- Exotec Product France SAS / Exotec North America Inc. et al. v. Opex CorporationAll claims unpatentablePTAB · Oct 28, 2025 · IPR2024-00850 · APJ Arthur M Peslak · IPR · Final written decision
Claims 1, 3–12, 14, and 23–27 are unpatentable as obvious over Raizer and Hangzhou.
RulingsFinal written decision- Skill levelOther
“B. Level of Ordinary Skill in the Art We consider the asserted grounds of unpatentability in view of the” slip op. at 9
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“C. Claim Construction Neither Petitioner nor Patent Owner proposes an express construction” slip op. at 10
- Obviousness (§103) › Motivation to combine / reasonable expectation of successUnpatentableMotivation foundUnpatentable
“that it would improve similar devices in the same way, using the technique is obvious unless its actual application is beyond his or her skill.” KSR, 550 U.S. at 417. In this case, we must determine whether one of ordinary skill in the art would recognize that Hangzhou’s disclosure of driving its auto-guided trolleys 200 under shelves 100 would improve the operation of Raizer’s system in the same way. For us to resolve this question in Petitioner’s favor, Petitioner must provide “some articulated reasoning with some rational underpinning to support the legal conclusion of obviousness.” Id. at 418 (citing In re Kahn, 441 F.3d 977, 988 (Fed. Cir. 2006)). However, bodily incorporation, i.e., “an actual physical substitution of” Hangzhou’s auto-guided trolleys or operating software into Raizer’s system, is not required. See In re Mouttet, 686 F.3d 1322, 1332 (Fed. Cir. 2012) (“It is well-established that a determination of obviousness based on teachings from multiple references does not require an actual, physical substitution of elements.”); In re Nievelt, 482 F.2d 965, 968 (CCPA 1973) (“Combining the teachings of references does not involve an ability to combine their specific structures.”).” slip op. at 23
Patent outcomesUS 11,472,632 unpatentableClaim construction§ 103 obviousnesscites KSR · GrahamPatents in suitUS 11,472,632 - Tanklogix, LLC v. Sitepro, Inc.Institution deniedPTAB · Oct 10, 2025 · IPR2025-00653 · APJ Bart A Gerstenblith · IPR · Institution
The Board denied institution on all claims because the Petition did not show a reasonable likelihood that any challenged claim was unpatentable over the asserted grounds.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“An inter partes review may be instituted only if “the information presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2
- Skill levelSkill level patent owner adoptedDecided for patent owner
“The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’504 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“Additionally, only terms that are in controversy need to be construed, and these need be construed only to the extent necessary to resolve the controversy. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 9; Prelim. Resp. 4 (citing Ex. 2009 ¶ 72); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13
- Expert testimonyPetitioner expert discountedDecided for patent owner
“Ex. 1002 ¶ 47. As reflected above, Dr. Wooley’s testimony as to element [1.2] does not even assert that Cardamone discloses a tank, let alone one or more sensors disposed at a tank as recited in element [1.2]. Thus, Dr. Wooley’s testimony does not support Petitioner’s argument on this issue.” slip op. at 18
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 11,726,504 - Tanklogix, LLC v. Sitepro, Inc.Institution deniedPTAB · Oct 10, 2025 · IPR2025-00652 · APJ Bart A Gerstenblith · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–23 and 25–30 were unpatentable over the asserted grounds.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied
“presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2
- Skill levelSkill level patent owner adoptedDecided for patent owner
“The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’403 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 10; Prelim. Resp. 4 (citing Ex. 2009 ¶ 73); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable
“We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses element [1.2] because the evidence cited does not disclose a “first computer system being configured to provide remote control of the first pump or first valve” (i.e., a fluid-handling device). Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but Petitioner has not identified any disclosure of the capability to remotely control fluid-handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, Kahn’s disclosures that Petitioner relies on for allegedly teaching remote control are deficient. We discuss each. First, Petitioner points to the following, “[f]or instance, as illustrated in FIG. 1C, a fluid control device such as a valve 15A is located on the input side of a sen[s]or unit 110.” Ex. 1005, 8:19–21, cited in Pet. 13. This portion of Kahn, however, does not disclose remote control. Second, Petitioner cites to the following: Finally, or in addition to, the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance. Pet. 13 (citing Ex. 1005, 10:62–67). We agree with Patent Owner that this portion of Kahn teaches on-site alerts and local control of the fluid-handling device. See Prelim. Resp. 7. This portion of Kahn does not disclose remote control.” slip op. at 18
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 11,294,403 - Tanklogix, LLC v. Sitepro, Inc.Institution deniedPTAB · Oct 10, 2025 · IPR2025-00651 · APJ Bart A Gerstenblith · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–3, 6, 7, and 9–20 were unpatentable over any asserted ground.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied
“presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2
- Skill levelSkill level patent owner adoptedDecided for patent owner
“The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’680 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 11
- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner
“target value” is part of a command that is sent from a computing device to a server and then to a controller. The controller then receives a measurement of the fluid by a sensor and determines whether the measurement satisfies the “target value.” If the measurement does not satisfy the “target value,” further operations are undertaken. The recited operation sequence makes clear that the plain and ordinary meaning of “target value” is not as Dr. Wooley opines because the particular operating condition that a device is in at a particular time is represented by the measurement taken by the sensor, 11 Some claim language less relevant to construing “target value” was omitted for ease of reference. which the controller then uses to determine whether the measurement satisfies the “target value.” Additionally, claim 1 recites that the “target value” is sent as part of a command to the controller. The “target value” is not sent to the controller from the sensor, as might be expected if the plain and ordinary meaning of “target value” were as Dr. Wooley opines. Petitioner and Dr. Wooley’s construction would also result in “target value” meaning effectively the same thing as the measurement of the fluid by the sensor, a concept that is separately recited in claim 1 and to which the “target value” is compared. The Specification of the ’680 patent does not support Petitioner’s understanding of the plain and ordinary meaning of “target value.” Although the Specification does not recite “target value,” it recites “target state,” and describes “target state” sufficiently to understand the plain and ordinary meaning of “target” as used in “target value” and “target state.” In particular, the ’680 patent explains that “[i]n some embodiments, the process 104 includes receiving, via a network interface, from a remote user device, (e.g., via a command-center server) a command to change a state of a fluid-handling device to a target state.” Ex. 1001, 11:48–51. This portion reflects that the command is seeking to change a state of a fluid-handling device to a target state. In other words, the “target value” or “target state” is not generally “the particular operating condition that a device is in at a particular time”; rather, it is a value or state that the fluid-handling device is desired to be in, as Patent Owner and Dr. Durham explain. Additionally, just as claim 1 recites a directional component for the “target value” to be sent to the controller in a command, so too does the Specification describe a “target state” as being sent in a command from a remote user device. Thus, the Specification clearly supports the plain and ordinary meaning proposed by Patent Owner and Dr. Durham and not the plain and ordinary meaning proposed by Petitioner and Dr. Wooley. slip op. at 14
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable
“time-stamped process data, report exception therein to the remote host, and extract and transmit time-stamped process data to the remote host.” Ex. 1005, Abst. (emphases added). Almadi explains that its remote field systems must include a plurality of controller units “to issue commands to, and gather and process data from a plurality of field devices, including remote systems and instruments, . . . [and] a database server for the storage of process data retrieved from the remote subsystems and instruments.” Id. at 2:22–30 (emphases added). Based on these disclosures, we agree with Patent Owner that Petitioner has not established that Almadi discloses element [1.4]. Specifically, the teachings from Almadi identified by Petitioner refer to process data, which is data retrieved from the remote subsystems/field devices. Thus, we understand that Almadi’s teaching—of using an Ethernet switch to transmit “process data”—describes transmitting data from the remote subsystems/field devices. See Ex. 1005, 3:13–17, cited in Pet. 15. But claim 1 and particularly element [1.4], recites “sending, with the server, the target value to the network address [which identifies a controller of the fluid-handling device13] via the network,” which is different than sending process data from the field devices to the remote host or database server for storage.” slip op. at 19
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 11,175,680 - Tanklogix, LLC v. SiteproInstitution deniedPTAB · Oct 10, 2025 · IPR2025-00650 · APJ Sheila F Mcshane · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood that claims 18–32 and 34 were unpatentable over Kahn or Kahn and Gutierrez.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). Upon consideration of the Petition, the Preliminary Response, and the evidence of record, we determine that Petitioner has not established a reasonable likelihood of prevailing with respect to the unpatentability of at least one claim of the ’871 patent. Accordingly, for the reasons that follow, we decline to institute an inter partes review of claims 18–32 and 34 of the ’871 patent.” slip op. at 2
- Skill levelSkill level patent owner adoptedDecided for patent owner
“The respective proposed levels of qualifications for a person of ordinary skill in the art are similar, with Patent Owner proposing two years of experience compared to Petitioner proposing significant experience with remotely controlling fluid-handling devices, like SCADA systems. Patent Owner also proposes more extensive experience in lieu of educational experience. While we find Petitioner’s proposed qualifications to be acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of skill necessary to understand and implement the teachings of the ’871 patent and the asserted prior art. Our analysis and findings herein, however, do not turn on any differences in the qualifications adopted.” slip op. at 8
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“We determine that we need not expressly construe any claim terms to resolve the parties’ disputes on the current record. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 10
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable
“actuators and the remote control of fluid handling devices, including the receipt with the user-interface module of “a user command to actuate an actuator via a presented control interface” (limitation [18.7]) and “account authorized to send commands to remotely control fluid handling devices” (limitation [18.11]). We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses or teaches these limitations because the evidence does not provide support that there is remote control of fluid handling devices or the use of a user command on a control interface to send a command to a fluid handling device, for instance. Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but we do not discern that it teaches or discloses the capability to remotely control fluid handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, the Kahn disclosures that Petitioner repeatedly relies upon for allegedly teaching this control are deficient. See Ex. 1005, 10:62–67, 14:35– 15:2, 15:62–16:32; see also Pet. 12–14, 16–18. Kahn discloses that “the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance.” Ex. 1005, 10:62–67. Communication unit 112B is part of the local “sensor unit,” wherein the detection conditions determined by the sensor are communicated to remote devices by communication unit 112B. See id. at 3:31–33, 5:62–6:2, 6:27–35, 7:33–37, 13:7–12, Figs. 1A–1C. Kahn discloses that the sensor units, which include communication units 112B, can be located near shut-off valves and can communicate with distant locations. See id. at 11:1–13. There are no disclosures, however, in the above passages that there is remote control of fluid handling devices, that there is a user command on a control interface that actuates an actuator, or that there is a command sent to the facility actuators via a network connection, as required in limitations [18.5]–[18.7] and [18.9]–[18.12], respectively. Rather, the disclosure indicates that the communication unit 112B includes on-site alerts and that the local (non-remote) communication unit 112B can be interfaced with the control valve.” slip op. at 18
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 10,488,871 - Cisco Systems, Inc. v. Portsmouth Network Corp.All claims unpatentablePTAB · Oct 1, 2025 · IPR2024-00506 · APJ Justin T Arbes · IPR · Final written decision
Claims 1, 2, 4–12, and 14–18 are unpatentable as obvious over the combinations of prior art listed in the decision.
RulingsFinal written decision- Obviousness (§103) › Graham factors (scope of art, differences, level of skill)UnpatentableUnpatentable
“d) Conclusion Petitioner has shown sufficiently that Weyman and Li collectively” slip op. at 50
Patent outcomesUS 8,014,394 unpatentable§ 103 obviousnesscites KSR · GrahamPatents in suitUS 8,014,394 - Cisco Systems, Inc. v. Umbra Technologies Ltd.No claims unpatentablePTAB · Aug 28, 2025 · IPR2024-00270 · APJ Gregg I Anderson · IPR · Final written decision
Claims 15–20 were not shown unpatentable because Hankins did not teach limitation 15.3; claims 1–14 were disclaimed.
RulingsFinal written decision- Skill levelSkill level petitioner adoptedDecided for petitioner
“Patent Owner does not dispute Petitioner’s proposal of the level of ordinary skill in the art. PO Resp. 6. Petitioner’s proposal is supported by the Reddy Declaration and is consistent with the ’595 patent and the asserted prior art. Accordingly, we apply Petitioner’s articulation in our obviousness evaluation below.” slip op. at 14
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“B. Claim Construction Beyond plain and ordinary meaning, Petitioner does not propose any term for claim construction. Pet. 13. Patent Owner does not argue any claim construction issue. See generally PO Resp. The argument and evidence provided by the parties regarding limitation 15.3 is dispositive. See Section II.E. below. Our analysis of limitation 15.3 does not turn on any claim construction question. Id. Accordingly, we do not need to construe any claim term. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (noting that “we need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))). We apply the plain and ordinary meaning of all claim terms, as would have been understood by a person of ordinary skill in the art, in the context of the ’595 patent.” slip op. at 14
- Adverse judgmentAdverse judgmentOther
“D. Claims 1–14 as Obvious Over Kommula As already noted, Patent Owner has disclaimed claims 1–14. Ex. 3001. We do not analyze claims 1–14 as the challenge is mooted by the filing of the Statutory Disclaimer.” slip op. at 15
- BurdenNot shown unpatentable
“350 receiving a request for a listing of “services” from a gateway device and provisioning one or more tunnel servers has not been shown to teach generating “a list of available servers.” There is no persuasive evidence to support Petitioner’s assertion. Petitioner relies on unsupported argument because, at best, Hankins discloses gateway devices 311 and 321, each of which is located in different logical broadcast domains, requesting services from one another. Ex. 1005, 12:9–16. This particular disclosure, however, does not appear to implicate the functionality of Hankins’s controller 350, much less result in controller 350 generating a list of available tunnel servers that would allow gateway devices 311 and 312 to exchange a listing of “services” therebetween. Petitioner’s reliance on Hankins’s controller 350 provisioning additional tunnel servers both to improve performance and without human intervention fares no better. Ex. 1005, 25:45–55. There is no indication in Hankins that this provisioning performed by controller 350 is done in response to receiving a request for a list of available tunnel servers from either gateway device 311 or 312.” slip op. at 20
Patent outcomesUS 11,108,595 not shown unpatentableClaim construction§ 103 obviousnesscites KSR · GrahamPatents in suitUS 11,108,595 - Cisco Systems, Inc. v. Umbra Technologies Ltd.All claims unpatentablePTAB · Aug 28, 2025 · IPR2024-00497 · APJ Gregg I Anderson · IPR · Final written decision
Claims 1–20 are unpatentable as obvious over Hankins alone or in the stated combinations with Munger and Treuhaft.
RulingsFinal written decision- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed board ownDecided for petitioner
“Based on the plain language alone, there are “end-to-end tunnels” which “connect[] the first device and the second device” of the network system. In addition, “the person of ordinary skill in the art is deemed to read the claim term not only in the context of the particular claim in which the disputed term appears, but in the context of the entire patent, including the specification.” Phillips, 415 F.3d at 1313. As already noted, the parties appear to agree that the specification does not define explicitly an “end-to-end tunnel.” In describing Figure 33 of the ’505 patent, reproduced above in Section I.D.2, the specification describes Figure 33 as illustrating “GVN Tunnel from LAN to EDP to SRV_AP to EPD to LAN. This variation illustrates an end-to-end GVN tunnel(s) between edges of two LANs via one SRV_AP.” Ex. 1001, 33:8–11 (emphasis added). The specification further describes Figure 33 as showing one tunnel between EPD-1 and AP-1. This is joined to a second tunnel between AP-1 and EPD-2. There are three neutral hops within the Third Layer of the GVN represented by NH1, NH2, and NH3 as compared to the 13 hops on the base Internet between EH3 and EH15. Id. at 33:15–19. This disclosure shows the end-to-end GVN tunnel has two hops, one between EPD-1 and AP-1, and one from AP-1 to EPD-2. The intermediate connection at AP-1 teaches the tunnel may be interrupted, contrary to Patent Owner’s assertion that Figure 33 of the ’505 patent supports a construction requiring the tunnel to be “uninterrupted.” See PO Resp. 9–10; see also Section II.D.2 below (addressing Patent Owner’s “uninterrupted” argument).” slip op. at 19
- Obviousness (§103) › Graham factors (scope of art, differences, level of skill)UnpatentableUnpatentable
“Patent Owner’s assertion that an “intermediate tunnel” is not an “endto-end tunnel. See, e.g., PO Sur-reply 20–21 (arguing Petitioner’s annotated version of Figure 2 of Hankins teaches only “intermediate tunnels”). Given our claim construction supra, we find Hankins’s tunnels are “end-to-end tunnels” even if they are made of separate segments. Based on our final construction, and for the reasons discussed in Section II above, on this complete record we find that Petitioner has shown that Hankins teaches or suggests limitation 1.3. For completeness, we have reviewed Petitioner’s arguments and evidence explaining how Hankins alone or in combination with Munger teaches the remaining limitations of claim 1, and we agree with and adopt Petitioner’s analysis. See Pet. 30–32, 38–44. Accordingly, Petitioner has demonstrated by a preponderance of the evidence that the subject matter of claim 1 would have been obvious over Hankins alone or in combination with Munger.” slip op. at 30
Patent outcomesUS 10,630,505 unpatentableClaim construction§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 10,630,505 - PTAB · Aug 27, 2025 · IPR2025-00565 · APJ St John Courtenay III · IPR · Institution
The Board instituted IPR of claims 1–5 on all five grounds, finding a reasonable likelihood that claim 1 is obvious over Shin.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“review. See 35 U.S.C. § 314 (2018); 37 C.F.R. § 42.4(a) (2022). Under 35 U.S.C. § 314(a), we may not authorize an inter partes review unless the information in the petition and the preliminary response “shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.”” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“Relying on the declaration testimony of Dr. Stern, Petitioner contends that an ordinarily skilled artisan for the ’337 patent “would have had a minimum of a bachelor’s degree in computer engineering, computer science, electrical engineering, or a similar field,” and would have “approximately two years of industry or academic experience in a field related to controlling the audio output of electronic devices.” Pet. 7 (citing Ex. 1002 ¶¶ 30–34). Petitioner further asserts that “[w]ork experience could substitute for formal education and additional formal education could substitute for work experience.” Id.” slip op. at 12
- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed board ownOther
“repeatedly emphasized that an indefinite article “a” or “an” in patent parlance carries the meaning of “one or more” in open-ended claims containing the transitional phrase “comprising.” That “a” or “an” can mean “one or more” is best described as a rule, rather than merely as a presumption or even a convention. The exceptions to this rule are extremely limited: a patentee must “evince[ ] a clear intent” to limit “a” or “an” to “one.” The subsequent use of definite articles “the” or “said” in a claim to refer back to the same claim term does not change the general plural rule, but simply reinvokes that non-singular meaning. SanDisk Corp. v. Kingston Tech. Co., Inc., 695 F.3d 1348, 1360 (Fed. Cir. 2012) (quoting Baldwin Graphic Systems, Inc. v. Siebert, 512 F.3d 1338, 1342 (Fed. Cir. 2008)). These controlling case authorities are applicable here. At this stage, we preliminarily construe the scope of the claim 1[b] term “a user” as covering one or more users. Likewise, we preliminarily construe the scope of the 1[b] phrase “a voice spoken by a user” as covering one or more voices spoken by a single user, or by plural users.” slip op. at 15
- Obviousness (§103) › Graham factors (scope of art, differences, level of skill)Instituted
“under 35 U.S.C. § 103 as obvious over Shin under Ground 2. Pet. 30–35. Petitioner contends that “[i]f [Patent Owner] argues that Shin fails to disclose any limitations [under anticipation Ground 1], such limitations would have been obvious over Shin [under obviousness Ground 2].” Pet. 30. Therefore, we refer to Petitioner’s individual mappings for claim 1 to Shin as set forth under anticipation Ground 1 as also being applicable to obviousness Ground 2, because “anticipation is the epitome of obviousness.” Jones v. Hardy, 727 F.2d 1524, 1529 (Fed. Cir. 1984). We note that under Ground 2, no modifications are required to arrive at the claimed invention. Therefore, no showing of a motivation to modify Shin or a reasonable expectation of success is required. See Unification Techs. LLC v. Micron Tech Inc., 23-1348, 2024 WL 3738401, at *6 (Fed. Cir. Aug. 9, 2024) (nonprecedential). We have also considered the Declaration by Dr. Stern, as cited by Petitioner in support of institution. See Ex. 1002 ¶¶ 107–116.” slip op. at 18
Claim construction§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 11,069,337 - Cisco Systems, Inc. v. Portsmouth Network Corp.No claims unpatentablePTAB · Aug 4, 2025 · IPR2024-00503 · APJ Charles J Boudreau · IPR · Final written decision
Claims 1–18 were not shown unpatentable because the asserted obviousness combinations did not cure the failure to show the claimed request and routing steps.
RulingsFinal written decision- Skill levelSkill level petitioner adoptedDecided for petitioner
“Petitioner contends that a person of ordinary skill in the art in the field of the ’279 patent in January 2001 “would have had a working knowledge of the network communication technologies that are pertinent to the ’279 patent, including network flow allocation in a ring topology.” Pet. 12. More specifically, Petitioner argues, a person of ordinary skill in the art “would have had a master’s degree in computer science, computer engineering, or an equivalent, and two years of professional experience relating to network communications and resource allocations,” where “[a]dditional work experience can substitute for specific educational background, and vice versa.” Id. (citing Ex. 1003 ¶ 20). Patent Owner represents that it “does not dispute Petitioner’s definition” for the purposes of its Response. PO Resp. 5. We find Petitioner’s proposal is consistent with the evidence of record, including the asserted prior art and the ’279 patent, and, therefore, we likewise adopt Petitioner’s proposed definition of the level of ordinary skill in the art for purposes of this Decision.” slip op. at 11
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached
“Neither party contends that any formal claim construction is necessary. See Pet. 12 (“Petitioner submits that, for the purposes of this proceeding and the grounds presented herein, no claim term requires express construction.”); PO Resp. 4 (“Here, at this stage in the proceeding, Patent Owner will apply the ordinary and customary meaning to the ’279 Patent’s claim terms.”). Patent Owner notes, however, that Petitioner had asserted specific constructions in the Cisco litigation for the term “predetermined,” as recited in claims 1, 10, 14–16, and 18, and for the term “quantum.” PO Resp. 4. Specifically, according to Patent Owner, Petitioner proposed that “predetermined” be construed as “determined before the data flow request” and that “quantum” be construed as “an amount of a requested resource by which to increase or decrease.” Id. (citing Ex. 2007). Patent Owner contends asserted prior art combinations disclose or render obvious the challenged claims under these constructions. Id. Because our conclusion that Petitioner has not demonstrated that any of the challenged claims are unpatentable does not turn on the construction of either “predetermined” or “quantum,” there is no need for us to construe those terms. See Realtime Data, 912 F.3d at 1375.” slip op. at 12
- Strike new argumentNew argument disregardedDecided for patent owner
“We again are not persuaded by Petitioner’s argument. As an initial matter, we find no argument with respect to “best effort data traffic” or dropped packets in the Petition. See Tr. 12:10–21 (conceding that “the phrase ‘best effort’ was not in the Petition” but arguing that it was raised in response to the Patent Owner Response). Moreover, we are unable to identify any argument in the Patent Owner Response to which this line of argument is properly responsive, and Petitioner does not identify any such line of argument. Instead, Petitioner’s argument appears to advance belatedly a new theory. See 37 C.F.R. § 42.23(b); Patent Trial and Appeal Board Consolidated Trial Practice Guide (Nov. 2019), 73–74, available at” slip op. at 43
- Expert testimonyPatent owner expert creditedPetitioner expert discountedMixed
“We credit the supporting testimony of Dr. Olivier on the points discussed above, as it is explained sufficiently and consistent with the testimony simply mirrors the Petition and does not explain sufficiently why a person of ordinary skill in the art would have understood Kovvali in the manner Petitioner asserts. See Pet. 35; Reply 17–18; Ex. 1003 ¶ 83.” slip op. at 44
Patent outcomesUS 7,035,279 not shown unpatentableClaim construction§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 7,035,279
Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.