PTAB
Advanced fields
530 decisions · 1083msnewest first
  • Apple Inc. v. Theta IP, LLCNo claims unpatentable
    PTAB · Nov 24, 2025 · IPR2024-00818 · APJ Kara L Szpondowski · IPR · Final written decision

    Claims 1, 2, and 4–23 were not shown unpatentable over Behbahani, Leete, and Tan because the combination did not teach comparing desired and interferer signal strengths.

    RulingsFinal written decision
    • Obviousness (§103) › Motivation to combine / reasonable expectation of successNot reached

      “Behbahani teaches “comparing the strength of the desired signal to the strength of the interfere signal,” as recited in limitation 1(a). See PO Resp. 68–69; Sur-reply 21–23. Although Petitioner argues that Behbahani “expressly teaches comparing the desired and interferer signal strengths,” Petitioner does not cite to sufficient evidence in support of this statement. Pet. 38. The basis of Petitioner’s argument is that Behbahani teaches the same process for determining signal strengths as shown in Figure 4 of the ’202 patent. Figure 4 of the ’202 patent is reproduced below: Figure 4 shows, among other things, signal strength indicator circuits 440 and 450 connected to input line 410 and output line 460, on either side of gain element 420 and filter 430. Ex. 1001, 6:53–57. The input signal on input line 410 is shown as desired signal 412 and interferers 464 and 466. Id. at 59–61. Figure 4 is further described as follows. The signal strength indicators 440 and 450 do not provide information as to the relative sizes of the desired and interfering signals. Rather, a cumulative signal level is provided at their outputs. For example, the first signal strength indicator 440 outputs a level corresponding to the sum of desired signal 412 and interfering signals 414 and 416, while the second signal strength indicator 450 provides a signal level corresponding to the sum of desired signal 462 and interfering signals 464 and 466. In this specific example, the gain of the gain and filter circuit combinations is shown as approximately one, while the interfering signals 414 and 416 signal levels are reduced. A comparison of the signal levels provided by the signal strength indicators 440 and 450 indicates that much of the combined received signal on line 410 has been filtered. Accordingly, it may be deduced that large interfering signals present at the input are being filtered by the filter 430. From this information, as will be shown in greater detail below, the bias, impedance, and gain of the gain stage 420 and filter 430 combination may be optimized to reduce power dissipation. Ex. 1001, 6:61–7:13 (emphasis added). In other words, Figure 4 shows a comparison of a sum of the desired and interferer signals output from the strength indicator circuits, not a comparison of the strength of the desired signal and the strength of the interferer signal, as required by the claim language. See Sur-reply 22–23. The ’202 patent describes Figure 4 as “an embodiment,” and claims are not limited to specific embodiments described in the specification. See Phillips v. AWH Corp., 415 F.3d 1303, 1323 (Fed. Cir. 2005) (en banc). Petitioner even admits that Figure 4 “compar[es] a cumulative signal strength at a first node to a cumulative signal strength at a second node.” Pet. 36 (emphasis added). In the Reply, Petitioner argues that Patent Owner “ignores the” slip op. at 33

    • Strike new argumentNew argument consideredDenied

      “Pursuant to 37 C.F.R. § 42.23(b), a reply “may only respond to arguments raised in the corresponding . . . patent owner response.” We agree with Petitioner, for the reasons stated in the Opposition, that the arguments in the Reply and Reply declaration testimony are responsive to arguments raised in the Patent Owner Response. See Opp Mot. 7–12 (explaining the positions taken in the Petition, Patent Owner’s arguments in Response, and the arguments presented in Reply); see Corephotonics, Ltd. v. Apple Inc., 84 F.4th 990, 1008–1009 (Fed. Cir. 2023). Petitioner does not provide a new theory of unpatentability; rather, Petitioner responds and elaborates on the theory presented in the Petition to explain why Patent Owner’s arguments are incorrect. E.g., Chamberlain Grp., Inc. v. One World Techs., Inc., 944 F.3d 919, 925 (Fed. Cir. 2019) (“Parties are not barred from elaborating on their arguments on issues previously raised.”); Belden Inc. v. Berk-Tek LLC, 805 F.3d 1064, 1081–82 (Fed. Cir. 2015) (reasoning that rebuttal evidence should be responsive such that it is offered “to explain, repel, counteract, or disprove the evidence of the adverse party”). “[T]he introduction of new evidence in the course of the trial is to be expected in [IPR] trial proceedings” and permissible “as long as the opposing party is given notice of the evidence and an opportunity to respond to it.” Genzyme Therapeutic Prods. Ltd. P’ship v. Biomarin Pharm. Inc., 825 F.3d 1360, 1366 (Fed. Cir. 2016). We also note that our Consolidated Trial Practice Guide (“CTPG”) states that In most cases, the Board is capable of identifying new issues or belatedly presented evidence when weighing the evidence at the close of trial, and disregarding any new issues or belatedly presented evidence that exceeds the proper scope of reply or sur-reply. As such, striking the entirety or a portion of a party's brief is an exceptional remedy that the Board expects will be granted rarely. CTPG at 80, 84 Fed. Reg. 64,280 (Nov. 21, 2019). We follow that guidance here. Further, Patent Owner argues that Dr. Abidi’s testimony as a co- author of Behbahani is “self-serving and unsupported.” Mot. 6–7. The fact that Dr. Abidi is a co-author of Behbahani, as well as Petitioner’s expert, is not, in and of itself, sufficient to discredit Dr. Abidi’s testimony. The CTPG provides that “[t]he Board has broad discretion to assign weight to be accorded expert testimony.” CTPG 35. We are capable of discerning from the testimony and the evidence presented whether Dr. Abidi’s testimony should be entitled to any weight, either as a whole or with regard to specific issues. We will weigh the testimony on an issue-by-issue basis as appropriate. Moreover, to the extent that Patent Owner has pointed out the inadequacies of Dr. Abidi’s testimony, we are also capable of noting those inadequacies and weighing that testimony accordingly. For the foregoing reasons, Patent Owner’s motion to strike is denied.” slip op. at 11

    • Expert testimonyPetitioner expert discountedOther

      “We also disagree with Petitioner that “Dr. Abidi provided well- reasoned analysis that Behbahani teaches determining and comparing desired and interferer signal strengths.” Reply 27 (citing Ex. 1003 ¶¶ 179– 181). We have reviewed the Dr. Abidi’s testimony cited in the Petition and Reply for limitation 1(a) (Ex. 1003 ¶¶ 95, 96, 113–120, 179–181; Ex. 1042 ¶¶ 12–16), and we disagree that Dr. Abidi provided well-reasoned analysis that Behbahani teaches comparing desired signal strengths with interferer signal strengths. Rather, Dr. Abidi’s testimony focuses on determining or measuring desired and interferer signal strengths, generally simply repeats what is in the Petition, and only provides a conclusory assertion that Behbahani expressly teaches comparing the strengths of the desired and interferer signals without providing any explanation. See TQ Delta, LLC v. Cisco Sys., Inc., 942 F.3d 1352, 1358–59 (Fed. Cir. 2019) (“Conclusory expert testimony does not qualify as substantial evidence.”). Accordingly, Dr. Abidi’s supporting testimony is also deficient. See 37 C.F.R. § 42.65(a) (“Expert testimony that does not disclose the underlying facts or data on which the opinion is based is entitled to little or no weight.”). As Patent Owner points out, the only comparison mentioned by Petitioner in Behbahani is to derive the strength of the interferer signal. Sur-reply 22 (citing Pet. 38–39); Ex. 1004, 1207 (“[B]y comparing the signal level at the input and the output of the digital filter (DI and DO), the relative strength of the out-of-channel signal that passes through the analog filter is calculated”). Accordingly, for the foregoing reasons we determine that Petitioner has not shown that Behbahani teaches limitation 1(a).” slip op. at 36

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “Petitioner thus proposes a Master’s degree with two years of experience, while Patent Owner proposes a Bachelor’s degree with five years of experience. At the institution stage, we did not see a material difference in the proposals given that both parties also indicate that more education could substitute for less experience and vice versa, and thus adopted Patent Owner’s proposal. Inst. Dec. 11. We requested that the parties address during trial if either believed that the choice of one proposal over the other would make a difference in the patentability analysis. Id. Neither party has done so. Accordingly, because nothing in the record persuades us that our preliminary finding in the Institution Decision was incorrect, and because neither party has challenged our finding, we maintain our adoption of Patent Owner’s proposed level of ordinary skill in the art.” slip op. at 14

    Patent outcomesUS 10,524,202 not shown unpatentable
    Claim construction§ 103 obviousnessDiscretionary denialcites Phillips · KSR · Graham
    Patents in suitUS 10,524,202
  • Apple Inc. v. Theta IP, LLCAll claims unpatentable
    PTAB · Nov 24, 2025 · IPR2024-00820 · APJ Aaron W Moore · IPR · Final written decision

    Claims 1–3, 5–6, and 8–11 are unpatentable as obvious over Behbahani and Tan; Patent Owner’s motion to strike is denied.

    RulingsFinal written decision
    • ExcludeMotion to exclude, deniedDenied

      “Under 37 C.F.R. § 42.23(b), a reply “may only respond to arguments raised in the corresponding . . . patent owner response.” We agree with Petitioner, for the reasons stated in the Opposition, that the arguments and declaration testimony are responsive to arguments raised in the Patent Owner Response. See Opp Mot. 7–10 (explaining the positions taken in the Petition, Patent Owner’s arguments in Response, and the arguments presented in Reply); Corephotonics, Ltd. v. Apple Inc., 84 F.4th 990, 1008– 1009 (Fed. Cir. 2023). Petitioner does not provide a new theory of unpatentability; instead, Petitioner appropriately responds and elaborates on the theory presented in the Petition to explain why Patent Owner’s arguments are incorrect. See, e.g., Chamberlain Grp., Inc. v. One World Techs., Inc., 944 F.3d 919, 925 (Fed. Cir. 2019) (“Parties are not barred from elaborating on their arguments on issues previously raised.”); Belden Inc. v. Berk-Tek LLC, 805 F.3d 1064, 1081–82 (Fed. Cir. 2015) (reasoning that rebuttal evidence should be responsive such that it is offered “to explain, repel, counteract, or disprove the evidence of the adverse party”). “[T]he introduction of new evidence in the course of the trial is to be expected in [IPR] trial proceedings” and is permissible “as long as the opposing party is given notice of the evidence and an opportunity to respond to it.” Genzyme Therapeutic Prods. Ltd. P’ship v. Biomarin Pharm. Inc., 825 F.3d 1360, 1366 (Fed. Cir. 2016).” slip op. at 11

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “Petitioner thus proposes a Master’s degree with two years of experience, while Patent Owner proposes a Bachelor’s degree with five years of experience. At the institution stage, we did not see a material difference in the proposals given that both parties also indicate that more education could substitute for less experience and vice versa, and we thus adopted Patent Owner’s proposal. See Inst. Dec. 14. We requested that the parties address during trial if either believed that the choice of one proposal over the other would make a difference in the patentability analysis. Id. Neither party has done so. Accordingly, because nothing in the record persuades us that our preliminary finding in the Institution Decision was incorrect, and because neither party has challenged our finding, we maintain our adoption of Patent Owner’s proposed level of ordinary skill in the art.” slip op. at 15

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITAPlain and ordinary meaningPrior construction adoptedDecided for petitioner

      “Revvo Techs., Inc. v. Cerebrum Sensor Techs., Inc., IPR2025-00632, Paper 20 at 3–5 (Director Nov. 3, 2025) (precedential), addressing situations where a petitioner takes different claim construction positions before the Board and a district court. In Revvo, the petitioner advanced its own proposed claim construction in a related district court litigation but adopted in the IPR a different proposed construction, which was advanced by the patent owner in the district court litigation. Revvo at 2. The Director acknowledged that “a petitioner is not necessarily precluded from arguing different claim construction positions before a district court and the Board,” but that if the petitioner does so, it “should explain sufficiently why the different positions are warranted.” Id. at 5. “For example,” the Director explained, “if a party advances a narrow construction in the district court and the district court declines to adopt the narrow construction, the party would have sufficient reason for advancing the broader, court-adopted construction in a proceeding before the Board.” Id. Here, as in the Director’s example, Petitioner advanced a narrower construction of “signal path” before the district court, which the district court declined to adopt. See Pet. 9; Ex. 2015. Instead, the district court adopted a “plain-and-ordinary meaning” construction, which Patent Owner proposed. See PO Resp. 38, 41; Ex. 2015; Ex. 2025, 5–14. In the Petition, Petitioner proposed applying the plain and ordinary meaning constructions that had already been preliminarily adopted by the district court. Compare Pet. (filed May 1, 2024) with Ex. 2015 (preliminarily adopting plain and ordinary meaning construction on March 25, 2024). Applying Revvo, we find that Petitioner had a sufficient reason for advancing the broader, courtadopted construction in this IPR. Thus, the parties do not dispute the meanings of “signal path,” and we adopt the district court’s construction of plain and ordinary meaning, as agreed by the parties. The “signal path” dispute concerns the application of this and the surrounding claim language (i.e., “in the receiver signal path”) to the disclosures in Behbahani. See PO Resp. 41–43. Therefore, we will provide further discussion in the context of the parties’ arguments regarding Behbahani below. However, we agree with Patent Owner that “plain language [of the claims] requires adjusting the impedance (or bias) of a circuit or component in the signal path.” PO Resp. 49. The parties also address the meaning of the terms “dynamically increasing/decreasing,” which Petitioner refers to as the “dynamic limitation.” See Pet. 9; PO Resp. 37–41. Petitioner proposes that the Board accept Patent Owner’s proposed construction, which was adopted by the district court in the related litigation, both preliminarily and following the Markman hearing. See Pet. 9–10; Ex. 2015, 2–3; Ex. 2025, 40. At Institution, we adopted the district court’s construction, that the term should be given its plain and ordinary meaning which is “varying during operation based, at least in part, on information gained during operation,”4 because there was no dispute between the parties. See Inst. Dec. 16. We continue to do so for purposes of this Decision, for the same reasons as set forth above. That is, applying Revvo, we find that Petitioner had a sufficient reason for advancing the broader, court-adopted construction in this IPR.” slip op. at 18

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successUnpatentableMotivation foundDecided for petitioner

      “Petitioner further argues that Tan “provides an example of circuitry used to detect signals at various points in the low-pass filter signal path as a means of implementing a prefilter automatic gain control.” Pet. 29 (citing Ex. 1006, 481); Ex. 1003 ¶ 85. The example in Tan is a peak detector circuit. See Pet. 29–30; Ex. 1003 ¶ 85; Ex. 1006, Fig. 8. Dr. Abidi testifies that a person of ordinary skill in the art would have been motivated to use Tan’s signal strength measurement circuitry to measure nodes AI and AO, as well as to use comparable circuity to measure nodes DI and DO. See Ex. 1003 ¶¶ 85–90. In response to Patent Owner’s argument that it is not possible to measure signal strength with Tan’s peak detectors (see PO Resp. 65–68), Dr. Abidi provides testimony explaining how Tan’s peak detector circuit provides a measure of the signal strength, which we find persuasive, and which is unrebutted by Patent Owner. See Ex. 1042 ¶ 15.” slip op. at 34

    Patent outcomesUS 11,638,210 unpatentable
    Claim construction§ 103 obviousnessDiscretionary denialcites KSR · Graham
    Patents in suitUS 11,638,210
  • PTAB · Nov 21, 2025 · IPR2024-00934 · APJ Michael R Zecher · IPR · Final written decision

    Claims 19–21 are unpatentable as obvious over DeMaw and, separately, over Macnally.

    RulingsFinal written decision
    • Obviousness (§103) › Graham factors (scope of art, differences, level of skill)UnpatentableUnpatentable

      “1. Principles of Law A claim is unpatentable under § 103(a) if the differences between the” slip op. at 16

    Patent outcomesUS 7,496,342 unpatentable
    § 103 obviousnesscites KSR · Graham
    Patents in suitUS 7,496,342
  • PTAB · Nov 14, 2025 · IPR2024-00373 · APJ Jon M Jurgovan · IPR · Remand

    Claims 1, 4–8, and 10–16 are unpatentable under § 103; claims 2, 3, 9, and 17 were not shown unpatentable on any asserted ground.

    RulingsRemand decision
    • RemandOther

      “The Director then issued an Order, Paper 47 (“Director’s Order” or “Dir. Ord.”) granting Director Review, vacating-in-part the Final Written Decision, and remanding the case to this Board panel for proceedings consistent with the Order. The Director vacated-in-part the Final Written Decision because it did not sufficiently address Patent Owner’s arguments with respect to claim 17 (and similar claims 2 and 9). We have jurisdiction under 35 U.S.C. § 6. This Final Written Decision on Remand from Director Review is entered pursuant to 35 U.S.C. § 318(a). Having reviewed the complete trial record, we determine that Petitioner has shown, by a preponderance of the evidence, that the challenged claims are unpatentable except for claims 2, 3, 9, and 17.” slip op. at 3

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “B. Level of Ordinary Skill in the Art The person of ordinary skill in the art is a hypothetical person who is” slip op. at 13

    • Obviousness (§103) › Analogous artAnalogous artDecided for petitioner

      “2. Analogous Art – DSL-Book A reference is analogous art to the claimed invention if: (1) the” slip op. at 75

    • Obviousness (§103) › Motivation to combine / reasonable expectation of success › Teaching awayTeaching away not foundDecided for petitioner

      “4. Motivation to Combine Amit and Jacobsen Petitioner contends that a POSITA would have modified “Amit’s” slip op. at 31

    Patent outcomesUS 7,594,249 mixed
    § 103 obviousnesscites KSR
    Patents in suitUS 7,594,249
  • PTAB · Oct 28, 2025 · IPR2024-00850 · APJ Arthur M Peslak · IPR · Final written decision

    Claims 1, 3–12, 14, and 23–27 are unpatentable as obvious over Raizer and Hangzhou.

    RulingsFinal written decision
    • Skill levelOther

      “B. Level of Ordinary Skill in the Art We consider the asserted grounds of unpatentability in view of the” slip op. at 9

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “C. Claim Construction Neither Petitioner nor Patent Owner proposes an express construction” slip op. at 10

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successUnpatentableMotivation foundUnpatentable

      “that it would improve similar devices in the same way, using the technique is obvious unless its actual application is beyond his or her skill.” KSR, 550 U.S. at 417. In this case, we must determine whether one of ordinary skill in the art would recognize that Hangzhou’s disclosure of driving its auto-guided trolleys 200 under shelves 100 would improve the operation of Raizer’s system in the same way. For us to resolve this question in Petitioner’s favor, Petitioner must provide “some articulated reasoning with some rational underpinning to support the legal conclusion of obviousness.” Id. at 418 (citing In re Kahn, 441 F.3d 977, 988 (Fed. Cir. 2006)). However, bodily incorporation, i.e., “an actual physical substitution of” Hangzhou’s auto-guided trolleys or operating software into Raizer’s system, is not required. See In re Mouttet, 686 F.3d 1322, 1332 (Fed. Cir. 2012) (“It is well-established that a determination of obviousness based on teachings from multiple references does not require an actual, physical substitution of elements.”); In re Nievelt, 482 F.2d 965, 968 (CCPA 1973) (“Combining the teachings of references does not involve an ability to combine their specific structures.”).” slip op. at 23

    Patent outcomesUS 11,472,632 unpatentable
    Claim construction§ 103 obviousnesscites KSR · Graham
    Patents in suitUS 11,472,632
  • PTAB · Oct 10, 2025 · IPR2025-00653 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution on all claims because the Petition did not show a reasonable likelihood that any challenged claim was unpatentable over the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “An inter partes review may be instituted only if “the information presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’504 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Additionally, only terms that are in controversy need to be construed, and these need be construed only to the extent necessary to resolve the controversy. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 9; Prelim. Resp. 4 (citing Ex. 2009 ¶ 72); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13

    • Expert testimonyPetitioner expert discountedDecided for patent owner

      “Ex. 1002 ¶ 47. As reflected above, Dr. Wooley’s testimony as to element [1.2] does not even assert that Cardamone discloses a tank, let alone one or more sensors disposed at a tank as recited in element [1.2]. Thus, Dr. Wooley’s testimony does not support Petitioner’s argument on this issue.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,726,504
  • PTAB · Oct 10, 2025 · IPR2025-00652 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–23 and 25–30 were unpatentable over the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’403 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 10; Prelim. Resp. 4 (citing Ex. 2009 ¶ 73); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses element [1.2] because the evidence cited does not disclose a “first computer system being configured to provide remote control of the first pump or first valve” (i.e., a fluid-handling device). Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but Petitioner has not identified any disclosure of the capability to remotely control fluid-handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, Kahn’s disclosures that Petitioner relies on for allegedly teaching remote control are deficient. We discuss each. First, Petitioner points to the following, “[f]or instance, as illustrated in FIG. 1C, a fluid control device such as a valve 15A is located on the input side of a sen[s]or unit 110.” Ex. 1005, 8:19–21, cited in Pet. 13. This portion of Kahn, however, does not disclose remote control. Second, Petitioner cites to the following: Finally, or in addition to, the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance. Pet. 13 (citing Ex. 1005, 10:62–67). We agree with Patent Owner that this portion of Kahn teaches on-site alerts and local control of the fluid-handling device. See Prelim. Resp. 7. This portion of Kahn does not disclose remote control.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,294,403
  • PTAB · Oct 10, 2025 · IPR2025-00651 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–3, 6, 7, and 9–20 were unpatentable over any asserted ground.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’680 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 11

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner

      “target value” is part of a command that is sent from a computing device to a server and then to a controller. The controller then receives a measurement of the fluid by a sensor and determines whether the measurement satisfies the “target value.” If the measurement does not satisfy the “target value,” further operations are undertaken. The recited operation sequence makes clear that the plain and ordinary meaning of “target value” is not as Dr. Wooley opines because the particular operating condition that a device is in at a particular time is represented by the measurement taken by the sensor, 11 Some claim language less relevant to construing “target value” was omitted for ease of reference. which the controller then uses to determine whether the measurement satisfies the “target value.” Additionally, claim 1 recites that the “target value” is sent as part of a command to the controller. The “target value” is not sent to the controller from the sensor, as might be expected if the plain and ordinary meaning of “target value” were as Dr. Wooley opines. Petitioner and Dr. Wooley’s construction would also result in “target value” meaning effectively the same thing as the measurement of the fluid by the sensor, a concept that is separately recited in claim 1 and to which the “target value” is compared. The Specification of the ’680 patent does not support Petitioner’s understanding of the plain and ordinary meaning of “target value.” Although the Specification does not recite “target value,” it recites “target state,” and describes “target state” sufficiently to understand the plain and ordinary meaning of “target” as used in “target value” and “target state.” In particular, the ’680 patent explains that “[i]n some embodiments, the process 104 includes receiving, via a network interface, from a remote user device, (e.g., via a command-center server) a command to change a state of a fluid-handling device to a target state.” Ex. 1001, 11:48–51. This portion reflects that the command is seeking to change a state of a fluid-handling device to a target state. In other words, the “target value” or “target state” is not generally “the particular operating condition that a device is in at a particular time”; rather, it is a value or state that the fluid-handling device is desired to be in, as Patent Owner and Dr. Durham explain. Additionally, just as claim 1 recites a directional component for the “target value” to be sent to the controller in a command, so too does the Specification describe a “target state” as being sent in a command from a remote user device. Thus, the Specification clearly supports the plain and ordinary meaning proposed by Patent Owner and Dr. Durham and not the plain and ordinary meaning proposed by Petitioner and Dr. Wooley. slip op. at 14

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “time-stamped process data, report exception therein to the remote host, and extract and transmit time-stamped process data to the remote host.” Ex. 1005, Abst. (emphases added). Almadi explains that its remote field systems must include a plurality of controller units “to issue commands to, and gather and process data from a plurality of field devices, including remote systems and instruments, . . . [and] a database server for the storage of process data retrieved from the remote subsystems and instruments.” Id. at 2:22–30 (emphases added). Based on these disclosures, we agree with Patent Owner that Petitioner has not established that Almadi discloses element [1.4]. Specifically, the teachings from Almadi identified by Petitioner refer to process data, which is data retrieved from the remote subsystems/field devices. Thus, we understand that Almadi’s teaching—of using an Ethernet switch to transmit “process data”—describes transmitting data from the remote subsystems/field devices. See Ex. 1005, 3:13–17, cited in Pet. 15. But claim 1 and particularly element [1.4], recites “sending, with the server, the target value to the network address [which identifies a controller of the fluid-handling device13] via the network,” which is different than sending process data from the field devices to the remote host or database server for storage.” slip op. at 19

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,175,680
  • Tanklogix, LLC v. SiteproInstitution denied
    PTAB · Oct 10, 2025 · IPR2025-00650 · APJ Sheila F Mcshane · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 18–32 and 34 were unpatentable over Kahn or Kahn and Gutierrez.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). Upon consideration of the Petition, the Preliminary Response, and the evidence of record, we determine that Petitioner has not established a reasonable likelihood of prevailing with respect to the unpatentability of at least one claim of the ’871 patent. Accordingly, for the reasons that follow, we decline to institute an inter partes review of claims 18–32 and 34 of the ’871 patent.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The respective proposed levels of qualifications for a person of ordinary skill in the art are similar, with Patent Owner proposing two years of experience compared to Petitioner proposing significant experience with remotely controlling fluid-handling devices, like SCADA systems. Patent Owner also proposes more extensive experience in lieu of educational experience. While we find Petitioner’s proposed qualifications to be acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of skill necessary to understand and implement the teachings of the ’871 patent and the asserted prior art. Our analysis and findings herein, however, do not turn on any differences in the qualifications adopted.” slip op. at 8

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “We determine that we need not expressly construe any claim terms to resolve the parties’ disputes on the current record. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 10

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “actuators and the remote control of fluid handling devices, including the receipt with the user-interface module of “a user command to actuate an actuator via a presented control interface” (limitation [18.7]) and “account authorized to send commands to remotely control fluid handling devices” (limitation [18.11]). We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses or teaches these limitations because the evidence does not provide support that there is remote control of fluid handling devices or the use of a user command on a control interface to send a command to a fluid handling device, for instance. Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but we do not discern that it teaches or discloses the capability to remotely control fluid handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, the Kahn disclosures that Petitioner repeatedly relies upon for allegedly teaching this control are deficient. See Ex. 1005, 10:62–67, 14:35– 15:2, 15:62–16:32; see also Pet. 12–14, 16–18. Kahn discloses that “the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance.” Ex. 1005, 10:62–67. Communication unit 112B is part of the local “sensor unit,” wherein the detection conditions determined by the sensor are communicated to remote devices by communication unit 112B. See id. at 3:31–33, 5:62–6:2, 6:27–35, 7:33–37, 13:7–12, Figs. 1A–1C. Kahn discloses that the sensor units, which include communication units 112B, can be located near shut-off valves and can communicate with distant locations. See id. at 11:1–13. There are no disclosures, however, in the above passages that there is remote control of fluid handling devices, that there is a user command on a control interface that actuates an actuator, or that there is a command sent to the facility actuators via a network connection, as required in limitations [18.5]–[18.7] and [18.9]–[18.12], respectively. Rather, the disclosure indicates that the communication unit 112B includes on-site alerts and that the local (non-remote) communication unit 112B can be interfaced with the control valve.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 10,488,871
  • PTAB · Sep 29, 2025 · IPR2021-00580 · APJ Monica S Ullagaddi · IPR · Remand

    On remand, the Board held claims 1–10 not shown unpatentable under the Sachs anticipation and obviousness grounds because Sachs did not disclose the required timer stopping, and the new theories were not considered.

    RulingsRemand decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Whether Mr. Bates is a Person of Ordinary Skill in the Art In the Final Written Decision, we adopted Petitioner’s definition because “there does not appear to be a dispute that needs to be resolved.” FWD 8. Here, where Mr. Bates’ qualifications are challenged, we have reviewed the complete record including the parties’ arguments on remand and we find that Mr. Bates does not meet the requirements for a person of ordinary skill in the art according to Petitioner’s definition for level of ordinary skill in the art, which we adopted (see FWD 8). Notably, the panel adopted Petitioner’s definition of the level of ordinary skill in the Institution Decision (Paper 16, 8), and neither party challenged that determination during the trial, although Patent Owner did offer its own definition (PO Resp. 9). Mr. Bates has one degree: “a bachelor’s degree in Business Management.” Ex. 2001 ¶ 7. A degree in Business Management is not “a degree in electrical engineering or a similar discipline.” Pet. 35 (emphasis added). Accordingly, we disregard the testimony of Mr. Bates in rendering our findings and conclusions in this Decision. We note that, even if we did consider Mr. Bates’s testimony, the findings and conclusions rendered in this Decision would not change.” slip op. at 12

    • Expert testimonyPatent owner expert discountedDecided for petitioner

      “cover for his lack of education.” Pet. Remand Br. 4. Patent Owner disagrees and argues, inter alia, that “Mr. Bates was a pioneer in the cellular telecommunications field with more than five decades of practical and teaching experience.” PO Remand Resp. 5 (citing Ex. 2001 ¶¶ 8–23) (emphasis omitted); see id. at 3–4, 6. Whether Mr. Bates is a Person of Ordinary Skill in the Art In the Final Written Decision, we adopted Petitioner’s definition because “there does not appear to be a dispute that needs to be resolved.” FWD 8. Here, where Mr. Bates’ qualifications are challenged, we have reviewed the complete record including the parties’ arguments on remand and we find that Mr. Bates does not meet the requirements for a person of ordinary skill in the art according to Petitioner’s definition for level of ordinary skill in the art, which we adopted (see FWD 8). Notably, the panel adopted Petitioner’s definition of the level of ordinary skill in the Institution Decision (Paper 16, 8), and neither party challenged that determination during the trial, although Patent Owner did offer its own definition (PO Resp. 9). Mr. Bates has one degree: “a bachelor’s degree in Business Management.” Ex. 2001 ¶ 7. A degree in Business Management is not “a degree in electrical engineering or a similar discipline.” Pet. 35 (emphasis added). Accordingly, we disregard the testimony of Mr. Bates in rendering our findings and conclusions in this Decision. We note that, even if we did consider Mr. Bates’s testimony, the findings and conclusions rendered in this Decision would not change.” slip op. at 12

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITAPlain and ordinary meaningDecided for patent owner

      “C. Claim Construction The Federal Circuit determined that “the plain and unambiguous language of claim 1 requires that a method, to come within the claim, must perform both limitations 1[c] and 1[d] where their preconditions apply.” Sierra Wireless, 130 F.4th at 1022. We interpret the claims and analyze Petitioner’s unpatentability arguments under the Federal Circuit’s determination.” slip op. at 13

    • Strike new argumentNew argument disregardedDecided for patent owner

      “Petitioner was on notice, when Patent Owner’s Response was filed at the latest, that claim 1 could be construed as unconditionally requiring both limitations 1[c] and 1[d]. Indeed, Petitioner contended that it had shown both limitations “in single references.” Pet. Reply 5. Petitioner now seeks to shift its unpatentability contentions for limitation 1[c] from Figure 5 of Sachs to Figures 6 and 7. Petitioner’s new reliance on Figures 6 and 7 of Sachs is “a meaningfully distinct contention” from its position in both the Petition and the Reply. See Ariosa Diagnostics v. Verinata Health, Inc., 805 F.3d 1359, 1367 (Fed. Cir. 2015). We therefore find that Petitioner impermissibly presents new theories of unpatentability on remand. 3. Independent Claim 1 We decline to address Petitioner’s new theories of unpatentability proposed on remand concerning Sachs’s Figure 7. See Pet. Remand Br. 15– 20. Although Petitioner cites pages 59–61 of the Petition as discussing Figure 7 of Sachs (see Pet. Remand Br. 15), the cited discussion concerns dependent claims 5 and 10, not independent claims 1 and 8.” slip op. at 17

    Patent outcomesUS 7,869,396 not shown unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites KSR · Graham
    Patents in suitUS 7,869,396

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.