PTAB
Advanced fields
411 decisions · 398msnewest first
  • PTAB · Oct 3, 2025 · IPR2025-00486 · APJ Karl D Easthom · IPR · Institution

    The Board instituted IPR on claims 1–4, 7–10, and 13–15 on all asserted § 103 grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “presented in the petition and preliminary response shows that “there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). For the reasons explained below, we determine that Petitioner establishes a reasonable likelihood that it would prevail with respect to at least one challenged claim. Accordingly, we institute an inter partes review as to the challenged claims and the grounds raised in the Petition.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Petitioner contends that a person of ordinary skill in the art (POSITA), would have been a person with a bachelor’s degree in electrical engineering, computer engineering, or similar major with at least two years of experience in the field [of data processing and streaming architectures including user-defined hardware and software modules] or a master’s degree in electrical engineering, computer engineering, or similar major with specialization in the field. A person with less education but more relevant practical experience may also meet this standard. Pet. 13 (citing Ex. 1001, 1:6–21, 2:47–3:20, codes (54), (57); Ex. 1003 ¶¶ 35–37). Patent Owner does not provide a level of ordinary skill in the art. See generally Prelim. Resp. Based on a review of the record, we adopt Petitioner’s proposed level of ordinary skill in the art because it is consistent with the evidence of record, including the asserted prior art and ’753 patent specification.” slip op. at 6

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)Term construed petitioner constructionOther

      “The preliminary record supports Petitioner’s proposals (as slightly modified by the panel as indicated via the bracketed information) for purposes of institution. 5. Claim 1 recites a “chassis identifier” and “one or more chassis.” Therefore, claim 1 does not require multiple chassis. The parties do not address whether a “chassis identifier” represents nonfunctional descriptive material when there is “one . . . chassis.” That is, claim 1 requires that “each module on each board in each chassis can be addressed through the header,” but it appears on this preliminary record that “each module . . . can be addressed through the header” regardless of the information conveyed by the ”chassis identifier” when there is only “one . . . chassis.” The Board welcomes input on this claim construction issue during trial. No other express construction of any claim term is necessary to determine whether to institute inter partes review. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))). D.” slip op. at 8

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITANo construction neededOther

      “5. Claim 1 recites a “chassis identifier” and “one or more chassis.” Therefore, claim 1 does not require multiple chassis. The parties do not address whether a “chassis identifier” represents nonfunctional descriptive material when there is “one . . . chassis.” That is, claim 1 requires that “each module on each board in each chassis can be addressed through the header,” but it appears on this preliminary record that “each module . . . can be addressed through the header” regardless of the information conveyed by the ”chassis identifier” when there is only “one . . . chassis.” The Board welcomes input on this claim construction issue during trial. No other express construction of any claim term is necessary to determine whether to institute inter partes review. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))). D.” slip op. at 8

    Claim construction§ 103 obviousnesscites KSR · Graham
    Patents in suitUS 10,873,753
  • PTAB · Oct 2, 2025 · IPR2025-00673 · APJ Michael R Zecher · IPR · Institution

    The Board instituted IPR on claims 1–7 and all petitioned grounds, finding a reasonable likelihood that Amazon would show at least one claim unpatentable over Shin and Aoyama.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “shown that there is a reasonable likelihood that it would prevail in demonstrating at least one of claims 1–7 of the ’675 patent is unpatentable. We begin our analysis with the principles of law that generally apply to an asserted ground based on obviousness, we then assess the level of skill in the art, next we provide brief overviews of Shin and Aoyama, and then we address the parties’ contentions with respect to independent claims 1, 6, and 7.” slip op. at 11

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “time it was made, we consider the level of ordinary skill in the pertinent art at the time of the invention. Graham, 383 U.S. at 17. “The importance of resolving the level of ordinary skill in the art lies in the necessity of maintaining objectivity in the obviousness inquiry.” Ryko Mfg. Co. v. Nu-Star, Inc., 950 F.2d 714, 718 (Fed. Cir. 1991). The “person having ordinary skill in the art” is a hypothetical construct, from whose vantage point obviousness is assessed. In re Rouffet, 149 F.3d 1350, 1357 (Fed. Cir. 1998). Factors pertinent to a determination of the level of ordinary skill in the art include “(1) the educational level of the inventor; (2) type of problems encountered in the art; (3) prior art solutions to those problems; (4) rapidity with which innovations are made; (5) sophistication of the technology; and (6) educational level of active workers in the field.” Env’t Designs, Ltd. v. Union Oil Co. of Cal., 713 F.2d 693, 696 (Fed. Cir. 1983) (citing Orthopedic Equip. Co. v. All Orthopedic Appliances, Inc., 707 F.2d 1376, 1381–82 (Fed. Cir. 1983)). “Not all such factors may be present in every case, and one or 4 At this stage in the proceeding, SoundClear does not present arguments or evidence of secondary considerations. See Prelim. Resp. more of these or other factors may predominate in a particular case.” Id. at 696–97. Relying on the testimony of Dr. Stern, Amazon argues the following: [a] person of ordinary skill in the art . . . would have had a minimum of a bachelor’s degree in computer engineering, computer science, electrical engineering, or a similar field, and approximately two years of industry or academic experience in a field related to controlling the audio output of electronic devices. Work experience could substitute for formal education and additional formal education could substitute for work experience. Pet. 7 (citing Ex. 1002 ¶¶ 28–32). In the Preliminary Response, SoundClear does not address Amazon’s assessment of the level of skill in the art. See Prelim. Resp. At this stage of the proceeding, we adopt Amazon’s uncontested assessment of the level of skill in the art because (1) it is consistent with the ’675 patent and the asserted prior art; and (2) it is supported by the testimony of Dr. Stern.” slip op. at 12

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundInstituted

      “arguments and evidence for purposes of institution that would support determining that a person of ordinary skill in the would have been motivated to combine the teachings of Shin and Aoyama. As one example, Amazon contends that the proposed combination is merely the addition of one known element (i.e., “Aoyama’s natural language processing and information retrieval”) to another known element (i.e., “Shin’s voice processing and response device”) to obtain predictable results (i.e., “identifying a user’s intent and providing information responsive to such intent”). Pet. 19–20 (citing KSR, 550 U.S. at 417; Ex. 1002 ¶ 83). As another example, Amazon contends the proposed combination also represents the addition of one known element (i.e., “Aoyama’s word replacement” feature) to another known element (i.e., “Shin’s distance-based content abbreviation/simplification”) to obtain predictable results (i.e., “using word replacement to simply content for distant users”). Id. at 25–26 (citing KSR, 550 U.S. at 417; Ex. 1002 ¶ 100). Amazon also presents sufficient arguments and evidence for purposes of institution that would support determining there is a reasonable expectation of success in making the proposed combination. Id. at 20 (citing Ex. 1002 ¶ 84), 27–28 (citing Ex. 1002 ¶ 102; Ex. 1011 ¶¶ 97, 98 Fig. 7). To the extent SoundClear argues that Amazon is required to identify a problem a person of ordinary skill in the art would have sought to solve when combining the teachings of Shin and Aoyama, we do not agree. See Prelim. Resp. 31–32. This line of argument runs contrary to the principles of law articulated in KSR. In KSR, the Supreme Court emphasized “an expansive and flexible approach” to an obviousness evaluation. KSR, 550 U.S. at 415; see also Jazz Pharm., Inc. v. Amneal Pharm., LLC, 895 F.3d 1347, 1363 (Fed. Cir. 2018) (“KSR did not impose a rigid requirement to identify . . . a problem to be solved in the art . . . .”). The Supreme Court stated that, “[o]ften, it will be necessary for a court to look to interrelated teachings of multiple patents,” amongst other things, “to determine whether there was apparent reason to combine the known elements in the fashion claimed by the patent at issue.” KSR, 550 U.S. at 418. Moreover, the Supreme Court explained that, “[u]nder the correct analysis, any need or problem known in the field of endeavor at the time of invention and addressed by the patent can provide a reason for combining the elements in the manner claimed.” Id. at 420.” slip op. at 26

    • Expert testimonyPetitioner expert creditedDecided for petitioner

      “Based on the preliminary record, we discern no deficiency in Amazon’s characterizations of Shin, Aoyama, or the general background knowledge in the art. In addition, for purposes of institution, we are persuaded by Dr. Stern’s testimony concerning the relevant disclosures in Shin and Aoyama. At this stage of the proceeding, SoundClear argues that Shin does not teach limitations 1[b]—“a voice classifying unit configured 1[b][i] to calculate a distance between the user and the output-content control device by a proximity sensor 1[b][ii] to classify the voice into either a first voice or a second voice based on the calculated distance.” See Prelim. Resp. 19–22. a. Limitations 1[b]—“a voice classifying unit configured to 1[b][i] calculate a distance between the user and the output-content control device by a proximity sensor to 1[b][ii] classify the voice into either a first voice or a second voice based on the calculated distance” In the Preliminary Response, SoundClear contends that Shin fails to teach voice classification because “Shin is incapable of distinguishing [between] multiple voices.” Prelim. Resp. 21. More specifically, SoundClear argues that Shin cannot teach classifying a voice into a first voice or second voice because “Shin never refers to a ‘first user’ or ‘second user’ or ‘multiple users.’” Id. (citing Ex. 1003 generally); see also id. at 26– 27 (arguing that Amazon misstates the record because Shin never discloses a “first voice” nor a “second voice”). Instead, SoundClear asserts that Shin only contemplates a single user (i.e., user 10) when calculating the distance between the user and an electronic device (e.g., Shin’s electronic device 100). Id. at 21–22 (citing Ex. 1003 ¶¶ 37, 38). Based on the preliminary record, Amazon presents sufficient evidence that would support a finding that Shin teaches “a voice classifying unit configured to calculate a distance between the user and the output-content control device by a proximity sensor to classify the voice into either a first voice or a second voice based on the calculated distance.” Pet. 10–14. Shin discloses that “processor 120 may determine an output scheme of corresponding content based on a distance between a user and the electronic device 101.” Ex. 1003 ¶ 53. Shin’s processor 120 accomplishes this distance calculation by using distance detection module 180, which may include various sensors, such as a proximity sensor. Id. ¶ 66; see also id. ¶ 153 (disclosing an embodiment where electronic device 901 includes sensor module 940, which, in turn, includes proximity sensor 940G). Shin’s Table 3 illustrates how the distance between the user and electronic device 101 determines the output scheme. Id. ¶ 86, Table 3. For instance, Shin’s Table 3 illustrates classifying the user’s voice input as a “first voice” when the distance between the user and electronic device 101 is between 1 to 2 meters, and classifying the user’s voice input as a “second voice” when the distance between the user and electronic device 101 is less than 1 meter. Id. ¶¶ 86, 87, Table 3.” slip op. at 23

    § 103 obviousnesscites KSR · Graham
    Patents in suitUS 11,244,675
  • PTAB · Aug 29, 2025 · IPR2025-00479 · APJ Justin T Arbes · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–20 were obvious over Erskine, Scherzer, or Scherzer and Gillett.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “III. CONCLUSION Based on the arguments and evidence presented by the parties, we conclude that Petitioner has not demonstrated a reasonable likelihood of prevailing with respect to at least one claim of the ’634 patent challenged in the Petition. Therefore, we do not institute an inter partes review. IV. ORDER In consideration of the foregoing, it is hereby: ORDERED that the Petition is denied and no inter partes review is instituted.” slip op. at 25

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “B. Level of Ordinary Skill in the Art Petitioner argues that at the time of the ’634 patent (July 2018), a person of ordinary skill in the art would have had “a bachelor’s degree in electrical engineering, computer science, computer engineering, or a similar major with at least two years of experience in the field; or a master’s degree with specialization in the field,” where “[a] person with less education but more relevant practical experience may also meet this standard.” Pet. 7 (citing Ex. 1003 ¶¶ 12–13). Petitioner further argues that a person of ordinary skill in the art would have had knowledge of “[d]esigning and using systems that include endpoint devices (e.g., client devices) and servers for establishing network connections and data transfer,” “[r]ecognizing and applying the client-server architecture,” and “[u]sing and applying concepts from known telecommunication and networking frameworks, protocols and standards, including TCP/IP, IEEE 802.11, VoIP, cellular systems and other known frameworks and standards.” Id. (citing Ex. 1003 ¶ 14). Patent Owner does not address the level of ordinary skill in the art in its Preliminary Response. Based on the record presented, including our review of the ’634 patent and the types of problems and solutions described in the ’634 patent and cited prior art, we agree with Petitioner’s definition and apply it for purposes of this Decision. See, e.g., Ex. 1001, col. 1, ll. 4–29 (describing in the “Background” section of the ’634 patent a “network connection between two endpoints” and known methods of reaching “full effective bandwidth capacity” in a network).” slip op. at 8

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “C. Claim Interpretation We interpret each challenged claim using the same claim construction standard that would be used to construe the claim in a civil action under 35 U.S.C. 282(b), including construing the claim in accordance with the ordinary and customary meaning of such claim as understood by one of ordinary skill in the art and the prosecution history pertaining to the patent. 37 C.F.R. § 42.100(b). Petitioner notes that it proposed a construction for the claim term “geographical area” in the district court case, but states that it “do[es] not believe proposing a construction for the term is necessary in this proceeding because the relied upon teachings of the prior art references are consistent with examples of ‘geographical area’ included in the ’634 patent [S]pecification.” Pet. 8. Patent Owner argues that “[t]he Board need not engage in express claim construction at this stage of the proceeding.” Prelim. Resp. 5. We conclude that no express interpretation of any claim term is necessary to determine whether to institute an inter partes review in this proceeding. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“Because we need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy,’ we need not construe [a particular claim limitation] where the construction is not ‘material to the . . . dispute.’” (citation omitted) (emphasis added)).” slip op. at 9

    • BurdenNot shown unpatentable

      “Petitioner has not shown sufficiently that Erskine teaches or suggests the second requirement of limitation [1c], i.e., “initiating the next network connection . . . with a transmission bandwidth based on the parameter values for the past network connection.” Petitioner’s theory is that (1) the QoS parameters in Erskine are for a “past” connection from one zone to another, (2) the sliding maximum interzone bandwidth is “based on” the QoS parameters, and (3) a new call only proceeds if the transmission bandwidth needed for the call added to the current bandwidth being used over the interzone link is less than the sliding maximum interzone bandwidth, so Erskine therefore teaches a call with a transmission bandwidth determined “based on” the sliding maximum interzone bandwidth (which in turn is determined “based on” the QoS parameters). See Pet. 27–28; Ex. 1003 ¶¶ 59–60 (similar testimony from Dr. Crovella). As Patent Owner points out, however, Erskine only makes “a binary, accept/reject decision as to whether to allow a new call to proceed based on a comparison between the bandwidth needed for the call and a predetermined ‘sliding maximum interzone bandwidth value.’” See Prelim. Resp. 6–7. Specifically, the additional bandwidth that would be needed for the call is added to the current bandwidth being used on the interzone link; if the sum of those values is less than the sliding maximum interzone bandwidth for the link, the call “proceeds”; otherwise, it is “blocked.” Ex. 1004, col. 4, ll. 36–40, col. 6, l. 55–col. 7, l. 10, col. 8, ll. 36–43, col. 9, ll. 9–26, col. 10, ll. 23–25 (the sum is compared to the sliding maximum interzone bandwidth “to determine whether enough bandwidth is available to proceed with the new call”), Fig. 3 (steps 308, 310, and 312). Erskine repeatedly refers to the bandwidth for the new call as the amount of bandwidth that is “necessary” or “required” to handle the call. See, e.g., id. at col. 1, ll. 43–57 (“an amount of bandwidth necessary to handle the new call”), col. 6, ll. 61–64 (“the additional bandwidth required (of the new call)”), col. 8, ll. 36–40 (“the bandwidth necessary for the new call”), col. 9, ll. 16–21 (“the anticipated additional bandwidth necessary for the new call”), 54–56 (“the bandwidth amount the new call will utilize (if connected)”), col. 10, ll. 21–23 (same), 41–43 (same), col. 12, ll. 1–2 (“an amount of bandwidth necessary to handle the new call”). It is that value—determined prior to the addition and comparison to the sliding maximum interzone bandwidth—that will be used for the new call if it is allowed to “proceed[].” Id. at col. 6, ll. 64–67 (if the sum is less than the sliding maximum interzone bandwidth, the call “proceeds” and “the QoS table is updated with the additional bandwidth used by that call”). Erskine does not describe the transmission bandwidth for the new call as being based on any parameter values for a past network connection, but rather as “whatever bandwidth the system determined is necessary for the additional call.” See Prelim. Resp. 8–9. In other words, the transmission bandwidth needed for a new call is predetermined and independent of whatever the sliding maximum interzone bandwidth is currently. See id.” slip op. at 15

    Claim construction§ 103 obviousnesscites KSR · Graham
    Patents in suitUS 10,944,634
  • PTAB · Aug 27, 2025 · IPR2025-00565 · APJ St John Courtenay III · IPR · Institution

    The Board instituted IPR of claims 1–5 on all five grounds, finding a reasonable likelihood that claim 1 is obvious over Shin.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “review. See 35 U.S.C. § 314 (2018); 37 C.F.R. § 42.4(a) (2022). Under 35 U.S.C. § 314(a), we may not authorize an inter partes review unless the information in the petition and the preliminary response “shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.”” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Relying on the declaration testimony of Dr. Stern, Petitioner contends that an ordinarily skilled artisan for the ’337 patent “would have had a minimum of a bachelor’s degree in computer engineering, computer science, electrical engineering, or a similar field,” and would have “approximately two years of industry or academic experience in a field related to controlling the audio output of electronic devices.” Pet. 7 (citing Ex. 1002 ¶¶ 30–34). Petitioner further asserts that “[w]ork experience could substitute for formal education and additional formal education could substitute for work experience.” Id.” slip op. at 12

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed board ownOther

      “repeatedly emphasized that an indefinite article “a” or “an” in patent parlance carries the meaning of “one or more” in open-ended claims containing the transitional phrase “comprising.” That “a” or “an” can mean “one or more” is best described as a rule, rather than merely as a presumption or even a convention. The exceptions to this rule are extremely limited: a patentee must “evince[ ] a clear intent” to limit “a” or “an” to “one.” The subsequent use of definite articles “the” or “said” in a claim to refer back to the same claim term does not change the general plural rule, but simply reinvokes that non-singular meaning. SanDisk Corp. v. Kingston Tech. Co., Inc., 695 F.3d 1348, 1360 (Fed. Cir. 2012) (quoting Baldwin Graphic Systems, Inc. v. Siebert, 512 F.3d 1338, 1342 (Fed. Cir. 2008)). These controlling case authorities are applicable here. At this stage, we preliminarily construe the scope of the claim 1[b] term “a user” as covering one or more users. Likewise, we preliminarily construe the scope of the 1[b] phrase “a voice spoken by a user” as covering one or more voices spoken by a single user, or by plural users.” slip op. at 15

    • Obviousness (§103) › Graham factors (scope of art, differences, level of skill)Instituted

      “under 35 U.S.C. § 103 as obvious over Shin under Ground 2. Pet. 30–35. Petitioner contends that “[i]f [Patent Owner] argues that Shin fails to disclose any limitations [under anticipation Ground 1], such limitations would have been obvious over Shin [under obviousness Ground 2].” Pet. 30. Therefore, we refer to Petitioner’s individual mappings for claim 1 to Shin as set forth under anticipation Ground 1 as also being applicable to obviousness Ground 2, because “anticipation is the epitome of obviousness.” Jones v. Hardy, 727 F.2d 1524, 1529 (Fed. Cir. 1984). We note that under Ground 2, no modifications are required to arrive at the claimed invention. Therefore, no showing of a motivation to modify Shin or a reasonable expectation of success is required. See Unification Techs. LLC v. Micron Tech Inc., 23-1348, 2024 WL 3738401, at *6 (Fed. Cir. Aug. 9, 2024) (nonprecedential). We have also considered the Declaration by Dr. Stern, as cited by Petitioner in support of institution. See Ex. 1002 ¶¶ 107–116.” slip op. at 18

    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,069,337
  • PTAB · Aug 26, 2025 · IPR2025-00437 · APJ Mitchell G Weatherly · IPR · Institution

    The Board instituted IPR of claims 1–19 on all grounds, finding a reasonable likelihood that Wang anticipates claim 1.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “Owner”) did not file a Preliminary Response on the merits of patentability. Institution of an inter partes review is authorized by statute when “the information presented in the petition filed under section 311 and any response filed under section 313 shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). Based on our review of the record,1 we conclude that Petitioner is reasonably likely to prevail with respect to at least one of the challenged claims.” slip op. at 2

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Instituted

      “A claim is anticipated only if each and every element as set forth in the claim is found, either expressly or inherently described, in a single prior art reference.” Verdegaal Bros., Inc. v. Union Oil Co. of Cal., 814 F.2d 628, 631 (Fed. Cir. 1987). slip op. at 5

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “35 U.S.C. § 282(b), including construing the claim in accordance with the ordinary and customary meaning of such claim as understood by one of ordinary skill in the art and the prosecution history pertaining to the patent.” 37 C.F.R. § 42.100(b). When applying that standard, we interpret the claim language as it would have been understood by one of ordinary skill in the art in light of the specification. Wasica Fin. GmbH v. Cont’l Auto. Sys., Inc., 853 F.3d 1272, 1279–80 (Fed. Cir. 2017). Thus, we give claim terms their ordinary and customary meaning as understood by an ordinarily skilled artisan. See Phillips v. AWH Corp., 415 F.3d 1303, 1312–13 (Fed. Cir. 2005) (en banc). Only terms that are in controversy need to be construed, and then only to the extent necessary to resolve the controversy. Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017). Petitioner contends that “no special constructions are required.” Pet. 10. We agree and do not expressly construe any claim term.” slip op. at 4

    Claim construction§ 102 anticipationcites Phillips
    Patents in suitUS 10,788,690
  • PTAB · Aug 26, 2025 · IPR2025-00436 · APJ Mitchell G Weatherly · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that Mizobuchi or Akashi anticipates any of claims 1–17.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “Institution of an inter partes review is authorized by statute when “the information presented in the petition filed under section 311 and any response filed under section 313 shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). Based on our review of the record, we conclude that Petitioner is reasonably likely to prevail with respect to at least one challenged claim.” slip op. at 2

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “All independent claims recite “a light engine driving circuit disposed on the substrate.” Ex. 1001, 9:59 (claim 1), 10:64 (claim 12), 12:7 (claim 15). Petitioner contends that “Mizobuchi discloses a light engine driving circuit disposed on the substrate that includes a clock data recovery (“CDR”) circuit and a power supply circuit.” See Pet. 19 (citing Ex. 1006, 3:57–4:18, 12:27–41, Figs. 2, 3A; Ex. 1003 ¶ 76 while addressing limitation 1d); see also id. at 26–28 (addressing claims 12 and 15 by cross-referencing showing for claim 1). Petitioner identifies the driving circuit on Mizobuchi’s “first circuit board” 2 in the annotated version of Mizobuchi’s Figure 2, reproduced below. See Pet. 19.” slip op. at 5

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Petitioner contends that the Board may find it necessary to interpret “feedthrough device,” “interconnect device,” and “opposing arrangement.” Pet. 8–11. Patent Owner responds to Petitioner’s proposed interpretations of these terms, but contends that the Board need not interpret them to determine whether to institute review. Prelim. Resp. 17–18. For reasons that become apparent below, we agree with Patent Owner and do not expressly construe these terms. B. Legal Standards” slip op. at 4

    Claim construction§ 102 anticipationcites Phillips
    Patents in suitUS 10,313,024
  • PTAB · Jul 29, 2025 · IPR2025-00434 · APJ Monica S Ullagaddi · IPR · Institution

    Institution was denied for claims 1–7 because the Petition did not show a reasonable likelihood that either Shen or Soldano anticipates any challenged claim.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “The standard for institution is set forth in 35 U.S.C. § 314, which provides that an inter partes review may not be instituted unless the information presented in the Petition and the Preliminary Response shows that “there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314 (2019); see also 37 C.F.R § 42.4(a) (2019) (“The Board institutes the trial on behalf of the Director.”). Upon consideration of the parties’ contentions and the evidence of record, we conclude that Petitioner has not established a reasonable likelihood of prevailing in demonstrating the unpatentability of at least one challenged claim of the ’301 patent. Accordingly, we deny Petitioner’s request and do not institute an inter partes review.” slip op. at 2

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “C. Claim Construction We interpret a claim “using the same claim construction standard that would be used to construe the claim in a civil action under 35 U.S.C. 282(b).” 37 C.F.R. § 42.100(b). Under this standard, we construe the claim “in accordance with the ordinary and customary meaning of such claim as understood by one of ordinary skill in the art and the prosecution history pertaining to the patent.” Id.” slip op. at 8

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “onset to show with particularity why the patent it challenges is unpatentable.” Harmonic Inc. v. Avid Tech., Inc., 815 F.3d 1356, 1363 (Fed. Cir. 2016) (citing 35 U.S.C. § 312(a)(3)). “A claim is anticipated only if each and every element as set forth in the claim is found, either expressly or inherently described, in a single prior art reference.” Verdegaal Bros., Inc. v. Union Oil Co. of California, 814 F.2d 628, 631 (Fed. Cir. 1987). We analyze” slip op. at 7

    Claim construction§ 102 anticipation
    Patents in suitUS 10,379,301
  • PTAB · Jul 15, 2025 · IPR2024-00425 · APJ Bach V Hoang · IPR · Final written decision

    Claims 1–3, 5, 9, and 10 are unpatentable as obvious over Beck, Heller, and Lovejoy; the Board did not reach the alternative Bandy grounds.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Patent Owner does not dispute this assessment. See generally PO Resp. Having considered the record, we adopt Petitioner’s proposed level of skill, as articulated above. We are satisfied that Petitioner’s proposal comports with the level of skill necessary to understand and implement the teachings of the ’307 Patent. Accord Inst. Dec. 8–9.” slip op. at 8

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITAPlain and ordinary meaningDecided for petitioner

      “both the unique sensor ID as well as the associated unique wireless device ID is contradicted, or at least unsupported, by the claim language and the Specification. We determine that this limitation does not require authentication of both the unique sensor ID and the unique wireless device ID, or otherwise require authentication using the unique wireless ID. Rather, the limitation only requires authentication of the unique sensor ID. The language and structure of the claim itself, “the remote server authenticates said unique sensor ID associated with said unique wireless device ID,” requires authentication of the unique sensor ID but not the unique wireless device ID. See Ex. 1001, 19:51–52 (emphasis added). The portion of the limitation reciting “associated with said unique wireless device ID” is linguistically an appositive modifying the “unique sensor ID.” Indeed, Patent Owner acknowledges the “plain meaning of the claim term is that the remote server authenticates the unique sensor ID and that such unique sensor ID is associated with a unique wireless device ID.” PO Resp. 18.” slip op. at 10

    • Claim Construction › Functional claiming / §112(f) means-plus-function › Whether §112(f) applies (Williamson, nonce words)§112(f) appliesDecided for petitioner

      “Patent Owner does not contest Petitioner’s proposed constructions of any of these other claim terms or phrases. PO Resp. 24. We agree with the parties that the identified limitations—which each recite a “means” or “means for” performing a particular function—are means-plus-function limitations that should be interpreted under pre-AIA 35 U.S.C. § 112 ¶ 6. See Williamson v. Citrix Online, LLC, 792 F.3d 1339, 1349 (Fed. Cir. 2015) (en banc) (holding that “use of the word ‘means’ creates a presumption that § 112, ¶ 6 applies”). And we agree with Petitioner’s uncontested identification of the recited functions and corresponding structure for these limitations for the reasons explained by Petitioner. See Pet. 11–15 (citing Ex. 1001, 2:20–21, 2:24–28, 3:33–36, 17:18–30); id. at 13–15 (citing Ex. 1009, 9:4–6, 9:19–20, 9:57–65, 10:10– 11) (explaining that Lovejoy is incorporated by reference into the ’307 Patent). We adopt the uncontested constructions identified by Petitioner, as” slip op. at 15

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundDecided for petitioner

      “We agree with Petitioner that the improvements offered by the incorporation of Heller’s teachings would have motivated one of ordinary skill in the art to combine the teachings of Beck and Heller in the manner proposed by Petitioner. Confirming Petitioner’s assertion that the combination yields improvements, Heller states that it improves the type of glucose monitor used in one of Beck’s embodiments. Beck states that its “medical device 130 includes a glucose meter” which “measure[s] blood glucose levels of blood applied to test strips.” Ex. 1007 ¶ 34. Specifically addressing such “conventional” test strip glucose monitoring, Heller states that its in vivo glucose sensor system addresses a need for continuous or automatic monitoring in a small, comfortable device. Ex. 1016, 2:1–7, 2:15–58, 3:19–25. As such, we agree that a person of ordinary skill in the art would have been motivated to combine the teachings of Beck and Heller to improve Beck’s medical device. See KSR, 550 U.S. at 401. We further agree with Petitioner that a POSITA would have been motivated to incorporate sensor implementation details described in Heller, e.g., an A/D converter and patient attachment systems, with Beck’s medical device. Pet. 44–45, 53, 55; Ex. 1003 ¶¶ 228, 234, 236–238, 259, 267, 278, which do no more than yield predictable results, e.g., converting signals or attaching a sensor to a patient. See KSR, 550 U.S. at 401 (“[A] combination of familiar elements according to known methods is likely to be obvious when it does no more than yield predictable results.”).” slip op. at 20

    Patent outcomesUS 7,969,307 unpatentable
    Claim construction§ 103 obviousnesscites Phillips · KSR
    Patents in suitUS 7,969,307
  • PTAB · Jul 14, 2025 · IPR2024-00465 · APJ Bart A Gerstenblith · IPR · Final written decision

    Claims 1–24 are unpatentable: claims 1–10 and 12–24 as obvious over Szrek and Llach, and claim 11 as obvious over Szrek, Llach, and Gilmore.

    RulingsFinal written decision
    • Skill levelSkill level board ownDecided for petitioner

      “B. Level of Ordinary Skill in the Art Petitioner proposes that the level of ordinary skill in the art is an artisan with a working knowledge of POS activation systems and lottery systems that was gained through a mixture of training and work experience in the relevant field such as (i) having a Bachelor’s degree in computer science, computer communications, electrical engineering, or equivalent degree, coupled with at least three years of work experience; (ii) having a Master’s degree in computer science, computer communications, or electrical engineering, but having less work experience; or (iii) having no formal degree, but having experience in the relevant field of at least six years of work experience. Pet. 2–3 (citing Ex. 1003 ¶¶ 13–14).9 Patent Owner states that, “[f]or the purpose of this proceeding, Patent Owner adopts the Petition’s proposed definition of the level of ordinary skill in the art.” PO Resp. 19 (citing Pet. 2–3). We find that the parties’ agreed-upon level of ordinary skill in the art is consistent with the level of ordinary skill in the art reflected by the ’451 patent and the prior art of record. See Inst. Dec. 14; see Okajima v. 9 Petitioner proposes the same level of ordinary skill in the art that the Board adopted in PGR2020-00084 (Pet. 2–3 (citing Ex. 1008, 11)), and IPR2023- 01235 (see IPR2023-01235, Paper 34 at 12–13). Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Therefore, we adopt the parties’ agreed-upon level of ordinary skill in the art, as articulated above, in our consideration of the issues presently before us.” slip op. at 13

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “We need not construe “transaction processor” expressly because its meaning is not in dispute and its construction is not necessary to resolve the controversy before us.” slip op. at 16

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundDecided for petitioner

      “On balance, we find that even with the alleged disadvantages identified by Patent Owner, one of ordinary skill in the art would have been motivated to modify Szrek with Llach’s third-party transaction processor because the advantage of having a “centralized intermediary” allows Szrek’s system to support different game providers, such as different lottery companies, which would reduce some implementation costs and allow the system to be more easily and cheaply extended. Pet. 47 (citing Ex. 1003 ¶ 181); see Medichem, S.A. v. Rolabo, S.L., 437 F.3d 1157, 1165 (Fed. Cir. 2006) (“a given course of action often has simultaneous advantages and disadvantages, and this does not necessarily obviate motivation to combine”) (citing Winner Int’l Royalty Corp. v. Wang, 202 F.3d 1340, 1349 n.8 (Fed. Cir. 2000)); see also Intel Corp. v. Qualcomm Inc., 21 F.4th 784, 795 (Fed. Cir. 2021) (stating the same). We acknowledge that the combination comes with some disadvantages, including “add[ed] delay, reduce[d] efficiency, and . . . implementation complexities by converting a simple, direct communication exchange into an exchange that traverses multiple systems.” PO Resp. 52 (citing Ex. 2052 ¶ 163). But, “[t]he fact that the motivating benefit comes at the expense of another benefit, however, should not nullify its use as a basis to modify the disclosure of one reference with the teachings of another. Instead, the benefits, both lost and gained, should be weighed against one another.” Winner, 202 F.3d at 1349 n.8. Here, Szrek expressly teaches indirect communication as a possible implementation of its system and Petitioner’s combination—employing Llach’s third-party transaction processor as part of the indirect communication channel—offers the attractive benefit of allowing Szrek’s system to support different game providers, which would reduce some implementation costs even if it might increase other costs, e.g., by having to program certain components (e.g., the cash registers) differently. Specifically, we find that the ability to expand Szrek’s system to support different game providers provides advantages that outweigh the disadvantages discussed above in the circumstance where one desires a more robust and comprehensive system. See Pet. Reply 23 (noting three advantages of the combination— (1) “allow[ing] Szrek’s system to use ‘a centralized system for activating lottery tickets from different retailers and different locations,’” (2) “allow[ing] support for different game providers, such as different lottery companies,” “reduc[ing] implementation costs,” and (3) “allow[ing] Szrek’s system to ‘communicate with individual card” slip op. at 37

    • Obviousness (§103) › Motivation to combine / reasonable expectation of success › HindsightMotivation foundDecided for petitioner

      “On balance, we find that even with the alleged disadvantages identified by Patent Owner, one of ordinary skill in the art would have been motivated to modify Szrek with Llach’s third-party transaction processor because the advantage of having a “centralized intermediary” allows Szrek’s system to support different game providers, such as different lottery companies, which would reduce some implementation costs and allow the system to be more easily and cheaply extended. Pet. 47 (citing Ex. 1003 ¶ 181); see Medichem, S.A. v. Rolabo, S.L., 437 F.3d 1157, 1165 (Fed. Cir. 2006) (“a given course of action often has simultaneous advantages and disadvantages, and this does not necessarily obviate motivation to combine”) (citing Winner Int’l Royalty Corp. v. Wang, 202 F.3d 1340, 1349 n.8 (Fed. Cir. 2000)); see also Intel Corp. v. Qualcomm Inc., 21 F.4th 784, 795 (Fed. Cir. 2021) (stating the same). We acknowledge that the combination comes with some disadvantages, including “add[ed] delay, reduce[d] efficiency, and . . . implementation complexities by converting a simple, direct communication exchange into an exchange that traverses multiple systems.” PO Resp. 52 (citing Ex. 2052 ¶ 163). But, “[t]he fact that the motivating benefit comes at the expense of another benefit, however, should not nullify its use as a basis to modify the disclosure of one reference with the teachings of another. Instead, the benefits, both lost and gained, should be weighed against one another.” Winner, 202 F.3d at 1349 n.8. Here, Szrek expressly teaches indirect communication as a possible implementation of its system and Petitioner’s combination—employing Llach’s third-party transaction processor as part of the indirect communication channel—offers the attractive benefit of allowing Szrek’s system to support different game providers, which would reduce some implementation costs even if it might increase other costs, e.g., by having to program certain components (e.g., the cash registers) differently. Specifically, we find that the ability to expand Szrek’s system to support different game providers provides advantages that outweigh the disadvantages discussed above in the circumstance where one desires a more robust and comprehensive system. See Pet. Reply 23 (noting three advantages of the combination— (1) “allow[ing] Szrek’s system to use ‘a centralized system for activating lottery tickets from different retailers and different locations,’” (2) “allow[ing] support for different game providers, such as different lottery companies,” “reduc[ing] implementation costs,” and (3) “allow[ing] Szrek’s system to ‘communicate with individual card” slip op. at 37

    Patent outcomesUS 11,488,451 unpatentable
    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,488,451
  • PTAB · Jun 13, 2025 · IPR2024-00343 · APJ Charles J Boudreau · IPR · Final written decision

    Claims 1–7 are unpatentable as obvious over Rădulescu2004 and OCP; the Board did not reach the Weber-based grounds.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “include (1) the educational level of the inventor; (2) the type of problems encountered in the art; (3) prior-art solutions to those problems; (4) the rapidity with which innovations are made; (5) the sophistication of the technology; and (6) the educational level of workers active in the field. Envtl. Designs, Ltd. v. Union Oil Co., 713 F.2d 693, 696–97 (Fed. Cir. 1983). Not all factors may exist in every case, and one or more of these or other factors may predominate in a particular case. Id. These factors are not exhaustive, but merely a guide to determining the level of ordinary skill in the art. Daiichi Sankyo Co. v. Apotex, Inc., 501 F.3d 1254, 1256 (Fed. Cir. 2007). Moreover, the prior art itself may reflect an appropriate skill level. Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001).” slip op. at 13

    • Claim Construction › Functional claiming / §112(f) means-plus-function › Whether §112(f) applies (Williamson, nonce words)§112(f) appliesDecided for petitioner

      “35 U.S.C. § 112 ¶ 6 (2006). “[T]he use of the word ‘means’ in a claim element creates a rebuttable presumption that § 112, para. 6 applies.” Williamson v. Citrix Online, LLC, 792 F.3d 1339, 1348 (Fed. Cir. 2015) (en banc in relevant part); Personalized Media Commc’ns, LLC v. Int’l Trade Comm’n, 161 F.3d 696, 703–04 (Fed. Cir. 1998). “[This] presumption may be rebutted if the properly construed claim limitation itself recites sufficiently definite structure to perform the claimed function.” Kemco Sales, Inc. v. Control Papers Co., 208 F.3d 1352, 1361 (Fed. Cir. 2000).” slip op. at 16

    • Claim Construction › Functional claiming / §112(f) means-plus-function › Corresponding structure / algorithm (indefinite if none)Term construed patent owner constructionDecided for patent owner

      “Ex. 1001, 4:46–50. This passage indicates that the interconnect can be a network on a chip and the network on a chip can include wires and buses. That does not necessarily mean that the interconnect can be just wires or buses; rather, it discloses that the interconnect can include wires and buses. In context, the disclosure regarding wires and buses does not support construing the corresponding structure broadly enough to encompass just wires and buses. The networks that constitute the corresponding structure, however, could include networks with wires and buses. Therefore, we agree with Patent Owner that the corresponding structure for the interconnect means should not include a mere bus, switch, and point-to-point wire and instead find that the corresponding structure under 35 U.S.C. § 112 ¶ 6 is a network, which the ’052 patent describes as a multi-hop interconnection between modules separated by one or more network nodes. See Ex. 1001, 2:33–37. Because this structure corresponds to the construction of “interconnect means” proposed by Patent Owner and adopted by the district courts in the TI and Qualcomm litigations (see supra Section III.C.3.b), and we do not rely in our analysis below on a recourse to “equivalents thereto” as permitted by § 112 ¶ 6, we note that our ultimate conclusions on the unpatentability of the challenged claims would be the same if § 112 ¶ 6 did not apply. iii. Conclusion For the reasons stated above, we construe “interconnect means” to cover the structure described in the Specification corresponding to the specified functions of “coupling said plurality of processing modules (M, S)” in the context of claim 6 and “coupling said plurality of processing modules (M, S)” and “enabling a connection-based communication having a set of connection properties” in the context of claims 1 and 7—i.e., a “multi-hop interconnection between modules separated by one or more network nodes”—and equivalents thereof.” slip op. at 28

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “standard as would be used by a district court to construe a claim in a civil action involving the validity or infringement of a patent. 37 C.F.R. § 42.100(b). Under that standard, claim terms are given their ordinary and customary meaning, as would have been understood by a person of ordinary skill in the art at the time of the invention, in light of the language of the claims, the specification, and the prosecution history of record. Id.; Phillips v. AWH Corp., 415 F.3d 1303, 1312–19 (Fed. Cir. 2005) (en banc); Thorner v. Sony Comput. Entm’t Am. LLC, 669 F.3d 1362, 1365–66 (Fed. Cir. 2012). “The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’” Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (quoting Vivid Techs., Inc. v. Am. Sci. Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 15

    Patent outcomesUS 7,594,052 unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 7,594,052

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.