PTAB
Advanced fields
603 decisions · 501msnewest first
  • PTAB · Jun 13, 2025 · IPR2024-00343 · APJ Charles J Boudreau · IPR · Final written decision

    Claims 1–7 are unpatentable as obvious over Rădulescu2004 and OCP; the Board did not reach the Weber-based grounds.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “include (1) the educational level of the inventor; (2) the type of problems encountered in the art; (3) prior-art solutions to those problems; (4) the rapidity with which innovations are made; (5) the sophistication of the technology; and (6) the educational level of workers active in the field. Envtl. Designs, Ltd. v. Union Oil Co., 713 F.2d 693, 696–97 (Fed. Cir. 1983). Not all factors may exist in every case, and one or more of these or other factors may predominate in a particular case. Id. These factors are not exhaustive, but merely a guide to determining the level of ordinary skill in the art. Daiichi Sankyo Co. v. Apotex, Inc., 501 F.3d 1254, 1256 (Fed. Cir. 2007). Moreover, the prior art itself may reflect an appropriate skill level. Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001).” slip op. at 13

    • Claim Construction › Functional claiming / §112(f) means-plus-function › Whether §112(f) applies (Williamson, nonce words)§112(f) appliesDecided for petitioner

      “35 U.S.C. § 112 ¶ 6 (2006). “[T]he use of the word ‘means’ in a claim element creates a rebuttable presumption that § 112, para. 6 applies.” Williamson v. Citrix Online, LLC, 792 F.3d 1339, 1348 (Fed. Cir. 2015) (en banc in relevant part); Personalized Media Commc’ns, LLC v. Int’l Trade Comm’n, 161 F.3d 696, 703–04 (Fed. Cir. 1998). “[This] presumption may be rebutted if the properly construed claim limitation itself recites sufficiently definite structure to perform the claimed function.” Kemco Sales, Inc. v. Control Papers Co., 208 F.3d 1352, 1361 (Fed. Cir. 2000).” slip op. at 16

    • Claim Construction › Functional claiming / §112(f) means-plus-function › Corresponding structure / algorithm (indefinite if none)Term construed patent owner constructionDecided for patent owner

      “Ex. 1001, 4:46–50. This passage indicates that the interconnect can be a network on a chip and the network on a chip can include wires and buses. That does not necessarily mean that the interconnect can be just wires or buses; rather, it discloses that the interconnect can include wires and buses. In context, the disclosure regarding wires and buses does not support construing the corresponding structure broadly enough to encompass just wires and buses. The networks that constitute the corresponding structure, however, could include networks with wires and buses. Therefore, we agree with Patent Owner that the corresponding structure for the interconnect means should not include a mere bus, switch, and point-to-point wire and instead find that the corresponding structure under 35 U.S.C. § 112 ¶ 6 is a network, which the ’052 patent describes as a multi-hop interconnection between modules separated by one or more network nodes. See Ex. 1001, 2:33–37. Because this structure corresponds to the construction of “interconnect means” proposed by Patent Owner and adopted by the district courts in the TI and Qualcomm litigations (see supra Section III.C.3.b), and we do not rely in our analysis below on a recourse to “equivalents thereto” as permitted by § 112 ¶ 6, we note that our ultimate conclusions on the unpatentability of the challenged claims would be the same if § 112 ¶ 6 did not apply. iii. Conclusion For the reasons stated above, we construe “interconnect means” to cover the structure described in the Specification corresponding to the specified functions of “coupling said plurality of processing modules (M, S)” in the context of claim 6 and “coupling said plurality of processing modules (M, S)” and “enabling a connection-based communication having a set of connection properties” in the context of claims 1 and 7—i.e., a “multi-hop interconnection between modules separated by one or more network nodes”—and equivalents thereof.” slip op. at 28

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “standard as would be used by a district court to construe a claim in a civil action involving the validity or infringement of a patent. 37 C.F.R. § 42.100(b). Under that standard, claim terms are given their ordinary and customary meaning, as would have been understood by a person of ordinary skill in the art at the time of the invention, in light of the language of the claims, the specification, and the prosecution history of record. Id.; Phillips v. AWH Corp., 415 F.3d 1303, 1312–19 (Fed. Cir. 2005) (en banc); Thorner v. Sony Comput. Entm’t Am. LLC, 669 F.3d 1362, 1365–66 (Fed. Cir. 2012). “The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’” Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (quoting Vivid Techs., Inc. v. Am. Sci. Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 15

    Patent outcomesUS 7,594,052 unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 7,594,052
  • PTAB · Jun 13, 2025 · IPR2024-01081 · APJ Steven M Amundson · IPR · Final written decision

    Claims 2, 6, and 9–16 are unpatentable as obvious over Goossens2003 and Drake; the Board did not reach the Goossens2002 and Drake challenge.

    RulingsFinal written decision
    • Obviousness (§103) › Motivation to combine / reasonable expectation of successUnpatentableUnpatentable

      “3. WHETHER AN ORDINARILY SKILLED ARTISAN WOULD HAVE BEEN MOTIVATED TO COMBINE THE TEACHINGS OF” slip op. at 54

    • PTAB / AIA Trials › Joinder §315(c) / SAS all-or-nothingJoinder, grantedGranted

      “Qualcomm”) filed a petition in IPR2024-01081 challenging claims 2, 6, and 9–16 in the ’449 patent on substantively identical grounds to those asserted in Samsung’s Petition. Qualcomm Incorporated v. Network System Technologies, LLC, IPR2024-01081, Paper 1 (“Pet.”).2 Concurrently with filing the petition in IPR2024-01081, Petitioner filed a motion for joinder, seeking joinder as a party in this proceeding under 35 U.S.C. § 315(c). IPR2024-01081, Paper 3. slip op. at 3

    • PTAB / AIA Trials › §315(b) time barNot time barredDecided for petitioner

      “IV. JOINDER AND THE ONE-YEAR TIME BAR IN § 315(b) Regarding joinder, § 315(c) permits joinder as a party and states:” slip op. at 157

    • ExcludeOther

      “In our analyses above, we do not rely on any of the evidence that Petitioner seeks to exclude. See, e.g., supra §§ III.C–III.E. Hence, we dismiss Petitioner’s motion to exclude evidence as moot. See, e.g., Netflix, Inc. v. GoTV Streaming, LLC, IPR2023-00757, Paper 39 at 135 (PTAB Nov. 5, 2024) (dismissing motion to exclude evidence as moot); Volkswagen Grp. of Am., Inc. v. Spero, IPR2023-00335, Paper 40 at 24 (PTAB July 15, 2024) (dismissing motion to exclude evidence as moot).” slip op. at 159

    Patent outcomesUS 7,373,449 unpatentable
    § 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 7,373,449
  • PTAB · Jun 13, 2025 · IPR2024-00338 · APJ Steven M Amundson · IPR · Final written decision

    Claims 2, 6, and 9–16 are unpatentable under § 103(a) as obvious over Goossens2003 and Drake.

    RulingsFinal written decision
    • Obviousness (§103) › Motivation to combine / reasonable expectation of successUnpatentableUnpatentable

      “Accordingly, “the teachings of Drake apply directly to systems on” slip op. at 82

    • PTAB / AIA Trials › Joinder §315(c) / SAS all-or-nothingJoinder, grantedGranted

      “In October 2024, the Board (1) instituted an inter partes review in IPR2024-01081, (2) granted Petitioner’s motion for joinder in IPR2024- 01081, and (3) joined Petitioner as a party in this proceeding. Paper 16 (“Qualcomm Inst. Dec.”), 50–51; IPR2024-01081, Paper 14 at 50–51. The next day, based on a settlement between Samsung and Patent Owner, the Board granted in part a joint motion to terminate filed by Samsung and Patent Owner and terminated Samsung as a petitioner in this proceeding. See Paper 14 (Joint Motion); Paper 17 (Order).” slip op. at 3

    • ExcludeOther

      “In our analyses above, we do not rely on any of the evidence that Petitioner seeks to exclude. See, e.g., supra §§ III.C–III.E. Hence, we dismiss Petitioner’s motion to exclude evidence as moot. See, e.g., Netflix, Inc. v. GoTV Streaming, LLC, IPR2023-00757, Paper 39 at 135 (PTAB Nov. 5, 2024) (dismissing motion to exclude evidence as moot); Volkswagen Grp. of Am., Inc. v. Spero, IPR2023-00335, Paper 40 at 24 (PTAB July 15, 2024) (dismissing motion to exclude evidence as moot).” slip op. at 159

    Patent outcomesUS 7,373,449 unpatentable
    § 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 7,373,449
  • PTAB · May 28, 2025 · IPR2025-00301 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution of review for claims 1–11, 16, and 21 under § 314(a), finding the Fintiv factors favored discretionary denial, and denied joinder.

    RulingsInstitution decision
    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Institution denied fintivInstitution denied

      “2026. This date is nearly five months prior to the date on which the final written decision would be due if trial were instituted in this proceeding. And, even if we assume Petitioner’s alleged February–March 2026 trial date, this date too is several months prior to the projected final written decision deadline. As such, it is unlikely that a final written decision in this proceeding would issue before trial in the district court, unless the trial was delayed or rescheduled for a later time. Thus, we find this factor weighs in favor of exercising our discretion to deny institution. See ARM Ltd. v. Daedalus Prime LLC, IPR2025-00207, Paper 10 at 2 (May 16, 2025) (Before the Office of the Under Secretary of Commerce for Intellectual Property and Director of the United States Patent and Trademark Office) (exercising discretion to deny institution with the same relative timing between district court trial and final written decision deadline).” slip op. at 13

    • PTAB / AIA Trials › Motions to amend / substitute claimsNot reached
    • PTAB / AIA Trials › Joinder §315(c) / SAS all-or-nothingJoinder, deniedDenied
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied discretionary otherInstitution denied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). Institution of inter partes review, however, is discretionary. See Harmonic Inc. v. Avid Tech., Inc., 815 F.3d 1356, 1367 (Fed. Cir. 2016) (“[T]he PTO is permitted, but never compelled, to institute an IPR proceeding.”). For the reasons discussed below, we exercise discretion pursuant to 35 U.S.C. § 314(a) not to institute inter partes review. Additionally, for the same reasons and because institution was denied in IPR2024-01248, we deny Petitioner’s Motion for Joinder. See 35 U.S.C. § 315(c) (“[T]he Director . . . may join as a party . . . any person who properly files a petition under section 311 that the Director . . . determines warrants the institution of an inter partes review under section 314.”).” slip op. at 3

    Discretionary denial
    Patents in suitUS 9,814,071
  • PTAB · May 14, 2025 · IPR2024-00156 · APJ Sheila F Mcshane · IPR · Final written decision

    Claims 1–3 and 8 are unpatentable over the stated obviousness grounds; claims 4–6 were not shown unpatentable because Hiroyuki does not teach the claimed terminal pins.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “II. ANALYSIS A. Level of Ordinary Skill in the Art Relying on the Schubert Declaration, Petitioner proposes that a person of ordinary skill in the art “would have had a bachelor’s degree in electrical engineering, physics, materials science, or a related discipline, and 6 years of 1 The Leahy-Smith America Invents Act (“AIA”), Pub. L. No. 112–29, 125 Stat. 284 (Sept. 16, 2011), includes amendments to Section 103 that became effective on March 16, 2013. Because the challenged claims issued from an application filed before March 16, 2013, we apply pre-AIA law. See Pet. 2; Ex. 1001, codes (22), (30). 2 US 2009/0021955 A1, published January 22, 2009 (Ex. 1004, codes (10), (43)) (“Kuang”). Petitioner contends that Kuang is prior art to the ’546 patent at least under pre-AIA 35 U.S.C. § 102(b). Pet. 2. 3 US 2012/0050606 A1, published March 1, 2012 (Ex. 1005, codes (10), (43)) (“Debevec”). Petitioner asserts that “[b]ecause Debevec was filed prior to the priority date of the ’546 patent, it qualifies as prior art at least under pre-AIA 35 U.S.C. § 102(e).” Pet. 2. 4 US 6,774,584 B2, issued August 10, 2004 (Ex. 1008, codes (10), (45)) (“Lys”). Petitioner contends that Lys is prior art to the ’546 patent at least under pre-AIA 35 U.S.C. § 102(b). Pet. 2–3. 5 JP2006-228529, published August 31, 2006 (Ex. 1006, code (43)) (“Hiroyuki”). We refer herein to the certified English translation filed as Exhibit 1007. Petitioner contends that Hiroyuki is prior art to the ’546 patent at least under pre-AIA 35 U.S.C. § 102(b). Pet. 2. practical experience in designing or fabricating LED lighting systems, including controlling and driving LEDs,” or “[a]lternatively . . . would have had a master’s degree and four years of experience, or a Ph.D. degree and two years of experience.” Pet. 5 (citing Ex. 1003 ¶ 31). Patent Owner applies Petitioner’s asserted level of ordinary skill in the art. PO Resp. 7–8. For the purposes of this Decision, we adopt the assessment offered by Petitioner as it is consistent with the ’546 patent and the prior art before us. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001).” slip op. at 16

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “The parties also dispute the interpretation of the term “synchronous signals” recited in claim 1, with the parties proposing these respective constructions: Petitioner’s Proposed Patent Owner’s Proposed Construction Construction “signals that are sent to the slave “signals related to activities governed by synchronized timing” nodes to control their corresponding LED strings at the same time.”” slip op. at 20

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed petitioner constructionDecided for petitioner

      “The “context” is typically evaluated by reviewing the intrinsic record. See e.g., Regeneron, 130 F.4th at 1380–84. Here, as discussed above, the ’546 patent has multiple disclosures where a curtain lamp has a single light-emitting diode in one light-emitting diode string. See Ex. 1001, 1:33–36, 6:15–20, 6:27–40, 8:25–45. In particular, the ’546 patent similarly discloses a first curtain lamp with one LED in one light string, as well as a second curtain lamp, which provides further support for Petitioner’s proposed interpretation. Id. at 8:25–45. Although Patent Owner argues that Figures 7 and 8 disclose multiple LEDs and light strings in curtain lamps, other embodiments and claims explicitly indicate single components in a “curtain lamp.” “[T]here is a strong presumption against a claim construction that excludes a disclosed embodiment.” See In re Katz Interactive Call Processing Patent Litig., 639 F.3d 1303, 1324 (Fed. Cir. 2011). Given that certain embodiments and claim 8 disclose a curtain lamp with one light string with one LED, we decline to interpret the claim to prohibit Petitioner’s interpretation. Additionally, we do not find that Petitioner’s claim interpretation renders the claim terms nonsensical or illogical. See Becton, 616 F.3d at 1255. Patent Owner asserts otherwise, arguing that Petitioner’s interpretation is based upon a “nonsensical” or “absurd[]” argument, there is no reason to have both a master and slave control unit to operate a single LED, and the interpretation renders most of the components superfluous. See PO Sur-reply 12; PO Resp. Supp. Br. 5. As discussed above, however, although the ’546 patent does not appear to provide any explanation for why there are master and slave control units to operate a single LED, the patent nevertheless discloses that in embodiments. This situation is also distinguishable from Becton, where “unequivocal language” of the claim recited “spring means ‘connected to’ the hinged arm,” such that interpreting the spring means and the hinged arm as the same structure would have rendered the claim nonsensical. Becton, 616 F.3d at 1254–55. Becton further found that interpreting the spring means and hinged arm as the same structure would be inconsistent with descriptions of the elements in the specification. Id. Here, in contrast, the ’546 patent Specification is replete with disclosures of a curtain lamp having one light string with one LED, and claim 8 is directed to the same. Accordingly, we adopt Petitioner’s interpretation of these claim elements.” slip op. at 36

    • Strike new argumentNew argument consideredDecided for petitioner

      “Although Patent Owner argues that Petitioner’s arguments in the Reply on “light strings” and “curtain lamp” as they relate to a single LED are improper, we do not agree. As Patent Owner acknowledges, the Petition and Dr. Schubert’s original declaration stated that a “curtain lamp” is “commonly understood to be one or more light strings.” See PO Sur-reply 12; see also Pet. 8; Ex. 1003 ¶ 37. Patent Owner did not contest Petitioner’s interpretation in its Response. See PO Resp. 15. Patent Owner did, however, argue that Kuang did not teach or suggest “light strings” in any form and therefore did not teach a “curtain lamp” under Petitioner’s definition of the same. PO Resp. 15–17. A petitioner reply may respond to arguments raised in a patent owner’s response under 35 U.S.C. § 42.23(b), and here Petitioner’s argument that a light string may have a single LED is properly presented in its Reply in response to Patent Owner’s arguments. Further, Patent Owner was not only aware that Petitioner had taken the position that a “curtain lamp” could be a single “light string,” but Patent Owner also did not dispute Petitioner’s interpretation.8 Our view, therefore, is that Petitioner’s argument that a curtain lamp may be a single LED is proper because it is corollary to Petitioner’s reply arguments on light strings. That is, Petitioner’s assertion follows from the reply arguments on light strings and the unopposed interpretation of curtain lamp as a single light string. Additionally, to the extent there could be any prejudice to Patent Owner by these light string and curtain lamp arguments, Patent Owner has had opportunities to address them by supplemental briefing.” slip op. at 32

    Patent outcomesUS 8,884,546 mixed
    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 8,884,546
  • PTAB · May 5, 2025 · IPR2024-00175 · APJ Norman H Beamer · IPR · Final written decision

    Claims 7, 9–11, 13, 14, 16, and 17 are unpatentable as obvious over Biswas and Kumar; the remaining challenged claims were not shown unpatentable.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Pet. 14 (citing Ex. 1003 ¶¶ 62–64). Patent Owner does not dispute Petitioner’s proposal. PO Resp. 8–9. Petitioner’s proposal is consistent with the level of ordinary skill in the art as reflected by the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); GPAC, 57 F.3d at 1579. On this record, the level of ordinary skill is neither in dispute nor dispositive of any challenge. For purposes of this Decision, we apply Petitioner’s articulation.” slip op. at 10

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Claim terms need only be construed to the extent necessary to resolve the controversy. Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017). The parties submit that no claim construction is necessary. Pet. 14; PO Resp. 15. We have not been presented with the need to construe any claim terms for this Decision. D.” slip op. at 11

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundDecided for petitioner

      “We determine that Petitioner has provided sufficiently articulated reasoning with rational underpinnings for the proffered combined teachings of Biswas and Kumar. We are persuaded by Petitioner’s declarant’s testimony that one of ordinary skill would have known to use the masking techniques exemplified by Kumar to implement the disclosed operation in Biswas of edge routers providing hosts with port number ranges. Ex. 1003 ¶¶ 77, 97–101. Accordingly, we determine that Petitioner has proved by a preponderance of the evidence that one of ordinary skill in the art would have been motivated to combine Biswas and Kumar.” slip op. at 13

    • Obviousness (§103) › Graham factors (scope of art, differences, level of skill)UnpatentableNot shown unpatentableMixed

      “This disclosure is inconsistent with any suggestion that the Fangman system, when routing a telephone call to its destination, identifies the private IP address of the destination telephone by determining the port range to which the port number of the destination telephone belongs. When Fangman describes the NAPPT process, it does not indicate that port ranges are used, but rather repeatedly states that port numbers are used: The [service gateway] receives a data packet from the IP device, including a public destination IP address . . . a destination port number . . . and source information, NAPPTs the data packet, using the [public destination IP address] and the [destination port number] to identify the [IP telephone] . . . . Ex. 1024, code (57). Performing NAPPT on the data packet received from the destination may include using the public destination IP address and the destination port number to uniquely identify the IP telephone, and changing the public destination IP address to a private source IP address of the IP telephone while leaving the destination port number unchanged. Ex. 1024, 4:28–33. The SG 170 may maintain a table of semi-permanent mappings of the external IP address and ports to the internal hosts and ports. Ex. 1024, 8:49–51.” slip op. at 33

    Patent outcomesUS 8,693,369 mixed
    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 8,693,369
  • PTAB · May 2, 2025 · IPR2024-01450 · APJ Justin T Arbes · IPR · Institution

    Instituted inter partes review of claims 1–4, 6–11, and 13–20 on all asserted grounds after finding a reasonable likelihood that claim 1 is unpatentable over Dziong and Sathyanath.

    RulingsInstitution decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “B. Level of Ordinary Skill in the Art Petitioner argues that at the time of the ’088 patent (January 2006), a person of ordinary skill in the art would have had “a bachelor’s degree in computer science, computer engineering, electrical engineering, or equivalent training, and approximately four years of experience working in the field of network communications, including experience with [Multiprotocol Label Switching (MPLS)] tunnels and bandwidth allocation,” where “[a]dditional work experience can substitute for specific educational background, and vice versa.” Pet. 12 (citing Ex. 1003 ¶¶ 20–21). Petitioner further contends that a person of ordinary skill in the art would have been knowledgeable and familiar with the network communications technologies discussed in [the Specification of the ’088 patent], including bandwidth reservations, quality of service techniques, routing protocols (including Open Shortest Path First (OSPF)), tunneling protocols (including [MPLS]), resource reservations (including Resource ReSerVation Protocol (RSVP)), traffic engineering (including relevant extensions to OSPF, IS-IS, and RSVP), and ring networking standards (e.g., Synchronous Optical Network (SONET) and resilient packet ring (RPR) defined by IEEE 802.17). Id. Patent Owner states that “Petitioner’s definition . . . is acceptable for” purposes of its Preliminary Response. Prelim. Resp. 8 n.3. Based on the record presented, including our review of the ’088 patent and the types of problems and solutions described in the ’088 patent and cited prior art, we agree with Petitioner’s proposed definition of the level of ordinary skill in the art and apply it for purposes of this Decision.” slip op. at 9

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “37 C.F.R. § 42.100(b). Petitioner argues that “no claim term requires express construction.” Pet. 12–13. Patent Owner does not propose interpretations of any claim terms in its Preliminary Response. We conclude that no express interpretation of any claim term is necessary to determine whether to institute an inter partes review in this proceeding. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“Because we need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy,’ we need not construe [a particular claim limitation] where the construction is not ‘material to the . . . dispute.’” (citation omitted) (emphasis added)).” slip op. at 10

    • Obviousness (§103) › Graham factors (scope of art, differences, level of skill)Instituted

      “Patent Owner, however, does not explain sufficiently why any of these issues demonstrate a failure to teach limitation [1.1]. We understand Petitioner’s position to be that Dziong identifies “two or more candidate routes” (i.e., A-B-C-D and A-C-D) for a “new connection” (i.e., a new recovery path to protect primary path SRLG 4 in the event of failure) with a “requested bandwidth” (i.e., 15 units) sufficient to protect against failure. See Pet. 27–31 (citing Ex. 1005 ¶¶ 36, 70, 89, 90, 104, 105). The 15 units are the “units of demand” on SRLG 4 that must be protected. Ex. 1005 ¶¶ 89 (“[E]ach solid line represents all of the demands that have the same link-detour path, which is represented by a corresponding broken line. For example, solid line 606 in SRLG 4 corresponds to one or more demands totaling 15 units of bandwidth between nodes A and D.”), 90. A link in a potential recovery path for that demand on SRLG 4, therefore, would need to have “sufficient recovery bandwidth” to protect against failure (i.e., at least 15 units). Id. ¶¶ 36, 104. That is reflected in the “SRLG 4 failure” column of Figure 6(b) for link A-B (part of the A-B-C-D recovery path shown in blue in Figure 6(a) above). On this record, we do not see why the fact that link A-B also protects against failures of SRLG 3 and 5 and has its own 12 units of demand, or the fact that SRLG 4 also has another 24 units of demand (which link A-B does not protect against), contradicts Petitioner’s position regarding Dziong and limitation [1.1]. See id. ¶¶ 89–90 (“link A-B is not part of the link-detour path for the other 24 XC units of demand on SRLG 4”). At this stage, we find that Petitioner has made a sufficient showing that Dziong teaches limitation [1.1]. Therefore, we need not evaluate any additional arguments regarding Sathyanath at this time. See Pet. 31–32; Prelim. Resp. 14–16.” slip op. at 23

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundInstituted

      “We disagree based on the current record. Dziong refers to both “link-based” and “path-based” recovery. Ex. 1005 ¶¶ 6–8. And the two methods are similar in various ways, as Dziong recognizes. See, e.g., id. ¶¶ 69 (“While some of the algorithms utilized in a link-based scheme are related to path-based recovery algorithms, there are significant modifications and special considerations that are made in the case of link-based recovery.”), 103 (“In some areas, the issues associated with recovery path calculation for link-based recovery [are] analogous to recovery path calculations for path-based restoration . . . .”). Dziong also purports to incorporate Sathyanath’s application by reference. Id. ¶ 1. And, as Petitioner points out, the references have similar disclosures and similar discussions of bandwidth sharing. See Pet. 1, 20–22; Ex. 1005 ¶¶ 10–12, 36–39, 60, 65, 88; Ex. 1006 ¶¶ 4, 12–13, 41–45, 200. Thus, on this record, we disagree with Patent Owner that a person of ordinary skill in the art would not consider combining the teachings of Dziong and Sathyanath. See In re Applied Materials, Inc., 692 F.3d 1289, 1298 (Fed. Cir. 2012) (“A reference must be considered for everything that it teaches, not simply the described invention or a preferred embodiment.”); In re Hyon, 679 F.3d 1363, 1366 (Fed. Cir. 2012) (affirming an obviousness determination where two “references both teach processes directed to making the same class of products” and minor differences between the disclosures did not “negate the motivation to combine”). Second, Patent Owner argues that Petitioner “fails to identify specific teachings in Sathyanath that a [person of ordinary skill in the art] would have been motivated to implement in Dziong with a reasonable expectation of success” and “does not explain how the features would have been combined or why there would have been a reasonable expectation of success in doing so.” Prelim. Resp. 11. Patent Owner, however, only mentions Petitioner’s introductory statement regarding reasons to combine and does not address the substance of Petitioner’s arguments for claim 1, where Petitioner explains how it is relying on Sathyanath as a secondary reference. See Prelim. Resp. 10–11 (citing Pet. 22–23). For example, regarding the “sharing definition” of limitation [1.2], Petitioner argues that because Dziong only gives “limited details about the data format used for sharing” reserved bandwidth information, “it would have been obvious to consider . . . Sathyanath’s examples,” relying on two particular alleged “sharing definition[s]” in Sathyanath (i.e., the “aggregate node-link vector” and “TE/Share database”). Pet. 36–39. Based on the current record, we preliminarily find that Petitioner has made a sufficient showing, supported by the testimony of Dr. Mir, that a person of ordinary skill in the art would have been motivated to use such data formats to share reserved bandwidth information in the system of Dziong, with a reasonable expectation of success. See id.; Ex. 1003 ¶¶ 38–39, 72–79.” slip op. at 38

    Claim construction§ 103 obviousnesscites KSR · Graham
    Patents in suitUS 7,596,088
  • PTAB · Apr 28, 2025 · IPR2024-01500 · APJ Neil T Powell · IPR · Institution

    Institution of IPR challenging claims 1–5 was denied because Petitioner did not show a reasonable likelihood of prevailing on any asserted obviousness ground.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “An inter partes review may not be instituted “unless . . . the information presented in the petition . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). For the reasons that follow, we do not institute inter partes review.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “of ordinary skill in the art at the time of the invention would have had “at least a bachelor’s degree in electrical engineering, computer engineering, computer science, physics, or an equivalent field, and two years of experience with cellular telecommunications, radio-access network architectures and protocols, and signal propagation in wireless networks.” Pet. 7 (citing Ex. 1003 ¶ 54). Petitioner further proposes that “[m]ore education can supplement practical experience and vice versa.” Id. (citing Ex. 1003 ¶ 54). 6 Elgamal, U.S. Patent No. 6,898,248 B1, issued May 24, 2005 (Ex. 1008, “Elgamal”). 7 Frank et al., U.S. Patent Application Publication No. 2003/0035469 A1, published Feb. 20, 2003 (Ex. 1006, “Frank”). 8 Zha et al., “Soft-Decision Successive Interference Cancellation CDMA Receiver with Amplitude Averaging and Robust to Timing Errors,” Proc. IEEE Global Telecommunications Conference, 2001 (GLOBECOM ’01), vol. 2, 2001, pp. 743–747 (Ex. 1010, “Zha”). In its Preliminary Response, Patent Owner does not take a position on the relevant level of ordinary skill in the art. See generally Prelim. Resp. At this stage of the proceeding and on the present record, we adopt Petitioner’s uncontested proposed level of ordinary skill in the art, which we find consistent with the level of ordinary skill in the art reflected by the ’703 patent and the prior art of record. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978).” slip op. at 7

    • Expert testimonyPetitioner expert discountedDecided for patent owner

      “provide sufficiently persuasive evidence in support of its position that claim 1’s “decoders” has a meaning broad enough to correspond to Zha’s decision rule. Petitioner disputes Patent Owner’s understanding of claim 1’s “decoders” by arguing that “[Patent Owner] does not argue that the specification disclaims decoders that do not perform error correction, or otherwise expressly limits the claimed bank of decoders to error correction.” Prelim. Reply 6. In support of its position, Petitioner cites Dr. Min’s testimony that “[i]n my opinion, a [person of ordinary skill in the art] would have understood that the ‘decision rule’ would be implemented using a decoder, as decoders typically make bit decisions.” Ex. 1003 ¶ 178; Pet. 59. Dr. Min does not cite any objective evidence in support of this view. Ex. 1003 ¶ 178. In response, Patent Owner marshals intrinsic evidence, along with Dr. Caire’s testimony based on objective supporting evidence. Prelim. Resp. 47–48; Prelim. Sur-Reply 5–6. For example, arguing that all embodiments disclosed in the ’703 patent use error-correcting coding, Patent Owner emphasizes the ’703 patent’s statement that “the [’703 patent’s] specification states that ‘[t]he invention is based on an iterative decoding solution that exploits error correction codes.’” Prelim. Sur-Reply 6 (quoting Ex. 1001, 25:27–29 (emphasis added by Patent Owner)). Patent Owner also cites the Abstract of the ’703 patent, which states that “[t]he present invention provides Turbo-decoding for joint signal demodulation based on an iterative decoding solution that exploits error correction codes.” Ex. 1001, code (57); Prelim. Sur-Reply 6. Patent Owner also cites Dr. Caire’s testimony that “any reasonable understanding of a decoder is one that implements an error correction coding approach.” Ex. 2001 ¶ 98; Prelim. Resp. 47. Dr. Caire cite objective evidence that supports this view. Ex. 2001 ¶ 98 (citing Ex. 2003, 3; Ex. 2004, 11; Ex. 2005, 228). Weighing the parties’ arguments and evidence, we find Patent Owner’s more persuasive than Petitioner’s. Starting with the intrinsic evidence, Patent Owner’s citation of the ’703 patent’s repeated statements that the “invention . . . exploits error correction codes” is more persuasive than Petitioner’s argument that the ’703 patent does not disclaim other approaches. Prelim. Sur-Reply 6 (citing Ex. 1001, 25:27–29, code (57)); Prelim. Reply 6. Petitioner argues that certain background documents suggest decoders may have a broad meaning, but this attorney argument warrants less weight than Dr. Caire’s testimony. Prelim. Reply 7 (citing Ex. 2003, 18–20; Ex. 2004, 7, 9). Accordingly, in sum, Petitioner does not” slip op. at 16

    • Obviousness (§103) › Graham factors (scope of art, differences, level of skill)Not reached

      “In view of all the parties’ arguments and evidence, we do not find a reasonable likelihood of Petitioner prevailing on this issue. When questioning who exactly had rights to which specific inventions of Mr. McElwain’s, Petitioner glosses over the key, undisputed fact that Mr. McElwain assigned the invention of the ’703 patent to the exact same entity to which Brommer was assigned, specifically BAESI. Ex. 2012, 2; Ex. 2011, 2. Mr. McElwain did so shortly after BAE filed Mr. McElwain’s provisional application on April 14, 2003, which both parties treat as the ’703 patent’s date of invention. Ex. 2012, 2; Ex. 2013, 1; Prelim. Resp. 32; Prelim. Reply 1. This, in combination with Patent Owner’s evidence regarding Mr. McElwain’s EPIIA and BAE’s acquisition of Lockheed Martin’s Aerospace Electronics System Business, evinces that Mr. McElwain had an obligation on April 14, 2003, to assign the invention of the ’703 patent to BAESI. Exs. 2014–2016. As Patent Owner notes, Petitioner does not advance a reason that Mr. McElwain would not have been obligated on April 14, 2003, to assign the invention of the ’703 patent to BAESI, much less provide evidence that he was not so obligated. See generally Prelim. Reply; Prelim. Sur-Reply 2. In sum, weighing the parties’ arguments and evidence, we do not find that Petitioner has a reasonable likelihood of prevailing on its position that Brommer is prior art to the ’703 patent for purposes of obviousness. Accordingly, we do not find that Petitioner has demonstrated a reasonable likelihood of prevailing on any of its assertions that the claims of the ’703 patent would have been obvious over Brommer in combination with other references.” slip op. at 20

    § 103 obviousnesscites Phillips
    Patents in suitUS 7,463,703
  • PTAB · Apr 28, 2025 · IPR2025-00011 · APJ Neil T Powell · IPR · Institution

    The Board denied institution of IPR challenging claims 1–4 and 6–8, exercising § 314(a) discretion because the Fintiv factors favored denial.

    RulingsInstitution decision
    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Institution denied fintivInstitution denied

      “1. whether the court granted a stay or evidence exists that one may be granted if a proceeding is instituted; 2. proximity of the court’s trial date to the Board’s projected statutory deadline for a final written decision; 3. investment in the parallel proceeding by the court and the parties; 4. overlap between issues raised in the petition and in the parallel proceeding; 5. whether the petitioner and the defendant in the parallel proceeding are the same party; and 6. other circumstances that impact the Board’s exercise of discretion, including the merits. Id. at 5–6. We take “a holistic view of whether efficiency and integrity of the system are best served by denying or instituting review” when evaluating these factors. Id. at 6.” slip op. at 19

    • Expert testimonyPetitioner expert discountedOther

      “For example, citing Fuller’s disclosures of “signals,” Petitioner argues that “[a person of ordinary skill in the art] would have understood that each individual signal necessarily includes an amplitude, and that the M individual signals thus correspond to a plurality of individual amplitude estimates.” Pet. 31 (citing Ex. 1003 ¶ 99). Similarly, citing Fuller’s disclosure of “channel estimates,” Petitioner argues that “[a person of ordinary skill in the art] would have understood that the channel estimates include amplitude estimates, and that the estimated individual signals include at least estimated amplitudes.” Id. at 33 (citing Ex. 1003 ¶ 102). In support of these arguments, however, Petitioner cites Dr. Min’s testimony, which does not cite objective supporting evidence and, thus, warrants limited weight. Ex. 1003 ¶¶ 99, 102; see also 37 C.F.R. § 42.65(a) (“Expert testimony that does not disclose the underlying facts or data on which the opinion is based is entitled to little or no weight.”).” slip op. at 23

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “of ordinary skill in the art at the time of the invention would have had “at least a bachelor’s degree in electrical engineering, computer engineering, computer science, physics, or an equivalent field, and two years of experience with cellular telecommunications, radio-access network architectures and protocols, and signal propagation in wireless networks.” Pet. 6 (citing Ex. 1003 ¶ 56). Petitioner further proposes that “[m]ore education can supplement practical experience and vice versa.” Id. (citing Ex. 1003 ¶ 56). In its Preliminary Response, Patent Owner does not take a position on the relevant level of ordinary skill in the art. See generally Prelim. Resp. At this stage of the proceeding and on the present record, we adopt Petitioner’s uncontested proposed level of ordinary skill in the art, which we find consistent with the level of ordinary skill in the art reflected by the ’651 patent and the prior art of record. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978).” slip op. at 9

    Discretionary denialcites Phillips
    Patents in suitUS 7,920,651
  • PTAB · Apr 11, 2025 · IPR2025-00285 · APJ Charles J Boudreau · IPR · Institution

    The Board denied institution on all challenged claims because the same claims, grounds, arguments, and evidence had already failed the reasonable-likelihood threshold in the Samsung IPR, and denied joinder.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “review. See 35 U.S.C. § 314 (2018); 37 C.F.R. § 42.4(a) (2024). We may not institute an inter partes review “unless . . . there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a).” slip op. at 2

    • PTAB / AIA Trials › Joinder §315(c) / SAS all-or-nothingJoinder, deniedDenied

      “35 U.S.C. § 315(c), which states as follows: JOINDER.— If the Director institutes an inter partes review, the Director, in his or her discretion, may join as a party to that inter partes review any person who properly files a petition under section 311 that the Director, after receiving a preliminary response under section 313 or the expiration of the time for filing such a response, determines warrants the institution of an inter partes review under section 314. Because joinder under 35 U.S.C. § 315(c) is premised on an inter partes review having been instituted, and the Board did not institute review in the Samsung IPR to which Petitioner seeks to join, we deny the Motion for Joinder.” slip op. at 3

    None
    Patents in suitUS 6,947,505

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.