  • PTAB · Oct 10, 2025 · IPR2025-00653 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution on all claims because the Petition did not show a reasonable likelihood that any challenged claim was unpatentable over the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “An inter partes review may be instituted only if “the information presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’504 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Additionally, only terms that are in controversy need to be construed, and these need be construed only to the extent necessary to resolve the controversy. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 9; Prelim. Resp. 4 (citing Ex. 2009 ¶ 72); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13

    • Expert testimonyPetitioner expert discountedDecided for patent owner

      “Ex. 1002 ¶ 47. As reflected above, Dr. Wooley’s testimony as to element [1.2] does not even assert that Cardamone discloses a tank, let alone one or more sensors disposed at a tank as recited in element [1.2]. Thus, Dr. Wooley’s testimony does not support Petitioner’s argument on this issue.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,726,504
  • PTAB · Oct 10, 2025 · IPR2025-00652 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–23 and 25–30 were unpatentable over the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’403 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 10; Prelim. Resp. 4 (citing Ex. 2009 ¶ 73); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses element [1.2] because the evidence cited does not disclose a “first computer system being configured to provide remote control of the first pump or first valve” (i.e., a fluid-handling device). Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but Petitioner has not identified any disclosure of the capability to remotely control fluid-handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, Kahn’s disclosures that Petitioner relies on for allegedly teaching remote control are deficient. We discuss each. First, Petitioner points to the following, “[f]or instance, as illustrated in FIG. 1C, a fluid control device such as a valve 15A is located on the input side of a sen[s]or unit 110.” Ex. 1005, 8:19–21, cited in Pet. 13. This portion of Kahn, however, does not disclose remote control. Second, Petitioner cites to the following: Finally, or in addition to, the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance. Pet. 13 (citing Ex. 1005, 10:62–67). We agree with Patent Owner that this portion of Kahn teaches on-site alerts and local control of the fluid-handling device. See Prelim. Resp. 7. This portion of Kahn does not disclose remote control.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,294,403
  • PTAB · Oct 10, 2025 · IPR2025-00651 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–3, 6, 7, and 9–20 were unpatentable over any asserted ground.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’680 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 11

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner

      “target value” is part of a command that is sent from a computing device to a server and then to a controller. The controller then receives a measurement of the fluid by a sensor and determines whether the measurement satisfies the “target value.” If the measurement does not satisfy the “target value,” further operations are undertaken. The recited operation sequence makes clear that the plain and ordinary meaning of “target value” is not as Dr. Wooley opines because the particular operating condition that a device is in at a particular time is represented by the measurement taken by the sensor, 11 Some claim language less relevant to construing “target value” was omitted for ease of reference. which the controller then uses to determine whether the measurement satisfies the “target value.” Additionally, claim 1 recites that the “target value” is sent as part of a command to the controller. The “target value” is not sent to the controller from the sensor, as might be expected if the plain and ordinary meaning of “target value” were as Dr. Wooley opines. Petitioner and Dr. Wooley’s construction would also result in “target value” meaning effectively the same thing as the measurement of the fluid by the sensor, a concept that is separately recited in claim 1 and to which the “target value” is compared. The Specification of the ’680 patent does not support Petitioner’s understanding of the plain and ordinary meaning of “target value.” Although the Specification does not recite “target value,” it recites “target state,” and describes “target state” sufficiently to understand the plain and ordinary meaning of “target” as used in “target value” and “target state.” In particular, the ’680 patent explains that “[i]n some embodiments, the process 104 includes receiving, via a network interface, from a remote user device, (e.g., via a command-center server) a command to change a state of a fluid-handling device to a target state.” Ex. 1001, 11:48–51. This portion reflects that the command is seeking to change a state of a fluid-handling device to a target state. In other words, the “target value” or “target state” is not generally “the particular operating condition that a device is in at a particular time”; rather, it is a value or state that the fluid-handling device is desired to be in, as Patent Owner and Dr. Durham explain. Additionally, just as claim 1 recites a directional component for the “target value” to be sent to the controller in a command, so too does the Specification describe a “target state” as being sent in a command from a remote user device. Thus, the Specification clearly supports the plain and ordinary meaning proposed by Patent Owner and Dr. Durham and not the plain and ordinary meaning proposed by Petitioner and Dr. Wooley. slip op. at 14

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “time-stamped process data, report exception therein to the remote host, and extract and transmit time-stamped process data to the remote host.” Ex. 1005, Abst. (emphases added). Almadi explains that its remote field systems must include a plurality of controller units “to issue commands to, and gather and process data from a plurality of field devices, including remote systems and instruments, . . . [and] a database server for the storage of process data retrieved from the remote subsystems and instruments.” Id. at 2:22–30 (emphases added). Based on these disclosures, we agree with Patent Owner that Petitioner has not established that Almadi discloses element [1.4]. Specifically, the teachings from Almadi identified by Petitioner refer to process data, which is data retrieved from the remote subsystems/field devices. Thus, we understand that Almadi’s teaching—of using an Ethernet switch to transmit “process data”—describes transmitting data from the remote subsystems/field devices. See Ex. 1005, 3:13–17, cited in Pet. 15. But claim 1 and particularly element [1.4], recites “sending, with the server, the target value to the network address [which identifies a controller of the fluid-handling device13] via the network,” which is different than sending process data from the field devices to the remote host or database server for storage.” slip op. at 19

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,175,680
  • Tanklogix, LLC v. SiteproInstitution denied
    PTAB · Oct 10, 2025 · IPR2025-00650 · APJ Sheila F Mcshane · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 18–32 and 34 were unpatentable over Kahn or Kahn and Gutierrez.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). Upon consideration of the Petition, the Preliminary Response, and the evidence of record, we determine that Petitioner has not established a reasonable likelihood of prevailing with respect to the unpatentability of at least one claim of the ’871 patent. Accordingly, for the reasons that follow, we decline to institute an inter partes review of claims 18–32 and 34 of the ’871 patent.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The respective proposed levels of qualifications for a person of ordinary skill in the art are similar, with Patent Owner proposing two years of experience compared to Petitioner proposing significant experience with remotely controlling fluid-handling devices, like SCADA systems. Patent Owner also proposes more extensive experience in lieu of educational experience. While we find Petitioner’s proposed qualifications to be acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of skill necessary to understand and implement the teachings of the ’871 patent and the asserted prior art. Our analysis and findings herein, however, do not turn on any differences in the qualifications adopted.” slip op. at 8

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “We determine that we need not expressly construe any claim terms to resolve the parties’ disputes on the current record. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 10

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “actuators and the remote control of fluid handling devices, including the receipt with the user-interface module of “a user command to actuate an actuator via a presented control interface” (limitation [18.7]) and “account authorized to send commands to remotely control fluid handling devices” (limitation [18.11]). We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses or teaches these limitations because the evidence does not provide support that there is remote control of fluid handling devices or the use of a user command on a control interface to send a command to a fluid handling device, for instance. Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but we do not discern that it teaches or discloses the capability to remotely control fluid handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, the Kahn disclosures that Petitioner repeatedly relies upon for allegedly teaching this control are deficient. See Ex. 1005, 10:62–67, 14:35– 15:2, 15:62–16:32; see also Pet. 12–14, 16–18. Kahn discloses that “the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance.” Ex. 1005, 10:62–67. Communication unit 112B is part of the local “sensor unit,” wherein the detection conditions determined by the sensor are communicated to remote devices by communication unit 112B. See id. at 3:31–33, 5:62–6:2, 6:27–35, 7:33–37, 13:7–12, Figs. 1A–1C. Kahn discloses that the sensor units, which include communication units 112B, can be located near shut-off valves and can communicate with distant locations. See id. at 11:1–13. There are no disclosures, however, in the above passages that there is remote control of fluid handling devices, that there is a user command on a control interface that actuates an actuator, or that there is a command sent to the facility actuators via a network connection, as required in limitations [18.5]–[18.7] and [18.9]–[18.12], respectively. Rather, the disclosure indicates that the communication unit 112B includes on-site alerts and that the local (non-remote) communication unit 112B can be interfaced with the control valve.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 10,488,871
  • PTAB · Oct 16, 2024 · IPR2023-00697 · APJ Barbara A Benoit · IPR · Final written decision

    Claims 1, 3, 4, and 8 were not proven unpatentable: Rauhala does not disclose the required simultaneous signal-strength determinations, and Masaaki does not cure the deficiency for claim 4.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Following institution, Patent Owner maintained the same level of ordinary skill proposed in its preliminary response and did not address our discussion of the level of ordinary skill in the art in the Institution Decision. PO Resp. 24–25; see also Prelim. Resp. 24. For the reasons discussed in the Institution Decision, we adopt and apply for this Decision the level of ordinary skill articulated by Petitioner and used previously in our Institution Decision. See Dec. 8–10. In light of our review of the complete record, we find that this formulation is consistent with the ’825 patent, the prior art of record, and is supported by the testimony of Dr. Baker. See Ex. 1002 ¶¶ 27– 31. Our decision would not change, however, if we had applied Patent Owner’s proposed level of ordinary skill.” slip op. at 12

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner

      “We agree with Patent Owner that the desired signal and interferer signal must be received at the same time. The plain language of the claim requires the wireless transceiver to “receiv[e] a wireless signal having a desired signal and an interferer signal,” the determining of a signal strength of the interferer signal and the determining of a signal strength of the desired signal must be performed at the same time; otherwise, the determinations of signal strengths would not be of the same wireless signal. The specification supports this understanding. “When a receiver is actively receiving a desired signal, each block in the signal path has at its input the desired signal as well as noise and possibly interfering signals.” Ex. 1001, 5:20–22; see also id. at 5:31–33 (“FIGS. 2A and 2B illustrate examples of desired signals, interferers, and noise that may be received by one of the various circuits in a” slip op. at 21

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “We agree with Patent Owner that Rauhala does not state that the signal strengths are measured simultaneously or at the same time. Indeed, as discussed above, Rauhala indicates unequivocally in the same paragraph the opposite—that detector DET provides to control unit 42 “an indication about either the receive channel signal strength RSS or the strength of any signal on the reception band.” Ex. 1004 ¶ 17. Rauhala describes that “control unit 42 provides two one-bit control signals cA and cM” based on indications received from detector DET. Id. Importantly, Rauhala indicates that “at the same time as” describes how the control unit 42 uses the received inputs RSS and RSSn shown in Figure 4, which are described earlier in paragraph 17 as indications of either RSS or RSSn from detector DET. Id. (“Signal cA is 0 when signal RSS is greater than S4 and signal RSSn is at the 11 Dr. Baker’s reply declaration correctly quotes Rauhala paragraph 17 but cites to paragraph 18. We deem this harmless error. same time smaller than Sn. . . . Signal cM is 1 when signal RSS is not greater than S4 and signal RSSn is at the same time at least Sn. Otherwise, signal cM is 0.”). The burden remains on Petitioner to demonstrate by a preponderance of the evidence that Rauhala discloses the disputed limitations as arranged or combined in the claim. Petitioner does not persuasively reconcile these “either/or” statements regarding the functioning of detector DET with the “at the same time as” statements regarding control signals output by control unit 42 in paragraph 17. We do not find persuasive Petitioner counsel’s position expressed at the hearing that Rauhala’s “either/or” statements are “simply an imprecise description” (Tr. 16:22–24). We do not see a lack of precision in Rauhala’s “either/or” statements.” slip op. at 30

    • Expert testimonyPetitioner expert discountedPatent owner expert creditedDecided for patent owner

      “When asked at his deposition to explain Rauhala’s use of the word “or” regarding the functioning of detector DET, Dr. Baker asserted that “[detectors] can be designed to determine RSS or RSSn.” Ex. 2016, 85:5– 12. We find Dr. Baker’s testimony that “it’s reasonable that if you can design . . . the detector to detect one or the other, you can also design it to detect both” to be without factual support. Id. at 85:13–16. He points to no textbook or other independent evidence to support that would have led one of ordinary skill to design such a detector or to support that one of ordinary skill would have understood Rauhala’s detector to be so designed. Furthermore, Dr. Baker recognizes that “Rauhala doesn’t teach the details of what’s in the detector.” Id. at 91:6–7. We give little weight to Dr. Baker’s unsupported testimony that one could design a detector to detect both RSS and RSSn from the same wireless signal. See 37 C.F.R. 42.65(a) (“Expert testimony that does not disclose the underlying facts or data on which the opinion is based is entitled to little or no weight.”); see also Xerox Corp. v. Bytemark, Inc., No. IPR2022-00624, 2022 WL 3648989, at *6 (PTAB 2022) (precedential) (Director affirming because “the cited declaration testimony is conclusory and unsupported, adds little to the conclusory assertion for which it is offered to support, and is entitled to little weight”).” slip op. at 31

    Patent outcomesUS 10,129,825 not shown unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 10,129,825
  • PTAB · Oct 16, 2024 · IPR2023-00698 · APJ Thomas L Giannetti · IPR · Final written decision

    Claims 7–11, 13, and 19–21 were not shown unpatentable because Rauhala does not disclose simultaneous desired and interferer signal-strength determinations, defeating anticipation and the obviousness combination.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “The two proposals are materially similar in the education requirement, but differ marginally in professional experience required (three versus five years). See supra. While we were persuaded, on the preliminary record, that both Petitioner’s and Patent Owner’s proposals were consistent with the problems and solutions in the ’202 patent and the prior art of record, on balance, we determined that Petitioner’s proposal was a better reflection of the level of skill in the prior art, and we therefore adopted it for our Institution Decision. See Institution Dec. 12–13. For this Decision, we adopt the description of the person of ordinary skill articulated by Petitioner and used previously in our Institution Decision. In light of our review of the complete record, we find that this formulation is consistent with the ’202 patent, the prior art of record, and is supported by the testimony of Dr. Baker. See Baker I Decl. ¶¶ 28–32. Our Decision would not change, however, if we had applied Patent Owner’s proposed level of ordinary skill.” slip op. at 12

    • Expert testimonyPetitioner expert discountedDecided for patent owner

      “85:13–16. He admits that “Rauhala doesn’t teach the details of what’s in the detector.” Id. at 91:6–7. He points to no textbook or other independent evidence that would have led a person of ordinary skill to design such a detector. Our Trial Practice Guide cautions against crediting such unsupported testimony: The Board has broad discretion to assign weight to be accorded expert testimony. Yorkey v. Diab, 601 F.3d 1279, 1284 (Fed. Cir. 2010). However, the testimony must be based on sufficient facts and data. Fed. R. Evid. 702(b). “Expert testimony that does not disclose the underlying facts or data on which the opinion is based is entitled to little or no weight.” 37 C.F.R. § 42.65(a). Patent Trial and Appeal Board Consolidated Trial Practice Guide 35 (Nov. 2019).7 We therefore give Dr, Baker’s unsupported testimony on this issue little weight.” slip op. at 24

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “We construe claim terms only as relevant to the parties’ contentions and only to the extent necessary to resolve the issues in dispute. See Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999); Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co. Matal, 868 F.3d 1013, 1017 (Fed. Cir. 2017). Having considered the positions of the parties, we find that for the purpose of this decision, we do not need to construe these terms to resolve a dispute.” slip op. at 9

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “requirement.” Pet. Reply 5. We do not agree with Petitioner. We find that the language of the claims supports Patent Owner’s argument that the desired signal and the interferer signal are received together. As discussed infra, claim limitations 7.7 and 7.8 recite determining a signal strength of the interferer signal and determining a signal strength of the desired signal. These determinations must be performed at the same time; otherwise, the determinations of signal strengths would not be of the same wireless signal. See Larson II Decl. ¶ 70; Baker II Decl. ¶¶ 48–49 (explaining that consideration of signal strengths detected at the same time would be “essential”). The specification of the ’202 patent further supports this finding: “When a receiver is actively receiving a desired signal, each block in the signal path has at its input the desired signal as well as noise and possibly interfering signals.” Ex. 1001, 5:22–24; see also Figs. 2A, 2B (showing interferer signals and desired signals together).” slip op. at 17

    Patent outcomesUS 10,524,202 not shown unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites Graham
    Patents in suitUS 10,524,202
  • PTAB · May 28, 2024 · IPR2024-00085 · APJ Michael L Woods · IPR · Institution

    The Board instituted IPR on claims 1, 2, 4, 5, 7–11, 13, and 15 on all asserted grounds, finding a reasonable likelihood that at least one challenged claim is unpatentable.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “Under 35 U.S.C. § 314 and 37 C.F.R. § 42.4(a), we have authority to institute an inter partes review if “the information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). After considering the Petition, the Preliminary Response, the Preliminary Reply, the Preliminary Sur-reply, and the evidence of record, we determine the information presented shows a reasonable likelihood that Petitioner would prevail in establishing the unpatentability of at least one of the Challenged Claims of the ’659 patent. Accordingly, we institute an inter partes review of the Challenged Claims on the grounds asserted in the Petition.” slip op. at 2

    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Denied

      “We disagree with Patent Owner. Our analysis under Fintiv is guided by the USPTO Director’s Memorandum issued on June 21, 2022, titled “Interim Procedure for Discretionary Denials in AIA Post Grant Proceedings with Parallel District Court Litigation.”8 The Director’s Memorandum explains that, when a petitioner makes a Sotera-type stipulation, “it mitigates concerns of potentially conflicting decisions and duplicative efforts between the district court and the PTAB” and “[w]ith such a stipulation, if an IPR or PGR is instituted, the grounds the PTAB resolves will differ from those present in 8 https://www.uspto.gov/sites/default/files/documents/interim_proc_discretio nary_denials_aia_parallel_district_court_litigation_memo_20220621_.pdf (“Director’s Memorandum”). the parallel district court litigation.” Director’s Memorandum 7 (citing Sotera, IPR2020-01019, Paper 12 at 18–19). Pursuant to the Director’s Memorandum, we “will not discretionarily deny institution of an IPR or PGR in view of parallel district court litigation where a petitioner stipulates not to pursue in a parallel district court proceeding the same grounds as in the petition or any grounds that could have reasonably been raised in the petition.” Id. Because Petitioner provides a Sotera-type stipulation, we do not exercise our discretion to deny institution under Fintiv.” slip op. at 8

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “Upon review of the prior art of record and the parties’ arguments, we adopt Patent Owner’s definition of the person of ordinary skill in the art for purposes of this Decision as it appears consistent with the prior art of record. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (holding that the prior art itself can reflect the appropriate level of ordinary skill in the art). Petitioner’s proposed definition appears overly restrictive, as it requires a graduate degree in a narrow field of engineering or equivalent experience. We find that a bachelor’s degree with the accompanying experience proposed by Patent Owner more closely aligns with the prior art of record and the ’659 patent. We note, however, there is some overlap in the proposed levels of ordinary skill in the art because Patent Owner’s proposal includes “at least” a bachelor’s degree, which would encompass Petitioner’s master’s degree as well. Prelim. Resp. 19. Nonetheless, our determination herein would be the same under either party’s definition.” slip op. at 9

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed petitioner constructionDecided for petitioner

      “We disagree with Patent Owner’s claim construction. By using the word “or,” the plain and ordinary meaning of “prone, kneeling, or standing” is that only one must be satisfied to meet the claim. See, e.g., SkinMedica, Inc. v. Histogen Inc., 727 F.3d 1187, 1199 (Fed. Cir. 2013) (“The disjunctive ‘or’ plainly designates that a series describes alternatives.”). Furthermore, and although claims are read in light of the specification, limitations in a specification are not read into a claim. In re van Geuns, 988 F.2d 1181, 1184 (Fed. Cir. 1993). Even if the Specification describes embodiments in which the user can begin in a prone position and then transition to a kneeling or standing position, as Patent Owner points out (see Prelim. Resp. 20), the claim does not recite the term “transitioning,” and we do not read the terms “each of” or “substantially flat surface” into this claim limitation. For example, the claim does not recite a “substantially flat” top surface and Patent Owner’s attempt to infer this structure into the claim is not supported under the law. See id. at 29–30. For purposes of this Decision, we agree with Petitioner and construe “prone, kneeling, or standing” in accordance with its plain and ordinary meaning as alternatives, and the prior art need only show one to satisfy this aspect of the claim.” slip op. at 12

    Claim construction§ 102 anticipation§ 103 obviousnessDiscretionary denialcites Phillips · KSR
    Patents in suitUS 9,586,659
  • PTAB · May 28, 2024 · IPR2024-00086 · APJ Kevin W Cherry · IPR · Institution

    The Board instituted IPR on claims 1, 2, 5-8, 10-15, 17, 18, 20, and 21 on all asserted grounds after finding a reasonable likelihood of success and declining Fintiv denial.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “In an [inter partes review], the petitioner has the burden from the onset to show with particularity why the patent it challenges is unpatentable.” Harmonic Inc. v. Avid Tech., Inc., 815 F.3d 1356, 1363 (Fed. Cir. 2016) (citing 35 U.S.C. § 312(a)(3) (requiring inter partes review petitions to identify “with particularity . . . the evidence that supports the grounds for the challenge to each claim”)). This burden of persuasion never shifts to Patent Owner. See Dynamic Drinkware, LLC v. Nat’l Graphics, Inc., 800 F.3d 1375, 1378 (Fed. Cir. 2015) (discussing the burden of proof in an inter partes review). slip op. at 10

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITAPlain and ordinary meaningDecided for petitioner

      “1. “wherein a user can be disposed on the top surface of the flotation device in a prone, kneeling, or standing position” With respect to the claim term “wherein a user can be disposed on the top surface of the flotation device in a prone, kneeling, or standing position,” Patent Owner points to passages of the Specification, arguing that all three positions are possible. Prelim. Resp. 19–21 (citing Ex. 1001, Abstr., 4:13–17, 4:33–40; Ex. 2006 ¶ 18). We do not agree with Patent’s Owner proposed construction because even if the Specification discloses that all three positions are possible, that is not what the plain language of the claim requires. Claim 1 recites “or,” which means that a user can be disposed on the top surface of the flotation device in any one of the three positions. See, e.g., SkinMedica, Inc. v. Histogen Inc., 727 F.3d 1187, 1199 (Fed. Cir. 2013) (“The disjunctive ‘or’ plainly designates that a series describes alternatives.”). Patent Owner does not identify any definition or disclaimer that would modify this plain meaning. See Thorner v. Sony Computer Entm’t Am. LLC, 669 F.3d 1362, 1365 (Fed. Cir. 2012). Thus, we agree with Petitioner and apply the plain and ordinary meaning of the phrase “wherein a user can be disposed on the top surface of the flotation device in a prone, kneeling, or standing position,” to construe “prone, kneeling, or standing” as alternatives, and the prior art need only show one to satisfy this aspect of the claim.” slip op. at 13

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “Neither party explains how or why its particular proposal impacts the issues before us in this proceeding. We find that a bachelor’s degree with the accompanying experience proposed by Patent Owner more closely aligns with the prior art of record and the ’044 patent. We note, however, there is some overlap in the proposed levels of ordinary skill in the art because Patent Owner’s proposal includes “at least” a bachelor’s degree, which would encompass Petitioner’s master’s degree as well. Prelim. Resp. 10. Nonetheless, our determination herein would be the same under either party’s definition.” slip op. at 12

    • Novelty / Anticipation (§102) › Prior-art status of a reference › Printed publication / public accessibilityPrinted publication establishedInstituted

      “As the Board has held in a precedential decision, “at the institution stage, the petition must identify, with particularity, evidence sufficient to establish a reasonable likelihood that the reference was publicly accessible before the critical date of the challenged patent and therefore that there is a reasonable likelihood that it qualifies as a printed publication.” Hulu, LLC v. Sound View Innovations, LLC, IPR2018-01039, Paper 29 at 13 (PTAB Dec. 20, 2019) (precedential).” slip op. at 23

    Claim construction§ 102 anticipation§ 103 obviousnessDiscretionary denialcites KSR · Graham
    Patents in suitUS 9,359,044
  • PTAB · Mar 5, 2024 · IPR2023-00830 · APJ Sharon Fenick · IPR · Final written decision

    Claims 1–19 are unpatentable: claims 1–5, 8–11, 13–16, 18, and 19 are anticipated by Wu; claims 6, 7, 12, and 17 are obvious over Wu and Sabat-552.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “an educational background in electrical engineering and experience in the design of wireless communication systems,” and “[m]ore particularly, a POSA would be a person with a bachelor’s degree in electrical engineering (or a similar technical degree or equivalent work experience) and at least 3 years of experience working with wireless communication systems.” PO Resp. 13. We found in the Decision on Institution that Patent Owner’s definition was generally consistent with Petitioner’s definition, with the exception of requiring 3 years or more (as opposed to 2 to 3 years) of work experience in wireless communication systems and, for the purpose of institution, we adopted Petitioner’s provided definition for the level of skill of a person of ordinary skill in the art as reasonable and consistent with the prior art. Dec. on Inst. 20–21. The record does not contain further argument or evidence regarding the level of skill of one of ordinary skill in the art, and we again adopt Petitioner’s definition, which does not encompass an open-ended (“at least 3 years”) amount of experience and which is supported by the testimony of Dr. open-ended terminology from Patent Owner’s definition and adopt that definition.” slip op. at 15

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed board ownDecided for petitioner

      “b) Our Conclusion We conclude that the proper construction of “digital representation of a . . . set of radio resources” encompasses user payload data packaged in or combined with RF carrier channels. We further conclude that “digital representation of a . . . set of radio resources” is not limited to and does not necessarily include configuration information that is required to or used to reconfigure remote radio units.” slip op. at 18

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “packetize” or “packetizing” as recited in claims 2, 9, and 14. PO Resp. 19– 20; Pet. Reply 5–6. Patent Owner argues that we should construe “packetize” to mean “create data packets that include destination information.” PO Resp. 19–20. Patent Owner argues that this is consistent with how the Board previously interpreted this claim term in the 00571 IPR. PO Resp. 19 (citing Ex. 1017). We do not need to construe “packetizing” because collateral estoppel prevents Patent Owner from arguing that Wu does not disclose “packetizing” as explained below. We also do not need to construe any other terms to resolve the disputes before us. Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms ... that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng'g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))). slip op. at 22

    • PTAB / AIA Trials › §315(e) estoppelEstoppel appliesDecided for petitioner

      “When deciding whether issue preclusion applies, we consider whether: (1) a prior action presents an identical issue; (2) the prior action actually litigated and adjudged that issue; (3) the judgment in that prior action necessarily required determination of the identical issue; and (4) the prior action featured full representation of the estopped party. VirnetX Inc. v Apple, Inc., 909 F.3d 1375, 1377 (Fed. Cir. 2018) (citing Stephen Slesinger, Inc. v. Disney Enterprises, Inc., 702 F.3d 640, 644 (Fed. Cir. 2012)). To the extent Petitioner asks us to consider the 01473 IPR institution decision for issue preclusion, we do not. In that decision the Board reached a finding based on the institution standard (showing of a “reasonable likelihood that the petitioner will prevail,” 35 U.S.C. § 314(a)) rather than proof by a preponderance of the evidence, which is before us now (35 U.S.C. § 316(e)). Ex. 1016. Thus, issues before us here were not presented and adjudged in that institution decision. Regarding the 01473 IPR adverse judgment decision, that decision did not require determination of any issues before us, as that decision was based on Patent Owner canceling the challenged claims rather than any determination regarding unpatentability that had been shown by a preponderance of the evidence. Ex. 1014. 2. Collateral Estoppel With Respect to the 00571 IPR We find and determine that the final written decision in the 00571 IPR, and the Federal Circuit’s CommScope decision affirming that decision, satisfies the conditions for applying collateral estoppel because the 00571 discloses materially the same claim limitations7 challenged here, and Patent Owner had full representation throughout the proceedings. Setting aside the factors of issue preclusion for a moment, our reviewing court’s affirmance of our final written decision in CommScope is persuasive authority that supports our prior construction of “packetizing” and Petitioner’s showing that Wu teaches the disputed packetizing limitations under that construction. In addition, issue preclusion prevents Patent Owner from re-litigating the issue of whether Wu teaches materially the same disputed limitation. See Pet. Reply 24; Ex. 1017, 31–34 (final written decision determining obviousness of claims 9, 10, 14, and 16 of the ’473 patent over Wu and Sabat-426); Ex. 1072, 5 (summarizing the final written decision regarding the packetizing limitations), 10–16 (finding no error in the determinations regarding the packetizing limitations).” slip op. at 12

    Patent outcomesUS 10,334,499 unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites KSR · Graham
    Patents in suitUS 10,334,499
  • PTAB · Mar 5, 2024 · IPR2022-01293 · APJ Sharon Fenick · IPR · Final written decision

    Claims 1–19 are unpatentable: claims 1–5, 8–11, 13–16, 18, and 19 as anticipated by and obvious over Wu; claims 6, 7, 12, and 17 as obvious over Wu and Sabat-552.

    RulingsFinal written decision
    • PTAB / AIA Trials › §315(e) estoppelEstoppel appliesDecided for petitioner

      “whether: (1) a prior action presents an identical issue; (2) the prior action actually litigated and adjudged that issue; (3) the judgment in that prior action necessarily required determination of the identical issue; and (4) the prior action featured full representation of the estopped party. VirnetX Inc. v Apple, Inc., 909 F.3d 1375, 1377 (Fed. Cir. 2018) (citing Stephen Slesinger, Inc. v. Disney Enterprises, Inc., 702 F.3d 640, 644 (Fed. Cir. 2012)).” slip op. at 12

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “would have a bachelor’s degree in electrical engineering (or equivalent field) with 2–3 years of work experience in wireless communications.” Pet. 21 (citing Ex. 1003 ¶¶ 20–22). Patent Owner argues that one of ordinary skill in the art “would have an educational background in electrical engineering and experience in the design of wireless communication systems,” and “[m]ore particularly, a POSA would be a person with a bachelor’s degree in electrical engineering (or a similar technical degree or equivalent work experience) and at least 3 years of experience working with wireless communication systems.” PO Resp. 13. We found in the Decision on Institution that Patent Owner’s definition was generally consistent with Petitioner’s definition, with the exception of requiring 3 years or more (as opposed to 2 to 3 years) of work experience in wireless communication systems and, for the purpose of institution, we adopted Petitioner’s provided definition for the level of skill of a person of ordinary skill in the art as reasonable and consistent with the prior art. Dec. on Inst. 20–21. The record does not contain further argument or evidence regarding the level of skill of one of ordinary skill in the art, and we again adopt Petitioner’s definition, which does not encompass an open-ended (“at least 3 years”) amount of experience and which is supported by the testimony of Dr.” slip op. at 15

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed board ownDecided for petitioner

      “a . . . set of radio resources” encompasses user payload data packaged in or combined with RF carrier channels. We further conclude that “digital representation of a . . . set of radio resources” is not limited to and does not necessarily include configuration information that is required to or used to reconfigure remote radio units.” slip op. at 18

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “We do not need to construe “packetizing” because collateral estoppel prevents Patent Owner from arguing that Wu does not disclose “packetizing” as explained below. We also do not need to construe any other terms to resolve the disputes before us. Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms ... that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng'g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 22

    Patent outcomesUS 10,334,499 unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites KSR · Graham
    Patents in suitUS 10,334,499
Page 1 of 12
← Previous12345…Next →

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.