  • PTAB · Feb 19, 2026 · IPR2024-01258 · APJ Kristen L Droesch · IPR · Final written decision

    Claims 1, 2, 4–7, and 9–14 are unpatentable; claims 3 and 8 are not shown unpatentable, principally because the Inoue–Smith obviousness rationale was insufficient.

    RulingsFinal written decision
    • BurdenFwd mixedMixed

      “found either expressly or inherently in a single prior art reference.’” King Pharm., Inc. v. Eon Labs, Inc., 616 F.3d 1267, 1274 (Fed. Cir. 2010) (quoting Celeritas Techs. Ltd. v. Rockwell Int’l Corp., 150 F.3d 1354, 1360 (Fed. Cir. 1998)). “Anticipation requires the presence in a single prior art disclosure of all elements of a claimed invention arranged as in the claim.” Therasense, Inc. v. Becton, Dickinson & Co., 593 F.3d 1325, 1332 (Fed. Cir. 2010) (quoting Connell v. Sears, Roebuck & Co., 722 F.2d 1542, 1548 (Fed. Cir. 1983)). A claim is unpatentable under 35 U.S.C. § 103 if the differences between the claimed subject matter and the prior art are such that the subject matter, as a whole, would have been obvious at the time the invention was made to a person having ordinary skill in the art to which the subject matter pertains. KSR Int’l Co. v. Teleflex Inc., 550 U.S. 398, 406 (2007). The question of obviousness is resolved on the basis of underlying factual determinations, including: (1) the scope and content of the prior art; (2) any differences between the claimed subject matter and the prior art; (3) the level of skill in the art; and (4) if in evidence, so-called secondary considerations. Graham v. John Deere Co., 383 U.S. 1, 17–18 (1966).” slip op. at 11

    • Strike new argumentNew argument disregardedDecided for patent owner

      “We do not agree with Petitioner that the fact pattern before us is analogous to Rembrandt. The rationale to combine the teachings of Inoue and Smith provided in the Petition focuses on replacing incandescent bulbs with LEDs, and includes the generic statement that “[t]he numerous record-supported advantages, set forth in Smith provide a clear motivation for use of the teachings of Smith as applied to Inoue, so as to enjoy the advantages set forth in Smith.” Pet. 47. The testimony in Dr. Schubert’s Declaration at pages 99–100 cited in support of Petitioner’s Reply arguments was not cited or otherwise referenced in the Petition. See Pet. 46–55. We find that the Petitioner’s Reply is not responsive to the Institution Decision and is improper because it presents a new rationale to combine the teachings of Inoue and Smith that was not expressed in the Petition. See 37 C.F.R. § 42.23; CTPG § II.I. Petitioner could have presented its rationale to make out a prima facie case of unpatentability in the Petition. See 37 C.F.R. § 42.23; CTPG § II.I. Accordingly, we do not consider Petitioner’s new rationale to combine the teachings of Inoue and Smith presented for the first time in the Reply. Based on the entire record, but not including Petitioner’s new rationale and newly cited support to Smith and Dr. Schubert’s testimony (Exs. 1013, 1017) presented for the first time in the Reply, we are not persuaded that Petitioner sets forth in the Petition sufficient articulated reasoning with rational underpinning to support the conclusion that it would have been obvious to one of ordinary skill in the art to modify the circuit of Inoue to include a light source or LED light source with a twinkling or flashing effect in view of Smith’s teachings. See Pet. 46–47, 49–50, 51–53, 55. Accordingly, we determine that Petitioner has not demonstrated by a preponderance of the evidence that the subject matter of independent claim 9 and dependent claims 3, 5, and 6 would have been obvious over the teachings of Inoue and Smith.” slip op. at 32

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundMotivation not foundMixed

      “Based on Petitioner’s citations to Holler, Inoue, and Dr. Schubert’s testimony (Ex. 1013), we are persuaded Petitioner sets forth sufficient articulated reasoning with rational underpinning to support the conclusion that it would have been obvious to one of ordinary skill in the art to “use the resistive value as taught by Holler in the circuit of Inoue to control the illumination of the light sources so that the other illumination devices in the serial light string will not go dark or change illumination if one of the LEDs fails or becomes disconnected.” Pet. 27; see KSR, 550 U.S. at 418. Based on the entire record and including the reasons explained above in Section II.D.2. addressing anticipation of claim 1 by Inoue, we determine Petitioner shows by a preponderance of the evidence that the subject matter of claims 1 and 10 would have been obvious over Inoue and Holler. See Pet. 26–32.” slip op. at 18

    • Novelty / Anticipation (§102) › Priority / effective filing date / continuation supportReference is prior artPriority date, deniedDecided for petitioner

      “We observe that, aside from Declaration testimony of Mr. Altamura and accompanying exhibits, Patent Owner does not offer any additional evidence to establish reduction to practice. An inventor’s testimonial assertion of inventive facts requires corroboration by independent evidence. Brown v. Barbacid, 276 F.3d 1327, 1335 (Fed. Cir. 2002). The purpose of the corroboration requirement is to prevent fraud, by providing independent confirmation of the inventor’s testimony. Kridl v. McCormick, 105 F.3d 1446, 1450 (Fed. Cir. 1997). Without the requirement of independent corroboration, there would be a great temptation to commit perjury and the adverse party would be effectively precluded from a successful rebuttal. Price v. Symsek, 988 F.2d 1187, 1194–95 (Fed. Cir. 1993). A rule of reason applies to determining whether the inventor’s testimony has been corroborated. See id. at 1195. “The rule of reason, however, does not dispense with the requirement for some evidence of independent corroboration.” Coleman v. Dines, 754 F.2d 353, 360 (Fed. Cir. 1985). Accordingly, based on the entire record, we find that Mr. Altamura’s Declaration testimony is uncorroborated. Yu is prior art to the ’252 Patent because Patent Owner is unable to establish actual reduction to practice earlier than the July 31, 2006, filing date of Yu.” slip op. at 51

    Patent outcomesUS 11,096,252 mixed
    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,096,252
  • PTAB · Feb 19, 2026 · IPR2024-01259 · APJ Kristen L Droesch · IPR · Final written decision

    Claims 1, 2, 4–7, and 9–15 are unpatentable; claims 3 and 8 are not shown unpatentable, principally because the Petition lacked a sufficient motivation to combine Inoue and Smith.

    RulingsFinal written decision
    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededDecided for patent owner

      “We do not agree with Patent Owner’s argument because it advocates for the importation of functional limitations from the ’794 Patent Specification into the claims––namely the disclosure that the bypass circuit continues to conduct electricity, and keeps the remaining lights lit, even when one or more individual lighting elements in the series are burned out, missing, or defective. See PO Resp. 7–9. It is well settled that it is improper to read an extraneous limitation into a claim from the specification. See e.g., Commark Comm’s Inc. v. Harris Corp., 156 F.3d 1182, 1186 (Fed. Cir. 1998); E.I. du Pont de Nemours & Co. v. Phillips Petroleum Co., 849 F.2d 1430, 1433 (Fed. Cir. 1988). An extraneous limitation is “a limitation read into a claim from the specification wholly apart from any need to interpret what the patentee meant by particular words or phrases in the claim.” E.I. du Pont de Nemours, 849 F.2d at 1433. Moreover, the language that Patent Owner wishes to import into the claim from the Specification is functional language that describes the function of the resistor bypass circuit. As explained below in the section addressing the subsequent claim recitation “conducting current at all times across the light sources when current is flowing through the circuit regardless of whether the LED light source are conducting current therethrough,” functional language is evaluated in view of the applied prior art to determine whether it imparts additional structure to distinguish the claimed invention over the prior art. Accordingly, to the extent the preamble recitation is limiting, we need not provide an express construction for “[a] resistor bypass circuit for a series lighting circuit.”” slip op. at 7

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITADecided for patent owner

      “We understand the term “inherent resistance” to mean the resistance at a particular operating current or voltage across the LED light source. Neither party disputes our understanding of the term “inherent resistance.” See Dec. on Inst. 9–10; PO Resp. 7–9; Pet. Reply.” slip op. at 10

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “bachelor’s degree in electrical engineering, physics, materials science, or a related discipline, and four years of practical experience in designing or fabricating LED lighting systems, including controlling and driving LEDs,” or alternatively “would have had a master’s degree and three years of experience, or a Ph.D. degree and two years of experience.” Ex. 1013, 31 ¶ 3; see also Pet. 18. Patent Owner does not dispute Petitioner’s proposed definition of a person of ordinary skill in the art for the purpose of institution. See PO Resp. 2. We adopt Petitioner’s definition of a person of ordinary skill in the art because it is consistent with the level of skill reflected by the ’794 Patent Specification and the asserted prior art.” slip op. at 11

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)UnpatentableUnpatentable

      “We do not agree with Patent Owner’s arguments because, as explained above in Section II.A., we decline to import functional language into the claim from the Specification to construe the preamble recitation as requiring the function of “continu[ing] to conduct electricity and keeps the remaining lights lit, even when one more individual lighting elements in the series are out, loose, broken, missing/removed, or defective.” Having considered both parties’ arguments and corresponding cited supporting evidence, we are persuaded that Inoue discloses each of the limitations of claim 1. Based on the entire record, we determine Petitioner shows by a preponderance of the evidence that claim 1 is anticipated by Inoue. See Pet. 25–26.” slip op. at 14

    Patent outcomesUS 11,533,794 mixed
    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,533,794
  • PTAB · Oct 10, 2025 · IPR2025-00653 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution on all claims because the Petition did not show a reasonable likelihood that any challenged claim was unpatentable over the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “An inter partes review may be instituted only if “the information presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’504 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Additionally, only terms that are in controversy need to be construed, and these need be construed only to the extent necessary to resolve the controversy. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 9; Prelim. Resp. 4 (citing Ex. 2009 ¶ 72); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13

    • Expert testimonyPetitioner expert discountedDecided for patent owner

      “Ex. 1002 ¶ 47. As reflected above, Dr. Wooley’s testimony as to element [1.2] does not even assert that Cardamone discloses a tank, let alone one or more sensors disposed at a tank as recited in element [1.2]. Thus, Dr. Wooley’s testimony does not support Petitioner’s argument on this issue.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,726,504
  • PTAB · Oct 10, 2025 · IPR2025-00652 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–23 and 25–30 were unpatentable over the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’403 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 10; Prelim. Resp. 4 (citing Ex. 2009 ¶ 73); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses element [1.2] because the evidence cited does not disclose a “first computer system being configured to provide remote control of the first pump or first valve” (i.e., a fluid-handling device). Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but Petitioner has not identified any disclosure of the capability to remotely control fluid-handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, Kahn’s disclosures that Petitioner relies on for allegedly teaching remote control are deficient. We discuss each. First, Petitioner points to the following, “[f]or instance, as illustrated in FIG. 1C, a fluid control device such as a valve 15A is located on the input side of a sen[s]or unit 110.” Ex. 1005, 8:19–21, cited in Pet. 13. This portion of Kahn, however, does not disclose remote control. Second, Petitioner cites to the following: Finally, or in addition to, the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance. Pet. 13 (citing Ex. 1005, 10:62–67). We agree with Patent Owner that this portion of Kahn teaches on-site alerts and local control of the fluid-handling device. See Prelim. Resp. 7. This portion of Kahn does not disclose remote control.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,294,403
  • PTAB · Oct 10, 2025 · IPR2025-00651 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–3, 6, 7, and 9–20 were unpatentable over any asserted ground.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’680 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 11

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner

      “target value” is part of a command that is sent from a computing device to a server and then to a controller. The controller then receives a measurement of the fluid by a sensor and determines whether the measurement satisfies the “target value.” If the measurement does not satisfy the “target value,” further operations are undertaken. The recited operation sequence makes clear that the plain and ordinary meaning of “target value” is not as Dr. Wooley opines because the particular operating condition that a device is in at a particular time is represented by the measurement taken by the sensor, 11 Some claim language less relevant to construing “target value” was omitted for ease of reference. which the controller then uses to determine whether the measurement satisfies the “target value.” Additionally, claim 1 recites that the “target value” is sent as part of a command to the controller. The “target value” is not sent to the controller from the sensor, as might be expected if the plain and ordinary meaning of “target value” were as Dr. Wooley opines. Petitioner and Dr. Wooley’s construction would also result in “target value” meaning effectively the same thing as the measurement of the fluid by the sensor, a concept that is separately recited in claim 1 and to which the “target value” is compared. The Specification of the ’680 patent does not support Petitioner’s understanding of the plain and ordinary meaning of “target value.” Although the Specification does not recite “target value,” it recites “target state,” and describes “target state” sufficiently to understand the plain and ordinary meaning of “target” as used in “target value” and “target state.” In particular, the ’680 patent explains that “[i]n some embodiments, the process 104 includes receiving, via a network interface, from a remote user device, (e.g., via a command-center server) a command to change a state of a fluid-handling device to a target state.” Ex. 1001, 11:48–51. This portion reflects that the command is seeking to change a state of a fluid-handling device to a target state. In other words, the “target value” or “target state” is not generally “the particular operating condition that a device is in at a particular time”; rather, it is a value or state that the fluid-handling device is desired to be in, as Patent Owner and Dr. Durham explain. Additionally, just as claim 1 recites a directional component for the “target value” to be sent to the controller in a command, so too does the Specification describe a “target state” as being sent in a command from a remote user device. Thus, the Specification clearly supports the plain and ordinary meaning proposed by Patent Owner and Dr. Durham and not the plain and ordinary meaning proposed by Petitioner and Dr. Wooley. slip op. at 14

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “time-stamped process data, report exception therein to the remote host, and extract and transmit time-stamped process data to the remote host.” Ex. 1005, Abst. (emphases added). Almadi explains that its remote field systems must include a plurality of controller units “to issue commands to, and gather and process data from a plurality of field devices, including remote systems and instruments, . . . [and] a database server for the storage of process data retrieved from the remote subsystems and instruments.” Id. at 2:22–30 (emphases added). Based on these disclosures, we agree with Patent Owner that Petitioner has not established that Almadi discloses element [1.4]. Specifically, the teachings from Almadi identified by Petitioner refer to process data, which is data retrieved from the remote subsystems/field devices. Thus, we understand that Almadi’s teaching—of using an Ethernet switch to transmit “process data”—describes transmitting data from the remote subsystems/field devices. See Ex. 1005, 3:13–17, cited in Pet. 15. But claim 1 and particularly element [1.4], recites “sending, with the server, the target value to the network address [which identifies a controller of the fluid-handling device13] via the network,” which is different than sending process data from the field devices to the remote host or database server for storage.” slip op. at 19

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,175,680
  • Tanklogix, LLC v. SiteproInstitution denied
    PTAB · Oct 10, 2025 · IPR2025-00650 · APJ Sheila F Mcshane · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 18–32 and 34 were unpatentable over Kahn or Kahn and Gutierrez.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). Upon consideration of the Petition, the Preliminary Response, and the evidence of record, we determine that Petitioner has not established a reasonable likelihood of prevailing with respect to the unpatentability of at least one claim of the ’871 patent. Accordingly, for the reasons that follow, we decline to institute an inter partes review of claims 18–32 and 34 of the ’871 patent.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The respective proposed levels of qualifications for a person of ordinary skill in the art are similar, with Patent Owner proposing two years of experience compared to Petitioner proposing significant experience with remotely controlling fluid-handling devices, like SCADA systems. Patent Owner also proposes more extensive experience in lieu of educational experience. While we find Petitioner’s proposed qualifications to be acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of skill necessary to understand and implement the teachings of the ’871 patent and the asserted prior art. Our analysis and findings herein, however, do not turn on any differences in the qualifications adopted.” slip op. at 8

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “We determine that we need not expressly construe any claim terms to resolve the parties’ disputes on the current record. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 10

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “actuators and the remote control of fluid handling devices, including the receipt with the user-interface module of “a user command to actuate an actuator via a presented control interface” (limitation [18.7]) and “account authorized to send commands to remotely control fluid handling devices” (limitation [18.11]). We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses or teaches these limitations because the evidence does not provide support that there is remote control of fluid handling devices or the use of a user command on a control interface to send a command to a fluid handling device, for instance. Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but we do not discern that it teaches or discloses the capability to remotely control fluid handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, the Kahn disclosures that Petitioner repeatedly relies upon for allegedly teaching this control are deficient. See Ex. 1005, 10:62–67, 14:35– 15:2, 15:62–16:32; see also Pet. 12–14, 16–18. Kahn discloses that “the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance.” Ex. 1005, 10:62–67. Communication unit 112B is part of the local “sensor unit,” wherein the detection conditions determined by the sensor are communicated to remote devices by communication unit 112B. See id. at 3:31–33, 5:62–6:2, 6:27–35, 7:33–37, 13:7–12, Figs. 1A–1C. Kahn discloses that the sensor units, which include communication units 112B, can be located near shut-off valves and can communicate with distant locations. See id. at 11:1–13. There are no disclosures, however, in the above passages that there is remote control of fluid handling devices, that there is a user command on a control interface that actuates an actuator, or that there is a command sent to the facility actuators via a network connection, as required in limitations [18.5]–[18.7] and [18.9]–[18.12], respectively. Rather, the disclosure indicates that the communication unit 112B includes on-site alerts and that the local (non-remote) communication unit 112B can be interfaced with the control valve.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 10,488,871
  • PTAB · Oct 6, 2025 · IPR2024-00432 · APJ Frederick C Laney · IPR · Final written decision

    Claims 1–20 are unpatentable: claims 1–3, 8, 9, 11–13, 18, and 19 as anticipated or obvious over Zhang; the remaining claims as obvious over the listed combinations.

    RulingsFinal written decision
    • Expert testimonyOther

      “and digital selector 240 disclosed by Zhang is “digital circuitry,” which is configured to receive a plurality of frequencies comprising a plurality of desired/undesired television channels from ADC 220 and to output the desired television channels to demodulators 250 as a digital datastream. Tr. 71:14–17 (PO Counsel: “There is no dispute that in both Zhang and the patent, an RF signal that has both desired and undesired channel comes in and what’s sent to demodulators are desired channels. Nobody is disputing that.”), 134:3–5 (PO Counsel: “The issue is not whether the black box 230- plus-240 is the digital circuitry. It is. The issue is not whether or not that overall circuitry selects channels. At some level, it does.”). In other words, Zhang teaches digital circuitry that is (1) capable of receiving a plurality of frequencies including desired/undesired television channels and (2) capable of distinguishing between the desired/undesired channels to output the desired television channels to a demodulator. We find these uncontested facts to be highly probative of Petitioner’s contention that, to a skilled artisan, Zhang suggests that its digital circuitry is capable of selecting the desired television channels from a digitized plurality of frequencies that include both desired/undesired television channels. This is because Zhang’s digital circuitry is able to take what is input originally as a digitized plurality of frequencies having both desired/undesired television channels and, using those frequencies, pick out the desired television channels that are subsequently output to a demodulator. Zhang teaches that “because only the selected channels are later demodulated” the disclosed digital circuitry is “much faster than traditional analog channel switching through RF tuners” and it “dissipates less heat because fewer resources are required when demodulating only the selected RF channels.” Ex. 1013 ¶ 28 (emphasis added).” slip op. at 22

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “ordinary and customary meaning to a POSITA.” Pet. 21. Although Petitioner proposes corresponding structure for the term “digital circuitry” recited in claim 1, it does so only “[t]o the extent” that term “is construed to be a means-plus-function term under 35 U.S.C. 112, paragraph 6.” Id. at 22. But Petitioner does not argue or suggest that “digital circuitry” should be construed as a means-plus-function term; nor does Petitioner make an argument to overcome the presumption that 35 U.S.C. § 112, paragraph 6, does not apply. See id. Patent Owner does not address claim construction. See generally PO Resp. Because neither party actually argues “digital circuitry” is a means-plus-function term, the presumption holds and we determine that no claim term requires express interpretation to resolve any controversy in this proceeding. See Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999).” slip op. at 8

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)UnpatentableUnpatentable
    • Obviousness (§103) › Graham factors (scope of art, differences, level of skill)UnpatentableUnpatentable
    Patent outcomesUS 9,210,362 unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips
    Patents in suitUS 9,210,362
  • PTAB · Oct 1, 2025 · IPR2024-00438 · APJ Michelle N Wormmeester · IPR · Final written decision

    Claims 1–76 are unpatentable: Zhang anticipates or renders some claims obvious, and the other challenged claims are obvious over combinations including Zhang.

    RulingsFinal written decision
    • BurdenFwd all claims unpatentableUnpatentable

      “IV. CONCLUSION For the reasons given, Petitioner has demonstrated by a preponderance of the evidence that claims 1–76 of the ’206 patent are unpatentable as follows.6” slip op. at 48

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Petitioner asserts that “[a]ll claim terms herein should be given their ordinary and customary meaning to a POSITA.” Pet. 18. Patent Owner does not respond. See PO Resp. For purposes of this Decision, we determine that no claim term requires express interpretation to resolve any controversy in this proceeding. See Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999).” slip op. at 8

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)UnpatentableUnpatentable

      “B. Asserted Challenges Based on Zhang Alone Petitioner asserts that claims 1, 3–7, 9, 11, 13, 15–19, 21, 23, 25, 27– 31, 33–35, 38, 40–44, and 46–48 of the ’206 patent are anticipated by Zhang. Pet. 19–45. Petitioner also asserts that these claims would have been obvious over Zhang. Id. Patent Owner disputes certain aspects of Petitioner’s analysis. PO Resp. 3–50. For the reasons explained below, we determine that Petitioner has demonstrated by a preponderance of the evidence that claims 1, 3–7, 9, 11, 13, 15–19, 21, 23, 25, 27–31, 33–35, 38, 40–44, and 46–48 are anticipated by Zhang or would have been obvious over Zhang.” slip op. at 8

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successUnpatentableMotivation foundUnpatentable

      “system may include a digital video recorder (DVR).” Id. at 45–46 (citing Ex. 1052 ¶¶ 5, 43, 48, 60, 73, 98, 112, 118, 191, 197, 212, 281–285, 296, 546). According to Petitioner, “[a] POSITA would have been motivated to include Reisman’s DVR in Zhang’s STB to provide a more feature-filled and individualized user experience, which in the proposed combination still includes Zhang’s wideband front-end receiver components cited for performing Elements [25A]–[25E].” Id. at 46. Petitioner explains that “Reisman’s DVR improves user experience and flexibility by allowing timeshifted and on-demand viewing, and enabling replay and trick-play (fast forwarding, rewinding, and pausing) of live programming.” Id. (citing Ex. 1052 ¶¶ 191, 197, 212, 284); see also id. at 46–47 (asserting that “[a]dding Reisman’s DVR to Zhang’s system would have been nothing more [than] applying a known technique of integrating a DVR into a set-top box . . . to a known STB . . . that was ready for improvement to yield a predictable result” and that “[a] POSITA would have had a reasonable expectation of success”). Patent Owner does not specifically dispute Petitioner’s contentions in this regard. See PO Resp. Based on Petitioner’s argument and evidence (see Pet. 45–47), we find Petitioner’s proposed combination of Zhang and Reisman teaches all the limitations of claims 25 and 38. We also find that Petitioner’s proffered reasoning for combining Zhang and Reisman supports a legal conclusion of obviousness. See In re Kahn, 441 F.3d 977, 988 (Fed. Cir. 2006) (“[T]here must be some articulated reasoning with some rational underpinning to support the legal conclusion of obviousness.”).” slip op. at 40

    Patent outcomesUS 11,399,206 unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips
    Patents in suitUS 11,399,206
  • PTAB · Sep 29, 2025 · IPR2024-00435 · APJ Michelle N Wormmeester · IPR · Final written decision

    Claims 1–82 are unpatentable: claims are anticipated by Zhang or obvious over Zhang, Zhang with Reisman, Zhang with Jackson, or the listed combinations with Pandey.

    RulingsFinal written decision
    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “using the same claim construction standard that would be used to construe the claim in a civil action under 35 U.S.C. 282(b).” See 37 C.F.R. § 42.100(b). That standard involves construing claims in accordance with the ordinary and customary meaning of such claims as would have been understood by a person of ordinary skill in the art (“POSITA”) and the prosecution history pertaining to the patent. See id.; Phillips v. AWH Corp., 415 F.3d 1303, 1312–14 (Fed. Cir. 2005) (en banc). Petitioner asserts that “[a]ll claim terms herein should be given their ordinary and customary meaning to a POSITA.” Pet. 16. Patent Owner does not respond. See PO Resp. For purposes of this Decision, we determine that no claim term requires express interpretation to resolve any controversy in this proceeding. See Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999). slip op. at 8

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)UnpatentableUnpatentable

      “We agree with Petitioner. Claim 1 recites “the DFE is configured to concurrently select and provide each of the plurality of desired channels . . . without providing any of the plurality of undesired channels.” The claim expressly covers both selecting desired channels and providing desired channels. By reciting “without providing any of the plurality of undesired channels,” the claim expressly excludes providing undesired channels; it does not exclude selecting undesired channels. Thus, the claim covers selecting both desired and undesired channels.” slip op. at 16

    • Obviousness (§103) › Graham factors (scope of art, differences, level of skill)UnpatentableUnpatentable

      “Patent Owner argues that Zhang’s PVR is not a ‘DVR’ as recited in Elements [27D] and [41D], Reisman discloses this feature.” Pet. 50. Petitioner asserts that “Reisman teaches that STBs in a cable system may include a digital video recorder (DVR).” Id. (citing Exc. 1052 ¶¶ 5, 43, 48, 60, 73, 98, 112, 118, 191, 197, 212, 281–285, 296, 546). According to Petitioner, an ordinarily skilled artisan “would have been motivated [to] include Reisman’s DVR in Zhang’s STB to provide a more feature-filled and individualized user experience, which in the proposed combination still includes Zhang’s wideband front-end receiver components cited for Elements [27A]–[27C] and [41A]–[41C].” Id. Petitioner explains that “Reisman’s DVR improves user experience by allowing time-shifted and ondemand view, and enabling, e.g., fast-forwarding, rewinding, and pausing of live programming.” Id. (citing Ex. 1052 ¶¶ 191, 197, 212, 284–285, 546, 758); see also id. at 50–51 (asserting that the proposed combination “merely applies a known technique of integrating a DVR into a STB . . . to a known STB . . . that was ready for improvement to yield a predictable result” and that an ordinarily skilled artisan “would have had a reasonable expectation of success”). Patent Owner does not specifically dispute Petitioner’s contentions in this regard. See PO Resp. Based on Petitioner’s argument and evidence (see Pet. 50–51), we find Petitioner’s proposed combination of Zhang and Reisman teaches all the limitations of claims 27 and 41. We also find that Petitioner’s proffered reasoning for combining Zhang and Reisman supports a legal conclusion of obviousness. See In re Kahn, 441 F.3d 977, 988 (Fed. Cir. 2006) (“[T]here must be some articulated reasoning with some rational underpinning to support the legal conclusion of obviousness.”).” slip op. at 37

    Patent outcomesUS 11,381,866 unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips
    Patents in suitUS 11,381,866
  • PTAB · Apr 29, 2025 · IPR2025-00180 · APJ Scott B Howard · IPR · Institution

    The Board instituted IPR of claims 1–20 on all asserted grounds, finding a reasonable likelihood that Comcast would prevail on at least one challenged claim.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “determine whether to institute an inter partes review. 35 U.S.C. § 314 (2024); 37 C.F.R. § 42.4(a) (2024). Inter partes review may not be instituted unless “the information presented in the petition filed under [35 U.S.C.] section 311 and any response filed under [35 U.S.C.] section 313 shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). “When instituting inter partes review, the Board will authorize the review to proceed on all of the challenged claims and on all grounds of unpatentability asserted for each claim.” 37 C.F.R. § 42.108(a). For the reasons set forth below, upon considering the briefing and the evidence of record, we determine that the information presented in the Petition establishes a reasonable likelihood that Petitioner will prevail with respect to at least one of the challenged claims. Accordingly, we institute inter partes review on all of the challenged claims based on all of the grounds identified in the Petition.” slip op. at 2

    • Parallel petitionsDenied

      “We do not agree with Patent Owner that Petitioner’s filing of three parallel petitions is grounds to deny all three petitions on that basis alone. Petitioner has complied with our guidance by filing a statement ranking the petitions. See Practice Guide, 59–60. For reasons discussed in our concurrent Decisions Denying Institution in IPR2025-00181 and IPR2025- meaning does not resolve the parties’ dispute.”). Claim construction arguments should not be relegated to patentability arguments on the facts. warranted. Given our Decisions to Deny Institution in IPR2025-00181 and IPR2025-00182 and the official guidance we have received in the Practice Guide, we have no option but to deny Patent Owner’s request that we exercise our discretion to deny institution on all three of the petitions challenging the ’275 patent. Accordingly, we do not exercise our discretion to the deny institution in the instant proceeding. E. Anticipation of Claim 1 by Zhang” slip op. at 10

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Patent Owner does not address the level of skill. See Prelim. Resp. Because Petitioner’s proposed level of ordinary skill in the art is consistent with the field of the invention of the ’275 patent and not disputed by Patent Owner, for purposes of this Decision, we adopt Petitioner’s formulation of the person having ordinary skill in the art.7 7 If Patent Owner disagrees with this formulation of the level of skill in the art, it must raise that disagreement in its Response. If a different level of skill would affect the outcome in this case, the parties must brief that issue as well. The failure of Patent Owner to describe how a different level of skill in the art is determinative will be a forfeiture of that argument. If there is a dispute regarding the level of ordinary skill in the art, then the parties are also encouraged to submit evidence, other than conclusory expert testimony, that supports their position. See 37 C.F.R § 42.65(a) (“Expert testimony that does not disclose the underlying facts or data on which the opinion is based is entitled to little or no weight.”).” slip op. at 8

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “Petitioner states that all of the limitations “should be given their ordinary and customary meaning to a” person having ordinary skill in the art. Pet. 19. Although Petitioner argues that none of the limitations are means-plus-function terms, Petitioner provides constructions to the extent that there are means-plus-function terms. Pet. 19–20. Patent Owner does not respond. See Prelim. Resp. For the purposes of this Decision, we need not expressly construe any claim terms.8 See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor 8 If either party intends to argue a claim construction at trial, including what is the plain and ordinary meaning of a term, they should do so in a clearly designated section of their briefing. See Patent Trial and Appeal Board Consolidated Trial Practice Guide (Nov. 21, 2019) (“Practice Guide”), 46, 49 (available at https://www.uspto.gov/TrialPracticeGuideConsolidated); O2 Micro Int’l Ltd. v. Beyond Innovation Tech. Co., 521 F.3d 1351, 1361 (Fed. Cir. 2008) (“A determination that a claim term ‘needs no construction’ or has the ‘plain and ordinary meaning’ may be inadequate when a term has more than one ‘ordinary’ meaning or when reliance on a term’s ‘ordinary’ construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))). D. Parallel Petitions” slip op. at 9

    Claim construction§ 102 anticipationDiscretionary denialcites Phillips · KSR · Graham
    Patents in suitUS 11,785,275
Page 1 of 13
← Previous12345…Next →

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.