PTAB
Advanced fields
477 decisions · 713msnewest first
  • PTAB · Jul 1, 2024 · IPR2023-00508 · APJ Jason W Melvin · IPR · Final written decision

    Claims 1–8 are unpatentable as anticipated by Govier and obvious over Govier and Williams; the Board did not reach the additional grounds.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “II. ANALYSIS A. LEVEL OF ORDINARY SKILL IN THE ART Petitioner contends that a person of ordinary skill in the art “would have had an undergraduate degree in the field of biomedical engineering, or a related engineering discipline, and at least two years of experience in the design and/or analysis of biomedical devices” and that “[a]dditional work experience could serve as a substitute for an engineering degree.” Pet. 9–10 (citing Ex. 1002 ¶ 23). Petitioner’s proposed level of ordinary skill in the art appears to be consistent with the challenged patent and prior art, and we adopt it here.” slip op. at 6

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “B. CLAIM CONSTRUCTION Petitioner argues that “no claim terms require express construction to resolve the challenges in this Petition.” Pet. 10. We agree and do not expressly construe any terms. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (noting that “we need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 6

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)UnpatentableUnpatentable

      “We have reviewed Petitioner’s contentions and evidence and conclude that they prove anticipation of the challenged claims by Govier for the reasons given by Petitioner. Pet. 19–55.” slip op. at 7

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successUnpatentableUnpatentable

      “For claim 1, Petitioner asserts that, if Govier does not disclose applying an electrode patch to the outer surface of the skin, skilled artisans would have had reason to substitute Williams’s known electrode patch for Govier’s ground pad as a simple substitution of one known structure for another performing the same function—“creating a current path along the tibial nerve”—and yielding the same results—“ability to stimulate the tibial nerve to treat overactive bladder.” Id. at 21–24. Petitioner contends also that, if Govier does not disclose a controller including a pulse generator, skilled artisans would have had reason “to substitute Williams’s pulse generator for Govier’s stimulator.” Id. at 27–29. Petitioner reasons that skilled artisans would have found it obvious to try Williams’s pulse generator because of its similarities with Govier’s stimulator—“each create current pulses between 1–10 mA.” Id. at 28. Petitioner reasons further that using Williams’s pulse generator would have been a simple substitution. Id.” slip op. at 9

    Patent outcomesUS 9,757,584 unpatentable
    Claim construction§ 102 anticipation§ 103 obviousness
    Patents in suitUS 9,757,584
  • PTAB · Jun 11, 2024 · IPR2024-00245 · APJ Nathan A Engels · IPR · Institution

    The Board instituted IPR on claims 1–4 on all asserted grounds, finding a reasonable likelihood that Samsung would show at least one claim unpatentable.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “Institution of an inter partes review is authorized by statute when “the information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a); see 37 C.F.R. § 42.108. Upon consideration of the evidence currently of record, we conclude that the information presented shows that there is a reasonable likelihood that Petitioner would prevail in establishing the unpatentability of at least one challenged claim of the ’150 Patent.” slip op. at 2

    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Denied

      “DISCRETIONARY DENIAL Patent Owner argues that we should exercise our discretion to deny the Petition based on the parallel district court litigation. Prelim. Resp. 35 (citing Apple Inc. v. Fintiv, Inc., IPR2020-00019, Paper 11 at 6 (PTAB Mar. 20, 2020) (precedential)). Petitioner, however, presented a Sotera stipulation.7 Pet. 88 (citing Ex. 1023). Thus, we do not exercise our discretion to deny institution here. See Katherine K. Vidal, Interim Procedure for Discretionary Denials in AIA Post-Grant Proceedings with 7 See Sotera Wireless, Inc. v. Masimo Corp., IPR2020-01019, Paper 12 at 19 (PTAB Dec. 1, 2020) (precedential). Parallel District Court Litigation (June 21, 2022) (“Consistent with [Sotera], the PTAB will not discretionarily deny institution in view of parallel district court litigation where a petitioner presents a stipulation not to pursue in a parallel proceeding the same grounds or any grounds that could have reasonably been raised before the PTAB.”).8” slip op. at 14

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)Term construed petitioner constructionOther

      “Petitioner states that (i) “coded multi-view video signal,” recited in each of the challenged claims, “encompasses a coded video signal for two or more viewpoints, including at least one base viewpoint and at least one nonbase viewpoint” (Pet. 7), and (ii) “picture signal,” also recited in each of the challenged claims, “refers to a signal that represents at least one picture from a viewpoint” (Pet. 9). Petitioner also identifies four elements of claim 1 that Petitioner contends are means-plus-function claim elements under 35 U.S.C. § 112 ¶ 6 (pre-AIA). Patent Owner states that for the purposes of its Preliminary Response, Patent Owner “does not dispute Petitioner’s proposed constructions . . . , including terms that it contends are subject to 35 U.S.C. § 112(6).” Prelim. Resp. 10. At this stage, we apply the parties’ agreed-upon constructions for the purposes of this Decision.” slip op. at 7

    • Obviousness (§103) › Graham factors (scope of art, differences, level of skill)Instituted

      “and DTS are provided in optional fields of packetized elementary stream packets. Ex. 1005, 7:19–25. Further, “[t]he video DTS . . . indicates the time when the picture needs to be decoded by the STD” (Ex. 1005, 7:47– 49), and on the current record, we understand Petitioner to cite the DTS parameters encoded in the transport stream for enhancement layer pictures as teaching the claimed coded information representing a desired delay time. Pet. 33. Among other examples, Petitioner (Pet. 34) and Dr. Reader (Ex. 1005 ¶ 201) cite Chen-736’s example of the formula DTSEi = DTSLi +1.5F, where F is a time interval based on the frame rate (Ex. 1005, 8:9–20), as indicating that DTSEi represents the start of decoding of the ith picture in the enhancement layer being delayed 1.5F relative to the start of decoding of the ith picture frame of the base layer. Pet. 36 (citing Ex. 1003 ¶ 201); see Pet. 35–40 (citing additional examples of serial and parallel decoding with similar DTS calculations). At this stage, we find Petitioner’s position that the claim’s recitation that the coded information must “represent” the desired delay time to be a reasonable reading of the plain language of the claim such that a DTS value can represent the desired delay time even if it requires calculation. Pet. 35 n.8. Even if Chen-736’s use of F-based offsets as time intervals “is different than the concept of a desired delay between decoding” and Chen-736 recognizes the distinction between PTS and DTS (Prelim. Resp. 14–15), on the current record, these arguments do not rebut Petitioner’s mapping of Chen-736 to the claim language. Similarly, Patent Owner’s argument that Chen-736 teaches a DTS for all picture signals, including the base viewpoints and non-base viewpoints (Prelim. Resp. 16), does not rebut Petitioner’s mapping of Chen-736’s enhancement-layer DTS to the claim language. At this stage, on the current record we determine Petitioner has sufficiently shown that Chen-736 teaches or reasonably suggests this claim element.” slip op. at 12

    Claim construction§ 103 obviousnessDiscretionary denialcites Phillips · KSR · Graham
    Patents in suitUS 8,139,150
  • PTAB · May 28, 2024 · IPR2024-00085 · APJ Michael L Woods · IPR · Institution

    The Board instituted IPR on claims 1, 2, 4, 5, 7–11, 13, and 15 on all asserted grounds, finding a reasonable likelihood that at least one challenged claim is unpatentable.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “Under 35 U.S.C. § 314 and 37 C.F.R. § 42.4(a), we have authority to institute an inter partes review if “the information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). After considering the Petition, the Preliminary Response, the Preliminary Reply, the Preliminary Sur-reply, and the evidence of record, we determine the information presented shows a reasonable likelihood that Petitioner would prevail in establishing the unpatentability of at least one of the Challenged Claims of the ’659 patent. Accordingly, we institute an inter partes review of the Challenged Claims on the grounds asserted in the Petition.” slip op. at 2

    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Denied

      “We disagree with Patent Owner. Our analysis under Fintiv is guided by the USPTO Director’s Memorandum issued on June 21, 2022, titled “Interim Procedure for Discretionary Denials in AIA Post Grant Proceedings with Parallel District Court Litigation.”8 The Director’s Memorandum explains that, when a petitioner makes a Sotera-type stipulation, “it mitigates concerns of potentially conflicting decisions and duplicative efforts between the district court and the PTAB” and “[w]ith such a stipulation, if an IPR or PGR is instituted, the grounds the PTAB resolves will differ from those present in 8 https://www.uspto.gov/sites/default/files/documents/interim_proc_discretio nary_denials_aia_parallel_district_court_litigation_memo_20220621_.pdf (“Director’s Memorandum”). the parallel district court litigation.” Director’s Memorandum 7 (citing Sotera, IPR2020-01019, Paper 12 at 18–19). Pursuant to the Director’s Memorandum, we “will not discretionarily deny institution of an IPR or PGR in view of parallel district court litigation where a petitioner stipulates not to pursue in a parallel district court proceeding the same grounds as in the petition or any grounds that could have reasonably been raised in the petition.” Id. Because Petitioner provides a Sotera-type stipulation, we do not exercise our discretion to deny institution under Fintiv.” slip op. at 8

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “Upon review of the prior art of record and the parties’ arguments, we adopt Patent Owner’s definition of the person of ordinary skill in the art for purposes of this Decision as it appears consistent with the prior art of record. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (holding that the prior art itself can reflect the appropriate level of ordinary skill in the art). Petitioner’s proposed definition appears overly restrictive, as it requires a graduate degree in a narrow field of engineering or equivalent experience. We find that a bachelor’s degree with the accompanying experience proposed by Patent Owner more closely aligns with the prior art of record and the ’659 patent. We note, however, there is some overlap in the proposed levels of ordinary skill in the art because Patent Owner’s proposal includes “at least” a bachelor’s degree, which would encompass Petitioner’s master’s degree as well. Prelim. Resp. 19. Nonetheless, our determination herein would be the same under either party’s definition.” slip op. at 9

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed petitioner constructionDecided for petitioner

      “We disagree with Patent Owner’s claim construction. By using the word “or,” the plain and ordinary meaning of “prone, kneeling, or standing” is that only one must be satisfied to meet the claim. See, e.g., SkinMedica, Inc. v. Histogen Inc., 727 F.3d 1187, 1199 (Fed. Cir. 2013) (“The disjunctive ‘or’ plainly designates that a series describes alternatives.”). Furthermore, and although claims are read in light of the specification, limitations in a specification are not read into a claim. In re van Geuns, 988 F.2d 1181, 1184 (Fed. Cir. 1993). Even if the Specification describes embodiments in which the user can begin in a prone position and then transition to a kneeling or standing position, as Patent Owner points out (see Prelim. Resp. 20), the claim does not recite the term “transitioning,” and we do not read the terms “each of” or “substantially flat surface” into this claim limitation. For example, the claim does not recite a “substantially flat” top surface and Patent Owner’s attempt to infer this structure into the claim is not supported under the law. See id. at 29–30. For purposes of this Decision, we agree with Petitioner and construe “prone, kneeling, or standing” in accordance with its plain and ordinary meaning as alternatives, and the prior art need only show one to satisfy this aspect of the claim.” slip op. at 12

    Claim construction§ 102 anticipation§ 103 obviousnessDiscretionary denialcites Phillips · KSR
    Patents in suitUS 9,586,659
  • PTAB · May 28, 2024 · IPR2024-00086 · APJ Kevin W Cherry · IPR · Institution

    The Board instituted IPR on claims 1, 2, 5-8, 10-15, 17, 18, 20, and 21 on all asserted grounds after finding a reasonable likelihood of success and declining Fintiv denial.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “In an [inter partes review], the petitioner has the burden from the onset to show with particularity why the patent it challenges is unpatentable.” Harmonic Inc. v. Avid Tech., Inc., 815 F.3d 1356, 1363 (Fed. Cir. 2016) (citing 35 U.S.C. § 312(a)(3) (requiring inter partes review petitions to identify “with particularity . . . the evidence that supports the grounds for the challenge to each claim”)). This burden of persuasion never shifts to Patent Owner. See Dynamic Drinkware, LLC v. Nat’l Graphics, Inc., 800 F.3d 1375, 1378 (Fed. Cir. 2015) (discussing the burden of proof in an inter partes review). slip op. at 10

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITAPlain and ordinary meaningDecided for petitioner

      “1. “wherein a user can be disposed on the top surface of the flotation device in a prone, kneeling, or standing position” With respect to the claim term “wherein a user can be disposed on the top surface of the flotation device in a prone, kneeling, or standing position,” Patent Owner points to passages of the Specification, arguing that all three positions are possible. Prelim. Resp. 19–21 (citing Ex. 1001, Abstr., 4:13–17, 4:33–40; Ex. 2006 ¶ 18). We do not agree with Patent’s Owner proposed construction because even if the Specification discloses that all three positions are possible, that is not what the plain language of the claim requires. Claim 1 recites “or,” which means that a user can be disposed on the top surface of the flotation device in any one of the three positions. See, e.g., SkinMedica, Inc. v. Histogen Inc., 727 F.3d 1187, 1199 (Fed. Cir. 2013) (“The disjunctive ‘or’ plainly designates that a series describes alternatives.”). Patent Owner does not identify any definition or disclaimer that would modify this plain meaning. See Thorner v. Sony Computer Entm’t Am. LLC, 669 F.3d 1362, 1365 (Fed. Cir. 2012). Thus, we agree with Petitioner and apply the plain and ordinary meaning of the phrase “wherein a user can be disposed on the top surface of the flotation device in a prone, kneeling, or standing position,” to construe “prone, kneeling, or standing” as alternatives, and the prior art need only show one to satisfy this aspect of the claim.” slip op. at 13

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “Neither party explains how or why its particular proposal impacts the issues before us in this proceeding. We find that a bachelor’s degree with the accompanying experience proposed by Patent Owner more closely aligns with the prior art of record and the ’044 patent. We note, however, there is some overlap in the proposed levels of ordinary skill in the art because Patent Owner’s proposal includes “at least” a bachelor’s degree, which would encompass Petitioner’s master’s degree as well. Prelim. Resp. 10. Nonetheless, our determination herein would be the same under either party’s definition.” slip op. at 12

    • Novelty / Anticipation (§102) › Prior-art status of a reference › Printed publication / public accessibilityPrinted publication establishedInstituted

      “As the Board has held in a precedential decision, “at the institution stage, the petition must identify, with particularity, evidence sufficient to establish a reasonable likelihood that the reference was publicly accessible before the critical date of the challenged patent and therefore that there is a reasonable likelihood that it qualifies as a printed publication.” Hulu, LLC v. Sound View Innovations, LLC, IPR2018-01039, Paper 29 at 13 (PTAB Dec. 20, 2019) (precedential).” slip op. at 23

    Claim construction§ 102 anticipation§ 103 obviousnessDiscretionary denialcites KSR · Graham
    Patents in suitUS 9,359,044
  • PTAB · May 23, 2024 · IPR2024-00062 · APJ Nathan A Engels · IPR · Institution

    The Board denied institution because Petitioner did not show that the prior art disclosed or taught the construed “emphasis level” limitation in any challenged claim.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “which the amplitude of the high frequency components of the video signal is increased,” as required by the construction of “emphasis level.”7 See Prelim. Resp. 9 (“the Petition’s analysis of the claim limitations containing these terms against the cited references does not indicate that those references disclose these limitations under Petitioner’s proposed constructions in the District Court Action”). Thus, without Petitioner mapping the constructions to the prior art in a clear and identifiable way, we determine the Petition itself does not satisfy Petitioner’s burden. See 37 C.F.R. §§ 42.104(b)(3)– (4).” slip op. at 6

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)Term construed petitioner constructionDecided for petitioner

      “the terms “emphasis processing” and “emphasis level.” In the Petition, Petitioner states that no constructions are necessary (Pet. 2), but after filing 2 US 5,491,514; issued Feb. 13, 1996. Ex. 1005. 3 US 5,241,387; issued Aug. 31, 1993. Ex. 1006. 4 US 6,801,665 B1; published Sept. 30, 1999. Ex. 1007. the Petition, Petitioner proposed constructions of those terms in the parties’ district-court litigation, stating that: (i) the claim term “emphasis processing” means “increasing the amplitude of the high frequency components of a video signal;” and (ii) the claim term “emphasis level” means “a value that represents the amount by which the amplitude of the high frequency components of the video signal is increased.” Ex. 2003, 10– 11. After Patent Owner relied on those constructions in its Preliminary Response (see, e.g., Prelim. Resp. 8–10),5 Petitioner requested (Ex. 3001), and the Board authorized (Paper 8), additional briefing to address how the analysis in the Petition applies under those constructions.6 Because we determine Petitioner’s showings with respect to those constructions are inadequate to carry Petitioner’s burden, our discussion below focuses primarily on those aspects of the parties’ briefing.” slip op. at 4

    • PTAB / AIA Trials › Discretionary denialNot reached

      “Discretionary Denial Because we determine Petitioner has not carried its burden on the merits, we do not reach the parties’ arguments relating to discretionary denial. See Pet. 98–99; Prelim. Resp. 26–32.” slip op. at 11

    Claim constructionDiscretionary denial
    Patents in suitUS 6,845,128
  • PTAB · May 23, 2024 · IPR2024-00150 · APJ Bart A Gerstenblith · IPR · Institution

    The Board instituted IPR of claims 1–5 on all four asserted obviousness grounds, finding a reasonable likelihood of success on the Gibson and Schiltz combination.

    RulingsInstitution decision
    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Decided for petitioner

      “As set forth in the Director’s Memorandum, Interim Procedure for Discretionary Denials in AIA Post-Grant Proceedings with Parallel District Court Litigation (dated June 21, 2022), at 7, available at https://www.uspto.gov/sites/default/files/documents/interim_proc_discretion ary_denials_aia_parallel_district_court_litigation_memo_20220621_.pdf, the PTAB will not discretionarily deny institution of an IPR . . . in view of parallel district court litigation where a petitioner stipulates not to pursue in a parallel district court proceeding the same grounds as in the petition or any grounds that could have reasonably been raised in the petition. Petitioner’s stipulation (Ex. 1025) satisfies the language from the Director’s Memorandum quoted above. Therefore, we need not analyze each Fintiv factor to reach the determination that we will not exercise our discretion to deny institution in view of the parallel Western District of Texas Litigation.” slip op. at 14

    • BurdenDecided for petitioner

      “We disagree. The Petition is clear that it presents alternative challenges where Goldberg, Thacker, ITU-T J.83, and/or AAPA are added to the combination of Gibson and Schiltz or are added to Crols, if the term “cable modem,” recited in the preamble of claim 1, is determined to be limiting. Pet. 6–7. In the context presented here, “and/or” clearly means one or more of the four additional references. And Petitioner’s reliance on one or more of the additional references is clear in the context of the issues before us based on Petitioner’s analysis of the preamble of claim 1, where Petitioner clearly states, “[a]nd to the extent that the preamble is limiting and requires a ‘cable modem,’ it would have been obvious to use the modem of Gibson (as modified by Schiltz, discussed below) as a cable modem, in view of Thacker, Goldberg, ITU-T J.83, and/or AAPA.” Pet. 42 (Ground 1); see id. at 66–67 (similarly asserting, in the context of Ground 2, that, “[t]o the extent that the preamble is limiting and requires a ‘cable modem,’ it would have been obvious to use the modem of Crols as a cable modem, in view of Thacker, Goldberg, ITU-T J.83, and/or AAPA”). Petitioner also includes a discussion as to why one of ordinary skill in the art would have been motivated to “use the modems of Gibson modified with Schiltz (Ground 1), and Crols (Ground 2), as ‘cable modems,’ in view of the DOCSIS References (Thacker and Goldberg), ITU-T J.83, and AAPA,” and would have had a reasonable expectation of success in so doing. Id. at 37–40. Thus, we do not agree with Patent Owner that the Petition lacks particularity and we find that the Petition clearly sets forth the alternative combinations discussed above such that Patent Owner has a fair opportunity to respond.” slip op. at 7

    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “l. Summary as to Claim 1 For the reasons discussed above, on the present record we find that Petitioner has established that the combination of Gibson and Schiltz teaches each of the elements of claim 1 and that one of ordinary skill in the art would have been motivated to combine the teachings of these two references as proposed by Petitioner with a reasonable expectation of success in so doing.” slip op. at 40

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Petitioner’s proposed level of ordinary skill in the art is identical to the level of skill that we found applicable in the final written decision in the TCL IPR. See IPR2021-00985, Paper 44 at 13. We see no reason to deviate from our previous finding, which is now further supported by Dr. Larson’s testimony. See Ex. 1003 ¶ 26. Accordingly, at this stage of the proceeding and on the present record, we adopt Petitioner’s proposed level of ordinary skill in the art, which we find consistent with the level of ordinary skill in the art reflected by the ’835 patent and the prior art of record. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978).” slip op. at 16

    Claim construction§ 103 obviousnessDiscretionary denialcites Phillips · KSR · Graham
    Patents in suitUS 7,292,835
  • PTAB · May 2, 2024 · IPR2023-00063 · APJ Jeremy M Plenzler · IPR · Final written decision

    Claims 1–5, 7–11, and 14–16 were not proven unpatentable because Hibi does not teach operating climate control based on battery level or determining available climate-control time from that level.

    RulingsFinal written decision
    • Obviousness (§103) › Motivation to combine / reasonable expectation of successNot shown unpatentable

      “d) Analysis We agree with Petitioner that Hibi teaches operating its climate control system in an AUTO mode for a duration of time. That time can be up to and beyond the low battery abnormality condition. As explained above, the claim language at least requires instructions that operate the climate control mechanism based on the predetermined battery level in some manner. Patent Owner is correct that Hibi does not care about its battery level for operation of its climate control mechanism. See PO Resp. 42–44. Patent Owner is also correct that “in response to a low battery event, Hibi’s system simply turns on the engine and charges the battery.” Id. at 43 (citing Ex. 1008, Fig. 5). And as Patent Owner further notes, “if a user selects a climate control temperature in system setting mode of Hibi, that temperature is unchanged in response to a low battery event” and “[i]nstead, the temperature remains constant in response to the low battery, as Hibi’s vehicle simply turns the gas engine on and charges the battery.” Id. (citing Ex. 1008 ¶ 43, Fig. 5; Ex. 2004 ¶¶ 91–94; Ex. 2005, 53:13–54:14). Because Hibi does not consider battery level for the operating instructions associated with its climate control system, Petitioner’s challenge to claim 1 fails. In its Reply Petitioner responds to Patent Owner’s contentions by addressing a scenario where limitation 1[h] requires ceasing the selected mode of operation. See Pet. Reply 19–20. As explained above, we do not read limitation 1[h] as requiring ceasing the selected mode of operation. And Petitioner’s explanation in its Reply does not address the issue with its challenge noted above. That is, even in its contentions regarding Hibi ceasing operation, Petitioner still relies on operation where Hibi’s climate control system is operated wholly independent of battery level considerations. See id. at 19 (discussing ceasing operation in Hibi based on a change from climate control with battery on to climate control with engine on). There does not appear to be any dispute that Hibi operates its climate” slip op. at 22

    Patent outcomesUS 10,819,135 not shown unpatentable
    § 103 obviousnesscites KSR · Graham
    Patents in suitUS 10,819,135
  • SNF S.A. v. Chevron U.S.A., Inc.No claims unpatentable
    PTAB · Apr 18, 2024 · IPR2022-01534 · APJ Barry L Grossman · IPR · Final written decision

    Claims 1–25 were not shown unpatentable on any asserted ground because the evidence failed to establish the claimed filter ratio or support the proposed combinations.

    RulingsFinal written decision
    • Skill levelSkill level board ownDecided for patent owner

      “In our Decision to Institute this proceeding, we adopted Dr. Barati’s proposed level of skill based on the prior art, the sophistication of the technology disclosed in the ’320 patent, and Dr. Barati’s opinion testimony. Dec. Inst. 17 (“we adopt Dr. Barati’s definition of the level of ordinary skill”). Patent Owner states it “does not dispute the level of skill applied by the Board in its institution decision.” PO Resp. 7. Accordingly, in this Decision, based on the evidence and the arguments of the parties, we maintain and adopt the level of ordinary skill stated in the Decision to Institute. In this proceeding, a person of ordinary skill would have had a Ph.D. in Chemical or Petroleum Engineering (or related science or engineering discipline) with 2-3 years of experience in the design and implementation of methods for hydrocarbon recovery including use of polymer compositions in such recovery methods. Alternatively, a person of ordinary skill might substitute several years of actual design or implementation experience for the advanced degree. See Ex. 1012 ¶ 18.” slip op. at 16

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “Claims must be construed “only to the extent necessary to resolve the controversy.” AstraZeneca AB v. Mylan Pharms. Inc., 19 F.4th 1325, 1345 (Fed. Cir. 2021) (quoting Vivid Techs., Inc. v. American Science & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999); see also Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“we need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy’” (citations omitted)). We determine that a specific construction of the claims is not necessary to reach a decision in this inter partes review of the challenged claims.” slip op. at 18

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element) › Inherent disclosureNot shown unpatentableInherency not foundNot shown unpatentable

      “To serve as an anticipation when the reference is silent about the asserted inherent characteristic, such gap in the reference may be filled with recourse to extrinsic evidence. Such evidence must make clear that the missing descriptive matter is necessarily present in the thing described in the reference, and that it would be so recognized by persons of ordinary skill. Cont’l Can Co. USA v. Monsanto Co., 948 F.2d 1264, 1268 (Fed. Cir. 1991). Inherency, however, may not be established by probabilities or possibilities. The mere fact that a certain thing may result from a given set of circumstances is not sufficient. [Citations omitted.] If, however, the disclosure is sufficient to show that the natural result flowing from the operation as taught would result in the performance of the 17 Again, to avoid confusion, this citation format is to page 15 of Exhibit C, which is an attachment to Exhibit 1012 in this proceeding. questioned function, it seems to be well settled that the disclosure should be regarded as sufficient. Id. at 1260 (quoting In re Oelrich, 666 F.2d 578, 581 (CCPA 1981)).” slip op. at 23

    • Obviousness (§103) › Graham factors (scope of art, differences, level of skill)Not shown unpatentableNot shown unpatentable

      “Petitioner fails to provide any persuasive evidence or argument that claims 1, 2, 13–15, and 20–25 would have been obvious in view of Li. As discussed above, anticipation and obviousness are different grounds, requiring different analyses, and different evidence. Petitioner fails to establish what modifications in Li would have been obvious and why it would have been obvious to make the modifications with a reasonable expectation of success. The word “obvious” appears in Ground 1 only in the analysis of claim 24, clause D, on page 37 of the Petition, where Petitioner merely states the conclusion that this clause “would be obvious” [sic, the statute requires a temporal component to establish the claim “would have been obvious”]. Accordingly, we determine that Petitioner fails to provide the requisite evidence and arguments that claims 1, 2, 13–15, and 20–25 would have been obvious in view of Li.” slip op. at 28

    Patent outcomesUS 10,626,320 not shown unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 10,626,320
  • Netflix Inc. v. Divx, LLCAll claims unpatentable
    PTAB · Apr 17, 2024 · IPR2020-00646 · APJ Iftikhar Ahmed · IPR · Remand

    On remand, the Board held claims 1, 5, 8, 9, 13–15, 18, and 21–23 unpatentable as obvious over Zetts and Kaku, with claims 5, 18, and 21 also obvious over Zetts, Kaku, and Seo.

    RulingsRemand decision
    • RemandDecided for petitioner

      “the Federal Circuit. Paper 49. On September 11, 2023, the Federal Circuit issued a decision in the appeal vacating our Final Written Decision and remanding for further proceedings consistent with its decision. Netflix, 80 F.4th at 1362. The Federal Circuit determined that we abused our discretion in finding that Petitioner had failed to articulate a field of endeavor. Id. at 1359. The Federal Circuit remanded to allow us to decide the “factual question of whether Kaku is directed to the same field of endeavor as the patent-in-suit.” Id. at 1361. The Federal Circuit, however, did not address the other three issues raised by Patent Owner since we did not decide those issues in the Final Written Decision and they were not presented for appeal. See generally Netflix.” slip op. at 3

    • Skill levelSkill level board ownOther

      “B. Level of Ordinary Skill in the Art In the Final Written Decision, we stated the following:” slip op. at 10

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)Term construed patent owner constructionDecided for patent owner

      “Petitioner has not shown that one of the prior art references is analogous to the claimed invention.” Final Dec. 9. On remand, the construction of this claim is an issue that must be decided to reach a conclusion on the patentability of the Challenged Claims of the ’792 patent.” slip op. at 12

    • Obviousness (§103) › Analogous artAnalogous artDecided for petitioner

      “1. Analogous Art – Field of Endeavor Before turning to Petitioner’s analysis of the claims, we address” slip op. at 29

    Patent outcomesUS 8,472,792 unpatentable
    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 8,472,792
  • PTAB · Apr 16, 2024 · IPR2023-00062 · APJ Jeremy M Plenzler · IPR · Final written decision

    Claims 1–15 are unpatentable as obvious: claims 1–3, 5–8, 10, and 13–15 over Ferro and Lowenthal; claim 9 with Evans; and claims 4, 11, and 12 with Boll.

    RulingsFinal written decision
    • Obviousness (§103) › Graham factors (scope of art, differences, level of skill)UnpatentableUnpatentable

      “Petitioner’s challenges are based on obviousness. A claim is unpatentable under 35 U.S.C. § 103 if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious at the time of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains. KSR Int’l Co. v. Teleflex Inc., 550 U.S. 398, 406 (2007). The question of obviousness is resolved based on underlying factual determinations including: (1) the scope and content of the prior art; (2) any differences between the claimed subject matter and the prior art; (3) the level of ordinary skill in the art; and (4) when in the record, objective evidence of non-obviousness. Graham v. John Deere Co. of Kan. City, 383 U.S. 1, 17–18 (1966).” slip op. at 5

    • Expert testimonyOther

      “2. Reduction to Practice “The diligence requirement implements the principle that, to antedate a reference,” an inventor “must not only have conceived the invention before the reference date, but must have reasonably continued activity to reduce the invention to practice.” ATI Techs. ULC v. Iancu, 920 F.3d 1362, 1369 (Fed. Cir. 2019). “A patent owner need not prove the inventor continuously exercised reasonable diligence throughout the critical period; it must show 1009 (emphasis by the court). An inventor’s testimony does not alone suffice to prove diligence. Id. at 1007. A “variety of activities” may corroborate an inventor’s testimony about diligence, and any corroborating evidence is considered “as a whole.” Id. at 1007–08.” slip op. at 8

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Petitioner’s declarant, Dr. MacCarley, testifies that one skilled in the art during the relevant timeframe “would have had at least a bachelor’s degree in electrical engineering, mechanical engineering, or physics (or an equivalent field) and at least two years of work experience involving automotive systems, including vehicle information systems, vehicle sensors, and vehicle controllers,” but “[m]ore education can supplement practical experience and vice versa.” Pet. 10 (citing Ex. 1002 ¶ 26). Patent Owner does not contest Petitioner’s articulation of the level of skill in the art. See PO Resp. 14 (“Because [the proposed level of ordinary skill] does not affect the ultimate analysis, Patent Owner takes no position with respect to Petitioner’s proposed level of ordinary skill in the art.”). We analyze the asserted prior art with respect to the level of skill set forth by Petitioner because it is consistent with the prior art.” slip op. at 6

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “According to Petitioner, “[n]o terms here require construction and so all claim terms should be given their plain and ordinary meaning.” Pet. 10–11. Similarly, “Patent Owner submits that the Board need not expressly construe any claim term.” PO Resp. 18. We do not need to construe any terms expressly to reach our decision. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 7

    Patent outcomesUS 9,853,488 unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites KSR · Graham
    Patents in suitUS 9,853,488

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.