PTAB
Advanced fields
183 decisions · 450msnewest first
  • PTAB · Oct 10, 2025 · IPR2025-00653 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution on all claims because the Petition did not show a reasonable likelihood that any challenged claim was unpatentable over the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “An inter partes review may be instituted only if “the information presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’504 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Additionally, only terms that are in controversy need to be construed, and these need be construed only to the extent necessary to resolve the controversy. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 9; Prelim. Resp. 4 (citing Ex. 2009 ¶ 72); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13

    • Expert testimonyPetitioner expert discountedDecided for patent owner

      “Ex. 1002 ¶ 47. As reflected above, Dr. Wooley’s testimony as to element [1.2] does not even assert that Cardamone discloses a tank, let alone one or more sensors disposed at a tank as recited in element [1.2]. Thus, Dr. Wooley’s testimony does not support Petitioner’s argument on this issue.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,726,504
  • PTAB · Oct 10, 2025 · IPR2025-00652 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–23 and 25–30 were unpatentable over the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’403 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 10; Prelim. Resp. 4 (citing Ex. 2009 ¶ 73); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses element [1.2] because the evidence cited does not disclose a “first computer system being configured to provide remote control of the first pump or first valve” (i.e., a fluid-handling device). Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but Petitioner has not identified any disclosure of the capability to remotely control fluid-handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, Kahn’s disclosures that Petitioner relies on for allegedly teaching remote control are deficient. We discuss each. First, Petitioner points to the following, “[f]or instance, as illustrated in FIG. 1C, a fluid control device such as a valve 15A is located on the input side of a sen[s]or unit 110.” Ex. 1005, 8:19–21, cited in Pet. 13. This portion of Kahn, however, does not disclose remote control. Second, Petitioner cites to the following: Finally, or in addition to, the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance. Pet. 13 (citing Ex. 1005, 10:62–67). We agree with Patent Owner that this portion of Kahn teaches on-site alerts and local control of the fluid-handling device. See Prelim. Resp. 7. This portion of Kahn does not disclose remote control.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,294,403
  • PTAB · Oct 10, 2025 · IPR2025-00651 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–3, 6, 7, and 9–20 were unpatentable over any asserted ground.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’680 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 11

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner

      “target value” is part of a command that is sent from a computing device to a server and then to a controller. The controller then receives a measurement of the fluid by a sensor and determines whether the measurement satisfies the “target value.” If the measurement does not satisfy the “target value,” further operations are undertaken. The recited operation sequence makes clear that the plain and ordinary meaning of “target value” is not as Dr. Wooley opines because the particular operating condition that a device is in at a particular time is represented by the measurement taken by the sensor, 11 Some claim language less relevant to construing “target value” was omitted for ease of reference. which the controller then uses to determine whether the measurement satisfies the “target value.” Additionally, claim 1 recites that the “target value” is sent as part of a command to the controller. The “target value” is not sent to the controller from the sensor, as might be expected if the plain and ordinary meaning of “target value” were as Dr. Wooley opines. Petitioner and Dr. Wooley’s construction would also result in “target value” meaning effectively the same thing as the measurement of the fluid by the sensor, a concept that is separately recited in claim 1 and to which the “target value” is compared. The Specification of the ’680 patent does not support Petitioner’s understanding of the plain and ordinary meaning of “target value.” Although the Specification does not recite “target value,” it recites “target state,” and describes “target state” sufficiently to understand the plain and ordinary meaning of “target” as used in “target value” and “target state.” In particular, the ’680 patent explains that “[i]n some embodiments, the process 104 includes receiving, via a network interface, from a remote user device, (e.g., via a command-center server) a command to change a state of a fluid-handling device to a target state.” Ex. 1001, 11:48–51. This portion reflects that the command is seeking to change a state of a fluid-handling device to a target state. In other words, the “target value” or “target state” is not generally “the particular operating condition that a device is in at a particular time”; rather, it is a value or state that the fluid-handling device is desired to be in, as Patent Owner and Dr. Durham explain. Additionally, just as claim 1 recites a directional component for the “target value” to be sent to the controller in a command, so too does the Specification describe a “target state” as being sent in a command from a remote user device. Thus, the Specification clearly supports the plain and ordinary meaning proposed by Patent Owner and Dr. Durham and not the plain and ordinary meaning proposed by Petitioner and Dr. Wooley. slip op. at 14

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “time-stamped process data, report exception therein to the remote host, and extract and transmit time-stamped process data to the remote host.” Ex. 1005, Abst. (emphases added). Almadi explains that its remote field systems must include a plurality of controller units “to issue commands to, and gather and process data from a plurality of field devices, including remote systems and instruments, . . . [and] a database server for the storage of process data retrieved from the remote subsystems and instruments.” Id. at 2:22–30 (emphases added). Based on these disclosures, we agree with Patent Owner that Petitioner has not established that Almadi discloses element [1.4]. Specifically, the teachings from Almadi identified by Petitioner refer to process data, which is data retrieved from the remote subsystems/field devices. Thus, we understand that Almadi’s teaching—of using an Ethernet switch to transmit “process data”—describes transmitting data from the remote subsystems/field devices. See Ex. 1005, 3:13–17, cited in Pet. 15. But claim 1 and particularly element [1.4], recites “sending, with the server, the target value to the network address [which identifies a controller of the fluid-handling device13] via the network,” which is different than sending process data from the field devices to the remote host or database server for storage.” slip op. at 19

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,175,680
  • Tanklogix, LLC v. SiteproInstitution denied
    PTAB · Oct 10, 2025 · IPR2025-00650 · APJ Sheila F Mcshane · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 18–32 and 34 were unpatentable over Kahn or Kahn and Gutierrez.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). Upon consideration of the Petition, the Preliminary Response, and the evidence of record, we determine that Petitioner has not established a reasonable likelihood of prevailing with respect to the unpatentability of at least one claim of the ’871 patent. Accordingly, for the reasons that follow, we decline to institute an inter partes review of claims 18–32 and 34 of the ’871 patent.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The respective proposed levels of qualifications for a person of ordinary skill in the art are similar, with Patent Owner proposing two years of experience compared to Petitioner proposing significant experience with remotely controlling fluid-handling devices, like SCADA systems. Patent Owner also proposes more extensive experience in lieu of educational experience. While we find Petitioner’s proposed qualifications to be acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of skill necessary to understand and implement the teachings of the ’871 patent and the asserted prior art. Our analysis and findings herein, however, do not turn on any differences in the qualifications adopted.” slip op. at 8

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “We determine that we need not expressly construe any claim terms to resolve the parties’ disputes on the current record. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 10

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “actuators and the remote control of fluid handling devices, including the receipt with the user-interface module of “a user command to actuate an actuator via a presented control interface” (limitation [18.7]) and “account authorized to send commands to remotely control fluid handling devices” (limitation [18.11]). We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses or teaches these limitations because the evidence does not provide support that there is remote control of fluid handling devices or the use of a user command on a control interface to send a command to a fluid handling device, for instance. Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but we do not discern that it teaches or discloses the capability to remotely control fluid handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, the Kahn disclosures that Petitioner repeatedly relies upon for allegedly teaching this control are deficient. See Ex. 1005, 10:62–67, 14:35– 15:2, 15:62–16:32; see also Pet. 12–14, 16–18. Kahn discloses that “the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance.” Ex. 1005, 10:62–67. Communication unit 112B is part of the local “sensor unit,” wherein the detection conditions determined by the sensor are communicated to remote devices by communication unit 112B. See id. at 3:31–33, 5:62–6:2, 6:27–35, 7:33–37, 13:7–12, Figs. 1A–1C. Kahn discloses that the sensor units, which include communication units 112B, can be located near shut-off valves and can communicate with distant locations. See id. at 11:1–13. There are no disclosures, however, in the above passages that there is remote control of fluid handling devices, that there is a user command on a control interface that actuates an actuator, or that there is a command sent to the facility actuators via a network connection, as required in limitations [18.5]–[18.7] and [18.9]–[18.12], respectively. Rather, the disclosure indicates that the communication unit 112B includes on-site alerts and that the local (non-remote) communication unit 112B can be interfaced with the control valve.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 10,488,871
  • PTAB · Jun 11, 2025 · IPR2025-00218 · APJ Frederick C Laney · IPR · Institution

    The Board denied institution because the Kim and Vayanos combination did not show that each individual bit indicates a separate time interval, as required by claims 1–12.

    RulingsInstitution decision
    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner

      “limitation 1.2 because it is more consistent with the claim language and the specification of the ’416 patent. The language “each of the plurality of bits” clearly individualizes the “plurality of bits” and the language “indicates a respective time interval that physical shared channel resources are utilized to signal channels” clearly ascribes to each individual bit the function of identifying a time interval that is separate from the time interval(s) that the other individual bit(s) identify. Petitioner’s claim constriction argument largely ignores the words used in limitation 1.2. Petitioner fails to provide anything to explain how or why the plain meaning of “each” and “respective” in the context of limitation 1.2 could be understood by a skilled artisan to connote something other than the plurality of bits individually identifying a separate and distinct time interval (i.e., a “one-to-one correspondence”). Petitioner similarly does not identify anything from the specification of the ’416 patent that would support deviating from the plain meaning of limitation 1.2. And Petitioner’s reliance on 3M Innovative Properties appears to miss the mark. Pet. Reply 7. In that case, the Federal Circuit held that, when a claim term has an “ascertainable definition in the body of the claim,” their “cases do not support prescribing a more particularized meaning unless a narrower construction is required by the specification or prosecution history.” 3M Innovative Properties Co., 725 F.3d at 1329. Here, however, Patent Owner is not attempting to import a more particularized meaning into limitation 1.2, but to demonstrate that the ’416 specification is consistent with the ascertainable definition of “each” and “respective” within the context of limitation 1.2. In particular, Patent Owner highlights that the ’416 specification describes the resource allocation technique as using an indicator bit, within a plurality of indicator bits, that has a one-to-one correspondence to a specific time window established for a Forward Access Channel (FACH). See Ex. 1001, 13:63–14:25, 14:44–53, Figs. 7, 9; PO Resp. 11–14, 19–20; PO Sur-reply 2–3; Ex. 2001 ¶¶ 36–40, 49. And we agree that the ’416 specification informs, and is consistent with, the plain reading of limitation 1.2. See Ex. 1001, 13:63–14:25, 14:44–53, Figs. 7, 9. Therefore, we determine that the plain and ordinary meaning of limitation 1.2 requires all the plurality of bits to individually identify a separate and distinct time interval that physical shared channel resources are utilized to signal channels.” slip op. at 12

    • Obviousness (§103) › Graham factors (scope of art, differences, level of skill)Not shown unpatentableNot shown unpatentable

      “PICH, which is communicated to Kim’s receiver, has a plurality of bits, the evidence fails to demonstrate sufficiently that each of those bits indicates a respective time interval that physical shared channel resources are utilized to signal channels, as limitation 1.2 recites. As Patent Owner correctly argues, the Vayanos paging indicators use multiple bits to indicate information about a single time interval in a frame, rather having several bits that individually identify a separate and distinct time interval. PO Resp. 39–41 (citing Ex. 2001 ¶¶ 67, 74–75). Vayanos teaches that “[t]he number of paging indicators (Np) in each PICH frame is configurable by the system and can take on a value of 18, 36, 72 or 144,” and that “[e]ach paging indicator is sent in 288/Np consecutive bits in the PICH frame, where 288/Np can take on a value of 16, 8, 4 or 2.” Ex. 1006, 3:26–34. As a result, if there are 18 (Np = 18) paging indicators, 288/NP = 288/18 = 16 (meaning that each paging indicator is 16 bits long), if there are 36 (Np = 36) paging indicators, 288/Np = 288/36 = 8 (meaning that each paging indicator is 8 bits long), if there are 72 (Np=72) paging indicators, 288/Np = 288/72= 4 (meaning that each paging indicator is 4 bits long), and if there are 144 (Np=144) paging indicators, 288/Np = 288/144 = 2 (meaning that each paging indicator is 2 bits long). Ex. 2001 ¶ 66. Each paging indicator (singular) taught by Vayanos includes multiple bits––each paging indicator (singular) has either 16, 8, 4 or 2 bits–– and Vayanos does not disclose or suggest a paging indicator that indicates a time interval with only a single bit. Id. And Petitioner does not cite Kim to show the number of bits used to indicate a time interval; only to show that a UE would receive broadcast information with paging information including paging indicators that identify a time interval in which physical shared channel resources are utilized to signal channels. See Pet. 40–49. Even accepting that the Kim/Vayanos combination discloses a UE receiving a paging indicator that is indicative of a time interval in which a Paging Channel PCH may be found or indicative of whether a frame will include a signaling channel (e.g., PCH) at a specific TTI within that frame, the combination does not disclose or suggest using a paging indicator that is a single bit indicating either of those time intervals. On the contrary, as noted above, Vayanos teaches that all paging indicators consist of multiple bits and, thus, the Kim/Vayanos combination discloses a UE that only receives and uses a plurality of bits to indicate a time interval that physical shared channel resources are utilized to signal channels. This is insufficient to show a reasonable likelihood that Petitioner will be able to establish that the Kim/Vayanos combination discloses or suggests receiving a plurality of bits wherein the individual bits each identify a separate and distinct time interval. Therefore, Petitioner has not shown sufficiently that the Kim/Vayanos combination discloses or suggests the subject matter limitation 1.2 recites. For the above reasons, we are not persuaded that Petitioner has shown sufficiently that the combination of Kim and Vayanos disclose or suggest broadcast information that includes a plurality of bits, wherein each of the plurality of bits indicates a respective time interval that physical shared channel resources are utilized to signal channels. This failing undermines Petitioner’s showing as to independent claims 1 and 7 (in the asserted Grounds 1 and 2) and, as a result, the same deficiency extends through to all of the dependent claims challenged in all of the grounds.4” slip op. at 18

    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “sufficiently that the combination of Kim and Vayanos disclose or suggest broadcast information that includes a plurality of bits, wherein each of the plurality of bits indicates a respective time interval that physical shared channel resources are utilized to signal channels. This failing undermines Petitioner’s showing as to independent claims 1 and 7 (in the asserted Grounds 1 and 2) and, as a result, the same deficiency extends through to all of the dependent claims challenged in all of the grounds.4 IV. CONCLUSION Based on the arguments and evidence presented by the parties, we conclude that Petitioner has not demonstrated a reasonable likelihood of prevailing with respect to at least one claim of the ’416 patent challenged in the Petition. Therefore, we do not institute an inter partes review.” slip op. at 20

    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 10,136,416
  • PTAB · May 28, 2025 · IPR2025-00301 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution of review for claims 1–11, 16, and 21 under § 314(a), finding the Fintiv factors favored discretionary denial, and denied joinder.

    RulingsInstitution decision
    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Institution denied fintivInstitution denied

      “2026. This date is nearly five months prior to the date on which the final written decision would be due if trial were instituted in this proceeding. And, even if we assume Petitioner’s alleged February–March 2026 trial date, this date too is several months prior to the projected final written decision deadline. As such, it is unlikely that a final written decision in this proceeding would issue before trial in the district court, unless the trial was delayed or rescheduled for a later time. Thus, we find this factor weighs in favor of exercising our discretion to deny institution. See ARM Ltd. v. Daedalus Prime LLC, IPR2025-00207, Paper 10 at 2 (May 16, 2025) (Before the Office of the Under Secretary of Commerce for Intellectual Property and Director of the United States Patent and Trademark Office) (exercising discretion to deny institution with the same relative timing between district court trial and final written decision deadline).” slip op. at 13

    • PTAB / AIA Trials › Motions to amend / substitute claimsNot reached
    • PTAB / AIA Trials › Joinder §315(c) / SAS all-or-nothingJoinder, deniedDenied
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied discretionary otherInstitution denied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). Institution of inter partes review, however, is discretionary. See Harmonic Inc. v. Avid Tech., Inc., 815 F.3d 1356, 1367 (Fed. Cir. 2016) (“[T]he PTO is permitted, but never compelled, to institute an IPR proceeding.”). For the reasons discussed below, we exercise discretion pursuant to 35 U.S.C. § 314(a) not to institute inter partes review. Additionally, for the same reasons and because institution was denied in IPR2024-01248, we deny Petitioner’s Motion for Joinder. See 35 U.S.C. § 315(c) (“[T]he Director . . . may join as a party . . . any person who properly files a petition under section 311 that the Director . . . determines warrants the institution of an inter partes review under section 314.”).” slip op. at 3

    Discretionary denial
    Patents in suitUS 9,814,071
  • PTAB · Apr 25, 2025 · IPR2024-01462 · APJ Jo-Anne M Kokoski · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–8 were unpatentable under the asserted obviousness grounds.

    RulingsInstitution decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “experience working on the development of materials or components for electronic devices such as batteries.” Pet. 2. Petitioner further contends that “[a]dditional education, such as a graduate degree, could compensate for less work experience, and additional work experience could compensate for less formal education.” Id. Patent Owner states that, “[f]or purposes of this Preliminary Response, Patent Owner applies Petitioner’s level of skill for a person of ordinary skill in the art.” Prelim. Resp. 4. For purposes of this Decision, we adopt Petitioner’s undisputed proposed definition because it appears to be consistent with the cited prior art and the disclosure of the ’014 patent. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (explaining that specific findings regarding ordinary skill level are not required “where the prior art itself reflects an appropriate level and a need for testimony is not shown” (quoting Litton Indus. Prods., Inc. v. Solid State Sys. Corp., 755 F.2d 158, 163 (Fed. Cir. 1985))).” slip op. at 8

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “customary meaning of such claim as understood by one of ordinary skill in the art and the prosecution history pertaining to the patent.” 37 C.F.R. § 42.100(b). Under this standard, claim terms are generally given their plain and ordinary meaning as would have been understood by a person of ordinary skill in the art at the time of the invention and in the context of the entire patent disclosure. Phillips v. AWH Corp., 415 F.3d 1303, 1313 (Fed. Cir. 2005) (en banc). Only those terms in controversy need to be construed, and only to the extent necessary to resolve the controversy. Realtime Data LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019). in this proceeding.” Pet. 3. Patent Owner contends that “[t]he Board need not construe any term in order to determine that institution should be denied.” Prelim. Resp. 4. Based on the record before us, we determine that no claim term requires express construction for purposes of this Decision. See Realtime Data, 912 F.3d at 1375.” slip op. at 8

    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “For these reasons, we are not persuaded that Petitioner sufficiently establishes that a POSITA would have been motivated to modify Hanafusa in light of Dobashi with a reasonable expectation of success as Petitioner contends. Accordingly, we determine that Petitioner fails to demonstrate a reasonable likelihood of prevailing in its assertion that the subject matter of claim 1, and claims 4 and 8 that depend therefrom, would have been obvious over the combined teachings of Hanafusa and Dobashi.” slip op. at 18

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation not foundNot shown unpatentableNot shown unpatentable

      “Petitioner also focuses on Hanafusa’s teaching that all known methods can be used to make a rough surface low-profile, and Dobashi’s teaching that RSm can be used as an indicator for judgment of the surface, to support its contention that a POSITA would have been motivated to apply Dobashi’s RSm to further achieve Hanafusa’s purpose, without explaining how and why that would be the case. In particular, neither Petitioner nor Dr. Josefowicz adequately explain why a POSITA looking for ways to make Hanafusa’s surface roughness low-profile would look to methods to achieve as the period of waviness, RSm can also be used as an indicator for judgment of the surface.” Ex. 1005, 2:66–3:1, 6:23–26. Dobashi explains that waviness is “an indicator for determining whether the fine pattern forming performance is good or bad,” and “[t]he surface has small waviness and is smooth when RSm is large, and the surface has large waviness and is rough when RSm is small.” Id. at 3:1–3, 6:27–29. Dobashi also teaches that surface roughness Rzjis is used as a low-profile indicator. Ex. 1005, 2:66– 3:1. Dobashi, therefore, teaches that RSm is an indicator of surface waviness, which Dobashi explains is different than surface roughness. Id. at 2:66–3:3, 6:23–29. Given these teachings in Dobashi, neither Petitioner nor Dr. Josefowicz sufficiently explains how or why a POSITA would have been motivated to implement Dobashi’s RSm values to make Hanafusa’s surface roughness low-profile. See Pet. 10–12; Ex. 1003 ¶¶ 46–52.” slip op. at 14

    Claim construction§ 103 obviousnesscites Phillips · KSR
    Patents in suitUS 11,346,014
  • PTAB · Apr 23, 2025 · IPR2024-01461 · APJ Jo-Anne M Kokoski · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–10 were unpatentable over either asserted § 103 ground.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “Institution of an inter partes review is authorized by statute when “the information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314 (2018); see also 37 C.F.R. § 42.4 (2023). For the reasons discussed below, we deny the Petition and do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “II. ANALYSIS A. Level of Ordinary Skill in the Art Petitioner contends that a person of ordinary skill in the art (“POSITA”) “would have had at least an undergraduate degree in materials science, chemical engineering, electrical engineering, or related field, or equivalent knowledge, training, or experience, with at least two years of experience working on the development of materials or components for electronic devices such as batteries.” Pet. 4. Petitioner further contends that “[a]dditional education, such as a graduate degree, could compensate for less 7 We refer to the page numbers added by Petitioner to the bottom-center of the page. formal education.” Id. (citing Ex. 1003 ¶ 10). Patent Owner states that, “[f]or purposes of this Preliminary Response, Patent Owner applies Petitioner’s level of skill for a person of ordinary skill in the art.” Prelim. Resp. 4. For purposes of this Decision, we adopt Petitioner’s undisputed proposed definition because it appears to be consistent with the cited prior art and the disclosure of the ’689 patent. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (explaining that specific findings regarding ordinary skill level are not required “where the prior art itself reflects an appropriate level and a need for testimony is not shown” (quoting Litton Indus. Prods., Inc. v. Solid State Sys. Corp., 755 F.2d 158, 163–64 (Fed. Cir. 1985))).” slip op. at 10

    • Expert testimonyPetitioner expert discountedDecided for patent owner

      “We are not persuaded, on this record, that Petitioner adequately establishes that Khatibi discloses a CTE in the claimed range of 16 to 22 µm/(m·°C.). Petitioner’s argument that Khatibi’s reported values meet this claim limitation are based solely on Dr. Randall’s testimony that Khatibi’s measurement method would produce results that would not significantly differ from results determined using the claimed method. See Pet. 16–18 (citing Ex. 1003 ¶¶ 56–60). Dr. Randall’s testimony, however, is largely conclusory and unsupported by adequate explanation and/or objective evidence. For example, Dr. Randall does not provide adequate explanation or objective evidence to support his opinion that Khatibi’s use of a laser speckle based dilatometer instead of the claimed thermomechanical analyzer “is unlikely to significantly impact the CTE value” because “variations in equipment and a heating speed of 5° C/min would not significantly alter the results.” Ex. 1003 ¶ 58. In particular, Dr. Randall neither explains what constitutes a “significant” impact on CTE, nor provides objective evidence to support his contention that equipment variations and heating differences would not “significantly alter” the resulting measurements. And although Dr. Randall opines that “the heating rate (5°C per minute) is typical for certain devices” such as a thermomechanical analyzer or dilatometer, and “[t]ypically, these devices use temperature ramp rates between 2°C and 20°C per minutes, so the ‘5° C./min’ recited in [1d] is common and should not drastically affect the measurement results,” Dr. Randall fails to point us to any evidence showing that these temperatures are “typical” or that the claimed heating rate is “common.” Id. ¶ 59 (emphases added). to little weight. See 37 C.F.R. § 42.65(a) (“Expert testimony that does not disclose the underlying facts or data on which the opinion is based is entitled to little or no weight.”); Xerox Corp. v. Bytemark, Inc., IPR2022-00624, Paper 12 at 5 (PTAB Feb. 10, 2023) (finding that “the Board was correct in giving little weight to Petitioner’s expert because the expert declaration merely offered conclusory assertions without underlying factual support”); Upjohn Co. v. Mova Pharm. Corp., 225 F.3d 1306, 1311 (Fed. Cir. 2000) (“Lack of factual support for expert opinion to factual determinations, however, may render the testimony of little probative value in a validity determination.” (quoting Ashland Oil, Inc. v. Delta Resins and Refractories, Inc., 776 F.2d 281, 294 (Fed. Cir. 1985))); see also In re Ethicon, Inc., 844 F.3d 1344, 1348, 1352 (Fed. Cir. 2017) (concluding that the Board properly gave “little weight” to conclusory expert testimony of objective indicia). Because Petitioner offers Dr. Randall’s testimony to supply a limitation missing from the prior art, namely, the CTE measurement method, and we give Dr. Randall’s unsupported and conclusory testimony little weight, we are not persuaded that Petitioner establishes a reasonable likelihood of showing that Khatibi discloses limitation [1d].” slip op. at 17

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation not foundNot shown unpatentable

      “second surfaces of the electrolytic copper foil ranges from 3 to 92.” Ex. 1001, 13:62–63. Petitioner contends that “Kim teaches that the electrolytic copper foil (e.g., untreated or treated copper foil) having Rz less than 2 µm is advantageous toward battery efficiency and performance,” and, similarly, Griesi describes the use of untreated electrolytic copper foil with an Rz value less than 2 µm in printed circuit boards that are compatible with secondary batteries. Pet. 58–59 (citing Ex. 1012, claim 2, ¶¶ 13, 25, 27; Ex. 1003 ¶ 157). In particular, Petitioner notes that Griesi’s Figure 3.16 describes an “Rz value of 1.2 µm.” Id. at 59 (citing Ex. 1015, 53–54; Ex. 1003 ¶ 158). Petitioner asserts that “Dr. Randall explains that a POSITA would have also recognized another surface roughness-related parameter, Rpc, in Griesi as a potentially useful parameter that can be optimized to further enhance uniformity or generally improve Kim’s copper foil surface, for example, to prevent wrinkles or achieve other advantageous effects.” Id. (citing Ex. 1003 ¶ 159). Although Dr. Randall demonstrates that Griesi’s Pc (or Rpc) value is 19.2 over a 4 mm sampling length (Ex. 1003 ¶ 155), Petitioner does not contend that Griesi addresses this value, or indicates any benefit that might be derived from its use. Instead, Griesi’s Pc value appears to be an incidental finding, which is not discussed or analyzed in the reference. See incidental, unexamined finding would lead a POSITA to import Griesi’s Pc value into Kim’s copper foil, absent a hindsight desire to reconstruct the claimed invention. As such, Petitioner’s arguments with respect to Kim and Griesi are not persuasive. See Cheese Sys. Inc. v. Tetra Pak Cheese and Powder Sys., Inc., 725 F.3d 1341, 1352 (Fed. Cir. 2013) (“Obviousness cannot be based on the hindsight combination of components selectively culled from the prior art to fit the parameters of the patented invention.” (internal quotations marks omitted)). Thus, we are not persuaded, on this record, that the combined disclosures of Kim and Griesi teach all of the elements of limitation [1g].” slip op. at 23

    § 103 obviousnesscites Phillips
    Patents in suitUS 10,811,689
  • PTAB · Apr 22, 2025 · IPR2024-01460 · APJ Jon B Tornquist · IPR · Institution

    The Board denied institution of review of claims 1–11 because the Fintiv factors, including the early trial date and close merits case, favored discretionary denial.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied fintivInstitution denied

      “whether to institute an inter partes review. Applying the standard set forth in 35 U.S.C. § 314(a), we may not institute an inter partes review unless the information presented in the petition “shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” Institution of inter partes review, however, is discretionary. See Harmonic Inc. v. Avid Tech., Inc., 815 F.3d 1356, 1367 (Fed. Cir. 2016) (“[T]he PTO is permitted, but never compelled, to institute an IPR proceeding.”). For the reasons stated below, we exercise our discretion not to institute an inter partes review. A. Real Parties-in-Interest” slip op. at 2

    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Institution denied fintivDenied

      “Board’s projected statutory deadline to issue a final written decision. Fintiv, Paper 11 at 9. “If the court’s trial date is at or around the same time as the projected statutory deadline . . . the decision whether to institute will likely implicate other factors.” Id. Conversely, “[i]f the court’s trial date is earlier than the projected statutory deadline,” this has generally weighed “in favor of exercising authority to deny institution.” Id.” slip op. at 15

    • PTAB / AIA Trials › Discretionary denial › §325(d) same art / argumentsNot reached

      “Petition under 35 U.S.C. § 325(d) because the same or substantially the same art and arguments were before the Examiner during prosecution and Petitioner’s has not demonstrated that the Examiner erred in a material manner when allowing the claims. Pet. 17–18. Given our discretionary denial of the Petition in view of the Fintiv factors, we do not address Petitioner’s further arguments with respect to § 325(d).” slip op. at 32

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Patent Owner applies Petitioner’s recited level of ordinary skill in the art for purposes of its Preliminary Response. Prelim. Resp. 4. Upon review of the parties’ arguments and the prior art of record, we adopt Petitioner’s unopposed definition of the ordinarily skilled artisan for purposes of this decision as it appears consistent with the disclosures of the ’090 patent and the prior art of record. C. Claim Construction” slip op. at 9

    § 103 obviousnessDiscretionary denialcites Phillips · KSR · Graham
    Patents in suitUS 10,480,090
  • PTAB · Mar 24, 2025 · IPR2024-01369 · APJ Christopher L Ogden · IPR · Institution

    The Board denied institution under Fintiv, finding the factors holistically favored discretionary denial of review.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied

      “and Trademark Office under 37 C.F.R. § 42.4(a), we may only institute an inter partes review when “the information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a); see also 37 C.F.R. § 42.108(c). However, institution of inter partes review is discretionary. See Harmonic Inc. v. Avid Tech., Inc., 815 F.3d 1356, 1367 (Fed. Cir. 2016) (“[T]he PTO is permitted, but never compelled, to institute an IPR proceeding.”). For the reasons below, we exercise our discretion not to institute an inter partes review.” slip op. at 2

    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Institution denied fintivDenied

      “A holistic balancing of the Fintiv factors weighs in favor of discretionary denial of the Petition. As discussed above, factor 2 weighs heavily in favor of discretionary denial because the district court is likely to address patentability issues at trial before we would issue a final written decision. Factor 4 weighs in favor of discretionary denial, as does Factor 5 at least to some degree. Factors 1 and 6 are neutral. Factor 3 weighs against discretionary denial, but this factor does not outweigh the other factors under the circumstances of this case. Thus, the evidence of record favors exercising our discretion to deny institution of an inter partes review.” slip op. at 19

    • Parallel petitionsNot reached

      “patent. See Pet. 1; PO Resp. 43; Pet. Reply 4–5; Pet. Sur-reply 3–4. Patent Owner argues that Petitioner failed to justify the filing of two petitions challenging the same patent, and has not provided a ranking of the petitions or explained the differences between the two petitions. Prelim. Resp. 43 (citing Patent Trial and Appeal Board Consolidated Trial Practice Guide (Nov. 2019), https://www.uspto.gov/TrialPracticeGuideConsolidated (“Trial Practice Guide”)). Because Petitioner has subsequently ranked this Petition as the first among the two (Pet. Reply 4–5), and because we deny institution based on the Fintiv factors as discussed above, we need not decide whether it was appropriate for Petitioner to file two petitions challenging the ’552 patent.” slip op. at 19

    • Obviousness (§103) › Graham factors (scope of art, differences, level of skill)Other

      “Based on the preliminary evidence, Petitioner has not shown that Vardi’s radio resource database from the server, which includes unauthenticated third-party information, teaches the claimed “authenticated access point list” transmitted by or received from the server. Petitioner has not cited to any evidence that a list including previously connected access points and unauthenticated third-party data constitutes the ordinary and customary meaning of the term “authenticated access point list.” To the extent that Petitioner is arguing that the term should be construed in a way that departs from its ordinary and customary meaning, Petitioner has not pointed to evidence for such a departure in the intrinsic record, and we are aware of no such evidence. We note that the ’522 patent states, “[b]y way of example, but not limitation,” that an “authenticated access point may include . . . an access point previously connected with [the] end device.” Ex. 1001, 4:33–36. But this does not appear to suggest that a prior connection is sufficient to authenticate the access point in the context of the ’552 patent.” slip op. at 18

    § 103 obviousnessDiscretionary denial
    Patents in suitUS 9,961,552
Page 1 of 19
← Previous12345…Next →

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.