  • PTAB · Oct 14, 2025 · IPR2024-00421 · APJ Scott B Howard · IPR · Final written decision

    The Board held claims 1–152 unpatentable over the asserted prior art and struck Section II of Petitioner’s reply claim construction brief.

    RulingsFinal written decision
    • Obviousness (§103) › Graham factors (scope of art, differences, level of skill)UnpatentableUnpatentable

      “d) Conclusion Regarding Claim 1 For the reasons set forth above, Petitioner has demonstrated by a” slip op. at 50

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)Term construed board ownOther

      “1. “Contracted to Display a TV Ad Petitioner argues that the term means “contracted to display any form” slip op. at 14

    • Strike new argumentGranted

      “F. Sua Sponte Striking Section II of Petitioner’s Reply Claim Construction Brief Our order allowing post-hearing claim construction briefing stated that “[t]he parties may not address any issues besides claim construction.” Paper 38, 1. Despite that order, Section II of Petitioner’s Reply Claim Construction Brief addresses obviousness under Patent Owner’s proposed construction. See Pet. Reply Post-hearing Br. 2–3 (Titled: “The Petition’s Obviousness Theory Renders Claims 121 and 146 Obvious Even Under Patent Owner’s Improper Construction.”). Because the section is in violation of our order, we sua sponte strike that section. See 37 C.F.R. § 42.12.” slip op. at 74

    Patent outcomesUS 7,861,260 unpatentable
    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 7,861,260
  • PTAB · Oct 10, 2025 · IPR2025-00653 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution on all claims because the Petition did not show a reasonable likelihood that any challenged claim was unpatentable over the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “An inter partes review may be instituted only if “the information presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’504 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Additionally, only terms that are in controversy need to be construed, and these need be construed only to the extent necessary to resolve the controversy. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 9; Prelim. Resp. 4 (citing Ex. 2009 ¶ 72); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13

    • Expert testimonyPetitioner expert discountedDecided for patent owner

      “Ex. 1002 ¶ 47. As reflected above, Dr. Wooley’s testimony as to element [1.2] does not even assert that Cardamone discloses a tank, let alone one or more sensors disposed at a tank as recited in element [1.2]. Thus, Dr. Wooley’s testimony does not support Petitioner’s argument on this issue.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,726,504
  • PTAB · Oct 10, 2025 · IPR2025-00652 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–23 and 25–30 were unpatentable over the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’403 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 10; Prelim. Resp. 4 (citing Ex. 2009 ¶ 73); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses element [1.2] because the evidence cited does not disclose a “first computer system being configured to provide remote control of the first pump or first valve” (i.e., a fluid-handling device). Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but Petitioner has not identified any disclosure of the capability to remotely control fluid-handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, Kahn’s disclosures that Petitioner relies on for allegedly teaching remote control are deficient. We discuss each. First, Petitioner points to the following, “[f]or instance, as illustrated in FIG. 1C, a fluid control device such as a valve 15A is located on the input side of a sen[s]or unit 110.” Ex. 1005, 8:19–21, cited in Pet. 13. This portion of Kahn, however, does not disclose remote control. Second, Petitioner cites to the following: Finally, or in addition to, the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance. Pet. 13 (citing Ex. 1005, 10:62–67). We agree with Patent Owner that this portion of Kahn teaches on-site alerts and local control of the fluid-handling device. See Prelim. Resp. 7. This portion of Kahn does not disclose remote control.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,294,403
  • PTAB · Oct 10, 2025 · IPR2025-00651 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–3, 6, 7, and 9–20 were unpatentable over any asserted ground.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’680 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 11

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner

      “target value” is part of a command that is sent from a computing device to a server and then to a controller. The controller then receives a measurement of the fluid by a sensor and determines whether the measurement satisfies the “target value.” If the measurement does not satisfy the “target value,” further operations are undertaken. The recited operation sequence makes clear that the plain and ordinary meaning of “target value” is not as Dr. Wooley opines because the particular operating condition that a device is in at a particular time is represented by the measurement taken by the sensor, 11 Some claim language less relevant to construing “target value” was omitted for ease of reference. which the controller then uses to determine whether the measurement satisfies the “target value.” Additionally, claim 1 recites that the “target value” is sent as part of a command to the controller. The “target value” is not sent to the controller from the sensor, as might be expected if the plain and ordinary meaning of “target value” were as Dr. Wooley opines. Petitioner and Dr. Wooley’s construction would also result in “target value” meaning effectively the same thing as the measurement of the fluid by the sensor, a concept that is separately recited in claim 1 and to which the “target value” is compared. The Specification of the ’680 patent does not support Petitioner’s understanding of the plain and ordinary meaning of “target value.” Although the Specification does not recite “target value,” it recites “target state,” and describes “target state” sufficiently to understand the plain and ordinary meaning of “target” as used in “target value” and “target state.” In particular, the ’680 patent explains that “[i]n some embodiments, the process 104 includes receiving, via a network interface, from a remote user device, (e.g., via a command-center server) a command to change a state of a fluid-handling device to a target state.” Ex. 1001, 11:48–51. This portion reflects that the command is seeking to change a state of a fluid-handling device to a target state. In other words, the “target value” or “target state” is not generally “the particular operating condition that a device is in at a particular time”; rather, it is a value or state that the fluid-handling device is desired to be in, as Patent Owner and Dr. Durham explain. Additionally, just as claim 1 recites a directional component for the “target value” to be sent to the controller in a command, so too does the Specification describe a “target state” as being sent in a command from a remote user device. Thus, the Specification clearly supports the plain and ordinary meaning proposed by Patent Owner and Dr. Durham and not the plain and ordinary meaning proposed by Petitioner and Dr. Wooley. slip op. at 14

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “time-stamped process data, report exception therein to the remote host, and extract and transmit time-stamped process data to the remote host.” Ex. 1005, Abst. (emphases added). Almadi explains that its remote field systems must include a plurality of controller units “to issue commands to, and gather and process data from a plurality of field devices, including remote systems and instruments, . . . [and] a database server for the storage of process data retrieved from the remote subsystems and instruments.” Id. at 2:22–30 (emphases added). Based on these disclosures, we agree with Patent Owner that Petitioner has not established that Almadi discloses element [1.4]. Specifically, the teachings from Almadi identified by Petitioner refer to process data, which is data retrieved from the remote subsystems/field devices. Thus, we understand that Almadi’s teaching—of using an Ethernet switch to transmit “process data”—describes transmitting data from the remote subsystems/field devices. See Ex. 1005, 3:13–17, cited in Pet. 15. But claim 1 and particularly element [1.4], recites “sending, with the server, the target value to the network address [which identifies a controller of the fluid-handling device13] via the network,” which is different than sending process data from the field devices to the remote host or database server for storage.” slip op. at 19

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,175,680
  • Tanklogix, LLC v. SiteproInstitution denied
    PTAB · Oct 10, 2025 · IPR2025-00650 · APJ Sheila F Mcshane · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 18–32 and 34 were unpatentable over Kahn or Kahn and Gutierrez.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). Upon consideration of the Petition, the Preliminary Response, and the evidence of record, we determine that Petitioner has not established a reasonable likelihood of prevailing with respect to the unpatentability of at least one claim of the ’871 patent. Accordingly, for the reasons that follow, we decline to institute an inter partes review of claims 18–32 and 34 of the ’871 patent.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The respective proposed levels of qualifications for a person of ordinary skill in the art are similar, with Patent Owner proposing two years of experience compared to Petitioner proposing significant experience with remotely controlling fluid-handling devices, like SCADA systems. Patent Owner also proposes more extensive experience in lieu of educational experience. While we find Petitioner’s proposed qualifications to be acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of skill necessary to understand and implement the teachings of the ’871 patent and the asserted prior art. Our analysis and findings herein, however, do not turn on any differences in the qualifications adopted.” slip op. at 8

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “We determine that we need not expressly construe any claim terms to resolve the parties’ disputes on the current record. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 10

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “actuators and the remote control of fluid handling devices, including the receipt with the user-interface module of “a user command to actuate an actuator via a presented control interface” (limitation [18.7]) and “account authorized to send commands to remotely control fluid handling devices” (limitation [18.11]). We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses or teaches these limitations because the evidence does not provide support that there is remote control of fluid handling devices or the use of a user command on a control interface to send a command to a fluid handling device, for instance. Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but we do not discern that it teaches or discloses the capability to remotely control fluid handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, the Kahn disclosures that Petitioner repeatedly relies upon for allegedly teaching this control are deficient. See Ex. 1005, 10:62–67, 14:35– 15:2, 15:62–16:32; see also Pet. 12–14, 16–18. Kahn discloses that “the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance.” Ex. 1005, 10:62–67. Communication unit 112B is part of the local “sensor unit,” wherein the detection conditions determined by the sensor are communicated to remote devices by communication unit 112B. See id. at 3:31–33, 5:62–6:2, 6:27–35, 7:33–37, 13:7–12, Figs. 1A–1C. Kahn discloses that the sensor units, which include communication units 112B, can be located near shut-off valves and can communicate with distant locations. See id. at 11:1–13. There are no disclosures, however, in the above passages that there is remote control of fluid handling devices, that there is a user command on a control interface that actuates an actuator, or that there is a command sent to the facility actuators via a network connection, as required in limitations [18.5]–[18.7] and [18.9]–[18.12], respectively. Rather, the disclosure indicates that the communication unit 112B includes on-site alerts and that the local (non-remote) communication unit 112B can be interfaced with the control valve.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 10,488,871
  • PTAB · Oct 1, 2025 · IPR2025-00097 · APJ Brent M Dougal · IPR · Adverse judgment

    The Board granted EcoFactor’s request for adverse judgment after it disclaimed claims 1–18 and terminated the proceeding.

    RulingsAdverse judgment
    • Adverse judgmentAdverse judgmentGranted

      “A party before the Board “may request judgment against itself at any time during a proceeding.” 37 C.F.R. § 42.73(b). “Cancellation or disclaimer of a claim such that the party has no remaining claim in the trial” constitutes a request for adverse judgment. 37 C.F.R. § 42.73(b)(2). As all claims of the ’394 Patent have been disclaimed, Patent Owner’s request for adverse judgment is granted, and the proceeding is terminated.” slip op. at 2

    None
    Patents in suitUS 11,835,394
  • PTAB · Oct 1, 2025 · IPR2024-00943 · APJ Scott B Howard · IPR · Final written decision

    Claims 2–23, 26, 41–60, 63, 64, 91–152, and 155–171 are unpatentable; Rao anticipates some claims, and the stated Rao combinations render the remaining claims obvious.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Petitioner argues that a person having ordinary skill in the art “would have at least a bachelor’s degree in computer science, computer engineering, or a similar field, and approximately two years of industry or academic experience in a field related to computer software development and/or computer networking.” Pet. 2 (citing Ex. 1015 ¶¶ 50–52). Petitioner further argues that “[w]ork experience can substitute for education, and additional education can substitute for work experience.” Id. at 2–3 (citing Ex. 1015 ¶¶ 50–52). Because Petitioner’s proposed level of ordinary skill in the art is consistent with the field of the invention of the ’541 patent and not disputed by Patent Owner (see PO Resp.), we adopt Petitioner’s formulation of the person having ordinary skill in the art.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “Petitioner states “[n]o terms require construction to resolve this Petition.” Pet. 3. Patent Owner does not propose any claim constructions. See PO Resp. For the purposes of this Decision, we need not expressly construe any claim terms. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (noting that “we need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 13

    • Expert testimonyPetitioner expert creditedDecided for petitioner
    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)UnpatentableNot shown unpatentableMixed

      “preponderance of the evidence that claim 3 was anticipated by Rao.” slip op. at 25

    Patent outcomesUS 8,589,541 unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 8,589,541
  • PTAB · Oct 1, 2025 · IPR2024-00942 · APJ Scott B Howard · IPR · Final written decision

    Claims 2–23, 26, 41–60, 63, 64, 91–152, and 155–171 are unpatentable; Rao anticipates some claims, and Rao-based combinations render the others obvious.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Petitioner argues that a person having ordinary skill in the art “would have at least a bachelor’s degree in computer science, computer engineering, or a similar field, and approximately two years of industry or academic experience in a field related to computer software development and/or computer networking.” Pet. 2 (citing Ex. 1015 ¶¶ 50–52). Petitioner further argues that “[w]ork experience can substitute for education, and additional education can substitute for work experience.” Id. at 2–3 (citing Ex. 1015 ¶¶ 50–52). Because Petitioner’s proposed level of ordinary skill in the art is consistent with the field of the invention of the ’541 patent and not disputed by Patent Owner (see PO Resp.), we adopt Petitioner’s formulation of the person having ordinary skill in the art.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Petitioner states “[n]o terms require construction to resolve this Petition.” Pet. 3. Patent Owner does not propose any claim constructions. See PO Resp. For the purposes of this Decision, we need not expressly construe any claim terms. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (noting that “we need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 13

    • Expert testimonyOther

      “157, and 171 are anticipated by Rao. Pet. 1, 19–39, 42. Petitioner’s arguments are supported by citations to the prior art and the testimony of Dr. Wolfe. See id. We have reviewed Petitioner’s arguments and evidence, agree with them, and, therefore, adopt Petitioner’s arguments and evidence as our own.” slip op. at 26

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)UnpatentableNot shown unpatentableMixed

      “anticipated by Rao. Pet. 1, 30–31, 33–42. We have reviewed Petitioner’s arguments for each of those dependent claims. See Pet. 30–31, 33–42. For each of those dependent claims, the Petition appears to only argue a theory of obvious. That is, the Petition never states that the additional limitation is disclosed by Rao. See id. For example, claim 26 depends from claim 1 and further recites “wherein the policy is based on a background service class.” Ex. 1001, 112:49–52. We reproduce Petitioner’s arguments directed to claim 26 below: Rao’s policies 520 may “define prioritization” for network packets “based on whether an application is running in the foreground or the background.” [Ex. 1002] ¶ 182; id. ¶¶ 38–43, 180, 182, 188–89, 193, Figs. 5A, 5B. Each packet “may be placed and arranged in a priority order respective to all other . . . packets to provide a packet by packet prioritization across all applications 338a-338n and . . . network packets.” Id. ¶ 191. It would have been obvious to determine and apply a policy assigning a specific priority to packets associated with background applications, supra [1e]-[1f], and Rao thus discloses or renders obvious assigning a priority to network communications based on whether they are characterized as background services (class of services associated with application(s) running in the background of client 105), EX-1015 ¶¶195-96; supra [1e], [1f]. Pet. 33–34. Although the Petition sets forth why the claim limitation would have been obvious, there is no discussion as to how the additional limitation of claim 26—policy based on background class—is disclosed in Rao. See id. Similar arguments are presented for the other claims. See Pet. 30–31, 35–42. Because the Petition does not sufficiently show how the additional limitations recited in claims 20, 26, 58, 64, 165, and 169 were disclosed by Rao, Petitioner has not shown by a preponderance of the evidence that claims 20, 26, 58, 64, 165, and 169 were anticipated by Rao.” slip op. at 28

    Patent outcomesUS 8,589,541 unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 8,589,541
  • PTAB · Sep 5, 2025 · IPR2024-00431 · APJ Jon M Jurgovan · IPR · Final written decision

    Claims 1, 3, and 4 are unpatentable as obvious over Afshary and Mirfakhraei; claim 2 was not shown unpatentable over either asserted combination.

    RulingsFinal written decision
    • Skill levelSkill level board ownDecided for petitioner

      “Patent Owner’s proposal to limit a POSITA’s education and experience to “broadband networks over coaxial cables” is too narrow. Although Patent Owner points to various parts of the ’518 patent as supporting its restrictive proposal, other parts of the patent are not so limited. For example, the patent’s technical field and summary are not limited to coaxial cable, and the patent discusses twisted pair wiring and satellite communications as media that can be used. See, e.g., Ex. 1001, 1:27–29, 3:33–35, 3:49–50, 3:67–4:3, 5:61–6:3, 8:20–23, 9:28–33. Accordingly, we adopt the following level of ordinary skill in the art for use in this Decision: A POSITA would have a bachelor’s degree in electrical engineering, computer engineering, or a related field, and two to four years of experience with broadband communication networks. Additional professional experience could substitute for education, and additional education could substitute for professional experience. We find that this skill level is consistent with the problems and solutions identified in the ’518 patent and the prior art references asserted by Petitioner. In addition, we find the adopted skill level consistent with the education and experience that a POSITA would have had. See In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995) (citing Custom Accessories, Inc. v. Jeffrey-Allan Indus., Inc., 807 F.2d 955, 962 (Fed. Cir. 1986)) (citing factors to consider when determining level of ordinary skill in the art).” slip op. at 15

    • Expert testimonyDecided for petitioner

      “We determine that Mr. Bertonis and Mr. Garrett had at least the skill level of a POSITA at the time they submitted their declarations and testimony in this case. Ex. 1002 ¶¶ 4–15, Appx. A; Ex. 2001 ¶¶ 8–12, Appx. A; cf Osseo Imaging, LLC v. Planmeca USA Inc., 116 F.4th 1335 1341 (Fed. Cir. 2024) (“An expert need not have acquired that skill level prior to the time of the invention to be able to testify from the vantage point of a person of ordinary skill in the art.”). Accordingly, we see no reason to disregard the testimony of either on the basis that they do not have a POSITA’s skill level.” slip op. at 45

    • Claim Construction › Functional claiming / §112(f) means-plus-function › Whether §112(f) applies (Williamson, nonce words)§112(f) appliesTerm construed petitioner constructionDecided for petitioner

      “Because an assessment of whether the prior art discloses a means- plus-function limitation depends not only on the presence of the recited function but also the structure that performs that function as described in the patent’s specification, we address Petitioner’s undisputed contentions for the means-plus-function limitations below.” slip op. at 12

    • Obviousness (§103) › Analogous artAnalogous artDecided for petitioner

      “We conclude that Petitioner has shown by preponderant evidence that Mirfakhraei is in the same field of endeavor as the ’518 patent, i.e., “broadband communication networks.” Mirfakhraei is thus analogous art because it is in the same field of endeavor as the ’518 patent.” slip op. at 27

    Patent outcomesUS 7,295,518 mixed
    Claim construction§ 103 obviousnesscites Graham
    Patents in suitUS 7,295,518
  • PTAB · Sep 3, 2025 · IPR2024-00441 · APJ Aaron W Moore · IPR · Final written decision

    Claims 1–18 are unpatentable over Kamieniecki and Konstantinos; Petitioner did not show claims 1–18 unpatentable over Renken or Renken and Cholas because Renken is not prior art.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Level of Ordinary Skill in The Art Petitioner contends that a person having ordinary skill in the art “would have had a degree in electrical engineering or a similar discipline, and three-to-four years of experience working with television signal processing and communication 1 Because the challenged claims have an effective filing date before the effective date of the AIA, we apply the pre-AIA version of 35 U.S.C. § 103. 2 US 2005/0114879 A1, published May 26, 2005 (Ex. 1009). 3 US 2010/0120386 A1, published May 13, 2010 (Ex. 1010). 4 US 2010/0303181 A1, published Dec. 2, 2010 (Ex. 1016). 5 US 2008/0313691 A1, published Dec. 18, 2008 (Ex. 1017). 6 US 8,649,421 B2, issued Feb. 11, 2014 (Ex. 1011). systems,” and that “[a]dditional education may substitute for professional experience and significant work experience may substitute for formal education.” Pet. 30 (citing Ex. 1002 ¶¶ 40–42). “Patent Owner accepts the Petition’s [description of a person of ordinary skill] solely for purposes of responding to the Petition in this proceeding.” PO Resp. 11. Based on our review of the record before us, we determine that Petitioner’s stated level of ordinary skill in the art is reasonable because it appears consistent with the evidence of record, including the asserted prior art. Accordingly, we apply Petitioner’s definition in this Decision. B.” slip op. at 8

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “On the present record, we do not discern a need to construe explicitly any claim language because doing so would have no effect on our analyses and will not assist in resolving the present controversy between the parties. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). C.” slip op. at 9

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundDecided for petitioner

      “We agree that the record provides sufficient evidence that one of ordinary skill in the art would have found it advantageous to add a multi-channel receiver to improve monitoring, as Petitioner argues. Having the ability to monitor without waiting for idle or disturbing users would be a clear advantage.” slip op. at 18

    • Obviousness (§103) › Objective indicia / secondary considerations › NexusObjective indicia no nexusDecided for petitioner

      “We conclude that Patent Owner has not shown a sufficient nexus between the claimed invention and any product embodying the claimed invention that was successful, praised, or solved a long-felt need. Patent Owner identifies five elements allegedly required “[t]o implement MaxLinear’s Remote Spectrum Monitoring in CPE.” See PO Resp. 65. To support this, Patent Owner cites pages 5–7 of Exhibit 2009. See id.7 That exhibit, however, describes requirements for “Full Band Capture,” not MaxLinear’s “Remote Spectrum Monitoring.” To” slip op. at 31

    Patent outcomesUS 8,792,008 unpatentable
    Claim construction§ 102 anticipation§ 103 obviousness
    Patents in suitUS 8,792,008

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.