PTAB
Advanced fields
385 decisions · 379msnewest first
  • PTAB · Jul 22, 2024 · IPR2024-00374 · APJ Jason M Repko · IPR · Institution

    The Board instituted IPR on claims 1–10 and all asserted grounds because the petition showed a reasonable likelihood of prevailing on at least one challenged claim.

    RulingsInstitution decision
    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Decided for petitioner

      “petition for inter partes review. Cuozzo Speed Techs., LLC v. Lee, 136 S. Ct. 2131, 2140 (2016). In determining whether to exercise that discretion on behalf of the Director, the Board considers an early trial date in related litigation, among other factors, as part of an assessment of all relevant circumstances of the case—including the merits—to balance considerations such as system efficiency, fairness, and patent quality. Fintiv, Paper 11 at 5. When the same prior art is submitted in district court and to the Board, there are “concerns of inefficiency and the possibility of conflicting decisions.” Id. at 12. Petitioner can mitigate those concerns by presenting a stipulation not to pursue in a parallel proceeding the same grounds or any grounds that” slip op. at 7

    • PTAB / AIA Trials › Discretionary denial › §325(d) same art / argumentsDecided for petitioner

      “(2) if either condition of first part of the framework is satisfied, whether the petitioner has demonstrated that the Office erred in a manner material to the patentability of challenged claims. If a condition in the first part of the framework is satisfied and the petitioner fails to make a showing of material error, the Director generally will exercise discretion not to institute inter partes review.” slip op. at 9

    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “To institute an inter partes review, we must determine “that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2018). For the reasons discussed below, Petitioner has shown a reasonable likelihood that it would prevail with respect to at least one claim challenged in the Petition. Thus, we institute an inter partes review.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “engineering, electrical engineering, or a related field, and (2) at least two years of industry experience in digital video processing, or a related field.” Pet. 3 (citing Ex. 10035 ¶¶ 76–78). Petitioner also asserts that “[a]dditional graduate education could substitute for professional experience, and vice versa.” Id. Patent Owner uses the same skill level in its Preliminary Response. Prelim. Resp. 21. We also apply Petitioner’s proposed skill level in this Decision. Pet. 3.” slip op. at 13

    Claim construction§ 103 obviousnessDiscretionary denialcites Phillips
    Patents in suitUS 8,090,025
  • PTAB · Jul 18, 2024 · IPR2024-00372 · APJ Jason M Repko · IPR · Institution

    The Board instituted review of claims 2–4 and 11 on all petition grounds, finding a reasonable likelihood that Samsung would show them unpatentable as obvious over Phek, Segall, Martins, and He.

    RulingsInstitution decision
    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Decided for petitioner

      “such as system efficiency, fairness, and patent quality. Fintiv, Paper 11 at 5. When the same prior art is submitted in district court and to the Board, there are “concerns of inefficiency and the possibility of conflicting decisions.” Id. at 12. Petitioner can mitigate those concerns by presenting a stipulation not to pursue in a parallel proceeding the same grounds or any grounds that could have reasonably been raised before the Board. Sotera Wireless, Inc. v. Masimo Corp., IPR2020-01019, Paper 12 at 19 (PTAB Dec. 1, 2020) (precedential). Here, Petitioner has presented such a stipulation: if the Board grants institution, Petitioner “agrees not to pursue any grounds raised in the petition, or any grounds [Petitioner] could have reasonably raised in the petition, in [the] district court litigation or any parallel proceeding” Ex. 1028, 1. “Consistent with [Sotera], the PTAB will not discretionarily deny institution in view of parallel district court litigation where a petitioner presents a stipulation not to pursue in a parallel proceeding the same grounds or any grounds that could have reasonably been raised before the PTAB.” Katherine K. Vidal, Interim Procedure for Discretionary Denials in AIA Post-Grant Proceedings with Parallel District Court Litigation (USPTO June 21, 2022).5 Thus, we decline to exercise our discretion to deny the Petition.” slip op. at 7

    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “present arguments specifically directed to the subject matter recited in the rest of the claim. See Prelim. Resp. Even so, Petitioner has the burden to show that the challenged claims are unpatentable. Thus, we have reviewed Petitioner’s arguments and evidence submitted in connection with the remaining limitations and find them to be sufficient at this stage and on this record. From the current record, Petitioner has established a reasonable likelihood that it will prevail in demonstrating that claim 2 is unpatentable.” slip op. at 25

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “digital video processing, or a related field.” Pet. 3–4 (citing Ex. 10036 ¶¶ 123–125). Petitioner also asserts that “[a]dditional graduate education could substitute for professional experience, and vice versa.” Id. at 4. Patent Owner uses the same skill level in its Preliminary Response. Prelim. Resp. 13. We also apply Petitioner’s proposed skill level in this Decision.” slip op. at 8

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Patent Owner’s arguments, however, are based on an implicit construction for the second resolution converter. See § II.D.5.c supra. For the reasons discussed below, we disagree with Patent Owner’s arguments and the implicit construction. See id. Apart from rejecting the implicit construction of the second resolution converter, we agree with the parties that no claim term needs to be construed in this Decision.” slip op. at 9

    Claim construction§ 103 obviousnessDiscretionary denialcites Phillips
    Patents in suitUS 10,218,995
  • Bright Data Ltd. v. Oxylabs, UabNo claims unpatentable
    PTAB · Jul 15, 2024 · IPR2023-00186 · APJ Iftikhar Ahmed · IPR · Final written decision

    Claims 1–20 were not shown unpatentable because Scoda did not disclose the claimed interception limitation and Hallak did not disclose execution of the removed script after removal.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “the invention of the ’091 patent would have had master’s degree or higher in the field of electrical engineering, computer engineering, or computer science, or would have had a bachelor’s degree in the same fields and two or more years of experience in internet communications. Pet. 15–16 (citing Ex. 1007 ¶¶ 30–31). Patent Owner does not dispute Petitioner’s definition for a person of ordinary skill in the art. See generally PO Resp. We adopt the level of ordinary skill as articulated by Petitioner because, based on the current record, this proposal appears to be consistent with the ’091 patent and the prior art of record and is supported by the testimony of Dr. Williams.” slip op. at 10

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed petitioner constructionDecided for petitioner

      “We find that the parties’ agreed upon construction is supported by the record before us and apply it in our patentability analysis below, requiring the embedded script to be removed before that script is executed. We determine that no other claim terms require express construction.” slip op. at 12

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “during trial, we determine that Petitioner has not shown by a preponderance of the evidence that Scoda discloses intercepting a web page sent from a We agree with Patent Owner that portions of Scoda cited in the Petition do not disclose a web page, let alone one sent from a server and addressed to a client browser. See PO Resp. 17; Tr. 73:10–23. Scoda discloses that “[t]he core module 21 is executed by the web content proxy server 12 to determine where to provide the response with the executed JavaScript functionality in the exemplary environment 10, such as to a web browser on one of the client devices 14(1)–14(n).” Ex. 1016 ¶ 55. But this functionality does not refer to a web page from a server. Instead, this discussion is about a HTTP request that comes from a client device and may include one or more hidden JavaScript identifiers. See id. ¶¶ 50–55. The discussion about providing a response to a web browser on a client device refers to a response to the client device’s HTTP request, in the form of an error message, that is sent from the proxy server to client device. Id. ¶ 58. As Patent Owner points out, this is one of the two scenarios presented in Scoda, the other one being that HTTP request is sent to the server. Id.; PO Resp. 36; see also Ex. 2009 ¶ 70. We agree with Patent Owner and Dr. Almeroth that these communications between the client and proxy server or the proxy server and the content server do not disclose the “intercepting” limitation.” slip op. at 19

    • Strike new argumentNew argument disregardedDenied

      “deficient, Petitioner attempts to change the focus of its argument. Pet. Reply 2–3. Petitioner instead relies on Figure 8 and related discussion as “Scoda’s disclosure of proxy server 12 processing a web page that was sent from a web server.” Id. Scoda, and Petitioner’s argument based on this disclosure is, therefore, an untimely new argument presented in the Reply. See 37 C.F.R. § 42.23(b); see also Intelligent Bio-Sys., 821 F.3d at 1369 (“It is of the utmost importance that petitioners in the IPR proceedings adhere to the requirement that the initial petition identify ‘with particularity’ the ‘evidence that supports the grounds for the challenge to each claim.’”) (citing 35 U.S.C. § 312(a)(3)).” slip op. at 20

    Patent outcomesUS 9,516,091 not shown unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites Enfish · Phillips · KSR · Graham
    Patents in suitUS 9,516,091
  • Bright Data Ltd. v. Oxylabs, UabNo claims unpatentable
    PTAB · Jul 11, 2024 · IPR2023-00185 · APJ Thomas L Giannetti · IPR · Final written decision

    Claims 1–19 were not proven unpatentable; the Board found the asserted WebShield and Hallak grounds failed on script-removal and execution sequencing, and the Kothari combination lacked motivation.

    RulingsFinal written decision
    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner

      “Post-institution, Patent Owner proposes two claim constructions. PO Resp. 7–8. Patent Owner proposes that we construe the term “embedded script,” as defined in the ’498 patent, as “a script that is included or incorporated by reference into a markup language description of a web page and executable by a browser rendering that web page.” Id. at 8 (citing Ex. 1001, 3:23–26). According to Patent Owner, a “script” is “a sequence of machine-readable instructions.” Id. (citing Ex. 1001, 3:21–23). Patent Owner proposes that we construe “executing . . . the removed embedded script” as requiring the removal of the script embedded in the web page to take place before the script is executed. Id. This limitation is recited in claim 1 and in each of the other independent claims. Ex. 1001, 11:43–46 (claim 1), 12:17–20 (claim 10); 12:58–63 (claim 19). Petitioner responds that “[t]hese claim terms have already been construed by the district court and those constructions are not disputed in this proceeding.” Pet. Reply 2. We find that these undisputed constructions are supported by the record before us. We, therefore, adopt them for this Decision. We do not find it necessary to expressly construe any other terms for this Decision.” slip op. at 9

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Patent Owner has not provided a description of the ordinarily skilled artisan. However, Dr. Almeroth testifies that although he “do[es] not necessarily agree with every aspect of Dr. Williams’ explanation,” he bases 7 Neither party has presented evidence or arguments regarding objective evidence of non-obviousness. his opinions on Dr. Williams’s description of the person of ordinary skill in the art. Almeroth Decl. ¶ 36. For this Decision, therefore, we adopt the description of the person of ordinary skill articulated by Petitioner and used previously in our Institution Decision. In light of our review of the complete record, we find that this formulation is consistent with the ’498 patent, the prior art of record, and is supported by the testimony of Dr. Williams. See Williams Decl. ¶¶ 30–31.” slip op. at 11

    • Expert testimonyPetitioner expert discountedDecided for patent owner

      “We are not persuaded by Dr. Williams’s testimony that WebShield teaches or suggests this limitation. See Williams Decl. ¶¶ 132–137. His testimony does not address the claimed sequence required by the claims and, in fact, quotes WebShield’s description of parsing and executing the embedded JavaScript files to create the DOM data structures relied on by Patent Owner and Dr. Almeroth. See id. at ¶ 136 (quoting Ex. 1008, 5).” slip op. at 21

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “We agree that Petitioner’s citations to WebShield do not disclose the sequence of operations called for by the claims. WebShield expressly states that “the HTML page, embedded JavaScript files and embedded CSS files will be parsed and executed to create the DOM data structures of the webpage.” Ex. 1008, 5 (emphasis added). As Dr. Almeroth explains, “WebShield does not remove an embedded script and then subsequently execute the removed embedded script. . . . WebShield . . . executes the embedded JavaScript without first removing that JavaScript from the web page, and only subsequently generates ‘the new HTML page [that WebShield] transfers to the client browser T(R).’” Almeroth Decl. ¶ 78 (quoting Ex. 1008, 6) (final alteration in original). We are not persuaded by Dr. Williams’s testimony that WebShield teaches or suggests this limitation. See Williams Decl. ¶¶ 132–137. His testimony does not address the claimed sequence required by the claims and, in fact, quotes WebShield’s description of parsing and executing the embedded JavaScript files to create the DOM data structures relied on by Patent Owner and Dr. Almeroth. See id. at ¶ 136 (quoting Ex. 1008, 5).” slip op. at 21

    Patent outcomesUS 9,503,498 not shown unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites Graham
    Patents in suitUS 9,503,498
  • PTAB · Jul 11, 2024 · IPR2023-00436 · APJ Garth D Baer · IPR · Final written decision

    Claims 1–18 are unpatentable as obvious over Pershing-789 and Bailey, with Abhyanker added for claims 6, 7, and 14–18; the alternative Kennedy grounds were not reached.

    RulingsFinal written decision
    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “Patent Owner contends one skilled in the art “would have had a Bachelor’s degree in an academic area emphasizing construction, architecture, and/or engineering, or similar discipline, and at least two years of experience with roofing measurement and estimation, aerial imagery use in roofing estimation, and roofing measurement software.” PO Resp. 4. Patent Owner’s definition is substantively similar to Petitioner’s. See Pet. 2 (“a person of ordinary skill in the art at the time of the alleged invention would have bachelor’s degree in architecture or an equivalent with at least five years of experience performing roof estimation”). We agree with and adopt Patent Owner’s definition with the added provision that, as we noted in our Institution Decision, “experience may compensate for formal education, and vice versa.” Paper 14, 7.” slip op. at 5

    • Expert testimonyPetitioner expert creditedDecided for petitioner

      “Cummings, qualifies as a skilled artisan. See PO Resp. 39–47. Instead, Patent Owner contends we “should give significantly more weight” to its expert’s testimony than to Petitioner’s because its expert “has much more relevant experience” and Mr. Cunningham’s opinions “are conclusory and merely repeat verbatim the arguments presented in the Petition.” PO Resp. 39. We disagree. We do not find that Patent Owner’s expert’s opinions are entitled to significantly more weight than Petitioner’s simply based on the experts’ relative experience. Instead, in our analysis below, where necessary, we have evaluated both experts’ opinions and we base our conclusions on the opinions’ persuasiveness. In addition, we do not find it problematic that the Petition repeats certain portions of Petitioner’s expert’s testimony. Though portions of the Petition may be the same as Mr. Cummings’s testimony, that does not by itself undermine the testimony’s persuasiveness or its status as evidence, nor does it mean Petitioner’s arguments are conclusory, as Patent Owner suggests. See PO Resp. 43–47.” slip op. at 5

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededDecided for petitioner

      “Neither party proposes an express construction for any claim terms. Pet. 2; see generally PO. Resp. We agree that no claim terms require express construction for purposes of this Decision.” slip op. at 4

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successUnpatentableMotivation foundUnpatentable

      “In light of Petitioner’s analysis as outlined above, we agree with Petitioner that together, Pershing-789 and Bailey teach “determin[ing] a footprint and predominant pitch of the roof by analyzing one or more image showing the roof; [and] determin[ing] an estimated roofing area of the roof based on the predominant pitch and the footprint of the roof,” as claimed. Further, given Petitioner’s rationale as outlined above, Petitioner has articulated sufficient reasoning with rational underpinning to support its assertion that it would have been obvious to combine Bailey’s predominantslope teaching with Pershing-789’s area calculation. See KSR Int’l Co. v. Teleflex Inc., 550 U.S. 398, 418, 419 (2007).” slip op. at 10

    Patent outcomesUS 9,183,538 unpatentable
    Claim construction§ 103 obviousnesscites KSR
    Patents in suitUS 9,183,538
  • PTAB · Jul 11, 2024 · IPR2023-00435 · APJ Garth D Baer · IPR · Final written decision

    Claims 1–17 are unpatentable: claims 1–8, 10–13, and 15–17 as obvious over Pershing-789 and Abhyanker; claims 9 and 14 over the Pictometry combination; and claims 1–17 over Kennedy, Abhyanker, and Bailey.

    RulingsFinal written decision
    • Skill levelSkill level patent owner adoptedPetitioner expert creditedDecided for petitioner

      “We agree with Petitioner that Mr. Cummings qualifies as a skilled artisan. Pet. Reply 2–7. As Petitioner notes, the ’800 patent’s computer-related features are fairly basic—i.e., “standard computer input devices, applications, and graphical user interface elements” that “would be familiar to and understood by one” with experience like Mr. Cummings’s. Pet. Reply 5–6 (citing Ex. 1001). As we explained in our Institution Decision, “[a]lthough Mr. Cummings may lack formal computer-related education, he ‘ha[s] extensive experience using software related to construction’ including ‘decades working with software related to construction modeling and estimation.’” Paper 16, 8 (quoting Ex. 1003 ¶ 6). Mr. Cummings also “ha[s] experience collaborating with software developers to create new software in my field.” Id. In light of the ’800 patent’s basic computing features, Mr. Cummings’s experience is sufficient. In addition, we do not find it problematic that the Petition repeats certain portions of Mr. Cummings’s testimony. Though portions of the Petition may be the same as Mr. Cummings’s testimony, that does not by itself undermine the testimony’s persuasiveness or its status as evidence, nor does it mean Petitioner’s arguments are conclusory, as Patent Owner suggests. See PO Resp. 37–39.” slip op. at 6

    • Expert testimonyPetitioner expert creditedDecided for petitioner

      “We agree with Petitioner that Mr. Cummings qualifies as a skilled artisan. Pet. Reply 2–7. As Petitioner notes, the ’800 patent’s computer-related features are fairly basic—i.e., “standard computer input devices, applications, and graphical user interface elements” that “would be familiar to and understood by one” with experience like Mr. Cummings’s. Pet. Reply 5–6 (citing Ex. 1001). As we explained in our Institution Decision, “[a]lthough Mr. Cummings may lack formal computer-related education, he ‘ha[s] extensive experience using software related to construction’ including ‘decades working with software related to construction modeling and estimation.’” Paper 16, 8 (quoting Ex. 1003 ¶ 6). Mr. Cummings also “ha[s] experience collaborating with software developers to create new software in my field.” Id. In light of the ’800 patent’s basic computing features, Mr. Cummings’s experience is sufficient. In addition, we do not find it problematic that the Petition repeats certain portions of Mr. Cummings’s testimony. Though portions of the Petition may be the same as Mr. Cummings’s testimony, that does not by itself undermine the testimony’s persuasiveness or its status as evidence, nor does it mean Petitioner’s arguments are conclusory, as Patent Owner suggests. See PO Resp. 37–39.” slip op. at 6

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “In an inter partes review proceeding, we construe patent claims using the same standard used in a civil action under 35 U.S.C. § 282(b), including construing the claim in accordance with the ordinary and customary meaning of the claim as understood by one of ordinary skill in the art and the prosecution history pertaining to the patent. 37 C.F.R. § 42.100(b). Neither party proposes an express construction for any claim terms. Pet. 2; see generally PO. Resp. We agree that no claim terms require express construction for purposes of this Decision.” slip op. at 5

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundMixed

      “Moreover, Petitioner’s proposed combination is sufficient for obviousness even if we accept Patent Owner’s proposed temporal requirement. Specifically, Petitioner’s rationale for adding Abhyanker’s user inputs (i.e., “allowing a user to designate a geographic position of a roof and to subsequently confirm that the roof location is correct would promote the accuracy of the system,” Pet. 24, 67 (emphasis added, Petitioner’s emphasis omitted)), explains why one skilled in the art would have provided Abhyanker’s lock pushpin option after placing a marker. See also Ex. 1003 ¶¶ 43, 127. Patent Owner’s argument, in contrast, assumes a skilled artisan could do no more than bodily incorporate Abhyanker’s placement and lock features without any thought as to sequence. That, however, is not the test for obviousness. See, e.g., Allied Erecting & Dismantling Co. v. Genesis Attachments, LLC, 825 F.3d 1373, 1381 (Fed. Cir. 2016); see also KSR Int’l Co. v. Teleflex Inc., 550 U.S. 398, 418 (2007) (noting that “a court can take account of the inferences and creative steps that a person of ordinary skill in the art would employ”). For these reasons, and in light of the Petition’s analysis, see Pet. 24– 25, 33–35, 67, 74, we agree with Petitioner that its proposed combination teaches “responsive to receiving the designation of the building roof structure location, providing a second computer input capable of signaling user-acceptance of the building roof structure location within the first image, wherein user-acceptance is one or more affirmative steps undertaken by the user to confirm the designation of the building roof structure location,” as claimed.6” slip op. at 11

    Patent outcomesUS 10,648,800 unpatentable
    Claim construction§ 103 obviousnesscites KSR
    Patents in suitUS 10,648,800
  • PTAB · Jun 11, 2024 · IPR2024-00245 · APJ Nathan A Engels · IPR · Institution

    The Board instituted IPR on claims 1–4 on all asserted grounds, finding a reasonable likelihood that Samsung would show at least one claim unpatentable.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “Institution of an inter partes review is authorized by statute when “the information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a); see 37 C.F.R. § 42.108. Upon consideration of the evidence currently of record, we conclude that the information presented shows that there is a reasonable likelihood that Petitioner would prevail in establishing the unpatentability of at least one challenged claim of the ’150 Patent.” slip op. at 2

    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Denied

      “DISCRETIONARY DENIAL Patent Owner argues that we should exercise our discretion to deny the Petition based on the parallel district court litigation. Prelim. Resp. 35 (citing Apple Inc. v. Fintiv, Inc., IPR2020-00019, Paper 11 at 6 (PTAB Mar. 20, 2020) (precedential)). Petitioner, however, presented a Sotera stipulation.7 Pet. 88 (citing Ex. 1023). Thus, we do not exercise our discretion to deny institution here. See Katherine K. Vidal, Interim Procedure for Discretionary Denials in AIA Post-Grant Proceedings with 7 See Sotera Wireless, Inc. v. Masimo Corp., IPR2020-01019, Paper 12 at 19 (PTAB Dec. 1, 2020) (precedential). Parallel District Court Litigation (June 21, 2022) (“Consistent with [Sotera], the PTAB will not discretionarily deny institution in view of parallel district court litigation where a petitioner presents a stipulation not to pursue in a parallel proceeding the same grounds or any grounds that could have reasonably been raised before the PTAB.”).8” slip op. at 14

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)Term construed petitioner constructionOther

      “Petitioner states that (i) “coded multi-view video signal,” recited in each of the challenged claims, “encompasses a coded video signal for two or more viewpoints, including at least one base viewpoint and at least one nonbase viewpoint” (Pet. 7), and (ii) “picture signal,” also recited in each of the challenged claims, “refers to a signal that represents at least one picture from a viewpoint” (Pet. 9). Petitioner also identifies four elements of claim 1 that Petitioner contends are means-plus-function claim elements under 35 U.S.C. § 112 ¶ 6 (pre-AIA). Patent Owner states that for the purposes of its Preliminary Response, Patent Owner “does not dispute Petitioner’s proposed constructions . . . , including terms that it contends are subject to 35 U.S.C. § 112(6).” Prelim. Resp. 10. At this stage, we apply the parties’ agreed-upon constructions for the purposes of this Decision.” slip op. at 7

    • Obviousness (§103) › Graham factors (scope of art, differences, level of skill)Instituted

      “and DTS are provided in optional fields of packetized elementary stream packets. Ex. 1005, 7:19–25. Further, “[t]he video DTS . . . indicates the time when the picture needs to be decoded by the STD” (Ex. 1005, 7:47– 49), and on the current record, we understand Petitioner to cite the DTS parameters encoded in the transport stream for enhancement layer pictures as teaching the claimed coded information representing a desired delay time. Pet. 33. Among other examples, Petitioner (Pet. 34) and Dr. Reader (Ex. 1005 ¶ 201) cite Chen-736’s example of the formula DTSEi = DTSLi +1.5F, where F is a time interval based on the frame rate (Ex. 1005, 8:9–20), as indicating that DTSEi represents the start of decoding of the ith picture in the enhancement layer being delayed 1.5F relative to the start of decoding of the ith picture frame of the base layer. Pet. 36 (citing Ex. 1003 ¶ 201); see Pet. 35–40 (citing additional examples of serial and parallel decoding with similar DTS calculations). At this stage, we find Petitioner’s position that the claim’s recitation that the coded information must “represent” the desired delay time to be a reasonable reading of the plain language of the claim such that a DTS value can represent the desired delay time even if it requires calculation. Pet. 35 n.8. Even if Chen-736’s use of F-based offsets as time intervals “is different than the concept of a desired delay between decoding” and Chen-736 recognizes the distinction between PTS and DTS (Prelim. Resp. 14–15), on the current record, these arguments do not rebut Petitioner’s mapping of Chen-736 to the claim language. Similarly, Patent Owner’s argument that Chen-736 teaches a DTS for all picture signals, including the base viewpoints and non-base viewpoints (Prelim. Resp. 16), does not rebut Petitioner’s mapping of Chen-736’s enhancement-layer DTS to the claim language. At this stage, on the current record we determine Petitioner has sufficiently shown that Chen-736 teaches or reasonably suggests this claim element.” slip op. at 12

    Claim construction§ 103 obviousnessDiscretionary denialcites Phillips · KSR · Graham
    Patents in suitUS 8,139,150
  • PTAB · May 28, 2024 · IPR2024-00085 · APJ Michael L Woods · IPR · Institution

    The Board instituted IPR on claims 1, 2, 4, 5, 7–11, 13, and 15 on all asserted grounds, finding a reasonable likelihood that at least one challenged claim is unpatentable.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “Under 35 U.S.C. § 314 and 37 C.F.R. § 42.4(a), we have authority to institute an inter partes review if “the information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). After considering the Petition, the Preliminary Response, the Preliminary Reply, the Preliminary Sur-reply, and the evidence of record, we determine the information presented shows a reasonable likelihood that Petitioner would prevail in establishing the unpatentability of at least one of the Challenged Claims of the ’659 patent. Accordingly, we institute an inter partes review of the Challenged Claims on the grounds asserted in the Petition.” slip op. at 2

    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Denied

      “We disagree with Patent Owner. Our analysis under Fintiv is guided by the USPTO Director’s Memorandum issued on June 21, 2022, titled “Interim Procedure for Discretionary Denials in AIA Post Grant Proceedings with Parallel District Court Litigation.”8 The Director’s Memorandum explains that, when a petitioner makes a Sotera-type stipulation, “it mitigates concerns of potentially conflicting decisions and duplicative efforts between the district court and the PTAB” and “[w]ith such a stipulation, if an IPR or PGR is instituted, the grounds the PTAB resolves will differ from those present in 8 https://www.uspto.gov/sites/default/files/documents/interim_proc_discretio nary_denials_aia_parallel_district_court_litigation_memo_20220621_.pdf (“Director’s Memorandum”). the parallel district court litigation.” Director’s Memorandum 7 (citing Sotera, IPR2020-01019, Paper 12 at 18–19). Pursuant to the Director’s Memorandum, we “will not discretionarily deny institution of an IPR or PGR in view of parallel district court litigation where a petitioner stipulates not to pursue in a parallel district court proceeding the same grounds as in the petition or any grounds that could have reasonably been raised in the petition.” Id. Because Petitioner provides a Sotera-type stipulation, we do not exercise our discretion to deny institution under Fintiv.” slip op. at 8

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “Upon review of the prior art of record and the parties’ arguments, we adopt Patent Owner’s definition of the person of ordinary skill in the art for purposes of this Decision as it appears consistent with the prior art of record. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (holding that the prior art itself can reflect the appropriate level of ordinary skill in the art). Petitioner’s proposed definition appears overly restrictive, as it requires a graduate degree in a narrow field of engineering or equivalent experience. We find that a bachelor’s degree with the accompanying experience proposed by Patent Owner more closely aligns with the prior art of record and the ’659 patent. We note, however, there is some overlap in the proposed levels of ordinary skill in the art because Patent Owner’s proposal includes “at least” a bachelor’s degree, which would encompass Petitioner’s master’s degree as well. Prelim. Resp. 19. Nonetheless, our determination herein would be the same under either party’s definition.” slip op. at 9

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed petitioner constructionDecided for petitioner

      “We disagree with Patent Owner’s claim construction. By using the word “or,” the plain and ordinary meaning of “prone, kneeling, or standing” is that only one must be satisfied to meet the claim. See, e.g., SkinMedica, Inc. v. Histogen Inc., 727 F.3d 1187, 1199 (Fed. Cir. 2013) (“The disjunctive ‘or’ plainly designates that a series describes alternatives.”). Furthermore, and although claims are read in light of the specification, limitations in a specification are not read into a claim. In re van Geuns, 988 F.2d 1181, 1184 (Fed. Cir. 1993). Even if the Specification describes embodiments in which the user can begin in a prone position and then transition to a kneeling or standing position, as Patent Owner points out (see Prelim. Resp. 20), the claim does not recite the term “transitioning,” and we do not read the terms “each of” or “substantially flat surface” into this claim limitation. For example, the claim does not recite a “substantially flat” top surface and Patent Owner’s attempt to infer this structure into the claim is not supported under the law. See id. at 29–30. For purposes of this Decision, we agree with Petitioner and construe “prone, kneeling, or standing” in accordance with its plain and ordinary meaning as alternatives, and the prior art need only show one to satisfy this aspect of the claim.” slip op. at 12

    Claim construction§ 102 anticipation§ 103 obviousnessDiscretionary denialcites Phillips · KSR
    Patents in suitUS 9,586,659
  • PTAB · May 28, 2024 · IPR2024-00086 · APJ Kevin W Cherry · IPR · Institution

    The Board instituted IPR on claims 1, 2, 5-8, 10-15, 17, 18, 20, and 21 on all asserted grounds after finding a reasonable likelihood of success and declining Fintiv denial.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “In an [inter partes review], the petitioner has the burden from the onset to show with particularity why the patent it challenges is unpatentable.” Harmonic Inc. v. Avid Tech., Inc., 815 F.3d 1356, 1363 (Fed. Cir. 2016) (citing 35 U.S.C. § 312(a)(3) (requiring inter partes review petitions to identify “with particularity . . . the evidence that supports the grounds for the challenge to each claim”)). This burden of persuasion never shifts to Patent Owner. See Dynamic Drinkware, LLC v. Nat’l Graphics, Inc., 800 F.3d 1375, 1378 (Fed. Cir. 2015) (discussing the burden of proof in an inter partes review). slip op. at 10

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITAPlain and ordinary meaningDecided for petitioner

      “1. “wherein a user can be disposed on the top surface of the flotation device in a prone, kneeling, or standing position” With respect to the claim term “wherein a user can be disposed on the top surface of the flotation device in a prone, kneeling, or standing position,” Patent Owner points to passages of the Specification, arguing that all three positions are possible. Prelim. Resp. 19–21 (citing Ex. 1001, Abstr., 4:13–17, 4:33–40; Ex. 2006 ¶ 18). We do not agree with Patent’s Owner proposed construction because even if the Specification discloses that all three positions are possible, that is not what the plain language of the claim requires. Claim 1 recites “or,” which means that a user can be disposed on the top surface of the flotation device in any one of the three positions. See, e.g., SkinMedica, Inc. v. Histogen Inc., 727 F.3d 1187, 1199 (Fed. Cir. 2013) (“The disjunctive ‘or’ plainly designates that a series describes alternatives.”). Patent Owner does not identify any definition or disclaimer that would modify this plain meaning. See Thorner v. Sony Computer Entm’t Am. LLC, 669 F.3d 1362, 1365 (Fed. Cir. 2012). Thus, we agree with Petitioner and apply the plain and ordinary meaning of the phrase “wherein a user can be disposed on the top surface of the flotation device in a prone, kneeling, or standing position,” to construe “prone, kneeling, or standing” as alternatives, and the prior art need only show one to satisfy this aspect of the claim.” slip op. at 13

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “Neither party explains how or why its particular proposal impacts the issues before us in this proceeding. We find that a bachelor’s degree with the accompanying experience proposed by Patent Owner more closely aligns with the prior art of record and the ’044 patent. We note, however, there is some overlap in the proposed levels of ordinary skill in the art because Patent Owner’s proposal includes “at least” a bachelor’s degree, which would encompass Petitioner’s master’s degree as well. Prelim. Resp. 10. Nonetheless, our determination herein would be the same under either party’s definition.” slip op. at 12

    • Novelty / Anticipation (§102) › Prior-art status of a reference › Printed publication / public accessibilityPrinted publication establishedInstituted

      “As the Board has held in a precedential decision, “at the institution stage, the petition must identify, with particularity, evidence sufficient to establish a reasonable likelihood that the reference was publicly accessible before the critical date of the challenged patent and therefore that there is a reasonable likelihood that it qualifies as a printed publication.” Hulu, LLC v. Sound View Innovations, LLC, IPR2018-01039, Paper 29 at 13 (PTAB Dec. 20, 2019) (precedential).” slip op. at 23

    Claim construction§ 102 anticipation§ 103 obviousnessDiscretionary denialcites KSR · Graham
    Patents in suitUS 9,359,044
  • PTAB · May 23, 2024 · IPR2024-00062 · APJ Nathan A Engels · IPR · Institution

    The Board denied institution because Petitioner did not show that the prior art disclosed or taught the construed “emphasis level” limitation in any challenged claim.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “which the amplitude of the high frequency components of the video signal is increased,” as required by the construction of “emphasis level.”7 See Prelim. Resp. 9 (“the Petition’s analysis of the claim limitations containing these terms against the cited references does not indicate that those references disclose these limitations under Petitioner’s proposed constructions in the District Court Action”). Thus, without Petitioner mapping the constructions to the prior art in a clear and identifiable way, we determine the Petition itself does not satisfy Petitioner’s burden. See 37 C.F.R. §§ 42.104(b)(3)– (4).” slip op. at 6

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)Term construed petitioner constructionDecided for petitioner

      “the terms “emphasis processing” and “emphasis level.” In the Petition, Petitioner states that no constructions are necessary (Pet. 2), but after filing 2 US 5,491,514; issued Feb. 13, 1996. Ex. 1005. 3 US 5,241,387; issued Aug. 31, 1993. Ex. 1006. 4 US 6,801,665 B1; published Sept. 30, 1999. Ex. 1007. the Petition, Petitioner proposed constructions of those terms in the parties’ district-court litigation, stating that: (i) the claim term “emphasis processing” means “increasing the amplitude of the high frequency components of a video signal;” and (ii) the claim term “emphasis level” means “a value that represents the amount by which the amplitude of the high frequency components of the video signal is increased.” Ex. 2003, 10– 11. After Patent Owner relied on those constructions in its Preliminary Response (see, e.g., Prelim. Resp. 8–10),5 Petitioner requested (Ex. 3001), and the Board authorized (Paper 8), additional briefing to address how the analysis in the Petition applies under those constructions.6 Because we determine Petitioner’s showings with respect to those constructions are inadequate to carry Petitioner’s burden, our discussion below focuses primarily on those aspects of the parties’ briefing.” slip op. at 4

    • PTAB / AIA Trials › Discretionary denialNot reached

      “Discretionary Denial Because we determine Petitioner has not carried its burden on the merits, we do not reach the parties’ arguments relating to discretionary denial. See Pet. 98–99; Prelim. Resp. 26–32.” slip op. at 11

    Claim constructionDiscretionary denial
    Patents in suitUS 6,845,128

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.