PTAB
Advanced fields
187 decisions · 513msnewest first
  • PTAB · Jan 15, 2026 · IPR2025-01231 · APJ Mary C Hoffman · IPR · Institution

    The Board instituted IPR on claims 1–13 on all asserted grounds, finding a reasonable likelihood that at least one challenged claim is unpatentable.

    RulingsInstitution decision
    • PTAB / AIA Trials › Real party in interest / privityRpi dispute resolved for petitionerDecided for petitioner

      “petition identifies all real parties in interest. 35 U.S.C. § 312(a)(2). Whether an unnamed party is a real party in interest “is a highly fact-dependent question.” See Applications in Internet Time, LLC v. RPX Corp., 897 F.3d 1336, 1351, 1360 (Fed. Cir. 2018) (“AIT”); Ventex Co., Ltd. v. Columbia Sportswear N. Am., Inc., IPR2017-00651, Paper 152 at 4–5 (PTAB Jan. 24, 2019) (precedential) (citing Worlds Inc. v. Bungie, Inc., 903 F.3d 1237, 1242 (Fed. Cir. 2018)); Consolidated Trial Practice Guide, 13 (2019), https://www.uspto.gov/sites/default/files/documents/tpgnov.pdf (CTPG). “A common consideration is whether the non-party exercised or could have exercised control over a party’s participation in a proceeding.” CTPG at 16. Other considerations include whether the non-party is funding or directing the proceeding; the non-party’s relationship with the petitioner; the non-party’s relationship to the petition itself, including the nature and/or degree of involvement in the filing; and the nature of the entity filing the petition. Id. at 17–18.” slip op. at 8

    • Skill levelSkill level board ownOther

      “person of ordinary skill in the art (“POSITA”) “would have at least a bachelor’s degree in electrical engineering or a related field and at least two years of experience with lighting technology.” Pet. 2 (citing Ex. 1017 ¶ 35). Petitioner makes additional contentions about what a POSITA would have understood. Id. (“A POSITA would understand that all types of cameras (e.g., analog and digital, photo and video) generally involve the same lighting considerations . . . . [and] that it is important to provide light that evenly illuminates the target subject or object to minimize reflected glare and shadows.”). Patent Owner contends that a POSITA would have at least: (a) a bachelor’s degree in electrical engineering, optical engineering, or a related field; (b) two years of practical experience in designing and developing lighting systems, particularly those integrated with electronic devices such as webcams or computer monitors; and (c) knowledge of user-interface considerations for consumer electronics . . . . Additional experience can substitute for education and vice versa. Prelim. Resp. 12 (citing Ex. 2036 ¶ 48). Patent Owner disputes Petitioner’s contentions regarding what a POSITA would have understood. Prelim. Resp. 12–13 (“[O]ne of ordinary skill in the art would have understood that analog and digital cameras have different operating principles and lighting requirements [and] Petitioner’s lack of appreciation for the suitability and unsuitability of different lights for different applications infects and dooms its invalidity analysis.” (citing Ex. 2036 ¶¶ 36–47)). and years of experience required for a POSITA. Pet. 2; Prelim. Resp. 12. For purposes of this Decision, we consider a person of ordinary skill in the art to have a bachelor’s degree in electrical engineering or related field and two years of practical experience in lighting technology, and that additional experience may substitute for education and vice versa, which is consistent with the level of skill reflected in the ’729 patent and prior art of record. See Exs. 1001, 1005–1010, 1012–1015; see also Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (explaining that specific findings regarding ordinary skill level are not required “where the prior art itself reflects an appropriate level and need for testimony is not shown” (quoting Litton Indus. Prods., Inc. v. Solid State Sys. Corp., 755 F.2d 158, 163 (Fed. Cir. 1985))).” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Patent Owner agrees that the Board need not formally construe any claim terms in order to adjudicate the merits of the Petition and argues Petitioner fails to show unpatentability of any claim under any reasonable construction of the claims. Prelim. Resp. 13 (citing Ex. 2036 ¶ 51). We determine that no express claim construction is necessary to determine whether institution is warranted in this proceeding. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (holding that only terms in controversy must be construed “and only to the extent necessary to resolve the controversy”) (citing Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)).” slip op. at 14

    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “claimed subject matter and the prior art are “such that the subject matter as a whole would have been obvious at the time the invention was made to a person having ordinary skill in the art to which said subject matter pertains.” KSR Int’l Co. v. Teleflex Inc., 550 U.S. 398, 406 (2007). When a ground in a petition is based on a combination of references, we consider “whether there was an apparent reason to combine the known elements in the fashion claimed by the patent at issue.” Id. at 418 (citing In re Kahn, 441 F.3d 977, 988 (Fed. Cir. 2006)). We base our obviousness inquiry on factual considerations including (1) the scope and content of the prior art, (2) any differences between the claimed subject matter and the prior art, (3) the level of skill in the art, and (4) any objective indicia of obviousness or non-obviousness that may be in evidence.14 See Graham, 383 U.S. at 17–18.” slip op. at 24

    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 7,841,729
  • PTAB · Oct 28, 2025 · IPR2024-00850 · APJ Arthur M Peslak · IPR · Final written decision

    Claims 1, 3–12, 14, and 23–27 are unpatentable as obvious over Raizer and Hangzhou.

    RulingsFinal written decision
    • Skill levelOther

      “B. Level of Ordinary Skill in the Art We consider the asserted grounds of unpatentability in view of the” slip op. at 9

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “C. Claim Construction Neither Petitioner nor Patent Owner proposes an express construction” slip op. at 10

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successUnpatentableMotivation foundUnpatentable

      “that it would improve similar devices in the same way, using the technique is obvious unless its actual application is beyond his or her skill.” KSR, 550 U.S. at 417. In this case, we must determine whether one of ordinary skill in the art would recognize that Hangzhou’s disclosure of driving its auto-guided trolleys 200 under shelves 100 would improve the operation of Raizer’s system in the same way. For us to resolve this question in Petitioner’s favor, Petitioner must provide “some articulated reasoning with some rational underpinning to support the legal conclusion of obviousness.” Id. at 418 (citing In re Kahn, 441 F.3d 977, 988 (Fed. Cir. 2006)). However, bodily incorporation, i.e., “an actual physical substitution of” Hangzhou’s auto-guided trolleys or operating software into Raizer’s system, is not required. See In re Mouttet, 686 F.3d 1322, 1332 (Fed. Cir. 2012) (“It is well-established that a determination of obviousness based on teachings from multiple references does not require an actual, physical substitution of elements.”); In re Nievelt, 482 F.2d 965, 968 (CCPA 1973) (“Combining the teachings of references does not involve an ability to combine their specific structures.”).” slip op. at 23

    Patent outcomesUS 11,472,632 unpatentable
    Claim construction§ 103 obviousnesscites KSR · Graham
    Patents in suitUS 11,472,632
  • PTAB · Oct 10, 2025 · IPR2025-00653 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution on all claims because the Petition did not show a reasonable likelihood that any challenged claim was unpatentable over the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “An inter partes review may be instituted only if “the information presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’504 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Additionally, only terms that are in controversy need to be construed, and these need be construed only to the extent necessary to resolve the controversy. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 9; Prelim. Resp. 4 (citing Ex. 2009 ¶ 72); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13

    • Expert testimonyPetitioner expert discountedDecided for patent owner

      “Ex. 1002 ¶ 47. As reflected above, Dr. Wooley’s testimony as to element [1.2] does not even assert that Cardamone discloses a tank, let alone one or more sensors disposed at a tank as recited in element [1.2]. Thus, Dr. Wooley’s testimony does not support Petitioner’s argument on this issue.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,726,504
  • PTAB · Oct 10, 2025 · IPR2025-00652 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–23 and 25–30 were unpatentable over the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’403 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 10; Prelim. Resp. 4 (citing Ex. 2009 ¶ 73); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses element [1.2] because the evidence cited does not disclose a “first computer system being configured to provide remote control of the first pump or first valve” (i.e., a fluid-handling device). Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but Petitioner has not identified any disclosure of the capability to remotely control fluid-handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, Kahn’s disclosures that Petitioner relies on for allegedly teaching remote control are deficient. We discuss each. First, Petitioner points to the following, “[f]or instance, as illustrated in FIG. 1C, a fluid control device such as a valve 15A is located on the input side of a sen[s]or unit 110.” Ex. 1005, 8:19–21, cited in Pet. 13. This portion of Kahn, however, does not disclose remote control. Second, Petitioner cites to the following: Finally, or in addition to, the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance. Pet. 13 (citing Ex. 1005, 10:62–67). We agree with Patent Owner that this portion of Kahn teaches on-site alerts and local control of the fluid-handling device. See Prelim. Resp. 7. This portion of Kahn does not disclose remote control.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,294,403
  • Tanklogix, LLC v. SiteproInstitution denied
    PTAB · Oct 10, 2025 · IPR2025-00650 · APJ Sheila F Mcshane · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 18–32 and 34 were unpatentable over Kahn or Kahn and Gutierrez.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). Upon consideration of the Petition, the Preliminary Response, and the evidence of record, we determine that Petitioner has not established a reasonable likelihood of prevailing with respect to the unpatentability of at least one claim of the ’871 patent. Accordingly, for the reasons that follow, we decline to institute an inter partes review of claims 18–32 and 34 of the ’871 patent.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The respective proposed levels of qualifications for a person of ordinary skill in the art are similar, with Patent Owner proposing two years of experience compared to Petitioner proposing significant experience with remotely controlling fluid-handling devices, like SCADA systems. Patent Owner also proposes more extensive experience in lieu of educational experience. While we find Petitioner’s proposed qualifications to be acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of skill necessary to understand and implement the teachings of the ’871 patent and the asserted prior art. Our analysis and findings herein, however, do not turn on any differences in the qualifications adopted.” slip op. at 8

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “We determine that we need not expressly construe any claim terms to resolve the parties’ disputes on the current record. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 10

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “actuators and the remote control of fluid handling devices, including the receipt with the user-interface module of “a user command to actuate an actuator via a presented control interface” (limitation [18.7]) and “account authorized to send commands to remotely control fluid handling devices” (limitation [18.11]). We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses or teaches these limitations because the evidence does not provide support that there is remote control of fluid handling devices or the use of a user command on a control interface to send a command to a fluid handling device, for instance. Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but we do not discern that it teaches or discloses the capability to remotely control fluid handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, the Kahn disclosures that Petitioner repeatedly relies upon for allegedly teaching this control are deficient. See Ex. 1005, 10:62–67, 14:35– 15:2, 15:62–16:32; see also Pet. 12–14, 16–18. Kahn discloses that “the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance.” Ex. 1005, 10:62–67. Communication unit 112B is part of the local “sensor unit,” wherein the detection conditions determined by the sensor are communicated to remote devices by communication unit 112B. See id. at 3:31–33, 5:62–6:2, 6:27–35, 7:33–37, 13:7–12, Figs. 1A–1C. Kahn discloses that the sensor units, which include communication units 112B, can be located near shut-off valves and can communicate with distant locations. See id. at 11:1–13. There are no disclosures, however, in the above passages that there is remote control of fluid handling devices, that there is a user command on a control interface that actuates an actuator, or that there is a command sent to the facility actuators via a network connection, as required in limitations [18.5]–[18.7] and [18.9]–[18.12], respectively. Rather, the disclosure indicates that the communication unit 112B includes on-site alerts and that the local (non-remote) communication unit 112B can be interfaced with the control valve.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 10,488,871
  • PTAB · Mar 21, 2025 · IPR2024-01248 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution because the Petition did not show a reasonable likelihood of proving claims 1–11, 16, and 21 unpatentable over the asserted obviousness grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2018). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “At this stage of the proceeding and on the present record, we adopt Petitioner’s uncontested proposed level of ordinary skill in the art, which we find consistent with the level of ordinary skill in the art reflected by the ’071 patent and the prior art of record. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978).” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Neither party proposes a specific construction of any claim term, although Petitioner contends each term should be construed according to its plain and ordinary meaning. Pet. 16; see generally Prelim. Resp. Accordingly, we need not construe any claim terms expressly because the meaning of the terms is not in dispute and an express construction is not necessary to resolve the controversy before us.” slip op. at 13

    • BurdenNot shown unpatentable

      “We find the Petition lacking in particularity because it does not clearly identify what aspect of Jin is alleged to teach the unique signal parameters (or unique estimated signal parameters) recited in claim 1. See, e.g., 35 U.S.C. § 312(a)(3) (“A petition filed under section 311 may be considered only if — (3) the petition identifies, in writing and with particularity, . . . the evidence that supports the ground for the challenge to each claim . . . .”). First, as reflected above, the Petition asserts that something called a “unique pilot parameter” teaches the recited unique estimated signal parameters. But “unique pilot parameter” is not a term or phrase recited in Jin. See Prelim. Resp. 19 (arguing the same). So, when Petitioner states “Jin discloses that the base station uses the unique pilot parameter (i.e., ‘unique estimated signal parameters’) to ‘identify which user (i.e., mobile terminal) has transmitted the received data,’” it is not clear what element in Jin Petitioner intends to identify by the term “unique pilot parameter.” Dr. Min’s testimony does not help resolve the ambiguity in the Petition. In particular, Dr. Min also refers to a “unique pilot parameter (i.e., ‘unique signal parameter’) for each user.” Ex. 1003 ¶ 89. But, as noted above, Jin does not disclose an element referred to as a “pilot parameter” and it is not clear what element Dr. Min intended to identify in Jin.8” slip op. at 18

    Claim construction§ 103 obviousnessDiscretionary denialcites Phillips · KSR · Graham
    Patents in suitUS 9,814,071
  • PTAB · Feb 28, 2025 · IPR2021-00045 · APJ Nathan A Engels · IPR · Remand

    Claims 1–3, 9–11, and 17–19 are unpatentable as obvious over Masters; claims 5, 13, and 21 are unpatentable as obvious over Masters and Stone.

    RulingsRemand decision
    • RemandOther

      “stated that on remand, the Board should “adopt a new construction that includes application instance-level, application-level, device-level, and tierlevel data” and “the Board should determine whether Masters, including its Decision Review Display and Path Display, renders the ‘collecting’ and ‘correlating’ limitations obvious in view of the Board’s new construction. In addition, the Board should consider Masters’ Appendix J in assessing whether Masters’ Path Display teaches life cycle events and the claimed correlating step.” Netflix, 2024 WL 3507601 at *8. After the Federal Circuit issued its mandate, with our authorization, the parties filed the following briefs: Petitioner’s Opening Brief on Remand (Paper 41, “Pet. Remand Br.”), Patent Owner’s Response Brief on Remand (Paper 42, “PO Remand Resp.”), Petitioner’s Reply Brief on Remand (Paper 43, “Pet. Remand Reply”), and Patent Owner’s Sur-Reply Brief on Remand (Paper 44, “PO Remand Sur-Reply”).” slip op. at 3

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “We determine a POSITA would have had “a bachelor’s degree in Electrical Engineering, Computer Science, or a similar discipline, with one or two years of experience,” which is consistent with the parties’ arguments and testimony of the parties’ declarants, as well as the level reflected in the ’722 patent and the asserted prior art. We determine it is unnecessary to reach the parties’ additional statements of the knowledge and skills that a POSITA would allegedly possess, as the parties’ arguments do not hinge on those statements.” slip op. at 12

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed board ownDecided for petitioner

      “We find Petitioner’s proposed construction to be generally consistent with the intrinsic record (including the claim language) and the Federal Circuit’s guidance. However, we decline to adopt the use of “related to” instead of “associated with” in Petitioner’s proposed construction because we determine the language used in the claim, “associated with,” is clear enough on its face and Petitioner provides no persuasive justification for altering the plain meaning to “related to”. Consistent with the Federal Circuit’s guidance, we determine the proper construction of “performance data” further includes data pertaining to the performance of a server and/or a technology tier. Netflix, 2024 WL 3507601 at *6 (citing Ex. 1001, 3:56–57, 4:3–8, 4:14–18, 7:26–29). Accordingly, we determine “performance data” means “data associated with the performance of one or more application instances, including instance-level, application-level, device-level, and tierlevel data and includes data pertaining to the performance of a server and/or a technology tier.” We determine no other terms require express construction. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng'g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)).” slip op. at 14

    • Obviousness (§103) › Graham factors (scope of art, differences, level of skill)UnpatentableUnpatentable

      “Applying our construction of “performance data,” we agree with Petitioner that, among other things, the CPU utilization and review time shown in Masters’ Figure 5.6.2.1-2 and Figures 8A and 8B fall within the scope of the claimed “performance data.” See Pet. 50–56; Reply 17. The CPU utilization data and review time data are both data associated with the performance of one or more application instances. Further, the Figures and corresponding description in Appendix J evidence collection of the performance data for each application instance. Pet. 34–38, 50; Ex. 1024, 39. Similarly, the startup of a copy of the Auto-Special process on Altair11 constitutes a life cycle event, as it is the creation of an application instance, and the termination of Auto-Special on Altair7 is another example of a life cycle event, as claimed. Ex. 1024, 39; see Pet. 39–44. We agree with Petitioner that these Figures and related descriptions in Masters teach collecting performance data and correlating the performance data to the life cycle events. See Pet. 46, 50–55. We also agree with Petitioner that Masters’ Figures 9A and 9B similarly show the collection and correlation of performance data, at least with the response time, action time, CPU score, and similar metrics depicted in the Figures. Pet. 47–49. Figures 9A and 9B show the correlation of the performance data to a life cycle event, by, for example, depicting the performance issue (an overload on Altair11) that cause the creation of a new application instance on Altair3. Pet. Reply 12. We agree with Petitioner that the response time to trigger the creation of an application instance on Altrair3 and the amount of time the application instance takes to start are two examples of performance data correlated with the life cycle event. Pet. Masters, Figures 9A and 9B depict Masters’ Decision Review Display that provides a summary of allocation and reallocation actions taken by the RMA, and “[f]or each action, timing information regarding how long it took the Resource Management functions, e.g., the Resource Manager . . . and the Program Controller . . ., to both arrive at a decision and to enact the decided action are shown along with host fitness scores that were used in arriving at the allocation decision.” Ex. 1004, 30:1–10. We disagree with Patent Owner’s arguments that the Masters’ “response time” “cannot be associated with the performance of the ‘Semi-Auto’ application instance because the response time passes before the instance exists” (PO Remand Br. 4), and we agree with Petitioner that the time required to start an application instance is a metric associated with the creation of that instance. In sum, we agree with Petitioner that Masters teaches the Correlating Limitations.” slip op. at 28

    Patent outcomesUS 7,457,722 unpatentable
    Claim construction§ 103 obviousnesscites Graham
    Patents in suitUS 7,457,722
  • PTAB · Feb 28, 2025 · IPR2021-00431 · APJ Nathan A Engels · IPR · Remand

    Claims 4, 6–8, 12, 14–16, 20, and 22 are unpatentable as obvious over Masters.

    RulingsRemand decision
    • RemandOther

      “stated that on remand, the Board should “adopt a new construction that includes application instance-level, application-level, device-level, and tierlevel data” and “the Board should determine whether Masters, including its Decision Review Display and Path Display, renders the ‘collecting’ and ‘correlating’ limitations obvious in view of the Board’s new construction. In addition, the Board should consider Masters’ Appendix J in assessing whether Masters’ Path Display teaches life cycle events and the claimed correlating step.” Netflix, 2024 WL 3507601 at *8. After the Federal Circuit issued its mandate, with our authorization, the parties filed the following briefs: Petitioner’s Opening Brief on Remand (Paper 37, “Pet. Remand Br.”), Patent Owner’s Response Brief on Remand (Paper 40, “PO Remand Resp.”), Petitioner’s Reply Brief on Remand (Paper 41, “Pet. Remand Reply”), and Patent Owner’s Sur-reply Brief on Remand (Paper 42, “PO Remand Sur-reply”).” slip op. at 3

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “We determine a POSITA would have had “a bachelor’s degree in Electrical Engineering, Computer Science, or a similar discipline, with one or two years of experience,” which is consistent with the parties’ arguments and testimony of the parties’ declarants, as well as the level reflected in the ’722 patent and the asserted prior art. We determine it is unnecessary to reach the parties’ additional statements of the knowledge and skills that a POSITA would allegedly possess.” slip op. at 11

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed petitioner constructionDecided for petitioner

      “We find Petitioner’s proposed construction to be generally consistent with the intrinsic record (including the claim language) and the Federal Circuit’s guidance. However, we decline to adopt the use of “related to” instead of “associated with” in Petitioner’s proposed construction. Consistent with the Federal Circuit’s guidance, we determine the proper construction of “performance data” further includes data pertaining to the performance of a server and/or a technology tier. Netflix, 2024 WL 3507601 at *6 (citing Ex. 1001, 3:56–57, 4:3–8, 4:14–18, 7:26–29). Accordingly, we determine “performance data” means “data associated with the performance of one or more application instances, including instance-level, application-level, device-level, and tier-level data and includes data pertaining to the performance of a server and/or a technology tier.”” slip op. at 13

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “With that backdrop, we agree with the parties that the claim language itself sufficiently defines the term “application instance” and that it is unnecessary to further define the term.” slip op. at 17

    Patent outcomesUS 7,457,722 unpatentable
    Claim construction§ 103 obviousnesscites Graham
    Patents in suitUS 7,457,722
  • PTAB · Feb 25, 2025 · IPR2024-00178 · APJ James P Calve · IPR · Final written decision

    Claims 1–10, 14–22, 24, and 25 are unpatentable as obvious over Carr and Almy; the Board did not reach the alternative Caveney grounds.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “II. DISCUSSION A. Level of Ordinary Skill in the Art Petitioner asserts that a skilled artisan would have had “a bachelor’s degree in a pertinent discipline, such as electrical engineering, civil engineering, mechanical engineering or equivalent with 2–3 years of experience in electrical utility systems, planning, and design.” Pet. 20 (citing Ex. 1002 ¶ 51). Petitioner also asserts that the number of years of experience could be higher or lower given the level of education and vice versa. Id. (citing Ex. 1002 ¶ 51).” slip op. at 7

    • Claim Construction › Intrinsic evidence (Phillips canons) › Preamble limiting or notPreamble not limitingDecided for petitioner

      “In general, a preamble limits the invention if it recites essential structure or steps, or if it is necessary to give life, meaning, and vitality to the claim.” Cochlear Bone Anchored Solutions AB v. Oticon Med. AB, 958 F.3d 1348, 1354–55 (Fed. Cir. 2020) (quoting Catalina Mktg. Int’l v. Coolsavings.com, Inc., 289 F.3d 801, 808 (Fed. Cir. 2002)). We agree with Petitioner that the preambles of claims 1 and 6 recite an intended use. The bodies of both claims recite a structurally complete system comprising a messenger wire and a plurality of cable hangers that are disposed along and suspended from the messenger wire and have a plurality of cable carrying surfaces structured to support at least one electrical cable of the plurality of electrical cables and are separated by a cable carrier divider. Ex. 1001, 10:27–37. According to the preambles, the system are used “for organizing a plurality of electrical cables extending from a plurality of solar panels.” Id. at 10:24–26. slip op. at 9

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed petitioner constructionDecided for petitioner

      “Petitioner asserts that Patent Owner’s construction “only replaces ‘organizing’ with ‘separating’” and “organizing” has a broader ordinary meaning than separating and includes “to arrange or order” not merely to separate. Reply 4 (citing Exs. 1052, 1053); id. at 5 (“Separated cables may be organized. But not all organized cables are necessarily separated.”). We adopt Petitioner’s interpretation of “organizing” as “to arrange or order.” Reply 4. This meaning is consistent with the preamble language of “[a] system for organizing a plurality of electrical cables extending from a plurality of solar panels” comprising a messenger wire and cable hangers disposed along and suspended from the messenger wire with cable carrying surfaces that support electrical cables separated by a divider. Ex. 1001, 10:24–37. The system organizes electrical cables by (1) suspending them from a messenger wire on cable hangers, (2) supporting the cables on cable carrying surfaces of each cable hanger, and (3) separating the cables on adjacent cable carrying surfaces of the cable hangers by using a divider. The “organizing” in the preamble encompasses each of these ways of arranging or ordering the electrical cables but is not limited to any particular way of doing so and merely recites an intended use of the systems. Because we interpret the preamble as reciting an intended use of the systems, we also interpret this portion of the preamble as an intended use of those systems. Our Decision would be the same under Patent Owner’s interpretation that organizing means separating because the combination of Almy and Carr renders obvious a system for organizing electrical cables extending from solar panels by suspending them from a messenger wire on cable hangers that also separate the cables, as discussed infra in Section II.D. See Reply 12 n.4.” slip op. at 12

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundDecided for petitioner

      “Patent Owner argues that a skilled artisan would not have replaced Almy’s wire loops with Carr’s hangers to prevent cross-induction because Almy discloses only DC power cables that extend from the photovoltaic (PV) modules to a combiner box and inverter that converts DC current to AC current without disclosing AC cables or data cables in close proximity to Almy’s DC cables that could create a cross-induction effect. PO Resp. 39– 44 (citing Ex. 1004 ¶¶ 3, 15, 34, Figs. 3, 6; Ex. 2038 ¶¶ 153, 154, 157–160, 163; Ex. 2004, 85:23–86:2, 148:9–14, 154:12–19). We disagree. We agree with Petitioner that a skilled artisan would have used Carr’s cable hangers to organize electrical cables in Almy’s solar power system and prevent cross-induction between AC, DC, and/or data cables. Pet. 45–46; Reply 12–13; Ex. 2001 ¶¶ 53–55. A skilled artisan would know that Carr’s cable hangers would improve Almy’s solar power system by supporting AC, DC, and/or data cables without cross-induction. Pet. 46; Reply 13; Ex. 1002 ¶¶ 48, 96–99; Ex. 1005, 1:27–34, 2:15–27, Fig. 1. Carr’s hangers would satisfy regulations requiring AC and DC cables to be separated. Reply 13. Because Almy’s wire loops cannot comply with NEC regulations that require the separation of AC, DC, and data cables, they limit the ability of Almy’s system to power trackers with AC current to move PV modules to track the sun and obtain maximum power. Ex. 1001, 1:20–56; PO Resp. 7–8 (describing the solar industry trend to use trackers and NEC rules requiring separation of AC, DC, and signal cables for such systems). Carr’s hangers would enable Almy’s solar power system to organize AC, DC, and data cables for solar panels and trackers on a single messenger wire to increase efficiency, comply with NEC rules, prevent cross induction, and avoid the costs of trenching and cable trays. Reply 12–13; Pet. 45–47; Ex. 1005, 1:27–34 (Carr’s cable hangers separate arial conducting cables to minimize cross induction); Ex. 1002 ¶¶ 32–36 (describing the benefits of separating electrical cables with hangers), 48, 96–98 (wire loops cannot prevent cross induction between current- and non-current-carrying cables as hangers do); Ex. 2001 ¶¶ 53–55 (NEC rules require separation of AC, DC, and signal cables); see Metso Mins., Inc. v Powerscreen Int’l Distrib., 526 F. App’x 988, 997 (Fed. Cir. 2013) (finding a motivation to combine to create a solution that complies with road permit regulations). Carr’s hangers would provide a simple, robust means to support and separate current- and non-current-carrying cables to prevent cross induction without deforming under load in Almy’s solar power system. See KSR, 550 U.S. at 417 (“[I]f a technique has been used to improve one device, and a person of ordinary skill in the art would recognize that it would improve similar devices in the same way, using the technique is obvious unless its actual application is beyond his or her skill.”); Intel Corp. v. PACT XPP Schweiz AG, 61 F.4th 1373, 1380 (Fed. Cir. 2023) (citing Intel Corp. v. Qualcomm Inc., 21 F.4th 784, 799–800 (Fed. Cir. 2021)) (“This is the so-called ‘known-technique’ rationale. And if there’s a known technique to address a known problem using ‘prior art elements according to their established functions,’ then there is a motivation to combine.”); DyStar Textilfarben GmbH & Co. Deutschland KG v. C.H. Patrick Co., 464 F.3d 1356, 1368 (Fed. Cir. 2006) (an implicit motivation to combine exists when a combination produces a stronger, cheaper, faster, lighter, smaller, more durable, and/or more efficient product); Ex. 1002 ¶¶ 32 (IEEE Standard 142 and NSC Rule 235G require spacing of current-carrying and data cables to avoid cross-linking), 42 (2014 NEC spacing requirements), 96–99 (Carr’s hangers support and space conducting cables to prevent cross-linking).” slip op. at 16

    Patent outcomesUS 11,349,291 unpatentable
    Claim construction§ 103 obviousnesscites Phillips · Graham
    Patents in suitUS 11,349,291
  • PTAB · Feb 18, 2025 · IPR2023-01274 · APJ Arthur M Peslak · IPR · Final written decision

    Claims 3 and 4 are unpatentable: claim 3 as obvious over Clark, Manner, and Santoro; claim 4 as obvious over Clark and Manner.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “have at least a four-year college degree in mechanical engineering, biomedical engineering, industrial design, or a closely related field and at least one year of experience in product development and design for commercial workstations and work platforms.” Pet. 7 (citing Ex. 1004 ¶¶ 17–18). Petitioner further contends that “[a]dditional education could substitute for professional experience, and significant work experience could substitute for formal education.” Id. Patent Owner contends that a person of ordinary skill in the art “would have had a bachelor’s degree in a pertinent discipline involving mechanical product design, such as mechanical engineering, with 2-3 years experience in in [sic] the design, manufacture, or analysis of mechanical devices.” PO Resp. 18. Patent Owner alternatively argues that a person of ordinary skill in the art “with a 2-year mechanical engineering diploma and . . . 4-6 years of experience in in [sic] the design, manufacture, or analysis of mechanical components and devices.” Id. Patent Owner contends that “Petitioner submits a somewhat different, and broader, definition” of a person of ordinary skill in the art than Patent Owner’s definition because Petitioner’s definition includes industrial design which is a field that does not require the same level of hard sciences as Patent Owner’s definition. Id. Patent Owner further contends that “the Petition should be denied under either party’s definition of a [person of ordinary skill in the art] as Petitioner has failed to meet its burden of establishing a prima facie case of obviousness.” Id. at 18–19 (citing Ex. 2012 ¶¶ 45–47). We apply Petitioner’s level of ordinary skill in the art because it appears consistent with the problems addressed in the ’668 patent and the prior art. Our Decision would not be affected if we were to apply Patent Owner’s definition.” slip op. at 9

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)Term construed patent owner constructionOther

      “We have considered the parties’ respective arguments concerning the construction of this claim term and, for the following reasons, we adopt Patent Owner’s construction of “compartment” as “an enclosed space for containing an item.” First, Petitioner does not dispute that it agreed to adopt Patent Owner’s construction in the district court proceeding between the parties. Pet. Reply 5; Tr. 8:14–21. Second, Petitioner cites to several Board Decisions in which the panels construed claim terms even though the parties agreed to constructions in parallel litigation and argues that the agreement between Petitioner and Patent Owner in the parallel district court proceeding has no bearing on this proceeding. Id. (citing Cook Grp. Inc. v. Cook Med. LLC, IPR2017-00135, Paper 7 at 7–8 (PTAB May 16, 2017); Arris Int’l PLC v. Sony Corp., IPR2016-00834, Paper 54 at 26–29 (PTAB Sept. 28, 2017); Apple Inc. v. VirnetX Inc., IPR2015-00810, Paper 44 at 18–19 (PTAB Aug. 30, 2016)). But, those cited decisions are not precedential and two of them were decided under the “broadest reasonable interpretation standard,” not the Phillips standard, thereby rendering a stipulation between the parties in district court less informative to the panels’ determinations. See Apple, IPR2015-00810, Paper 44 at 18; Cook Grp., IPR2017-00135, Paper 7 at 7. More importantly, given Petitioner’s agreement with Patent Owner’s construction in the district court, we see no reason to apply a different construction here simply because Petitioner proposed that construction prior to agreeing to the construction with Patent Owner in district court. Tr. 11:21–25.8” slip op. at 14

    • Claim Construction › Intrinsic evidence (Phillips canons) › Specification disavowal / 'present invention' languageDisclaimer not foundDecided for petitioner

      “There are two exceptions to the general rule that claims “are generally given their ordinary and customary meaning as understood by a person of ordinary skill in the art when read in the context of the specification and prosecution history.” Thorner, 669 F.3d at 1365. First, “when a patentee sets out a definition and acts as his own lexicographer” or second, “when the patentee disavows the full scope of a claim term either in the specification or during prosecution.” Id. (citing Vitronics Corp., 90 F.3d at 1580). In order for the patentee to act as his or her own lexicographer, the patentee must ‘clearly set forth a definition of the disputed claim term’ other than its plain and ordinary meaning . . . [i]t is not enough for a patentee to simply disclose a single embodiment or use a word in the same manner in all embodiments, the patentee must ‘clearly express an intent’ to define the term. Id. Further, in order to establish disavowal of claim scope, the specification must “make[] clear that the invention does not include a particular feature . . . even though the language of the claims, read without reference to the specification, might be considered broad enough to encompass the feature in question.” Id. As noted above, the underlying premise of Patent Owner’s proposed construction is that the language “disposed in” is broad enough to encompass compartments not “entirely in” or “contained in” the recited portion of the work platform.” slip op. at 17

    • Claim Construction › Intrinsic evidence (Phillips canons) › Prosecution history disclaimer / disavowalDisclaimer not foundDecided for petitioner

      “For the following reasons, we determine that the portions of the prosecution history of the ’650 patent relied on by Patent Owner do not “prov[e] the existence of a ‘clear and unmistakable’ disclaimer that would have been evident to one skilled in the art.” Trivascular, 812 F.3d at 1063– 64.14 Patent Owner argues that the prosecution history redefined the term forward “by disclaiming workstations that are mounted on top of or over the height adjustment mechanism.” PO Resp. 29. Claims 3 and 4 recite “a work platform including a work surface and compartments for containing items” not a “workstation.” It is unclear what Patent Owner is referring to as the “workstation,” i.e., the recited “work platform,” the recited “work surface,” or the combination of “work platform,” “work surface,” and the recited “compartments.” Patent Owner injects further ambiguity by rephrasing the disclaimer, as “Applicant explicitly disclaimed carts having work stations mounted entirely to the top of the height adjustment mechanism (e.g., carts like Clark and Reeder).” Id. at 30 (emphasis added). Regardless of these 14 Because of our determination that the requirements for a clear and unmistakable disclaimer are not met by the cited portions of the prosecution history of the ’650 patent, we need not and do not reach the question of relevance of the statements in the prosecution of the ’650 patent to the claims of the ’668 patent. ambiguities, Patent Owner misinterprets the statements in the prosecution history. The applicant’s primary argument was that an ordinarily skilled artisan would not have incorporated moveable work surfaces above the “compartment” of Clark. Ex. 1033, 137–38. The applicant’s arguments, thus, do not support Patent Owner’s argument here that “workstations” should not be mounted “over or on top of the height adjustment mechanism.” See id.” slip op. at 32

    Patent outcomesUS 7,594,668 unpatentable
    Claim construction§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 7,594,668
Page 1 of 19
← Previous12345…Next →

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.