- Tanklogix, LLC v. SiteproInstitution deniedPTAB · Oct 10, 2025 · IPR2025-00650 · APJ Sheila F Mcshane · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood that claims 18–32 and 34 were unpatentable over Kahn or Kahn and Gutierrez.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). Upon consideration of the Petition, the Preliminary Response, and the evidence of record, we determine that Petitioner has not established a reasonable likelihood of prevailing with respect to the unpatentability of at least one claim of the ’871 patent. Accordingly, for the reasons that follow, we decline to institute an inter partes review of claims 18–32 and 34 of the ’871 patent.” slip op. at 2
- Skill levelSkill level patent owner adoptedDecided for patent owner
“The respective proposed levels of qualifications for a person of ordinary skill in the art are similar, with Patent Owner proposing two years of experience compared to Petitioner proposing significant experience with remotely controlling fluid-handling devices, like SCADA systems. Patent Owner also proposes more extensive experience in lieu of educational experience. While we find Petitioner’s proposed qualifications to be acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of skill necessary to understand and implement the teachings of the ’871 patent and the asserted prior art. Our analysis and findings herein, however, do not turn on any differences in the qualifications adopted.” slip op. at 8
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“We determine that we need not expressly construe any claim terms to resolve the parties’ disputes on the current record. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 10
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable
“actuators and the remote control of fluid handling devices, including the receipt with the user-interface module of “a user command to actuate an actuator via a presented control interface” (limitation [18.7]) and “account authorized to send commands to remotely control fluid handling devices” (limitation [18.11]). We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses or teaches these limitations because the evidence does not provide support that there is remote control of fluid handling devices or the use of a user command on a control interface to send a command to a fluid handling device, for instance. Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but we do not discern that it teaches or discloses the capability to remotely control fluid handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, the Kahn disclosures that Petitioner repeatedly relies upon for allegedly teaching this control are deficient. See Ex. 1005, 10:62–67, 14:35– 15:2, 15:62–16:32; see also Pet. 12–14, 16–18. Kahn discloses that “the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance.” Ex. 1005, 10:62–67. Communication unit 112B is part of the local “sensor unit,” wherein the detection conditions determined by the sensor are communicated to remote devices by communication unit 112B. See id. at 3:31–33, 5:62–6:2, 6:27–35, 7:33–37, 13:7–12, Figs. 1A–1C. Kahn discloses that the sensor units, which include communication units 112B, can be located near shut-off valves and can communicate with distant locations. See id. at 11:1–13. There are no disclosures, however, in the above passages that there is remote control of fluid handling devices, that there is a user command on a control interface that actuates an actuator, or that there is a command sent to the facility actuators via a network connection, as required in limitations [18.5]–[18.7] and [18.9]–[18.12], respectively. Rather, the disclosure indicates that the communication unit 112B includes on-site alerts and that the local (non-remote) communication unit 112B can be interfaced with the control valve.” slip op. at 18
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 10,488,871 - Luminex International Co., Ltd. / Menard, Inc. v. Signify Holdings B.V.Some claims unpatentablePTAB · Aug 13, 2025 · IPR2024-01469 · APJ Steven M Amundson · IPR · Final written decision
Claims 1–7, 9–15, and 18–20 are unpatentable; claims 8, 16, and 17 are not determined unpatentable under the asserted prior-art grounds.
RulingsFinal written decision- PTAB / AIA Trials › §315(b) time barNot time barredDecided for petitioner
“G. Analysis 1. REAL PARTY IN INTEREST Based on the record before us and for the reasons explained below, we disagree with Patent Owner that Menard is a “real party in interest” under § 315(b). See Resp. 77–82; Sur-reply 27–28. First, the circumstances here differ materially from the circumstances in Ventex. There, two agreements defined the relationship between Ventex (the petitioner and manufacturer of Heatwave fabric) and Seirus (the alleged real party in interest and purchaser of Heatwave fabric). Ventex, IPR2017- 00651, Paper 152 at 7 & n.8. First, a 2013 Supplier Agreement “prevented Ventex from selling to Seirus competitors” and included an indemnity provision requiring Ventex to indemnify Seirus for losses arising from Ventex’s failure to perform certain obligations. Id. at 7, 14. Second, a 2016 Exclusive Manufacturing Agreement provided that Ventex would manufacture the Heatwave fabric only for Seirus in exchange for Seirus’s payment of an exclusivity fee. Id. at 7. Columbia (the patent owner) accused Seirus products incorporating the Heatwave fabric of infringing the patent at issue, and Columbia served Seirus with a complaint alleging patent infringement in 2014 more than two years before Ventex filed a petition in 2017. Id. at 5, 7. When determining that Seirus was a “real party in interest” under § 315(b), the Board reasoned that “Ventex and Seirus had a specially structured, preexisting, and well established business relationship with one another, including indemnification and exclusivity arrangements.” Ventex, IPR2017-00651, Paper 152 at 10; see id. at 12. Additionally, the Board noted that certain evidence “suggest[ed] that” slip op. at 32
- PTAB / AIA Trials › Real party in interest / privityRpi dispute resolved for petitionerDecided for petitioner
“G. Analysis 1. REAL PARTY IN INTEREST Based on the record before us and for the reasons explained below, we disagree with Patent Owner that Menard is a “real party in interest” under § 315(b). See Resp. 77–82; Sur-reply 27–28. First, the circumstances here differ materially from the circumstances in Ventex. There, two agreements defined the relationship between Ventex (the petitioner and manufacturer of Heatwave fabric) and Seirus (the alleged real party in interest and purchaser of Heatwave fabric). Ventex, IPR2017- 00651, Paper 152 at 7 & n.8. First, a 2013 Supplier Agreement “prevented Ventex from selling to Seirus competitors” and included an indemnity provision requiring Ventex to indemnify Seirus for losses arising from Ventex’s failure to perform certain obligations. Id. at 7, 14. Second, a 2016 Exclusive Manufacturing Agreement provided that Ventex would manufacture the Heatwave fabric only for Seirus in exchange for Seirus’s payment of an exclusivity fee. Id. at 7. Columbia (the patent owner) accused Seirus products incorporating the Heatwave fabric of infringing the patent at issue, and Columbia served Seirus with a complaint alleging patent infringement in 2014 more than two years before Ventex filed a petition in 2017. Id. at 5, 7. When determining that Seirus was a “real party in interest” under § 315(b), the Board reasoned that “Ventex and Seirus had a specially structured, preexisting, and well established business relationship with one another, including indemnification and exclusivity arrangements.” Ventex, IPR2017-00651, Paper 152 at 10; see id. at 12. Additionally, the Board noted that certain evidence “suggest[ed] that” slip op. at 32
- Skill levelOther
“C. Level of Ordinary Skill in the Art Factors pertinent to determining the level of ordinary skill in the art include (1) the educational level of the inventor; (2) the type of problems encountered in the art; (3) prior-art solutions to those problems; (4) the rapidity with which innovations are made; (5) the sophistication of the technology; and (6) the educational level of workers active in the field. Envtl. Designs, Ltd. v. Union Oil Co., 713 F.2d 693, 696–97 (Fed. Cir. 1983). Not all factors may exist in every case, and one or more of these or other factors may predominate in a particular case. Id. These factors are not exhaustive, but merely a guide to determining the level of ordinary skill in the art. Daiichi Sankyo Co. v. Apotex, Inc., 501 F.3d 1254, 1256 (Fed. Cir. 2007). Moreover, the prior art itself may reflect an appropriate skill level. Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001). Petitioner asserts that a person of ordinary skill in the art at the ’336 patent’s effective filing date would have had “a bachelor’s degree in mechanical engineering, electrical engineering, optics, or physics with at least three years of experience working in the design of LED lights or lighting fixtures; a master’s degree in one of the above disciplines with at least two years of experience; or equivalent experience.” Pet. 14 (citing Ex. 1004 ¶¶ 26–29). Dr. Eden’s testimony supports Petitioner’s assertion. See Ex. 1004 ¶¶ 27–28. Patent Owner “adopts for purposes of this proceeding only” Petitioner’s description of an ordinarily skilled artisan. Resp. 10 (citing Pet. 14). We adopt Petitioner’s description of an ordinarily skilled artisan because it comports with the technology and claims of the ’336 patent as” slip op. at 40
- Obviousness (§103) › Objective indicia / secondary considerationsObjective indicia no nexusDecided for petitioner
“Alleged Objective Indicia of Nonobviousness (i) General Principles Before reaching a conclusion about obviousness, we consider evidence concerning objective indicia of nonobviousness. See Apple, 839 F.3d at 1048. For such evidence to have substantial weight, “its proponent must establish a nexus between the evidence and the merits of the claimed invention.” ClassCo, Inc. v. Apple, Inc., 838 F.3d 1214, 1220 (Fed. Cir. 2016); see Ancora Techs., Inc. v. Roku, Inc., 140 F.4th 1351, 1361 (Fed. Cir. 2025) (noting that the Board did not err by requiring “a nexus to the challenged claims as opposed to the patent as a whole”). “[T]here is no nexus unless the evidence presented is ‘reasonably commensurate with the scope of the claims.’” ClassCo, 838 F.3d at 1220 (quoting Rambus Inc. v. Rea, 731 F.3d 1248, 1257 (Fed. Cir. 2013)). The patentee “bears the burden of showing that a nexus exists.” WMS Gaming, Inc. v. Int’l Game Tech., 184 F.3d 1339, 1359 (Fed. Cir. 1999). A rebuttable presumption of nexus arises “when the patentee shows that the asserted objective evidence is tied to a specific product and that product ‘embodies the claimed features, and is coextensive with them.’” Fox Factory, Inc. v. SRAM, LLC, 944 F.3d 1366, 1373 (Fed. Cir. 2019) (quoting Polaris Indus., Inc. v. Arctic Cat, Inc., 882 F.3d 1056, 1072 (Fed. Cir. 2018)). Whether a rebuttable presumption of nexus arises “turns on the nature of the claims and the specific facts.” Teva Pharms. Int’l GmbH v. Eli Lilly & Co., 8 F.4th 1349, 1362 (Fed. Cir. 2021). The presumption analysis should consider the unclaimed features in the product tied to the objective evidence to assess their significance and impact on the correspondence between the patented invention and the product. Quanergy Sys., Inc. v. Velodyne Lidar USA, Inc., 24 F.4th 1406, 1418 (Fed. Cir. 2022). When, “for example, the patented invention is only a small component of the product tied to the objective evidence, there is no presumption of nexus.” Henny Penny Corp. v. Frymaster LLC, 938 F.3d 1324, 1333 (Fed. Cir. 2019). Absent a presumption of nexus, the patentee may prove nexus by” slip op. at 76
Patent outcomesUS 10,299,336 mixed§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 10,299,336 - Interactive Communications International, Inc. v. Blackhawk Network Inc.All claims unpatentablePTAB · Jul 14, 2025 · IPR2024-00465 · APJ Bart A Gerstenblith · IPR · Final written decision
Claims 1–24 are unpatentable: claims 1–10 and 12–24 as obvious over Szrek and Llach, and claim 11 as obvious over Szrek, Llach, and Gilmore.
RulingsFinal written decision- Skill levelSkill level board ownDecided for petitioner
“B. Level of Ordinary Skill in the Art Petitioner proposes that the level of ordinary skill in the art is an artisan with a working knowledge of POS activation systems and lottery systems that was gained through a mixture of training and work experience in the relevant field such as (i) having a Bachelor’s degree in computer science, computer communications, electrical engineering, or equivalent degree, coupled with at least three years of work experience; (ii) having a Master’s degree in computer science, computer communications, or electrical engineering, but having less work experience; or (iii) having no formal degree, but having experience in the relevant field of at least six years of work experience. Pet. 2–3 (citing Ex. 1003 ¶¶ 13–14).9 Patent Owner states that, “[f]or the purpose of this proceeding, Patent Owner adopts the Petition’s proposed definition of the level of ordinary skill in the art.” PO Resp. 19 (citing Pet. 2–3). We find that the parties’ agreed-upon level of ordinary skill in the art is consistent with the level of ordinary skill in the art reflected by the ’451 patent and the prior art of record. See Inst. Dec. 14; see Okajima v. 9 Petitioner proposes the same level of ordinary skill in the art that the Board adopted in PGR2020-00084 (Pet. 2–3 (citing Ex. 1008, 11)), and IPR2023- 01235 (see IPR2023-01235, Paper 34 at 12–13). Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Therefore, we adopt the parties’ agreed-upon level of ordinary skill in the art, as articulated above, in our consideration of the issues presently before us.” slip op. at 13
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached
“We need not construe “transaction processor” expressly because its meaning is not in dispute and its construction is not necessary to resolve the controversy before us.” slip op. at 16
- Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundDecided for petitioner
“On balance, we find that even with the alleged disadvantages identified by Patent Owner, one of ordinary skill in the art would have been motivated to modify Szrek with Llach’s third-party transaction processor because the advantage of having a “centralized intermediary” allows Szrek’s system to support different game providers, such as different lottery companies, which would reduce some implementation costs and allow the system to be more easily and cheaply extended. Pet. 47 (citing Ex. 1003 ¶ 181); see Medichem, S.A. v. Rolabo, S.L., 437 F.3d 1157, 1165 (Fed. Cir. 2006) (“a given course of action often has simultaneous advantages and disadvantages, and this does not necessarily obviate motivation to combine”) (citing Winner Int’l Royalty Corp. v. Wang, 202 F.3d 1340, 1349 n.8 (Fed. Cir. 2000)); see also Intel Corp. v. Qualcomm Inc., 21 F.4th 784, 795 (Fed. Cir. 2021) (stating the same). We acknowledge that the combination comes with some disadvantages, including “add[ed] delay, reduce[d] efficiency, and . . . implementation complexities by converting a simple, direct communication exchange into an exchange that traverses multiple systems.” PO Resp. 52 (citing Ex. 2052 ¶ 163). But, “[t]he fact that the motivating benefit comes at the expense of another benefit, however, should not nullify its use as a basis to modify the disclosure of one reference with the teachings of another. Instead, the benefits, both lost and gained, should be weighed against one another.” Winner, 202 F.3d at 1349 n.8. Here, Szrek expressly teaches indirect communication as a possible implementation of its system and Petitioner’s combination—employing Llach’s third-party transaction processor as part of the indirect communication channel—offers the attractive benefit of allowing Szrek’s system to support different game providers, which would reduce some implementation costs even if it might increase other costs, e.g., by having to program certain components (e.g., the cash registers) differently. Specifically, we find that the ability to expand Szrek’s system to support different game providers provides advantages that outweigh the disadvantages discussed above in the circumstance where one desires a more robust and comprehensive system. See Pet. Reply 23 (noting three advantages of the combination— (1) “allow[ing] Szrek’s system to use ‘a centralized system for activating lottery tickets from different retailers and different locations,’” (2) “allow[ing] support for different game providers, such as different lottery companies,” “reduc[ing] implementation costs,” and (3) “allow[ing] Szrek’s system to ‘communicate with individual card” slip op. at 37
- Obviousness (§103) › Motivation to combine / reasonable expectation of success › HindsightMotivation foundDecided for petitioner
“On balance, we find that even with the alleged disadvantages identified by Patent Owner, one of ordinary skill in the art would have been motivated to modify Szrek with Llach’s third-party transaction processor because the advantage of having a “centralized intermediary” allows Szrek’s system to support different game providers, such as different lottery companies, which would reduce some implementation costs and allow the system to be more easily and cheaply extended. Pet. 47 (citing Ex. 1003 ¶ 181); see Medichem, S.A. v. Rolabo, S.L., 437 F.3d 1157, 1165 (Fed. Cir. 2006) (“a given course of action often has simultaneous advantages and disadvantages, and this does not necessarily obviate motivation to combine”) (citing Winner Int’l Royalty Corp. v. Wang, 202 F.3d 1340, 1349 n.8 (Fed. Cir. 2000)); see also Intel Corp. v. Qualcomm Inc., 21 F.4th 784, 795 (Fed. Cir. 2021) (stating the same). We acknowledge that the combination comes with some disadvantages, including “add[ed] delay, reduce[d] efficiency, and . . . implementation complexities by converting a simple, direct communication exchange into an exchange that traverses multiple systems.” PO Resp. 52 (citing Ex. 2052 ¶ 163). But, “[t]he fact that the motivating benefit comes at the expense of another benefit, however, should not nullify its use as a basis to modify the disclosure of one reference with the teachings of another. Instead, the benefits, both lost and gained, should be weighed against one another.” Winner, 202 F.3d at 1349 n.8. Here, Szrek expressly teaches indirect communication as a possible implementation of its system and Petitioner’s combination—employing Llach’s third-party transaction processor as part of the indirect communication channel—offers the attractive benefit of allowing Szrek’s system to support different game providers, which would reduce some implementation costs even if it might increase other costs, e.g., by having to program certain components (e.g., the cash registers) differently. Specifically, we find that the ability to expand Szrek’s system to support different game providers provides advantages that outweigh the disadvantages discussed above in the circumstance where one desires a more robust and comprehensive system. See Pet. Reply 23 (noting three advantages of the combination— (1) “allow[ing] Szrek’s system to use ‘a centralized system for activating lottery tickets from different retailers and different locations,’” (2) “allow[ing] support for different game providers, such as different lottery companies,” “reduc[ing] implementation costs,” and (3) “allow[ing] Szrek’s system to ‘communicate with individual card” slip op. at 37
Patent outcomesUS 11,488,451 unpatentableClaim construction§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 11,488,451 - Qualcomm Incorporated v. Network System Technologies, LLCAll claims unpatentablePTAB · Jun 13, 2025 · IPR2024-01081 · APJ Steven M Amundson · IPR · Final written decision
Claims 2, 6, and 9–16 are unpatentable as obvious over Goossens2003 and Drake; the Board did not reach the Goossens2002 and Drake challenge.
RulingsFinal written decision- Obviousness (§103) › Motivation to combine / reasonable expectation of successUnpatentableUnpatentable
“3. WHETHER AN ORDINARILY SKILLED ARTISAN WOULD HAVE BEEN MOTIVATED TO COMBINE THE TEACHINGS OF” slip op. at 54
- PTAB / AIA Trials › Joinder §315(c) / SAS all-or-nothingJoinder, grantedGranted
“Qualcomm”) filed a petition in IPR2024-01081 challenging claims 2, 6, and 9–16 in the ’449 patent on substantively identical grounds to those asserted in Samsung’s Petition. Qualcomm Incorporated v. Network System Technologies, LLC, IPR2024-01081, Paper 1 (“Pet.”).2 Concurrently with filing the petition in IPR2024-01081, Petitioner filed a motion for joinder, seeking joinder as a party in this proceeding under 35 U.S.C. § 315(c). IPR2024-01081, Paper 3. slip op. at 3
- PTAB / AIA Trials › §315(b) time barNot time barredDecided for petitioner
“IV. JOINDER AND THE ONE-YEAR TIME BAR IN § 315(b) Regarding joinder, § 315(c) permits joinder as a party and states:” slip op. at 157
- ExcludeOther
“In our analyses above, we do not rely on any of the evidence that Petitioner seeks to exclude. See, e.g., supra §§ III.C–III.E. Hence, we dismiss Petitioner’s motion to exclude evidence as moot. See, e.g., Netflix, Inc. v. GoTV Streaming, LLC, IPR2023-00757, Paper 39 at 135 (PTAB Nov. 5, 2024) (dismissing motion to exclude evidence as moot); Volkswagen Grp. of Am., Inc. v. Spero, IPR2023-00335, Paper 40 at 24 (PTAB July 15, 2024) (dismissing motion to exclude evidence as moot).” slip op. at 159
Patent outcomesUS 7,373,449 unpatentable§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 7,373,449 - Samsung Electronics Co., Ltd. / Qualcomm Incorporated v. Network System Technologies, LLCAll claims unpatentablePTAB · Jun 13, 2025 · IPR2024-00338 · APJ Steven M Amundson · IPR · Final written decision
Claims 2, 6, and 9–16 are unpatentable under § 103(a) as obvious over Goossens2003 and Drake.
RulingsFinal written decision- Obviousness (§103) › Motivation to combine / reasonable expectation of successUnpatentableUnpatentable
“Accordingly, “the teachings of Drake apply directly to systems on” slip op. at 82
- PTAB / AIA Trials › Joinder §315(c) / SAS all-or-nothingJoinder, grantedGranted
“In October 2024, the Board (1) instituted an inter partes review in IPR2024-01081, (2) granted Petitioner’s motion for joinder in IPR2024- 01081, and (3) joined Petitioner as a party in this proceeding. Paper 16 (“Qualcomm Inst. Dec.”), 50–51; IPR2024-01081, Paper 14 at 50–51. The next day, based on a settlement between Samsung and Patent Owner, the Board granted in part a joint motion to terminate filed by Samsung and Patent Owner and terminated Samsung as a petitioner in this proceeding. See Paper 14 (Joint Motion); Paper 17 (Order).” slip op. at 3
- ExcludeOther
“In our analyses above, we do not rely on any of the evidence that Petitioner seeks to exclude. See, e.g., supra §§ III.C–III.E. Hence, we dismiss Petitioner’s motion to exclude evidence as moot. See, e.g., Netflix, Inc. v. GoTV Streaming, LLC, IPR2023-00757, Paper 39 at 135 (PTAB Nov. 5, 2024) (dismissing motion to exclude evidence as moot); Volkswagen Grp. of Am., Inc. v. Spero, IPR2023-00335, Paper 40 at 24 (PTAB July 15, 2024) (dismissing motion to exclude evidence as moot).” slip op. at 159
Patent outcomesUS 7,373,449 unpatentable§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 7,373,449 - Intel Corporation / Lenovo (United States) Inc. et al. v. Collision Communications, Inc.Institution deniedPTAB · May 28, 2025 · IPR2025-00301 · APJ Bart A Gerstenblith · IPR · Institution
The Board denied institution of review for claims 1–11, 16, and 21 under § 314(a), finding the Fintiv factors favored discretionary denial, and denied joinder.
RulingsInstitution decision- PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Institution denied fintivInstitution denied
“2026. This date is nearly five months prior to the date on which the final written decision would be due if trial were instituted in this proceeding. And, even if we assume Petitioner’s alleged February–March 2026 trial date, this date too is several months prior to the projected final written decision deadline. As such, it is unlikely that a final written decision in this proceeding would issue before trial in the district court, unless the trial was delayed or rescheduled for a later time. Thus, we find this factor weighs in favor of exercising our discretion to deny institution. See ARM Ltd. v. Daedalus Prime LLC, IPR2025-00207, Paper 10 at 2 (May 16, 2025) (Before the Office of the Under Secretary of Commerce for Intellectual Property and Director of the United States Patent and Trademark Office) (exercising discretion to deny institution with the same relative timing between district court trial and final written decision deadline).” slip op. at 13
- PTAB / AIA Trials › Motions to amend / substitute claimsNot reached
- PTAB / AIA Trials › Joinder §315(c) / SAS all-or-nothingJoinder, deniedDenied
- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied discretionary otherInstitution denied
“presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). Institution of inter partes review, however, is discretionary. See Harmonic Inc. v. Avid Tech., Inc., 815 F.3d 1356, 1367 (Fed. Cir. 2016) (“[T]he PTO is permitted, but never compelled, to institute an IPR proceeding.”). For the reasons discussed below, we exercise discretion pursuant to 35 U.S.C. § 314(a) not to institute inter partes review. Additionally, for the same reasons and because institution was denied in IPR2024-01248, we deny Petitioner’s Motion for Joinder. See 35 U.S.C. § 315(c) (“[T]he Director . . . may join as a party . . . any person who properly files a petition under section 311 that the Director . . . determines warrants the institution of an inter partes review under section 314.”).” slip op. at 3
Discretionary denialPatents in suitUS 9,814,071 - PTAB · Mar 28, 2025 · IPR2024-01505 · APJ Jameson Lee · IPR · Institution
The Board instituted IPR on claims 1–8, 15, 17, and 19–25 because Petitioner showed a reasonable likelihood of proving obviousness over Rusert and Zheng.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“review. See 35 U.S.C. § 314 (2024); 37 C.F.R. § 42.4(a) (2024). An inter partes review may not be instituted unless the information presented in the Petition “shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C.§ 314(a). The “reasonable likelihood” standard is “a higher standard than mere notice pleading” but “lower than the ‘preponderance’ standard to prevail in a final written decision.” Hulu, LLC v. Sound View Innovations, LLC, IPR2018-01039, Paper 29 at 13 (PTAB Dec. 20, 2019) (precedential). Upon consideration of the contentions and the evidence of record before us, we conclude Petitioner has shown a reasonable likelihood that it would prevail in establishing unpatentability of at least one challenged claim of the ’833 patent. Accordingly, we institute an inter partes review of all challenged claims of the ’833 patent on all grounds set forth in the Petition.” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“ordinary skill in the art (hereinafter “POSITA”) “would have had (1) a bachelor’s degree in electrical engineering, computer engineering, computer science, or a comparable field of study such as physics, and (2) approximately two to three years of practical experience with video encoding/decoding.” Pet. 19 (citing Ex. 1003 ¶¶ 37–39). Patent Owner states that it “has applied Petitioner’s POSITA for the sake of this Response.” Prelim. Resp. 33. On this record, we adopt Petitioner’s statement of the level of ordinary skill in the art. It is supported by the testimony of Dr. Creusere and not disputed by Patent Owner. Further, it appears consistent with what is reflected by the content of the applied prior art. Cf. Okajima v. Bourdeau, 261 F.3d 1350, 1354–55 (Fed. Cir. 2001) (the applied prior art may reflect an appropriate level of skill). C.” slip op. at 14
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached
“Only those claim terms that are in controversy need to be construed, and only to the extent necessary to resolve the controversy. Realtime Data, LLC v. Iancu, 912 F.3d 1368 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 16
- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner
“That specific claim language of association indicates a relationship between “the block” and the first spatial motion vector prediction candidate, that is more than how every single prediction candidate broadly may be regarded in general as related to the current block being processed, the block for which a motion vector prediction list is being generated. The modifier “associated with the first spatial motion vector prediction candidate” clearly modifies “the block” at issue here and cannot be discarded or ignored. Further, if “the block” refers to the block recited in limitation [1a], i.e., the current block being processed, then the modifying phrase “associated with the first spatial motion vector prediction candidate” would be superfluous and have no meaning, because “the block,” without the modifying phrase, would already derive its antecedent basis from “a block of pixels” recited in limitation [1a]. We decline to adopt a construction that reads out “associated with the first spatial motion vector prediction candidate.” Construing the claim according to what the claim language actually states, without excluding any part of the claim language recited, is more appropriate.” slip op. at 18
Claim construction§ 103 obviousnessDiscretionary denialcites KSR · GrahamPatents in suitUS 9,571,833 - Samsung Electronics America, Inc. / Samsung Electronics Co., Ltd. v. Collision Communications, Inc.Institution deniedPTAB · Mar 21, 2025 · IPR2024-01250 · APJ Bart A Gerstenblith · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood of proving claims 1–5, 7, 9–16, or 20 unpatentable over the asserted grounds.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“An inter partes review may be instituted only if “the information presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2018). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“B. Level of Ordinary Skill in the Art Petitioner, supported by Dr. Min’s testimony, proposes that a person of ordinary skill in the art at the time of the invention would have had “at least a bachelor’s [degree] in [electrical engineering, computer engineering, or computer science], physics, or equivalent, and two years of experience with cellular telecommunications, radio-access network architectures, protocols and signal propagation in wireless networks.” Pet. 3 (citing Ex. 1003 ¶ 59). Dr. Min testifies that “[a]dditional education could substitute for professional experience and vice versa.” Ex. 1003 ¶ 59. Additionally, Petitioner contends that Dr. Min “exceeded this level of experience by the priority date.” Pet. 3 (citing Ex. 1010 (curriculum vitae of Dr. Min)). In its Preliminary Response, Patent Owner does not take a position on the relevant level of ordinary skill in the art. See generally Prelim. Resp. At this stage of the proceeding and on the present record, we adopt Petitioner’s uncontested proposed level of ordinary skill in the art, which we find consistent with the level of ordinary skill in the art reflected by the ’946 patent and the prior art of record. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978).” slip op. at 10
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached
“Neither party contends that any claim terms require an express construction to resolve the present controversy. Pet. 8 (“For purposes of this Petition only, Petitioner does not believe any terms require a formal construction.”); see generally Prelim. Resp. Nonetheless, Petitioner explains that the Petition is structured such that “Ground 1 is based on Patent Owner’s infringement contentions in the district court litigation, where the claimed ‘MUD module’ is generally mapped to multiple-input multiple-output (MIMO) receivers in a wireless network.” Pet. 2. Petitioner contends that “[u]nder this broad interpretation of a ‘MUD module,’ Walton’s MIMO receiver renders every challenged claim obvious.” Id. In contrast to Ground 1, the Petition states that “Ground 2 is based on the plain meaning of ‘MUD module,’ which is a component that detects, separates, and decodes signals from multiple users transmitting simultaneously over the same frequency band.” Id. Petitioner contends that, “[a]pplying the correct meaning of the term, Walton’s MIMO receiver does not necessarily comprise a MUD module.” Id. Therefore, Petitioner explains that “Ground 2 combines Walton with Learned, which expressly discloses [a] multi-user detector, and thus renders every challenged claim obvious in combination with Walton.” Id. at 2–3.7 In other words, the Petition presents Ground 1 and Grounds 2/3 as alternatives depending on the meaning of 7 Although not specifically relevant to claim construction, Petitioner explains that “Ground 3 further combines Walton and Learned with Quigley, to the extent Patent Owner argues Walton does not disclose providing a burst control input.” Pet. 3. “MUD module,” where Ground 1 is based on Petitioner’s understanding of Patent Owner’s interpretation of the term and Grounds 2 and 3 are based on Petitioner’s interpretation of the term as having its plain meaning. Petitioner further contends that “[e]very other claim term carries its ‘ordinary and customary meaning’ . . . .” Id. at 8. Although Petitioner presents a potential dispute regarding the meaning of “MUD module,” we need not construe this term expressly because the determination we reach herein does not depend on which meaning MUD module is applied. Accordingly, we do not construe any claim terms expressly because express constructions are not necessary to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 12
- PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Not reached
“IV. DISCRETIONARY DENIAL Patent Owners contends that the factors set forth in Apple Inc. v. Fintiv, Inc., IPR2020-00019, Paper 11 at 9 (PTAB Mar. 20, 2020) (precedential), weigh heavily in favor of discretionary denial. Prelim. Resp. 40–46; Paper 10. Petitioner disagrees. Pet. 74–77; Paper 9. In light of the conclusion reached above, we need not address the parties’ arguments regarding discretionary denial.” slip op. at 25
Claim construction§ 103 obviousnessDiscretionary denialcites Phillips · KSR · GrahamPatents in suitUS 8,089,946 - Samsung Electronics America, Inc. / Samsung Electronics Co., Ltd. v. Collision Communications, Inc.Institution deniedPTAB · Mar 21, 2025 · IPR2024-01248 · APJ Bart A Gerstenblith · IPR · Institution
The Board denied institution because the Petition did not show a reasonable likelihood of proving claims 1–11, 16, and 21 unpatentable over the asserted obviousness grounds.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2018). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“At this stage of the proceeding and on the present record, we adopt Petitioner’s uncontested proposed level of ordinary skill in the art, which we find consistent with the level of ordinary skill in the art reflected by the ’071 patent and the prior art of record. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978).” slip op. at 12
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“Neither party proposes a specific construction of any claim term, although Petitioner contends each term should be construed according to its plain and ordinary meaning. Pet. 16; see generally Prelim. Resp. Accordingly, we need not construe any claim terms expressly because the meaning of the terms is not in dispute and an express construction is not necessary to resolve the controversy before us.” slip op. at 13
- BurdenNot shown unpatentable
“We find the Petition lacking in particularity because it does not clearly identify what aspect of Jin is alleged to teach the unique signal parameters (or unique estimated signal parameters) recited in claim 1. See, e.g., 35 U.S.C. § 312(a)(3) (“A petition filed under section 311 may be considered only if — (3) the petition identifies, in writing and with particularity, . . . the evidence that supports the ground for the challenge to each claim . . . .”). First, as reflected above, the Petition asserts that something called a “unique pilot parameter” teaches the recited unique estimated signal parameters. But “unique pilot parameter” is not a term or phrase recited in Jin. See Prelim. Resp. 19 (arguing the same). So, when Petitioner states “Jin discloses that the base station uses the unique pilot parameter (i.e., ‘unique estimated signal parameters’) to ‘identify which user (i.e., mobile terminal) has transmitted the received data,’” it is not clear what element in Jin Petitioner intends to identify by the term “unique pilot parameter.” Dr. Min’s testimony does not help resolve the ambiguity in the Petition. In particular, Dr. Min also refers to a “unique pilot parameter (i.e., ‘unique signal parameter’) for each user.” Ex. 1003 ¶ 89. But, as noted above, Jin does not disclose an element referred to as a “pilot parameter” and it is not clear what element Dr. Min intended to identify in Jin.8” slip op. at 18
Claim construction§ 103 obviousnessDiscretionary denialcites Phillips · KSR · GrahamPatents in suitUS 9,814,071 - Phison Electronics Corporation v. Vervain, LLCInstitution deniedPTAB · Mar 17, 2025 · PGR2024-00047 · APJ Steven M Amundson · PGR · Institution
The Board denied institution because Petitioner did not show it was more likely than not that any of claims 1–7 was unpatentable.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“to institute a post-grant review. We may not institute a post-grant review unless we determine that “the information presented in the petition filed under section 321, if such information is not rebutted, would demonstrate that it is more likely than not that at least 1 of the claims challenged in the petition is unpatentable.” 35 U.S.C. § 324(a) (2024).” slip op. at 2
- Patent Eligibility (§101) › Alice/Mayo step one — 'directed to'Not shown unpatentable
“2. PETITIONER’S CONTENTIONS Petitioner challenges the ’546 patent’s claims as encompassing a” slip op. at 20
- Disclosure Requirements (§112) › Written description (Ariad)Not shown unpatentable
“2. PETITIONER’S CONTENTIONS Petitioner challenges the ’546 patent’s claims as failing to satisfy” slip op. at 26
- Disclosure Requirements (§112) › Enablement (Wands, Amgen full scope)Not shown unpatentable
“2. PETITIONER’S CONTENTIONS Petitioner challenges the ’546 patent’s claims as failing to satisfy” slip op. at 36
§ 101 eligibility§ 103 obviousness§ 112 disclosureDiscretionary denialcites Alice · Mayo · Phillips · KSR · Graham · NautilusPatents in suitUS 11,830,546
Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.