- PTAB · Oct 15, 2025 · IPR2025-00762 · APJ Scott B Howard · IPR · Institution
The Board instituted IPR on claims 1–5 and 8–12 on all asserted grounds, finding a reasonable likelihood that claim 1 would have been obvious over Koskinen.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“determine whether to institute an inter partes review. 35 U.S.C. § 314 (2024); 37 C.F.R. § 42.4(a) (2024). Inter partes review may not be instituted unless “the information presented in the petition filed under [35 U.S.C.] section 311 and any response filed under [35 U.S.C.] section 313 shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). “When instituting inter partes review, the Board will authorize the review to proceed on all of the challenged claims and on all grounds of unpatentability asserted for each claim.” 37 C.F.R. § 42.108(a). For the reasons set forth below, upon considering the briefing and the evidence of record, we determine that the information presented in the Petition establishes a reasonable likelihood that Petitioner will prevail with respect to at least one of the challenged claims. Accordingly, we institute inter partes review on all of the challenged claims based on all of the grounds identified in the Petition.” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“Petitioner argues that a person having ordinary skill in the art “would have had a bachelor’s degree in electrical engineering, computer engineering, computer science, or a related field and at least two years of practical experience with design or development of telecommunication and/or wireless communications systems, or the equivalent.” Pet. 7 (citing Ex. 1003 ¶¶ 19–21). Petitioner further argues that “[a]dditional education” slip op. at 8
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“For the purposes of this Decision, we need not expressly construe any claim terms.6 See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (noting that “we need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 10
- Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundInstituted
“Additionally, a person having ordinary skill in the art would have known and been familiar with information elements (IEs) that specified an RLC reordering timer value based on (1) general knowledge that IEs carried information in RRC messages and (2) that 3GPP TSs describe an IE carrying recording timer duration information for the RLC layer. See Ex. 1003 ¶ 151; Ex. 1014, 219–20. Accordingly, it would have been obvious to a person having ordinary skill in the art “that the PDCP timer information, which used similar variables as its RLC counterpart (Koskinen, ¶¶37-38), would also be carried in a PDCP configuration IE.” Ex. 1003 ¶ 151.” slip op. at 13
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 10,863,573 - Tanklogix, LLC v. Sitepro, Inc.Institution deniedPTAB · Oct 10, 2025 · IPR2025-00653 · APJ Bart A Gerstenblith · IPR · Institution
The Board denied institution on all claims because the Petition did not show a reasonable likelihood that any challenged claim was unpatentable over the asserted grounds.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“An inter partes review may be instituted only if “the information presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2
- Skill levelSkill level patent owner adoptedDecided for patent owner
“The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’504 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“Additionally, only terms that are in controversy need to be construed, and these need be construed only to the extent necessary to resolve the controversy. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 9; Prelim. Resp. 4 (citing Ex. 2009 ¶ 72); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13
- Expert testimonyPetitioner expert discountedDecided for patent owner
“Ex. 1002 ¶ 47. As reflected above, Dr. Wooley’s testimony as to element [1.2] does not even assert that Cardamone discloses a tank, let alone one or more sensors disposed at a tank as recited in element [1.2]. Thus, Dr. Wooley’s testimony does not support Petitioner’s argument on this issue.” slip op. at 18
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 11,726,504 - Tanklogix, LLC v. Sitepro, Inc.Institution deniedPTAB · Oct 10, 2025 · IPR2025-00652 · APJ Bart A Gerstenblith · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–23 and 25–30 were unpatentable over the asserted grounds.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied
“presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2
- Skill levelSkill level patent owner adoptedDecided for patent owner
“The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’403 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 10; Prelim. Resp. 4 (citing Ex. 2009 ¶ 73); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable
“We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses element [1.2] because the evidence cited does not disclose a “first computer system being configured to provide remote control of the first pump or first valve” (i.e., a fluid-handling device). Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but Petitioner has not identified any disclosure of the capability to remotely control fluid-handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, Kahn’s disclosures that Petitioner relies on for allegedly teaching remote control are deficient. We discuss each. First, Petitioner points to the following, “[f]or instance, as illustrated in FIG. 1C, a fluid control device such as a valve 15A is located on the input side of a sen[s]or unit 110.” Ex. 1005, 8:19–21, cited in Pet. 13. This portion of Kahn, however, does not disclose remote control. Second, Petitioner cites to the following: Finally, or in addition to, the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance. Pet. 13 (citing Ex. 1005, 10:62–67). We agree with Patent Owner that this portion of Kahn teaches on-site alerts and local control of the fluid-handling device. See Prelim. Resp. 7. This portion of Kahn does not disclose remote control.” slip op. at 18
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 11,294,403 - Tanklogix, LLC v. Sitepro, Inc.Institution deniedPTAB · Oct 10, 2025 · IPR2025-00651 · APJ Bart A Gerstenblith · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–3, 6, 7, and 9–20 were unpatentable over any asserted ground.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied
“presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2
- Skill levelSkill level patent owner adoptedDecided for patent owner
“The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’680 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 11
- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner
“target value” is part of a command that is sent from a computing device to a server and then to a controller. The controller then receives a measurement of the fluid by a sensor and determines whether the measurement satisfies the “target value.” If the measurement does not satisfy the “target value,” further operations are undertaken. The recited operation sequence makes clear that the plain and ordinary meaning of “target value” is not as Dr. Wooley opines because the particular operating condition that a device is in at a particular time is represented by the measurement taken by the sensor, 11 Some claim language less relevant to construing “target value” was omitted for ease of reference. which the controller then uses to determine whether the measurement satisfies the “target value.” Additionally, claim 1 recites that the “target value” is sent as part of a command to the controller. The “target value” is not sent to the controller from the sensor, as might be expected if the plain and ordinary meaning of “target value” were as Dr. Wooley opines. Petitioner and Dr. Wooley’s construction would also result in “target value” meaning effectively the same thing as the measurement of the fluid by the sensor, a concept that is separately recited in claim 1 and to which the “target value” is compared. The Specification of the ’680 patent does not support Petitioner’s understanding of the plain and ordinary meaning of “target value.” Although the Specification does not recite “target value,” it recites “target state,” and describes “target state” sufficiently to understand the plain and ordinary meaning of “target” as used in “target value” and “target state.” In particular, the ’680 patent explains that “[i]n some embodiments, the process 104 includes receiving, via a network interface, from a remote user device, (e.g., via a command-center server) a command to change a state of a fluid-handling device to a target state.” Ex. 1001, 11:48–51. This portion reflects that the command is seeking to change a state of a fluid-handling device to a target state. In other words, the “target value” or “target state” is not generally “the particular operating condition that a device is in at a particular time”; rather, it is a value or state that the fluid-handling device is desired to be in, as Patent Owner and Dr. Durham explain. Additionally, just as claim 1 recites a directional component for the “target value” to be sent to the controller in a command, so too does the Specification describe a “target state” as being sent in a command from a remote user device. Thus, the Specification clearly supports the plain and ordinary meaning proposed by Patent Owner and Dr. Durham and not the plain and ordinary meaning proposed by Petitioner and Dr. Wooley. slip op. at 14
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable
“time-stamped process data, report exception therein to the remote host, and extract and transmit time-stamped process data to the remote host.” Ex. 1005, Abst. (emphases added). Almadi explains that its remote field systems must include a plurality of controller units “to issue commands to, and gather and process data from a plurality of field devices, including remote systems and instruments, . . . [and] a database server for the storage of process data retrieved from the remote subsystems and instruments.” Id. at 2:22–30 (emphases added). Based on these disclosures, we agree with Patent Owner that Petitioner has not established that Almadi discloses element [1.4]. Specifically, the teachings from Almadi identified by Petitioner refer to process data, which is data retrieved from the remote subsystems/field devices. Thus, we understand that Almadi’s teaching—of using an Ethernet switch to transmit “process data”—describes transmitting data from the remote subsystems/field devices. See Ex. 1005, 3:13–17, cited in Pet. 15. But claim 1 and particularly element [1.4], recites “sending, with the server, the target value to the network address [which identifies a controller of the fluid-handling device13] via the network,” which is different than sending process data from the field devices to the remote host or database server for storage.” slip op. at 19
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 11,175,680 - Tanklogix, LLC v. SiteproInstitution deniedPTAB · Oct 10, 2025 · IPR2025-00650 · APJ Sheila F Mcshane · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood that claims 18–32 and 34 were unpatentable over Kahn or Kahn and Gutierrez.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). Upon consideration of the Petition, the Preliminary Response, and the evidence of record, we determine that Petitioner has not established a reasonable likelihood of prevailing with respect to the unpatentability of at least one claim of the ’871 patent. Accordingly, for the reasons that follow, we decline to institute an inter partes review of claims 18–32 and 34 of the ’871 patent.” slip op. at 2
- Skill levelSkill level patent owner adoptedDecided for patent owner
“The respective proposed levels of qualifications for a person of ordinary skill in the art are similar, with Patent Owner proposing two years of experience compared to Petitioner proposing significant experience with remotely controlling fluid-handling devices, like SCADA systems. Patent Owner also proposes more extensive experience in lieu of educational experience. While we find Petitioner’s proposed qualifications to be acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of skill necessary to understand and implement the teachings of the ’871 patent and the asserted prior art. Our analysis and findings herein, however, do not turn on any differences in the qualifications adopted.” slip op. at 8
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“We determine that we need not expressly construe any claim terms to resolve the parties’ disputes on the current record. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 10
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable
“actuators and the remote control of fluid handling devices, including the receipt with the user-interface module of “a user command to actuate an actuator via a presented control interface” (limitation [18.7]) and “account authorized to send commands to remotely control fluid handling devices” (limitation [18.11]). We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses or teaches these limitations because the evidence does not provide support that there is remote control of fluid handling devices or the use of a user command on a control interface to send a command to a fluid handling device, for instance. Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but we do not discern that it teaches or discloses the capability to remotely control fluid handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, the Kahn disclosures that Petitioner repeatedly relies upon for allegedly teaching this control are deficient. See Ex. 1005, 10:62–67, 14:35– 15:2, 15:62–16:32; see also Pet. 12–14, 16–18. Kahn discloses that “the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance.” Ex. 1005, 10:62–67. Communication unit 112B is part of the local “sensor unit,” wherein the detection conditions determined by the sensor are communicated to remote devices by communication unit 112B. See id. at 3:31–33, 5:62–6:2, 6:27–35, 7:33–37, 13:7–12, Figs. 1A–1C. Kahn discloses that the sensor units, which include communication units 112B, can be located near shut-off valves and can communicate with distant locations. See id. at 11:1–13. There are no disclosures, however, in the above passages that there is remote control of fluid handling devices, that there is a user command on a control interface that actuates an actuator, or that there is a command sent to the facility actuators via a network connection, as required in limitations [18.5]–[18.7] and [18.9]–[18.12], respectively. Rather, the disclosure indicates that the communication unit 112B includes on-site alerts and that the local (non-remote) communication unit 112B can be interfaced with the control valve.” slip op. at 18
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 10,488,871 - Mim Software Inc. v. Progenics Pharmaceuticals, Inc.Institution deniedPTAB · Oct 10, 2025 · IPR2025-00726 · APJ Annette R Reimers · IPR · Institution
The Board denied institution because the Petition did not adequately explain which of its three alternative constructions of “risk indices” applied to the asserted grounds.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“review. 35 U.S.C. § 314(b) (2018); 37 C.F.R. § 42.4(a) (2024). An inter partes review may not be instituted “unless . . . the information presented in the petition . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). Upon consideration of the Petition and the evidence of record, we determine that Petitioner has not demonstrated a reasonable likelihood of success in proving that at least 1 claim of the ’141 patent is unpatentable. 1” slip op. at 2
- BurdenDenied
“risk index” differ in several “particular details,” but those details matter and can make a difference in our patentability analysis, especially given Petitioner’s acknowledgment that there is no well-established ordinary and customary meaning for the term. In taking this “choose-your-own-adventure” approach to claim construction, Petitioner fails to satisfy the requirements of 37 C.F.R. § 42.104(b)(3)–(4), which specify the content of the petition. In particular, Rule 42.104(b)(3) requires the petition to identify “[h]ow the challenged claim is to be construed,” while Rule 42.104(b)(4) requires the petition to identify “[h]ow the construed claim is unpatentable” under either 35 U.S.C. § 102 or § 103. Moreover, by proposing these “choose-your-own-adventure” constructions, Petitioner obfuscates which circumstances each proposed construction should be applied. The Board does not find that alternative claim constructions are per se improper. Nonetheless, there must be reasoning to explain the circumstances under which each alternative construction should be applied. For example, Petitioner may assert one construction on the basis that a claim term should be construed as a means-plus-function term under 35 U.S.C. § 112(f), but also propose an alternative construction to be applied if the term is not found to be a means-plus-function term. However, Petitioner does not provide any rationale here for including three alternative constructions. Rather, Petitioner indicates there is no well-established ordinary and customary meaning for the term(s), and incorrectly contends that the three alternative constructions are not significantly different without explaining why three different constructions are being proposed or under what circumstances one construction should be applied over the other two constructions. slip op. at 7
Discretionary denialPatents in suitUS 11,894,141 - Mim Software Inc. v. Progenics Pharmaceuticals, Inc.Institution deniedPTAB · Oct 8, 2025 · IPR2025-00725 · APJ Christopher G Paulraj · IPR · Institution
The Board denied institution because the Petition failed to explain how the challenged claims should be construed or how the prior art rendered them unpatentable under the proposed constructions.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied
“III.CONCLUSION For the foregoing reasons, we determine that the Petition fails to satisfy the requirement of 37 C.F.R. § 42.104(b) to set forth how the challenged claims are to be construed. Accordingly, we decline to institute an inter partes review. IV.ORDER In consideration of the foregoing, it is hereby: ORDERED that, pursuant to 35 U.S.C. § 314, the Petition for an inter partes review is denied and no inter partes review is instituted.” slip op. at 10
- BurdenDenied
“particular details,” but those details matter and can make a difference in our patentability analysis, especially given Petitioner’s acknowledgment that there is no well-established ordinary and customary meaning for the term. In taking this “choose-your-own-adventure” approach to claim construction, Petitioner fails to satisfy the requirements of 37 C.F.R. § 42.104(b)(3)–(4), which specify the content of the petition. In particular, Rule 42.104(b)(3) requires the petition to identify “[h]ow the challenged claim is to be construed,” while Rule 42.104(b)(4) requires the petition to identify “[h]ow the construed claim is unpatentable” under either 35 U.S.C. § 102 or § 103. Moreover, by proposing these “choose-your-own-adventure” constructions, Petitioner obfuscates which claim construction the Board is being asked to apply, and under what circumstances each proposed construction should be applied. To be sure, we do not find that alternative claim constructions are per se improper. Nonetheless, there must be reasoning to explain the circumstances under which each alternative construction should be applied or an explanation of how the prior art renders the claims unpatentable under alternative constructions. For instance, Petitioner may assert one construction on the basis that a claim term should be construed as a meansplus-function term under 35 U.S.C. § 112(f), but also propose an alternative construction to be applied if the term is not found to be a means-plus- any rationale here for including three alternative constructions. Instead, Petitioner indicates there is no well-established ordinary and customary meaning for the term, and incorrectly contends that the three alternative constructions are not significantly different without explaining why three different constructions are being proposed or under what circumstances one construction should be applied over the other two constructions. slip op. at 7
Discretionary denialPatents in suitUS 11,424,035 - Mim Software Inc. v. Progenics Pharmaceuticals, Inc.Institution deniedPTAB · Oct 8, 2025 · IPR2025-00630 · APJ Christopher G Paulraj · IPR · Institution
The Board denied institution because the Petition failed to explain which of three alternative constructions of “risk map” applied or how the prior art met the claims under those constructions.
RulingsInstitution decision- BurdenDenied
“particular details,” but those details matter and can make a difference in our patentability analysis, especially given that Petitioner acknowledges there is no well-established ordinary and customary meaning for the term. In taking this “choose-your-own-adventure” approach to claim construction, Petitioner fails to satisfy the requirements of 37 C.F.R. § 42.104(b)(3)–(4), which specify the content of the petition. In particular, Rule 42.104(b)(3) requires the petition to identify “[h]ow the challenged claim is to be construed,” while Rule 42.104(b)(4) requires the petition to identify “[h]ow the construed claim is unpatentable” under either 35 U.S.C. § 102 or § 103. Moreover, by proposing these “choose-your-own-adventure” constructions, Petitioner obfuscates which claim construction the Board is being asked to apply, and under what circumstances each proposed construction should be applied. To be sure, we do not find that alternative claim constructions are per se improper. Nonetheless, there must be reasoning to explain the circumstances under which each alternative construction should be applied or an explanation of how the prior art renders the claims unpatentable under alternative constructions. For instance, Petitioner may assert one construction on the basis that a claim term should be construed as a means- construction assuming the term is not found to be a means-plus-function term. Unlike this example, however, Petitioner does not provide any rationale here for including three alternative constructions. Instead, Petitioner indicates there is no well-established ordinary and customary meaning for the term, and summarily contends that the three alternative constructions are not significantly different without explaining why three different constructions are being proposed or under what circumstances one construction should be applied over the other two constructions. slip op. at 7
Discretionary denialPatents in suitUS 10,665,346 - Commscope Technologies LLC v. Belden Canada UlcAdverse judgmentPTAB · Sep 8, 2025 · IPR2024-01228 · APJ Kimberly Mcgraw · IPR · Adverse judgment
The Board granted Patent Owner’s withdrawal of its motion to amend and entered adverse judgment on the disclaimed challenged claims, terminating the IPR.
RulingsAdverse judgment- PTAB / AIA Trials › Motions to amend / substitute claimsMotion to amend, grantedGranted
“In view of the facts presented, including that no decision as to the patentability of the proposed substitute claims has yet been made and Petitioner does not oppose the withdrawal, we grant Patent Owner’s Motion to Withdraw its Motion to Amend.” slip op. at 2
- Adverse judgmentAdverse judgmentGranted
“Under our rules, a party may request adverse judgment against itself at any time during a proceeding, including by disclaiming all claims involved in a trial. 37 C.F.R. §42.73(b). Because Patent Owner’s request to withdraw its Motion to Amend has been granted and Patent Owner has disclaimed all Challenged Claims such that no claims remain in the trial, we grant Patent Owner’s Motion to Terminate by Adverse Judgment.” slip op. at 3
NonePatents in suitUS 11,656,422 - Commscope Technologies LLC v. Belden Canada UlcAdverse judgmentPTAB · Sep 8, 2025 · IPR2024-01227 · APJ Christopher M Kaiser · IPR · Adverse judgment
The Board granted Patent Owner’s withdrawal of its motion to amend and entered adverse judgment after it disclaimed challenged claims 1–5 and 8–13, terminating the IPR.
RulingsAdverse judgment- Adverse judgmentAdverse judgmentGranted
“Under our rules, a party may request adverse judgment against itself at any time during a proceeding, including by disclaiming all claims involved in a trial. 37 C.F.R. §42.73(b). Because Patent Owner’s request to withdraw its Motion to Amend has been granted and Patent Owner has disclaimed all Challenged Claims such that no claims remain in the trial, we grant Patent Owner’s Motion to Terminate by Adverse Judgment.” slip op. at 3
- PTAB / AIA Trials › Motions to amend / substitute claimsMotion to amend, grantedGranted
“In view of the facts presented, including that no decision as to the patentability of the proposed substitute claims has yet been made and Petitioner does not oppose the withdrawal, we grant Patent Owner’s Motion to Withdraw its Motion to Amend.” slip op. at 2
NonePatents in suitUS 11,435,542
Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.