PTAB
Advanced fields
138 decisions · 490msnewest first
  • PTAB · Feb 11, 2026 · IPR2024-01221 · APJ Iftikhar Ahmed · IPR · Final written decision

    Petitioner failed to prove claims 1, 2, 4, 5, 7, 8, 12, 13, 17, 19–21, 23, 24, 26, 27, 29, 30, 34, 39–41, and 43 unpatentable because the cited grounds did not establish the required …

    RulingsFinal written decision
    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner

      “image capture device” refers to an imaging-based barcode reader and not a laser-based barcode scanner because we are persuaded that claim language and Specification support that interpretation and also because Patent Owner persuasively shows that a person of ordinary skill in the art would have understood the term as such. Claim 1 recites an “image capture device configured to capture an image.” Ex. 1001, 16:24–25. The plain meaning of the claim term requires that the image be captured, not just scanned. The claim further requires “generating an output based on the information embedded in the image,” requiring that information is retrieved from the captured image. Id. at 16:32–33. A device that does not capture an image is not an “image capture device” under the plain language of the claim. A laser-based barcode scanner employs light reflected from a laser beam to “generate an electrical signal that corresponds to the bars and spaces in the barcode being scanned.” See Ex. 2029 ¶¶ 42–43 (explaining in detail how laser-based barcode self-emitting a laser light across a code to be scanned, with a sensor tuned to capture the reflected light from the laser.”). It simply does not capture an image. slip op. at 14

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Based on our review of the complete record, we determine that Petitioner’s stated level of ordinary skill in the art is reasonable because it is consistent with the evidence of record, including the asserted prior art. The field of the ’167 patent “relates generally to secure transactions, and more specifically, to methods and devices for providing secure identification, verification, and authorization using a portable secure device.” Ex. 1001, 1:8–11. The ’167 patent seeks “to provide methods and devices that are capable of providing secure transactions in a more efficient manner.” Id. at 3:11–13. Accordingly, we adopt Petitioner’s definition. We note, however, that our patentability analysis would be the same under Patent Owner’s definition.” slip op. at 11

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “We agree with Patent Owner that Wang fails to disclose limitation 1[a]. Wang discloses a portable electronic authorization device (PEAD) that can be used as a self-checkout terminal. Ex. 1004 ¶ 115. In this context, Wang discloses By entering the UPC code or barcode using keypad on the PEAD or scanning in the UPC code or barcode using the input device built into the PEAD such as a barcode scanner or OCR reader, the PEAD can generate the receipt with the list of item prices through the wireless network and Internet by querying the item price using the barcode as the index for price lookup table which is Stored in a Server System. Id. (emphasis added). As discussed above (Section III.C.1), we are persuaded by Patent Owner’s arguments that the claimed “image capture device” refers to an imaging-based device and not a laser-based barcode scanner. Petitioner does not contend that Wang’s disclosure of the barcode scanner necessarily refers to an imaging-based device, but argues that Wang’s disclosure is sufficient because “both imaging-based barcode scanners and laser-based barcode scanners constitute image capture devices.” Reply 11. In light of our claim construction above, we disagree.” slip op. at 27

    • Obviousness (§103) › Graham factors (scope of art, differences, level of skill)Not shown unpatentableNot shown unpatentable

      “Petitioner contends that claims 1, 4, 5, 7, 12, 17, 23, 26, 27, 29, 34, and 43 are unpatentable as obvious over the combination of Wang and Drummond. Pet. 30–43. 1. Drummond Drummond is a patent titled “Automated Banking Machine System and Method,” and “relates to an automated banking machine apparatus and system that are capable of use in a wide area network, and which provides a user with a remote electronic receipt or other record related to a transaction performed at the machine.” Ex. 1008, code (54), ¶ 2. Drummond discloses that its automated banking machine, may “initiate the sending of a non-paper transaction receipt to the customer,” “[t]he receipt may be sent using a wide area network, such as the Internet,” and “[t]he receipt may be an electronic receipt, for example a receipt in the form of an e-mail message.” Id. ¶ 247. 2. Claims 1, 4, 5, 7, 12, 17, 23, 26, 27, 29, 34, and 43 For this obviousness ground, Petitioner relies on the same arguments and evidence as its Ground 1a (anticipation by Wang), discussed above, for the majority of claim limitations. See Pet. 33–43. Importantly, Petitioner relies solely on Wang as teaching independent claim limitations [1a], [23a], and [43b] relating to an image capture device and embedded information. Pet. 36, 41, 43. Accordingly, for the reasons discussed above with respect to Ground 1a, Petitioner has not established by a preponderance of the evidence, that the subject matter of claims 1, 4, 5, 7, 12, 17, 23, 26, 27, 29, 34, and 43 would have been obvious to one of ordinary skill in the art over the combination of Wang and Drummond.” slip op. at 31

    Patent outcomesUS 7,314,167 not shown unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 7,314,167
  • PTAB · Dec 19, 2025 · IPR2025-00434 · APJ Mitchell G Weatherly · IPR · Rehearing

    The Board denied Petitioner’s rehearing request, leaving institution denied because Shen and Soldano did not establish a reasonable likelihood of anticipating claims 1–7.

    RulingsRehearing decision
    • RehearingRehearing, deniedDenied

      “When rehearing a decision on petition, the Board will review the decision for an abuse of discretion. See 37 C.F.R. § 42.71(c). An abuse of discretion may be determined if a decision is based on an erroneous interpretation of law, if a factual finding is not supported by substantial evidence, or if the decision represents an unreasonable judgment in weighing relevant factors. See Arnold P’ship v. Dudas, 362 F.3d 1338, 1340 (Fed. Cir. 2004). The party challenging the decision has the burden of showing the decision should be modified, and the request for rehearing “must specifically identify all matters the party believes the Board misapprehended or overlooked, and the place where each matter was previously addressed” in its papers. 37 C.F.R. § 42.71(d).” slip op. at 2

    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “II. ANALYSIS In our Decision, we concluded that Petitioner had failed to carry its burden of demonstrating a reasonable likelihood of prevailing that either Shen or Soldano anticipated claims 1–7. Dec. 18, 26. Petitioner argues that we should institute review for three reasons. First, Petitioner argues that we abused our discretion by (a) “refusing” to interpret the scope of the claimed” slip op. at 2

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “Owner’s interpretation of “carrier” as meaning “one or more components for supporting ROSA components such as an AWG.” Dec. 9 (quoting Pet. 11). For our analysis of Petitioner’s challenges, we referred to this interpretation of “carrier” as Petitioner’s second alternative construction. Id. We also noted that Petitioner appeared to dispute Patent Owner’s interpretation when it argued that “carrier” should mean “a ceramic or silicon substrate.” Id. (quoting Pet. 10). We referred to this interpretation of “carrier” as the first alternative construction. Id. Rather than resolve this apparent dispute about the meaning of “carrier,” we found that both of Petitioner’s anticipation challenges failed under both interpretations of “carrier.” Id. at 10–26. Because we found that Petitioner had failed to carry its burden regardless of which interpretation of “carrier” applied, we found it unnecessary to resolve the dispute over that interpretation. Id. at 9–10. For the reasons expressed in Parts II.B–C below, we maintain our conclusion that Petitioner has failed to demonstrate a reasonable likelihood of proving that either Shen or Soldano anticipates any claim under either interpretation of “carrier.” Accordingly, Petitioner fails to demonstrate an abuse of discretion in our alleged “refusal” to interpret “carrier.”” slip op. at 3

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “Reh’g Req. 14. We cannot weigh Petitioner’s arguments based on its assertions about “caselaw” because Petitioner cited no cases to support its arguments. See id. Nevertheless, we infer that Petitioner intends its statements of “caselaw” to refer to the requirements to make out a case for anticipation. If so, Petitioner demonstrably miscasts what appear to be the legal principles for proving anticipation. As stated in our Decision: “A claim is anticipated only if each and every element as set forth in the claim is found, either expressly or inherently described, in a single prior art reference.” Verdegaal Bros., Inc. v. Union Oil Co. of California, 814 F.2d 628, 631 (Fed. Cir. 1987).” Dec. 7. Making a showing that a prior art reference anticipates a patent claim thus necessarily requires proof that a single reference “expressly or inherently” describes every element of that claim and with all elements being arranged in the reference as they are in the” slip op. at 7

    Claim construction§ 102 anticipation
    Patents in suitUS 10,379,301
  • PTAB · Oct 10, 2025 · IPR2025-00652 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–23 and 25–30 were unpatentable over the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’403 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 10; Prelim. Resp. 4 (citing Ex. 2009 ¶ 73); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses element [1.2] because the evidence cited does not disclose a “first computer system being configured to provide remote control of the first pump or first valve” (i.e., a fluid-handling device). Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but Petitioner has not identified any disclosure of the capability to remotely control fluid-handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, Kahn’s disclosures that Petitioner relies on for allegedly teaching remote control are deficient. We discuss each. First, Petitioner points to the following, “[f]or instance, as illustrated in FIG. 1C, a fluid control device such as a valve 15A is located on the input side of a sen[s]or unit 110.” Ex. 1005, 8:19–21, cited in Pet. 13. This portion of Kahn, however, does not disclose remote control. Second, Petitioner cites to the following: Finally, or in addition to, the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance. Pet. 13 (citing Ex. 1005, 10:62–67). We agree with Patent Owner that this portion of Kahn teaches on-site alerts and local control of the fluid-handling device. See Prelim. Resp. 7. This portion of Kahn does not disclose remote control.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,294,403
  • PTAB · Oct 10, 2025 · IPR2025-00651 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–3, 6, 7, and 9–20 were unpatentable over any asserted ground.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’680 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 11

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner

      “target value” is part of a command that is sent from a computing device to a server and then to a controller. The controller then receives a measurement of the fluid by a sensor and determines whether the measurement satisfies the “target value.” If the measurement does not satisfy the “target value,” further operations are undertaken. The recited operation sequence makes clear that the plain and ordinary meaning of “target value” is not as Dr. Wooley opines because the particular operating condition that a device is in at a particular time is represented by the measurement taken by the sensor, 11 Some claim language less relevant to construing “target value” was omitted for ease of reference. which the controller then uses to determine whether the measurement satisfies the “target value.” Additionally, claim 1 recites that the “target value” is sent as part of a command to the controller. The “target value” is not sent to the controller from the sensor, as might be expected if the plain and ordinary meaning of “target value” were as Dr. Wooley opines. Petitioner and Dr. Wooley’s construction would also result in “target value” meaning effectively the same thing as the measurement of the fluid by the sensor, a concept that is separately recited in claim 1 and to which the “target value” is compared. The Specification of the ’680 patent does not support Petitioner’s understanding of the plain and ordinary meaning of “target value.” Although the Specification does not recite “target value,” it recites “target state,” and describes “target state” sufficiently to understand the plain and ordinary meaning of “target” as used in “target value” and “target state.” In particular, the ’680 patent explains that “[i]n some embodiments, the process 104 includes receiving, via a network interface, from a remote user device, (e.g., via a command-center server) a command to change a state of a fluid-handling device to a target state.” Ex. 1001, 11:48–51. This portion reflects that the command is seeking to change a state of a fluid-handling device to a target state. In other words, the “target value” or “target state” is not generally “the particular operating condition that a device is in at a particular time”; rather, it is a value or state that the fluid-handling device is desired to be in, as Patent Owner and Dr. Durham explain. Additionally, just as claim 1 recites a directional component for the “target value” to be sent to the controller in a command, so too does the Specification describe a “target state” as being sent in a command from a remote user device. Thus, the Specification clearly supports the plain and ordinary meaning proposed by Patent Owner and Dr. Durham and not the plain and ordinary meaning proposed by Petitioner and Dr. Wooley. slip op. at 14

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “time-stamped process data, report exception therein to the remote host, and extract and transmit time-stamped process data to the remote host.” Ex. 1005, Abst. (emphases added). Almadi explains that its remote field systems must include a plurality of controller units “to issue commands to, and gather and process data from a plurality of field devices, including remote systems and instruments, . . . [and] a database server for the storage of process data retrieved from the remote subsystems and instruments.” Id. at 2:22–30 (emphases added). Based on these disclosures, we agree with Patent Owner that Petitioner has not established that Almadi discloses element [1.4]. Specifically, the teachings from Almadi identified by Petitioner refer to process data, which is data retrieved from the remote subsystems/field devices. Thus, we understand that Almadi’s teaching—of using an Ethernet switch to transmit “process data”—describes transmitting data from the remote subsystems/field devices. See Ex. 1005, 3:13–17, cited in Pet. 15. But claim 1 and particularly element [1.4], recites “sending, with the server, the target value to the network address [which identifies a controller of the fluid-handling device13] via the network,” which is different than sending process data from the field devices to the remote host or database server for storage.” slip op. at 19

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,175,680
  • PTAB · Aug 29, 2025 · IPR2025-00479 · APJ Justin T Arbes · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–20 were obvious over Erskine, Scherzer, or Scherzer and Gillett.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “III. CONCLUSION Based on the arguments and evidence presented by the parties, we conclude that Petitioner has not demonstrated a reasonable likelihood of prevailing with respect to at least one claim of the ’634 patent challenged in the Petition. Therefore, we do not institute an inter partes review. IV. ORDER In consideration of the foregoing, it is hereby: ORDERED that the Petition is denied and no inter partes review is instituted.” slip op. at 25

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “B. Level of Ordinary Skill in the Art Petitioner argues that at the time of the ’634 patent (July 2018), a person of ordinary skill in the art would have had “a bachelor’s degree in electrical engineering, computer science, computer engineering, or a similar major with at least two years of experience in the field; or a master’s degree with specialization in the field,” where “[a] person with less education but more relevant practical experience may also meet this standard.” Pet. 7 (citing Ex. 1003 ¶¶ 12–13). Petitioner further argues that a person of ordinary skill in the art would have had knowledge of “[d]esigning and using systems that include endpoint devices (e.g., client devices) and servers for establishing network connections and data transfer,” “[r]ecognizing and applying the client-server architecture,” and “[u]sing and applying concepts from known telecommunication and networking frameworks, protocols and standards, including TCP/IP, IEEE 802.11, VoIP, cellular systems and other known frameworks and standards.” Id. (citing Ex. 1003 ¶ 14). Patent Owner does not address the level of ordinary skill in the art in its Preliminary Response. Based on the record presented, including our review of the ’634 patent and the types of problems and solutions described in the ’634 patent and cited prior art, we agree with Petitioner’s definition and apply it for purposes of this Decision. See, e.g., Ex. 1001, col. 1, ll. 4–29 (describing in the “Background” section of the ’634 patent a “network connection between two endpoints” and known methods of reaching “full effective bandwidth capacity” in a network).” slip op. at 8

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “C. Claim Interpretation We interpret each challenged claim using the same claim construction standard that would be used to construe the claim in a civil action under 35 U.S.C. 282(b), including construing the claim in accordance with the ordinary and customary meaning of such claim as understood by one of ordinary skill in the art and the prosecution history pertaining to the patent. 37 C.F.R. § 42.100(b). Petitioner notes that it proposed a construction for the claim term “geographical area” in the district court case, but states that it “do[es] not believe proposing a construction for the term is necessary in this proceeding because the relied upon teachings of the prior art references are consistent with examples of ‘geographical area’ included in the ’634 patent [S]pecification.” Pet. 8. Patent Owner argues that “[t]he Board need not engage in express claim construction at this stage of the proceeding.” Prelim. Resp. 5. We conclude that no express interpretation of any claim term is necessary to determine whether to institute an inter partes review in this proceeding. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“Because we need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy,’ we need not construe [a particular claim limitation] where the construction is not ‘material to the . . . dispute.’” (citation omitted) (emphasis added)).” slip op. at 9

    • BurdenNot shown unpatentable

      “Petitioner has not shown sufficiently that Erskine teaches or suggests the second requirement of limitation [1c], i.e., “initiating the next network connection . . . with a transmission bandwidth based on the parameter values for the past network connection.” Petitioner’s theory is that (1) the QoS parameters in Erskine are for a “past” connection from one zone to another, (2) the sliding maximum interzone bandwidth is “based on” the QoS parameters, and (3) a new call only proceeds if the transmission bandwidth needed for the call added to the current bandwidth being used over the interzone link is less than the sliding maximum interzone bandwidth, so Erskine therefore teaches a call with a transmission bandwidth determined “based on” the sliding maximum interzone bandwidth (which in turn is determined “based on” the QoS parameters). See Pet. 27–28; Ex. 1003 ¶¶ 59–60 (similar testimony from Dr. Crovella). As Patent Owner points out, however, Erskine only makes “a binary, accept/reject decision as to whether to allow a new call to proceed based on a comparison between the bandwidth needed for the call and a predetermined ‘sliding maximum interzone bandwidth value.’” See Prelim. Resp. 6–7. Specifically, the additional bandwidth that would be needed for the call is added to the current bandwidth being used on the interzone link; if the sum of those values is less than the sliding maximum interzone bandwidth for the link, the call “proceeds”; otherwise, it is “blocked.” Ex. 1004, col. 4, ll. 36–40, col. 6, l. 55–col. 7, l. 10, col. 8, ll. 36–43, col. 9, ll. 9–26, col. 10, ll. 23–25 (the sum is compared to the sliding maximum interzone bandwidth “to determine whether enough bandwidth is available to proceed with the new call”), Fig. 3 (steps 308, 310, and 312). Erskine repeatedly refers to the bandwidth for the new call as the amount of bandwidth that is “necessary” or “required” to handle the call. See, e.g., id. at col. 1, ll. 43–57 (“an amount of bandwidth necessary to handle the new call”), col. 6, ll. 61–64 (“the additional bandwidth required (of the new call)”), col. 8, ll. 36–40 (“the bandwidth necessary for the new call”), col. 9, ll. 16–21 (“the anticipated additional bandwidth necessary for the new call”), 54–56 (“the bandwidth amount the new call will utilize (if connected)”), col. 10, ll. 21–23 (same), 41–43 (same), col. 12, ll. 1–2 (“an amount of bandwidth necessary to handle the new call”). It is that value—determined prior to the addition and comparison to the sliding maximum interzone bandwidth—that will be used for the new call if it is allowed to “proceed[].” Id. at col. 6, ll. 64–67 (if the sum is less than the sliding maximum interzone bandwidth, the call “proceeds” and “the QoS table is updated with the additional bandwidth used by that call”). Erskine does not describe the transmission bandwidth for the new call as being based on any parameter values for a past network connection, but rather as “whatever bandwidth the system determined is necessary for the additional call.” See Prelim. Resp. 8–9. In other words, the transmission bandwidth needed for a new call is predetermined and independent of whatever the sliding maximum interzone bandwidth is currently. See id.” slip op. at 15

    Claim construction§ 103 obviousnesscites KSR · Graham
    Patents in suitUS 10,944,634
  • PTAB · Jun 13, 2025 · IPR2024-00343 · APJ Charles J Boudreau · IPR · Final written decision

    Claims 1–7 are unpatentable as obvious over Rădulescu2004 and OCP; the Board did not reach the Weber-based grounds.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “include (1) the educational level of the inventor; (2) the type of problems encountered in the art; (3) prior-art solutions to those problems; (4) the rapidity with which innovations are made; (5) the sophistication of the technology; and (6) the educational level of workers active in the field. Envtl. Designs, Ltd. v. Union Oil Co., 713 F.2d 693, 696–97 (Fed. Cir. 1983). Not all factors may exist in every case, and one or more of these or other factors may predominate in a particular case. Id. These factors are not exhaustive, but merely a guide to determining the level of ordinary skill in the art. Daiichi Sankyo Co. v. Apotex, Inc., 501 F.3d 1254, 1256 (Fed. Cir. 2007). Moreover, the prior art itself may reflect an appropriate skill level. Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001).” slip op. at 13

    • Claim Construction › Functional claiming / §112(f) means-plus-function › Whether §112(f) applies (Williamson, nonce words)§112(f) appliesDecided for petitioner

      “35 U.S.C. § 112 ¶ 6 (2006). “[T]he use of the word ‘means’ in a claim element creates a rebuttable presumption that § 112, para. 6 applies.” Williamson v. Citrix Online, LLC, 792 F.3d 1339, 1348 (Fed. Cir. 2015) (en banc in relevant part); Personalized Media Commc’ns, LLC v. Int’l Trade Comm’n, 161 F.3d 696, 703–04 (Fed. Cir. 1998). “[This] presumption may be rebutted if the properly construed claim limitation itself recites sufficiently definite structure to perform the claimed function.” Kemco Sales, Inc. v. Control Papers Co., 208 F.3d 1352, 1361 (Fed. Cir. 2000).” slip op. at 16

    • Claim Construction › Functional claiming / §112(f) means-plus-function › Corresponding structure / algorithm (indefinite if none)Term construed patent owner constructionDecided for patent owner

      “Ex. 1001, 4:46–50. This passage indicates that the interconnect can be a network on a chip and the network on a chip can include wires and buses. That does not necessarily mean that the interconnect can be just wires or buses; rather, it discloses that the interconnect can include wires and buses. In context, the disclosure regarding wires and buses does not support construing the corresponding structure broadly enough to encompass just wires and buses. The networks that constitute the corresponding structure, however, could include networks with wires and buses. Therefore, we agree with Patent Owner that the corresponding structure for the interconnect means should not include a mere bus, switch, and point-to-point wire and instead find that the corresponding structure under 35 U.S.C. § 112 ¶ 6 is a network, which the ’052 patent describes as a multi-hop interconnection between modules separated by one or more network nodes. See Ex. 1001, 2:33–37. Because this structure corresponds to the construction of “interconnect means” proposed by Patent Owner and adopted by the district courts in the TI and Qualcomm litigations (see supra Section III.C.3.b), and we do not rely in our analysis below on a recourse to “equivalents thereto” as permitted by § 112 ¶ 6, we note that our ultimate conclusions on the unpatentability of the challenged claims would be the same if § 112 ¶ 6 did not apply. iii. Conclusion For the reasons stated above, we construe “interconnect means” to cover the structure described in the Specification corresponding to the specified functions of “coupling said plurality of processing modules (M, S)” in the context of claim 6 and “coupling said plurality of processing modules (M, S)” and “enabling a connection-based communication having a set of connection properties” in the context of claims 1 and 7—i.e., a “multi-hop interconnection between modules separated by one or more network nodes”—and equivalents thereof.” slip op. at 28

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “standard as would be used by a district court to construe a claim in a civil action involving the validity or infringement of a patent. 37 C.F.R. § 42.100(b). Under that standard, claim terms are given their ordinary and customary meaning, as would have been understood by a person of ordinary skill in the art at the time of the invention, in light of the language of the claims, the specification, and the prosecution history of record. Id.; Phillips v. AWH Corp., 415 F.3d 1303, 1312–19 (Fed. Cir. 2005) (en banc); Thorner v. Sony Comput. Entm’t Am. LLC, 669 F.3d 1362, 1365–66 (Fed. Cir. 2012). “The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’” Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (quoting Vivid Techs., Inc. v. Am. Sci. Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 15

    Patent outcomesUS 7,594,052 unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 7,594,052
  • PTAB · May 28, 2025 · IPR2025-00301 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution of review for claims 1–11, 16, and 21 under § 314(a), finding the Fintiv factors favored discretionary denial, and denied joinder.

    RulingsInstitution decision
    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Institution denied fintivInstitution denied

      “2026. This date is nearly five months prior to the date on which the final written decision would be due if trial were instituted in this proceeding. And, even if we assume Petitioner’s alleged February–March 2026 trial date, this date too is several months prior to the projected final written decision deadline. As such, it is unlikely that a final written decision in this proceeding would issue before trial in the district court, unless the trial was delayed or rescheduled for a later time. Thus, we find this factor weighs in favor of exercising our discretion to deny institution. See ARM Ltd. v. Daedalus Prime LLC, IPR2025-00207, Paper 10 at 2 (May 16, 2025) (Before the Office of the Under Secretary of Commerce for Intellectual Property and Director of the United States Patent and Trademark Office) (exercising discretion to deny institution with the same relative timing between district court trial and final written decision deadline).” slip op. at 13

    • PTAB / AIA Trials › Motions to amend / substitute claimsNot reached
    • PTAB / AIA Trials › Joinder §315(c) / SAS all-or-nothingJoinder, deniedDenied
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied discretionary otherInstitution denied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). Institution of inter partes review, however, is discretionary. See Harmonic Inc. v. Avid Tech., Inc., 815 F.3d 1356, 1367 (Fed. Cir. 2016) (“[T]he PTO is permitted, but never compelled, to institute an IPR proceeding.”). For the reasons discussed below, we exercise discretion pursuant to 35 U.S.C. § 314(a) not to institute inter partes review. Additionally, for the same reasons and because institution was denied in IPR2024-01248, we deny Petitioner’s Motion for Joinder. See 35 U.S.C. § 315(c) (“[T]he Director . . . may join as a party . . . any person who properly files a petition under section 311 that the Director . . . determines warrants the institution of an inter partes review under section 314.”).” slip op. at 3

    Discretionary denial
    Patents in suitUS 9,814,071
  • PTAB · May 23, 2025 · IPR2025-00050 · APJ Iftikhar Ahmed · IPR · Institution

    Instituted IPR of claims 1–3 and 5 on all asserted grounds; the Board found a reasonable likelihood of prevailing on obviousness over Walker.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “Pursuant to 35 U.S.C. § 314(a), an inter partes review may not be instituted “unless . . . there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” For the reasons that follow, we determine that Petitioner has demonstrated a reasonable likelihood of prevailing in demonstrating the unpatentability of claims 1–3 and 5. Accordingly, we institute an inter partes review of those claims. We do not address claims 4 and 6–13 because Patent Owner disclaimed those claims. See Exs. 2001, 2008; Prelim. Resp. 30; Supp. Prelim. Resp. 3.” slip op. at 2

    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Denied

      “Jury trial in the Related Litigation is currently scheduled to begin on June 22, 2026. Ex. 1008, 16. The statutory deadline for issuing a Final Written Decision predates the trial by approximately one month. Patent Owner argues that Petitioner was not diligent in filing the Petition, and this factor favors discretionary denial. Supp. Prelim. Resp. 2. Petitioner argues that Factor 2 favors institution because that Final Written Decision date precedes the scheduled trial date and also because based on the median time to trial for Judge Noreika, the judge presiding over the Related Litigation, the anticipated trial date would be in December 2026. Pet. Supp. Resp. 2. Petitioner also points out that even based on the median time to trial in the District of Delaware, the trial in the Related Litigation would occur in October 2026. Id.; Pet. 72. We agree with Petitioner that based on median time-to-trial statistics for the District of Delaware and for Judge Noreika, the Final Written Decision in this proceeding would issue a few months before the anticipated trial date and a month before the currently scheduled trial date. Exs. 1007, 1012. This factor therefore weighs against exercising our discretion to deny institution.5” slip op. at 9

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successInstituted

      “Walker discloses that during normal television viewing, a broadcast program is provided to and displayed on an interactive television system and a streaming version of the broadcast program is provided to a television distribution facility in advance of the broadcast. Ex. 1005 ¶ 10. Walker explains that if a user requests a playback control function, the interactive television system may switch from displaying the broadcast television program to the streaming version of the program. Id. When switching, the system may switch to displaying the streaming version of the program at the same point in time in the program that the user was viewing in the broadcast program. Id.” slip op. at 17

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “B. Claim Construction Only those claim terms that are in controversy need to be construed, and only to the extent necessary to resolve the controversy. Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017). Petitioner contends that “[b]ecause the asserted prior art discloses embodiments within the indisputable scope of the claims, the Board need not construe the outer bounds of the claims.” Pet. 3. Petitioner lists several terms and proffers its position on the plain and ordinary meaning of those terms. Id. at 4–6. Patent Owner does not challenge Petitioner’s claim construction positions. Prelim. Resp. 5. For purposes of this Decision, we determine that no term requires express construction.” slip op. at 16

    Claim construction§ 103 obviousnessDiscretionary denialcites Graham
    Patents in suitUS 10,880,592
  • PTAB · Feb 13, 2025 · IPR2024-00978 · APJ Bart A Gerstenblith · IPR · Institution

    The Board instituted IPR on claims 1–17 on all petition grounds, finding a reasonable likelihood that Dolan renders at least one challenged claim obvious.

    RulingsInstitution decision
    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Denied

      “letter stipulating that if the Board institutes this IPR petition on the grounds presented therein, then Samsung will not pursue in the above-captioned litigation any grounds that were raised or reasonably could have been raised in the IPR. For the sake of clarity, this stipulation does not extend to co-petitioner Google, which is not a party to the above-referenced litigation.” slip op. at 7

    • PTAB / AIA Trials › Real party in interest / privityNot reached

      “Electronics, America, Inc.; and Google LLC as real parties in interest. Pet. 61. Petitioner explains that “Google LLC is a subsidiary of XXVI Holdings Inc., which is a subsidiary of Alphabet Inc.” Id. at 61 n.10. Petitioner asserts that “XXVI Holdings Inc. and Alphabet Inc. are not real parties-in-interest to this proceeding.” Id. Patent Owner identifies Cerence Operating Co. and Cerence, Inc. as real parties in interest. Paper 5, 1. Patent Owner disagrees with Petitioner, contending Alphabet Inc. is also a real party in interest. Id. At this stage of the proceeding, we need not determine whether Alphabet Inc. is a real party in interest to Petitioner since neither Petitioner nor Patent Owner has identified any effect that determination would have on the outcome of this proceeding. To the extent Patent Owner seeks to maintain this contention, it should raise the issue in its Patent Owner response.” slip op. at 3

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Patent Owner does not currently take a position on the relevant level of ordinary skill in the art, but believes that “the Board could assume Petitioner’s proposed level of ordinary skill for purposes of deciding whether to institute.” Prelim. Resp. 3. At this stage of the proceeding and on the present record, we adopt Petitioner’s uncontested, proposed level of ordinary skill in the art, which we find consistent with the level of ordinary skill in the art reflected by the ’078 patent and the prior art of record. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978).” slip op. at 10

    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “An inter partes review may be instituted only if “the information presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). For the reasons given below, on this record, Petitioner has established a reasonable likelihood that it would prevail in showing the unpatentability of at least one of the Challenged Claims. Accordingly, we institute an inter partes review of the Challenged Claims on all grounds raised in the Petition.” slip op. at 2

    § 103 obviousnessDiscretionary denialcites Phillips · KSR · Graham
    Patents in suitUS 7,395,078
  • PTAB · Jan 31, 2025 · IPR2024-01267 · APJ Lisa A Murray · IPR · Institution

    The Board instituted IPR on claims 1–3, 7–9, 12, and 13 on all petitioned grounds, finding a reasonable likelihood that claim 1 is obvious over Arai and Fenwick.

    RulingsInstitution decision
    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Denied

      “the PTAB will not discretionarily deny institution of an IPR . . . in view of parallel district court litigation where a petitioner stipulates not to pursue in a parallel district court proceeding the same grounds as in the petition or any grounds that could have reasonably been raised in the petition. Petitioner’s stipulation in Exhibit 1020 satisfies the language from the Director’s Memorandum quoted above. Therefore, we need not analyze each Fintiv factor before determining that we will not exercise our discretion to deny institution in view of the parallel Eastern District of Texas Litigation. In light of Petitioner’s stipulation, Patent Owner’s request is denied.” slip op. at 6

    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “any evidence of objective indicia of nonobviousness. We conclude that on balance, considering the record presently before us, Petitioner has established a reasonable likelihood of showing that the differences between the subject matter of claim 1 and the teachings of Arai and Fenwick are such that the subject matter, as a whole, would have been obvious at the time of the invention to a person having ordinary skill in the art. e. Summary as to Claim 1 For the reasons discussed above, on the present record we find that Petitioner has established a reasonable likelihood that it would prevail in showing that the combination of Arai and Fenwick teaches or suggests each element of claim 1 of the ’428 patent. See 35 U.S.C. § 314(a).” slip op. at 27

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “At this stage of the proceeding and on the present record, we adopt Petitioner’s uncontested, proposed level of ordinary skill in the art, which we find consistent with the level of ordinary skill in the art reflected by the ’428 patent and the prior art of record. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978).” slip op. at 9

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundInstituted

      “Relying on the Declaration of Jean Renard Ward, Petitioner contends that “[a] POSITA would have been motivated to incorporate[] Fenwick’s teachings regarding automatically sending recognized words to an application into Arai because this would have furthered Arai’s purpose of having a natural, uninterrupted flow in entering characters without having to press extra keys.” Pet. 31–32 (citing Ex. 1002 ¶ 139). Petitioner concludes that the combination would have been obvious in that it would apply Fenwick’s known technique for recognizing words without additional user confirmation to Arai’s known method of performing handwriting recognition, ready for improvement, to yield the predictable result of the Arai/Fenwick combination: “recognition results are sent to an application without further user confirmation—e.g., pressing the Enter Key—and handwritten character recognition results are removed from the temporary memory such as RAM when the recognition results are sent to the application.” Id. at 32 (citing Ex. 1002 ¶ 140).” slip op. at 18

    § 103 obviousnessDiscretionary denialcites Phillips · KSR · Graham
    Patents in suitUS 9,026,428
Page 1 of 14
← Previous12345…Next →

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.