  • Uatp IP LLC v. Slick Slide LLCSome claims unpatentable
    PTAB · Oct 2, 2026 · PGR2024-00054 · APJ Brian D Range · PGR · Final written decision

    Claims 22–26 are unpatentable based on obviousness; claims 1–17, 27, and 28 were not shown unpatentable. Patent Owner’s motion to terminate was denied.

    RulingsFinal written decision
    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)Term construed board ownDecided for patent owner

      “1. Mesh Layer Petitioner contends “no formal claim construction is necessary in this” slip op. at 13

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “5. Analysis On this complete record, we determine that Petitioner’s arguments do” slip op. at 31

    • Obviousness (§103) › Graham factors (scope of art, differences, level of skill)Not shown unpatentableNot shown unpatentable

      “form of nylon and some form of Teflon (and possible combinations thereof) having the specific coefficient of friction range given in limitation [1c] breaks down, because the building blocks of the obviousness argument are not sufficiently identified in Phillips alone, nor in the supporting testimony. Accordingly, we determine that Petitioner’s arguments and evidence fail to show that Phillips renders the challenged claims obvious. 6. Conclusion Based on the foregoing, we determine that Petitioner has not established by a preponderance of the evidence that claims 1–4, 6, and 7 would have been anticipated by or obvious in view of Phillips.” slip op. at 33

    • Obviousness (§103) › Objective indicia / secondary considerations › NexusObjective indicia no nexusDecided for petitioner

      “2. Products and Nexus We first consider the issue of whether certain evidence relied upon by” slip op. at 20

    Patent outcomesUS 11,998,854 mixed
    Claim construction§ 102 anticipation§ 103 obviousness§ 112 disclosurecites Phillips · Graham · Nautilus
    Patents in suitUS 11,998,854
  • PTAB · Feb 17, 2026 · IPR2024-01261 · APJ Jamie T Wisz · IPR · Final written decision

    Claims 1–20 were not shown unpatentable because the asserted combinations did not teach the claimed predetermined cycle for controlling distal fluid flow.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “(1) a person with a B.S. in engineering or an equivalent field, with two-four years of academic or industry experience in aspiration embolectomy and thrombectomy or comparable industry experience who would, where appropriate, work or consult with others, including a physician, to develop embolectomy or thrombectomy devices; or (2) an interventional neurosurgeon with at least three years of experience developing and/or using medical devices in embolectomy or thrombectomy procedures, and who would, where appropriate, work or consult with others, including an engineer, to develop such a medical device. Pet. 11 (citing Ex. 1005 ¶ 48). Petitioner also contends that, “[a] person with less education but more relevant practical experience, or more relevant education but less practical experience, may also meet this standard.” Id. Patent Owner states that for purposes of its PO Response, it “accepts ¶ 44). We adopt Petitioner’s characterization because it is consistent with the level of skill in the art at the time of the invention as reflected by the ’402 patent and the cited prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (explaining that specific findings regarding ordinary skill level are not required “where the prior art itself reflects an appropriate level and a need for testimony is not shown” (quoting Litton Indus. Prods., Inc. v. Solid State Sys. Corp., 755 F.2d 158, 163 (Fed. Cir. 1985))).” slip op. at 8

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner

      “specification explicitly includes sensors similar to those in the prior art in support of their argument that the claimed “predetermined cycle” must not exclude the use of such sensors. Pet. Reply 15 (citing Ex. 1001, 32:55–33:7, 40:66–41:5, 44:9–29). We reviewed the portions of the specification cited by Petitioner. We agree with Patent Owner that one excerpt discussing sensor use appears to be directed to triggering the predetermined cycle rather than causing timing changes during the cycle itself (Ex. 1001, 32:55–66) (describing use of a pressure sensor to “determine when the vacuum channel 3 is clogged by a thrombus and automatically perform the unclogging procedures described herein”), while another excerpt discusses a sensor that Petitioner that the ’402 patent discusses the use of sensors to “tune” the system and that such “tuning” can be done statically (setting the cycle timing in advance) or dynamically (adjusting the timing during the cycle itself). See Ex. 1001, 48:19–49:50. Overall, we find that these disclosures involving sensors demonstrate that sensors may be used in various ways in different embodiments. However, none of these disclosures explicitly discuss the use of sensors in conjunction with a “pre-determined cycle.” Therefore, we find that the ’402 patent specification’s discussion of “sensors” are not particularly informative as to the appropriate construction of a “predetermined cycle” and do not outweigh the other explicit disclosures of “predetermined cycle” in the patent. We next turn to the other intrinsic evidence discussed by the parties — the prosecution history. As discussed by Patent Owner, in the Notice of Allowance, the Examiner found that Garrison did not teach or suggest a “predetermined cycle” because Garrison’s controller “changed the cycle of opening and closing the valves based on feedback from sensors.” Ex. 1004, 86. We acknowledge that the patent applicant filed subsequent comments during prosecution in which they stated that they “do[] not concede that the Examiner’s characterizations of the terms of the claims and the prior art are correct.” Id. at 29. However, we agree with Patent Owner that the importance of the Examiner’s statement in the Notice of Allowance does not rely on it being an express disclaimer (a standard which it does not meet). PO Sur-reply 8. We also considered Petitioner’s contention that the Examiner’s interpretation of Garrison may have been in error (PO Resp. 16); however, even if this were true, the Examiner’s statement still provides helpful insight into how the Examiner was interpreting the term sensors to change the opening and closing of valves during a cycle was not a “predetermined cycle.” Id. at 86. In sum, we find that Patent Owner’s proposed construction is consistent with the usage of the term “predetermined cycle” in the ’402 patent specification and prosecution history. Thus, after considering all of the cited evidence, we construe “predetermined cycle” to mean that “the timing of the sequence of valve operations in the cycle is determined beforehand, i.e., fixed, rather than varying based on feedback after operation begins.”” slip op. at 14

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “2. Other Terms The parties also provided proposed constructions for the limitations of “[limited/limiting] to a positive amount of exit flow” and “control[ling] fluid flow in and out from the distal end of the catheter.” See Pet. 15–16; Pet. Reply 1–8; PO Resp. 22–24; PO Sur-Reply 2–6. However, having evaluated the arguments and evidence before us, we determine that construction of these terms is not necessary for purposes of this Decision. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (citing Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999) (“[O]nly those terms need be construed that are in controversy, and only to the extent necessary to resolve the controversy.”)).” slip op. at 16

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successNot shown unpatentableNot shown unpatentable

      “We agree with Patent Owner that neither Petitioner nor Mr. Brown propose any combination of Yang and Mullins that does not include Mullins’s pressure sensor in order “to control fluid flow in and out from the distal end of the catheter.” Indeed, in addressing the “predetermined cycle” limitation, Mr. Brown contends that Mullins discloses a “cycling controller that ‘varies aspiration pressure according to sensed pressure within the catheter lumen.’” Ex.1005 ¶¶ 131–32 (citing, e.g., Ex.1008, 27:40–28:20 (“[a] novel aspect of this pump system is the incorporation of feedback into the pump algorithm in order to produce more effective pressure cycling”)). This use of a sensor to change pressure during a cycle, is not a “predetermined cycle” under our construction. combinations is its discussion of distal end flow control, not for its sensors.” Pet. Reply 17 (citing Ex. 1035 ¶ 83). However, Petitioner’s obviousness grounds rely on the combination of Yang and Mullins, especially with regard to Mullins’s disclosure of “a controller” in order “to control fluid flow in and out.” As discussed above, Mullins relies on the sensor-feedback approach in order to control flow and we find that Petitioner has not presented persuasive evidence of how the combined disclosures of Yang and Mullins would control flow without using Mullins’s sensor feedback approach. See W.L. Gore & Assocs., Inc. v. Garlock, Inc., 721 F.2d 1540, 1550 (Fed. Cir. 1983) (error to “consider[] … references in less than their entireties, i.e., in disregarding disclosures in [them] … that diverge from and teach away from the invention”). Therefore, we determine that Petitioner has not sufficiently shown that the combination of Yang and Mullins discloses or renders obvious “a controller configured to open and close the vacuum valve and the vent valve in a predetermined cycle to change a level of vacuum at the distal end of the catheter and to control fluid flow in and out from the distal end of the catheter.” Accordingly, having considered the parties’ respective evidence and arguments, we find that Petitioner has not shown by a preponderance of the evidence that claim 1 of the ’402 patent would have been unpatentable as obvious over the combination of Yang and Mullins.” slip op. at 27

    Patent outcomesUS 11,406,402 not shown unpatentable
    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,406,402
  • PTAB · Jan 26, 2026 · IPR2024-01179 · APJ Carl M Defranco · IPR · Final written decision

    Claims 1–25 are unpatentable under § 103 over the asserted combinations of Waldner, Dynatek, and additional references; the Board cancelled all challenged claims.

    RulingsFinal written decision
    • Expert testimonyPetitioner expert creditedPatent owner expert discountedDecided for petitioner

      “Also, to the extent Masaba relies on extrinsic expert testimony, we note that Masaba’s expert cites absolutely no support for his understanding of the claims, much less explains why we should adopt his understanding over the plain and ordinary meaning of “conveying aggregate” and “moving aggregate.” See Ex. 2004 ¶ 34. Absent supporting citations, such extrinsic testimony is entitled to little, if any, weight. As such, we reject the notion that Waldner’s discharge chute member 242 is not a conveyor “for conveying aggregate” or “for moving aggregate,” as required by claim elements 1[h] and 1[i].” slip op. at 21

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “We disagree that Dr. Durham does not possess the necessary level of skill in the art to qualify as an expert in this case. Looking at the specification of the ’689 patent and the prior art of record, we think Masaba sets the bar too high. We acknowledge that one of ordinary skill in the art should have some education and/or experience in the mechanical art of conveying aggregate materials, but we do not think opining on the ’689 patent and asserted prior art necessarily requires that person to have the amount of education and experience that Masaba advocates. The ’689 patent relates generally to an “aggregate transferring system for receiving aggregate from a vehicle and elevating the aggregate to a higher vertical level for deposit into, for example, a silo.” Ex. 1001, 1:15– 18. And, as described in the ’689 patent and discussed later, the transferring system is an assembly of known types of conveyors, such as a belly-dump truck conveyor, a bucket elevator, and an articulated belt conveyor, for transferring the aggregate horizontally and vertically from a belly-dump truck to the discharge point, such as a silo. Without doubt, Dr. Durham has enough education and experience to reliably opine on the combination of known parts.” slip op. at 8

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)Plain and ordinary meaningNo construction needed

      “We reject this argument for several reasons. First, nowhere does the plain language of the claims specify how the aggregate is conveyed or moved from the conveyor extension assembly’s inlet to its outlet, be it passively by means of gravity or actively by means of a conveyor belt. Instead, the claims simply use those verbs according to their plain and ordinary meaning, which is “to transfer or deliver” or “to cause to go or pass” from one place to another. See Ex. 3001, 253 (defining “convey”), 760 (defining “move”).10 Second, the specification of the ’689 patent similarly uses these terms in a plain and ordinary sense, without ever attributing to them some sort of special meaning. See, e.g., Ex. 1001, 4:9–12 (“The apparatus 10 is suitable for performing the transfer of aggregate from 10 We reference the original pagination of the dictionary in which these definitions appear. one location to another, such as, for example, from a vehicle carrying the aggregate to a silo 1 for storing the aggregate.”). The ’689 patent specification also makes clear that active conveyance of the aggregate is an option and not a requirement of the claimed invention, stating that the conveyor extension assembly “may further include a conveyor belt 150.” Ex. 1001, 10:60–66 (emphasis added). Limiting claim elements 1[h] and 1[i] to a device “for actively conveying” or “for actively moving aggregate” would improperly import limitations from the specification into the claims. Thus, based on the intrinsic evidence, we determine that claim elements 1h and 1k are properly construed to encompass passive and/or active movement of the aggregate via the conveyor extension assembly.” slip op. at 20

    • Claim Construction › Functional claiming / §112(f) means-plus-function › Whether §112(f) applies (Williamson, nonce words)Not reached

      “Owner asserts” that two claim terms—“unloader structure” and “trailer structure”—should be construed as means-plus-function limitations under 35 U.S.C. § 112(f), Solaris submits an express construction detailing the corresponding structure in the specification for performing the recited function of the claimed unloader and trailer structures. See id. at 24–25. Only in disputing Solaris’s Ground 3 does Masaba advocate that the claim term “trailer structure” should be construed under § 112(f), and then only in conjunction with dependent claims 3 and 21. See PO Resp. 58. As such, we address Masaba’s proposed construction in our analysis of Ground 3. We now turn to Solaris’s grounds of unpatentability.” slip op. at 12

    Patent outcomesUS 11,780,689 unpatentable
    Claim construction§ 103 obviousnesscites KSR
    Patents in suitUS 11,780,689
  • PTAB · Dec 19, 2025 · IPR2025-01078 · APJ Robert L Kinder · IPR · Institution

    The Board instituted IPR on claims 1, 2, 4–12, 14–22, and 24–30, finding a reasonable likelihood that Kido anticipates at least one challenged claim.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “review. 35 U.S.C. § 314(b); 37 C.F.R. § 42.4(a) (2024). An inter partes review may not be instituted “unless. . . the information presented in the petition . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). Moreover, a decision to institute under 35 U.S.C. § 314 may not institute on fewer than all claims challenged in the petition. SAS Inst., Inc. v. Iancu, 584 U.S. 357, 371 (2018).” slip op. at 2

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITAPlain and ordinary meaningDecided for petitioner

      “At this juncture in the proceeding, and based on the current record, we do not agree with Patent Owner that “payout,” as claimed, should be limited to “the amount a player will win in relation to the amount wagered.” We recognize, as Patent Owner points out, that the examples provided in the Specification are listed in odds format. See id. at 2. The Specification, however, also states that “[a]ny suitable payouts can be used in some embodiments.” Ex. 1011, 5:18–21. This language suggests a broader interpretation of “payout” beyond just payout odds and we therefore decline to import the wager limitation into the claim term. Although the ’371 patent generally describes payouts in terms of odds, like 49:1, the intrinsic record lacks clear evidence necessary to limit the claims as Patent Owner proposes.” slip op. at 8

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Petitioner proposes “a person having at least a Bachelor’s Degree in electrical engineering, computer science, or computer engineering, or undergraduate training in an equivalent field and at least two years of relevant experience in electronic gaming technology.” Pet. 10 (citing Ex. 1003 ¶¶ 22–26). Petitioner further notes that “[a]dditional graduate education could substitute for professional experience, and significant work experience could substitute for formal education.” Id. Patent Owner does not dispute this level of skill. See Prelim. Resp. 13–14 (“Evolution does not set forth an alternative level of skill for a person of ordinary skill in the art”). For purposes of this Decision, we adopt Petitioner’s proposal, which comports with the teachings of the ’371 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (holding that the prior art itself can reflect the appropriate level of ordinary skill in the art).” slip op. at 11

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Instituted

      “Based on the evidence before us, we find persuasive Petitioner’s contention that Kido’s accumulated jackpot paid when landing on a star mark reads on the claimed “a first selected position . . . to have an increased payout . . . greater than a first non-selected payout.” See Pet. 25–27, 30, 35, 36. As explained above, the current record does not support limiting the term “payout” to just the amount a player will win in relation to the amount wagered. As Petitioner notes, a payout that receives Kido’s accumulated Prog bonus payout is necessarily higher than a payout that does not receive the Prog bonus. Pet. 35–36 (“had the first selected position not been randomly selected, the player would only be eligible for the basic payout”). Further, Kido even describes its bonus routines and jackpots as payouts. Kido describes, for example, that “[w]hen the privilege unit 113 obtains the win information from the special game value award mark win determining unit 112, it awards, as a payout, the game value stored in the accumulated game value memory 117” and it describes the “jackpot (JP) amount” as “a special payout.” Ex. 1007 ¶¶ 119, 129.” slip op. at 14

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips
    Patents in suitUS 11,756,371
  • PTAB · Dec 9, 2025 · IPR2024-00990 · APJ Brent M Dougal · IPR · Final written decision

    Claims 11–12 and 14–20 are unpatentable; claims 1–10 and 21–23 are not shown unpatentable. Substitute claims 29–37 are unpatentable, and the motion to amend is denied as to them.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “The level of skill is uncontested. Patent Owner adopts the level of skill identified by Petitioner as: [at] the time of the alleged invention in 2018, a POSITA[2] would have had a B.S. degree in mechanical or petroleum engineering or a similar technical discipline, with at least five years of experience in oil or gas well drilling, completion, and/or subsurface production operations or in technical support of such operations including at least some experience in unconsolidated formations utilizing sand control methods and means. Also,” slip op. at 8

    • Obviousness (§103) › Graham factors (scope of art, differences, level of skill)UnpatentableNot shown unpatentableMixed

      “on embodiments of Yeh with concentric sand screens having nine shunt tubes (six transport tubes and three packing tubes) (Yeh Figures 4A–B) and eccentric sand screens with four shunt tubes (two transport tubes and two packing tubes) (Yeh Figures 8A, 8C). See Pet. 32–37, 39, 41–43. Yet, Petitioner’s reasoning as to why “a higher-pressure shunt tube assembly necessitated greater wall thickness” rests on an unspoken one to one comparison between the shunt tubes of the different systems. See id.; see also Ex. 1003 ¶¶ 291–297 (Petitioner’s declarant comparing possible transport tubes of different pressure regions without considering or addressing any difference in the number of transport tubes). However, the embodiments relied on by Petitioner have different numbers of shunt tubes, and thus the greater wall thickness does not appear to be “necessitated” in the way inferred by Petitioner. Further, Petitioner’s analysis would seem to be most appropriate when comparing two concentric sand screens for different pressure regions, or two eccentric sand screens for different pressure regions. relies on Yeh’s teachings related to a horizontal well bore of 5000 feet for the “concentric screen → crossover tool → eccentric screen” arrangement, as well as, for why the concentric screen needs to be rated for a high pressure. Pet. 32–37, 39, 41–43. Petitioner also refers to these features for why one of skill in the art would combine the teachings of Yeh and Yeh2. Id. at 32. However, on cross-examination, Petitioner’s declarant agreed that it is concentric sand screens having a 6x3 shunt tube design that would provide the noted benefits of being rated for a higher pressure and being more robust (as relied on in the Petition), as compared to eccentric sand screens. Ex. 2013, 42:20–43:8; Sur-reply 4–5. This also exposes another issue with Petitioner’s arguments. Though Petitioner identifies that one of skill in the art would be aware that material choice, wall thickness, and pipe diameter all impact burst pressure of a pipe (Pet. 42 (citing Ex. 1017, 24 (Equation (14))), the Petition essentially ignores the fact that the claims do not require a single pipe in isolation. The claims require two shunt tube assemblies, each surrounding a base pipe within a wellbore. It is uncontested that a wellbore provides a confined space for such a system and thus any change in wall thickness of one pipe can result in a significant impact in the function of the other pipes. We find the testimony of Petitioner’s declarant (see, e.g., Ex. 1003 ¶¶ 290–297) unpersuasive when discussing wall thickness because it focusses on basic considerations of a standalone pipe, without sufficient consideration of the claimed completion assembly with its required pipe and tube structure. PO Resp. 20–26.” slip op. at 17

    • Strike new argumentNew argument disregardedDecided for patent owner

      “In response to Patent Owner’s argument concerning Yeh’s embodiments relied on in the Petition, Petitioner argues for the first time that Patent Owner’s declarant “conceded, Yeh discloses that both concentric and 47:19–48:21). Petitioner does not provide a citation to Yeh or a citation to where the Petition relies on the same number of shunt tubes between concentric and eccentric screens. The deposition cited by Petitioner discusses Yeh at column 16, lines 26 through 35. However, the Petition does not cite or rely on these teachings of Yeh. Thus, we decline to consider this late argument.4 See 35 U.S.C. § 312(a)(3) (requiring the petition to identify “with particularity . . . the grounds on which the challenge to each claim is based, and the evidence that supports the grounds”); 37 C.F.R. § 42.104(b)(5).” slip op. at 18

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundUnpatentable

      “Thus, we agree with Petitioner that the combination of Yeh and Yeh2 teaches determining the shunt tube system operating pressures associated with the distal end of the production zone, but also more generally, determining the operating pressures along the entire production zone. With this knowledge of the system operating pressures, Petitioner argues that one of skill in the art would have selected eccentric screens for the distal end of the production zone “at any point at which the slurry pressure dropped below the pressure capacity of the eccentric screen shunt tubes.” Pet. 66 (citing Ex. 1005, 30:16–20; Ex. 1003 ¶ 388). In other words, knowing that the pressure decreases as you approach the toe, Yeh’s low-pressure rated eccentric screens could be used from some point prior to and covering the toe. determined pressure.” PO Resp. 37–38. We disagree. As discussed above, the record supports Petitioner’s position that one of skill in the art would have “understood the need to determine the shunt tube system operating pressure throughout the horizontal wellbore.” Ex. 1003 ¶ 383; see also Pet. 64–65. We find convincing Petitioner’s argument that one of skill with this understanding of the system pressures would select a shunt tube system rated to not only address the distal end, but also to address the needs of the adjacent region, so long as the pressure rating supported such a selection. See Pet. 65–67; Ex. 1003 ¶¶ 385–388.” slip op. at 22

    Patent outcomesUS 11,333,007 mixed
    Claim construction§ 101 eligibility§ 103 obviousness§ 112 disclosurecites Graham
    Patents in suitUS 11,333,007
  • Tanklogix, LLC v. SiteproInstitution denied
    PTAB · Oct 10, 2025 · IPR2025-00650 · APJ Sheila F Mcshane · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 18–32 and 34 were unpatentable over Kahn or Kahn and Gutierrez.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). Upon consideration of the Petition, the Preliminary Response, and the evidence of record, we determine that Petitioner has not established a reasonable likelihood of prevailing with respect to the unpatentability of at least one claim of the ’871 patent. Accordingly, for the reasons that follow, we decline to institute an inter partes review of claims 18–32 and 34 of the ’871 patent.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The respective proposed levels of qualifications for a person of ordinary skill in the art are similar, with Patent Owner proposing two years of experience compared to Petitioner proposing significant experience with remotely controlling fluid-handling devices, like SCADA systems. Patent Owner also proposes more extensive experience in lieu of educational experience. While we find Petitioner’s proposed qualifications to be acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of skill necessary to understand and implement the teachings of the ’871 patent and the asserted prior art. Our analysis and findings herein, however, do not turn on any differences in the qualifications adopted.” slip op. at 8

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “We determine that we need not expressly construe any claim terms to resolve the parties’ disputes on the current record. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 10

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “actuators and the remote control of fluid handling devices, including the receipt with the user-interface module of “a user command to actuate an actuator via a presented control interface” (limitation [18.7]) and “account authorized to send commands to remotely control fluid handling devices” (limitation [18.11]). We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses or teaches these limitations because the evidence does not provide support that there is remote control of fluid handling devices or the use of a user command on a control interface to send a command to a fluid handling device, for instance. Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but we do not discern that it teaches or discloses the capability to remotely control fluid handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, the Kahn disclosures that Petitioner repeatedly relies upon for allegedly teaching this control are deficient. See Ex. 1005, 10:62–67, 14:35– 15:2, 15:62–16:32; see also Pet. 12–14, 16–18. Kahn discloses that “the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance.” Ex. 1005, 10:62–67. Communication unit 112B is part of the local “sensor unit,” wherein the detection conditions determined by the sensor are communicated to remote devices by communication unit 112B. See id. at 3:31–33, 5:62–6:2, 6:27–35, 7:33–37, 13:7–12, Figs. 1A–1C. Kahn discloses that the sensor units, which include communication units 112B, can be located near shut-off valves and can communicate with distant locations. See id. at 11:1–13. There are no disclosures, however, in the above passages that there is remote control of fluid handling devices, that there is a user command on a control interface that actuates an actuator, or that there is a command sent to the facility actuators via a network connection, as required in limitations [18.5]–[18.7] and [18.9]–[18.12], respectively. Rather, the disclosure indicates that the communication unit 112B includes on-site alerts and that the local (non-remote) communication unit 112B can be interfaced with the control valve.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 10,488,871
  • PTAB · Jul 14, 2025 · IPR2024-00465 · APJ Bart A Gerstenblith · IPR · Final written decision

    Claims 1–24 are unpatentable: claims 1–10 and 12–24 as obvious over Szrek and Llach, and claim 11 as obvious over Szrek, Llach, and Gilmore.

    RulingsFinal written decision
    • Skill levelSkill level board ownDecided for petitioner

      “B. Level of Ordinary Skill in the Art Petitioner proposes that the level of ordinary skill in the art is an artisan with a working knowledge of POS activation systems and lottery systems that was gained through a mixture of training and work experience in the relevant field such as (i) having a Bachelor’s degree in computer science, computer communications, electrical engineering, or equivalent degree, coupled with at least three years of work experience; (ii) having a Master’s degree in computer science, computer communications, or electrical engineering, but having less work experience; or (iii) having no formal degree, but having experience in the relevant field of at least six years of work experience. Pet. 2–3 (citing Ex. 1003 ¶¶ 13–14).9 Patent Owner states that, “[f]or the purpose of this proceeding, Patent Owner adopts the Petition’s proposed definition of the level of ordinary skill in the art.” PO Resp. 19 (citing Pet. 2–3). We find that the parties’ agreed-upon level of ordinary skill in the art is consistent with the level of ordinary skill in the art reflected by the ’451 patent and the prior art of record. See Inst. Dec. 14; see Okajima v. 9 Petitioner proposes the same level of ordinary skill in the art that the Board adopted in PGR2020-00084 (Pet. 2–3 (citing Ex. 1008, 11)), and IPR2023- 01235 (see IPR2023-01235, Paper 34 at 12–13). Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Therefore, we adopt the parties’ agreed-upon level of ordinary skill in the art, as articulated above, in our consideration of the issues presently before us.” slip op. at 13

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “We need not construe “transaction processor” expressly because its meaning is not in dispute and its construction is not necessary to resolve the controversy before us.” slip op. at 16

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundDecided for petitioner

      “On balance, we find that even with the alleged disadvantages identified by Patent Owner, one of ordinary skill in the art would have been motivated to modify Szrek with Llach’s third-party transaction processor because the advantage of having a “centralized intermediary” allows Szrek’s system to support different game providers, such as different lottery companies, which would reduce some implementation costs and allow the system to be more easily and cheaply extended. Pet. 47 (citing Ex. 1003 ¶ 181); see Medichem, S.A. v. Rolabo, S.L., 437 F.3d 1157, 1165 (Fed. Cir. 2006) (“a given course of action often has simultaneous advantages and disadvantages, and this does not necessarily obviate motivation to combine”) (citing Winner Int’l Royalty Corp. v. Wang, 202 F.3d 1340, 1349 n.8 (Fed. Cir. 2000)); see also Intel Corp. v. Qualcomm Inc., 21 F.4th 784, 795 (Fed. Cir. 2021) (stating the same). We acknowledge that the combination comes with some disadvantages, including “add[ed] delay, reduce[d] efficiency, and . . . implementation complexities by converting a simple, direct communication exchange into an exchange that traverses multiple systems.” PO Resp. 52 (citing Ex. 2052 ¶ 163). But, “[t]he fact that the motivating benefit comes at the expense of another benefit, however, should not nullify its use as a basis to modify the disclosure of one reference with the teachings of another. Instead, the benefits, both lost and gained, should be weighed against one another.” Winner, 202 F.3d at 1349 n.8. Here, Szrek expressly teaches indirect communication as a possible implementation of its system and Petitioner’s combination—employing Llach’s third-party transaction processor as part of the indirect communication channel—offers the attractive benefit of allowing Szrek’s system to support different game providers, which would reduce some implementation costs even if it might increase other costs, e.g., by having to program certain components (e.g., the cash registers) differently. Specifically, we find that the ability to expand Szrek’s system to support different game providers provides advantages that outweigh the disadvantages discussed above in the circumstance where one desires a more robust and comprehensive system. See Pet. Reply 23 (noting three advantages of the combination— (1) “allow[ing] Szrek’s system to use ‘a centralized system for activating lottery tickets from different retailers and different locations,’” (2) “allow[ing] support for different game providers, such as different lottery companies,” “reduc[ing] implementation costs,” and (3) “allow[ing] Szrek’s system to ‘communicate with individual card” slip op. at 37

    • Obviousness (§103) › Motivation to combine / reasonable expectation of success › HindsightMotivation foundDecided for petitioner

      “On balance, we find that even with the alleged disadvantages identified by Patent Owner, one of ordinary skill in the art would have been motivated to modify Szrek with Llach’s third-party transaction processor because the advantage of having a “centralized intermediary” allows Szrek’s system to support different game providers, such as different lottery companies, which would reduce some implementation costs and allow the system to be more easily and cheaply extended. Pet. 47 (citing Ex. 1003 ¶ 181); see Medichem, S.A. v. Rolabo, S.L., 437 F.3d 1157, 1165 (Fed. Cir. 2006) (“a given course of action often has simultaneous advantages and disadvantages, and this does not necessarily obviate motivation to combine”) (citing Winner Int’l Royalty Corp. v. Wang, 202 F.3d 1340, 1349 n.8 (Fed. Cir. 2000)); see also Intel Corp. v. Qualcomm Inc., 21 F.4th 784, 795 (Fed. Cir. 2021) (stating the same). We acknowledge that the combination comes with some disadvantages, including “add[ed] delay, reduce[d] efficiency, and . . . implementation complexities by converting a simple, direct communication exchange into an exchange that traverses multiple systems.” PO Resp. 52 (citing Ex. 2052 ¶ 163). But, “[t]he fact that the motivating benefit comes at the expense of another benefit, however, should not nullify its use as a basis to modify the disclosure of one reference with the teachings of another. Instead, the benefits, both lost and gained, should be weighed against one another.” Winner, 202 F.3d at 1349 n.8. Here, Szrek expressly teaches indirect communication as a possible implementation of its system and Petitioner’s combination—employing Llach’s third-party transaction processor as part of the indirect communication channel—offers the attractive benefit of allowing Szrek’s system to support different game providers, which would reduce some implementation costs even if it might increase other costs, e.g., by having to program certain components (e.g., the cash registers) differently. Specifically, we find that the ability to expand Szrek’s system to support different game providers provides advantages that outweigh the disadvantages discussed above in the circumstance where one desires a more robust and comprehensive system. See Pet. Reply 23 (noting three advantages of the combination— (1) “allow[ing] Szrek’s system to use ‘a centralized system for activating lottery tickets from different retailers and different locations,’” (2) “allow[ing] support for different game providers, such as different lottery companies,” “reduc[ing] implementation costs,” and (3) “allow[ing] Szrek’s system to ‘communicate with individual card” slip op. at 37

    Patent outcomesUS 11,488,451 unpatentable
    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,488,451
  • PTAB · May 28, 2025 · IPR2025-00301 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution of review for claims 1–11, 16, and 21 under § 314(a), finding the Fintiv factors favored discretionary denial, and denied joinder.

    RulingsInstitution decision
    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Institution denied fintivInstitution denied

      “2026. This date is nearly five months prior to the date on which the final written decision would be due if trial were instituted in this proceeding. And, even if we assume Petitioner’s alleged February–March 2026 trial date, this date too is several months prior to the projected final written decision deadline. As such, it is unlikely that a final written decision in this proceeding would issue before trial in the district court, unless the trial was delayed or rescheduled for a later time. Thus, we find this factor weighs in favor of exercising our discretion to deny institution. See ARM Ltd. v. Daedalus Prime LLC, IPR2025-00207, Paper 10 at 2 (May 16, 2025) (Before the Office of the Under Secretary of Commerce for Intellectual Property and Director of the United States Patent and Trademark Office) (exercising discretion to deny institution with the same relative timing between district court trial and final written decision deadline).” slip op. at 13

    • PTAB / AIA Trials › Motions to amend / substitute claimsNot reached
    • PTAB / AIA Trials › Joinder §315(c) / SAS all-or-nothingJoinder, deniedDenied
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied discretionary otherInstitution denied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). Institution of inter partes review, however, is discretionary. See Harmonic Inc. v. Avid Tech., Inc., 815 F.3d 1356, 1367 (Fed. Cir. 2016) (“[T]he PTO is permitted, but never compelled, to institute an IPR proceeding.”). For the reasons discussed below, we exercise discretion pursuant to 35 U.S.C. § 314(a) not to institute inter partes review. Additionally, for the same reasons and because institution was denied in IPR2024-01248, we deny Petitioner’s Motion for Joinder. See 35 U.S.C. § 315(c) (“[T]he Director . . . may join as a party . . . any person who properly files a petition under section 311 that the Director . . . determines warrants the institution of an inter partes review under section 314.”).” slip op. at 3

    Discretionary denial
    Patents in suitUS 9,814,071
  • PTAB · May 19, 2025 · IPR2024-00694 · APJ Robert L Kinder · IPR · Final written decision

    Claims 1, 4–6, 11, 14–16, 21, and 22 are unpatentable over the stated obviousness grounds; claims 2, 3, 12, and 13 were not shown unpatentable.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Based on the final record before us, we determine the knowledge level of a person of ordinary skill in the art. Relying on the testimony of Dr. Lippman, LG argues the following: [a] Person of Ordinary Skill in The Art . . . in August of 2012 would have been someone knowledgeable and familiar with the interactive media guide arts that are pertinent to the ’040 patent. A [person of ordinary skill in the art] would have had a bachelor’s degree in Electrical Engineering, Software Engineering, or Computer Engineering, or equivalent training, and approximately two years of experience working in the field of television systems and networking, human-computer interaction, or related technologies. Lack of professional experience can be remedied by additional education, and vice versa.” slip op. at 13

    • Novelty / Anticipation (§102) › Prior-art status of a reference › Printed publication / public accessibilityReference is prior artPrinted publication establishedDecided for petitioner

      “under 35 U.S.C. § 311(b) because they were not published before the ’040 patent’s priority date of August 17, 2012. PO Resp. 13–14. Multimedia referenced a case pending at the Federal Circuit, Lynk Labs, Inc. v. Samsung Electronics Co., Ltd., as pertinent to addressing whether applications for patent published after the priority date of the challenged patent are permissible “printed publications” in IPRs. Id. Multimedia’s arguments are not persuasive because on January 14, 2025, the Federal Circuit in Lynk Labs Inc. v. Samsung Electronics Co. Ltd., clarified that inter partes review challenges may be based upon published patent applications, and such published patent applications can be deemed prior art in IPRs as of their filing date. 125 F.4th 1120, 1127 (Fed. Cir. 2025). As such, both Choi and Kim are prior art pursuant to 35 U.S.C. § 311(b).” slip op. at 16

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundDecided for petitioner

      “Turning to rationale to combine, LG contends that it would have been obvious to a person of ordinary skill in the art to implement Kim’s EXTERNAL DEVICE card object 1380 to include Choi’s specific symbols representing external devices connected to the input ports of smart TV 100 to inform the user which external devices are actually connected to the smart TV versus those that are not connected. Pet. 42–44 (citing Ex. 1005, Fig. 19 (modifying card object 1380); Ex. 1003 ¶ 137); see also id. at 14 (arguing the same). LG argues this proposed combination is merely combining prior art elements (i.e., Choi’s specific symbols representing external devices connected via input ports, with Kim’s EXTERNAL DEVICE card object 1380) according to known methods to yield the predictable result of “informing the user which external device is connected to an input port.” Id. at 45; see also id. at 14–15 (arguing the same). LG also argues that this proposed combination represents the use of a known technique (i.e., Choi’s specific symbols representing external devices connected via input ports) to improve a similar device (i.e., Kim’s smart TV 100) in the same way (i.e., “to inform the user which external device is connected to an input port”). See id. at 45 (citing Ex. 1003 ¶ 130); see also id. at 15 (arguing the same). LG asserts that there would have been a reasonable expectation of success in making this proposed combination because both Kim and Choi disclose “similar televisions” with “external devices connected via an input port,” and implementing Kim with Choi’s thumbnail icons that have specific symbols representing input ports would have been “a matter of routine software programming.” Id. at 15 (citing Ex. 1003 ¶ 61).” slip op. at 22

    • Obviousness (§103) › Motivation to combine / reasonable expectation of success › HindsightMotivation not foundDecided for patent owner

      “Limitation [2.1] requires identifying a user associated with the “received indication,” which is the selection of a home key button or go-tohome button to invoke the home screen, as alleged by LG. See Pet. Reply 20–21. Both Kim and Lee-2 allow a distinct procedure wherein a user can login, but LG has not explained persuasively how these distinct procedures are associated with Kim’s home key button such that a user is identified through its selection. For example, Lee-2’s Favorite Channel List (Figure 39B) is displayed based on the user’s selection of the favorite channel object 2019 on a home screen, but not related to the user’s selection of the home key button to invoke the home screen. See Ex. 1010, 41:41–43 (“Referring to FIG. 39B, upon selection of the favorite channel object 2019 [in FIG. 39A], a favorite channel list screen including a favorite channel list is displayed fullscreen.”).” slip op. at 62

    Patent outcomesUS 9,510,040 mixed
    § 102 anticipation§ 103 obviousnesscites KSR · Graham
    Patents in suitUS 9,510,040
  • PTAB · May 19, 2025 · IPR2024-00351 · APJ Robert L Kinder · IPR · Final written decision

    Claims 1, 4–6, 11, 14–16, 21, and 22 are unpatentable as obvious; claims 2, 3, 12, and 13 were not shown unpatentable.

    RulingsFinal written decision
    • Novelty / Anticipation (§102) › Prior-art status of a reference › Printed publication / public accessibilityReference is prior artDecided for petitioner

      “6. Whether Choi and Kim Are Printed Publications Pursuant to 35 U.S.C. § 311(b) Multimedia contends that Choi and Kim are not printed publications under 35 U.S.C. § 311(b) because they were not published before the ’040 patent’s priority date of August 17, 2012. PO Resp. 13–14. Multimedia referenced a case pending at the Federal Circuit, Lynk Labs, Inc. v. Samsung Electronics Co., Ltd., as pertinent to addressing whether applications for patent published after the priority date of the challenged patent are permissible “printed publications” in IPRs. Id. Multimedia’s arguments are not persuasive because on January 14, 2025, the Federal Circuit in Lynk Labs Inc. v. Samsung Electronics Co. Ltd., clarified that inter partes review challenges may be based upon published patent applications, and such published patent applications can be deemed prior art in IPRs as of their filing date. 125 F.4th 1120, 1127 (Fed. Cir. 2025). As such, both Choi and Kim are prior art pursuant to 35 U.S.C. § 311(b).” slip op. at 15

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Based on the final record before us, we determine the knowledge level of a person of ordinary skill in the art. Relying on the testimony of Dr. Lippman, LG argues the following: [a] Person of Ordinary Skill in The Art . . . in August of 2012 would have been someone knowledgeable and familiar with the interactive media guide arts that are pertinent to the ’040 patent. A [person of ordinary skill in the art] would have had a bachelor’s degree in Electrical Engineering, Software Engineering, or Computer Engineering, or equivalent training, and approximately two years of experience working in the field of television systems and networking, human-computer interaction, or related technologies. Lack of professional experience can be remedied by additional education, and vice versa. Pet. 8–9 (citing Ex. 1003 ¶¶ 18–20). In its Response, “Patent Owner accepts the Petitioner’s definition of the POSITA” and Multimedia and its expert, Dr. Surati, “find that definition to be reasonable.” PO Resp. 7 (citing Ex. 2011 ¶¶ 43, 44). Accordingly, we adopt LG’s assessment of the level of skill in the art because it is consistent with the ’040 patent and the asserted prior art.” slip op. at 13

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededDecided for petitioner

      “Based on the final record, including the parties’ contention that no claim term requires express construction, there is no readily discernible controversy between the parties that requires us to construe any claim terms, and thus we do not construe any claim terms except as discussed below with respect to limitation 1.6. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (noting that “we need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 10

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITAPlain and ordinary meaningDecided for petitioner

      “highlighted when a user selects this content source in some manner. Ex. 1001, 30:27–51. At that juncture, after a user selects the content source and it is highlighted, the content source is then associated with the first content information, “801 – CNXN,” which is displayed on the right panel of Figure 15B. See id. We do not understand the ’040 patent as requiring the display “801 – CNXN” to cause the corresponding highlighting of Live TV 1504A as suggested by Multimedia. The claim language requires the two elements “being associated with”5 one another, but it does not require that one element’s display (first content information) causes the highlighting of the other element (content source). Our view is supported by the only description of highlighting a content source found in the specification of the ’040 patent. In regard to Figure 15B, the specification describes that “global panel 1404 may include one or more sources represented by icons and text, or shortcuts, 1504A-E.” Ex. 1001, 30:27–28. The specification describes how highlighting the source is user directed: Global panel 1404 may additionally indicate a source that is selected or highlight [sic] using indicator 1512; for example, indicator 1512 may comprise a box positioned around Live TV 5 As the Federal Circuit has explained, “the plain meaning of associating relates to a mere commonality.” Apple Inc. v. Motorola, Inc., 757 F.3d 1286, 1306 (Fed. Cir. 2014), overruled by Williamson v. Citrix Online, LLC, 792 F.3d 1339 (Fed. Cir. 2015) (on unrelated grounds). 801 CNXN. Although illustrated as a box, other methods or configurations which provide for icon selection and/or identification may be used. For example, instead of a box, indicator 1512 may comprise adjusting the background of an icon and text, such as 1504A for example, such that the color, shade, or hue is different. Id. at 30:41–49 (emphasis added). Highlighting, as the specification describes, occurs when a user selects a source using indicator 1512 and that source is boxed or differentiated by color or shading. Id. The specification, in relation to Figure 15C, further describes a user moving indicator 1512 to another source such that the “the content or a preview of the content may be displayed in active content area 1408.” Id. at 32:9–17 (“For example, FIG. 15C illustrates an image or video associated with Skyfalls being displayed in content area 1408.”). Thus, the specification is clear that the highlighting function results from user selection of the source and the corresponding association of the first content information with that source flows from that user selection. See also id. at 2:30–31 (describing a purpose of the ’040 patent as “an Intelligent TV with intuitive user interfaces and with seamless user interaction capability”), 32:35–43 (“[t]he user . . . move[s] the focus box”). This supports our understanding that the claim language does not require that the display of first content to cause the highlighting of a displayed source identifier.” slip op. at 29

    Patent outcomesUS 9,510,040 mixed
    Claim construction§ 102 anticipation§ 103 obviousnesscites KSR · Graham
    Patents in suitUS 9,510,040
Page 1 of 14
← Previous12345…Next →

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.