  • PTAB · Nov 22, 2024 · IPR2024-00827 · APJ Thomas L Giannetti · IPR · Institution

    Institution was denied because Petitioner did not show a reasonable likelihood of proving claims 1, 2, 15, or 22 unpatentable on any asserted obviousness ground.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “To institute an inter partes review, we must determine “that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2018). For the reasons stated below, we determine that Petitioner has not established a reasonable likelihood that it would prevail with respect to any claim challenged in the Petition. We, therefore, deny institution of inter partes review.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “alleged invention “would have had a bachelor’s degree in electrical engineering, computer engineering, computer science, or a related field, and at least two years of experience in the research, design, development, and/or testing of GPS and related location tracking techniques, or the equivalent, with additional education substituting for experience and vice versa.” Pet. 6 (citing Andrews Decl. ¶ 25). At this stage, Patent Owner does not dispute this contention. Prelim. Resp. 5. For the purpose of determining institution, we adopt Petitioner’s definition of a person of ordinary skill in the art because it is consistent with the level of skill reflected by the ’918 patent specification and the asserted prior art.” slip op. at 20

    • Claim Construction › Functional claiming / §112(f) means-plus-function › Whether §112(f) applies (Williamson, nonce words)§112(f) appliesDecided for petitioner

      “means.” See Ex. 1001, 11:60–12:4, 12:6–8, 15:30–37. The use of the word “means” in a claim element creates a rebuttable presumption that 35 U.S.C. § 112 ¶ 63 applies. See Williamson v. Citrix Online, LLC, 792 F.3d 1339, 1348 (Fed. Cir. 2015) (en banc in relevant part). 3 Section 4(c) of the AIA re-designated 35 U.S.C. § 112, sixth paragraph, as 35 U.S.C. § 112(f). Because the ’918 patent has a filing date before the We must first identify the claimed function. Then, we must determine what structure, if any, disclosed in the specification corresponds to the claimed function. Id. at 1351 (citation omitted). The parties do not dispute that 35 U.S.C. § 112 ¶ 6 applies to those “means” elements recited in claims 1, 2, and 22. See Pet. 7–12; Prelim. Resp. 9–21. slip op. at 10

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction needed

      “Having reviewed Patent Owner’s position on claim limitation 1[C], we determine that we do not need to expressly construe this claim term to effective date of the relevant amendment, we refer to the pre-AIA version of § 112. Owner acknowledges that the asserted network “includes control units programmed to obtain the locations of the offender and victim devices,” and does not base its arguments on the construction of this limitation. Id. at 42.” slip op. at 11

    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 6,756,918
  • PTAB · Nov 22, 2024 · IPR2024-00826 · APJ Thomas L Giannetti · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood of proving any challenged claim unpatentable on the asserted obviousness grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “To institute an inter partes review, we must determine “that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2018). For the reasons stated below, we determine that Petitioner has not established a reasonable likelihood that it would prevail with respect to any claim challenged in the Petition. We, therefore, deny institution of inter partes review.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “alleged invention “would have had a bachelor’s degree in electrical engineering, computer engineering, computer science, or a related field, and at least two years of experience in the research, design, development, and/or testing of GPS and related location tracking techniques, or the equivalent, with additional education substituting for experience and vice versa.” Pet. 8 (citing Andrews Decl. ¶¶ 25–26). Patent Owner does not dispute this contention or offer an alternative formulation. See Prelim. Resp. 6. For the purpose of institution, we adopt Petitioner’s definition of a person of ordinary skill in the art because it is consistent with the level of skill reflected by the ’752 patent specification and the asserted prior art.” slip op. at 19

    • Claim Construction › Functional claiming / §112(f) means-plus-function › Whether §112(f) applies (Williamson, nonce words)§112(f) appliesDecided for petitioner

      “1. Means-Plus-Function Terms Challenged claims 14 and 15 recite elements using the word “means.” See Ex. 1001, 13:6–18, 13:20–22. The use of the word “means” in a claim ’752 patent has a filing date prior to the effective date of the applicable AIA amendment, we refer to the pre-AIA version of §103. See Williamson v. Citrix Online, LLC, 792 F.3d 1339, 1348 (Fed. Cir. 2015) (en banc in relevant part). Construing a means-plus-function claim term is a two-step process. We must first identify the claimed function. Then, we must determine what structure, if any, disclosed in the specification corresponds to the claimed function. Id. at 1351 (citation omitted). The parties do not dispute that 35 U.S.C. § 112 ¶ 6 applies to those “means” elements recited in claims 14 and 15. See Pet. 8–12; Prelim. Resp. 11–19.” slip op. at 10

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)Term construed patent owner constructionDecided for patent owner

      “geographic region.” The ’752 patent describes polling specific sub-regions of the network for a PRU. Ex. 1001, 2:12–15, 7:22–34. As Mr. McAlexander testifies, “[a] PRU may choose to instruct the network to relay certain information to mobile units in a specific geographic region. That information would then be appended to the geographic boundary information and beamed in the specified geographic region.” McAlexander Decl. ¶ 49 (quoting Ex. 1001, 10:19–23) (alteration in original). For example, a nearby boundary can be polled for the locations of nearby wireless customers within proximity of a distressed wireless customer. As described in the ’752 patent, a distressed mobile user M1 may need to find where another party might exist in that geographic region. The user could initiate a page from their PRU for the closest available PRUs that could be found in that geographic jurisdiction. Looking at FIG. 3, mobile user M1 will provide its location, latitude and longitude (x0,y0) to the closest available ground station serving area C1 or grid G1. As stated earlier, appropriate terrestrial technology will be scattered in that region to serve the PRUs in that area as shown in FIG. 1. Once a ground station picks up this signal, it sends a page for all location reporting devices in the specified boundary surrounding mobile unit M1, FIG. 3 to disclose their location. Ex. 1001, 7:22–34 (emphasis added). slip op. at 18

    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 6,441,752
  • PTAB · Nov 15, 2024 · IPR2024-00851 · APJ Eric C Jeschke · IPR · Institution

    The Board denied institution on all claims 1–7 because the Petition did not show a reasonable likelihood of prevailing on any challenged ground.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “review. See 35 U.S.C. § 314 (2018); 37 C.F.R. § 42.4(a) (2023) (“The Board institutes the trial on behalf of the Director.”). Inter partes review may not be instituted “unless . . . the information presented in the petition . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314. Upon consideration of the evidence and arguments in the record, for the reasons below, we determine that the information presented does not show a reasonable likelihood that Petitioner would prevail with respect to at least one of challenged claims 1–7. We thus deny institution of inter partes review. See 37 C.F.R. § 42.108(b) (“At any” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “we view the prior art and the claimed invention. Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001). The person of ordinary skill in the art is a hypothetical person presumed to have known the relevant prior art. In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995). In determining the level of ordinary skill in the art, we may consider certain factors, including the “type of problems encountered in the art; prior art solutions to those problems; rapidity with which innovations are made; sophistication of the technology; and educational level of active workers in the field.” Id. (internal quotation marks and citation omitted).” slip op. at 10

    • Claim Construction › Functional claiming / §112(f) means-plus-function › Whether §112(f) applies (Williamson, nonce words)§112(f) appliesDecided for patent owner

      “claim element creates a rebuttable presumption that § 112[(f)] applies” and that “the failure to use the word ‘means’ also creates a rebuttable presumption—this time that § 112[(f)] does not apply.”12 Williamson v. Citrix Online, LLC, 792 F.3d 1339, 1348 (Fed. Cir. 2015) (en banc in relevant part) (internal citations omitted). Because the “sealing means” limitation includes the word “means,” we start from the rebuttable presumption that § 112(f) applies. Petitioner does not address the applicability of § 112(f) and does not rebut the presumption. We continue the analysis, however, and, for the reasons below, we agree with Patent Owner that § 112(f) applies to the “sealing means” limitation.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “3. “fits behind” In wherein clause (vi), claim 1 recites: “the outwardly pointing outer flange of the first connecting device fits behind the inner flange of the nut unit.” Ex. 1001, 9:4–5 (emphasis added). In the Preliminary Response, Patent Owner discusses the term “fits behind” in this claim language. See Prelim. Resp. 41–45. We need not construe explicitly this language or any other claim terms because doing so would not change the outcome of the analysis. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)).” slip op. at 14

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · Graham
    Patents in suitUS 9,851,030
  • PTAB · Nov 14, 2024 · PGR2024-00026 · APJ Hyun J Jung · PGR · Institution

    Instituted PGR on claims 1–7 and all grounds because Petitioner showed it was more likely than not that at least one challenged claim lacks written-description support.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “At this stage, Petitioner’s arguments, cited portions of the Specification, and supporting testimonial evidence demonstrate that it is more likely than not that claims 1–7 are unpatentable.” slip op. at 20

    • Disclosure Requirements (§112) › Written description (Ariad)Written description inadequateDecided for petitioner

      “patent describes that “angular position transducer 78 is placed on top of swing leg pivot shaft 24” and that “pivot shaft 24 is rotationally fixed to the connector plate and duplicates the angular movements of swing leg 20 about the pivot shaft.” Ex. 1001, 12:15–16, 12:20–22, Figs. 5, 7. The ’723 patent also describes that “[a]ngular position transducer 78 is mounted inside . . . protective can 90 . . . which is bolted to hinge bracket 28 via an upright holding arm 92” and that “trigger pin 94 projects upwardly from the top surface of pivot shaft 24 and cooperates with angular position transducer 78 to generate an angular position signal.” Id. at 12:28–33, Fig. 5. These descriptions expressly convey that angular position transducer 78 is on pivot shaft 24 and mounted inside protective can 90 that is bolted to hinge bracket 28. Id. at 12:15–16, 12:20–22, 12:28–30, Figs. 5, 7; see also Prelim. Resp. 17 (describing the same embodiment shown in Figs. 5 and 7). According to Petitioner, the ’723 patent describes the pivot shaft as part of the hinge bracket, not the modular frame or swing leg. Pet. 109–110 (citing Ex. 1001, 7:42–46, 12:17–22). On the preliminary record, we agree because the cited portions of the Specification describe that a “hinge bracket is interposed between each swing leg and an associated surface of the bolsters and includes a fixed, upright pivot shaft that pivotally engages the swing leg for pivotal movements” and “pivot shaft 24 is rotationally fixed to the connector plate.” Ex. 1001, 7:42–45, 12:20–21. We also agree that “even if one were to find that the hinge bracket is part of either the modular frame or swing leg (contrary to the claims and specification treating these all as separate components), the specification would only provide written description for one of the claimed alternatives.” Pet. 110 (citing Ex. 1002 ¶ 199).” slip op. at 19

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “At this preliminary stage, we determine that express claim interpretation is not necessary to determine whether it is more likely than not that at least one of the claims challenged in the petition is unpatentable. Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms that . . . are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)).” slip op. at 16

    • PTAB / AIA Trials › Discretionary denial › §325(d) same art / argumentsDecided for petitioner

      “We will also not use our discretion under § 325(d) to deny the Petition based on arguments previously presented in IPR2021-00135, because Petitioner relies on a Board determination regarding claim 8 from IPR2021- 00136, not arguments previously made for claim 1 in IPR2021-00135. Pet. 111–115, 119; Prelim. Resp. 8–9; Prelim. Sur-reply 5. Furthermore, we determined the effective filing date of claim 8 of the ’571 patent without deciding, that other challenged claims, such as claim 1, were entitled to their earliest possible effective filing date. See Godberson-Smith, Paper 61 at 11, 12.” slip op. at 12

    Claim construction§ 112 disclosureDiscretionary denialcites Phillips · KSR · Graham
    Patents in suitUS 11,772,723
  • PTAB · Nov 14, 2024 · IPR2024-00835 · APJ Hyun J Jung · IPR · Institution

    The Board instituted IPR of claims 1–8 on all asserted grounds, finding a reasonable likelihood that claim 1 would be unpatentable over CIII and Rio.

    RulingsInstitution decision
    • PTAB / AIA Trials › Discretionary denial › §325(d) same art / argumentsDecided for petitioner

      “Advanced Bionics stated that: If, after review of factors (a), (b), and (d), it is determined that the same or substantially the same art or arguments previously were presented to the Office, then factors (c), (e), and (f) relate to whether the petitioner has demonstrated a material error by the Office. Factor (c) focuses on the record developed by the Office in previously reviewing the art or arguments. It informs, therefore, the petitioner’s showing under factors (e) and (f), which focus on the petitioner’s evidence of previous Office error regardless of the context in which the same or substantially the same art or arguments were previously presented. For example, if the record of the Office’s previous consideration of the art is not well developed or silent, then a petitioner may show the Office erred by overlooking something persuasive under factors (e) and (f). On the other hand, if the alleged error is a disagreement with a specific finding of record by the Office, then ordinarily the petitioner’s required showing of material error must overcome persuasively that specific finding of record. That is, although Becton, Dickinson factor (c) evaluates “the extent to which the asserted art was evaluated during examination, including whether the prior art was the basis for rejection,” the focus should be on the record when determining whether the Office erred in evaluating such art or arguments.” slip op. at 10

    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “d) Petitioner Shows a Reasonable Likelihood of Prevailing Based on the preliminary record, Petitioner shows a reasonable likelihood of prevailing in its challenge that CIII and Rio teach, suggest, or would have been understood to disclose the limitations of claim 1 and that one of ordinary skill in the art would have combined the references in the manner asserted with a reasonable expectation of success.” slip op. at 28

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundInstituted

      “track” that “is configured to rotate . . . relative to the jacking column,” Petitioner proposes modifying CIII in view of Rio “by positioning Rio’s rotary actuator 44 between the jacking column and crawler track, and using that rotary actuator to rotate CIII’s crawler track relative to the entire jacking column, rather than just its outer cylinder.” Pet. 45 (citing Ex. 1002 ¶ 89) (emphasis added); see also id. at 47 (citing Ex. 1002 ¶ 92; Ex. 1006, 5:8–11, 6:2–6). Petitioner argues such a modification would have been a design choice, one of a finite number of alternatives, obvious to try, and a known design that provides maneuverability. Id. at 29–31 (citing Ex. 1002 ¶¶ 61–67; Ex. 1006, 5:8–11; Ex. 1007, 5:14–59, Figs. 4–5; Ex. 1008, 7:35– 53, Figs. 7, 20; Ex. 1009 ¶¶ 5, 19–20, Fig. 2; Ex. 1011, 4:7–16, Fig. 3; Ex. 1013 ¶¶ 41, 44–45). At this stage, Petitioner’s arguments and cited evidence sufficiently support for institution that the modification would have been made so that the proposed combination would have had “a crawler track” that “is configured to rotate . . . relative to the jacking column.” Regarding claim 1’s “slew drive,” as discussed above, Petitioner proposes modifying CIII so that rotary actuator 44, the asserted slew drive, would be between the jacking column and crawler track. See Pet. 29–31. Petitioner also argues that, in the proposed combination, “actuating the rotary actuator causes the crawler track to rotate relative to the entire jacking column.” Id. at 47 (citing Ex. 1002 ¶ 92). The present record supports Petitioner’s argument that Rio’s worm gear actuator would have been understood to disclose a slew drive with support from the ’318 patent itself, the opinion of its declarant, and deposition testimony of Patent Owner’s expert in related litigation. Id. at 46–47 (citing Ex. 1001, 11:40–61; Ex. 1002 ¶ 91; Ex. 1006, 4:61–5:3; Ex. 1032, 84:12–86:17). At this stage, the cited evidence sufficiently supports for purposes of institution Petitioner’s argument that the proposed combination would have included the recited “slew drive.”” slip op. at 28

    • Skill levelSkill level petitioner adoptedOther

      “had at least a four-year degree in mechanical engineering or a closely related field and at least two years of experience designing, developing, or operating heavy machinery, including their components and control systems.” Pet. 8– 9 (citing Ex. 1002 ¶¶ 22–24). Petitioner also argues that “[a]dditional experience could substitute for a formal degree, and an advanced degree could substitute for experience.” Id. at 9 (citing Ex. 1002 ¶¶ 22–25). Petitioner states that “[t]he Board adopted this definition of the level of ordinary skill for the related ’749 patent.” Id. (citing Godberson-Smith Const. Co. v. Guntert & Zimmerman Const. Div., Inc., IPR2020-01698, Paper 80, 21–24 (PTAB Apr. 12, 2022) (Final Written Decision)). For purposes of its Preliminary Response, Patent Owner applies Petitioner’s proposed level of ordinary skill in the art. Prelim. Resp. 13 (quoting Pet. 8–9). Based on the preliminary record, we adopt Petitioner’s asserted level of ordinary skill to determine whether there is a reasonable likelihood that Petitioner would prevail with respect to at least one of the claims challenged in the Petition. Pet. 8–9; Godberson-Smith, Paper 80 at 21–24 (determining level of ordinary skill after considering the parties’ competing proposals and evidence).” slip op. at 13

    Claim construction§ 103 obviousnessDiscretionary denialcites Phillips · KSR · Graham
    Patents in suitUS 11,535,318
  • PTAB · Nov 12, 2024 · IPR2024-00744 · APJ Patrick R Scanlon · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood of prevailing on any challenged claim under the asserted obviousness grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “We have authority to determine whether to institute an inter partes review. See 35 U.S.C. § 314 (2018); 37 C.F.R. § 42.4(a) (2023). To institute an inter partes review, we must determine that the information presented in the Petition shows “a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). For the reasons set forth below, we determine that Petitioner has not demonstrated a reasonable likelihood that it would prevail with respect to at least one challenged claim. Accordingly, we do not institute an inter partes review of the challenged claims on the grounds set forth in the Petition.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Petitioner contends that a person having ordinary skill in the art (“POSA”) “would have a bachelor’s degree in electrical engineering and at least one year of experience in sensor/detector design or RF communications (RFIDs)” and “would have a working knowledge of tire pressure management systems and, as most POSA would also be automobile owners, would have had personal experience with tire pressure management systems which have been required in all new cars, trucks, and SUVs in the United States since 2007.” Pet. 17. Petitioner adds that “[e]ducation may substitute for experience and vice versa.” Id.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Petitioner contends that all claim terms should be given their ordinary and customary meaning. Pet. 17. Petitioner notes that, in the tire pressure detecting field, terms such as “detector,” “sensor,” and “monitor” relate to the same device and can be used interchangeably. Id. at 17–18. Patent Owner contends that no claim term needs construction to resolve the grounds asserted in the Petition. Prelim. Resp. 16. On the present record, we do not discern a need to construe explicitly any claim language because doing so would have no effect on our analyses below of Petitioner’s asserted grounds and will not assist in resolving the” slip op. at 13

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation not foundNot shown unpatentable

      “We agree with Patent Owner that Petitioner’s unsupported assertion that tire pressure sensors typically are programmed with only the ID as part of the factory installation is insufficient to establish obviousness in this instance. Petitioner does not provide adequate reasoning or evidence to 11 Petitioner relies on the same analysis of this claim 26 limitation for the substantially similar limitation of claim 27. Pet. 66. Accordingly, our analysis of the claim 26 limitation applies equally to the corresponding limitation of claim 27. art would have known that tire pressure sensors typically are programmed at the factory with a single ID. Furthermore, even if assuming for the sake of argument that Petitioner’s assertion is correct, the Petition fails to explain adequately how or why one of ordinary skill in the art would have modified the combination of Tang and Lemense to store only the old identification in the old tire pressure detector.” slip op. at 20

    Claim construction§ 103 obviousnessDiscretionary denialcites Graham
    Patents in suitUS 8,031,064
  • PTAB · Oct 23, 2024 · IPR2024-00823 · APJ Carl W Whitehead Jr · IPR · Institution

    Instituted IPR on claims 1–8 and 13–22 over Bigbee and Nguyen, finding a reasonable likelihood of obviousness, and granted Valeo’s motion to join IPR2023-01373.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “Having considered the arguments presented in the Petition, the Preliminary Response, and the evidence of record, we determine that Petitioner has demonstrated a reasonable likelihood of success in proving that at least one claim of the ’958 patent is unpatentable as obvious over the combination of Bigbee and Nguyen. Accordingly, we institute an inter partes review of all challenged claims (i.e., claims 1–8 and 13–22) on all grounds set forth in the Petition. Our determinations at this stage of the proceeding are based on the evidentiary record currently before us. This decision to institute trial is not a final decision as to the patentability of any claim for which we have instituted an inter partes review. See TriVascular, Inc. v. Samuels, 812 F.3d 1056, 1068 (Fed. Cir. 2016) (noting that “there is a significant difference between a Petitioner’s burden to establish a ‘reasonable likelihood of” slip op. at 12

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Patent Owner asserts: A person of ordinary skill in the art of the subject matter of the ’958 patent would have the equivalent of a bachelor’s degree in Computer Science, Computer Engineering (or a related field) and approximately two years of work experience with computer architecture design. Additional education in the field could be substituted for industry experience, and vice versa. See Prelim. Resp. 3. The parties’ positions appear to be more or less the same. Based on the current record, we adopt Petitioner’s proposed level of ordinary skill in the art for purposes of this Decision, as it is consistent with the level of ordinary skill in the art reflected by the prior art of record. We note that our Decision would be the same under either party’s proposed construction.” slip op. at 9

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededDecided for patent owner

      “At this stage of the proceeding, only terms that are in controversy need to be construed, and then only to the extent necessary to determine whether to institute inter partes review. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F. 3d 795, 803 (Fed. Cir. 1999))). After reviewing the parties’ evidence and contentions, we do not observe a dispute over the meaning of these terms that is necessary to resolve at this stage. Accordingly, we determine that we do not need to expressly construe any term for purposes of this Decision.” slip op. at 10

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundInstituted

      “Based on our review and consideration of the current record, we determine that Petitioner has sufficiently shown that the combination of Bigbee and Nguyen teaches the recited elements of limitation 19a for purposes of institution and has provided reasons sufficiently supported by factual underpinnings to combine the references with a reasonable expectation of success. Nguyen discloses, “[t]he present invention addresses mechanisms for combining recoverable and non-recoverable error handling mechanisms efficiently in FRC-enabled processors.” Ex. 1006 ¶ 9. Subsequently, Nguyen distinguishes recoverable from non-recoverable errors by treating non-recoverable errors differently from recoverable errors. Nguyen discloses, “If an error reaches error detector 140 from either core 120, recovery module 150 is activated to implement a recovery routine. Recovery can be implemented with relatively low latency by hardware, software, firmware or some combination of these.” Id. ¶ 22, Fig. 1. “However, an FRC error will be triggered if the corrupted data from one execution core and an uncorrupted version of the data from the other execution are allowed to reach FRC checker 130 before recovery module 150 is activated.” Id. Nguyen recognizes, “[s]ince FRC errors are not recoverable, reset module 160 resets the system, if FRC checker 130 signals an FRC error before the underlying parity/ECC error is detected.” Id. Nguyen further recognizes that, “[n]ot all FRC-errors are traceable to underlying parity/ECC or other correctible soft errors. For those that are, it is faster for error detector 140 to address the under lying soft error than for FRC-checker to address the FRC error that results when the corrupted data reaches FRC boundary 104.” Id. ¶ 23 (emphasis added). In this instance instead of the FRC-error being processed by the FRC checker 130 and the Reset module 160, the FRC error is directed to the Error detector 140 and eventually recovery module 150. See id. at Fig. 1. Nguyen also discloses, “the recovery routine triggered by error detector 140 provides greater system availability than the reset routine triggered by FRC checker 130” and “[e]xpanding the FRC boundary thus increases both the amount of logic that is duplicated for execution cores 120 and the flight time, during which detectable errors may be identified.” Id. ¶ 30, Fig 1; see Pet. 37. Nguyen further discloses, “[t]he former increases FRC protection, albeit through a reset mechanism” as shown in Figure 1, elements FRC Checker 130 and Reset Module 160. Ex. 1006 ¶ 30. “The latter increases the likelihood that errors identifiable through parity, ECC [error correction code] or similar core-specific protections are handled through recovery rather than reset” as shown in Figure 1, elements Error Detector, 140 and Recovery Module 150. Id. Additionally, Nguyen’s Figure 7, as discussed above, “is a block” slip op. at 33

    Claim construction§ 103 obviousnesscites KSR · Graham
    Patents in suitUS 7,502,958
  • PTAB · Oct 16, 2024 · IPR2023-00697 · APJ Barbara A Benoit · IPR · Final written decision

    Claims 1, 3, 4, and 8 were not proven unpatentable: Rauhala does not disclose the required simultaneous signal-strength determinations, and Masaaki does not cure the deficiency for claim 4.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Following institution, Patent Owner maintained the same level of ordinary skill proposed in its preliminary response and did not address our discussion of the level of ordinary skill in the art in the Institution Decision. PO Resp. 24–25; see also Prelim. Resp. 24. For the reasons discussed in the Institution Decision, we adopt and apply for this Decision the level of ordinary skill articulated by Petitioner and used previously in our Institution Decision. See Dec. 8–10. In light of our review of the complete record, we find that this formulation is consistent with the ’825 patent, the prior art of record, and is supported by the testimony of Dr. Baker. See Ex. 1002 ¶¶ 27– 31. Our decision would not change, however, if we had applied Patent Owner’s proposed level of ordinary skill.” slip op. at 12

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner

      “We agree with Patent Owner that the desired signal and interferer signal must be received at the same time. The plain language of the claim requires the wireless transceiver to “receiv[e] a wireless signal having a desired signal and an interferer signal,” the determining of a signal strength of the interferer signal and the determining of a signal strength of the desired signal must be performed at the same time; otherwise, the determinations of signal strengths would not be of the same wireless signal. The specification supports this understanding. “When a receiver is actively receiving a desired signal, each block in the signal path has at its input the desired signal as well as noise and possibly interfering signals.” Ex. 1001, 5:20–22; see also id. at 5:31–33 (“FIGS. 2A and 2B illustrate examples of desired signals, interferers, and noise that may be received by one of the various circuits in a” slip op. at 21

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “We agree with Patent Owner that Rauhala does not state that the signal strengths are measured simultaneously or at the same time. Indeed, as discussed above, Rauhala indicates unequivocally in the same paragraph the opposite—that detector DET provides to control unit 42 “an indication about either the receive channel signal strength RSS or the strength of any signal on the reception band.” Ex. 1004 ¶ 17. Rauhala describes that “control unit 42 provides two one-bit control signals cA and cM” based on indications received from detector DET. Id. Importantly, Rauhala indicates that “at the same time as” describes how the control unit 42 uses the received inputs RSS and RSSn shown in Figure 4, which are described earlier in paragraph 17 as indications of either RSS or RSSn from detector DET. Id. (“Signal cA is 0 when signal RSS is greater than S4 and signal RSSn is at the 11 Dr. Baker’s reply declaration correctly quotes Rauhala paragraph 17 but cites to paragraph 18. We deem this harmless error. same time smaller than Sn. . . . Signal cM is 1 when signal RSS is not greater than S4 and signal RSSn is at the same time at least Sn. Otherwise, signal cM is 0.”). The burden remains on Petitioner to demonstrate by a preponderance of the evidence that Rauhala discloses the disputed limitations as arranged or combined in the claim. Petitioner does not persuasively reconcile these “either/or” statements regarding the functioning of detector DET with the “at the same time as” statements regarding control signals output by control unit 42 in paragraph 17. We do not find persuasive Petitioner counsel’s position expressed at the hearing that Rauhala’s “either/or” statements are “simply an imprecise description” (Tr. 16:22–24). We do not see a lack of precision in Rauhala’s “either/or” statements.” slip op. at 30

    • Expert testimonyPetitioner expert discountedPatent owner expert creditedDecided for patent owner

      “When asked at his deposition to explain Rauhala’s use of the word “or” regarding the functioning of detector DET, Dr. Baker asserted that “[detectors] can be designed to determine RSS or RSSn.” Ex. 2016, 85:5– 12. We find Dr. Baker’s testimony that “it’s reasonable that if you can design . . . the detector to detect one or the other, you can also design it to detect both” to be without factual support. Id. at 85:13–16. He points to no textbook or other independent evidence to support that would have led one of ordinary skill to design such a detector or to support that one of ordinary skill would have understood Rauhala’s detector to be so designed. Furthermore, Dr. Baker recognizes that “Rauhala doesn’t teach the details of what’s in the detector.” Id. at 91:6–7. We give little weight to Dr. Baker’s unsupported testimony that one could design a detector to detect both RSS and RSSn from the same wireless signal. See 37 C.F.R. 42.65(a) (“Expert testimony that does not disclose the underlying facts or data on which the opinion is based is entitled to little or no weight.”); see also Xerox Corp. v. Bytemark, Inc., No. IPR2022-00624, 2022 WL 3648989, at *6 (PTAB 2022) (precedential) (Director affirming because “the cited declaration testimony is conclusory and unsupported, adds little to the conclusory assertion for which it is offered to support, and is entitled to little weight”).” slip op. at 31

    Patent outcomesUS 10,129,825 not shown unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 10,129,825
  • PTAB · Oct 16, 2024 · IPR2023-00698 · APJ Thomas L Giannetti · IPR · Final written decision

    Claims 7–11, 13, and 19–21 were not shown unpatentable because Rauhala does not disclose simultaneous desired and interferer signal-strength determinations, defeating anticipation and the obviousness combination.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “The two proposals are materially similar in the education requirement, but differ marginally in professional experience required (three versus five years). See supra. While we were persuaded, on the preliminary record, that both Petitioner’s and Patent Owner’s proposals were consistent with the problems and solutions in the ’202 patent and the prior art of record, on balance, we determined that Petitioner’s proposal was a better reflection of the level of skill in the prior art, and we therefore adopted it for our Institution Decision. See Institution Dec. 12–13. For this Decision, we adopt the description of the person of ordinary skill articulated by Petitioner and used previously in our Institution Decision. In light of our review of the complete record, we find that this formulation is consistent with the ’202 patent, the prior art of record, and is supported by the testimony of Dr. Baker. See Baker I Decl. ¶¶ 28–32. Our Decision would not change, however, if we had applied Patent Owner’s proposed level of ordinary skill.” slip op. at 12

    • Expert testimonyPetitioner expert discountedDecided for patent owner

      “85:13–16. He admits that “Rauhala doesn’t teach the details of what’s in the detector.” Id. at 91:6–7. He points to no textbook or other independent evidence that would have led a person of ordinary skill to design such a detector. Our Trial Practice Guide cautions against crediting such unsupported testimony: The Board has broad discretion to assign weight to be accorded expert testimony. Yorkey v. Diab, 601 F.3d 1279, 1284 (Fed. Cir. 2010). However, the testimony must be based on sufficient facts and data. Fed. R. Evid. 702(b). “Expert testimony that does not disclose the underlying facts or data on which the opinion is based is entitled to little or no weight.” 37 C.F.R. § 42.65(a). Patent Trial and Appeal Board Consolidated Trial Practice Guide 35 (Nov. 2019).7 We therefore give Dr, Baker’s unsupported testimony on this issue little weight.” slip op. at 24

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “We construe claim terms only as relevant to the parties’ contentions and only to the extent necessary to resolve the issues in dispute. See Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999); Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co. Matal, 868 F.3d 1013, 1017 (Fed. Cir. 2017). Having considered the positions of the parties, we find that for the purpose of this decision, we do not need to construe these terms to resolve a dispute.” slip op. at 9

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “requirement.” Pet. Reply 5. We do not agree with Petitioner. We find that the language of the claims supports Patent Owner’s argument that the desired signal and the interferer signal are received together. As discussed infra, claim limitations 7.7 and 7.8 recite determining a signal strength of the interferer signal and determining a signal strength of the desired signal. These determinations must be performed at the same time; otherwise, the determinations of signal strengths would not be of the same wireless signal. See Larson II Decl. ¶ 70; Baker II Decl. ¶¶ 48–49 (explaining that consideration of signal strengths detected at the same time would be “essential”). The specification of the ’202 patent further supports this finding: “When a receiver is actively receiving a desired signal, each block in the signal path has at its input the desired signal as well as noise and possibly interfering signals.” Ex. 1001, 5:22–24; see also Figs. 2A, 2B (showing interferer signals and desired signals together).” slip op. at 17

    Patent outcomesUS 10,524,202 not shown unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites Graham
    Patents in suitUS 10,524,202
  • PTAB · Oct 10, 2024 · IPR2024-00734 · APJ Steven M Amundson · IPR · Institution

    The Board instituted IPR on claims 1, 3, 15, 17, and 19–21, finding a reasonable likelihood of success on the asserted obviousness grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “to institute an inter partes review. We may institute an inter partes review only if “the information presented in the petition filed under section 311 and any response filed under section 313 shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2018). The “reasonable likelihood” standard is “a higher standard than mere notice pleading” but “lower than the ‘preponderance’ standard to prevail in a final written decision.” Hulu, LLC v. Sound View Innovations, LLC, IPR2018- 01039, Paper 29 at 13 (PTAB Dec. 20, 2019) (precedential). Based on the current record and for the reasons explained below, Petitioner has shown that there is a reasonable likelihood that it would prevail with respect to at least one of the challenged claims. Thus, we institute an inter partes review of claims 1, 3, 15, 17, and 19–21 in the ’518 patent on all challenges included in the Petition.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Petitioner asserts that a person of ordinary skill in the art at the time of the alleged invention “would have been someone”: (1) “knowledgeable with the computer networking techniques available at the time”; and (2) “who had a bachelor’s degree in computer science, computer engineering, electrical engineering, or an equivalent, and two years of experience working with computer networks, including network security.” Pet. 7. Petitioner also asserts that “[l]ack of work experience can be remedied by additional education, and vice versa.” Id. Dr. Crovella’s testimony supports Petitioner’s assertions. See Ex. 1003 ¶¶ 15–16. Based on the current record and for purposes of this decision, we accept Petitioner’s description of an ordinarily skilled artisan because it comports with the technology and claims of the ’518 patent as well as the asserted references. See Ex. 1003 ¶ 16.” slip op. at 13

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “[O]nly those terms need be construed that are in controversy, and only to the extent necessary to resolve the controversy.” Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999); see Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017). Based on the current record, we determine that no claim term requires an explicit construction to decide whether Petitioner satisfies the “reasonable likelihood” standard for instituting trial. slip op. at 14

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundInstituted

      “Based on the current record, Petitioner establishes sufficiently for purposes of institution that an ordinarily skilled artisan would have had reasons, i.e., as articulated by Dr. Crovella, to combine the teachings of Gai, Yip, and Kwan in the way Petitioner proposes. See Pet. 14–21, 27, 29–31, 38; Ex. 1003 ¶¶ 51–58, 62–72, 91–92, 98, 101, 121. Based on the current record, Petitioner also establishes sufficiently that an ordinarily skilled artisan would have had a reasonable expectation of success in combining the teachings of the references. See Pet. 16–17, 22, 38; Ex. 1003 ¶¶ 59–60, 73–74, 121. (f) Preliminary Conclusion About Alleged Obviousness As discussed above, Petitioner’s analysis addresses how the combined disclosures in Gai, Yip, and Kwan teach claim 1’s subject matter. See supra §§ III.D.4(a)–(d). Additionally, Petitioner provides reasons with rational underpinnings as to why an ordinarily skilled artisan would have been motivated to combine the teachings of Gai, Yip, and Kwan in the way Petitioner proposes and would have had a reasonable expectation of success. See supra § III.D.4(e). Hence, Petitioner demonstrates a reasonable likelihood of proving that claim 1 is unpatentable under § 103(a) because the claim would have been obvious over Gai, Yip, and Kwan.” slip op. at 34

    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 7,623,518

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.