- Tanklogix, LLC v. Sitepro, Inc.Institution deniedPTAB · Oct 10, 2025 · IPR2025-00653 · APJ Bart A Gerstenblith · IPR · Institution
The Board denied institution on all claims because the Petition did not show a reasonable likelihood that any challenged claim was unpatentable over the asserted grounds.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“An inter partes review may be instituted only if “the information presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2
- Skill levelSkill level patent owner adoptedDecided for patent owner
“The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’504 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“Additionally, only terms that are in controversy need to be construed, and these need be construed only to the extent necessary to resolve the controversy. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 9; Prelim. Resp. 4 (citing Ex. 2009 ¶ 72); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13
- Expert testimonyPetitioner expert discountedDecided for patent owner
“Ex. 1002 ¶ 47. As reflected above, Dr. Wooley’s testimony as to element [1.2] does not even assert that Cardamone discloses a tank, let alone one or more sensors disposed at a tank as recited in element [1.2]. Thus, Dr. Wooley’s testimony does not support Petitioner’s argument on this issue.” slip op. at 18
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 11,726,504 - Tanklogix, LLC v. Sitepro, Inc.Institution deniedPTAB · Oct 10, 2025 · IPR2025-00652 · APJ Bart A Gerstenblith · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–23 and 25–30 were unpatentable over the asserted grounds.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied
“presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2
- Skill levelSkill level patent owner adoptedDecided for patent owner
“The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’403 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 10; Prelim. Resp. 4 (citing Ex. 2009 ¶ 73); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable
“We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses element [1.2] because the evidence cited does not disclose a “first computer system being configured to provide remote control of the first pump or first valve” (i.e., a fluid-handling device). Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but Petitioner has not identified any disclosure of the capability to remotely control fluid-handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, Kahn’s disclosures that Petitioner relies on for allegedly teaching remote control are deficient. We discuss each. First, Petitioner points to the following, “[f]or instance, as illustrated in FIG. 1C, a fluid control device such as a valve 15A is located on the input side of a sen[s]or unit 110.” Ex. 1005, 8:19–21, cited in Pet. 13. This portion of Kahn, however, does not disclose remote control. Second, Petitioner cites to the following: Finally, or in addition to, the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance. Pet. 13 (citing Ex. 1005, 10:62–67). We agree with Patent Owner that this portion of Kahn teaches on-site alerts and local control of the fluid-handling device. See Prelim. Resp. 7. This portion of Kahn does not disclose remote control.” slip op. at 18
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 11,294,403 - Tanklogix, LLC v. Sitepro, Inc.Institution deniedPTAB · Oct 10, 2025 · IPR2025-00651 · APJ Bart A Gerstenblith · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–3, 6, 7, and 9–20 were unpatentable over any asserted ground.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied
“presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2
- Skill levelSkill level patent owner adoptedDecided for patent owner
“The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’680 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 11
- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner
“target value” is part of a command that is sent from a computing device to a server and then to a controller. The controller then receives a measurement of the fluid by a sensor and determines whether the measurement satisfies the “target value.” If the measurement does not satisfy the “target value,” further operations are undertaken. The recited operation sequence makes clear that the plain and ordinary meaning of “target value” is not as Dr. Wooley opines because the particular operating condition that a device is in at a particular time is represented by the measurement taken by the sensor, 11 Some claim language less relevant to construing “target value” was omitted for ease of reference. which the controller then uses to determine whether the measurement satisfies the “target value.” Additionally, claim 1 recites that the “target value” is sent as part of a command to the controller. The “target value” is not sent to the controller from the sensor, as might be expected if the plain and ordinary meaning of “target value” were as Dr. Wooley opines. Petitioner and Dr. Wooley’s construction would also result in “target value” meaning effectively the same thing as the measurement of the fluid by the sensor, a concept that is separately recited in claim 1 and to which the “target value” is compared. The Specification of the ’680 patent does not support Petitioner’s understanding of the plain and ordinary meaning of “target value.” Although the Specification does not recite “target value,” it recites “target state,” and describes “target state” sufficiently to understand the plain and ordinary meaning of “target” as used in “target value” and “target state.” In particular, the ’680 patent explains that “[i]n some embodiments, the process 104 includes receiving, via a network interface, from a remote user device, (e.g., via a command-center server) a command to change a state of a fluid-handling device to a target state.” Ex. 1001, 11:48–51. This portion reflects that the command is seeking to change a state of a fluid-handling device to a target state. In other words, the “target value” or “target state” is not generally “the particular operating condition that a device is in at a particular time”; rather, it is a value or state that the fluid-handling device is desired to be in, as Patent Owner and Dr. Durham explain. Additionally, just as claim 1 recites a directional component for the “target value” to be sent to the controller in a command, so too does the Specification describe a “target state” as being sent in a command from a remote user device. Thus, the Specification clearly supports the plain and ordinary meaning proposed by Patent Owner and Dr. Durham and not the plain and ordinary meaning proposed by Petitioner and Dr. Wooley. slip op. at 14
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable
“time-stamped process data, report exception therein to the remote host, and extract and transmit time-stamped process data to the remote host.” Ex. 1005, Abst. (emphases added). Almadi explains that its remote field systems must include a plurality of controller units “to issue commands to, and gather and process data from a plurality of field devices, including remote systems and instruments, . . . [and] a database server for the storage of process data retrieved from the remote subsystems and instruments.” Id. at 2:22–30 (emphases added). Based on these disclosures, we agree with Patent Owner that Petitioner has not established that Almadi discloses element [1.4]. Specifically, the teachings from Almadi identified by Petitioner refer to process data, which is data retrieved from the remote subsystems/field devices. Thus, we understand that Almadi’s teaching—of using an Ethernet switch to transmit “process data”—describes transmitting data from the remote subsystems/field devices. See Ex. 1005, 3:13–17, cited in Pet. 15. But claim 1 and particularly element [1.4], recites “sending, with the server, the target value to the network address [which identifies a controller of the fluid-handling device13] via the network,” which is different than sending process data from the field devices to the remote host or database server for storage.” slip op. at 19
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 11,175,680 - Tanklogix, LLC v. SiteproInstitution deniedPTAB · Oct 10, 2025 · IPR2025-00650 · APJ Sheila F Mcshane · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood that claims 18–32 and 34 were unpatentable over Kahn or Kahn and Gutierrez.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). Upon consideration of the Petition, the Preliminary Response, and the evidence of record, we determine that Petitioner has not established a reasonable likelihood of prevailing with respect to the unpatentability of at least one claim of the ’871 patent. Accordingly, for the reasons that follow, we decline to institute an inter partes review of claims 18–32 and 34 of the ’871 patent.” slip op. at 2
- Skill levelSkill level patent owner adoptedDecided for patent owner
“The respective proposed levels of qualifications for a person of ordinary skill in the art are similar, with Patent Owner proposing two years of experience compared to Petitioner proposing significant experience with remotely controlling fluid-handling devices, like SCADA systems. Patent Owner also proposes more extensive experience in lieu of educational experience. While we find Petitioner’s proposed qualifications to be acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of skill necessary to understand and implement the teachings of the ’871 patent and the asserted prior art. Our analysis and findings herein, however, do not turn on any differences in the qualifications adopted.” slip op. at 8
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“We determine that we need not expressly construe any claim terms to resolve the parties’ disputes on the current record. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 10
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable
“actuators and the remote control of fluid handling devices, including the receipt with the user-interface module of “a user command to actuate an actuator via a presented control interface” (limitation [18.7]) and “account authorized to send commands to remotely control fluid handling devices” (limitation [18.11]). We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses or teaches these limitations because the evidence does not provide support that there is remote control of fluid handling devices or the use of a user command on a control interface to send a command to a fluid handling device, for instance. Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but we do not discern that it teaches or discloses the capability to remotely control fluid handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, the Kahn disclosures that Petitioner repeatedly relies upon for allegedly teaching this control are deficient. See Ex. 1005, 10:62–67, 14:35– 15:2, 15:62–16:32; see also Pet. 12–14, 16–18. Kahn discloses that “the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance.” Ex. 1005, 10:62–67. Communication unit 112B is part of the local “sensor unit,” wherein the detection conditions determined by the sensor are communicated to remote devices by communication unit 112B. See id. at 3:31–33, 5:62–6:2, 6:27–35, 7:33–37, 13:7–12, Figs. 1A–1C. Kahn discloses that the sensor units, which include communication units 112B, can be located near shut-off valves and can communicate with distant locations. See id. at 11:1–13. There are no disclosures, however, in the above passages that there is remote control of fluid handling devices, that there is a user command on a control interface that actuates an actuator, or that there is a command sent to the facility actuators via a network connection, as required in limitations [18.5]–[18.7] and [18.9]–[18.12], respectively. Rather, the disclosure indicates that the communication unit 112B includes on-site alerts and that the local (non-remote) communication unit 112B can be interfaced with the control valve.” slip op. at 18
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 10,488,871 - PTAB · Dec 18, 2024 · IPR2024-00981 · APJ Georgianna W Braden · IPR · Institution
The Board instituted review of claims 1–20 on all petitioned grounds, finding a reasonable likelihood of prevailing on the Kleve-based obviousness challenges.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“to determine whether to institute review. Based on the current record and for the reasons explained below, Petitioner has shown that there is a reasonable likelihood that it would prevail with respect to at least one of the challenged claims. Therefore, pursuant to § 314, we institute an inter partes review of claims 1–20 in the ’188 patent on all challenges included in the Petition.” slip op. at 2
- PTAB / AIA Trials › Discretionary denial › §325(d) same art / argumentsDecided for petitioner
“We agree with Patent Owner that Examiner’s notation indicates that Zaid was considered. We do not agree, however, with Patent Owner’s position regarding Petitioner’s challenges based on Kleve. The challenges over Kleve alone or in combination with Sekiyama, Mottla, and/or Patenaude counsel us not to discretionarily deny institution. Patent Owner does not dispute that Kleve, Sekiyama, Mottla, and/or Patenaude were not before the Office. See Prelim. Resp. 15–24; Prelim. Sur-reply 5. Although Patent Owner characterizes the Petition’s challenges based on Kleve as an “attempt to end-run Section 325(d) by including additional grounds that lack merit” (Prelim. Resp. 23–24), we disagree. Rather, explained in detail below, we are persuaded by Petitioner’s challenges based on Kleve and it is the reason for institution. Accordingly, at this stage of the proceeding, Petitioner’s challenges based on Zaid are not relevant. As such, we determine any analysis under Advanced Bionics is inapplicable, and we do not exercise our discretion under § 325(d) to deny institution. b. Advanced Bionics Prong Two: whether “the Office erred in a manner material to the patentability of the challenged claims” Because the Board is persuaded to instituted based on challenges not involving Zaid, , we will not consider the second part of the Advanced Bionics framework.” slip op. at 16
- PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Decided for petitioner
“We agree with Patent Owner that the language in Petitioner’s stipulation does not eliminate completely any overlap with district court invalidity arguments. Petitioner’s stipulation allows Petitioner to use any prior art reference that is not relied on in the Petition. This may not fully address “concerns of inefficiency and the possibility of conflicting decisions.” See Fintiv, Paper 11 at 12. Nonetheless, Petitioner’s stipulation does decrease the overlap in issues and mitigates to a great degree the concerns regarding duplicative efforts and potentially conflicting decisions. Additionally, we agree with Petitioner that the fact that the Petition challenges claims that are not asserted in the litigation weighs marginally in its favor. Based on the foregoing discussion, we determine that factor four weighs against discretionary denial.” slip op. at 22
- BurdenInstituted
“teaches, or at least suggests, that the user’s “request includes a condition of use of the vehicle as set by the user via the user account” because we are persuaded that the distribution of Kleve’s virtual e-key includes a rental period restriction. Specifically, we are persuaded by the Petition’s reliance on Kleve’s express disclosure that “terms and conditions for the rental period” are agreed to before the virtual key is generated. See Pet. 15 (quoting Ex. 1004 ¶ 38). We preliminarily agree with Petitioner that Kleve describes an e-key that is only operable during a rental period because Kleve discloses “[t]he virtual key may also be sent to the vehicle configuring the VCS to enable the keyless drive system for the appropriate Temporary User during a given rental period.” Ex. 1004 ¶ 39; see Pet. 16. We note Patent Owner’s citations to Kleve’s Figures 2 and 5 that indicate control restrictions are added after the distribution of a virtual key. At this stage of the proceeding, however, based on the disclosure of Kleve we are persuaded the rental period would be included as a restriction when the virtual key is created at step 206 of Figure 2 prior to the distribution of the virtual key at 210. See Ex. 1004 ¶¶ 38–39. At this stage, we credit the testimony of Dr. Almeroth, who opines that Kleve discloses that certain restrictions are sent with the request to generate a virtual key. Ex. 1003 ¶¶ 118–123. Specifically, Dr. Almeroth testifies that Kleve discloses that the virtual key “enable[s] the keyless drive system for the appropriate Temporary User during a given rental period.” restrictions were sent with the request so that the virtual key could be associated with said restrictions.” Id. (citing Ex. 1004 ¶¶ 39, 68 (“Once the rental period has expired the virtual key may be reset and cleared from the VCS.”)). Dr. Almeroth further testifies that the virtual key in Kleve is always generated after the rental agreement. Id. (citing Ex. 1004 ¶¶ 39, 68 (“[O]nce the Temporary User selects the vehicle, pays the appropriate amount and signs a consent agreement, then the system may generate a virtual key to distribute to the Temporary User and VCS.”)). Thus, after review of the arguments and evidence, we find that Petitioner has provided adequate explanation and supporting evidence that Kleve teaches or suggests the challenged claim limitation.” slip op. at 40
Claim construction§ 102 anticipation§ 103 obviousnessDiscretionary denialcites Phillips · KSR · GrahamPatents in suitUS 9,365,188 - AT&T Services Inc. / T-Mobile USA, Inc. et al. v. Innovative Sonic Ltd.Institution deniedPTAB · Dec 12, 2024 · IPR2024-00991 · APJ Juliet Mitchell Dirba · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood of prevailing on any asserted anticipation or obviousness ground for claims 1–11.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“An inter partes review may not be instituted unless “the information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). Having reviewed the parties’ papers and the evidence of record, we determine that Petitioner has not shown a reasonable likelihood it will prevail in establishing the unpatentability of any of the challenged claims. Accordingly, we do not institute an inter partes review.” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“Patent Owner responds that “a person with the 3-year experience proposed by Petitioner would not have the intimate knowledge of the existing standardized cellular system” required to understand “how a proposed change would impact the rest of the system.” Prelim. Resp. 7. But Patent Owner also states that engineers participating in the development of the relevant cellular specifications “would not be expected to be familiar with all relevant aspects of the specifications” given their length and complexity. Id. at 7–8. For purposes of this Decision, we adopt Petitioner’s proposed level of skill, as articulated above, because we are satisfied that it generally comports with the level of skill necessary to understand and implement the teachings of the ’883 patent and the asserted prior art. To the extent Patent Owner disagrees (see Prelim. Resp. 6–8), it fails to sufficiently explain its contrary position by, for example, providing its own proposed level of skill.” slip op. at 9
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“Petitioner states that “the Board does not need to expressly construe any terms” in this proceeding because “the prior art in this Petition discloses all limitations under any plausible construction.” Pet. 10–11. Patent Owner similarly states that “all terms are entitled to their plain and ordinary meaning.” Prelim. Resp. 21. We agree with the parties that it is not necessary to construe any claim terms or phrases in this Decision. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe only those terms that are in controversy, and only to the extent necessary to resolve the controversy.”) (cleaned up).” slip op. at 9
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable
“(step 406) discloses the claimed “second request” (Pet. 44–45),9 but Petitioner fails to show that this message discloses a request. See Prelim. Resp. 46–48. Han explains that the dual connection setup response in step 406 is a “dual connection setup request acknowledge (ACK)” message sent in response to “dual connection setup request” received in step 404. Ex. 1007 ¶¶ 40–42; accord Pet. 42–44. An acknowledgement is not a request, and Petitioner fails to sufficiently support its contention to the contrary (see Pet. 44–45). According to Petitioner, the acknowledgement message is “a request to change a data path” because the data path is “change[d] . . . based on this message” (id. at 45 (citing Ex. 1007 ¶¶ 42–47; Ex. 1003 ¶ 202)); however, this is faulty reasoning. At most, Petitioner’s argument shows that the acknowledgement is a message “to change a data 9 We note that this is the same message relied upon by Petitioner to teach the claimed “accept message” recited earlier in claim 1. Compare Pet. 44– 45, with id. at 43–44. We need not (and do not) decide whether Petitioner has sufficiently shown that this message discloses two separate claim elements. path,” not that it is a request to do so. In other words, even if Han’s acknowledgement message (in step 406) is a condition precedent to changing the data path, this does not make the message a “request.” Although Dr. Mahon agrees with Petitioner, his analysis mirrors Petitioner’s arguments and suffers from the same deficiencies. See Ex. 1003 ¶¶ 202– 203; see also Motorola, Inc. v. Interdigital Tech. Corp., 121 F.3d 1461, 1473 (Fed. Cir. 1997) (“An expert’s conclusory testimony, unsupported by the documentary evidence, cannot supplant the requirement of anticipatory disclosure in the prior art reference itself.”).” slip op. at 14
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 9,736,883 - PTAB · Nov 22, 2024 · PGR2024-00034 · APJ Patrick R Scanlon · PGR · Institution
Instituted PGR on claims 1–19 and all asserted grounds after finding at least one claim more likely than not unpatentable.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“We have authority to determine whether to institute a post-grant review. See 35 U.S.C. § 324 (2018); 37 C.F.R. § 42.4(a) (2022). To institute a post-grant review, we must determine that “the information presented in the petition . . . would demonstrate that it is more likely than not that at least 1 of the claims challenged in the petition is unpatentable.” 35 U.S.C. § 324(a). For the reasons set forth below, we determine that the information presented shows that it is more likely than not that Petitioner would prevail in establishing unpatentability of at least one challenged claim. Accordingly, we institute a post-grant review of the challenged claims on the grounds set forth in the Petition.” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“We note that the identification of a Ph.D. as an example of “more formal education” creates a vast range of education relative to a bachelor’s degree. Thus, we treat the identification of a Ph.D. just as it is—an example—and not a requirement. In this case, “more formal education” can be satisfied by a level of education less than a Ph.D (but greater than a bachelor’s degree). Based on our review of the record before us, we determine that Petitioner’s stated level of ordinary skill in the art is reasonable because it appears consistent with the evidence of record, definition, limited as discussed above, for the purposes of this Decision.” slip op. at 9
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“On the present record, we do not discern a need to construe explicitly any claim language because doing so would have no effect on our analyses below of Petitioner’s asserted grounds and will not assist in resolving the present controversy between the parties. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)).” slip op. at 10
- Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundInstituted
“would have understood Unger’s disclosure to “suggest the use of a torsion spring to facilitate attachment and detachment, because torsion springs are designed to impart this functionality.” Id. (citing Ex. 1002 ¶ 118). Petitioner also asserts that one of ordinary skill in the art would have “understood that there were a limited number of ways to impart the referenced resilient or flexible ‘manipulation,’” and “would have been motivated to look to various known solutions to impart the suggested functionality, including the torsional spring mechanism of Smith that is used in a similar hearing protection device application for a similar purpose as Unger’s mounting arms (to apply a clamping force).” Id. at 32 (citing Ex. 1002 ¶¶ 120–121).” slip op. at 17
Claim construction§ 103 obviousness§ 112 disclosurecites KSR · GrahamPatents in suitUS 11,736,855 - PTAB · Oct 31, 2024 · IPR2024-00858 · APJ Carl M Defranco · IPR · Institution
The Board instituted review of claims 5–7 and 16–19, finding a reasonable likelihood that claims 5–7 and 16–19 are unpatentable over Samartgis and at least claims 5 and 19 over Leoncavallo.
RulingsInstitution decision- PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Denied
“U.S.C. § 314(a) due to the advanced state of the parallel district court action, and, in doing so, relies heavily on the district court’s scheduled trial date of September 22, 2025. See Prelim. Resp. 51, 54. While the district court’s scheduled trial date may be earlier than the Board’s projected deadline for a final written decision here, CamelBak’s reliance on that date is misplaced. The Office takes the position that a district court’s scheduled trial dates are “unreliable and often change” and that a more reliable indicator is the district court’s “median time-to-trial for civil actions,” which, in this case, would place the district court’s trial date after the projected deadline of any final written decision here. See Director Memorandum, Interim Procedure for Discretionary Denials in AIA-Post Grant Proceedings With Parallel District Court Litigation, U.S. PATENT AND TRADEMARK OFFICE (June 21, 2022) (“Director’s Interim Procedure”), at 8–9. Thus, CamelBak’s reliance 5 US D586,184 S, issued Feb. 10, 2009 (Ex. 1006, “Miller”). on the district court’s scheduled trial date has no bearing on whether we should discretionarily deny institution. Of greater relevance is Trove’s express stipulation not to pursue the same grounds in the district court action as advanced in the petition or any ground that relies on the prior art references cited in the petition. See Pet. 100. Although not exactly a Sotera stipulation, the Office nonetheless recognizes that such stipulations further mitigate concerns of potentially conflicting decisions and duplicative efforts between us and the district court. See Director’s Interim Procedure, at 7–8. Thus, given Trove’s stipulation and the fact that the district court’s median time-to-trial is after the projected deadline of our final written decision here, we will not discretionarily deny institution under § 314(a).” slip op. at 6
- PTAB / AIA Trials › Discretionary denial › §325(d) same art / argumentsDenied
“We disagree that Samartgis is the substantially the same as the corresponding design patent cited during prosecution, mainly because the design patent fails to show the closure retention mechanism that is clearly shown and described in Samartgis and goes to the very heart of Trove’s showing of anticipation and obviousness. Compare Ex. 1004, Figs. 3–5 (showing lug members 15, 16 and ramp sections 23, 25, 27), with Ex. 2001, Figs. 1–8 (omitting any depiction of lug members or ramp sections). Thus, Samartgis clearly was not considered. And, although Leoncavallo and Miller may arguably have been considered during prosecution, “[w]hen instituting . . . review, the Board will authorize the review to proceed on all of the challenged claims and on all grounds of unpatentability asserted for each claim.” 42 C.F.R. § 42.108(a). As such, we will not discretionarily deny institution under § 325(d). B. Level of Ordinary Skill in the Art” slip op. at 8
- Skill levelSkill level petitioner adoptedDecided for petitioner
“Trove proposes that one of ordinary skill in the art would have had: an undergraduate degree in mechanical engineering or equivalent coursework, and a year or more of experience in designing, prototyping, and/or manufacturing fluid containers or similar products . . . [and that] [m]ore work experience may substitute for a lower level of education, and vice versa. Pet. 17–18 (citing Ex. 1003 ¶¶ 25–30). CamelBak appears to agree. See Prelim. Resp. 16 (“Patent Owner assumes Petitioner has correctly stated the level of ordinary skill in the art and does not set forth its own definition.”). At this stage, we see no reason to depart from Trove’s proposed definition, as it appears reasonable and consistent with the asserted prior art and the ’252 patent.” slip op. at 8
- Claim Construction › Functional claiming / §112(f) means-plus-function › Whether §112(f) applies (Williamson, nonce words)Not reached
“At this stage, we do not see the need to resolve the § 112(f) issue in light of Trove’s express and unrebutted showing that the prior art teaches sufficiently analogous structure to that identified in the ’252 patent for performing the disputed functional limitations of the claimed “closure retention mechanism.” See Pet. 35 (asserting that “[Samartgis’s] lug members 15 and 16 also are at least equivalent to the structure identified in the specification (i.e., the two or more spaced-apart tabs on the handle)” because “[l]ike the opposed tabs of the ’252 patent, the lug members 15 and 16 are projections that extend from the inner surface of the handle to engage the closure.”). Indeed, at this stage, CamelBak chooses not to address Trove’s showing in this regard, instead arguing that “the construction of ‘closure retention mechanism’ is irrelevant because [Trove] fails to show lug members 15 and 16 are configured to meet other limitations of claims 5 and 19.” Prelim. Resp. 20 n.7. That said, to the extent either party believes it is necessary for final resolution of patentability, they should explore the § 112(f) issue further during the trial phase.” slip op. at 10
Claim construction§ 102 anticipationDiscretionary denialPatents in suitUS 8,905,252 - PTAB · Oct 22, 2024 · IPR2024-00786 · APJ Frances L Ippolito · IPR · Institution
The Board instituted IPR of claims 10–20 on all petitioned grounds, finding a reasonable likelihood of success on at least one challenged claim.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“Under 35 U.S.C. § 314(a), an inter partes review may not be instituted unless the information presented in the Petition and any response thereto shows “there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” Considering the arguments presented, we conclude there is a reasonable likelihood that Petitioner would prevail in challenging at least one of claims 10–20 of the ’268 patent as unpatentable under the challenges presented in the Petition. Pursuant to § 314, we hereby institute an inter partes review as to these claims of the ’268 patent.” slip op. at 2
- PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Denied
“Nonetheless, Petitioner’s stipulation mitigates to a great degree the concerns regarding duplicative efforts and potentially conflicting decisions. Thus, we determine that the fourth Fintiv factor weighs against discretionary denial of institution.” slip op. at 48
- Obviousness (§103) › Analogous artAnalogous artDecided for petitioner
“A reference qualifies as prior art for an obviousness determination only when it is analogous to the claimed invention. See In re Klein, 647 F.3d 1343, 1348 (Fed. Cir. 2011). The Federal Circuit has laid out two separate tests to determine whether a reference is analogous art to the claimed invention, i.e., whether one of ordinary skill in the art would even look to the teachings of that reference. In re Bigio, 381 F.3d 1320, 1325 (Fed. Cir. 2004). They are: “(1) whether the art is from the same field of [the inventor’s] endeavor” and “(2) if the reference is not within the field of the inventor’s endeavor, whether the reference still is reasonably pertinent to the particular problem with which the inventor is involved.” Id.; see also In re Klein, 647 F.3d at 1348.” slip op. at 33
- Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundDecided for petitioner
“recognizing the heterogeneity of vehicles, one would have been motivated to determine applicable settings (e.g., command codes) that are compatible with settings that are settable in the selected vehicle but would avoid determining applicable settings that are incompatible with settings that are settable in the selected vehicle, ensuring that Xiao’s server 118 does not attempt to command vehicles to do things they cannot do, potentially resulting in unexpected and/or undesired vehicle configurations or errors. Pet. 49; Ex. 1009 ¶ 191. Petitioner adds that “[a]voiding such undesirable effects would be a predictable result of implementing Hayashi’s known method of determining compatibility.” Id. For the purposes of institution, Petitioner’s arguments and Dr. Almeroth’s testimony are better supported by the Xiao and Hayashi. Nevertheless, the parties are encouraged to further develop the record on this issue after institution. After review of the arguments and evidence currently of record, we determine that Petitioner has established a reasonable likelihood that it would prevail in showing that Xiao in combination with Hayashi renders independent claim 10 obvious.” slip op. at 40
Claim construction§ 102 anticipation§ 103 obviousnessDiscretionary denialcites Phillips · KSR · GrahamPatents in suitUS 9,171,268 - Vicor Corporation v. Delta Electronics, Inc.Institution deniedPTAB · Oct 2, 2024 · IPR2024-00706 · APJ Sheila F Mcshane · IPR · Institution
The Board denied institution on all challenged claims and grounds because Petitioner did not show a reasonable likelihood of prevailing on at least one claim.
RulingsInstitution decision- Parallel petitionsDecided for petitioner
“The Board has indicated that “one petition should be sufficient to challenge the claims of a patent in most situations.” Consolidated Trial Practice Guide 59 (Nov. 2019) (“CTPG”).6 But “the Board recognizes that there may be circumstances in which more than one petition may be necessary.” Id. Here, although there is overlap in the prior art asserted, there are clear differences in the limitations in the respective claim sets in each case, which requires different analysis. The issues related to a potentially different priority date for claims in the -715 case also support the need for two petitions. Additionally, under these circumstances, it is not apparent there has been a substantial benefit afforded to Petitioner by filing two petitions. Thus, we determine that Petitioner’s filing of two parallel petitions does not weigh in favor of exercising our discretion to deny institution in this particular case.” slip op. at 9
- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“partes review. See 35 U.S.C. § 314; 37 C.F.R. § 42.4(a). Under 35 U.S.C. § 314(a), we may not authorize an inter partes review unless the information in the petition and the preliminary response “shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” For the reasons stated below, we determine that Petitioner has not established a reasonable likelihood that it would prevail with respect to at least one claim. We therefore do not institute inter partes review.” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“Patent Owner does not challenge Petitioner’s definition of a person of ordinary skill in the art and its definition appears to be similar to that of Petitioner’s definition. Prelim. Resp. 10. For the purposes of this Decision, we adopt the assessment offered by Petitioner as it is consistent with the ’534 patent and the prior art before us. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001).” slip op. at 10
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“Petitioner argues that “[t]he invalidity issues raised in this Petition may be resolved without any formal claim construction.” Pet. 3. Patent Owner offers no claim construction. Prelim. Resp. 9–10. We determine that we need not expressly construe any claim terms to resolve the parties’ disputes on the current record. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 10
Claim construction§ 102 anticipation§ 103 obviousnessDiscretionary denialcites Phillips · KSR · GrahamPatents in suitUS 10,877,534
Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.