record, we adopt the parties’ proposed level of ordinary skill in the art because it is consistent with the evidence of record, including the asserted prior art and ’307 patent.” slip op. at 14

    Claim constructionDiscretionary denialcites Phillips
    Patents in suitUS 7,187,307
  • PTAB · Apr 7, 2025 · IPR2024-01479 · APJ Miriam L Quinn · IPR · Institution

    The Board denied institution of IPR on claims 1, 4–5, 8, 11, and 14–16 based on Fintiv balancing, including the earlier district court trial date and weak merits.

    RulingsInstitution decision
    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Institution denied fintivInstitution denied

      “is our focus here. As stated, that trial is set to occur about six months before a final written decision would issue in this proceeding. The District Court has stated that this trial date setting “cannot be changed without an acceptable showing of good cause.” Prelim. Resp. 8. We are not persuaded by Petitioner’s unsupported argument that the trial date is speculative. We also consider the fact that the median time-to-trial statistic discussed by both parties projects a trial date of July 2025, earlier than the actual date set by the District Court. Ex. 2007; Prelim. Resp. 8; Reply 3. The fact that the time-to-trial statistic is earlier than the trial date set by Judge Gilstrap confirms that the schedule set by the District Court is credible and should be given weight. From this evidence, we are persuaded that we should rely on the trial date in the Lenovo Group litigation as the main indicator of a trial court reaching the merits of the invalidity of the patent-at-issue before we issue a final written decision. Accordingly, this factor strongly favors exercising discretionary denial.” slip op. at 6

    • Obviousness (§103) › Motivation to combine / reasonable expectation of success › Teaching awayNot reached

      “First, Iwamoto’s “standby” mode is chosen specifically to avoid malfunction as explained above, and selecting a default mode of operation that bypasses the standby mode would undermine the stated purpose of Iwamoto’s standby mode. See, e.g., Depuy Spine, Inc. v. Medtronic Sofamor Danek, 567 F.3d 1314, 1326 (Fed. Cir. 2009) (“An inference of” slip op. at 14

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successNot reached

      “c) Knight5 Knight describes power source negotiation in a power management system. Ex. 1007 ¶ 4. Knight discloses that if the internal battery or external power source has sufficient power, it can connect with another device as a power source, otherwise, it attempts to connect as a power sink. Id. ¶ 42. The Petition does not explain a reason to combine Knight’s power 5 U.S. Pat. Pub. No. US 2008/0028237 A1, filed July 26, 2006. (Exhibit 1007, “Knight”). or Hsieh. Pet. 60. Grounds based on Knight are unpersuasive for at least this reason.” slip op. at 15

    § 103 obviousnessDiscretionary denial
    Patents in suitUS 9,232,265
Page 1 of 22
← Previous12345…Next →

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.