- PTAB · Aug 27, 2025 · IPR2025-00565 · APJ St John Courtenay III · IPR · Institution
The Board instituted IPR of claims 1–5 on all five grounds, finding a reasonable likelihood that claim 1 is obvious over Shin.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“review. See 35 U.S.C. § 314 (2018); 37 C.F.R. § 42.4(a) (2022). Under 35 U.S.C. § 314(a), we may not authorize an inter partes review unless the information in the petition and the preliminary response “shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.”” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“Relying on the declaration testimony of Dr. Stern, Petitioner contends that an ordinarily skilled artisan for the ’337 patent “would have had a minimum of a bachelor’s degree in computer engineering, computer science, electrical engineering, or a similar field,” and would have “approximately two years of industry or academic experience in a field related to controlling the audio output of electronic devices.” Pet. 7 (citing Ex. 1002 ¶¶ 30–34). Petitioner further asserts that “[w]ork experience could substitute for formal education and additional formal education could substitute for work experience.” Id.” slip op. at 12
- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed board ownOther
“repeatedly emphasized that an indefinite article “a” or “an” in patent parlance carries the meaning of “one or more” in open-ended claims containing the transitional phrase “comprising.” That “a” or “an” can mean “one or more” is best described as a rule, rather than merely as a presumption or even a convention. The exceptions to this rule are extremely limited: a patentee must “evince[ ] a clear intent” to limit “a” or “an” to “one.” The subsequent use of definite articles “the” or “said” in a claim to refer back to the same claim term does not change the general plural rule, but simply reinvokes that non-singular meaning. SanDisk Corp. v. Kingston Tech. Co., Inc., 695 F.3d 1348, 1360 (Fed. Cir. 2012) (quoting Baldwin Graphic Systems, Inc. v. Siebert, 512 F.3d 1338, 1342 (Fed. Cir. 2008)). These controlling case authorities are applicable here. At this stage, we preliminarily construe the scope of the claim 1[b] term “a user” as covering one or more users. Likewise, we preliminarily construe the scope of the 1[b] phrase “a voice spoken by a user” as covering one or more voices spoken by a single user, or by plural users.” slip op. at 15
- Obviousness (§103) › Graham factors (scope of art, differences, level of skill)Instituted
“under 35 U.S.C. § 103 as obvious over Shin under Ground 2. Pet. 30–35. Petitioner contends that “[i]f [Patent Owner] argues that Shin fails to disclose any limitations [under anticipation Ground 1], such limitations would have been obvious over Shin [under obviousness Ground 2].” Pet. 30. Therefore, we refer to Petitioner’s individual mappings for claim 1 to Shin as set forth under anticipation Ground 1 as also being applicable to obviousness Ground 2, because “anticipation is the epitome of obviousness.” Jones v. Hardy, 727 F.2d 1524, 1529 (Fed. Cir. 1984). We note that under Ground 2, no modifications are required to arrive at the claimed invention. Therefore, no showing of a motivation to modify Shin or a reasonable expectation of success is required. See Unification Techs. LLC v. Micron Tech Inc., 23-1348, 2024 WL 3738401, at *6 (Fed. Cir. Aug. 9, 2024) (nonprecedential). We have also considered the Declaration by Dr. Stern, as cited by Petitioner in support of institution. See Ex. 1002 ¶¶ 107–116.” slip op. at 18
Claim construction§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 11,069,337 - PTAB · Aug 26, 2025 · IPR2025-00437 · APJ Mitchell G Weatherly · IPR · Institution
The Board instituted IPR of claims 1–19 on all grounds, finding a reasonable likelihood that Wang anticipates claim 1.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“Owner”) did not file a Preliminary Response on the merits of patentability. Institution of an inter partes review is authorized by statute when “the information presented in the petition filed under section 311 and any response filed under section 313 shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). Based on our review of the record,1 we conclude that Petitioner is reasonably likely to prevail with respect to at least one of the challenged claims.” slip op. at 2
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Instituted
“A claim is anticipated only if each and every element as set forth in the claim is found, either expressly or inherently described, in a single prior art reference.” Verdegaal Bros., Inc. v. Union Oil Co. of Cal., 814 F.2d 628, 631 (Fed. Cir. 1987). slip op. at 5
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“35 U.S.C. § 282(b), including construing the claim in accordance with the ordinary and customary meaning of such claim as understood by one of ordinary skill in the art and the prosecution history pertaining to the patent.” 37 C.F.R. § 42.100(b). When applying that standard, we interpret the claim language as it would have been understood by one of ordinary skill in the art in light of the specification. Wasica Fin. GmbH v. Cont’l Auto. Sys., Inc., 853 F.3d 1272, 1279–80 (Fed. Cir. 2017). Thus, we give claim terms their ordinary and customary meaning as understood by an ordinarily skilled artisan. See Phillips v. AWH Corp., 415 F.3d 1303, 1312–13 (Fed. Cir. 2005) (en banc). Only terms that are in controversy need to be construed, and then only to the extent necessary to resolve the controversy. Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017). Petitioner contends that “no special constructions are required.” Pet. 10. We agree and do not expressly construe any claim term.” slip op. at 4
Claim construction§ 102 anticipationcites PhillipsPatents in suitUS 10,788,690 - Cambridge Industries USA, Inc. v. Applied Optoelectronics, Inc.Institution deniedPTAB · Aug 26, 2025 · IPR2025-00436 · APJ Mitchell G Weatherly · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood that Mizobuchi or Akashi anticipates any of claims 1–17.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“Institution of an inter partes review is authorized by statute when “the information presented in the petition filed under section 311 and any response filed under section 313 shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). Based on our review of the record, we conclude that Petitioner is reasonably likely to prevail with respect to at least one challenged claim.” slip op. at 2
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable
“All independent claims recite “a light engine driving circuit disposed on the substrate.” Ex. 1001, 9:59 (claim 1), 10:64 (claim 12), 12:7 (claim 15). Petitioner contends that “Mizobuchi discloses a light engine driving circuit disposed on the substrate that includes a clock data recovery (“CDR”) circuit and a power supply circuit.” See Pet. 19 (citing Ex. 1006, 3:57–4:18, 12:27–41, Figs. 2, 3A; Ex. 1003 ¶ 76 while addressing limitation 1d); see also id. at 26–28 (addressing claims 12 and 15 by cross-referencing showing for claim 1). Petitioner identifies the driving circuit on Mizobuchi’s “first circuit board” 2 in the annotated version of Mizobuchi’s Figure 2, reproduced below. See Pet. 19.” slip op. at 5
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“Petitioner contends that the Board may find it necessary to interpret “feedthrough device,” “interconnect device,” and “opposing arrangement.” Pet. 8–11. Patent Owner responds to Petitioner’s proposed interpretations of these terms, but contends that the Board need not interpret them to determine whether to institute review. Prelim. Resp. 17–18. For reasons that become apparent below, we agree with Patent Owner and do not expressly construe these terms. B. Legal Standards” slip op. at 4
Claim construction§ 102 anticipationcites PhillipsPatents in suitUS 10,313,024 - PTAB · Aug 25, 2025 · IPR2025-00631 · APJ Kevin W Cherry · IPR · Institution
The Board instituted IPR on claims 1–3, 5, 7–9, 11–13, and 15–22 on all five asserted § 103 grounds, finding a reasonable likelihood of success on at least one claim.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“institute an inter partes review. The standard for instituting an inter partes review is set forth in 35 U.S.C. § 314(a), which provides that an inter partes review may not be instituted unless “there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” The Supreme Court has held that the Board, in a decision to institute under 35 U.S.C. § 314(b), may not institute review on less than all claims challenged in the petition. SAS Inst. Inc. v. Iancu, 138 S. Ct. 1348, 1355–56 (2018). Moreover, in accordance with our rules, “[w]hen instituting inter partes review, the Board will authorize the review to proceed on all of the challenged claims and on all grounds of unpatentability asserted for each claim.” 37 C.F.R. § 42.108(a) (2020); see also PGS Geophysical AS v. Iancu, 891 F.3d 1354, 1360 (Fed. Cir. 2018) (interpreting the statute to require “a simple yes-or-no institution choice respecting a petition, embracing all challenges included in the petition”). Applying those standards, and upon considering the Petition, the Preliminary Response, and the evidence of record, we determine the information presented shows a reasonable likelihood that Petitioner would prevail in establishing the unpatentability of at least one of the challenged claims of the ’027 patent. Accordingly, we institute an inter partes review of all challenged claims (i.e., 1–3, 5, 7–9, 11–13, and 15–22) of the ’027 patent, based on the grounds asserted in the Petition.” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“Petitioner contends that a person of ordinary skill in the art would have “possessed an undergraduate degree in chemistry, polymers, materials science, chemical engineering (or related field) and one to two years of experience with constructing and manufacturing tires, tire patches, tire decals/stickers and/or the like.” Pet. 8 (citing Ex. 1003 ¶¶ 6–11). According to Petitioner, “Additional education could compensate for less practical experience. Conversely, additional practical experience could compensate for less education.” Id. Patent Owner does not provide an alternate definition, but, “Patent Owner does not acquiesce to, and reserves the right to address, [Petitioner’s] definition of a POSA.” Prelim. Resp. 6 n.6. Petitioner’s proposed definition appears to be consistent with the disclosure of the ’027 patent, and we adopt it for purposes of this Decision. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (explaining that the prior art itself may “reflect[] an appropriate level” of ordinary skill in the art) (quoting Litton Indus. Prods., Inc. v. Solid State Sys. Corp., 755 F.2d 158, 163 (Fed. Cir. 1985)).” slip op. at 8
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededDecided for petitioner
“Having considered the record, we determine that no express claim construction is necessary for any claim terms. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)).” slip op. at 10
- Obviousness (§103) › Graham factors (scope of art, differences, level of skill)Instituted
“We disagree with Patent Owner’s contentions that these disclosures indicate that Wilson’s patch would not meet the construction of “barrier material composition.” None of these disclosures even suggests that the base of Wilson’s patch is rigid as Patent Owner suggests. To begin with, the fact that the housing is “more rigid” provides no information about the absolute rigidness of the patch. See Ex. 1009, 9:16–21. As for the disclosure that the patch is contoured (id. at 3:35–67), Patent Owner provides only attorney argument to support its contention that the contour demonstrates that Wilson’s patch must be so rigid that it cannot be meet the claim limitation. In contrast, Petitioner demonstrates that Wilson discloses using the exact same materials described in the challenged patent (see Ex. 1001, 6:33–58 (noting “[e]lastomeric materials useful for forming the intermediate layer 24 include but are not limited to gum rubber, vulcanized natural rubber SBR . . . or comparable materials”); Ex. 1009, 3:49–55 (noting the patch may be constructed from natural rubber (NR), a preferred mixture of chlorobutyl rubber and natural rubber (CR/NR), or a preferred mixture of SBR and natural rubber (SBR/NR)), and provides detailed testimony from its expert to support its contentions (see Ex. 1003 ¶¶ 114–119). On the current record, we find Petitioner’s reasoning and evidence to be persuasive, and find that Petitioner has shown sufficiently that Willson discloses or teaches this limitation.” slip op. at 20
Claim construction§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 11,124,027 - Cambridge Industries USA, Inc. v. Applied Optoelectronics, Inc.Institution deniedPTAB · Jul 29, 2025 · IPR2025-00434 · APJ Monica S Ullagaddi · IPR · Institution
Institution was denied for claims 1–7 because the Petition did not show a reasonable likelihood that either Shen or Soldano anticipates any challenged claim.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“The standard for institution is set forth in 35 U.S.C. § 314, which provides that an inter partes review may not be instituted unless the information presented in the Petition and the Preliminary Response shows that “there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314 (2019); see also 37 C.F.R § 42.4(a) (2019) (“The Board institutes the trial on behalf of the Director.”). Upon consideration of the parties’ contentions and the evidence of record, we conclude that Petitioner has not established a reasonable likelihood of prevailing in demonstrating the unpatentability of at least one challenged claim of the ’301 patent. Accordingly, we deny Petitioner’s request and do not institute an inter partes review.” slip op. at 2
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“C. Claim Construction We interpret a claim “using the same claim construction standard that would be used to construe the claim in a civil action under 35 U.S.C. 282(b).” 37 C.F.R. § 42.100(b). Under this standard, we construe the claim “in accordance with the ordinary and customary meaning of such claim as understood by one of ordinary skill in the art and the prosecution history pertaining to the patent.” Id.” slip op. at 8
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable
“onset to show with particularity why the patent it challenges is unpatentable.” Harmonic Inc. v. Avid Tech., Inc., 815 F.3d 1356, 1363 (Fed. Cir. 2016) (citing 35 U.S.C. § 312(a)(3)). “A claim is anticipated only if each and every element as set forth in the claim is found, either expressly or inherently described, in a single prior art reference.” Verdegaal Bros., Inc. v. Union Oil Co. of California, 814 F.2d 628, 631 (Fed. Cir. 1987). We analyze” slip op. at 7
Claim construction§ 102 anticipationPatents in suitUS 10,379,301 - Posco Co., Ltd. v. ArcelormittalInstitutedPTAB · Jul 23, 2025 · IPR2025-00371 · APJ Brian D Range · IPR · Institution
The Board instituted IPR on claims 1–25 based on all petitioned grounds, finding a reasonable likelihood that POSCO would prevail.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“Under 35 U.S.C. § 314(a), an inter partes review may not be instituted unless the information presented in the petition “shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” The following findings of fact and conclusions of law are not final, but are made for the sole purpose of determining whether Petitioner meets the threshold for initiating review. Any final decision shall be based on the full trial record, including any response timely filed by Patent Owner. Any arguments not raised by Patent Owner in a timely-filed response may be deemed waived. For the reasons stated below, we determine that Petitioner has established a reasonable likelihood that it would prevail with respect to at least one claim. We hereby institute an inter partes review as to claims 1–25 of the ’227 patent based upon Petitioner’s asserted grounds of unpatentability.” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“Petitioner contends that a person of ordinary skill in the art (POSITA) “would have had an undergraduate degree in materials science, manufacturing engineering, mechanical engineering, or equivalent knowledge, training, or experience, with two years of experience working in metallurgy.” Pet. 6 (citing Ex. 1003 ¶ 15). For purposes of this Decision, we adopt Petitioner’s proposal as reasonable and consistent with the ’227 patent specification and the prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (the prior art may reflect an appropriate level of skill in the art).” slip op. at 8
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“Petitioner does not propose any claim constructions. Pet. 3. We do not discern a need to construe explicitly any claim language at this juncture because doing so would have no effect on our analyses below of Petitioner’s asserted grounds and will not assist in resolving the present controversy between the parties. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)).” slip op. at 9
- Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundInstituted
“35 U.S.C. § 103(a) as obvious over Takagi and Cornette, citing the Declaration of Dr. Miles for support. Pet. 1, 6–49 (citing Ex. 1003) (Petitioner’s Ground 1A). a. Claim 1 Petitioner argues that Takagi and Cornette teach or suggest each recitation of claim 1. Pet. 6–31. Petitioner argues, for example, that the preamble of claim 1 is not limiting or, alternatively, imparts no structural distinction from Takagi. Id. at 20–23 (citing, e.g., Ex. 1003 ¶ 48). Petitioner further argues that Takagi and Cornette teach forming or hot stamping to arrive at their products. Id. at 23 (citing, e.g., Ex. 1016 ¶ 36 (Takagi referring to “form[ing]” its products shape); Ex. 1014, 9–11 (Cornette referring to “hot stamping”); Ex. 1003 ¶ 48. Petitioner argues that Takagi teaches a strip of base steel having a first and second side. Id. at 23–24 (citing, e.g., Ex. 1003 ¶ 49; Ex. 1016 ¶¶ 13, 36. Petitioner argues that Takagi teaches a coating that is a “diffusion layer” having five phases as depicted by Takagi Figure 2A and explained by Takagi Table 1 (Takagi Fig. 4). Id. at 24–30 (citing, e.g., Ex. 1003 ¶¶ 50–59; Ex. 1016 ¶ 20, Fig. 2A). Petitioner argues that Takagi alone or as modified by Cornette teaches a coating thickness greater than than 30 µm. Id. at 30–31; Ex. 1014, 9; Ex. 1016 ¶ 35; Ex. 1003 ¶¶ 60–61. Petitioner explains why a person having ordinary skill in the art would have had reason to combine teachings of Takagi and Cornette with a reasonable expectation of success. Pet. 11–20 (citing, e.g., Ex. 1003 ¶¶ 31–47; Ex. 1016 ¶¶ 19–37, 47; Ex. 1014, 9; Ex. 1025, 5:17–20; Ex. 1026, 7; Ex. 1034 ¶ 13; Ex. 1055 ¶¶ 2, 7, 14–15, 18, Fig. 3). Based on our review and consideration of the current record, we determine that the information presented sufficiently supports, for purposes of institution, Petitioner’s assertions that Takagi and Cornette teach or suggest each limitation of claim 1. See Pet. 6–31. We therefore determine Petitioner has met its burden to show a reasonable likelihood it would prevail in demonstrating that claim 1 would have been obvious over Takagi and Cornette.” slip op. at 12
Claim construction§ 103 obviousnesscites KSR · GrahamPatents in suitUS 11,326,227 - Posco Co., Ltd. v. ArcelormittalInstitutedPTAB · Jul 23, 2025 · IPR2025-00370 · APJ Brian D Range · IPR · Institution
The Board instituted IPR of claims 1–30 on all twelve asserted obviousness grounds, finding a reasonable likelihood that POSCO would prevail.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“unless the information presented in the petition “shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” The following findings of fact and conclusions of law are not final, but are made for the sole purpose of determining whether Petitioner meets the threshold for initiating review. Any final decision shall be based on the full trial record, including any response timely filed by Patent Owner. Any arguments not raised by Patent Owner in a timely-filed response may be deemed waived. For the reasons stated below, we determine that Petitioner has established a reasonable likelihood that it would prevail with respect to at least one claim. We hereby institute an inter partes review as to claims 1–30 of the ’602 patent based upon Petitioner’s asserted grounds of unpatentability.” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“For purposes of this Decision, we adopt Petitioner’s proposal as reasonable and consistent with the ’602 patent specification and the prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (the prior art may reflect an appropriate level of skill in the art).” slip op. at 9
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“Petitioner does not propose any claim constructions. Pet. 3. We do not discern a need to construe any claim language at this juncture because doing so would have no effect on our analyses below of Petitioner’s asserted grounds and will not assist in resolving the present controversy between the parties. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200” slip op. at 9
- BurdenInstituted
“determine that the information presented sufficiently supports, for purposes of institution, Petitioner’s assertions that Takagi and Cornette teach or suggest each limitation of claim 1. See Pet. 6–33. We therefore determine Petitioner has met its burden to show a reasonable likelihood it would prevail in demonstrating that claim 1 is obvious over Takagi and Cornette.” slip op. at 12
Claim constructioncites KSR · GrahamPatents in suitUS 10,961,602 - PTAB · Jun 25, 2025 · IPR2024-01280 · APJ Jo-Anne M Kokoski · IPR · Remand
On remand, the Board denied institution under § 314(a), finding the Fintiv factors favored denial despite declining to deny under § 325(d).
RulingsRemand decision- PTAB / AIA Trials › Discretionary denial › §325(d) same art / argumentsInstitution denied 325dDecided for petitioner
“Other than initials on a lengthy IDS, nothing in the record indicates that the Examiner substantively considered Takeuchi, Kim, Pienemann, or among over 1,000 other references listed on the IDS, which, as noted in the Director Review Decision, “is over 40 times the size of a typical IDS.” Pet. Remand Br. 5–6; DR Dec. 7 n.3 (citing Setting and Adjusting Patent Fees During Fiscal Year 2025, 89 FR 91898 at 91924 (Nov. 20, 2024)); Ex. 1002, 228–284. Petitioner also shows that the applicant did not respond to the Examiner’s request that the applicant specifically point out “any particular reference or portion of a reference in the [IDS] which the examiner should take [sic] pay particular attention to.” Ex. 1002, 174, 295– 302.” slip op. at 13
- PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Institution denied fintivInstitution denied
“Patent Owner is likely correct that the ITC would not have been inclined to grant a stay if one had been requested at the time the Institution Decision issued. Moreover, the ITC conducted a full evidentiary hearing a month after the Institution Decision issued, and the target date for the ITC’s final determination is several months before the projected statutory deadline for the Board’s final written decision. PO Remand Br. 7. Accordingly, we determine that Fintiv factor 1 weighs in favor of discretionary denial. See also Klein Tools, Inc. v. Milwaukee Electric Tool Corp., IPR2024-01400, Paper 22 at 2 (PTAB June 9, 2025) (Acting Director Stewart determining that Fintiv factor 1 weighs in favor of discretionary denial when the ITC investigation is unlikely to be stayed, the ITC already conducted a full evidentiary hearing, and the ITC final determination is expected to issue six months before the statutory deadline for the Board’s final written decision).” slip op. at 19
Discretionary denialcites PhillipsPatents in suitUS 11,925,202 - PTAB · Jun 25, 2025 · IPR2024-01406 · APJ Jo-Anne M Kokoski · IPR · Remand
On remand, the Board denied institution of review of claims 1, 3, 4, 8–13, and 15 under § 314(a), finding the Fintiv factors favored discretionary denial.
RulingsRemand decision- PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Denied
“stay or evidence exists that one may be granted if a proceeding is instituted.” Fintiv, Paper 11 at 6. A stay of litigation pending resolution of an inter partes review allays concerns about inefficiency and duplication of efforts, and strongly weighs against exercising our authority to deny institution. Fintiv, Paper 11 at 6. The Guidance Memo states that “the Board will apply the Fintiv factors when there is a parallel proceedings at the International Trade Commission.” Guidance Memo 2. Patent Owner asserts that a stay of the ITC Investigation had not been requested at the time of the Institution Decision,7 and argues that “the ITC does not stay investigations pending IPR.” PO Supp. Br. 4. Patent Owner also notes that the Institution Decision issued “just days before the ITC evidentiary hearing.” Id. Accordingly, Patent Owner argues that this factor favors denial. Id. Patent Owner is likely correct that the ITC would not have been inclined to grant a stay if one had been requested at the time the Institution Decision issued. Moreover, the ITC conducted a full evidentiary hearing less than three weeks after the Institution Decision issued, and the target date for the ITC’s final determination is four months before the statutory deadline for the Board’s final written decision. PO Supp. Br. 5. Accordingly, we” slip op. at 9
Discretionary denialPatents in suitUS 11,925,202 - Qualcomm Incorporated v. Network System Technologies, LLCAll claims unpatentablePTAB · Jun 13, 2025 · IPR2024-00343 · APJ Charles J Boudreau · IPR · Final written decision
Claims 1–7 are unpatentable as obvious over Rădulescu2004 and OCP; the Board did not reach the Weber-based grounds.
RulingsFinal written decision- Skill levelSkill level petitioner adoptedDecided for petitioner
“include (1) the educational level of the inventor; (2) the type of problems encountered in the art; (3) prior-art solutions to those problems; (4) the rapidity with which innovations are made; (5) the sophistication of the technology; and (6) the educational level of workers active in the field. Envtl. Designs, Ltd. v. Union Oil Co., 713 F.2d 693, 696–97 (Fed. Cir. 1983). Not all factors may exist in every case, and one or more of these or other factors may predominate in a particular case. Id. These factors are not exhaustive, but merely a guide to determining the level of ordinary skill in the art. Daiichi Sankyo Co. v. Apotex, Inc., 501 F.3d 1254, 1256 (Fed. Cir. 2007). Moreover, the prior art itself may reflect an appropriate skill level. Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001).” slip op. at 13
- Claim Construction › Functional claiming / §112(f) means-plus-function › Whether §112(f) applies (Williamson, nonce words)§112(f) appliesDecided for petitioner
“35 U.S.C. § 112 ¶ 6 (2006). “[T]he use of the word ‘means’ in a claim element creates a rebuttable presumption that § 112, para. 6 applies.” Williamson v. Citrix Online, LLC, 792 F.3d 1339, 1348 (Fed. Cir. 2015) (en banc in relevant part); Personalized Media Commc’ns, LLC v. Int’l Trade Comm’n, 161 F.3d 696, 703–04 (Fed. Cir. 1998). “[This] presumption may be rebutted if the properly construed claim limitation itself recites sufficiently definite structure to perform the claimed function.” Kemco Sales, Inc. v. Control Papers Co., 208 F.3d 1352, 1361 (Fed. Cir. 2000).” slip op. at 16
- Claim Construction › Functional claiming / §112(f) means-plus-function › Corresponding structure / algorithm (indefinite if none)Term construed patent owner constructionDecided for patent owner
“Ex. 1001, 4:46–50. This passage indicates that the interconnect can be a network on a chip and the network on a chip can include wires and buses. That does not necessarily mean that the interconnect can be just wires or buses; rather, it discloses that the interconnect can include wires and buses. In context, the disclosure regarding wires and buses does not support construing the corresponding structure broadly enough to encompass just wires and buses. The networks that constitute the corresponding structure, however, could include networks with wires and buses. Therefore, we agree with Patent Owner that the corresponding structure for the interconnect means should not include a mere bus, switch, and point-to-point wire and instead find that the corresponding structure under 35 U.S.C. § 112 ¶ 6 is a network, which the ’052 patent describes as a multi-hop interconnection between modules separated by one or more network nodes. See Ex. 1001, 2:33–37. Because this structure corresponds to the construction of “interconnect means” proposed by Patent Owner and adopted by the district courts in the TI and Qualcomm litigations (see supra Section III.C.3.b), and we do not rely in our analysis below on a recourse to “equivalents thereto” as permitted by § 112 ¶ 6, we note that our ultimate conclusions on the unpatentability of the challenged claims would be the same if § 112 ¶ 6 did not apply. iii. Conclusion For the reasons stated above, we construe “interconnect means” to cover the structure described in the Specification corresponding to the specified functions of “coupling said plurality of processing modules (M, S)” in the context of claim 6 and “coupling said plurality of processing modules (M, S)” and “enabling a connection-based communication having a set of connection properties” in the context of claims 1 and 7—i.e., a “multi-hop interconnection between modules separated by one or more network nodes”—and equivalents thereof.” slip op. at 28
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“standard as would be used by a district court to construe a claim in a civil action involving the validity or infringement of a patent. 37 C.F.R. § 42.100(b). Under that standard, claim terms are given their ordinary and customary meaning, as would have been understood by a person of ordinary skill in the art at the time of the invention, in light of the language of the claims, the specification, and the prosecution history of record. Id.; Phillips v. AWH Corp., 415 F.3d 1303, 1312–19 (Fed. Cir. 2005) (en banc); Thorner v. Sony Comput. Entm’t Am. LLC, 669 F.3d 1362, 1365–66 (Fed. Cir. 2012). “The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’” Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (quoting Vivid Techs., Inc. v. Am. Sci. Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 15
Patent outcomesUS 7,594,052 unpatentableClaim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 7,594,052
Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.