PTAB
Advanced fields
151 decisions · 675msnewest first
  • PTAB · Aug 3, 2026 · IPR2025-00283 · APJ Lilan Ren · IPR · Final written decision

    The Board cancelled claim 11 and granted substitute claims 14–16, finding Petitioner had not shown those claims unpatentable on any asserted ground.

    RulingsFinal written decision
    • PTAB / AIA Trials › Motions to amend / substitute claimsMotion to amend, grantedGranted

      “must determine whether the motion to amend meets the statutory and regulatory requirements set forth in 35 U.S.C. § 316(d) and 37 C.F.R. § 42.121. Lectrosonics, Paper 15 at 4. In that regard, Patent Owner bears the burden of persuasion to show that: (1) the amendment proposes a reasonable number of substitute claims; (2) the amendment responds to a ground of unpatentability involved in the trial; (3) the amendment does not seek to enlarge the scope of the claims of the patent or introduce new subject matter;” slip op. at 9

    • ExcludeMotion to exclude, deniedDenied

      “In this case, Patent Owner’s expert “Dr. Zhou signed the second declaration, stood behind its contents, and was available for cross-examination.” Paper 35, 4. Petitioner does not dispute this statement. Paper 39, 1. Petitioner does not identify any specific undue prejudice caused by Exhibit 2008. For example, Petitioner argues that “the failure to impress upon a witness that a statement is under oath goes to the heart of its reliability as evidence” and that “as the Board has recognized, hearsay is inherently unreliable” without specifying what statement in Exhibit 2008 lacks reliability. Paper 39, 4. Because Petitioner does not provide specific evidence of undue prejudice, we find Petitioner has suffered no such undue prejudice in this case. See Liquidia, 2021 WL 4860773 at *25. We therefore deny Petitioner’s Motion to Exclude on the basis of lack of authenticity. With regard to the assertion that Exhibit 2008 is hearsay, Petitioner objects to the exhibit because the testimony is based “on other informal and unpublished documents that are hearsay under FRE 802.” Paper 29, 1. Petitioner does not specify what such “informal and unpublished documents” are. See id. Federal Rule of Evidence 703 expressly states, “[a]n expert may base an opinion on fact or data in the case that the expert has been made aware of or personally observed.” The facts or data “need not be deny Petitioner’s Motion to Exclude on the basis of hearsay.” slip op. at 50

    • Disclosure Requirements (§112) › Written description (Ariad)Written description adequateNot shown unpatentable

      “Petitioner’s argument is unpersuasive. Paragraph 59 of the ’503 application describes formula 8-1 but does not support Petitioner’s argument that other unknown formulas may be included in the recited modified heavy chains. Ex. 2003 ¶ 59. Petitioner’s hypothesis that the recited heavy chains may (or may not) encompass unknown formulas is also inapposite to the written description inquiry before us — that is, whether the inventor was in possession of the subject matter recited in claims 14–16 based on the disclosure including formulas 8-1, 8-2, and 8-3. See PowerOasis, 522 F.3d at 1306.” slip op. at 14

    • Disclosure Requirements (§112) › Enablement (Wands, Amgen full scope)EnabledNot shown unpatentable

      “These arguments in the Sur-Reply are unpersuasive to show a lack of enablement first and foremost because the arguments do not specifically provide evidence showing that any purported experimentation is undue. See Sur-Reply 2–8 (asserting, but without providing evidence under any specific Wands factors, that the examples and guidance in the specification do not extend to the broad scope of all antibodies); see Wands, 858 F.2d at 737. We again emphasize that the analysis of undue experimentation does not necessarily require every Wands factor to be explicitly addressed but the analysis must be based on “weighing many factual considerations” depending on the nature of the invention and underlying art. Cephalon, Inc. v. Watson Pharms., Inc., 707 F.3d 1330, 1336 (Fed. Cir. 2013). The assertion that the claim scope is broad alone does not suffice to show a lack of enablement based on the record before us. Moreover, as we note supra, Petitioner’s claim scope argument is based on the false premise that the scope of claims 14–16 is as broad as the claim term “antibody” without taking into account all other claim elements. For example, Petitioner does not disagree with Patent Owner’s statement that “[t]he ’675 Patent’s specification discloses the structural modification site, the chemistry used to modify that residue, and working examples demonstrating the modification” (Reply 2), but asserts only that “[t]he disclosure of SSFI that only binds to IgG1 Fc domains (SEQ ID NO:1) is . . . . inconsistent with the expansive scope of the claims.” Sur-Reply 5. Petitioner’s argument that the claims encompass proteins that lack a lysine reside at a 248 position improperly excludes from the claim language the “lysine residue at 248 position . . . [as] determined by the EU numbering system” that claims 14–16 require. As Dr. Zhou testifies, “each proposed lysine residue at position 248 (EU numbering) is covalently modified with a specific attachment with a terminal bio-orthogonal click-chemistry functional group. The specification describes targeted transfer of a chemical functional group to lysine 248” and when claims 14–16 are considered in their entirety, which includes all claim elements, “[a] POSA would understand the claim itself to limit the modified antibodies to those with lysine at position 248.” Ex. 2004 ¶ 48; Ex. 2008 ¶ 47. We also note that Patent Owner states “a POSA would understand that the phrase ‘one or more modified heavy chain’ encompasses antibodies within typical DAR distributions (i.e., fractional numbers) rather than requiring a distinct process for producing antibodies bearing modified heavy chains in exact integers.” Reply 2–3. Moreover, Patent Owner states that PepTalk Presentation demonstrates that “a POSA would understand antibody conjugation products to exist as mixtures rather than discrete whole number species” because PepTalk Presentation “presents DAR values as non-integer measurements, i.e. DARs of 1.8 and 1.9 reflecting such distributions.” Id. at 3 (citing Ex. 1007, 28). According to Patent Owner, “preparations having an average DAR of approximately 1.8 (commonly referred to in practice as ‘DAR2’) may reflect typical reaction distributions in which some antibodies contain two modified heavy chains while others contain fewer.” Id. at 3 (citing Ex. 2008 ¶ 46). Petitioner does not rebut these statements. See Sur-Reply 2–8. Based on the foregoing, the evidence before us does not show any” slip op. at 27

    Patent outcomesUS 11,896,675 not shown unpatentable
    § 102 anticipation§ 103 obviousness§ 112 disclosurecites Phillips · KSR · Graham · Nautilus
    Patents in suitUS 11,896,675
  • PTAB · Jun 9, 2026 · IPR2025-00321 · APJ Christopher M Kaiser · IPR · Final written decision

    The Board held claims 1, 2, 5–7, 9, 16, and 17 not unpatentable because the asserted combinations did not establish the required purge-tower teachings or prior-art status.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Petitioner contends that one of ordinary skill in the art “would have had (1) at least a bachelor’s degree in Mechanical Engineering, Computer Engineering, Chemical Engineering, Materials Science, or a related field, and (2) at least two years of research or industry experience in 3D printing or materials used for 3D printing.” Pet. 5 (citing Ex. 1003 ¶¶ 14–16). Petitioner also argues that “[a]dditional experience could substitute for a formal degree or formal training (and vice versa).” Id. Patent Owner proposes a slightly different level of skill, arguing that a person of ordinary skill in the art “would have had a bachelor’s degree in Mechanical Engineering, Computer Engineering, Chemical Engineering, Materials Science, or a comparable field and at least two years of experience related to 3D printing, with additional experience potentially being a substitute for a formal degree or training (and vice versa).” Prelim. Resp. 24. Neither party explains why the outcome of this case would be affected by the adoption of any of the proffered definitions of a person of ordinary skill in the art. We adopt Petitioner’s assessment of the level of ordinary skill in the art, as it appears consistent with the ’324 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001).” slip op. at 8

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed board ownOther

      “According to the ’713 patent, “[p]urge tower 24 itself may be . . . recycled or otherwise discarded as desired.” Ex. 1001, 8:27–28. This description provides some support for Patent Owner’s view, because a purge tower too intimately integrated with the part would be difficult or impossible to recycle or discard. This is further supported by the ’713 patent’s statement that “purge tower 24 may be printed at any suitable location on build substrate 44 (i.e., at any location in the x-y build plane not occupied by 3D part 20 or support structure 22).” Id. at 8:30–34. It also is supported by Dr. Hickner’s testimony that the ’713 patent “clearly shows . . . the 24 purge tower separated from the part” and that “the purge tower is a separate physical object.” Ex. 2016, 28:8–10, 64:1–9. On the other hand, there is evidence supporting Petitioner’s view that, as long as the purge tower is generally separate from the part and the support structure, it may still make contact with those portions of the print. As noted above, “purge tower 24 may be printed at any suitable location on build substrate 44 (i.e., at any location in the x-y build plane not occupied by 3D part 20 or support structure 22).” Ex. 1001, 8:30–34. This language does not exclude locations adjacent to or in contact with the part or the support structure. Thus, determine that a “purge tower,” as that term is used in the context of the ’713 patent, may not be an integrated portion of a printed part or support structure but need not be free of all contact with the printed part or support structure.” slip op. at 9

    • BurdenNot shown unpatentable

      “There is evidence of record to support both Petitioner’s view and Patent Owner’s view. On the record developed at trial, however, we cannot say that the preponderance of the evidence favors Petitioner, who bears the burden of proof. See 35 U.S.C. § 316(e). Accordingly, Petitioner has not shown by a preponderance of the evidence that KISSlicer teaches printing a layer of a purge tower each time the printer switches one extruder to the operating mode. Because proving the obviousness of claims 1 and 16 requires such a showing, Petitioner has not shown by a preponderance of the evidence that claims 1 and 16 would have been obvious over the combination of Priedeman and KISSlicer. 5. Analysis of Remaining Claims Claims 2, 6, 7, 9, and 17 all depend, directly or indirectly, from claim 1 or claim 16. Accordingly, they all include the limitations of either claim 1 or claim 16. Because, as discussed above, Petitioner has not shown that the combination of Priedeman and KISSlicer teaches or suggests all the limitations of claims 1 and 16, Petitioner also has not proven by a preponderance of the evidence that claims 2, 6, 7, 9, and 17 would have been obvious over that combination of references.” slip op. at 21

    • Obviousness (§103) › Analogous artAnalogous artOther

      “On the record developed at trial, we agree with Petitioner. According to several industry forum posts, people interested in three-dimensional printing located the website where KISSlicer was posted between February 2012 and April 2012. Ex. 1028, 1 (post discussing and directing others to KISSlicer on April 11, 2012); Ex. 1031, 1 (two posts discussing KISSlicer on March 16, 2012, and March 21, 2012); Ex. 1032, 1 (two posts discussing KISSlicer on February 11, 2012, and February 14, 2012). Thus, not only was it possible for people of ordinary skill in the art to locate KISSlicer; people of ordinary skill in the art actually did locate it. Accordingly, Petitioner has shown by a preponderance of the evidence that KISSlicer was publicly accessible.” slip op. at 19

    Patent outcomesUS 9,421,713 not shown unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 9,421,713
  • PTAB · Oct 10, 2025 · IPR2025-00652 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–23 and 25–30 were unpatentable over the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’403 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 10; Prelim. Resp. 4 (citing Ex. 2009 ¶ 73); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses element [1.2] because the evidence cited does not disclose a “first computer system being configured to provide remote control of the first pump or first valve” (i.e., a fluid-handling device). Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but Petitioner has not identified any disclosure of the capability to remotely control fluid-handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, Kahn’s disclosures that Petitioner relies on for allegedly teaching remote control are deficient. We discuss each. First, Petitioner points to the following, “[f]or instance, as illustrated in FIG. 1C, a fluid control device such as a valve 15A is located on the input side of a sen[s]or unit 110.” Ex. 1005, 8:19–21, cited in Pet. 13. This portion of Kahn, however, does not disclose remote control. Second, Petitioner cites to the following: Finally, or in addition to, the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance. Pet. 13 (citing Ex. 1005, 10:62–67). We agree with Patent Owner that this portion of Kahn teaches on-site alerts and local control of the fluid-handling device. See Prelim. Resp. 7. This portion of Kahn does not disclose remote control.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,294,403
  • PTAB · Oct 10, 2025 · IPR2025-00651 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–3, 6, 7, and 9–20 were unpatentable over any asserted ground.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’680 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 11

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner

      “target value” is part of a command that is sent from a computing device to a server and then to a controller. The controller then receives a measurement of the fluid by a sensor and determines whether the measurement satisfies the “target value.” If the measurement does not satisfy the “target value,” further operations are undertaken. The recited operation sequence makes clear that the plain and ordinary meaning of “target value” is not as Dr. Wooley opines because the particular operating condition that a device is in at a particular time is represented by the measurement taken by the sensor, 11 Some claim language less relevant to construing “target value” was omitted for ease of reference. which the controller then uses to determine whether the measurement satisfies the “target value.” Additionally, claim 1 recites that the “target value” is sent as part of a command to the controller. The “target value” is not sent to the controller from the sensor, as might be expected if the plain and ordinary meaning of “target value” were as Dr. Wooley opines. Petitioner and Dr. Wooley’s construction would also result in “target value” meaning effectively the same thing as the measurement of the fluid by the sensor, a concept that is separately recited in claim 1 and to which the “target value” is compared. The Specification of the ’680 patent does not support Petitioner’s understanding of the plain and ordinary meaning of “target value.” Although the Specification does not recite “target value,” it recites “target state,” and describes “target state” sufficiently to understand the plain and ordinary meaning of “target” as used in “target value” and “target state.” In particular, the ’680 patent explains that “[i]n some embodiments, the process 104 includes receiving, via a network interface, from a remote user device, (e.g., via a command-center server) a command to change a state of a fluid-handling device to a target state.” Ex. 1001, 11:48–51. This portion reflects that the command is seeking to change a state of a fluid-handling device to a target state. In other words, the “target value” or “target state” is not generally “the particular operating condition that a device is in at a particular time”; rather, it is a value or state that the fluid-handling device is desired to be in, as Patent Owner and Dr. Durham explain. Additionally, just as claim 1 recites a directional component for the “target value” to be sent to the controller in a command, so too does the Specification describe a “target state” as being sent in a command from a remote user device. Thus, the Specification clearly supports the plain and ordinary meaning proposed by Patent Owner and Dr. Durham and not the plain and ordinary meaning proposed by Petitioner and Dr. Wooley. slip op. at 14

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “time-stamped process data, report exception therein to the remote host, and extract and transmit time-stamped process data to the remote host.” Ex. 1005, Abst. (emphases added). Almadi explains that its remote field systems must include a plurality of controller units “to issue commands to, and gather and process data from a plurality of field devices, including remote systems and instruments, . . . [and] a database server for the storage of process data retrieved from the remote subsystems and instruments.” Id. at 2:22–30 (emphases added). Based on these disclosures, we agree with Patent Owner that Petitioner has not established that Almadi discloses element [1.4]. Specifically, the teachings from Almadi identified by Petitioner refer to process data, which is data retrieved from the remote subsystems/field devices. Thus, we understand that Almadi’s teaching—of using an Ethernet switch to transmit “process data”—describes transmitting data from the remote subsystems/field devices. See Ex. 1005, 3:13–17, cited in Pet. 15. But claim 1 and particularly element [1.4], recites “sending, with the server, the target value to the network address [which identifies a controller of the fluid-handling device13] via the network,” which is different than sending process data from the field devices to the remote host or database server for storage.” slip op. at 19

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,175,680
  • Tanklogix, LLC v. SiteproInstitution denied
    PTAB · Oct 10, 2025 · IPR2025-00650 · APJ Sheila F Mcshane · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 18–32 and 34 were unpatentable over Kahn or Kahn and Gutierrez.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). Upon consideration of the Petition, the Preliminary Response, and the evidence of record, we determine that Petitioner has not established a reasonable likelihood of prevailing with respect to the unpatentability of at least one claim of the ’871 patent. Accordingly, for the reasons that follow, we decline to institute an inter partes review of claims 18–32 and 34 of the ’871 patent.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The respective proposed levels of qualifications for a person of ordinary skill in the art are similar, with Patent Owner proposing two years of experience compared to Petitioner proposing significant experience with remotely controlling fluid-handling devices, like SCADA systems. Patent Owner also proposes more extensive experience in lieu of educational experience. While we find Petitioner’s proposed qualifications to be acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of skill necessary to understand and implement the teachings of the ’871 patent and the asserted prior art. Our analysis and findings herein, however, do not turn on any differences in the qualifications adopted.” slip op. at 8

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “We determine that we need not expressly construe any claim terms to resolve the parties’ disputes on the current record. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 10

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “actuators and the remote control of fluid handling devices, including the receipt with the user-interface module of “a user command to actuate an actuator via a presented control interface” (limitation [18.7]) and “account authorized to send commands to remotely control fluid handling devices” (limitation [18.11]). We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses or teaches these limitations because the evidence does not provide support that there is remote control of fluid handling devices or the use of a user command on a control interface to send a command to a fluid handling device, for instance. Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but we do not discern that it teaches or discloses the capability to remotely control fluid handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, the Kahn disclosures that Petitioner repeatedly relies upon for allegedly teaching this control are deficient. See Ex. 1005, 10:62–67, 14:35– 15:2, 15:62–16:32; see also Pet. 12–14, 16–18. Kahn discloses that “the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance.” Ex. 1005, 10:62–67. Communication unit 112B is part of the local “sensor unit,” wherein the detection conditions determined by the sensor are communicated to remote devices by communication unit 112B. See id. at 3:31–33, 5:62–6:2, 6:27–35, 7:33–37, 13:7–12, Figs. 1A–1C. Kahn discloses that the sensor units, which include communication units 112B, can be located near shut-off valves and can communicate with distant locations. See id. at 11:1–13. There are no disclosures, however, in the above passages that there is remote control of fluid handling devices, that there is a user command on a control interface that actuates an actuator, or that there is a command sent to the facility actuators via a network connection, as required in limitations [18.5]–[18.7] and [18.9]–[18.12], respectively. Rather, the disclosure indicates that the communication unit 112B includes on-site alerts and that the local (non-remote) communication unit 112B can be interfaced with the control valve.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 10,488,871
  • PTAB · Jul 14, 2025 · IPR2024-00465 · APJ Bart A Gerstenblith · IPR · Final written decision

    Claims 1–24 are unpatentable: claims 1–10 and 12–24 as obvious over Szrek and Llach, and claim 11 as obvious over Szrek, Llach, and Gilmore.

    RulingsFinal written decision
    • Skill levelSkill level board ownDecided for petitioner

      “B. Level of Ordinary Skill in the Art Petitioner proposes that the level of ordinary skill in the art is an artisan with a working knowledge of POS activation systems and lottery systems that was gained through a mixture of training and work experience in the relevant field such as (i) having a Bachelor’s degree in computer science, computer communications, electrical engineering, or equivalent degree, coupled with at least three years of work experience; (ii) having a Master’s degree in computer science, computer communications, or electrical engineering, but having less work experience; or (iii) having no formal degree, but having experience in the relevant field of at least six years of work experience. Pet. 2–3 (citing Ex. 1003 ¶¶ 13–14).9 Patent Owner states that, “[f]or the purpose of this proceeding, Patent Owner adopts the Petition’s proposed definition of the level of ordinary skill in the art.” PO Resp. 19 (citing Pet. 2–3). We find that the parties’ agreed-upon level of ordinary skill in the art is consistent with the level of ordinary skill in the art reflected by the ’451 patent and the prior art of record. See Inst. Dec. 14; see Okajima v. 9 Petitioner proposes the same level of ordinary skill in the art that the Board adopted in PGR2020-00084 (Pet. 2–3 (citing Ex. 1008, 11)), and IPR2023- 01235 (see IPR2023-01235, Paper 34 at 12–13). Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Therefore, we adopt the parties’ agreed-upon level of ordinary skill in the art, as articulated above, in our consideration of the issues presently before us.” slip op. at 13

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “We need not construe “transaction processor” expressly because its meaning is not in dispute and its construction is not necessary to resolve the controversy before us.” slip op. at 16

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundDecided for petitioner

      “On balance, we find that even with the alleged disadvantages identified by Patent Owner, one of ordinary skill in the art would have been motivated to modify Szrek with Llach’s third-party transaction processor because the advantage of having a “centralized intermediary” allows Szrek’s system to support different game providers, such as different lottery companies, which would reduce some implementation costs and allow the system to be more easily and cheaply extended. Pet. 47 (citing Ex. 1003 ¶ 181); see Medichem, S.A. v. Rolabo, S.L., 437 F.3d 1157, 1165 (Fed. Cir. 2006) (“a given course of action often has simultaneous advantages and disadvantages, and this does not necessarily obviate motivation to combine”) (citing Winner Int’l Royalty Corp. v. Wang, 202 F.3d 1340, 1349 n.8 (Fed. Cir. 2000)); see also Intel Corp. v. Qualcomm Inc., 21 F.4th 784, 795 (Fed. Cir. 2021) (stating the same). We acknowledge that the combination comes with some disadvantages, including “add[ed] delay, reduce[d] efficiency, and . . . implementation complexities by converting a simple, direct communication exchange into an exchange that traverses multiple systems.” PO Resp. 52 (citing Ex. 2052 ¶ 163). But, “[t]he fact that the motivating benefit comes at the expense of another benefit, however, should not nullify its use as a basis to modify the disclosure of one reference with the teachings of another. Instead, the benefits, both lost and gained, should be weighed against one another.” Winner, 202 F.3d at 1349 n.8. Here, Szrek expressly teaches indirect communication as a possible implementation of its system and Petitioner’s combination—employing Llach’s third-party transaction processor as part of the indirect communication channel—offers the attractive benefit of allowing Szrek’s system to support different game providers, which would reduce some implementation costs even if it might increase other costs, e.g., by having to program certain components (e.g., the cash registers) differently. Specifically, we find that the ability to expand Szrek’s system to support different game providers provides advantages that outweigh the disadvantages discussed above in the circumstance where one desires a more robust and comprehensive system. See Pet. Reply 23 (noting three advantages of the combination— (1) “allow[ing] Szrek’s system to use ‘a centralized system for activating lottery tickets from different retailers and different locations,’” (2) “allow[ing] support for different game providers, such as different lottery companies,” “reduc[ing] implementation costs,” and (3) “allow[ing] Szrek’s system to ‘communicate with individual card” slip op. at 37

    • Obviousness (§103) › Motivation to combine / reasonable expectation of success › HindsightMotivation foundDecided for petitioner

      “On balance, we find that even with the alleged disadvantages identified by Patent Owner, one of ordinary skill in the art would have been motivated to modify Szrek with Llach’s third-party transaction processor because the advantage of having a “centralized intermediary” allows Szrek’s system to support different game providers, such as different lottery companies, which would reduce some implementation costs and allow the system to be more easily and cheaply extended. Pet. 47 (citing Ex. 1003 ¶ 181); see Medichem, S.A. v. Rolabo, S.L., 437 F.3d 1157, 1165 (Fed. Cir. 2006) (“a given course of action often has simultaneous advantages and disadvantages, and this does not necessarily obviate motivation to combine”) (citing Winner Int’l Royalty Corp. v. Wang, 202 F.3d 1340, 1349 n.8 (Fed. Cir. 2000)); see also Intel Corp. v. Qualcomm Inc., 21 F.4th 784, 795 (Fed. Cir. 2021) (stating the same). We acknowledge that the combination comes with some disadvantages, including “add[ed] delay, reduce[d] efficiency, and . . . implementation complexities by converting a simple, direct communication exchange into an exchange that traverses multiple systems.” PO Resp. 52 (citing Ex. 2052 ¶ 163). But, “[t]he fact that the motivating benefit comes at the expense of another benefit, however, should not nullify its use as a basis to modify the disclosure of one reference with the teachings of another. Instead, the benefits, both lost and gained, should be weighed against one another.” Winner, 202 F.3d at 1349 n.8. Here, Szrek expressly teaches indirect communication as a possible implementation of its system and Petitioner’s combination—employing Llach’s third-party transaction processor as part of the indirect communication channel—offers the attractive benefit of allowing Szrek’s system to support different game providers, which would reduce some implementation costs even if it might increase other costs, e.g., by having to program certain components (e.g., the cash registers) differently. Specifically, we find that the ability to expand Szrek’s system to support different game providers provides advantages that outweigh the disadvantages discussed above in the circumstance where one desires a more robust and comprehensive system. See Pet. Reply 23 (noting three advantages of the combination— (1) “allow[ing] Szrek’s system to use ‘a centralized system for activating lottery tickets from different retailers and different locations,’” (2) “allow[ing] support for different game providers, such as different lottery companies,” “reduc[ing] implementation costs,” and (3) “allow[ing] Szrek’s system to ‘communicate with individual card” slip op. at 37

    Patent outcomesUS 11,488,451 unpatentable
    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,488,451
  • PTAB · Jun 18, 2025 · IPR2025-00321 · APJ Christopher M Kaiser · IPR · Institution

    The Board instituted IPR on claims 1, 2, 5–7, 9, 16, and 17, finding a reasonable likelihood that claim 1 is anticipated by Boyer.

    RulingsInstitution decision
    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Denied

      “approximately two weeks before the statutory deadline for a final written decision, but the most recent median time-to-trial statistics for Judge Gilstrap in the Eastern District of Texas indicate that the actual trial date will likely be in July 2026, which is later than the statutory deadline to issue a final written decision in this proceeding in mid-June 2026. See Ex. 2001, 7 (median time from filing to trial of 23.2 months); Prelim. Resp. 10. Thus, we find this factor is neutral or weighs slightly against discretionary denial.” slip op. at 10

    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “At this preliminary stage, we determine whether the information presented shows a reasonable likelihood that Petitioner would prevail in establishing that at least one of the challenged claims would have been unpatentable over the proposed prior art. We analyze the asserted grounds with the above-noted principles in mind.” slip op. at 7

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Petitioner contends that one of ordinary skill in the art “would have had (1) at least a bachelor’s degree in Mechanical Engineering, Computer Engineering, Chemical Engineering, Materials Science, or a related field, and (2) at least two years of research or industry experience in 3D printing or materials used for 3D printing.” Pet. 5 (citing Ex. 1003 ¶¶ 14–16). Petitioner also argues that “[a]dditional experience could substitute for a formal degree or formal training (and vice versa).” Id. Patent Owner proposes a slightly different level of skill, arguing that a person of ordinary skill in the art “would have had a bachelor’s degree in Mechanical Engineering, Computer Engineering, Chemical Engineering, Materials Science, or a comparable field and at least two years of experience related to 3D printing, with additional experience potentially being a substitute for a formal degree or training (and vice versa).” Prelim. Resp. 24. Neither party explains why the outcome of this case would be affected by the adoption of any of the proffered definitions of a person of ordinary skill in the art. For purposes of this Decision, we adopt Petitioner’s assessment of the level of ordinary skill in the art, as it appears to be consistent with the ’713 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001).” slip op. at 16

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction needed

      “We note that, as discussed below, we are able to determine whether to institute inter partes review of the ’713 patent without expressly construing the term “from multiple print heads or deposition lines.” See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))). As for Patent Owner’s argument that Petitioner has failed to carry its burden to identify how the claims are to be construed, we disagree on the present record. Although Petitioner does not provide a preferred construction for the single term it proposes requires construction, Petitioner does identify which of its two alternative constructions applies to each of its asserted grounds of unpatentability. Pet. 6 (“Under the first construction, [the obviousness grounds] are applicable, and [the anticipation ground] would be excluded from the claim scope. Under the alternative construction, all of [the asserted grounds] are applicable.”). In our view, this approach does not fail to satisfy Petitioner’s burden under 37 U.S.C. § 42.104(b)(3).” slip op. at 17

    Claim construction§ 102 anticipationDiscretionary denialcites Phillips
    Patents in suitUS 9,421,713
  • PTAB · Jun 6, 2025 · IPR2025-00257 · APJ Lilan Ren · IPR · Institution

    The Board instituted IPR on claims 1–15 and all asserted grounds, finding a reasonable likelihood that claim 1 is unpatentable over Cable and Naware and over Comb and Tummala.

    RulingsInstitution decision
    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Denied

      “discussed below, we decline to exercise our discretion to deny the Petition.” slip op. at 8

    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “review. See 35 U.S.C. § 314 (2024); 37 C.F.R. § 42.4(a) (2024). Institution of an inter partes review requires that “the information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). For the reasons set forth below, we determine that there is a reasonable likelihood that Petitioner will prevail with respect to at least one challenged claim, and we institute an inter partes review.” slip op. at 2

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundInstituted

      “persuaded that Petitioner has sufficiently shown for purposes of institution that a person of ordinary skill in the art would have been motivated to combine the teachings of Cable and Naware in the manner argued by Petitioner. For example, both references directly relate to 3D printing, and we are persuaded that Cable teaches “a heated build platform and calls on the POSITA to implement this teaching via suitable solutions known in the art.” Pet. 13 (noting that Cable teaches a build platform that can be heated “by any suitable heating elements” (citing 1006 ¶ 45)). The current record also indicates that Naware taught known options in this regard, e.g., where it describes a build plate to be used in a 3D printing process that includes contact plates and temperature control modules. See, e.g., Ex. 1007, code (57). Petitioner additionally argues that there is a reasonable expectation of success in combining Cable with Naware because “3D printers with temperature-controlled heated build plates were well-known technologies at the time of the ’660 patent in 2014, and these technologies had been successfully demonstrated in the real-world by then.” Pet 15 (citing various portions of Ex. 1003). Patent Owner does not contest Petitioner’s arguments with respect to a reasonable expectation of success in combining Cable with Naware. See generally Prelim. Resp. Based on our review and consideration of the current record, we are persuaded that Petitioner has sufficiently shown for the teachings of Cable and Naware in the manner argued by Petitioner.” slip op. at 23

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Patent Owner “does not contest Petitioner’s description of a person of ordinary skill in the art (a ‘POSITA’) having a bachelor’s degree in Mechanical Engineering, Chemical Engineering, Materials Science, or a comparable field and at least two years of experience related to 3D printing, with additional experience potentially being a substitute for a formal degree or training (and vice versa).” Prelim. Resp. 37. Patent Owner does not address the specific knowledge that Petitioner contends that ordinarily skilled artisan would possess. Id. For purposes of this decision, we adopt Petitioner’s unopposed definition of the level of ordinary skill in the art as it appears consistent with the disclosures of the ’660 patent and the prior art of record. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001).” slip op. at 18

    Claim construction§ 103 obviousnessDiscretionary denialcites Phillips · KSR · Graham
    Patents in suitUS 9,592,660
  • PTAB · May 28, 2025 · IPR2025-00301 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution of review for claims 1–11, 16, and 21 under § 314(a), finding the Fintiv factors favored discretionary denial, and denied joinder.

    RulingsInstitution decision
    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Institution denied fintivInstitution denied

      “2026. This date is nearly five months prior to the date on which the final written decision would be due if trial were instituted in this proceeding. And, even if we assume Petitioner’s alleged February–March 2026 trial date, this date too is several months prior to the projected final written decision deadline. As such, it is unlikely that a final written decision in this proceeding would issue before trial in the district court, unless the trial was delayed or rescheduled for a later time. Thus, we find this factor weighs in favor of exercising our discretion to deny institution. See ARM Ltd. v. Daedalus Prime LLC, IPR2025-00207, Paper 10 at 2 (May 16, 2025) (Before the Office of the Under Secretary of Commerce for Intellectual Property and Director of the United States Patent and Trademark Office) (exercising discretion to deny institution with the same relative timing between district court trial and final written decision deadline).” slip op. at 13

    • PTAB / AIA Trials › Motions to amend / substitute claimsNot reached
    • PTAB / AIA Trials › Joinder §315(c) / SAS all-or-nothingJoinder, deniedDenied
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied discretionary otherInstitution denied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). Institution of inter partes review, however, is discretionary. See Harmonic Inc. v. Avid Tech., Inc., 815 F.3d 1356, 1367 (Fed. Cir. 2016) (“[T]he PTO is permitted, but never compelled, to institute an IPR proceeding.”). For the reasons discussed below, we exercise discretion pursuant to 35 U.S.C. § 314(a) not to institute inter partes review. Additionally, for the same reasons and because institution was denied in IPR2024-01248, we deny Petitioner’s Motion for Joinder. See 35 U.S.C. § 315(c) (“[T]he Director . . . may join as a party . . . any person who properly files a petition under section 311 that the Director . . . determines warrants the institution of an inter partes review under section 314.”).” slip op. at 3

    Discretionary denial
    Patents in suitUS 9,814,071
  • PTAB · Mar 21, 2025 · IPR2024-01250 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood of proving claims 1–5, 7, 9–16, or 20 unpatentable over the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “An inter partes review may be instituted only if “the information presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2018). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “B. Level of Ordinary Skill in the Art Petitioner, supported by Dr. Min’s testimony, proposes that a person of ordinary skill in the art at the time of the invention would have had “at least a bachelor’s [degree] in [electrical engineering, computer engineering, or computer science], physics, or equivalent, and two years of experience with cellular telecommunications, radio-access network architectures, protocols and signal propagation in wireless networks.” Pet. 3 (citing Ex. 1003 ¶ 59). Dr. Min testifies that “[a]dditional education could substitute for professional experience and vice versa.” Ex. 1003 ¶ 59. Additionally, Petitioner contends that Dr. Min “exceeded this level of experience by the priority date.” Pet. 3 (citing Ex. 1010 (curriculum vitae of Dr. Min)). In its Preliminary Response, Patent Owner does not take a position on the relevant level of ordinary skill in the art. See generally Prelim. Resp. At this stage of the proceeding and on the present record, we adopt Petitioner’s uncontested proposed level of ordinary skill in the art, which we find consistent with the level of ordinary skill in the art reflected by the ’946 patent and the prior art of record. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978).” slip op. at 10

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “Neither party contends that any claim terms require an express construction to resolve the present controversy. Pet. 8 (“For purposes of this Petition only, Petitioner does not believe any terms require a formal construction.”); see generally Prelim. Resp. Nonetheless, Petitioner explains that the Petition is structured such that “Ground 1 is based on Patent Owner’s infringement contentions in the district court litigation, where the claimed ‘MUD module’ is generally mapped to multiple-input multiple-output (MIMO) receivers in a wireless network.” Pet. 2. Petitioner contends that “[u]nder this broad interpretation of a ‘MUD module,’ Walton’s MIMO receiver renders every challenged claim obvious.” Id. In contrast to Ground 1, the Petition states that “Ground 2 is based on the plain meaning of ‘MUD module,’ which is a component that detects, separates, and decodes signals from multiple users transmitting simultaneously over the same frequency band.” Id. Petitioner contends that, “[a]pplying the correct meaning of the term, Walton’s MIMO receiver does not necessarily comprise a MUD module.” Id. Therefore, Petitioner explains that “Ground 2 combines Walton with Learned, which expressly discloses [a] multi-user detector, and thus renders every challenged claim obvious in combination with Walton.” Id. at 2–3.7 In other words, the Petition presents Ground 1 and Grounds 2/3 as alternatives depending on the meaning of 7 Although not specifically relevant to claim construction, Petitioner explains that “Ground 3 further combines Walton and Learned with Quigley, to the extent Patent Owner argues Walton does not disclose providing a burst control input.” Pet. 3. “MUD module,” where Ground 1 is based on Petitioner’s understanding of Patent Owner’s interpretation of the term and Grounds 2 and 3 are based on Petitioner’s interpretation of the term as having its plain meaning. Petitioner further contends that “[e]very other claim term carries its ‘ordinary and customary meaning’ . . . .” Id. at 8. Although Petitioner presents a potential dispute regarding the meaning of “MUD module,” we need not construe this term expressly because the determination we reach herein does not depend on which meaning MUD module is applied. Accordingly, we do not construe any claim terms expressly because express constructions are not necessary to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 12

    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Not reached

      “IV. DISCRETIONARY DENIAL Patent Owners contends that the factors set forth in Apple Inc. v. Fintiv, Inc., IPR2020-00019, Paper 11 at 9 (PTAB Mar. 20, 2020) (precedential), weigh heavily in favor of discretionary denial. Prelim. Resp. 40–46; Paper 10. Petitioner disagrees. Pet. 74–77; Paper 9. In light of the conclusion reached above, we need not address the parties’ arguments regarding discretionary denial.” slip op. at 25

    Claim construction§ 103 obviousnessDiscretionary denialcites Phillips · KSR · Graham
    Patents in suitUS 8,089,946
Page 1 of 16
← Previous12345…Next →

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.