PTAB
Advanced fields
48 decisions · 241msnewest first
  • PTAB · Oct 10, 2025 · IPR2025-00653 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution on all claims because the Petition did not show a reasonable likelihood that any challenged claim was unpatentable over the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “An inter partes review may be instituted only if “the information presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’504 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Additionally, only terms that are in controversy need to be construed, and these need be construed only to the extent necessary to resolve the controversy. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 9; Prelim. Resp. 4 (citing Ex. 2009 ¶ 72); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13

    • Expert testimonyPetitioner expert discountedDecided for patent owner

      “Ex. 1002 ¶ 47. As reflected above, Dr. Wooley’s testimony as to element [1.2] does not even assert that Cardamone discloses a tank, let alone one or more sensors disposed at a tank as recited in element [1.2]. Thus, Dr. Wooley’s testimony does not support Petitioner’s argument on this issue.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,726,504
  • PTAB · Oct 10, 2025 · IPR2025-00652 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–23 and 25–30 were unpatentable over the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’403 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 10; Prelim. Resp. 4 (citing Ex. 2009 ¶ 73); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses element [1.2] because the evidence cited does not disclose a “first computer system being configured to provide remote control of the first pump or first valve” (i.e., a fluid-handling device). Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but Petitioner has not identified any disclosure of the capability to remotely control fluid-handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, Kahn’s disclosures that Petitioner relies on for allegedly teaching remote control are deficient. We discuss each. First, Petitioner points to the following, “[f]or instance, as illustrated in FIG. 1C, a fluid control device such as a valve 15A is located on the input side of a sen[s]or unit 110.” Ex. 1005, 8:19–21, cited in Pet. 13. This portion of Kahn, however, does not disclose remote control. Second, Petitioner cites to the following: Finally, or in addition to, the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance. Pet. 13 (citing Ex. 1005, 10:62–67). We agree with Patent Owner that this portion of Kahn teaches on-site alerts and local control of the fluid-handling device. See Prelim. Resp. 7. This portion of Kahn does not disclose remote control.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,294,403
  • Tanklogix, LLC v. SiteproInstitution denied
    PTAB · Oct 10, 2025 · IPR2025-00650 · APJ Sheila F Mcshane · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 18–32 and 34 were unpatentable over Kahn or Kahn and Gutierrez.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). Upon consideration of the Petition, the Preliminary Response, and the evidence of record, we determine that Petitioner has not established a reasonable likelihood of prevailing with respect to the unpatentability of at least one claim of the ’871 patent. Accordingly, for the reasons that follow, we decline to institute an inter partes review of claims 18–32 and 34 of the ’871 patent.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The respective proposed levels of qualifications for a person of ordinary skill in the art are similar, with Patent Owner proposing two years of experience compared to Petitioner proposing significant experience with remotely controlling fluid-handling devices, like SCADA systems. Patent Owner also proposes more extensive experience in lieu of educational experience. While we find Petitioner’s proposed qualifications to be acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of skill necessary to understand and implement the teachings of the ’871 patent and the asserted prior art. Our analysis and findings herein, however, do not turn on any differences in the qualifications adopted.” slip op. at 8

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “We determine that we need not expressly construe any claim terms to resolve the parties’ disputes on the current record. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 10

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “actuators and the remote control of fluid handling devices, including the receipt with the user-interface module of “a user command to actuate an actuator via a presented control interface” (limitation [18.7]) and “account authorized to send commands to remotely control fluid handling devices” (limitation [18.11]). We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses or teaches these limitations because the evidence does not provide support that there is remote control of fluid handling devices or the use of a user command on a control interface to send a command to a fluid handling device, for instance. Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but we do not discern that it teaches or discloses the capability to remotely control fluid handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, the Kahn disclosures that Petitioner repeatedly relies upon for allegedly teaching this control are deficient. See Ex. 1005, 10:62–67, 14:35– 15:2, 15:62–16:32; see also Pet. 12–14, 16–18. Kahn discloses that “the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance.” Ex. 1005, 10:62–67. Communication unit 112B is part of the local “sensor unit,” wherein the detection conditions determined by the sensor are communicated to remote devices by communication unit 112B. See id. at 3:31–33, 5:62–6:2, 6:27–35, 7:33–37, 13:7–12, Figs. 1A–1C. Kahn discloses that the sensor units, which include communication units 112B, can be located near shut-off valves and can communicate with distant locations. See id. at 11:1–13. There are no disclosures, however, in the above passages that there is remote control of fluid handling devices, that there is a user command on a control interface that actuates an actuator, or that there is a command sent to the facility actuators via a network connection, as required in limitations [18.5]–[18.7] and [18.9]–[18.12], respectively. Rather, the disclosure indicates that the communication unit 112B includes on-site alerts and that the local (non-remote) communication unit 112B can be interfaced with the control valve.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 10,488,871
  • PTAB · May 28, 2024 · IPR2024-00085 · APJ Michael L Woods · IPR · Institution

    The Board instituted IPR on claims 1, 2, 4, 5, 7–11, 13, and 15 on all asserted grounds, finding a reasonable likelihood that at least one challenged claim is unpatentable.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “Under 35 U.S.C. § 314 and 37 C.F.R. § 42.4(a), we have authority to institute an inter partes review if “the information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). After considering the Petition, the Preliminary Response, the Preliminary Reply, the Preliminary Sur-reply, and the evidence of record, we determine the information presented shows a reasonable likelihood that Petitioner would prevail in establishing the unpatentability of at least one of the Challenged Claims of the ’659 patent. Accordingly, we institute an inter partes review of the Challenged Claims on the grounds asserted in the Petition.” slip op. at 2

    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Denied

      “We disagree with Patent Owner. Our analysis under Fintiv is guided by the USPTO Director’s Memorandum issued on June 21, 2022, titled “Interim Procedure for Discretionary Denials in AIA Post Grant Proceedings with Parallel District Court Litigation.”8 The Director’s Memorandum explains that, when a petitioner makes a Sotera-type stipulation, “it mitigates concerns of potentially conflicting decisions and duplicative efforts between the district court and the PTAB” and “[w]ith such a stipulation, if an IPR or PGR is instituted, the grounds the PTAB resolves will differ from those present in 8 https://www.uspto.gov/sites/default/files/documents/interim_proc_discretio nary_denials_aia_parallel_district_court_litigation_memo_20220621_.pdf (“Director’s Memorandum”). the parallel district court litigation.” Director’s Memorandum 7 (citing Sotera, IPR2020-01019, Paper 12 at 18–19). Pursuant to the Director’s Memorandum, we “will not discretionarily deny institution of an IPR or PGR in view of parallel district court litigation where a petitioner stipulates not to pursue in a parallel district court proceeding the same grounds as in the petition or any grounds that could have reasonably been raised in the petition.” Id. Because Petitioner provides a Sotera-type stipulation, we do not exercise our discretion to deny institution under Fintiv.” slip op. at 8

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “Upon review of the prior art of record and the parties’ arguments, we adopt Patent Owner’s definition of the person of ordinary skill in the art for purposes of this Decision as it appears consistent with the prior art of record. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (holding that the prior art itself can reflect the appropriate level of ordinary skill in the art). Petitioner’s proposed definition appears overly restrictive, as it requires a graduate degree in a narrow field of engineering or equivalent experience. We find that a bachelor’s degree with the accompanying experience proposed by Patent Owner more closely aligns with the prior art of record and the ’659 patent. We note, however, there is some overlap in the proposed levels of ordinary skill in the art because Patent Owner’s proposal includes “at least” a bachelor’s degree, which would encompass Petitioner’s master’s degree as well. Prelim. Resp. 19. Nonetheless, our determination herein would be the same under either party’s definition.” slip op. at 9

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed petitioner constructionDecided for petitioner

      “We disagree with Patent Owner’s claim construction. By using the word “or,” the plain and ordinary meaning of “prone, kneeling, or standing” is that only one must be satisfied to meet the claim. See, e.g., SkinMedica, Inc. v. Histogen Inc., 727 F.3d 1187, 1199 (Fed. Cir. 2013) (“The disjunctive ‘or’ plainly designates that a series describes alternatives.”). Furthermore, and although claims are read in light of the specification, limitations in a specification are not read into a claim. In re van Geuns, 988 F.2d 1181, 1184 (Fed. Cir. 1993). Even if the Specification describes embodiments in which the user can begin in a prone position and then transition to a kneeling or standing position, as Patent Owner points out (see Prelim. Resp. 20), the claim does not recite the term “transitioning,” and we do not read the terms “each of” or “substantially flat surface” into this claim limitation. For example, the claim does not recite a “substantially flat” top surface and Patent Owner’s attempt to infer this structure into the claim is not supported under the law. See id. at 29–30. For purposes of this Decision, we agree with Petitioner and construe “prone, kneeling, or standing” in accordance with its plain and ordinary meaning as alternatives, and the prior art need only show one to satisfy this aspect of the claim.” slip op. at 12

    Claim construction§ 102 anticipation§ 103 obviousnessDiscretionary denialcites Phillips · KSR
    Patents in suitUS 9,586,659
  • PTAB · May 28, 2024 · IPR2024-00086 · APJ Kevin W Cherry · IPR · Institution

    The Board instituted IPR on claims 1, 2, 5-8, 10-15, 17, 18, 20, and 21 on all asserted grounds after finding a reasonable likelihood of success and declining Fintiv denial.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “In an [inter partes review], the petitioner has the burden from the onset to show with particularity why the patent it challenges is unpatentable.” Harmonic Inc. v. Avid Tech., Inc., 815 F.3d 1356, 1363 (Fed. Cir. 2016) (citing 35 U.S.C. § 312(a)(3) (requiring inter partes review petitions to identify “with particularity . . . the evidence that supports the grounds for the challenge to each claim”)). This burden of persuasion never shifts to Patent Owner. See Dynamic Drinkware, LLC v. Nat’l Graphics, Inc., 800 F.3d 1375, 1378 (Fed. Cir. 2015) (discussing the burden of proof in an inter partes review). slip op. at 10

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITAPlain and ordinary meaningDecided for petitioner

      “1. “wherein a user can be disposed on the top surface of the flotation device in a prone, kneeling, or standing position” With respect to the claim term “wherein a user can be disposed on the top surface of the flotation device in a prone, kneeling, or standing position,” Patent Owner points to passages of the Specification, arguing that all three positions are possible. Prelim. Resp. 19–21 (citing Ex. 1001, Abstr., 4:13–17, 4:33–40; Ex. 2006 ¶ 18). We do not agree with Patent’s Owner proposed construction because even if the Specification discloses that all three positions are possible, that is not what the plain language of the claim requires. Claim 1 recites “or,” which means that a user can be disposed on the top surface of the flotation device in any one of the three positions. See, e.g., SkinMedica, Inc. v. Histogen Inc., 727 F.3d 1187, 1199 (Fed. Cir. 2013) (“The disjunctive ‘or’ plainly designates that a series describes alternatives.”). Patent Owner does not identify any definition or disclaimer that would modify this plain meaning. See Thorner v. Sony Computer Entm’t Am. LLC, 669 F.3d 1362, 1365 (Fed. Cir. 2012). Thus, we agree with Petitioner and apply the plain and ordinary meaning of the phrase “wherein a user can be disposed on the top surface of the flotation device in a prone, kneeling, or standing position,” to construe “prone, kneeling, or standing” as alternatives, and the prior art need only show one to satisfy this aspect of the claim.” slip op. at 13

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “Neither party explains how or why its particular proposal impacts the issues before us in this proceeding. We find that a bachelor’s degree with the accompanying experience proposed by Patent Owner more closely aligns with the prior art of record and the ’044 patent. We note, however, there is some overlap in the proposed levels of ordinary skill in the art because Patent Owner’s proposal includes “at least” a bachelor’s degree, which would encompass Petitioner’s master’s degree as well. Prelim. Resp. 10. Nonetheless, our determination herein would be the same under either party’s definition.” slip op. at 12

    • Novelty / Anticipation (§102) › Prior-art status of a reference › Printed publication / public accessibilityPrinted publication establishedInstituted

      “As the Board has held in a precedential decision, “at the institution stage, the petition must identify, with particularity, evidence sufficient to establish a reasonable likelihood that the reference was publicly accessible before the critical date of the challenged patent and therefore that there is a reasonable likelihood that it qualifies as a printed publication.” Hulu, LLC v. Sound View Innovations, LLC, IPR2018-01039, Paper 29 at 13 (PTAB Dec. 20, 2019) (precedential).” slip op. at 23

    Claim construction§ 102 anticipation§ 103 obviousnessDiscretionary denialcites KSR · Graham
    Patents in suitUS 9,359,044
  • PTAB · Oct 23, 2023 · IPR2023-00698 · APJ Thomas L Giannetti · IPR · Institution

    The Board instituted review of claims 7–11, 13, and 19–21 on all asserted grounds, finding a reasonable likelihood of prevailing for claims 11 and 13.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “Under 35 U.S.C. § 314(a), an inter partes review may not be instituted unless the information presented in the petition “shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” For the reasons stated below, we determine that Petitioner has established a reasonable likelihood that it would prevail with respect to at least one claim. We, therefore, institute inter partes review as to all of the challenged claims of the ’202 patent and all of the asserted grounds of unpatentability.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “The two proposals are materially similar in the education requirement, but differ marginally in professional experience required (three versus five years). See supra. While we are persuaded, on the present record, that both Petitioner’s and Patent Owner’s proposals are consistent with the problems Petitioner’s proposal is a better reflection of the level of skill in the prior art, and we therefore adopt it for this decision. Our decision would not change, however, if we had applied Patent Owner’s proposed level of ordinary skill.” slip op. at 12

    • BurdenMixed

      “Figure 6 of Rauhala has been annotated by Patent Owner to show that the parallel connection (outlined in red) including resistors R1, R2. R3 and switches ka, kb is outside the signal path (highlighted in yellow) through differential amplifier 61. Prelim. Resp. 38. Petitioner identifies R1, R2, R3 and switches ka and kb as the claimed variable impedance. See, e.g., Pet. 39–41. The Petition (and the supporting Baker Declaration) do not explain adequately how, under this interpretation by Petitioner and its expert, Rauhala meets the adjusting an impedance “in the signal path” limitation. See Prelim. Resp. 39–41. For the reasons given, therefore, even if we were to disagree with Patent Owner’s construction of “impedance,” we agree with Patent Owner that Petitioner fails to demonstrate sufficiently that Rauhala meets the limitation in claims 7 and 19 requiring “dynamically adjusting one or more of an impedance . . . in the [receiver] signal path.” For the reasons given, we determine that Petitioner has demonstrated a reasonable likelihood of prevailing on its challenge to claims 11 and 13 as anticipated by Rauhala. We further determine that Petitioner has not demonstrated a reasonable likelihood of prevailing on its challenge to claims 7 and 19 as anticipated by Rauhala.” slip op. at 26

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Instituted

      “We disagree. Noting in the language of the claims requires that these method steps be performed by separate components, or that these method steps “provide two different channel indications at once” (Prelim. Resp. 38), only that they be performed as stated in the claim. In that respect, this case is distinguished from In re Robertson, where the Federal Circuit determined that the “third fastening means” required by the claims was not inherently disclosed by the prior art. Robertson, 169 F.3d at 745 (“The [prior art] patent does not expressly include a third fastening means for disposal of the diaper, as claim 76 requires.”). In further contrast to this case, Robertson addressed mechanical elements of a product (fasteners for disposable diaper), not steps in a process. More pertinent to our facts is the Federal Circuit’s decision in Microsoft Corporation v. Uniloc, 2017 LLC, No. 2021- 2039, 2022 WL 11531235 (Fed. Cir. Oct. 20, 2022), that addresses steps in a method claim. Reversing the Board’s determination that a petitioner had 6 See Ex. 1001, 14:5–6 (claim 7), 14:41–42 (claim 11), 15:18–19 (claim 13), and 17:28–29 (claim 19). Circuit concluded that the Board had misconstrued the claims to require separate acts: We agree with [petitioner] that the Board misconstrued the claims to require that the comparing and determining step are performed by two separate acts in a certain order. Nothing in the intrinsic record requires such a narrow construction, and neither party presented this construction to the Board. Without any such evidence, we decline to impose such a narrow claim construction. Microsoft Corp., 2022 WL 11531235, at *3 (citation and footnote omitted). We find that at this stage, Petitioner has made a sufficient showing that this limitation is met by Rauhala. Pet. 31–33; Baker Decl. ¶¶ 111–114.” slip op. at 22

    § 102 anticipation§ 103 obviousnesscites Graham
    Patents in suitUS 10,524,202
  • PTAB · Oct 23, 2023 · IPR2023-00697 · APJ Barbara A Benoit · IPR · Institution

    The Board instituted review of claims 1, 3, 4, and 8 on all asserted grounds, finding a reasonable likelihood that Rauhala anticipates at least one challenged claim.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “Applying the standard set forth in 35 U.S.C. § 314, which requires demonstration of a reasonable likelihood that Petitioner would prevail with respect to at least one challenged claim, we institute an inter partes review.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “We are persuaded, on the present record, that both Petitioner’s and Patent Owner’s proposals are consistent with the problems and solutions in the ’825 patent and prior art of record. See In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001). On balance, Petitioner’s proposal of education plus a minimum of two years of experience is a better reflection of the level of skill in the prior art. For example, Rauhala presents functional block diagrams of signal strength information. See, e.g., Ex. 1004, Figs. 1–5, ¶¶ 15, 17, 19, 21. Similarly, Masaaki’s Figure 1 shows “a circuit block diagram of a reception unit 40 of a pager” according to an embodiment of the invention. Ex. 1005, 5:3–4. The block diagram shows various components, including an antenna, amplifiers, bandpass filters, a mixer, an oscillator, and a detection circuit. Id. at 5:5–8, Fig. 1. Accordingly, we adopt Petitioner’s definition of the level of ordinary skill for purposes of this Decision. Our decision, however, would not change if we had applied Patent Owner’s proposed level of ordinary skill.” slip op. at 9

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed board ownDecided for petitioner

      “strength indicator circuits 440 and 450, the written description unambiguously discloses that each circuit determines the cumulative signal level of the desired signal and the interfering signals. Neither circuit determines only the signal strength of the interferer signals, nor does a circuit determine only the signal strength of the desired signal. In other words, the written description does not support a limited reading of the claim language so as to require two separate circuits—one circuit for determining a a signal strength of the desired signal. Thus, based on this preliminary record, we do not construe the circuit limitation as requiring the wireless transceiver necessarily to have two circuits, one circuit for determining a signal strength of the interferer signal and a different circuit for determining a signal strength of the desired signal, because, under that reading of the claim, the only embodiment in the written description would not fall within the scope of the claim. It is well-established that “[s]uch an interpretation is rarely, if ever, correct and would require highly persuasive evidentiary support,” which is not present in this record as discussed below. Vitronics Corp. v. Conceptronic, Inc., 90 F.3d 1576, 1584 (Fed. Cir. 1996).” slip op. at 14

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Instituted

      “As explained above, however, on this preliminary record, we do not interpret the circuit limitation to impose a timing requirement such that the determining has to occur at precisely the same time. Nor at this preliminary juncture do we read a precise timing requirement into the circuit limitation based on written description disclosure that the desired signal and the interferer signal are part of the received signal input spectrum. As explained above, for example, the written description describes a circuit providing a cumulative signal level corresponding to the sum of the desired and interfering signals. Ex. 1001, 6:59–67. As such, the written description describes making the determinations on two signals that are part of the received signal input spectrum. Patent Owner argues that Rauhala does not disclose “two determinations of two different signal strengths together.” Prelim. Resp. 40. We do not agree with Patent Owner on this preliminary record. Rauhala’s disclosure of providing control bits based on the comparisons of the signal strengths to respective thresholds, discussed above, also undermines Patent Owner’s argument that detector DET, which (i) provides one or the other and (ii) needs to be re-tuned to read the other signal, cannot anticipate the claim. Notably, for example, Rauhala discloses setting control bits based on comparisons of the respective signal strengths to thresholds: cM. Signal cA is 0 when signal RSS is greater than S4 and signal RSSn is at the same time smaller than Sn. Otherwise, signal cA is 1. Signal cA is taken to amplifiers Al and A2. Signal cM is 1 when signal RSS is not greater than S4 and signal RSSn is at the same time at least Sn. Ex. 1004 ¶ 17 (emphases added). Here Rauhala describes providing control signals based on the strength of both signals from the receive and neighboring channels, which undermines Patent Owner’s arguments.” slip op. at 25

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR
    Patents in suitUS 10,129,825
  • PTAB · Jul 21, 2023 · IPR2023-00466 · APJ Sharon Fenick · IPR · Institution

    The Board instituted review of claims 7–9, 11, 15, 17, 18, 20, and 21 on all asserted grounds, finding a reasonable likelihood of unpatentability.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “An inter partes review may be instituted only if “the information presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2018). For the reasons below, Petitioner has established a reasonable likelihood that it would prevail in showing the unpatentability of at least one of the challenged claims. Accordingly, we institute an inter partes review of the challenged claims on all grounds raised in the Petition.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “A person of ordinary skill in the art (“POSA”) would have had a bachelor’s degree in electrical engineering and a minimum of 3-4 years of industry experience in wireless communications networks and engineering, including some knowledge of or experience with distributed antenna systems. An individual with a master’s degree in electrical engineering would require less industry experience (e.g., 1-2 years). Pet. 19 (citing Ex. 1003 (Declaration of Dr. Anthony Acampora) ¶ 24). Patent Owner proposes substantially the same level of skill, but does not require the industry experience in wireless communications networks and engineering to include “some knowledge of or experience with [distributed antenna systems].” Prelim. Resp. 8–9 (citing Ex. 2001 (Declaration of Dr. Daniel Foty) ¶ 13); Ex. 1025, 9–10). For purposes of this Decision, we apply Petitioner’s definition of the level of ordinary skill in the art. Our decision would not be different if we adopted Patent Owner’s proposed level of skill.” slip op. at 11

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed petitioner constructionDecided for petitioner

      “On the present record and for the purpose of this Decision, we agree with Petitioner that the proper construction of “communications unit” encompasses multiple DRUs or antenna units. Although Patent Owner is correct that not every embodiment needs to be reflected in every claim, and indeed, some embodiments may not appear in any claim, we do not agree that there is evidence supporting Patent Owner’s argument that the construction of “communications unit” should be narrowed to the embodiment requiring only one DRU/antenna. The cited claims do not indicate that multiple units may not transmit at the sets of frequencies recited. Additionally, although Patent Owner cites claim 16 as requiring that each communications unit is a single DRU, if that were a correct reading of claim 16, it is not clear what the claim recitation would add, as it would not narrow the prior recitation of a “communications unit” from claim 15. Such interpretations are disfavored. See Cat Tech LLC v. TubeMaster, Inc., 528 F.3d 871, 885 (Fed. Cir. 2008) (refusing to adopt a claim construction that would render a claim limitation meaningless); Bicon, Inc. v. Straumann Co., 441 F.3d 945, 950 (Fed. Cir. 2006) (explaining that “claims are interpreted claim 16 uses the inclusive “comprises” in its recitations, which is an open-ended term and does not exclude the possibility of other DRUs in a communication unit. See Genentech, Inc. v. Chiron Corp., 112 F.3d 495, 501 (Fed. Cir. 1997) (“‘Comprising’ is a term of art used in claim language which means that the named elements are essential, but other elements may be added and still form a construct within the scope of the claim.”).” slip op. at 14

    • Prior constructionPrior construction adoptedDecided for petitioner

      “Additionally, with respect to claim 20, Petitioner argues that “the first frequency band” and “the second frequency band” recited in claim 20 lack antecedent bases and are indefinite. Pet. 42, 64. This issue was addressed in the Eastern District of Texas cases claim construction order that construed “the first frequency band and the second frequency band” as “the first frequency range and the second frequency range.” Ex. 1037, 19–20. For the purposes of this Decision, we agree with and adopt the reasoning and this determination is preliminary and for the purposes of this Decision; the parties may address it further in future briefing in accordance with our rules.” slip op. at 17

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 9,197,358
  • PTAB · Apr 13, 2023 · IPR2022-01577 · APJ William V Saindon · IPR · Institution

    The Board instituted IPR on claims 1–4 and 6–10 on all petitioned grounds, finding a reasonable likelihood that claim 1 was anticipated by the HDI 3000 Manual.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “review under 35 U.S.C. § 314(b) and 37 C.F.R. § 42.4(a) (2020). The standard for instituting an inter partes review is set forth in 35 U.S.C. § 314(a), which provides that an inter partes review may not be instituted unless “there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” For the reasons provided below, we determine Petitioner has satisfied the threshold requirement set forth in 35 U.S.C. § 314(a). Because Petitioner has demonstrated a reasonable likelihood that at least one claim of the ’157 patent is unpatentable, we institute an inter partes review of all challenged claims based on all grounds raised in the Petition. 37 C.F.R. § 42.08(a).” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “B. Level of Ordinary Skill in the Art Petitioner asserts that a person of ordinary skill in the art: would have a degree in electrical engineering, biomedical engineering, or a related discipline, along with relevant experience (at least 2–3 years for a Ph.D., 3–5 years for a Master’s, and 5+ years for a Bachelor’s) researching or developing ultrasound systems or other medical imaging devices. EX1008, ¶¶21–26. The POSA would have general knowledge of ultrasound systems and related technologies as of January 15, 2001. Id. Pet. 7–8. Patent Owner applies Petitioner’s definition for purposes of its Preliminary Response. Prelim. Resp. 5. We adopt the parties’ accepted definition for purposes of this Decision.” slip op. at 6

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed board ownDecided for petitioner

      “In this case, Patent Owner’s assertion that its proposed construction is “consistent with the specification” fails to articulate or apply the proper standard. For example, any interpretation whose scope is equal to or narrower than a proper construction would logically be consistent with that proper construction. Thus, Patent Owner could only establish that its proposed interpretation is equal to or narrower in scope than the proper interpretation. Comparing the claims to prior art using a claim construction potentially narrower than what is claimed would not be a fruitful exercise because the claim could read on the prior art but not on the unduly narrow interpretation. Cf. Brown v. 3M, 265 F.3d 1349, 1351 (Fed. Cir. 2001) (holding that a broad claim is anticipated by any narrow disclosure falling within the broad claim). Patent Owner’s assertion that its proposed construction is consistent with examples in the specification is also not persuasive, and no more persuasive than its prior implication that its proposed construction is not inconsistent with the specification. i4i Ltd. P’ship v. Microsoft Corp., 598 F.3d 831, 843–44 (Fed. Cir. 2010) (“[A] claim is not limited to the embodiments described in the specification unless the patentee has demonstrated a clear intention to limit the claim’s scope with words or expressions of manifest exclusion or restriction.” (internal quotation omitted)). Similar to the situation in i4i, Patent Owner here has failed to explain how the claim is clearly limited to the examples in the specification. Instead, we construe “information of object” to be an identification of the object to be studied in the ultrasound examination, based on its plain language in the context of the claimed ultrasound device. We are not apprised of any language, on this record, in the ’157 patent or prosecution history that otherwise constrains what types of “object” would be inspected by the claimed device. For example, there is no indication that the machine is less capable than other ultrasound machines in a way that limits its use to examinations of certain things in a body such as a liver or a heart, but not simpler things in a body such as blood vessels or more complex things such as a fetus. Accordingly, we see no reason to constrain “object” to something other than those things in a body that a person of ordinary skill in the art would investigate during an ultrasound examination.” slip op. at 7

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “It does not appear necessary at this time to specifically construe any other claim terms. Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)).” slip op. at 9

    Claim construction§ 102 anticipationcites Phillips · KSR
    Patents in suitUS 6,901,157
  • PTAB · Apr 13, 2023 · IPR2022-01576 · APJ William V Saindon · IPR · Institution

    The Board instituted IPR on claims 1–3 on all petitioned grounds, finding a reasonable likelihood that claim 1 is unpatentable over Petruzzelli.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “review under 35 U.S.C. § 314(b) and 37 C.F.R. § 42.4(a) (2020). The standard for instituting an inter partes review is set forth in 35 U.S.C. § 314(a), which provides that an inter partes review may not be instituted unless “there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” For the reasons provided below, we determine Petitioner has satisfied the threshold requirement set forth in 35 U.S.C. § 314(a). Because Petitioner has demonstrated a reasonable likelihood that at least one claim of the ’985 patent is unpatentable, we institute an inter partes review of all challenged claims based on all grounds raised in the Petition. 37 C.F.R. § 42.08(a).” slip op. at 2

    • Skill levelSkill level board ownDecided for petitioner

      “B. Level of Ordinary Skill in the Art Petitioner asserts that a person of ordinary skill in the art: would have a degree in electrical engineering, computer science, or a related discipline, along with relevant experience (at least 1– 2 years for a Ph.D., 2–3 years for a Master’s, and 3+ years for a Bachelor’s) researching or developing graphical user interfaces (GUIs) for ultrasound systems or other medical imaging devices. EX1007, ¶¶14–19. The person would have general knowledge of GUIs for ultrasound systems or other medical imaging devices as of April 18, 2014. Id.” slip op. at 7

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “C. Claim Construction Petitioner asserts that no claim terms require construction at this stage. Pet. 15. Patent Owner does not offer any claim constructions, but does challenge Petitioner’s choice not to offer any claim constructions, and suggests that we should deny the Petition on that basis. Prelim. Resp. 75– 77. We find Patent Owner’s arguments unavailing. First, we note that the parties have not offered competing claim constructions, such that there is no specific claim construction issue between the parties at this time. Second, we note that we consider Petitioner’s interpretation of the claims sufficiently clear based on their application of the claims on the art. Thus, we are able to proceed without explicitly construing any claim terms, and we are not persuaded to deny on that basis. In view of the above, we do not construe any claim terms. Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)).” slip op. at 8

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Instituted

      “To establish anticipation, every element and limitation of the claimed invention must be found in a single prior art reference, arranged as in the claim. Karsten Mfg. Corp. v. Cleveland Golf Co., 242 F.3d 1376, 1383 (Fed. Cir. 2001).” slip op. at 6

    Claim construction§ 102 anticipation§ 103 obviousnesscites KSR
    Patents in suitUS 9,538,985
Page 1 of 5
← Previous12345Next →

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.