  • PTAB · May 21, 2025 · IPR2025-00061 · APJ Hyun J Jung · IPR · Institution

    The Board instituted IPR on claims 1–5, 9, 10, 16, 17, and 20 on all asserted grounds, finding a reasonable likelihood that claim 1 is unpatentable over Purcell and Nicholas.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “Under 35 U.S.C. § 314 (2024), an inter partes review may not be instituted “unless . . . there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” Upon consideration of the Petition and for the reasons explained below, we determine that Petitioner has shown a reasonable likelihood of prevailing with respect to at least one of the challenged claims. Thus, we institute an inter partes review of claims 1–5, 9, 10, 16, 17, and 20 of the ’007 patent on all presented challenges. 37 C.F.R. § 42.108(a) (2024) (“When instituting . . . review, the Board will authorize the review to proceed on all of the challenged claims and on all grounds of unpatentability asserted for each claim.”); see also SAS Inst. Inc. v. Iancu, 138 S. Ct. 1348, 1359–60 (2018).” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Petitioner contends that a person of ordinary skill in the art “would have had an undergraduate degree in electrical engineering, computer engineering, computer science or a related field along with two years of work experience in the field of user interface technologies, including e.g., graphical user interface technologies, or a related field” and that “[m]ore education can supplement practical experience and vice versa.” Pet. 5 (citing Ex. 1002 ¶¶ 20, 21). As noted above, Patent Owner has not yet responded. Based on the preliminary record, we adopt Petitioner’s asserted level of ordinary skill to determine whether there is a reasonable likelihood that in the Petition.” slip op. at 8

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “At this stage, we do not need to adopt a particular interpretation of “[first or second] configurable area” to determine whether to institute review. Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms that . . . are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). Also, at this stage, we do not need to interpret expressly any other claim term. Id. For our analysis below, we apply Petitioner’s interpretations of “first configurable area” and “second configurable area” based on Patent Owner’s infringement contentions. Pet. 12–13; Ex. 1007, 1–33. The parties, however, are encouraged to explore further Petitioner’s proposed interpretations in their subsequent briefs.” slip op. at 10

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundInstituted

      “In Petitioner’s view, one of ordinary skill in the art would have known how to implement Nicholas in Purcell and the advantages of doing so would have been readily apparent, thereby motivating the modification. Pet. 22–23 (citing Ex. 1002 ¶ 95; Ex. 1010 ¶ 10). Petitioner contends there would have been a reasonable expectation of success in making the proposed modification because of the known use of Microsoft Windows OS and the “modification would have been a predictable application of known Ex. 1002 ¶ 96; Ex. 1010 ¶¶ 13, 17). Petitioner notes that the proposed combination discloses, suggests, or would have rendered obvious “wherein the first image is in focus, wherein input options for the first application are displayed in a first configurable area, wherein input is allowed from the first configurable area and the first display,” consistent with Patent Owner’s interpretation from its infringement contentions. Id. at 24–25 (citing Ex. 1002 ¶ 99). b) Petitioner Shows a Reasonable Likelihood of Prevailing Based on the present record, Petitioner sufficiently shows that the combination of Purcell and Nicholas teaches, suggests, or would have been understood to disclose the limitations of claim 1 and that one of ordinary skill in the art would have combined these references in the manner asserted with a reasonable expectation of success. Petitioner, thus, shows a reasonable likelihood of prevailing in its challenge to claim 1 as unpatentable over Purcell and Nicholas.” slip op. at 19

    Claim construction§ 103 obviousnesscites Phillips · KSR
    Patents in suitUS 9,792,007
  • PTAB · May 21, 2025 · IPR2025-00060 · APJ Arthur M Peslak · IPR · Institution

    The Board instituted IPR on all challenged claims and grounds, finding a reasonable likelihood that claims 1 and 12 are anticipated by Ogawa.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “determine whether to institute an inter partes review under 35 U.S.C. § 314(a). See 37 C.F.R § 42.4(a) (2024) (“The Board institutes the trial on behalf of the Director.”). Under 35 U.S.C. § 314(a), an inter partes review may not be instituted unless the information presented in the Petition shows “there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.”” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Patent Owner notes that it “applies [Petitioner’s] definition of a POSITA for the purposes of th[e] preliminary response but expressly reserves the right to urge a different definition of a POSITA and support such definition with evidence including expert testimony.” Prelim. Resp. 6. For the purposes of this Decision, we apply Petitioner’s currently uncontested definition because it appears consistent with the problems addressed in the ’080 patent and the prior art.” slip op. at 10

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “Petitioner submits that “the Board need not construe any terms of the challenged claims to resolve the underlying controversy.” Pet. 9. Petitioner however notes the multiple “displays” recited in, e.g., independent claim 12 and dependent claims 2 and 4, and submits that Patent Owner’s infringement contentions “suggest that the ‘first display’ and ‘second display’ in claim 12 read on a single physical display divided into two or more logical displays.” Pet. 9–10 (citing Ex. 1015, 33–34). Petitioner submits that (i) the presented grounds 1 and 2 cover the respective claims under Patent Owner’s interpretation of “display” which Petitioner alleges to encompass the claimed “first display” and “second display” being logically divided displays of a single physical display, (ii) grounds 3 and 4 cover the respective claims under a narrower interpretation of “display” under which the claimed “first display” and “second display” are physically distinct from each other,7 and (iii) ground 3 also covers the respective claims under Patent Owner’s interpretation of “display.” In response, Patent Owner submits that for the purposes of the Preliminary Response, its arguments “do not turn on any specific construction of ‘display’ and the Board need not address the construction of this term for institution.” Prelim. Resp. 5. Based on the record at this stage of the proceeding, we need not construe “display” or any other claim term to resolve the controversy before us. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 10

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITAPlain and ordinary meaningDecided for petitioner

      “Patent Owner begins its argument with the premise that “Ogawa’s teaching of an active screen indicator cannot suggest the claimed open application state indicator.” Prelim. Resp. 8. We note that Patent Owner does not direct us to any portion of the Specification or prosecution history of the ’080 patent describing the recited “open application state” nor does Patent Owner propose a construction of this term. See generally Prelim. Resp. Our review of the Specification and prosecution history does not reveal any explicit description of “open application state.” Consequently, we give this term its plain and ordinary meaning that an application screen is open in the display.” slip op. at 18

    Claim construction§ 102 anticipationcites Phillips · KSR · Graham
    Patents in suitUS 8,842,080
  • PTAB · May 21, 2025 · IPR2025-00059 · APJ Hyun J Jung · IPR · Institution

    The Board instituted IPR of claims 1–3, 5–9, 15, 16, 19, and 20 on all asserted grounds, finding a reasonable likelihood that at least one challenged claim is unpatentable.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “Under 35 U.S.C. § 314 (2024), an inter partes review may not be instituted “unless . . . there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” Upon consideration of the present record and for the reasons explained below, we determine that Petitioner has shown a reasonable likelihood of prevailing with respect to at least one of the challenged claims.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Petitioner contends that a person of ordinary skill in the art “would have had an undergraduate degree in electrical engineering, computer engineering, computer science or a related field along with two years of work experience in the field of user interface technologies, including e.g., graphical user interface technologies, or a related field” and that “[m]ore education can supplement practical experience and vice versa.” Pet. 5–6 (citing Ex. 1002 ¶¶ 20, 21, 22–34). “Patent Owner applies [Petitioner’s] definition of a [person of ordinary skill in the art] for the purposes of [its] preliminary response but expressly reserves the right to urge a different definition . . . and support such definition with evidence including expert testimony.” Prelim. Resp. 9 (citing Pet. 5–6). Based on the preliminary record, we adopt Petitioner’s as yet undisputed level of ordinary skill to determine whether there is a reasonable likelihood that Petitioner would prevail with respect to at least one of the claims challenged in the Petition.” slip op. at 8

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed petitioner constructionDecided for petitioner

      “displays information selectively” has a meaning broader than Patent Owner’s proposal. In particular, claim 3 depends from claim 1 and recites: wherein modifying the display of the annunciator window further includes: displaying the changed state across a portion of the annunciator window; and masking at least one icon representing the device status, connectivity status, or messaging status, wherein the first display is on a first screen of the multi-display device, and wherein the second display is on a different second screen of the multi-display device. Ex. 1001, 30:1–9 (emphasis added). Dependent claim 8 and unchallenged dependent claim 12 recite similar limitations. Id. at 30:56–64, 32:8–14. The limitation “masking at least one icon representing the device status, connectivity status, or messaging status” of these dependent claims indicates that “displays information selectively” recited by the independent claims has a meaning broader than Patent Owner’s proposal of “display[ing] information in a way that involves intentionally choosing some information to display and not others.” Prelim. Resp. 7. At this stage, on the preliminary record, we determine that, in view of the language of dependent claims 3, 8, and 12, the phrase “wherein the modified display of the annunciator window displays information selectively across the annunciator window” of the independent claims has a meaning broader than Patent Owner’s proposed interpretation. Prelim. Resp. 7–8. slip op. at 10

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundInstituted

      “Also, on the present record, Petitioner argues sufficiently that Yook’s status bar on screen 140 displays information showing device status and connectivity status. Pet. 33. Furthermore, on the present record, Petitioner sufficiently argues that one of ordinary skill in the art would have been motivated to implement and pre-configure Yook’s status bar to display dynamically the device status and connectivity status, so that Yook discloses or suggests “wherein the modified display of the annunciator window displays information selectively across the annunciator window.” Id. at 33–36, 38–39. In other words, as we understand the argument, Petitioner associates dynamically updating a status via a status icon with “display[ing] information selectively.” See id. at 38–39; Ex. 1002 ¶ 67. Moreover, even if we adopted Patent Owner’s proposed interpretation for “displays information selectively,” Petitioner’s arguments for dependent claim 3 include contentions that Yook modified by Bauer would have “mask[ed] at least one icon representing the device status, connectivity status, or messaging status.” Pet. 53–55 (citing Ex. 1001, 26:45–50; Ex. 1002 ¶¶ 82, 83; Ex. 1007, 6:14–29, 6:33–42 (describing that “the interactive indicator (e.g., the icon 204 and the corresponding preview) are superimposed over the static indicators” and that “[o]nce the preview intensity of the static indicators may be restored”), 6:47–61, 7:22–27, Fig. 2A). At this preliminary stage, based on the arguments presented for dependent claim 3, Petitioner sufficiently shows that Yook and Bauer would have rendered obvious an annunciator window that “displays information selectively across the annunciator window,” as recited by claim 1, under an interpretation of that limitation meaning “displays information in a way that involves intentionally choosing some information to display and not others,” as proposed by Patent Owner. For the reasons above, Petitioner shows a reasonable likelihood of prevailing in its challenge to claim 1 as unpatentable over Yook.” slip op. at 21

    Claim construction§ 103 obviousnesscites Phillips · KSR
    Patents in suitUS 9,141,135
  • PTAB · Mar 24, 2025 · IPR2024-01322 · APJ Brian P Murphy · IPR · Institution

    The Board instituted IPR of claims 1–20 on all grounds, finding a reasonable likelihood that claims 1, 10–12, and 19 are obvious over Mooney and over Mooney in view of Lee.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “inter partes review may not be instituted “unless . . . there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” Under § 314, the Board may not institute review on fewer than all claims challenged in the petition. SAS Inst., Inc. v. Iancu, 138 S. Ct. 1348, 1359–60 (2018). If the Board institutes a review, it will institute “on all of the challenged claims and on all grounds of unpatentability asserted for each claim.” 37 C.F.R. § 42.108(a). Upon consideration of the Petition, the Preliminary Response, the Pre-Institution Reply, Pre-Institution Sur-Reply, and the evidence of record, for the reasons set forth below, we conclude the Petition demonstrates a reasonable likelihood that Petitioner would prevail in showing the unpatentability of at least one challenged claim in the ’294 patent. Accordingly, we institute an inter partes review of claims 1–20 of the ’294 patent.” slip op. at 2

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed petitioner constructionDecided for petitioner

      “the claims nor the specification of the ’294 Patent require such a narrow reading of the term ‘activation cue’” as that proposed by Patent Owner. Reply 1 (citing Prelim. Resp. 9–10). Operative claim language—“a cue receiver operatively linked to said electronic circuit for receiving an activation cue from a source external to said cellular phone”—does not limit “activation cue” to a predetermined bit sequence or predetermined indicator as argued by Patent Owner. Claim 1 further recites the “data conveyance switching element . . . being assigned a first state upon an activation cue having been received by said cue receiver,” which also does not limit “activation cue” to a predetermined bit sequence or predetermined indicator. Both parties, moreover, cite the same description of the structure and function of the “activation cue” in the ’294 patent: “This activation cue is in the form of a data communication of a specific type which will be recognized by electronic device 10 as an activation cue, for example a predetermined bit sequence.” Prelim. Resp. 22 (citing Ex. 1001, 9:24–27); Reply 1 (citing Ex. 1001, 9:24–27); Sur-Reply 1 (citing same). The recited “activation cue,” when read in context and in view of the” slip op. at 13

    • Claim Construction › Functional claiming / §112(f) means-plus-function › Whether §112(f) applies (Williamson, nonce words)Term construed petitioner constructionDecided for petitioner

      “for the recited “data conveyance switching element” pursuant to §112, sixth Petition characterizes the corresponding structure as “a physical structure, a virtual program, or both because the ’294 patent explains that a switching element ‘can be any type of device allowing data to be conveyed according to alternate data conveyance operations,’ such as ‘a series of instructions programmed onto [a] microchip’ or a ‘decisional logical circuit,’ and ‘can be a physical structure, a virtual program, or both.’” Id. (citing Ex. 1001, 9:28– 31, 9:40–41; Lipoff Decl. Ex. 1003 ¶ 64). The Petition identifies the claimed function as switching between inactive and activated states based on whether or not the cellular phone receives an activation cue. Id. (citing Ex. 1001, 2:4–9, 4:18–23, 5:48–53; Ex. 1003 ¶ 64).” slip op. at 14

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “construction of an “external data exchange device” as a data transceiver coupled to a circuit that carries out the function of exchanging data. Prelim. Resp. 11 (citing Ex. 1001, 9:4–6, 12:62, 13:28, Figs. 1, 3, 4; Ex. 2001 ¶ 48); see Pet. 7–8 (citing Ex. 1001, 2:14–17, 4:7–14, 9:3–6; Ex. 1003 ¶¶ 67–68). Patent Owner states that “[a]n external data exchange device is not a transceiver but a device with a transceiver.” Prelim. Resp. 11 (citing Ex. 2001 ¶ 48). On this preliminary record, we need not construe “external data exchange device” to decide whether or not to institute. To the extent there is a dispute over the plain meaning of “external data exchange device,” the parties are invited to address it in detail in their briefs following institution. On the present record, we determine that no further construction of claim terms is necessary to determine whether to institute a trial in this case. See, e.g., Wellman, Inc. v. Eastman Chem. Co., 642 F.3d 1355, 1361 (Fed. Cir. 2011) (“[C]laim terms need only be construed ‘to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). The parties are free to address any further claim construction issues bearing on this inter partes review following institution.” slip op. at 16

    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 9,022,294
  • PTAB · Mar 18, 2025 · IPR2024-01285 · APJ Nabeel U Khan · IPR · Institution

    The Board instituted review of claims 1–18 on all asserted grounds after finding a reasonable likelihood that claims 1 and 1 were obvious over the Yerazunis–Fiedler and Ely–Fiedler combinations, respectively.

    RulingsInstitution decision
    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Decided for petitioner

      “1. whether the court granted a stay or evidence exists that one may be granted if a proceeding is instituted; 2. proximity of the court’s trial date to the Board’s projected statutory deadline for a final written decision; 3. investment in the parallel proceeding by the court and the parties; 4. overlap between issues raised in the petition and in the parallel proceeding; 5. whether the petitioner and the defendant in the parallel proceeding are the same party; and 6. other circumstances that impact the Board’s exercise of discretion, including the merits. Apple Inc. v. Fintiv, Inc., IPR2020-00019, Paper 11 at 5–6 (PTAB Mar. 20, 2020) (precedential) (“Fintiv”). In evaluating these factors, we “take[] a holistic view of whether efficiency and integrity of the system are best served by denying or instituting review.” Id. at 6. With these factors and guidance in mind, we consider parties’ contentions.5 1.” slip op. at 6

    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “information presented in the petition . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). “When instituting inter partes review, the Board will authorize the review to proceed on all of the challenged claims and on all grounds of unpatentability asserted for each claim.” 37 C.F.R. § 42.108(a). Having considered the arguments and evidence presented by Petitioner and Patent Owner, we determine that Petitioner has demonstrated a reasonable likelihood of prevailing on at least one of the challenged claims of the ’752 patent. We exercise our discretion to institute inter partes review and, as required, we do so as to all the challenged claims of the ’752 patent on all the grounds of unpatentability set forth in the Petition.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Patent Owner does not contest Petitioner’s proposed level of ordinary skill. See generally Prelim. Resp. For purposes of this Decision, we adopt Petitioner’s proposed level of ordinary skill, which is supported by Dr. Sarhan’s testimony, except that we find that the phrase “at least” in Petitioner’s proposed definition creates a vague, open-ended upper bound for the level of ordinary skill, and we therefore do not adopt that aspect of the proposal.” slip op. at 13

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “ordinary and customary meaning as would have been understood by a person of ordinary skill in the art at the time of the invention and in the context of the entire patent disclosure. Phillips, 415 F.3d at 1312–13. “In determining the meaning of the disputed claim limitation, we look principally to the intrinsic evidence of record, examining the claim language itself, the written description, and the prosecution history, if in evidence.” DePuy Spine, Inc. v. Medtronic Sofamor Danek, Inc., 469 F.3d 1005, 1014 (Fed. Cir. 2006) (citing Phillips, 415 F.3d at 1312–17). Only claim terms in controversy require express construction, “and only to the extent necessary to resolve the controversy.” Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017); see also Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999) (“[O]nly those terms need resolve the controversy.”). Having reviewed the parties’ arguments, we determine no terms require express construction to resolve the disputes at this stage of the proceeding.8 A final determination as to claim construction will be made at the close of the proceeding, after any hearing, based on all the evidence of record. The parties are expected to assert all their claim construction arguments and evidence in the Petition, Patent Owner’s Response, Petitioner’s Reply, Patent Owner’s Sur-reply, or otherwise during trial, as permitted by our rules.” slip op. at 13

    Claim construction§ 103 obviousnessDiscretionary denialcites Phillips · Graham
    Patents in suitUS 8,928,752
  • PTAB · Mar 18, 2025 · IPR2024-01284 · APJ Nabeel U Khan · IPR · Institution

    The Board instituted inter partes review of claims 1–19 on all asserted grounds, finding a reasonable likelihood that at least one challenged claim is unpatentable.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “An inter partes review may not be instituted “unless . . . the information presented in the petition . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). Per Board practice, if the Board institutes trial, it will institute “on all of the challenged claims and on all grounds of unpatentability asserted for each claim.” See 37 C.F.R. § 42.108(a). Having considered the arguments and evidence presented by Petitioner and Patent Owner, we determine that Petitioner has demonstrated a reasonable likelihood of prevailing on at least one of the challenged claims of the ’540 patent. We exercise our discretion to institute inter partes review and, as required, we do so as to all the challenged claims of the ’540 patent on all the grounds of unpatentability set forth in the Petition.” slip op. at 2

    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Denied

      “issued an order temporarily staying all deadlines and hearings scheduled in the matter.6 Ex. 1058, 1–2. The District Court’s order notes that Patent Owner asserts 8 patents in the litigation, that IPRs have been instituted on 4 of those patents covering 10 of the 14 claims asserted in the litigation, and that further consideration of a stay will depend upon whether IPRs are instituted on patents including the 4 remaining claims. Id. at 1, 3. The District Court also ordered the parties to update their positions on a stay within one week of a decision on institution. It is unclear if, and when, a new trial date would be set. In light of this stay, we determine that this factor weighs strongly against discretionary denial. 2.” slip op. at 9

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “or undergraduate training in an equivalent field and at least two years of relevant experience in electronics technology.” Ex. 1051 ¶ 30. Dr. Sarhan further opines that “[a]dditional graduate education could substitute for professional experience, and significant work experience could substitute for formal education.” Id. Patent Owner does not contest Petitioner’s proposed level of ordinary skill. See generally Prelim. Resp. For purposes of this Decision, we adopt Petitioner’s proposed level of ordinary skill, which is supported by Dr. Sarhan’s testimony, except that we find that the phrase “at least” in Petitioner’s proposed definition creates a vague, open-ended upper bound for the level of ordinary skill, and we therefore do not adopt that aspect of the proposal.” slip op. at 15

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “Having reviewed the parties’ arguments we determine, as explained further below in our analysis of claim 1 (§ III.D.4.a), that an express construction of the term “file” is not necessary at this stage of the proceeding. A final determination as to claim construction will be made at the close of the proceeding, after any hearing, based on all the evidence of record. The parties are expected to assert all their claim construction arguments and evidence in the Petition, Patent Owner’s Response, Petitioner’s Reply, Patent Owner’s Sur-reply, or otherwise during trial, as permitted by our rules.” slip op. at 17

    Claim construction§ 103 obviousnessDiscretionary denialcites Phillips · KSR · Graham
    Patents in suitUS 8,310,540
  • PTAB · Mar 18, 2025 · IPR2024-01314 · APJ Brian J Mcnamara · IPR · Institution

    The Board instituted IPR on claims 1–20 and all asserted grounds, finding a reasonable likelihood that Motorola would prevail on at least one obviousness challenge.

    RulingsInstitution decision
    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Decided for petitioner

      “February 24, 2025, the District Court ordered all deadlines and hearings stayed pending further order of the court. See Ex. 1066. The District Court’s order notes that Patent Owner asserts 8 patents in the litigation, that IPRs have been instituted on 4 of those patents covering 10 of the 14 claims asserted in the litigation, and that further consideration of a stay will depend upon whether IPRs are instituted on patents including the 4 remaining claims. Id. at 1, 3. The District Court also ordered the parties to update their positions on a stay within one week of a decision on institution. It is unclear if, and when, a new trial date would be set. Thus, factors 1 and 2 weigh against exercising discretion to deny institution. The subject matter of the challenged claims is closely related to the subject matter of the claims of the patents in the previously instituted IPRs and the remaining pending petitions, as evidenced by the overlap of the asserted references and arguments advanced in these cases. As detailed in the substantive sections of this Decision, the Petition meets the standard for institution, i.e., there is a reasonable likelihood that Petitioner would prevail with respect to at least 1 of the claims challenged in the Petition. Under Fintiv factor 6, these circumstances weigh against exercising discretion to deny institution. In view of these circumstances, we determine that factors 1, 2, and 6 strongly weigh against exercising discretion to deny institution.” slip op. at 5

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “ordinarily skilled artisan”) as having at least a Bachelor’s Degree in electrical engineering, computer science, or computer engineering, or undergraduate training in an equivalent field and at least two years of relevant experience in electronics technology. Pet. 7 (citing Ex. 1062, Sarhan Decl. ¶¶ 26–30). Petitioner adds that additional graduate education could substitute for professional experience, and significant work experience could substitute for formal education. Id. Patent Owner does not comment specifically on the level of ordinary skill in the art. The level of ordinary skill in the art usually is evidenced by the references themselves. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). As Petitioner’s description of an 4U.S. Patent Publication No. 2004/0008255 A1 (Ex. 1019) 5 U.S. Patent Publication No. 2002/0191952 A1 (Ex. 1009) 6 U.S. Patent 5,982,418 (Ex. 1020) 7 Another Declaration of Dr. Sarhan has also been made of record in this proceeding. See Ex. 1003. This Decision distinguishes references to the Sarhan Declarations by Exhibit number. ’910 patent and the references, we apply it for purposes of this Decision. slip op. at 11

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “A. A computer processor configured to Petitioner notes that in the parallel litigation Patent Owner contends that this term is not a means plus function limitation. Pet. 9. Petitioner states that for purposes of the petition it has applied means plus function and non-means plus function interpretations to this limitation. Id. For purposes of this Decision, we need not construe this claim limitation. B. File In this proceeding, Petitioner does not propose a construction of the term “file.” See Pet. 9. Patent Owner does not propose a construction of “file” but, nonetheless, states that “Petitioner’s vague and unduly broad definition of ‘file’ is not only contradicted by the prosecution history, but also the extrinsic evidence it relies upon.” Prelim. Resp. 5 (citing Pet. 10– 12). Patent Owner reserves the right to present claim constructions arguments if trial is instituted. Id. at 6. For purposes of this Decision, we address the meaning of “file” in the context of the parties’ substantive arguments and do not articulate a specific construction. A final determination as to claim construction will be made at the close of the proceeding, after any hearing, based on all the evidence of record. The parties are expected to assert all their claim construction arguments and evidence in the Petition, Patent Owner’s Response, Petitioner’s Reply, Patent Owner’s Sur-reply, or otherwise during trial, as permitted by our rules.” slip op. at 13

    • Obviousness (§103) › Graham factors (scope of art, differences, level of skill)Instituted

      “c) Claim 1 Analysis Petitioner has demonstrated that, contrary to Patent Owner’s arguments, Yerazunis discloses write protecting a segment of the buffer. Yerazunis explicitly states that “[upon] a firing event, specified frame data associated with that firing event both before and after the event is preserved and cannot be overwritten as a result of further use of the gun or subsequent of memory to a second portion of memory to avoid overwriting the data in the first portion of memory upon the occurrence of a second trigger event is an effective approach to designating the first portion of memory as write protected. As Petitioner points out, an ordinarily skilled artisan would have understood from Yerazunis that retrieving video data for gun firing events necessitates the ability to locate the relevant video data within the buffer and that using pointers in a table to index the data allows for its later retrieval. Pet. 25 (citing Ex. 1062, Sarhan Decl. ¶ 372). We find unavailing Patent Owner’s argument that Yerazunis’ disclosure of a purge button to erase the contents of the circular buffer is further evidence that that entire buffer contents is protected and unprotected as a whole. Prelim. Resp. 30 (citing Ex. 1017, 9:47–51). It is unclear how providing an “optional” purge feature that erases the contents of the circular buffer and captured still images a “user does not desire to retain” supports Patent Owner’s argument that Yerazunis does not disclose write protecting segments of the buffer associated with a trigger event. Ex. 1017, 9:49–53. Inclusion of this feature further supports Petitioner’s argument, as the segments of a circular buffer associated with an event are not overwritten, unless the user invokes the purge feature to erase the contents of the circular buffer. Also unavailing is Patent Owner’s argument that video data preservation in Yerazunis “is a step that occurs after, not as part of, the step of ‘continu[ing] to record for a brief interval.’” See Prelim. Resp. 30–31. Claim 1 is an apparatus claim and does not recite “continuing to record for a brief interval.” See Ex. 1060, 12:19–47 (claim 1). Claim 1 recites “a computer processor configured to . . . continuing to record the sensor data in designated for saving.” Ex. 1060, 12:22, 34–36. Yerazunis discloses that upon detection of a trigger event a predetermined number of frames, e.g., 2 frames, are stored in successive frame locations within the circular buffer. Ex. 1017, 8:26–32; 12:14–28. Yerazunis further discloses that “any desired percentage of frames may be captured prior to or after the trigger event by specifying how many frames are to be captured and stored after the trigger event.” Id. at 8:39–42.” slip op. at 21

    Claim construction§ 103 obviousnessDiscretionary denialcites Phillips · KSR · Graham
    Patents in suitUS 10,965,910
  • PTAB · Mar 18, 2025 · IPR2024-01313 · APJ Brian J Mcnamara · IPR · Institution

    Instituted IPR on claims 1–25 because Petitioner showed a reasonable likelihood of prevailing on each asserted §103 ground.

    RulingsInstitution decision
    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Decided for petitioner

      “February 24, 2025, the District Court ordered all deadlines and hearings stayed pending further order of the court. See Ex. 1066. The District Court’s order notes that Patent Owner asserts 8 patents in the litigation, that inter partes reviews (IPRs) have been instituted on 4 of those patents covering 10 of the 14 claims asserted in the litigation, and that further consideration of a stay will depend upon whether IPRs are instituted on patents including the 4 remaining claims. Id. at 1, 3. The District Court also ordered the parties to update their positions on a stay within one week of a decision on institution. It is unclear if, and when, a new trial date would be set. Thus, Fintiv factors 1 and 2 weigh against exercising discretion to deny institution. The subject matter of the challenged claims is closely related to the subject matter of the claims of the patents in the previously instituted IPRs and the remaining pending petitions, as evidenced by the overlap of the asserted references and arguments advanced in these cases. As detailed in the substantive sections of this Decision, the Petition meets the standard for institution, i.e., there is a reasonable likelihood that Petitioner would prevail with respect to at least 1 of the claims challenged in the Petition. Under Fintiv factor 6, these circumstances weigh against exercising discretion to deny institution. In view of these circumstances, we determine that factors 1, 2, and 6 strongly weigh against exercising discretion to deny institution.” slip op. at 5

    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “(“Petition” or “Pet.”), to institute an inter partes review (“IPR”) of claims 1– 25 (the “challenged claims”) of U.S. Patent No. 10,523,901 B2 (“the ’901 patent”). 35 U.S.C. § 311. Stellar, LLC (“Patent Owner”) filed a Preliminary Response, Paper 8 (“Prelim. Resp.”), contending that the Petition should be denied as to all challenged claims. We have jurisdiction under 35 U.S.C. § 6. Under 35 U.S.C. § 314 an inter partes review may not be instituted unless the information presented in the Petition “shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.”” slip op. at 2

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundDecided for petitioner

      “Contentions concerning reason to combine the teachings of Yerazunis and Campbell Noting that both Yerazunis and Campbell disclose compact, mountable video recording systems, Petitioner contends an ordinarily skilled artisan would have had reason to combine the eyeglass mounted apparatus of Campbell with the teachings of Yerazunis in order to provide a hands-free instantaneous recording apparatus that for use in policing and security and in military fields. Pet. 16. Petitioner further contends that an ordinarily skilled artisan would have had a reasonable expectation of success with such a combination because Yerazunis provides a detailed disclosure of its buffer-based approach and because applying those techniques to Campbell’s eyeglass mounted apparatus would have been a routine matter. Id. at 17 (citing Ex. 1017, 10:37–49; Ex. 1062, Sarhan Decl. ¶ 165).” slip op. at 16

    § 103 obviousnessDiscretionary denialcites Phillips · KSR · Graham
    Patents in suitUS 10,523,901
  • PTAB · Mar 5, 2025 · IPR2024-01241 · APJ Aaron W Moore · IPR · Institution

    The Board instituted IPR of claims 1–2 and 4–15 on all petitioned grounds, finding a reasonable likelihood that claims 1 and 2, 4–7, and 9–15 are obvious over Johnson or Stubbs.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “determine whether to institute an inter partes review. An inter partes review may not be instituted unless it is determined that “the information presented in the petition filed under section 311 and any response filed under section 313 shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314 (2018); see also 37 C.F.R § 42.4(a) (2020) (“The Board institutes the trial on behalf of the Director.”). For the reasons provided below, and based on the present record, we determine that Petitioner has demonstrated a reasonable likelihood that it will prevail in showing the unpatentability of at least one of the challenged claims. Accordingly, we institute an inter partes review on all grounds set forth in the Petition. B.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “1. Level of Ordinary Skill in the Art Petitioner asserts that one of ordinary skill in the art “would have at least a Bachelor’s degree in Electrical Engineering, Computer Engineering, or a related field, and 2-3 years of experience in memory system design,” or, alternatively, “a Master’s degree in one of those fields and 1-2 years of relevant experience.” Pet. 9 (citing Ex. 1003 ¶¶ 26–29). Patent Owner “does not contest Petitioner’s definition of a person of ordinary skill in the art, but it reserves the right to do so in the event that trial is instituted.” Prelim. Resp. 7. There being no present dispute, we adopt Petitioner’s formulation for purposes of this decision.” slip op. at 9

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Petitioner asserts that “that no construction is necessary for any terms for the purposes of this Petition as the challenged claims are invalid under any reasonable construction.” Pet. 9. Patent Owner states that “the Board need not construe any claim term in a particular manner to arrive at the conclusion that the Petition is substantively deficient.” Prelim. Resp. 7. 5 At this stage of the proceeding, Patent Owner has not presented objective evidence of non-obviousness. In view of the parties’ positions, we determine that we need not expressly construe any terms for purposes of this Decision.” slip op. at 9

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation not foundNot shown unpatentable

      “to combine Johnson and Moss is inadequate. See Prelim. Resp. 20–24. We tend to agree. In the “Motivation to Combine Johnson and Moss” section, the Petition first asserts that “Johnson and Moss are in the same field of endeavor,” which is insufficient without more to provide a motivation. See, e.g., Sisvel Int’l S.A. v. Sierra Wireless, Inc., 82 F.4th 1355, 1364 (Fed. Cir. 2023). The Petition then asserts that “[t]o provide enhanced flexibility, [one of ordinary skill in the art] in possession of Johnson would look to Moss to incorporate a plurality of delay elements to the data strobe signal.” Pet. 22. This is not persuasive because (a) Petitioner argues that Johnson already provides a plurality of delay elements, (b) Petitioner fails to explain where or how additional delay elements from Moss would be added to Johnson, and (c) Petitioner fails to explain how or why the modification would “provide enhanced flexibility,” or even what “enhanced flexibility” might mean in 9 “a first sampling circuit to sample the first delayed data signal based on the strobe signal” 10 “a second sampling circuit to sample the second delayed data signal based on the received strobe signal” this context. Petitioner also argues that “Moss further discloses that the size of the data path – i.e. the number of data pins in each data path – is a design choice well within the knowledge and ability of a POSITA, and expressly recites examples of 4, 8, and 16-bit wide data paths.” Pet. 23. We agree that varying the width of the data path would have been within level of ordinary skill and would have depended on the particular application, but the Petition fails to explain how or why that would have made it obvious to incorporate various elements of Moss into Johnson.” slip op. at 19

    Claim construction§ 103 obviousnesscites KSR · Graham
    Patents in suitUS 9,111,608
  • PTAB · Mar 5, 2025 · IPR2024-01240 · APJ Michelle N Wormmeester · IPR · Institution

    The Board instituted IPR on claims 1–19 based on all asserted challenges, finding a reasonable likelihood of success on the Meaney and Meaney-Greeff obviousness grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “Pursuant to 35 U.S.C. § 314(a), an inter partes review may not be instituted “unless . . . there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” For the reasons that follow, we institute an inter partes review as to all the challenged claims of the ’466 patent based on all the challenges presented.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “in Electrical Engineering, Computer Engineering, or a related field as well as at least two years of academic or industry experience in design and implementation of high-speed digital communication systems.” Pet. 13. Petitioner further asserts that “[a]n individual with an advanced degree in a relevant field, such as computer or electrical engineering, would require less experience in the design and implementation of high-speed digital communication systems, and vice versa.” Id. Patent Owner “does not contest Petitioner’s definition of a person of ordinary skill in the art, but it reserves the right to do so if trial is instituted.” Prelim. Resp. 7. There being no present dispute, we adopt Petitioner’s formulation for purposes of this Decision.” slip op. at 6

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “using the same claim construction standard that would be used to construe the claim in a civil action under 35 U.S.C. 282(b).” See 37 C.F.R. § 42.100(b). That standard involves construing claims in accordance with the ordinary and customary meaning of such claims as would have been understood by one of ordinary skill in the art and the prosecution history pertaining to the patent. See id.; Phillips v. AWH Corp., 415 F.3d 1303, 1312–14 (Fed. Cir. 2005) (en banc). slip op. at 6

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundInstituted

      “Petitioner contends that “[a] POSITA would have been motivated to incorporate the termination circuitry disclosed in Greeff with the system of Meaney to achieve enhanced system performance and reliability.” Pet. 53 (citing Ex. 1002, app. A at 82). As support, Petitioner asserts that “Greeff’s termination circuitry ensures proper signal integrity and reduces reflections in high-speed data transmission systems.” Id. (citing Ex. 1006, 1:28–31, 4:10–12, 8:3–5; Ex. 1002, app. A at 82). Petitioner further asserts that “Meaney’s calibration techniques, when applied to the termination resistance and transistor drive strength of Greeff, would ensure that these parameters remain optimal throughout system operation.” Id. (citing Ex. 1002, app. A at 82); see also id. at 54 (“A POSITA would have found it obvious to apply Meaney’s calibration process to Greeff’s termination circuitry in order to optimize the termination resistance and drive strength of the termination circuitry.”). Petitioner adds that “[a] POSITA would have had a reasonable expectation of success in combining Meaney and Greeff.” Id. at 54. According to Petitioner, “[t]he integration of Greeff’s termination circuitry into Meaney’s system would have been straightforward and cost-effective,” any “required modifications are minimal, and the results of the combination are predictable, given the complementary nature of the technologies.” Id. (citing Ex. 1002, app. A at 82). Patent Owner does not dispute Petitioner’s analysis for this limitation. See Prelim. Resp. Based on Petitioner’s argument and evidence, we are persuaded that Petitioner has shown sufficiently for purposes of this Decision that its proposed combination of Meaney and Greeff teaches or suggests the recited “circuitry” of limitation 17a. We also are persuaded that Petitioner’s proffered reasoning for modifying Meaney’s system to include Greeff’s termination circuitry, namely, to ensure proper signal integrity and reduce reflections, is sufficient to support institution. See In re Kahn, 441 F.3d 977, 988 (Fed. Cir. 2006) (“[T]here must be some articulated reasoning with some rational underpinning to support the legal conclusion of obviousness.”).” slip op. at 26

    Claim construction§ 103 obviousnesscites Phillips
    Patents in suitUS 9,160,466

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.