- Apple Inc.InstitutedPTAB · Nov 25, 2024 · IPR2024-01399 · APJ Thu A Dang · IPR · Institution
The Board instituted review of claims 1–6, 8–15, and 17–20 on the petition’s grounds and granted Apple’s motion to join IPR2024-00782.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“As we explain above, Petitioner has shown a reasonable likelihood that it would prevail with respect to each of the claims challenged in the petition. Thus, Petitioner has shown that the Petition warrants institution.” slip op. at 7
- PTAB / AIA Trials › Joinder §315(c) / SAS all-or-nothingJoinder, grantedGranted
“The Petition does not present any new grounds or issues. Joinder Mot. 1, 3–5. Petitioner agrees to the schedule in the Google IPR and, thus, has shown that the trial schedule is not likely to be affected by joinder. Id. at 3, 5–6. No changes in the schedule are anticipated or necessary, and the limited participation, if at all, of Petitioner will not impact the timeline of the ongoing trial. Petitioner has agreed to an “understudy” role, which will simplify matters in the ongoing Google IPR and will be an efficient use of resources. Id. at 3, 5–6. Petitioner will assume a primary role only if Google ceases to participate in the Google IPR. Id. at 6. Accordingly, we determine that Petitioner has met its burden of showing that we should exercise our discretion to join Petitioner to the Google IPR (IPR2024-00782).” slip op. at 8
NonePatents in suitUS 8,646,042 - Google LLC v. Proxense, LLCInstitutedPTAB · Nov 18, 2024 · IPR2024-00784 · APJ Thu A Dang · IPR · Institution
The Board instituted IPR on claims 1–20 because Petitioner showed a reasonable likelihood of prevailing on at least one challenged claim across the asserted obviousness grounds.
RulingsInstitution decision- Claim Construction › Intrinsic evidence (Phillips canons) › Lexicography (patentee as own lexicographer)Term construed petitioner constructionDecided for petitioner
“The plain meaning of “an integrated, secure memory storing local, secured information,” as claimed, suggests an integrated, secure memory for storing information locally, wherein the information is secured. See Pet. 28, 59; see also Prelim. Resp. 19–21. Further, nothing in the Specification clearly limits or redefines “local, secured information” to “information stored within a service block of a PDK and unlocked with a corresponding access key provided to the PDK,” as Patent Owner proposes. Prelim. Resp. 23. We are unpersuaded by Patent Owner’s contention that the Specification “clearly defines ‘which information is used as local secured information.’” Prelim. Resp. 22. Although Patent Owner points to an “instance” in the Specification that it alleges is such a “clear[] defin[ition]” (id.), this portion of the Specification merely shows an exemplary embodiment and not a definition. See Ex. 1001, 3:50–57. In particular, the language Patent Owner points to in the Specification provides that “[i]n this example, the sensor 108 contains three of the service block access keys 118A, D, F,” wherein “[t]he service block access keys 118 allow the sensor 108 to unlock information stored in the corresponding service blocks 112, which information is used as local secured information.” See id. (emphasis added). That is, although the referenced portion of the Specification indicates that, in an example, information stored in a “service block” can be used as “local, secured information,” nothing in the Specification limits “local, secured information” to “information stored within service block of a PDK and unlocked with a corresponding access key provided to the PDK,” as Patent Owner contends.6 Prelim. Resp. 23. Any special definition for “local, secured information” limiting it to “information stored within a service block of a PDK and unlocked with a corresponding access key provided to the PDK” must be set forth in the Specification with reasonable clarity, deliberateness, and precision. In re Paulsen, 30 F.3d 1475, 1480 (Fed. Cir. 1994). We do not discern such clarity, deliberateness, and precision to be present here.” slip op. at 8
- Prior constructionPrior construction not adoptedDecided for petitioner
“We are unpersuaded by Patent Owner’s contention that “the District Court found it necessary to construe the term ‘enabled.’” Prelim. Resp. 4. In particular, we disagree that the District Court in the Samsung case provided any construction for the term “enabled.” Id. Although Patent Owner points to the District Court’s Memorandum in Support of Claim Construction Order (id. (citing Ex. 2002, 26)) to support its contention that the District Court construed the term “enabled,” this portion of the District Court’s Memorandum merely discusses that “hybrid device” is not indefinite, and discusses exemplary operations of the “hybrid device” from which a POSITA “could reasonably ascertain the scope of the claim.” See Ex. 2002, 26.7 That is, a determination of whether a term is indefinite is not the same thing as construing a claim term. Thus, the District Court’s determination that “hybrid device” is not indefinite did not constitute a construction of that term, much less provide a construction of “enabled” recited elsewhere in the claim. In any case, even if assuming arguendo that the referenced portion of the district court’s Memorandum indicates that a POSITA could reasonably ascertain the scope of the claim (id.), nothing in the Memorandum provides a definition of “enabled” as being limited to when an application, function, or service “receives information from a PDK in exchange for an access key,” as Patent Owner contends. Prelim. Resp. 8. b) Means-plus function analysis Patent Owner further contends that the term “enabling” “may further be defined by way of a means-plus-function analysis.” Prelim. Resp. 8. According to Patent Owner, “§ 112, para 6 will apply if the challenger demonstrates that the claim term fails to ‘recite sufficiently definite structure’ or else recites ‘function without reciting a sufficient structure for performing that function.’” Id. (citing Williamson v. Citrix Online, LLC, 792 F.3d 1339, 1349 (Fed. Cir. 2015)). Patent Owner contends that because none of “the ‘local secured information’, ‘wireless communication interface’ [and] ‘enablement signal’ provide sufficiently definite structure,” the term 7 Even if the Court’s explanation that “[a]n application, function, or service is ‘enabled’ by a PDK when it receives information from a PDK in exchange for an access key” is an express construction, the Board is not required to adopt that construction. See Power Integrations, Inc. v. Lee, 797 F.3d 1318, 1326 (Fed. Cir. 2015) (“There is no dispute that the board is not generally bound by a prior judicial construction of a claim term.”).” slip op. at 10
- Claim Construction › Functional claiming / §112(f) means-plus-function › Whether §112(f) applies (Williamson, nonce words)§112(f) does not applyDecided for petitioner
“We are unpersuaded by Patent Owner’s contentions. In particular, we are unpersuaded that “enabling” may be defined by way of means-plus-function analysis. Prelim. Resp. 8. As Petitioner points out, “none of the claims of the ’960 patent recite the disputed limitation in ‘means-plus-function’ or ‘step-plus-function’ format.” Prelim. Reply 2. As Petitioner contends, when a disputed claim limitation does not employ “means for” language, the presumption is that each of the terms conveys sufficiently definite structure or act and, thus, is not subject to § 112 ¶ 6. Id.; see also Dyfan, 28 F.4th at 1367. Although this presumption is rebuttable and can be overcome if the challenger demonstrates that the claim term fails to recite sufficiently definite structure (see Raining Computing v. Samsung Electronics America, 998 F.3d 1002, 1005 (Fed. Cir. 2021)), we are unpersuaded that Patent Owner has demonstrated that claim terms “wireless communication interface,” “local secured information,” and “enablement signal” fail to recite sufficiently definite structure. That is, Patent Owner has not sufficiently demonstrated that the terms could not be understood by person of ordinary skill in the art “to have a sufficiently definite meaning as the name for structure for the claimed functions.” Prelim. Sur-reply 1. We agree with Petitioner that the terms are “not used as ‘generic terms or black box recitations of structure or abstractions.’” Prelim. Reply 3; see Dyfan, 28 F.4th at 1368. As Petitioner points out, “when a ‘structure-connoting term . . . is coupled with a description of the ‘term’s’ operation’ § 112 ¶ 6 does not apply.” Id.; accord Linear Tech. Corp. v. Impala Linear Corp., 379 F.3d 1311, 1320 (Fed. Cir. 2004); Dyfan, 28 F.4th at 1368.” slip op. at 13
- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“III. CONCLUSION Because we determine that Petitioner has demonstrated a reasonable likelihood that it would prevail in showing at least one of the challenged claims is unpatentable, we institute inter partes review as to all challenged claims and grounds presented in the Petition. 37 C.F.R. § 42.108(a). At this stage of the proceeding, we have not made a final determination as to the patentability of any of these challenged claims. IV. ORDER For the reasons given, it is ORDERED that pursuant to 35 U.S.C. § 314, an inter partes review is instituted as to claims 1–20 of the ’960 patent to determine whether: 1) claims 1–6, 8–11, and 14–19 are unpatentable under 35 U.S.C. § 103 as obvious over Dua and Giobbi ’157; 2) claims 1–7, 10, 11, and 14–19 are unpatentable under 35” slip op. at 49
Claim construction§ 103 obviousnesscites KSR · GrahamPatents in suitUS 10,073,960 - Google LLC v. Proxense, LLCInstitutedPTAB · Nov 18, 2024 · IPR2024-00783 · APJ Thu A Dang · IPR · Institution
Instituted review of claims 1–20 on five obviousness grounds: Dua and Giobbi ’157; that combination with Kotola; Buer; Buer with Giobbi ’157; and Buer with Nishikawa.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“III. CONCLUSION Because we determine that Petitioner has demonstrated a reasonable likelihood that it would prevail in showing at least one of the challenged claims is unpatentable, we institute inter partes review as to all challenged claims and grounds presented in the Petition. 37 C.F.R. § 42.108(a). At this stage of the proceeding, we have not made a final determination as to the patentability of any of these challenged claims. IV. ORDER For the reasons given, it is ORDERED that pursuant to 35 U.S.C. § 314, an inter partes review is instituted as to claims 1–20 of the ’289 patent to determine whether:” slip op. at 46
- Claim Construction › Intrinsic evidence (Phillips canons) › Lexicography (patentee as own lexicographer)Term construed board ownDecided for petitioner
“secured information,” as claimed, suggests an integrated, secure memory for storing information locally, wherein the information is secured. See Pet. 26– 27; see also Prelim. Resp. 28. Further, nothing in the Specification clearly limits or redefines “local, secured information” to “information stored within a service block of a PDK and unlocked with a corresponding access key provided to the PDK,” as Patent Owner proposes. Prelim. Resp. 27. We are unpersuaded by Patent Owner’s contention that the Specification “clearly defines ‘which information is used as local secured information.’” Prelim. Resp. 28. Although Patent Owner points to an “instance” in the Specification that it alleges is such a “clear[] defin[ition],” this portion of the Specification merely shows an exemplary embodiment and not a definition. See Ex. 1001, 3:43–50. The language Patent Owner points to in the Specification provides that “[i]n this example, the sensor 108 contains three of the service block access keys 118A, D, F,” wherein “[t]he service block access keys 118 allow the sensor 108 to unlock information stored in the corresponding service blocks 112, which information is used as local secured information.” Prelim. Resp. 28 (citing Ex. 1001, 3:43–50) (emphasis added). That is, although the referenced portion of the Specification indicates that, in an example, information stored in a “service block” can be used as “local secured information,” nothing in the Specification limits “local, secured information” to “information stored within service block of a PDK and unlocked with a corresponding access key provided to the PDK,” as Patent Owner contends.7 Id. Any special definition for “local, secured information” limiting it to “information stored within a service block of a PDK and unlocked with a corresponding access key provided to the PDK” must be set forth in the Specification with reasonable clarity, deliberateness, and precision. In re Paulsen, 30 F.3d 1475, 1480 (Fed. Cir. 1994). We do not discern such clarity, deliberateness, and precision to be present here. In view of the plain language of the claims and the Specification, we determine that the term “local, secured information” encompasses information stored locally on an integrated, secure memory, wherein the information is secured, and is not limited to information stored within a service block of a PDK and unlocked with a corresponding access key provided to the PDK.” slip op. at 9
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached
“The plain language of “hybrid device” does not suggest a requirement that the “hybrid device” comprises an integrated PDK. Further, nothing in the Specification clearly limits or redefines “hybrid device” to a device comprising an integrated PDK, as Patent Owner proposes. Prelim. Resp. 3– 4. Although Patent Owner contends that the District Court construed “hybrid device” as “comprising an integrated personal digital key (PDK)” (id. (citing Ex. 2001, 3)), as Patent Owner points out, the District Court’s construction was predicated on the use of “PDK” in the “hybrid device” recited in the independent claims of a family member of the ’289 patent. Prelim. Resp. 3–4. In view of the plain language of the claims and the Specification, we determine that the term “hybrid device” recited in claims 1–16 and 19 is not limited to “comprising an integrated personal digital key (PDK).” We determine no further explicit construction of this term is necessary to resolve the parties’ issues in controversy. See Vivid Techs., 200 F.3d at 803.” slip op. at 7
- Claim Construction › Functional claiming / §112(f) means-plus-function › Whether §112(f) applies (Williamson, nonce words)§112(f) does not applyDecided for petitioner
“are unpersuaded that “enabling” may be defined by way of means-plus-function analysis. Prelim. Resp. 14. As Petitioner points out, “none of the claims of the ’289 patent recite the disputed limitation in ‘means-plus-function’ or ‘step-plus-function’ format.” Prelim. Reply 2. As Petitioner contends, when a disputed claim limitation does not employ “means for” language, the presumption is that each of the terms conveys sufficiently definite structure or act and, thus, is not subject to § 112 ¶ 6. Id.; see also Dyfan, 28 F.4th at 1367. Although, as Patent Owner argues, this presumption is rebuttable and can be overcome “if the challenger demonstrates that the claim term fails to recite sufficiently definite structure” (Prelim. Sur-reply 1 (citing Raining Computing v. Samsung Electronics America, 998 F.3d 1002, 1005 (Fed. Cir. 2021))), we are unpersuaded that Patent Owner has demonstrated that “PDK,” “RDC,” “enabling signal,” and “local secured information” fail to recite sufficiently definite structure. Prelim. Resp. 14–17. That is, Patent Owner has not sufficiently demonstrated that the terms could not be understood by person of ordinary skill in the art “to have a sufficiently definite meaning as the name for structure for the claimed functions.” Prelim. Sur-reply 1. We agree with Petitioner that the terms are “not used as ‘generic terms or black box recitations of structure or abstractions.’” Prelim. Reply 3; see Dyfan, 28 F.4th at 1368. As Petitioner points out, “when a ‘structure-connoting term . . . is coupled with a description of the ‘term’s’ operation’ § 112 ¶ 6 does not apply.” Id.; accord Linear Tech. Corp. v. Impala Linear Corp., 379 F.3d 1311, 1320 (Fed. Cir. 2004); Dyfan, 28 F.4th at 1368).” slip op. at 14
Claim construction§ 103 obviousnesscites KSR · GrahamPatents in suitUS 9,679,289 - Google LLC v. Proxense, LLCInstitutedPTAB · Nov 18, 2024 · IPR2024-00782 · APJ Thu A Dang · IPR · Institution
The Board instituted IPR on claims 1–6, 8–15, and 17–20 based on six § 103 grounds, finding a reasonable likelihood of prevailing on at least one challenged claim.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“whether to institute an inter partes review. Applying the standard set forth in 35 U.S.C. § 314(a), which requires demonstration of a reasonable likelihood that Petitioner would prevail with respect to at least one challenged claim, we grant Petitioner’s request and institute an inter partes review of all challenged claims.” slip op. at 2
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededDecided for petitioner
“Only those terms in controversy need to be construed, and only to the extent necessary to resolve the controversy. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co. Matal, 868 F.3d 1013, 1017 (Fed. Cir. 2017) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)).” slip op. at 7
- Claim Construction › Functional claiming / §112(f) means-plus-function › Whether §112(f) applies (Williamson, nonce words)§112(f) does not applyDecided for petitioner
“are unpersuaded that “enabling” may be defined by way of means-plus-function analysis. Prelim. Resp. 17. As Petitioner points out, “none of the independent claims of the ’042 patent recite the disputed limitation in ‘means-plus-function’ or ‘step-plus-function’ format.” Prelim. Reply 2. As Petitioner contends, when a disputed claim limitation does not employ “means for” language, the presumption is that each of the terms conveys sufficiently definite structure or act and, thus, is not subject to § 112 ¶ 6. Id.; see also Dyfan, 28 F.4th at 1367. Although, as Patent Owner argues, this presumption is rebuttable and can be overcome “if the challenger demonstrates that the claim term fails to recite sufficiently definite structure” (Prelim. Sur-reply 1 (citing Raining Computing v. Samsung Electronics America, 998 F.3d 1002, 1005 (Fed. Cir. 2021))), we are unpersuaded that Patent Owner has demonstrated that “PDK,” “RDC,” and “enabling signal,” fail to recite sufficiently definite structure. Prelim. Resp. 17–20. That is, Patent Owner has not sufficiently demonstrated that the terms could not be understood by person of ordinary skill in the art “to have a sufficiently definite meaning as the name for structure for the claimed functions.” Prelim. Sur-reply 1. According to Petitioner, the terms are “not used as ‘generic terms or black box recitations of structure or abstractions.’” Prelim. Reply 3; see Dyfan, 28 F.4th at 1368. As Petitioner points out, “when a ‘structure-connoting term . . . is coupled with a description of the ‘term’s’ operation’ § 112 ¶ 6 does not apply.” Id.; see also Linear Tech. Corp. v. Impala Linear Corp., 379 F.3d 1311, 1320 (Fed. Cir. 2004); Dyfan, 28 F.4th at 1368).” slip op. at 12
- Prior constructionPrior construction not adoptedDecided for petitioner
“We are unpersuaded by Patent Owner’s contention that “the District Court found it necessary to construe the term ‘enabled.’” Prelim. Resp. 13. In particular, we disagree that the District Court in the Samsung litigation provided any construction for the term “enabled.” Id. Although Patent Owner points to the District Court’s Memorandum in Support of Claim Construction Order (id. (citing Ex. 2002, 26)) to support its contention that the District Court construed the term “enabled,” this portion of the District Court’s Memorandum merely discusses that “hybrid device” is not indefinite, and discusses exemplary operations of the “hybrid device” from which a POSITA “could reasonably ascertain the scope of the claim.” See Ex. 2002, 26.8 That is, a determination of whether a term is indefinite is not the same thing as construing a claim term. Thus, the District Court’s determination that “hybrid device” is not indefinite did not constitute a construction of that term, much less provide a construction of “enabled” recited elsewhere in the claims. In any case, even if assuming arguendo that the referenced portion of the District Court’s Memorandum indicates that a POSITA could reasonably ascertain the scope of the claim (id.), nothing in the Memorandum provides a definition of “enabled” as being limited to “exchanging an access key for information held within a service block of a PDK,” as Patent Owner contends. Prelim. Resp. 28.” slip op. at 9
Claim construction§ 103 obviousnesscites KSR · GrahamPatents in suitUS 8,646,042 - PTAB · Nov 1, 2024 · IPR2024-01010 · APJ Brian D Range · IPR · Institution
The Board instituted inter partes review of claims 1–6 and 8 on all petition grounds and granted Texas Instruments’ motion to join the NXP IPR as an understudy petitioner.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“Thus, for the same reasons set forth in our institution decision in the NXP IPR, we determine that the information presented in the Petition shows a reasonable likelihood that Petitioner would prevail in showing that claims 1–6 and 8 are unpatentable. See NXP Dec. Accordingly, we institute an inter partes review of the same claims on the same grounds as the ones on which we instituted review in the NXP IPR. 35 U.S.C. § 314(a).” slip op. at 5
- PTAB / AIA Trials › Joinder §315(c) / SAS all-or-nothingJoinder, grantedGranted
“Petitioner agrees that, if joinder is granted, it will have an “understudy role.” Id. at 2–3, 6–8. Petitioner agrees to various restrictions as an understudy. Id. Along these lines, Petitioner will abide by the following conditions so long as NXP is actively participating in this proceeding: (a) TI shall not make any substantive filing and shall be bound by the filings of Petitioner NXP, unless a filing concerns termination and settlement, or issues solely involving TI; (b) TI shall not present any argument or make any presentation at oral argument unless an issue solely involves TI, or when addressing Board-approved motions that do not affect Petitioner NXP or its respective position; (c) TI shall not seek to cross-examine or defend the cross-examination of any witness, unless the topic of cross-examination concerns issues solely involving TI; (d) TI shall not seek discovery from Patent Owner on issues not solely involving TI; (e) TI will not rely on expert testimony beyond that submitted by Petitioner NXP unless Petitioner NXP is terminated from the case. If Petitioner NXP is not terminated from the case, TI agrees to rely entirely on, and be bound by, the expert declarations and depositions in the NXP IPR. Mot. 6–7. In sum, TI “will not assume an active role unless Petitioner NXP ceases to participate in the proceeding.” Mot. 2.13 The conditions above mean that joinder will have no impact on the NXP IPR trial schedule and will not complicate the NXP IPR briefing or discovery. These understudy provisions are consistent with the provisions imposed by, for example, Ecobee Techs. ULC v. EcoFactor, Inc., IPR 2022-01460, IPR2022-00473, Paper 7 (PTAB Jan. 24, 2023) and Apple Inc. v. INVT SPE LLC, IPR2019-00959, Paper 8 (PTAB May 30, 2019).” slip op. at 6
NonePatents in suitUS 7,345,245 - PTAB · Oct 21, 2024 · IPR2024-00697 · APJ Brian D Range · IPR · Institution
The Board instituted IPR on claims 1–5 on all petitioned grounds, finding a reasonable likelihood that Apple would prevail on at least one claim.
RulingsInstitution decision- Skill levelSkill level petitioner adoptedDecided for petitioner
“would have had a degree in mechanical engineering, electrical engineering, physics, or a related technical field, and at least 2–3 years of experience related to the design or development of systems incorporating linear actuators; additional years of experience could substitute for the degree. Pet. 4 (citing Ex. 1003 ¶ 30–31). Patent Owner contends a POSITA would have had (1) a bachelor’s degree in electrical engineering, mechanical engineering, or a comparable field of study, and (2) at least two years of professional experience with electro-mechanical control systems, or other similarly relevant industry experience. Prelim. Resp. 3. Additional relevant industry experience may compensate for lack of formal education or vice versa. Id. Patent Owner further contends this is similar to Petitioner’s POSITA contention. Id. For purposes of this Decision, we adopt Petitioner’s proposal as reasonable and consistent with the ’767 patent specification and the prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (the prior art may reflect an appropriate level of skill in the art).” slip op. at 8
- Claim Construction › Intrinsic evidence (Phillips canons) › Preamble limiting or notPreamble limitingDecided for patent owner
“Patent Owner contends “the preamble of claim 1 is limiting based on Petitioner’s assertion in the District Court and based on the District Court’s order.” Prelim. Resp. 6. Patent Owner also contends “the District Court agreed with Patent Owner and ordered that the ‘control component’ term has its plain and ordinary meaning and is not subject to means-plus-function treatment.” Id. Patent Owner finally contends “there is no need for the Board to make claim construction determinations about Section 112, Paragraph 6 to decide institution.” Id. As to the preamble, we agree, for purposes of this decision, that claim 1’s preamble is limiting. The parties agreed that this preamble is limiting in the District Court case. Dist. Ct. Const. 10.” slip op. at 10
- Claim Construction › Functional claiming / §112(f) means-plus-function › Whether §112(f) applies (Williamson, nonce words)Term construed board ownTerm construed patent owner constructionMixed
“As to the “driving component” recitation, the parties agreed to a construction in the District Court case. Dist. Ct. Constr. 11. For purposes of this Decision, we adopt the parties’ agreed construction. Pet. 6. The parties agreed the “driving component” term is a means-plus-function term. Dist. Ct. Constr. 11. The function is “drives the moveable component in each of two opposite directions.” Id. Corresponding structure includes “coils 420, 514, 626, 1202, 1204, 1302, 1304, 1412, 1414, 1510 (also shown in Figs. 16–17); electromagnets shown in Figs. 10–11; and equivalents thereof.” Id. As to “control component,” the District Court held that the term is not a means-plus-function term because the claim defines the term structurally by requiring a “microprocessor,” “control program,” and “switch.” Dist. Ct. Constr. 17–22. For purposes of this Decision, we agree with the District Court that means-plus-function treatment does not apply to the “control component” recitation because structure in claim 1 defines the component. Given the context provided by claim 1 as a whole, a person having ordinary skill in the art would have understood the “control component” as identifying a specific structure (requiring a microprocessor, control program, and switch as claim 1 recites). See Williamson v. Citrix Online, LLC, 792 F.3d 1339, 1348 (Fed. Cir. 2015) (holding that the means-plus-function inquiry depends on “whether the words of the claim are understood by persons of ordinary skill in the art to have a sufficiently definite meaning as the name for a structure”).” slip op. at 11
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“With respect to other claim terms, Petitioner establishes a reasonable likelihood that it would prevail with respect to at least one claim based on the ordinary and customary meaning of these terms. Thus, no other claim terms require express construction for purposes of this Decision. See, e.g., Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)).” slip op. at 11
Claim construction§ 103 obviousnessDiscretionary denialcites KSR · GrahamPatents in suitUS 8,093,767 - PTAB · Oct 21, 2024 · IPR2024-00698 · APJ Brian D Range · IPR · Institution
The Board instituted IPR on claims 1–5 under all six asserted § 103 grounds, finding a reasonable likelihood that Apple would prevail on at least one challenged claim.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“Under 35 U.S.C. § 314(a), an inter partes review may not be instituted unless the information presented in the petition “shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” The following findings of fact and conclusions of law are not final, but are made for the sole purpose of determining whether Petitioner meets the threshold for initiating review. Any final decision shall be based on the full trial record, including any response timely filed by Patent Owner. Any arguments not raised by Patent Owner in a timely-filed response may be deemed waived. For the reasons stated below, we determine that Petitioner has established a reasonable likelihood that it would prevail with respect to at least one claim. We hereby institute an inter partes review as to claims 1–5 of the ’767 patent based upon Petitioner’s asserted grounds of unpatentability.” slip op. at 2
- PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Decided for petitioner
“On June 21, 2022, the Director of the U.S. Patent and Trademark Office (“USPTO”) issued a Memorandum titled “Interim Procedure for Discretionary Denials in AIA Post-Grant Proceedings With Parallel District Court Litigation” (“Memorandum”),7 which states, among other things, that “the PTAB will not discretionarily deny institution in view of parallel district court litigation where a petitioner presents a stipulation not to pursue in a parallel proceeding the same grounds or any grounds that could have reasonably been raised before the PTAB.” Memorandum 3 (citing Sotera Wireless, Inc. v. Masimo Corp., IPR2020-01019, Paper 12 (PTAB Dec. 1, 2020) (precedential as to § II.A)). In a September 25, 2024, submission, Petitioner has stated that “[Petitioner] will not pursue [in the related litigation] the same invalidity grounds raised (or any grounds that could have been raised) [in this IPR].” Ex. 1048 (citing Sotera, IPR2020-01019, Paper 12). In view of this stipulation, we do not exercise discretion to deny institution.” slip op. at 12
- Parallel petitionsDecided for petitioner
“Second, we determine both petitions, at this stage, to be strong. Patent Owner has not refuted the obviousness merits of either Petition, and, at this stage, we do not independently identify a flaw in Petitioner’s analysis. Third, we agree with Petitioner that it could not have reasonably addressed both the Shahoian and Izumi theories in one petition. Petitioner’s Notice 4. At the time Petitioner filed its petitions, Petitioner was reasonably uncertain as to whether or not the term “control component” is a means-plus-function term. If means-plus-function, Petitioner was reasonable in taking extra effort to address the term. Petitioner did not have space in one Petition to address both a means-plus-function possibility while also addressing both Shahoian and Izumi theories. Fourth, granting both Petitions will not place an undue burden on Patent Owner. As Patent Owner emphasizes, only five claims are at issue. Resp. 19–20. Moreover, we indicate, in this decision, our preliminary agreement with the U.S. District Court for the Western District of Texas that “control component” should not be construed as means-plus-function. See Section III(C), supra. Based on this indication, we hope that the parties may be able to narrow the focus of this proceeding at trial. We determine that these four reasons, along with all other circumstances specific to this particular matter, cumulatively weigh against exercising discretion to deny institution for this particular matter.” slip op. at 14
- Skill levelSkill level petitioner adoptedDecided for petitioner
“Petitioner contends that a person of ordinary skill in the art (POSITA) would have had a degree in mechanical engineering, electrical engineering, physics, or a related technical field, and at least 2–3 years of experience related to the design or development of systems incorporating linear actuators; additional years of experience could substitute for the degree. Pet. 4 (citing Ex. 1003 ¶ 30–31). Patent Owner contends a POSITA would have had (1) a bachelor’s degree in electrical engineering, mechanical engineering, or a comparable field of study, and (2) at least two years of professional experience with electro-mechanical control systems, or other similarly relevant industry experience. Prelim Resp. 3. Additional relevant industry experience may compensate for lack of formal education or vice versa. Id. Patent Owner further contends this is similar to Petitioner’s POSITA contention. Id. For purposes of this Decision, we adopt Petitioner’s proposal as reasonable and consistent with the ’767 patent specification and the prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (the prior art may reflect an appropriate level of skill in the art).” slip op. at 8
Claim construction§ 103 obviousnessDiscretionary denialcites KSR · GrahamPatents in suitUS 8,093,767 - Apple Inc. v. Resonant Systems, Inc.InstitutedPTAB · Oct 15, 2024 · IPR2024-00807 · APJ Karl D Easthom · IPR · Institution
The Board instituted review of claims 2 and 3 on all petitioned grounds, finding a reasonable likelihood that at least one challenged claim is unpatentable.
RulingsInstitution decision- PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Denied
“Office (“USPTO”) issued a Memorandum titled “Interim Procedure for Discretionary Denials in AIA Post-Grant Proceedings With Parallel District Court Litigation” (“Memorandum”),8 which states, among other things, that “the PTAB will not discretionarily deny institution in view of parallel district court litigation where a petitioner presents a stipulation not to pursue in a parallel proceeding the same grounds or any grounds that could have reasonably been raised before the PTAB.” Memorandum 3 (citing Sotera Wireless, Inc. v. Masimo Corp., IPR2020-01019, Paper 12 (PTAB Dec. 1, 2020) (precedential as to § II.A)). In a September 18, 2024 letter, Petitioner states that “Apple hereby stipulates that if the PTAB authorizes petitioner to enter this stipulation into evidence in IPR2024-00807 and institutes the proceeding, Apple will not pursue in the above-captioned litigation the same invalidity grounds raised (or any grounds that could have been raised) in IPR2024-00807 for any claim of the patent.” Ex. 1048 (citing Sotera, IPR2020-01019, Paper 12). 8 The Memorandum is available at https://www.uspto.gov/sites/default/files/documents/interim_proc_discretion ary_denials_aia_parallel_district_court_litigation_memo_20220621_.pdf. Applying the guidance provided in the Memorandum, we decline to exercise our discretion to deny institution in this proceeding under Fintiv because Petitioner submitted a Sotera stipulation.” slip op. at 8
- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“The standard for instituting an inter partes review is set forth in 35 U.S.C. § 314(a), which provides that an inter partes review may not be instituted unless the information presented in the Petition and any preliminary response shows that “there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” For the reasons explained below, we determine that Petitioner has established a reasonable likelihood that it would prevail with respect to at least one challenged claim. Accordingly, we institute an inter partes review as to all remaining challenged claims, claims 2 and 3, and the grounds raised in the Petition.” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“Petitioner’s expert declarant contends that a person of ordinary skill in the art (POSITA), would have had a degree in mechanical engineering, electrical engineering, physics, or a related technical field, and at least 2–3 years of experience related to the design or development of systems incorporating linear actuators; additional years of experience could substitute for the advanced-level degree. Ex. 1003 ¶ 30. Patent Owner offers “a similar level of ordinary skill in the art.” Prelim. Resp. 4. Based on a review of the record, we adopt Petitioner’s proposed level of ordinary skill in the art because it is consistent with the evidence of record, including the asserted prior art and ’337 patent specification.” slip op. at 10
- Claim Construction › Functional claiming / §112(f) means-plus-function › Whether §112(f) applies (Williamson, nonce words)§112(f) appliesDecided for petitioner
“For purposes of this proceeding, the parties agree that independent claim 2 includes means-plus-function limitations under 35 U.S.C. § 112 ¶ 6.9 Pet. 2–6; Prelim. Resp. 7–14. An element in a claim for a combination may be expressed as a means . . . for performing a specified function without the 9 As indicated above, statutory citations are to the pre-AIA version of 35 U.S.C. § 112. See supra note 1. recital of structure, material, or acts in support thereof, and such claim shall be construed to cover the corresponding structure, material, or acts described in the specification and equivalents thereof. 35 U.S.C. § 112 ¶ 6. In particular, the parties agree that the “driving component” and “control component” requirements of independent claim 2 are means-plus-function limitations. Pet. 2–6; Prelim. Resp. 7–14. Construing a means-plus-function limitation under 35 U.S.C. § 112 ¶ 6 involves two steps: 1) identifying the claimed function and 2) identifying in the specification the corresponding structure that performs the claimed function. Med. Instrumentation & Diagnostics Corp. v. Elekta AB, 344 F.3d 1205, 1210 (Fed. Cir. 2003); Cardiac Pacemakers, Inc. v. St. Jude Med., Inc., 296 F.3d 1106, 1119 (Fed. Cir. 2002).” slip op. at 10
Claim construction§ 103 obviousnessDiscretionary denialcites KSR · GrahamPatents in suitUS 8,860,337 - Apple Inc. v. Resonant Systems, Inc.InstitutedPTAB · Oct 15, 2024 · IPR2024-00806 · APJ Norman H Beamer · IPR · Institution
The Board instituted IPR on claims 1–8, 14–17, 19, and 20, finding a reasonable likelihood of unpatentability over the asserted §103 combinations.
RulingsInstitution decision- PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Decided for petitioner
“Office (“USPTO”) issued a Memorandum titled “Interim Procedure for Discretionary Denials in AIA Post-Grant Proceedings With Parallel District Court Litigation” (“Memorandum”),8 which states, among other things, that “the PTAB will not discretionarily deny institution in view of parallel district court litigation where a petitioner presents a stipulation not to pursue in a parallel proceeding the same grounds or any grounds that could have reasonably been raised before the PTAB.” Memorandum 3 (citing Sotera Wireless, Inc. v. Masimo Corp., IPR2020-01019, Paper 12 (PTAB Dec. 1, 2020) (precedential as to § II.A)). In a September 18, 2024 letter, Petitioner has stated that “Apple hereby stipulates that if the PTAB authorizes petitioner to enter this stipulation into evidence in IPR2024-00806 and institutes the proceeding, Apple will not pursue in the above-captioned litigation the same invalidity 8 The Memorandum is available at https://www.uspto.gov/sites/default/files/documents/interim_proc_discretion ary_denials_aia_parallel_district_court_litigation_memo_20220621_.pdf. grounds raised (or any grounds that could have been raised) in IPR2024-00806 for any claim of the patent.” Ex. 1048 (citing Sotera, IPR2020-01019, Paper 12). Applying the guidance provided in the Memorandum, we decline to exercise our discretion to deny institution in this proceeding under Fintiv because Petitioner submitted a Sotera stipulation.” slip op. at 8
- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
- Skill levelSkill level petitioner adoptedDecided for petitioner
- Claim Construction › Functional claiming / §112(f) means-plus-function › Whether §112(f) applies (Williamson, nonce words)§112(f) appliesOther
Claim construction§ 103 obviousnessDiscretionary denialcites KSR · GrahamPatents in suitUS 9,941,830 - PTAB · Oct 9, 2024 · IPR2024-00613 · APJ James J Mayberry · IPR · Institution
The Board instituted IPR on claims 1–5, 8–12, and 15–19 because Petitioner showed a reasonable likelihood that the claims are obvious over Agee.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“(4) Analysis and conclusion as to the processor configuration limitations For the reasons below, after considering Patent Owner’s arguments, we determine that Petitioner has demonstrated, sufficient for institution, that Agee teaches or suggests a processor configured as recited in limitations [1.3]–[1.8]. We do not agree with Patent Owner that Petitioner does not present a coherent theory for how Agee teaches or suggests the subject matter of limitations [1.3]–[1.6]. Although we recognize that the Petition provides discussions on alternative disclosures in Agee, we determine that the Petition sufficiently presents a theory that coherently treats the subject matter of limitations [1.3]–[1.6]. Specifically, we determine, on the current record, that Petitioner sufficiently demonstrates for institution that Agee teaches or suggests a processor that is configured to receive a first signal transmission at a first antenna element from a remote station and a second signal transmission at a second antenna element from the remote station—a pilot signal. As Petitioner contends, signals transmitted from Agee’s remote station include a pilot signal. Pet. 52. These signals are simultaneously sampled at multiple antenna elements. Id.” slip op. at 24
- PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Denied
“stay. See Ex. 3001 (providing the docket sheet for the consolidated litigation and showing item 83, “UNOPPOSED MOTION to Withdraw 78 OPPOSED Motion to Stay PROCEEDINGS,” and item 84, granting the UNOPPOSED MOTION). Because no motion to stay the proceeding is currently pending, we weigh this factor as neutral. We do not speculate as to whether a motion to stay would be renewed and ultimately granted. See Apple Inc. v. Fintiv, Inc., IPR2020-00019, Paper 15 at 12 (PTAB May 13, 2020) (informative) (“Fintiv II”) (“We decline to infer . . . how the District Court would rule should a stay be requested by the parties in the parallel case here.”); Sand Revolution II, LLC v. Continental Intermodal Group-Trucking LLC, IPR2019-01393, Paper 24 at 7 (PTAB June 16, 2020) (informative) (“Sand Revolution”) (similar).” slip op. at 33
- Skill levelSkill level petitioner adoptedDecided for petitioner
“the prior art and the claimed invention. Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001). Petitioner contends that a person having ordinary skill in the art “in November 2002 would have been familiar with wireless communications networks, including the design of beamforming using multiple antennas. Pet. 6. Petitioner contends that a person having ordinary skill in the art would have at least a Bachelor’s degree in Electrical Engineering or equivalent, and at least two years of work experience. Id. at 6–7. Petitioner adds that “[a] more advanced degree can substitute for some work experience.” Id. at 7 (referencing Ex. 1003 ¶¶ 37–39). Patent Owner does not challenge Petitioner’s characterization of the level of ordinary skill in the art at this stage of the proceeding. Prelim. Resp. 8. For the purposes of this Decision, we apply Petitioner’s definition of the level of ordinary skill in the art. We determine that this definition is consistent with the prior art of record and the skill reflected in the Specification of the ’235 patent, and previous proceedings concerning the ’235 patent. See IPR2022-00367, Paper 10 at 24 (PTAB July 14, 2022); IPR2022-01155, Paper 11 at 13–14 (PTAB Jan. 5, 2023).” slip op. at 12
- Expert testimonyPetitioner expert creditedDecided for petitioner
“A wave interacts with two different antenna elements simultaneously, where the phase and amplitude (signal strength) of the wave is different at each antenna element. Id. ¶¶ 333–336 (cited at Pet. 10–11). We reproduce Dr. Mahon’s figure illustrating this point below. Id. ¶ 336. Dr. Mahon explains that at a given sampling instance, the wave is in the process of propagating across the antenna array and antenna A detects the signal when it is at phase 45 degrees and detects a signal strength of around 0.7 (sin(45°)). Antenna B is physically located such that (sampling at the same time as Antenna A) it detects the same signal at phase 270 degrees and will measure a received signal strength of -1.0 (sin(270°)). If the array summed those two values, the output of the array would in this case be sin(45°) + sin (270°) = 0.7 + -1.0 = -0.3 which is much less than the value at antenna A (0.7) without summation. However, if the sample value at antenna B is adjusted by the “phase shift” or “phase difference” between A and B (i.e., 235°), the sum would be sin(45°) + sin (270° - 235°) = 0.7 + 0.7 = 1.4, which is twice as large as the value at antenna A (0.7) without the coherent summation. Id. ¶ 337. Dr. Mahon testifies that “[t]he Butler matrix purposefully uses these different phases detected simultaneously by the antennas.” Id. ¶ 338. Dr. Mahon explains that the different signal strengths at different antenna elements are measured, and “[t]hese measurements are passed into the circuitry of [phase] shifters and dividers / combiners.” Id. ¶ 342 (included in the Petition at Pet. 14). On the limited record before us, we credit Dr. Mahon’s testimony, for at least the reason that it is consistent with our understanding of Exhibits 1001, 1004, and 1005.” slip op. at 25
Claim construction§ 103 obviousnessDiscretionary denialcites KSR · GrahamPatents in suitUS 10,715,235
Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.