- Apple Inc. v. Apex Beam Technologies LLCInstitutedPTAB · Nov 5, 2025 · IPR2025-00895 · APJ Scott Raevsky · IPR · Institution
The Board instituted IPR on claims 1–20 and all asserted challenges after finding a reasonable likelihood that at least one challenged claim would be unpatentable.
RulingsInstitution decision- Skill levelSkill level petitioner adoptedDecided for petitioner
“A person of ordinary skill in the art (POSITA) would have had at least [a bachelor’s degree in] electrical engineering, computer engineering, computer science, or a similar field, along with two years of experience designing or developing wireless networks. Additional education might substitute for some of the experience, and additional substantial experience might substitute for some of the educational background. . . . A POSITA would also have familiarity with the 3GPP LTE standards, and would have understood how to search through the available Technical Specifications for implementing RAN technologies. Pet. 21–22 (citing Ex. 1003 ¶¶ 50–53). Patent Owner uses Petitioner’s proposed level of skill in the art at this stage, with a proposed modification to insert “a bachelor’s degree in” to Petitioner’s statement. Prelim. Resp. 12–13; id. at 12, n.1. We have inserted this proposed modification in brackets in the above block quotation. We are persuaded, on the present record, that Petitioner’s proposal, as modified by Patent Owner, is consistent with the problems and solutions in the ’113 patent and prior art of record. We adopt Petitioner’s skill definition at this stage.” slip op. at 7
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached
“The parties do not propose any claim constructions. See Pet. 11–12; Prelim. Resp. 8. As no terms are in dispute, we determine that no terms require construction at this stage.” slip op. at 8
- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“IV. CONCLUSION At this stage of the proceeding, we determine that Petitioner has demonstrated a reasonable likelihood of prevailing on its challenges as to at least one challenged claim. At this preliminary stage, we have not made a final determination as to the patentability of the challenged claims or any underlying factual and legal issues. V. ORDER It is, therefore, ORDERED that, pursuant to 35 U.S.C. § 314(a), an inter partes review of all challenged claims of the ’113 patent is instituted with respect to all challenges of unpatentability set forth in the Petition; and FURTHER ORDERED that pursuant to 35 U.S.C. § 314(c) and 37 C.F.R. § 42.4, notice is hereby given of the institution of a trial commencing on the entry date of this Decision.” slip op. at 18
- Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundInstituted
“measurement value, as Jover teaches.” Id. (citing Ex. 1005 ¶¶ 39–40; Ex. 1003 ¶¶ 115–30). Among other reasons, Petitioner contends that a POSITA would have been motivated to combine “to improve the accuracy and reliability of the beam failure determination.” Id. at 37 (citing Ex. 1003 ¶¶ 115–30). Petitioner further contends that a POSITA would have had a reasonable expectation of success because “it would have been straightforward for a POSITA to implement Jover’s triggering condition in Xia’s method.” Id. at 38 (citing Ex. 1003 ¶¶ 115–30). After considering Patent Owner’s arguments, which we address below, we agree with Petitioner at this stage that the combination of Xia and Jover renders obvious limitation [1e]. Patent Owner first argues that Jover “does not cure the deficiencies of Xia because Jover’s threshold condition for an increase in BER is not used for triggering a transmission of the first and second radio signal.” Prelim. Resp. 20. Just like Xia, Patent Owner contends, Jover discloses no “causality between the threshold being exceeded and transmitting the first and second radio signal.” Id. at 21. This argument does not undermine Petitioner’s showing at this stage because Petitioner relies on Xia, not Jover, for the claimed “triggering the transmission,” or “causality,” as Patent Owner calls it. See Pet. 36–38. That is, Petitioner relies on Jover for the triggering condition and on Xia for the actual triggering. See id. Patent Owner’s argument attacking the references individually is unpersuasive. See In re Merck & Co., Inc., 800 F.2d 1091, 1097 (Fed. Cir. 1986) (“Non-obviousness cannot be established by attacking references individually where the rejection is based upon the teachings of a combination of refences.”). Patent Owner next contends that one of ordinary skill in the art would not have combined Xia and Jover “since Jover is directed to the opposite objective of the ’113 Patent or Xia.” Prelim. Resp. 21. That is, Patent Owner asserts, Jover teaches away from the disclosed methods. Id. at 22. Patent Owner explains, “Jover provides no attempt to improve the beam strength, but rather ignores it through beam sweeping or nullif[ies] it, in contrast to the purpose of the ’113 Patent.” Id. at 22–23. At this stage, Patent Owner’s argument is insufficient to undermine” slip op. at 15
Claim construction§ 103 obviousnessPatents in suitUS 10,568,113 - Apple Inc. v. Apex Beam Technologies LLCInstitutedPTAB · Nov 4, 2025 · IPR2025-00898 · APJ Scott Raevsky · IPR · Institution
The Board instituted review of claims 1–20 on all asserted challenges, finding a reasonable likelihood that claims 1, 6, 11, and 16 would have been obvious over Kim and Chen.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“After considering the parties’ arguments and evidence, and for the reasons set forth below, Petitioner demonstrates a reasonable likelihood of prevailing with respect to at least one of the challenged claims of the ’271 patent. See 35 U.S.C. § 314(a). Accordingly, we institute an inter partes review with respect to all challenged claims and challenges asserted in the Petition. 37 C.F.R. § 42.108(a).” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“Pet. 4 (citing Ex. 1003 ¶¶ 10, 16, 29–32). Patent Owner uses Petitioner’s proposed level of skill in the art at this stage. Prelim. Resp. 6. We are persuaded, on the present record, that Petitioner’s proposal is consistent with the problems and solutions in the ’271 patent and prior art of record. We adopt Petitioner’s definition of the level of skill at this stage.” slip op. at 6
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“The parties do not propose any explicit claim constructions. See Pet. 4–6; Prelim. Resp. 6. As no terms are in dispute, we do not construe any terms. Petitioner discusses constructions proposed by Patent Owner in the Samsung IPR, but Patent Owner does not rely on those constructions here. Pet. 4–6 (citing IPR2023-00747, Paper 14 at 11–13). We therefore do not address them at this stage.” slip op. at 6
- Obviousness (§103) › Graham factors (scope of art, differences, level of skill)Instituted
“discloses the claimed “proportional sequence.” Prelim. Resp. 9. First, Patent Owner contends that “indexes of antenna port groups with RSRP measurement values higher than a certain threshold are not a sequence of ratios,” but rather, just an identification of antenna port groups. Id. (emphasis added). We disagree, on this record. The flaw in this reasoning is that the claim does not require the first proportional sequence to be a sequence of ratios. Rather, the claimed “first proportional sequence” merely “corresponds to . . . ratios.” Thus, Patent Owner’s argument that the indexes “are not a sequence of ratios” is not commensurate with the scope of the claim. Petitioner persuades us, at this stage, that the indexes correspond to ratios (e.g., RSRP_n/max(RSRP_i)). See Pet. 32–33.” slip op. at 7
Claim construction§ 103 obviousnesscites GrahamPatents in suitUS 10,951,271 - Exotec Product France SAS / Exotec North America Inc. et al. v. Opex CorporationAll claims unpatentablePTAB · Oct 28, 2025 · IPR2024-00850 · APJ Arthur M Peslak · IPR · Final written decision
Claims 1, 3–12, 14, and 23–27 are unpatentable as obvious over Raizer and Hangzhou.
RulingsFinal written decision- Skill levelOther
“B. Level of Ordinary Skill in the Art We consider the asserted grounds of unpatentability in view of the” slip op. at 9
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“C. Claim Construction Neither Petitioner nor Patent Owner proposes an express construction” slip op. at 10
- Obviousness (§103) › Motivation to combine / reasonable expectation of successUnpatentableMotivation foundUnpatentable
“that it would improve similar devices in the same way, using the technique is obvious unless its actual application is beyond his or her skill.” KSR, 550 U.S. at 417. In this case, we must determine whether one of ordinary skill in the art would recognize that Hangzhou’s disclosure of driving its auto-guided trolleys 200 under shelves 100 would improve the operation of Raizer’s system in the same way. For us to resolve this question in Petitioner’s favor, Petitioner must provide “some articulated reasoning with some rational underpinning to support the legal conclusion of obviousness.” Id. at 418 (citing In re Kahn, 441 F.3d 977, 988 (Fed. Cir. 2006)). However, bodily incorporation, i.e., “an actual physical substitution of” Hangzhou’s auto-guided trolleys or operating software into Raizer’s system, is not required. See In re Mouttet, 686 F.3d 1322, 1332 (Fed. Cir. 2012) (“It is well-established that a determination of obviousness based on teachings from multiple references does not require an actual, physical substitution of elements.”); In re Nievelt, 482 F.2d 965, 968 (CCPA 1973) (“Combining the teachings of references does not involve an ability to combine their specific structures.”).” slip op. at 23
Patent outcomesUS 11,472,632 unpatentableClaim construction§ 103 obviousnesscites KSR · GrahamPatents in suitUS 11,472,632 - Samsung Electronics Co., Ltd. / Samsung Electronics America, Inc. v. Power2b Inc.All claims unpatentablePTAB · Oct 27, 2025 · IPR2021-01257 · APJ Sheila F Mcshane · IPR · Remand
On remand, the Board held claims 1, 2, 6–8, 13, 14, 16, 18, 19, 21–23, 26, and 30 unpatentable as obvious over the stated Newton and Reime grounds.
RulingsRemand decision- RemandOther
“On February 12, 2025, the Federal Circuit issued an opinion vacating and remanding our Final Written Decision based on the determination of the construction of the impingement term recited in the ’170 patent. Appeal Dec. 9. More specifically, the Federal Circuit found that the Board’s construction was too limited. Id. at 8–9. The Federal Circuit found that As properly construed, in the context of the challenged claims, ‘impingement of an electromagnetic radiation spot’ must include ‘reflected, projected, and interrupted or blocked radiation.’ In other words, when a finger or non-light-emitting stylus interrupts or blocks a beam of electromagnetic radiation, and does so over a certain spot on the surface of a device, the claim limitation is satisfied. Contrary to the Board’s construction, as articulated by Power2B on appeal, the ‘electromagnetic radiation spot on . . . [the] interactive surface element’ does not ‘require[that] radiation imping[e] on the surface element’ and, hence, does not exclude interrupting or blocking radiation. Appeal Dec. 9 (citations omitted).” slip op. at 3
- Skill levelSkill level petitioner adoptedDecided for petitioner
“better definition for purposes of this proceeding, except we again decline to adopt “at least” because that language is vague and open-ended. With respect to the educational qualifications, Petitioner’s proposed qualifications are that one of ordinary skill in the art would have had a bachelor’s degree in electrical engineering, computer engineering, computer science, or a related field. Pet. 8 (citing Ex. 1002 ¶ 41) (emphasis added). The claims are directed to an interactive assembly comprising at least one input sensor to provide an output indicative of an impingement of an electromagnetic radiation spot. Individuals with bachelor’s degrees in physics would be knowledgeable in researching, designing, or developing such assemblies and would be able to comprehend and evaluate the teachings of the prior art. Accordingly, Petitioner’s proposed qualifications are overly narrow in not including individuals with bachelor’s degrees in physics. With respect to work experience, a person having two years of experience would be able to comprehend and evaluate the teachings of the prior art, consistent with Petitioner’s proposal.” slip op. at 10
- Prior constructionPrior construction adoptedDecided for petitioner
“impingement of an electromagnetic radiation spot” includes “reflected, projected, and interrupted or blocked radiation” and “when a finger or nonlight-emitting stylus interrupts or blocks a beam of electromagnetic radiation, and does so over a certain spot on the surface of a device, the claim limitation is satisfied.” Appeal Dec. 9. Under this construction, we determine that Petitioner has demonstrated that Newton teaches this claim limitation. More specifically, Newton discloses that a user touch interrupts beams of electromagnetic radiation over certain spots over a surface, which provides an output. See Ex. 1012 ¶¶ 13, 25; see also Ex. 1002 ¶ 72. slip op. at 18
- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed board ownDecided for petitioner
“We agree with Petitioner that the claims do not require a detector assembly to be physically separate from the interactive surface element. The language of the claims does not require this, nor is there any disclosure in the ’170 patent specification that indicates that separation of these elements is required. Patent Owner refers to certain embodiments that have separate structures, but we decline to import this as a requirement to the claim term. We also agree with Petitioner that the ’170 patent broadly views what it means to be “at an edge,” and that can include being behind, about, or along an edge within its scope. See Ex. 1001, 55:63–56:2.” slip op. at 24
Patent outcomesUS 9,317,170 unpatentableClaim construction§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 9,317,170 - Valve Corporation v. Immersion CorporationAll claims unpatentablePTAB · Oct 24, 2025 · IPR2024-00714 · APJ Christopher L Ogden · IPR · Final written decision
Claims 1–20 are unpatentable: Goldenberg anticipates or renders claims 1–6, 8–13, and 15–19 obvious, and Goldenberg with Cruz-Hernandez renders claims 7, 14, and 20 obvious.
RulingsFinal written decision- Skill levelSkill level petitioner adoptedDecided for petitioner
“The parties’ proposed levels of ordinary skill are substantially similar, supported by testimonial evidence, and consistent with the asserted prior art and the types of problems and solutions in the ’907 patent. See, e.g., Ex. 1001, 1:14–62. Because we discern no dispositive difference between the parties’ proposals, and neither party has argued that the choice between the two would affect the outcome,6 we adopt Petitioner’s proposed level of skill for this decision. We note, however, that our decision would be the same under Patent Owner’s proposal.” slip op. at 8
- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITAPlain and ordinary meaningDecided for patent owner
“to,” as recited in each of claims 1, 8, and 15, to “require[] a cause-and-effect relationship between a secondary event (e.g., a haptic effect) that occurs in reaction to a first event (e.g., entry of the user input element to one or more positions within the boundary range of positions).” PO Resp. 26–27 (citing Ex. 2004 ¶ 44). Patent Owner argues that “in response to” refers to more than just a coincidence and involves at least some degree of causality. Id. at 27 (citing American Calcar, Inc. v. American Honda Motor Co., 651 F.3d 1318, 1339–40 (Fed. Cir. 2011); Ex. 2007, 12–14 (dictionary definition); Ex. 2008, 7 (dictionary definition); Ex. 2006, 30:13–31:2, 32:8–11, 32:17– 21 (testimony by Mr. Ward)); PO Sur-reply 8–9 (citing Ex. 2009, 34:8–19, 36:5–21 (testimony by Mr. Ward)).” slip op. at 17
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)Term construed patent owner constructionDecided for patent owner
“to,” as recited in each of claims 1, 8, and 15, to “require[] a cause-and-effect relationship between a secondary event (e.g., a haptic effect) that occurs in reaction to a first event (e.g., entry of the user input element to one or more positions within the boundary range of positions).” PO Resp. 26–27 (citing Ex. 2004 ¶ 44). Patent Owner argues that “in response to” refers to more than just a coincidence and involves at least some degree of causality. Id. at 27 (citing American Calcar, Inc. v. American Honda Motor Co., 651 F.3d 1318, 1339–40 (Fed. Cir. 2011); Ex. 2007, 12–14 (dictionary definition); Ex. 2008, 7 (dictionary definition); Ex. 2006, 30:13–31:2, 32:8–11, 32:17– 21 (testimony by Mr. Ward)); PO Sur-reply 8–9 (citing Ex. 2009, 34:8–19, 36:5–21 (testimony by Mr. Ward)).” slip op. at 17
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)UnpatentableUnpatentable
“To show anticipation under § 102, a petitioner must locate every element in a claim, arranged as recited in the claim, in a single prior art reference. See Net MoneyIN, Inc. v. VeriSign, Inc., 545 F.3d 1359, 1369 (Fed. Cir. 2008). The limitations may be present in the reference “either explicitly or inherently.” In re Schreiber, 128 F.3d 1473, 1477 (Fed. Cir. 1997). In making this determination, we consider the reference “together with the knowledge of one of ordinary skill in the pertinent art.” In re Paulsen, 30 F.3d 1475, 1480 (Fed. Cir. 1994) (citing In re Samour, 571 F.2d 559, 562 (CCPA 1978)).” slip op. at 18
Patent outcomesUS 10,627,907 unpatentableClaim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 10,627,907 - Tanklogix, LLC v. Sitepro, Inc.Institution deniedPTAB · Oct 10, 2025 · IPR2025-00653 · APJ Bart A Gerstenblith · IPR · Institution
The Board denied institution on all claims because the Petition did not show a reasonable likelihood that any challenged claim was unpatentable over the asserted grounds.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“An inter partes review may be instituted only if “the information presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2
- Skill levelSkill level patent owner adoptedDecided for patent owner
“The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’504 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“Additionally, only terms that are in controversy need to be construed, and these need be construed only to the extent necessary to resolve the controversy. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 9; Prelim. Resp. 4 (citing Ex. 2009 ¶ 72); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13
- Expert testimonyPetitioner expert discountedDecided for patent owner
“Ex. 1002 ¶ 47. As reflected above, Dr. Wooley’s testimony as to element [1.2] does not even assert that Cardamone discloses a tank, let alone one or more sensors disposed at a tank as recited in element [1.2]. Thus, Dr. Wooley’s testimony does not support Petitioner’s argument on this issue.” slip op. at 18
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 11,726,504 - Tanklogix, LLC v. Sitepro, Inc.Institution deniedPTAB · Oct 10, 2025 · IPR2025-00652 · APJ Bart A Gerstenblith · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–23 and 25–30 were unpatentable over the asserted grounds.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied
“presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2
- Skill levelSkill level patent owner adoptedDecided for patent owner
“The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’403 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 10; Prelim. Resp. 4 (citing Ex. 2009 ¶ 73); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable
“We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses element [1.2] because the evidence cited does not disclose a “first computer system being configured to provide remote control of the first pump or first valve” (i.e., a fluid-handling device). Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but Petitioner has not identified any disclosure of the capability to remotely control fluid-handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, Kahn’s disclosures that Petitioner relies on for allegedly teaching remote control are deficient. We discuss each. First, Petitioner points to the following, “[f]or instance, as illustrated in FIG. 1C, a fluid control device such as a valve 15A is located on the input side of a sen[s]or unit 110.” Ex. 1005, 8:19–21, cited in Pet. 13. This portion of Kahn, however, does not disclose remote control. Second, Petitioner cites to the following: Finally, or in addition to, the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance. Pet. 13 (citing Ex. 1005, 10:62–67). We agree with Patent Owner that this portion of Kahn teaches on-site alerts and local control of the fluid-handling device. See Prelim. Resp. 7. This portion of Kahn does not disclose remote control.” slip op. at 18
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 11,294,403 - Tanklogix, LLC v. Sitepro, Inc.Institution deniedPTAB · Oct 10, 2025 · IPR2025-00651 · APJ Bart A Gerstenblith · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–3, 6, 7, and 9–20 were unpatentable over any asserted ground.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied
“presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2
- Skill levelSkill level patent owner adoptedDecided for patent owner
“The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’680 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 11
- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner
“target value” is part of a command that is sent from a computing device to a server and then to a controller. The controller then receives a measurement of the fluid by a sensor and determines whether the measurement satisfies the “target value.” If the measurement does not satisfy the “target value,” further operations are undertaken. The recited operation sequence makes clear that the plain and ordinary meaning of “target value” is not as Dr. Wooley opines because the particular operating condition that a device is in at a particular time is represented by the measurement taken by the sensor, 11 Some claim language less relevant to construing “target value” was omitted for ease of reference. which the controller then uses to determine whether the measurement satisfies the “target value.” Additionally, claim 1 recites that the “target value” is sent as part of a command to the controller. The “target value” is not sent to the controller from the sensor, as might be expected if the plain and ordinary meaning of “target value” were as Dr. Wooley opines. Petitioner and Dr. Wooley’s construction would also result in “target value” meaning effectively the same thing as the measurement of the fluid by the sensor, a concept that is separately recited in claim 1 and to which the “target value” is compared. The Specification of the ’680 patent does not support Petitioner’s understanding of the plain and ordinary meaning of “target value.” Although the Specification does not recite “target value,” it recites “target state,” and describes “target state” sufficiently to understand the plain and ordinary meaning of “target” as used in “target value” and “target state.” In particular, the ’680 patent explains that “[i]n some embodiments, the process 104 includes receiving, via a network interface, from a remote user device, (e.g., via a command-center server) a command to change a state of a fluid-handling device to a target state.” Ex. 1001, 11:48–51. This portion reflects that the command is seeking to change a state of a fluid-handling device to a target state. In other words, the “target value” or “target state” is not generally “the particular operating condition that a device is in at a particular time”; rather, it is a value or state that the fluid-handling device is desired to be in, as Patent Owner and Dr. Durham explain. Additionally, just as claim 1 recites a directional component for the “target value” to be sent to the controller in a command, so too does the Specification describe a “target state” as being sent in a command from a remote user device. Thus, the Specification clearly supports the plain and ordinary meaning proposed by Patent Owner and Dr. Durham and not the plain and ordinary meaning proposed by Petitioner and Dr. Wooley. slip op. at 14
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable
“time-stamped process data, report exception therein to the remote host, and extract and transmit time-stamped process data to the remote host.” Ex. 1005, Abst. (emphases added). Almadi explains that its remote field systems must include a plurality of controller units “to issue commands to, and gather and process data from a plurality of field devices, including remote systems and instruments, . . . [and] a database server for the storage of process data retrieved from the remote subsystems and instruments.” Id. at 2:22–30 (emphases added). Based on these disclosures, we agree with Patent Owner that Petitioner has not established that Almadi discloses element [1.4]. Specifically, the teachings from Almadi identified by Petitioner refer to process data, which is data retrieved from the remote subsystems/field devices. Thus, we understand that Almadi’s teaching—of using an Ethernet switch to transmit “process data”—describes transmitting data from the remote subsystems/field devices. See Ex. 1005, 3:13–17, cited in Pet. 15. But claim 1 and particularly element [1.4], recites “sending, with the server, the target value to the network address [which identifies a controller of the fluid-handling device13] via the network,” which is different than sending process data from the field devices to the remote host or database server for storage.” slip op. at 19
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 11,175,680 - Tanklogix, LLC v. SiteproInstitution deniedPTAB · Oct 10, 2025 · IPR2025-00650 · APJ Sheila F Mcshane · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood that claims 18–32 and 34 were unpatentable over Kahn or Kahn and Gutierrez.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). Upon consideration of the Petition, the Preliminary Response, and the evidence of record, we determine that Petitioner has not established a reasonable likelihood of prevailing with respect to the unpatentability of at least one claim of the ’871 patent. Accordingly, for the reasons that follow, we decline to institute an inter partes review of claims 18–32 and 34 of the ’871 patent.” slip op. at 2
- Skill levelSkill level patent owner adoptedDecided for patent owner
“The respective proposed levels of qualifications for a person of ordinary skill in the art are similar, with Patent Owner proposing two years of experience compared to Petitioner proposing significant experience with remotely controlling fluid-handling devices, like SCADA systems. Patent Owner also proposes more extensive experience in lieu of educational experience. While we find Petitioner’s proposed qualifications to be acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of skill necessary to understand and implement the teachings of the ’871 patent and the asserted prior art. Our analysis and findings herein, however, do not turn on any differences in the qualifications adopted.” slip op. at 8
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“We determine that we need not expressly construe any claim terms to resolve the parties’ disputes on the current record. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 10
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable
“actuators and the remote control of fluid handling devices, including the receipt with the user-interface module of “a user command to actuate an actuator via a presented control interface” (limitation [18.7]) and “account authorized to send commands to remotely control fluid handling devices” (limitation [18.11]). We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses or teaches these limitations because the evidence does not provide support that there is remote control of fluid handling devices or the use of a user command on a control interface to send a command to a fluid handling device, for instance. Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but we do not discern that it teaches or discloses the capability to remotely control fluid handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, the Kahn disclosures that Petitioner repeatedly relies upon for allegedly teaching this control are deficient. See Ex. 1005, 10:62–67, 14:35– 15:2, 15:62–16:32; see also Pet. 12–14, 16–18. Kahn discloses that “the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance.” Ex. 1005, 10:62–67. Communication unit 112B is part of the local “sensor unit,” wherein the detection conditions determined by the sensor are communicated to remote devices by communication unit 112B. See id. at 3:31–33, 5:62–6:2, 6:27–35, 7:33–37, 13:7–12, Figs. 1A–1C. Kahn discloses that the sensor units, which include communication units 112B, can be located near shut-off valves and can communicate with distant locations. See id. at 11:1–13. There are no disclosures, however, in the above passages that there is remote control of fluid handling devices, that there is a user command on a control interface that actuates an actuator, or that there is a command sent to the facility actuators via a network connection, as required in limitations [18.5]–[18.7] and [18.9]–[18.12], respectively. Rather, the disclosure indicates that the communication unit 112B includes on-site alerts and that the local (non-remote) communication unit 112B can be interfaced with the control valve.” slip op. at 18
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 10,488,871 - PTAB · Oct 8, 2025 · IPR2025-00629 · APJ Scott C Moore · IPR · Institution
The Board instituted IPR of claims 1–20 on all asserted grounds, finding a reasonable likelihood that claim 1 is obvious over Beard and Laufer.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“We may institute an inter partes review when “the information presented in the petition . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). If we institute an inter partes review, the trial must encompass all claims and grounds identified in the Petition. 37 C.F.R. § 42.108(a) (“When instituting inter partes review, the Board will authorize the review to proceed on all of the challenged claims and on all grounds of unpatentability asserted for each claim.”). For the reasons set forth below, we conclude that there is a reasonable likelihood that Petitioner will prevail in establishing the unpatentability of one or more claims of the ’711 Patent. We, therefore, institute inter partes review of claims 1–20 on the grounds identified in the Petition. B.” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“Petitioner contends that one of ordinary skill in the art would have had the following qualifications: [E]ither (1) a Bachelor of Science in Mechanical Engineering, Electrical Engineering, Aerospace engineering, or an equivalent field, as well as at least 2 years of academic or industry experience in the aerospace or avionics fields, or (2) at least four years of experience in any of the above industries. 1 The Leahy-Smith America Invents Act (“AIA”) included revisions to 35 U.S.C. §§ 102 and 103 that became effective on March 16, 2013. Because the applications from which the ’711 Patent claims priority were all filed after this date, the post-AIA version of §103 applies. See Ex. 1001, codes (60), (63). 2 U.S. Patent No. 9,769,387 B1, iss. Sept. 19, 2017 (Ex. 1009). 3 U.S. Patent App. Pub. No. 2017/0059692 A1, pub. Mar. 2, 2017 (Ex. 1010). 4 U.S. Patent App. Pub. No. 2012/0106800 A1, pub. May 3, 2012 (Ex. 1021). 5 U.S. Patent App. Pub. No. 2017/0161911 A1, pub. June 8, 2017 (Ex. 1007). 6 U.S. Patent App. Pub. No. 2013/0301905 A1, pub. Nov. 14, 2013 (Ex. 1024). 7 U.S. Patent App. Pub. No. 2012/0004844 A1, pub. Jan. 5, 2012 (Ex. 1025). 8 PCT App. Pub. No. WO 2017/123477 A1, pub. July 20, 2017 (Ex. 1022). 9 U.S. Patent App. Pub. No. 2017/0160751 A1, pub. June 8, 2017 (Ex. 1005). Pet. 8 (citing Ex. 1003 ¶¶ 50–54). Patent Owner does not presently dispute Petitioner’s proposed formulation. See generally Prelim. Resp. For purposes of this Decision, we adopt and apply Petitioner’s formulation regarding the level of ordinary skill in the art because it is (1) consistent with the ’711 Patent and the asserted prior art; and (2) it is supported by the testimony of Dr. Singhose. B.” slip op. at 6
- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITAPlain and ordinary meaningDecided for petitioner
“But the Detecting Limitations of claims 1, 19, and 20, merely require that a target be “detected.” The Detecting Limitations do not require that target detection be performed “aboard the reference UAV,” and claim 19 does not recite or require “machine learning.” Moreover, the Specification makes clear that the claims should not be limited to aspects of the disclosed embodiments, as Patent Owner proposes to do here. See, e.g., Ex. 1001, 2:56–59 (“The invention is described in connection with such embodiments, but the invention is not limited to any embodiment. The scope of the invention is limited only by the claims . . . .”) Patent Owner additionally fails to cite any lexicographic definition or clear and unambiguous disclaimer of claim scope sufficient to limit the claims in the manner it proposes. We, thus, are not persuaded that the Detecting Limitations require “applying aboard the reference UAV a machine learning model to the capture image for: (i) identifying a target in the captured image.”” slip op. at 8
- Disclosure Requirements (§112) › Written description (Ariad)Not entitled to earlier dateDecided for petitioner
“Priority Date of the Challenged Claims Petitioner contends that claims 1–20 of the ’711 Patent “should not have priority to the October 9, 2016 filing date of U.S. provisional [patent] application 62/405,972 due to a lack of written description support.” Pet. 3. Petitioner thus “assumes” a priority date of October 1, 2017 (the filing date of U.S. Provisional Patent Application No. 62/556,449) for purposes of this proceeding. Id. at n.2; see also Ex. 1003, code (60). Patent Owner does not presently dispute Petitioner’s contention that the ’711 Patent is not entitled to a priority date earlier than October 1, 2017. See generally Prelim. Resp. For purposes of this decision, we accept Petitioner’s undisputed contention that the ’711 Patent is not entitled to a priority date prior to 10 Any determination, no matter how designated in this Institution Decision (except our ultimate decision to institute), is preliminary and non-binding. Our Final Written Decision, based on a fully developed record of arguments and evidence, will state our binding determinations, findings, and conclusions. If a party disagrees with this preliminary construction, or any other determination set forth in this Institution Decision, that party should present its arguments at trial. The parties are reminded that any arguments not made during trial will be considered waived. Patent Owner is further reminded that arguments in the Preliminary Response are not preserved and will be considered waived at trial unless those arguments are re-raised in the Patent Owner Response. The parties are additionally reminded that arguments raised in subsequent briefing must be set forth in full in the briefs themselves, and may not be incorporated by reference from prior filings such as the Preliminary Response. See 37 C.F.R. § 42.6(a)(3). October 1, 2017.11 Accordingly, Petitioner has made a sufficient showing that all of the cited references qualify as prior art. See Pet. 4–6. D.” slip op. at 11
Claim construction§ 103 obviousness§ 112 disclosurecites Phillips · KSR · GrahamPatents in suitUS 10,514,711
Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.