PTAB
Advanced fields
231 decisions · 420msnewest first
  • PTAB · Oct 5, 2026 · IPR2025-00598 · APJ David C Mckone · IPR · Final written decision

    Claims 1–31 were not shown unpatentable under either § 103 ground because the asserted combinations did not teach required claim limitations.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedOther

      “admissions by Patent Owner in litigation, contends that a person of ordinary skill in the art would have had “a Master of Science (M.S.) degree in electrical engineering or computer science, and five years of work experience in a related field” and that “[a]dditional educational experience could substitute for some of the work experience.” Pet. 5 (citing Ex. 1002 ¶¶ 36–37). “Patent Owner does not dispute Petitioner’s proposed level of skill in the art (Petition, 5) at this time.” PO Resp. 6. On the complete record, we adopt Petitioner’s description of the level of ordinary skill in the art, as it is uncontested and is consistent with the technology described in the ’347 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001).” slip op. at 8

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “In the Preliminary Response, “Patent Owner accept[ed] the Petition’s claim construction.” Prelim. Resp. 6. However, in the Patent Owner Response, Patent Owner argues that “the claims of the ’347 Patent require no construction as they are valid under their plain and ordinary meaning.” PO Resp. 6. Based on the complete record, we do not find it necessary to provide express claim constructions of any claim terms. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (noting that “we need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)).” slip op. at 9

    • Expert testimonyPetitioner expert discountedDecided for patent owner

      “Beel actually discloses the following: [0321] On the peripheral device 32 the video packets are received at the corresponding plug and play port, e.g. the USB port 11, read by the Human Interface Driver (HID) interface handler 13, unpacked to remove HID protocol headers in an unpacker 20 and then transmitted to the communications network by a transmitter 21. The network can be wireless for example WiFi or LiFi network. [0322] Having been routed over a communications network to the base unit 33, the incoming stream is read from the communications interface such as a WiFi access point 22, unpacked in an unpacker 25, decoded in a decoder 26 and then inserted into a suitable composition such as an OpenGL based composition in the compositor 29 for display on a central display device. Ex. 1005 ¶¶ 321–322 (emphasis added to portions quoted by Petitioner). Patent Owner notes that “[t]he Petition mistakenly cites to ¶ 322 of Beel but quotes ¶ 321.” PO Resp. 20 n.3. However, it appears that Petitioner has grafted together a portion of paragraph 321 that introduces peripheral device 32 with a portion of paragraph 322, which discusses features of base unit 33. However, this grafting has been done in such a way as to convey (incorrectly) that peripheral device 32, not base unit 33, includes unpacker 25, decoder 26, and compositor 29 that process the first processed video data received by the first peripheral device to generate second video data. Dr. Almeroth’s testimony, which copies Petitioner’s incorrectly altered quotation to paragraph 322 of Beel, is unreliable as to this claim limitation and is entitled to no weight.4 Thus, Petitioner has no expert testimony on which to rely for this claim limitation.” slip op. at 19

    • Strike new argumentNew argument disregardedDecided for patent owner

      “5 At the oral argument, when challenged on its reliance on paragraph 322, Petitioner argued that paragraph 321 of Beel teaches this limitation. Tr. 22:26–23:24. Petitioner did not make this argument in the Petition and, instead, raised it for the first time during oral argument; thus, it will not be considered. See Dell Inc. v. Acceleron, LLC, 884 F.3d 1364, 1369 (Fed. Cir. 2018) (“Unless it chose to exercise its waiver authority under 37 C.F.R. § 42.5(b), the Board was obligated to dismiss Dell’s untimely argument given that the untimely argument in this case was raised for the first time during oral argument.”). Even if we were to consider this new argument, it would not be persuasive. As Patent Owner observes (PO Resp. 20), any processing performed by peripheral device 32 in paragraph 321 is on data received from the processing device and destined for the base station via the network, rather than data flowing in the direction of the first processed video data of claim 1.” slip op. at 22

    Patent outcomesUS 11,966,347 not shown unpatentable
    Claim construction§ 103 obviousnesscites Phillips · Graham
    Patents in suitUS 11,966,347
  • PTAB · Sep 3, 2026 · IPR2025-00673 · APJ Michael R Zecher · IPR · Final written decision

    Claims 1–7 are unpatentable as obvious over the combined teachings of the asserted references, including Shin and Aoyama and Shimomura and Iwase.

    RulingsFinal written decision
    • PTAB / AIA Trials › Motions to amend / substitute claimsOther

      “1 SoundClear also filed a Contingent Motion to Amend that proposed to replace originally challenged claim 5 of the ’675 patent with proposed substitute claim 8. Paper 21. We, however, granted SoundClear’s request to withdraw its Contingent Motion to Amend and, as a result, the Contingent Motion to Amend will no longer be considered in this proceeding. Paper 30.” slip op. at 2

    • Skill levelOther

      “2. Level of Skill in the Art In determining whether an invention would have been obvious, we” slip op. at 21

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundMotivation not foundMixed

      “combination because (1) configuring Shin’s processor 120 accordingly “would have been trivial, involving straightforward changes to enhance the processor’s approach to simplifying and abbreviating its output”; and (2) this approach was well-known as evidenced by Ha’s disclosure of replacing “team meeting” and “date” with “schedules” based on the user’s environment.6 Id. at 27–28 (first quoting Ex. 1011 ¶ 97, then quoting Ex. 1011 ¶ 98) (citing Ex. 1002 ¶ 102; Ex. 1011, Fig. 7).” slip op. at 33

    • Expert testimonyPetitioner expert creditedDecided for petitioner

      “4. Dr. Stern’s Testimony is Reliable In its Patent Owner Response, SoundClear contends that “Dr. Stern’s” slip op. at 125

    Patent outcomesUS 11,244,675 unpatentable
    § 103 obviousnesscites KSR · Graham
    Patents in suitUS 11,244,675
  • PTAB · Jul 27, 2026 · IPR2025-00565 · APJ Michael R Zecher · IPR · Final written decision

    Claims 1–5 are unpatentable because Amazon showed they are anticipated by Shin; the Board did not reach Amazon’s contingent obviousness ground over Shin.

    RulingsFinal written decision
    • BurdenOther

      “Written Decision under 35 U.S.C. § 318(a) as to the patentability of claims 1–5 of the ’337 patent. For the reasons we identify below, we hold that Amazon has demonstrated by a preponderance of the evidence that these claims are unpatentable.” slip op. at 2

    • Skill levelOther

      “2. Level of Skill in the Art In determining whether an invention would have been obvious, we” slip op. at 18

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)UnpatentableUnpatentable

      “1. Principles of Law To establish anticipation, “all of the elements and limitations of the” slip op. at 17

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successUnpatentableNot shown unpatentableMixed

      “1. Principles of Law To establish anticipation, “all of the elements and limitations of the” slip op. at 17

    Patent outcomesUS 11,069,337 unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites KSR · Graham
    Patents in suitUS 11,069,337
  • PTAB · Dec 15, 2025 · IPR2024-01193 · APJ David C Mckone · IPR · Final written decision

    Claims 1–3, 5, 7–13, 15–19, and 23–25 are unpatentable: claims 1, 7, 8, 10, 11, 15, 16, 18, 19, and 23–25 as anticipated by Zhang; all challenged claims also as obvious over at least one …

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “person of ordinary skill in the art “would have had a bachelor’s degree in electrical engineering and two years of work experience with network and communication technologies.” Pet. 5 (citing Ex. 1003 ¶¶ 13–15). Patent Owner does not contest Petitioner’s proposal or provide a proposal of its own. On the complete record, we adopt Petitioner’s description of the level of ordinary skill in the art, as it is consistent with the technology described in the ’448 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001).” slip op. at 11

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededTerm construed board ownMixed

      “construction of “feature flag” is inconsistent with the language of claim 8, which states that “the feature flag indicates that the running state of the second apparatus is the sleep state.” Petitioner also argues that Patent Owner’s proposal is not supported by claim 24, which depends from claim 23 and states that “the feature flag is located at a header of the sleep login packet.” Id. at 3. We agree with Petitioner. The plain language of claim 8 states what a feature flag indicates. Claim 24 recites where the feature flag is located. Neither claim suggests any of Patent Owner’s additional limitations.” slip op. at 13

    • Expert testimonyPetitioner expert creditedDecided for petitioner
    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)UnpatentableUnpatentable

      “[A] prior art reference will anticipate if it ‘disclose[s] each and every element of the claimed invention . . . arranged or combined in the same way as in the claim.’” Blue Calypso, LLC v. Groupon, Inc., 815 F.3d 1331, 1341 (Fed. Cir. 2016) (quoting In re Gleave, 560 F.3d 1331, 1334 (Fed. Cir. 2009) (alteration by Federal Circuit)). “However, a reference can anticipate a claim even if it ‘d[oes] not expressly spell out’ all the limitations arranged or combined as in the claim, if a person of skill in the art, reading the reference, would ‘at once envisage’ the claimed arrangement or combination.” Id. (quoting Kennametal, Inc. v. Ingersoll Cutting Tool Co., 780 F.3d 1376, 1381 (Fed. Cir. 2015) (alteration by Federal Circuit); In re Petering, 301 F.2d 676, 681 (CCPA 1962)). For the reasons explained below, we are persuaded that Petitioner has shown, by a preponderance of the evidence, that claims 1, 7, 8, 10, 11, 15, 16, 18, 19, and 23–25 are anticipated by Zhang. slip op. at 16

    Patent outcomesUS 10,602,448 unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · Graham
    Patents in suitUS 10,602,448
  • PTAB · Oct 10, 2025 · IPR2025-00652 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–23 and 25–30 were unpatentable over the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’403 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 10; Prelim. Resp. 4 (citing Ex. 2009 ¶ 73); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses element [1.2] because the evidence cited does not disclose a “first computer system being configured to provide remote control of the first pump or first valve” (i.e., a fluid-handling device). Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but Petitioner has not identified any disclosure of the capability to remotely control fluid-handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, Kahn’s disclosures that Petitioner relies on for allegedly teaching remote control are deficient. We discuss each. First, Petitioner points to the following, “[f]or instance, as illustrated in FIG. 1C, a fluid control device such as a valve 15A is located on the input side of a sen[s]or unit 110.” Ex. 1005, 8:19–21, cited in Pet. 13. This portion of Kahn, however, does not disclose remote control. Second, Petitioner cites to the following: Finally, or in addition to, the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance. Pet. 13 (citing Ex. 1005, 10:62–67). We agree with Patent Owner that this portion of Kahn teaches on-site alerts and local control of the fluid-handling device. See Prelim. Resp. 7. This portion of Kahn does not disclose remote control.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,294,403
  • PTAB · Oct 10, 2025 · IPR2025-00651 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–3, 6, 7, and 9–20 were unpatentable over any asserted ground.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’680 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 11

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner

      “target value” is part of a command that is sent from a computing device to a server and then to a controller. The controller then receives a measurement of the fluid by a sensor and determines whether the measurement satisfies the “target value.” If the measurement does not satisfy the “target value,” further operations are undertaken. The recited operation sequence makes clear that the plain and ordinary meaning of “target value” is not as Dr. Wooley opines because the particular operating condition that a device is in at a particular time is represented by the measurement taken by the sensor, 11 Some claim language less relevant to construing “target value” was omitted for ease of reference. which the controller then uses to determine whether the measurement satisfies the “target value.” Additionally, claim 1 recites that the “target value” is sent as part of a command to the controller. The “target value” is not sent to the controller from the sensor, as might be expected if the plain and ordinary meaning of “target value” were as Dr. Wooley opines. Petitioner and Dr. Wooley’s construction would also result in “target value” meaning effectively the same thing as the measurement of the fluid by the sensor, a concept that is separately recited in claim 1 and to which the “target value” is compared. The Specification of the ’680 patent does not support Petitioner’s understanding of the plain and ordinary meaning of “target value.” Although the Specification does not recite “target value,” it recites “target state,” and describes “target state” sufficiently to understand the plain and ordinary meaning of “target” as used in “target value” and “target state.” In particular, the ’680 patent explains that “[i]n some embodiments, the process 104 includes receiving, via a network interface, from a remote user device, (e.g., via a command-center server) a command to change a state of a fluid-handling device to a target state.” Ex. 1001, 11:48–51. This portion reflects that the command is seeking to change a state of a fluid-handling device to a target state. In other words, the “target value” or “target state” is not generally “the particular operating condition that a device is in at a particular time”; rather, it is a value or state that the fluid-handling device is desired to be in, as Patent Owner and Dr. Durham explain. Additionally, just as claim 1 recites a directional component for the “target value” to be sent to the controller in a command, so too does the Specification describe a “target state” as being sent in a command from a remote user device. Thus, the Specification clearly supports the plain and ordinary meaning proposed by Patent Owner and Dr. Durham and not the plain and ordinary meaning proposed by Petitioner and Dr. Wooley. slip op. at 14

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “time-stamped process data, report exception therein to the remote host, and extract and transmit time-stamped process data to the remote host.” Ex. 1005, Abst. (emphases added). Almadi explains that its remote field systems must include a plurality of controller units “to issue commands to, and gather and process data from a plurality of field devices, including remote systems and instruments, . . . [and] a database server for the storage of process data retrieved from the remote subsystems and instruments.” Id. at 2:22–30 (emphases added). Based on these disclosures, we agree with Patent Owner that Petitioner has not established that Almadi discloses element [1.4]. Specifically, the teachings from Almadi identified by Petitioner refer to process data, which is data retrieved from the remote subsystems/field devices. Thus, we understand that Almadi’s teaching—of using an Ethernet switch to transmit “process data”—describes transmitting data from the remote subsystems/field devices. See Ex. 1005, 3:13–17, cited in Pet. 15. But claim 1 and particularly element [1.4], recites “sending, with the server, the target value to the network address [which identifies a controller of the fluid-handling device13] via the network,” which is different than sending process data from the field devices to the remote host or database server for storage.” slip op. at 19

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,175,680
  • Tanklogix, LLC v. SiteproInstitution denied
    PTAB · Oct 10, 2025 · IPR2025-00650 · APJ Sheila F Mcshane · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 18–32 and 34 were unpatentable over Kahn or Kahn and Gutierrez.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). Upon consideration of the Petition, the Preliminary Response, and the evidence of record, we determine that Petitioner has not established a reasonable likelihood of prevailing with respect to the unpatentability of at least one claim of the ’871 patent. Accordingly, for the reasons that follow, we decline to institute an inter partes review of claims 18–32 and 34 of the ’871 patent.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The respective proposed levels of qualifications for a person of ordinary skill in the art are similar, with Patent Owner proposing two years of experience compared to Petitioner proposing significant experience with remotely controlling fluid-handling devices, like SCADA systems. Patent Owner also proposes more extensive experience in lieu of educational experience. While we find Petitioner’s proposed qualifications to be acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of skill necessary to understand and implement the teachings of the ’871 patent and the asserted prior art. Our analysis and findings herein, however, do not turn on any differences in the qualifications adopted.” slip op. at 8

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “We determine that we need not expressly construe any claim terms to resolve the parties’ disputes on the current record. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 10

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “actuators and the remote control of fluid handling devices, including the receipt with the user-interface module of “a user command to actuate an actuator via a presented control interface” (limitation [18.7]) and “account authorized to send commands to remotely control fluid handling devices” (limitation [18.11]). We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses or teaches these limitations because the evidence does not provide support that there is remote control of fluid handling devices or the use of a user command on a control interface to send a command to a fluid handling device, for instance. Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but we do not discern that it teaches or discloses the capability to remotely control fluid handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, the Kahn disclosures that Petitioner repeatedly relies upon for allegedly teaching this control are deficient. See Ex. 1005, 10:62–67, 14:35– 15:2, 15:62–16:32; see also Pet. 12–14, 16–18. Kahn discloses that “the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance.” Ex. 1005, 10:62–67. Communication unit 112B is part of the local “sensor unit,” wherein the detection conditions determined by the sensor are communicated to remote devices by communication unit 112B. See id. at 3:31–33, 5:62–6:2, 6:27–35, 7:33–37, 13:7–12, Figs. 1A–1C. Kahn discloses that the sensor units, which include communication units 112B, can be located near shut-off valves and can communicate with distant locations. See id. at 11:1–13. There are no disclosures, however, in the above passages that there is remote control of fluid handling devices, that there is a user command on a control interface that actuates an actuator, or that there is a command sent to the facility actuators via a network connection, as required in limitations [18.5]–[18.7] and [18.9]–[18.12], respectively. Rather, the disclosure indicates that the communication unit 112B includes on-site alerts and that the local (non-remote) communication unit 112B can be interfaced with the control valve.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 10,488,871
  • PTAB · Jul 14, 2025 · IPR2024-00465 · APJ Bart A Gerstenblith · IPR · Final written decision

    Claims 1–24 are unpatentable: claims 1–10 and 12–24 as obvious over Szrek and Llach, and claim 11 as obvious over Szrek, Llach, and Gilmore.

    RulingsFinal written decision
    • Skill levelSkill level board ownDecided for petitioner

      “B. Level of Ordinary Skill in the Art Petitioner proposes that the level of ordinary skill in the art is an artisan with a working knowledge of POS activation systems and lottery systems that was gained through a mixture of training and work experience in the relevant field such as (i) having a Bachelor’s degree in computer science, computer communications, electrical engineering, or equivalent degree, coupled with at least three years of work experience; (ii) having a Master’s degree in computer science, computer communications, or electrical engineering, but having less work experience; or (iii) having no formal degree, but having experience in the relevant field of at least six years of work experience. Pet. 2–3 (citing Ex. 1003 ¶¶ 13–14).9 Patent Owner states that, “[f]or the purpose of this proceeding, Patent Owner adopts the Petition’s proposed definition of the level of ordinary skill in the art.” PO Resp. 19 (citing Pet. 2–3). We find that the parties’ agreed-upon level of ordinary skill in the art is consistent with the level of ordinary skill in the art reflected by the ’451 patent and the prior art of record. See Inst. Dec. 14; see Okajima v. 9 Petitioner proposes the same level of ordinary skill in the art that the Board adopted in PGR2020-00084 (Pet. 2–3 (citing Ex. 1008, 11)), and IPR2023- 01235 (see IPR2023-01235, Paper 34 at 12–13). Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Therefore, we adopt the parties’ agreed-upon level of ordinary skill in the art, as articulated above, in our consideration of the issues presently before us.” slip op. at 13

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “We need not construe “transaction processor” expressly because its meaning is not in dispute and its construction is not necessary to resolve the controversy before us.” slip op. at 16

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundDecided for petitioner

      “On balance, we find that even with the alleged disadvantages identified by Patent Owner, one of ordinary skill in the art would have been motivated to modify Szrek with Llach’s third-party transaction processor because the advantage of having a “centralized intermediary” allows Szrek’s system to support different game providers, such as different lottery companies, which would reduce some implementation costs and allow the system to be more easily and cheaply extended. Pet. 47 (citing Ex. 1003 ¶ 181); see Medichem, S.A. v. Rolabo, S.L., 437 F.3d 1157, 1165 (Fed. Cir. 2006) (“a given course of action often has simultaneous advantages and disadvantages, and this does not necessarily obviate motivation to combine”) (citing Winner Int’l Royalty Corp. v. Wang, 202 F.3d 1340, 1349 n.8 (Fed. Cir. 2000)); see also Intel Corp. v. Qualcomm Inc., 21 F.4th 784, 795 (Fed. Cir. 2021) (stating the same). We acknowledge that the combination comes with some disadvantages, including “add[ed] delay, reduce[d] efficiency, and . . . implementation complexities by converting a simple, direct communication exchange into an exchange that traverses multiple systems.” PO Resp. 52 (citing Ex. 2052 ¶ 163). But, “[t]he fact that the motivating benefit comes at the expense of another benefit, however, should not nullify its use as a basis to modify the disclosure of one reference with the teachings of another. Instead, the benefits, both lost and gained, should be weighed against one another.” Winner, 202 F.3d at 1349 n.8. Here, Szrek expressly teaches indirect communication as a possible implementation of its system and Petitioner’s combination—employing Llach’s third-party transaction processor as part of the indirect communication channel—offers the attractive benefit of allowing Szrek’s system to support different game providers, which would reduce some implementation costs even if it might increase other costs, e.g., by having to program certain components (e.g., the cash registers) differently. Specifically, we find that the ability to expand Szrek’s system to support different game providers provides advantages that outweigh the disadvantages discussed above in the circumstance where one desires a more robust and comprehensive system. See Pet. Reply 23 (noting three advantages of the combination— (1) “allow[ing] Szrek’s system to use ‘a centralized system for activating lottery tickets from different retailers and different locations,’” (2) “allow[ing] support for different game providers, such as different lottery companies,” “reduc[ing] implementation costs,” and (3) “allow[ing] Szrek’s system to ‘communicate with individual card” slip op. at 37

    • Obviousness (§103) › Motivation to combine / reasonable expectation of success › HindsightMotivation foundDecided for petitioner

      “On balance, we find that even with the alleged disadvantages identified by Patent Owner, one of ordinary skill in the art would have been motivated to modify Szrek with Llach’s third-party transaction processor because the advantage of having a “centralized intermediary” allows Szrek’s system to support different game providers, such as different lottery companies, which would reduce some implementation costs and allow the system to be more easily and cheaply extended. Pet. 47 (citing Ex. 1003 ¶ 181); see Medichem, S.A. v. Rolabo, S.L., 437 F.3d 1157, 1165 (Fed. Cir. 2006) (“a given course of action often has simultaneous advantages and disadvantages, and this does not necessarily obviate motivation to combine”) (citing Winner Int’l Royalty Corp. v. Wang, 202 F.3d 1340, 1349 n.8 (Fed. Cir. 2000)); see also Intel Corp. v. Qualcomm Inc., 21 F.4th 784, 795 (Fed. Cir. 2021) (stating the same). We acknowledge that the combination comes with some disadvantages, including “add[ed] delay, reduce[d] efficiency, and . . . implementation complexities by converting a simple, direct communication exchange into an exchange that traverses multiple systems.” PO Resp. 52 (citing Ex. 2052 ¶ 163). But, “[t]he fact that the motivating benefit comes at the expense of another benefit, however, should not nullify its use as a basis to modify the disclosure of one reference with the teachings of another. Instead, the benefits, both lost and gained, should be weighed against one another.” Winner, 202 F.3d at 1349 n.8. Here, Szrek expressly teaches indirect communication as a possible implementation of its system and Petitioner’s combination—employing Llach’s third-party transaction processor as part of the indirect communication channel—offers the attractive benefit of allowing Szrek’s system to support different game providers, which would reduce some implementation costs even if it might increase other costs, e.g., by having to program certain components (e.g., the cash registers) differently. Specifically, we find that the ability to expand Szrek’s system to support different game providers provides advantages that outweigh the disadvantages discussed above in the circumstance where one desires a more robust and comprehensive system. See Pet. Reply 23 (noting three advantages of the combination— (1) “allow[ing] Szrek’s system to use ‘a centralized system for activating lottery tickets from different retailers and different locations,’” (2) “allow[ing] support for different game providers, such as different lottery companies,” “reduc[ing] implementation costs,” and (3) “allow[ing] Szrek’s system to ‘communicate with individual card” slip op. at 37

    Patent outcomesUS 11,488,451 unpatentable
    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,488,451
  • PTAB · Jun 9, 2025 · IPR2025-00044 · APJ Michael J Strauss · IPR · Institution

    The Board denied institution because the Petition violated Rule 42.104(b)(3) and did not show a reasonable likelihood that claims 1–3, 5, and 6 were unpatentable as obvious.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “Accordingly, Petitioner has not identified corresponding structure for performing the recited functions of “optimizing . . . gamma reference voltage levels using means for executing a predetermined algorithm according to a predetermined criteria and data sensed by . . . at least one sensor, wherein said means for executing said predetermined algorithm is separate from [a] display to achieve [a] desired gamma curve” as required under 37 C.F.R. § 42.104(b)(3). Because Petitioner has not provided constructions, either rebutting the presumption that “means for executing” is a means-plus-function term, or identifying corresponding structure if it is a means-plus-function term, Petitioner has violated Rule 104(b)(3).” slip op. at 20

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Petitioner argues that a person of ordinary skill in the art (POSA) “would have had at least a bachelor of science degree in physics, electrical engineering, or the equivalent thereof and three (3) years of experience in circuit design or display technologies.” Pet. 12 (citing Ex. 1003 ¶ 24). According to Petitioner “[s]uch a POSA would have had knowledge of integrated circuits, gamma correction, and storage of gamma correction voltage values within memory, and would have understood how to search available literature for relevant publications.” Id. (citing Ex. 1003 ¶ 24). Patent Owner applies Petitioner’s definition for the purposes of the Preliminary Response. Prelim. Resp. 2. For purposes of this Decision, and based on the current record, we adopt Petitioner’s assessment of the level of skill for one of ordinary skill in the art. Pet. 12. This assessment is consistent with the ’788 Patent and the asserted prior art, and we apply it in our analysis below.” slip op. at 8

    • BurdenDecided for patent owner

      “Accordingly, Petitioner has not identified corresponding structure for performing the recited functions of “optimizing . . . gamma reference voltage levels using means for executing a predetermined algorithm according to a predetermined criteria and data sensed by . . . at least one sensor, wherein said means for executing said predetermined algorithm is separate from [a] display to achieve [a] desired gamma curve” as required under 37 C.F.R. § 42.104(b)(3). Because Petitioner has not provided constructions, either rebutting the presumption that “means for executing” is a means-plus-function term, or identifying corresponding structure if it is a means-plus-function term, Petitioner has violated Rule 104(b)(3).” slip op. at 20

    • Claim Construction › Functional claiming / §112(f) means-plus-function › Whether §112(f) applies (Williamson, nonce words)§112(f) appliesDecided for patent owner

      “and 5 recites “means for executing.” Ex. 1001, 7:36–40, 8:35–37. The use of the term “means” creates a rebuttable presumption that 35 U.S.C. § 112 ¶ 6 applies. See Williamson, 792 F.3d at 1348. Consistent with Patent Owner’s arguments (Prelim. Resp. 36–39), the Petition does not address the presumption and, more specifically, the Petition does not provide any argument or evidence as to why the presumption is rebutted. Furthermore, even if we were to consider Petitioner’s newly presented argument that “[t]he plain and ordinary meaning of ‘means for executing a predetermined algorithm . . . ’ connotes a general-purpose processor, which is understood as structure sufficient to perform the function” (Pet. Reply 5), such argument is not persuasive as it is not supported by evidence earlier presented in the Petition or otherwise. Furthermore, even if the plain and ordinary meaning of means for executing a predetermined algorithm were a general-purpose processor, for a computer implemented means-plus-function term the corresponding structure must be the specific algorithm implemented by the processor as argued by Petitioner. Pet. Reply 6.” slip op. at 16

    Claim construction§ 103 obviousnessDiscretionary denialcites Phillips · Graham
    Patents in suitUS 7,557,788
  • PTAB · May 14, 2025 · IPR2024-01389 · APJ David C Mckone · IPR · Institution

    The Board denied institution for claims 1–4 because Petitioner did not show a reasonable likelihood of establishing unpatentability under any asserted obviousness ground.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “review. See 35 U.S.C. § 314 (2016); 37 C.F.R. § 42.4(a) (2019). The standard for instituting an inter partes review is set forth in 35 U.S.C. § 314(a), which provides that an inter partes review may not be instituted “unless . . . there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” For the reasons explained below, we do not institute an inter partes review of the ’000 patent.” slip op. at 2

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “We construe a claim “using the same claim construction standard that would be used to construe the claim in a civil action under 35 U.S.C. [§] 282(b), including construing the claim in accordance with the ordinary and customary meaning of such claim as understood by one of ordinary skill in the art and the prosecution history pertaining to the patent.” 37 C.F.R. § 42.100(b) (2019); see also Phillips v. AWH Corp., 415 F.3d 1303 (Fed. Cir. 2005) (en banc). Neither party proposes construing any claim term. Pet. 6; Prelim. Resp. 36. Based on the record before us, we do not find it necessary to provide express claim constructions of any claim terms. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (noting that “we need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)).” slip op. at 7

    • Skill levelSkill level board ownOther

      “3 The parties do not dispute that a skilled artisan “would have had a B.S. degree in Computer Science, Computer Engineering, or equivalent experience relating to computing, as well as two to three additional years of academic or industry experience related to web application development and data visualization services.” Pet. 6 (citing Ex. 1003 ¶ 85); Prelim. Resp. 35– 36. 4 The record does not include allegations or evidence of objective indicia of nonobviousness.” slip op. at 8

    • Expert testimonyPetitioner expert discountedPatent owner expert creditedOther

      “connotes interactivity, and does not explain why a “Data Animation Effect” would be interactive.6 These aspects of Figure 53 do not appear to show interactivity. Thus, the issue is whether selecting a choice other than “Hide” for “Scroll buttons” in box 710 of Figure 53 adds to chart 840, once published, a feature that allows a user to interact with that chart via scrolling, or whether “Scroll buttons” refers to some other feature of the configuration process (such as the scroll buttons shown in Figure 53 for scrolling through the various charts in the layout). Both experts provide conclusory testimony stating how they view Figure 53. Ex. 1003 ¶ 181 (“For example, Figure 53 of Rostoker shows the ‘Configure Chart View’ toolbar, which includes multiple ‘interactive’ features, such as making the chart ‘Selectable’ (suggesting interactivity using an input device such as a mouse), including ‘Scroll buttons’ to scroll the chart, and adding ‘Data Animation[s].’”); Ex. 2001 ¶ 141 (“Schmandt relies on the ‘Configure Chart View’ toolbar of FIG. 53 of Rostoker, but he is confusing the configuration step 330 of Rostoker with the end result.”). Petitioner invites us to speculate as to the behavior of features that are depicted in Figure 53 but otherwise are not described in any meaningful detail by Rostoker. We conclude that this is insufficient to show a reasonable likelihood of prevailing.” slip op. at 13

    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 8,520,000
Page 1 of 24
← Previous12345…Next →

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.