- Abbott Laboratories v. Miracor Medical SANo claims unpatentablePTAB · Jun 11, 2026 · IPR2025-00116 · APJ John D Hamann · IPR · Final written decision
The Board held claims 1–5, 7, 10, 16–24, 26, and 28 not unpatentable under any of the four § 103 grounds because the petition failed to prove required limitations.
RulingsFinal written decision- Skill levelSkill level petitioner adoptedDecided for petitioner
“We find that the ’077 patent and the cited prior art references reflect the appropriate level of skill at the time of the claimed invention and that the level of skill reflected in these references and in the ’077 patent is consistent with the definition of one of ordinary skill in the art proposed by Petitioner, which we adopt. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001). We further find that our determinations in this Decision would be the same if we were to instead adopt the level of skill proposed by Patent Owner.” slip op. at 11
- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner
“We agree with Patent Owner that “axially adjacent” should be given its plain and ordinary meaning of “adjacent to one another as measured along a central axis.” PO Resp. 5–6; see also Ex. 2015 ¶¶ 73–79 (Mr. Leschinsky addressing the claim term “axially adjacent” and explaining that a person of ordinary skill would have understood it to mean that the “first magnetic device and the rotor are ‘adjacent’ to one another, i.e., disposed next to one another, as measured along the central axis about which the rotor spins”). Patent Owner’s construction also is supported by Petitioner’s expert, Mr. Crosby, who agrees that “adjacent to one another as measured along a central axis,” could be “one meaning,” along with “many other meanings.” Ex. 2014,8 19:13–20:11. In sum, consistent with our Institution Decision, we conclude that the plain and ordinary meaning of “axially adjacent” is “at a position adjacent to one another as measured along a central axis.” See Dec. on Inst. 12.” slip op. at 14
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached
“Second, for the reasons below, we determine that we do not need to construe any other claim terms to resolve the disputes between the parties. See, e.g., Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)) (“[W]e need only construe” slip op. at 14
- Obviousness (§103) › Graham factors (scope of art, differences, level of skill)Not shown unpatentableNot shown unpatentable
“We agree with Patent Owner. As we discuss above, we find “axially adjacent” to mean “adjacent to one another as measured along a central arguments that rest on Petitioner’s assertion that in the Parallel Litigation, Patent Owner “asserts that a magnetic element sealed within a rotor is . . . ‘axially adjacent.’” Id. at 20–21, n.6 (citing Ex. 1019, 5–7). In particular, we find unavailing Petitioner’s argument that Wampler teaches that magnetic pieces 88 (“a first magnetic device”) “are inserted [‘axially adjacent’] in…the impeller.” Id. at 20–21 (citing Ex. 1008 ¶ 80, Fig. 13; Ex. 1003 ¶ 174). We also find unavailing Petitioner’s reliance on Wampler’s Figure 13 and Mr. Crosby’s cited testimony that “the ‘impeller’ and ‘magnetic pieces’ are axially adjacent—situated next to each other on the same axis.” Id. at 21–22 (annotating Ex. 1008, Fig. 13; citing Ex. 1003 ¶¶ 174–176). Petitioner does not sufficiently explain this argument, but appears to conflate being adjacent along a central axis with about an axis. Id. We also find unavailing Petitioner’s argument that under Patent Owner’s construction, Wampler also teaches this limitation, because Patent Owner “concedes that ‘axially adjacent’ components ‘have positioning that is next to one another, perhaps touching or sharing a common side, when measured along the axis.’” Pet. Reply 14–15 (citing PO Resp. 14). Petitioner mischaracterizes Patent Owner’s arguments and ignores Patent Owner’s showing that “axially adjacent” components are “distinct from components that are aligned with one another such that they overlap or occupy the same portion of an axis upon which they are positioned.” PO Resp. 14 (citing Ex. 2015 ¶ 78). For the preceding reasons, Petitioner fails to show by a” slip op. at 24
Patent outcomesUS 11,754,077 not shown unpatentableClaim construction§ 103 obviousnesscites Phillips · GrahamPatents in suitUS 11,754,077 - Western Digital Technologies, Inc. v. Godo Kaisha IP Bridge 1No claims unpatentablePTAB · Apr 28, 2026 · IPR2024-01494 · APJ Justin T Arbes · IPR · Final written decision
The Board found claims 5, 6, and 9–20 not shown unpatentable over either Bowen and Soukup or Nagahama and Soukup under § 103.
RulingsFinal written decision- Skill levelSkill level petitioner adoptedDecided for petitioner
“Petitioner argues that at the time of the ’909 patent (2004), a person of ordinary skill in the art would have had “a Ph.D. in electrical engineering, physics, materials science, or a related field, and at least one year of experience in the research, design, and/or development of magnetic/spintronic devices, or the equivalent,” or “a Master’s degree in electrical engineering, physics, materials science, or a related field, and four years of experience in the research, design, and/or development of magnetic/spintronic devices, or the equivalent,” where “[l]ess work experience may be compensated by a higher level of relevant education, and vice versa.” Pet. 18–19. In the Decision on Institution, we agreed with and applied Petitioner’s proposed definition. Dec. on Inst. 9. Patent Owner does not propose a different level of ordinary skill in the art in its Response. Both experts utilized Petitioner’s proposed definition. See Ex. 1024 ¶ 25; Ex. 2053 ¶¶ 29–30. Based on the full record developed during trial, including our review of the ’909 patent and the types of problems and solutions described in the ’909 patent and cited prior art, we maintain the previously adopted definition of the level of ordinary skill in the art and apply it for purposes of this Decision.” slip op. at 8
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“B. Claim Interpretation We interpret the claims of the challenged patent using the same claim construction standard that would be used to construe the [claims] in a civil action under 35 U.S.C. 282(b), including construing the [claims] in accordance with the ordinary and customary meaning of such [claims] as understood by one of ordinary skill in the art and the prosecution history pertaining to the patent. 37 C.F.R. § 42.100(b). Petitioner argues that “the claim terms should be given their plain and ordinary meaning and no claim construction is necessary.” Pet. 15. We did not interpret any terms in the Decision on Institution. Dec. on Inst. 9–10. Patent Owner does not propose interpretations of any claim terms in its Response. We conclude, based on the full trial record, that no term requires express interpretation to determine whether Petitioner has met its burden to prove unpatentability of the challenged claims. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“Because we need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy,’ we need not construe [a particular claim limitation] where the construction is not ‘material to the . . . dispute.’” (emphasis added) (citation omitted)).” slip op. at 8
- Strike new argumentNew argument disregardedGranted in part
“Pursuant to 37 C.F.R. § 42.23(b), “[a] reply may only respond to arguments raised in the corresponding . . . patent owner response.” “‘Respond,’ in the context of 37 C.F.R. § 42.23(b), does not mean proceed in a new direction with a new approach as compared to the positions taken in a prior filing.” Patent Trial and Appeal Board Trial Practice Guide § II.I, available at https://www.uspto.gov/patents/ptab/trial-practice-guide (last updated Dec. 12, 2025). “While replies . . . can help crystalize issues for decision, a reply . . . that raises a new issue or belatedly presents evidence may not be considered.” Id. An indication that a new issue is improperly raised in a reply is where a petitioner submits “new evidence necessary to make out a prima facie case” of unpatentability, such as a “newly raised rationale to combine the prior art references that was not expressed in the petition.” Id. That is the case here. Petitioner’s rationale in the Petition for why a person of ordinary skill in the art would have been motivated to lower Bowen’s 0.9 eV barrier height to 0.33 eV based on Soukup was that such an artisan would have expected lowering the barrier height to increase TMR. See Pet. 34–36. Faced with Dr. Bokor’s testimony on cross-examination, Petitioner presents a new theory in its Reply that a person of ordinary skill in the art would not have known what impact lowering the barrier height would have (increase TMR, decrease it, or have no impact at all), but would have expected it to change in some “uncertain” way, which is a “legally sufficient motivation” in Petitioner’s view. See Reply 6–10, 13–16, 23–25. In other words, “[r]ather than explaining how its original” position that lowering barrier height would increase TMR “was correct,” Petitioner articulated “an entirely new theory . . . absent from the [P]etition” after Patent Owner cross-examined Dr. Bokor and “pointed out the flaws of [Petitioner’s] position” in its Response. See Wasica Finance GmbH v. Continental Auto. Sys., Inc., 853 F.3d 1272, 1286 (Fed. Cir. 2017). “Shifting arguments in this fashion is foreclosed by statute, [Federal Circuit] precedent, and Board guidelines.” Id.” slip op. at 20
- Expert testimonyPetitioner expert discountedPatent owner expert creditedDecided for patent owner
“Ultimately, the cross-examination testimony above is inconsistent with Dr. Bokor’s opinions in his declaration that, for example, “[i]t was understood to one of skill that lowering the barrier height to increase tunneling would have increased the TMR,” and “[o]ne of skill would have been motivated to adjust oxygen vacancy defects to improve TMR by lowering the barrier height.” See Ex. 1024 ¶¶ 176, 277 (emphasis added); see also id. ¶ 172 (“[O]ne of skill in the art would have been motivated to use [Soukup’s 0.33 eV] or similar height in an MgO MTJ to improve tunneling and hence TMR in Bowen.”). Accordingly, we do not find Dr. Bokor’s declaration testimony regarding a motivation to lower Bowen’s barrier height credible. It is Petitioner’s burden to provide a reasoned, evidence-supported explanation for why a person of ordinary skill in the art would have been motivated to lower Bowen’s 0.9 eV barrier height to 0.33 eV as disclosed in Soukup. See NuVasive, 842 F.3d at 1383; Magnum Oil, 829 F.3d at 1380; TriVascular, 812 F.3d at 1066. Petitioner’s reasoning in the Petition that lowering the barrier height (by introducing oxygen defects) would increase TMR is unsupported by evidence.” slip op. at 31
Patent outcomesUS 11,968,909 not shown unpatentableClaim construction§ 103 obviousnesscites KSR · GrahamPatents in suitUS 11,968,909 - Samsung Electronics Co., Ltd. / Samsung Electronics America, Inc. v. Power2b, Inc.All claims unpatentablePTAB · Mar 13, 2026 · IPR2021-01239 · APJ John D Hamann · IPR · Remand
On remand, the Board held claims 17, 18, 21, 22, 26, and 30 unpatentable as obvious over Reime, with claims 17, 18, 21, 22, and 30 also obvious over Reime and Hinckley.
RulingsRemand decision- ExcludeMotion to exclude, deniedDenied
“In addition, Patent Owner filed a Motion to Exclude certain of Petitioner’s evidence (Paper 28) and Petitioner filed an Opposition (Paper 34). We denied this motion. See Paper 41, 47–50.” slip op. at 3
- Skill levelSkill level board ownOther
“one having ordinary skill in the art at the time of the invention of the ’850 patent: one who “would have had a bachelor’s degree in electrical engineering, computer engineering, computer science, or a related field, and . . . years of experience in the research, design, development, and/or testing of touch and/or proximity sensors, human-machine interaction and 3 The Leahy-Smith America Invents Act (“AIA”) included revisions to 35 U.S.C. § 103 that became effective on March 16, 2013. Because the ’850 patent issued from an application filed before March 16, 2013, we apply the pre-AIA version of the statutory basis for unpatentability. 4 US 2003/0034439 A1, published Feb. 20, 2003 (Ex. 1010, “Reime”). 5 US 2002/0021278 A1, published Feb. 21, 2002 (Ex. 1011, “Hinckley”). Petitioner lists the combination of Reime and Hinckley as a separate asserted ground for claim 26. We combine these two asserted grounds into one as they rely on the same combination. additional education substituting for experience and vice versa.” Final Dec. 8–9. This definition for one having ordinary skill was not the subject of appeal, and we maintain it for purposes of this Final Written Decision on Remand. Moreover, it is consistent with the ’850 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001).” slip op. at 8
- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed board ownDecided for petitioner
“PO Resp. 17–29; Pet. Reply 8–15; PO Sur-reply 6–11. We construed this term in the Final Written Decision. Final Dec. 10–24. In particular, we concluded that (i) “detector assembly” means “two or more detector elements that detect electromagnetic radiation,” and (ii) a detector assembly is not required to be physically separate from (i.e., not interspersed with) a pixel array. Id. at 20, 22. The Federal Circuit found the first part of our construction erroneous. Appeal Dec. 7–10. In particular, the Federal Circuit concluded that “[t]he element.” Id. at 8. In addition, to guide the Board’s analysis on remand, the Federal Circuit construed “the terms ‘at an edge’ and ‘at least one edge’ [to] require a detector assembly to be arranged along one or more edges of a viewing plane defining plate.” Id. at 10–11. In other words, the Federal Circuit “clarif[ied] that arranging a detector assembly ‘at,’ ‘along,’ or ‘about’ ‘at least one edge’ or ‘an edge’ does not limit the detector assembly to being arranged entirely on ‘one edge.’” Id. at 12.” slip op. at 9
- Obviousness (§103) › Graham factors (scope of art, differences, level of skill)UnpatentableUnpatentable
“the Federal Circuit already has concluded that claim 15 is obvious in view of Reime. Appeal Dec. 9–10. Claim 17 further recites “wherein the detector assembly comprises: a support substrate, and an arrangement of detector elements.” Ex. 1001, 67:15–18. We agree with Petitioner and find that Reime teaches these further limitations. Pet. 34–35; Pet. Remand 2–4; Pet. Resp. Remand 1–3. First, as we found in the Final Written Decision, Reime’s receivers 30 and 32 are two detector elements that detect electromagnetic radiation (i.e., light), and Reime’s receivers 30 and 32, collectively, comprise a detector assembly. Final Dec. 27–28 (citations omitted). Moreover, Reime’s two receivers 30 and 32 comprise a detector assembly having multiple detector elements (e.g., two receivers) to teach “an arrangement of detector elements.” Ex. 1010 ¶¶ 73, 86, Figs. 9A–9C; Ex. 2060,7 127:17–18; Pet. 32–33; Pet. Reply 20; Pet. Remand 3. In addition, as we found in the Final Written Decision, Reime teaches that each of receivers 30 and 32 are centered on opposite edges of the plate. 7 Deposition Transcript of Dr. Benjamin Bederson (Apr. 7, 2022). Ex. 1010, Fig. 6A, ¶ 82) (affirming that Reime teaches having one light receiver (e.g., 30 or 32) on each side of a four-sided touch pad). In further support, we agree with Petitioner and find that Reime teaches that receivers 30 and 32 “are mounted in the peripheral area surrounding the LCD 92.” Pet. 32–33; Ex. 1010 ¶ 86; see also id. at Figs. 9A–9C (showing that the receivers are positioned at the edge of the LCD screen); infra annotated Fig. 9E (showing receivers 30 and 32 along edges of the LCD). Accordingly, we find Reime’s detector assembly that comprises receivers 30 and 32 is arranged along two edges (one edge for each receiver) of the LCD, which meets the Federal Circuit’s construction for being arranged at at least one edge. See supra Section III (concluding “at least one edge” means “arranged along one or more edges”) (emphasis added).” slip op. at 12
Patent outcomesUS 8,624,850 unpatentableClaim construction§ 103 obviousnesscites Phillips · GrahamPatents in suitUS 8,624,850 - Apple Inc. v. Apex Beam Technologies LLCInstitutedPTAB · Dec 2, 2025 · IPR2025-00894 · APJ Scott A Daniels · IPR · Institution
The Board instituted IPR on claims 1–20 and all petitioned grounds, finding a reasonable likelihood that Yeo and TS36 render at least claim 1 obvious.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“unless . . . there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” Upon consideration of the arguments and evidence presented by Petitioner and Patent Owner, we are persuaded that Petitioner has demonstrated a reasonable likelihood that it would prevail in showing the unpatentability of at least one of the challenged claims. See 35 U.S.C. § 314(a). Accordingly, we institute an inter partes review of the challenged claims. slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“Patent Owner does not dispute Petitioner’s proposed level of ordinary skill in the art stating that “[f]or the purposes of this Preliminary Response only, Patent Owner utilizes Petitioner’s proposed level of skill in the art.” Prelim. Resp. 2. On this record, Petitioner’s proposed level of ordinary skill in the art is not disputed and is consistent with our review and understanding of the technology and descriptions in the ’767 patent and the asserted prior art references. Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001). For purposes of this Decision, we rely on Petitioner’s proposed level of ordinary skill in the art.” slip op. at 9
- Claim Construction › Functional claiming / §112(f) means-plus-function › Whether §112(f) applies (Williamson, nonce words)No construction neededNot reached
“under 112(f) pointing out the respective functions and structure disclosed in the ’767 patent specification. Pet. 18–20. Patent Owner does not dispute the construction of these terms, stating only “that claim construction is not required to resolve any issues.” PO Resp. 2 (citing Pet. 18–20). Where there is no dispute and our Decision does not turn on any particular construction of these terms, we need not decide at this point whether “receiver module” and “transmitter module” invoke means-plus-function under 112(f). Pet. 13; Prelim. Resp. 5. And, because there is no dispute, we conclude that no express interpretation of any claim term is necessary to determine whether to institute an inter partes review in this proceeding. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the” slip op. at 10
- BurdenInstituted
“In an [inter partes review], the petitioner has the burden from the onset to show with particularity why the patent it challenges is unpatentable.” Harmonic Inc. v. Avid Tech., Inc., 815 F.3d 1889, 1363 (Fed. Cir. 2016) (citing 35 U.S.C. § 312(a)(3) (requiring inter partes review petitions to identify “with particularity . . . the evidence that supports the grounds for the challenge to each claim”)). This burden of persuasion never shifts to Patent Owner. See Dynamic Drinkware, LLC v. Nat’l Graphics, Inc., 800 F.3d 1375, 1378 (Fed. Cir. 2015) (discussing the burden of proof in inter partes review). slip op. at 8
Claim construction§ 103 obviousnesscites KSR · GrahamPatents in suitUS 10,462,767 - Apple Inc. v. Apex Beam Technologies LLCInstitutedPTAB · Nov 5, 2025 · IPR2025-00895 · APJ Scott Raevsky · IPR · Institution
The Board instituted IPR on claims 1–20 and all asserted challenges after finding a reasonable likelihood that at least one challenged claim would be unpatentable.
RulingsInstitution decision- Skill levelSkill level petitioner adoptedDecided for petitioner
“A person of ordinary skill in the art (POSITA) would have had at least [a bachelor’s degree in] electrical engineering, computer engineering, computer science, or a similar field, along with two years of experience designing or developing wireless networks. Additional education might substitute for some of the experience, and additional substantial experience might substitute for some of the educational background. . . . A POSITA would also have familiarity with the 3GPP LTE standards, and would have understood how to search through the available Technical Specifications for implementing RAN technologies. Pet. 21–22 (citing Ex. 1003 ¶¶ 50–53). Patent Owner uses Petitioner’s proposed level of skill in the art at this stage, with a proposed modification to insert “a bachelor’s degree in” to Petitioner’s statement. Prelim. Resp. 12–13; id. at 12, n.1. We have inserted this proposed modification in brackets in the above block quotation. We are persuaded, on the present record, that Petitioner’s proposal, as modified by Patent Owner, is consistent with the problems and solutions in the ’113 patent and prior art of record. We adopt Petitioner’s skill definition at this stage.” slip op. at 7
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached
“The parties do not propose any claim constructions. See Pet. 11–12; Prelim. Resp. 8. As no terms are in dispute, we determine that no terms require construction at this stage.” slip op. at 8
- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“IV. CONCLUSION At this stage of the proceeding, we determine that Petitioner has demonstrated a reasonable likelihood of prevailing on its challenges as to at least one challenged claim. At this preliminary stage, we have not made a final determination as to the patentability of the challenged claims or any underlying factual and legal issues. V. ORDER It is, therefore, ORDERED that, pursuant to 35 U.S.C. § 314(a), an inter partes review of all challenged claims of the ’113 patent is instituted with respect to all challenges of unpatentability set forth in the Petition; and FURTHER ORDERED that pursuant to 35 U.S.C. § 314(c) and 37 C.F.R. § 42.4, notice is hereby given of the institution of a trial commencing on the entry date of this Decision.” slip op. at 18
- Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundInstituted
“measurement value, as Jover teaches.” Id. (citing Ex. 1005 ¶¶ 39–40; Ex. 1003 ¶¶ 115–30). Among other reasons, Petitioner contends that a POSITA would have been motivated to combine “to improve the accuracy and reliability of the beam failure determination.” Id. at 37 (citing Ex. 1003 ¶¶ 115–30). Petitioner further contends that a POSITA would have had a reasonable expectation of success because “it would have been straightforward for a POSITA to implement Jover’s triggering condition in Xia’s method.” Id. at 38 (citing Ex. 1003 ¶¶ 115–30). After considering Patent Owner’s arguments, which we address below, we agree with Petitioner at this stage that the combination of Xia and Jover renders obvious limitation [1e]. Patent Owner first argues that Jover “does not cure the deficiencies of Xia because Jover’s threshold condition for an increase in BER is not used for triggering a transmission of the first and second radio signal.” Prelim. Resp. 20. Just like Xia, Patent Owner contends, Jover discloses no “causality between the threshold being exceeded and transmitting the first and second radio signal.” Id. at 21. This argument does not undermine Petitioner’s showing at this stage because Petitioner relies on Xia, not Jover, for the claimed “triggering the transmission,” or “causality,” as Patent Owner calls it. See Pet. 36–38. That is, Petitioner relies on Jover for the triggering condition and on Xia for the actual triggering. See id. Patent Owner’s argument attacking the references individually is unpersuasive. See In re Merck & Co., Inc., 800 F.2d 1091, 1097 (Fed. Cir. 1986) (“Non-obviousness cannot be established by attacking references individually where the rejection is based upon the teachings of a combination of refences.”). Patent Owner next contends that one of ordinary skill in the art would not have combined Xia and Jover “since Jover is directed to the opposite objective of the ’113 Patent or Xia.” Prelim. Resp. 21. That is, Patent Owner asserts, Jover teaches away from the disclosed methods. Id. at 22. Patent Owner explains, “Jover provides no attempt to improve the beam strength, but rather ignores it through beam sweeping or nullif[ies] it, in contrast to the purpose of the ’113 Patent.” Id. at 22–23. At this stage, Patent Owner’s argument is insufficient to undermine” slip op. at 15
Claim construction§ 103 obviousnessPatents in suitUS 10,568,113 - Tanklogix, LLC v. SiteproInstitution deniedPTAB · Oct 10, 2025 · IPR2025-00650 · APJ Sheila F Mcshane · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood that claims 18–32 and 34 were unpatentable over Kahn or Kahn and Gutierrez.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). Upon consideration of the Petition, the Preliminary Response, and the evidence of record, we determine that Petitioner has not established a reasonable likelihood of prevailing with respect to the unpatentability of at least one claim of the ’871 patent. Accordingly, for the reasons that follow, we decline to institute an inter partes review of claims 18–32 and 34 of the ’871 patent.” slip op. at 2
- Skill levelSkill level patent owner adoptedDecided for patent owner
“The respective proposed levels of qualifications for a person of ordinary skill in the art are similar, with Patent Owner proposing two years of experience compared to Petitioner proposing significant experience with remotely controlling fluid-handling devices, like SCADA systems. Patent Owner also proposes more extensive experience in lieu of educational experience. While we find Petitioner’s proposed qualifications to be acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of skill necessary to understand and implement the teachings of the ’871 patent and the asserted prior art. Our analysis and findings herein, however, do not turn on any differences in the qualifications adopted.” slip op. at 8
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“We determine that we need not expressly construe any claim terms to resolve the parties’ disputes on the current record. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 10
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable
“actuators and the remote control of fluid handling devices, including the receipt with the user-interface module of “a user command to actuate an actuator via a presented control interface” (limitation [18.7]) and “account authorized to send commands to remotely control fluid handling devices” (limitation [18.11]). We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses or teaches these limitations because the evidence does not provide support that there is remote control of fluid handling devices or the use of a user command on a control interface to send a command to a fluid handling device, for instance. Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but we do not discern that it teaches or discloses the capability to remotely control fluid handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, the Kahn disclosures that Petitioner repeatedly relies upon for allegedly teaching this control are deficient. See Ex. 1005, 10:62–67, 14:35– 15:2, 15:62–16:32; see also Pet. 12–14, 16–18. Kahn discloses that “the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance.” Ex. 1005, 10:62–67. Communication unit 112B is part of the local “sensor unit,” wherein the detection conditions determined by the sensor are communicated to remote devices by communication unit 112B. See id. at 3:31–33, 5:62–6:2, 6:27–35, 7:33–37, 13:7–12, Figs. 1A–1C. Kahn discloses that the sensor units, which include communication units 112B, can be located near shut-off valves and can communicate with distant locations. See id. at 11:1–13. There are no disclosures, however, in the above passages that there is remote control of fluid handling devices, that there is a user command on a control interface that actuates an actuator, or that there is a command sent to the facility actuators via a network connection, as required in limitations [18.5]–[18.7] and [18.9]–[18.12], respectively. Rather, the disclosure indicates that the communication unit 112B includes on-site alerts and that the local (non-remote) communication unit 112B can be interfaced with the control valve.” slip op. at 18
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 10,488,871 - Interactive Communications International, Inc. v. Blackhawk Network Inc.All claims unpatentablePTAB · Jul 14, 2025 · IPR2024-00465 · APJ Bart A Gerstenblith · IPR · Final written decision
Claims 1–24 are unpatentable: claims 1–10 and 12–24 as obvious over Szrek and Llach, and claim 11 as obvious over Szrek, Llach, and Gilmore.
RulingsFinal written decision- Skill levelSkill level board ownDecided for petitioner
“B. Level of Ordinary Skill in the Art Petitioner proposes that the level of ordinary skill in the art is an artisan with a working knowledge of POS activation systems and lottery systems that was gained through a mixture of training and work experience in the relevant field such as (i) having a Bachelor’s degree in computer science, computer communications, electrical engineering, or equivalent degree, coupled with at least three years of work experience; (ii) having a Master’s degree in computer science, computer communications, or electrical engineering, but having less work experience; or (iii) having no formal degree, but having experience in the relevant field of at least six years of work experience. Pet. 2–3 (citing Ex. 1003 ¶¶ 13–14).9 Patent Owner states that, “[f]or the purpose of this proceeding, Patent Owner adopts the Petition’s proposed definition of the level of ordinary skill in the art.” PO Resp. 19 (citing Pet. 2–3). We find that the parties’ agreed-upon level of ordinary skill in the art is consistent with the level of ordinary skill in the art reflected by the ’451 patent and the prior art of record. See Inst. Dec. 14; see Okajima v. 9 Petitioner proposes the same level of ordinary skill in the art that the Board adopted in PGR2020-00084 (Pet. 2–3 (citing Ex. 1008, 11)), and IPR2023- 01235 (see IPR2023-01235, Paper 34 at 12–13). Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Therefore, we adopt the parties’ agreed-upon level of ordinary skill in the art, as articulated above, in our consideration of the issues presently before us.” slip op. at 13
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached
“We need not construe “transaction processor” expressly because its meaning is not in dispute and its construction is not necessary to resolve the controversy before us.” slip op. at 16
- Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundDecided for petitioner
“On balance, we find that even with the alleged disadvantages identified by Patent Owner, one of ordinary skill in the art would have been motivated to modify Szrek with Llach’s third-party transaction processor because the advantage of having a “centralized intermediary” allows Szrek’s system to support different game providers, such as different lottery companies, which would reduce some implementation costs and allow the system to be more easily and cheaply extended. Pet. 47 (citing Ex. 1003 ¶ 181); see Medichem, S.A. v. Rolabo, S.L., 437 F.3d 1157, 1165 (Fed. Cir. 2006) (“a given course of action often has simultaneous advantages and disadvantages, and this does not necessarily obviate motivation to combine”) (citing Winner Int’l Royalty Corp. v. Wang, 202 F.3d 1340, 1349 n.8 (Fed. Cir. 2000)); see also Intel Corp. v. Qualcomm Inc., 21 F.4th 784, 795 (Fed. Cir. 2021) (stating the same). We acknowledge that the combination comes with some disadvantages, including “add[ed] delay, reduce[d] efficiency, and . . . implementation complexities by converting a simple, direct communication exchange into an exchange that traverses multiple systems.” PO Resp. 52 (citing Ex. 2052 ¶ 163). But, “[t]he fact that the motivating benefit comes at the expense of another benefit, however, should not nullify its use as a basis to modify the disclosure of one reference with the teachings of another. Instead, the benefits, both lost and gained, should be weighed against one another.” Winner, 202 F.3d at 1349 n.8. Here, Szrek expressly teaches indirect communication as a possible implementation of its system and Petitioner’s combination—employing Llach’s third-party transaction processor as part of the indirect communication channel—offers the attractive benefit of allowing Szrek’s system to support different game providers, which would reduce some implementation costs even if it might increase other costs, e.g., by having to program certain components (e.g., the cash registers) differently. Specifically, we find that the ability to expand Szrek’s system to support different game providers provides advantages that outweigh the disadvantages discussed above in the circumstance where one desires a more robust and comprehensive system. See Pet. Reply 23 (noting three advantages of the combination— (1) “allow[ing] Szrek’s system to use ‘a centralized system for activating lottery tickets from different retailers and different locations,’” (2) “allow[ing] support for different game providers, such as different lottery companies,” “reduc[ing] implementation costs,” and (3) “allow[ing] Szrek’s system to ‘communicate with individual card” slip op. at 37
- Obviousness (§103) › Motivation to combine / reasonable expectation of success › HindsightMotivation foundDecided for petitioner
“On balance, we find that even with the alleged disadvantages identified by Patent Owner, one of ordinary skill in the art would have been motivated to modify Szrek with Llach’s third-party transaction processor because the advantage of having a “centralized intermediary” allows Szrek’s system to support different game providers, such as different lottery companies, which would reduce some implementation costs and allow the system to be more easily and cheaply extended. Pet. 47 (citing Ex. 1003 ¶ 181); see Medichem, S.A. v. Rolabo, S.L., 437 F.3d 1157, 1165 (Fed. Cir. 2006) (“a given course of action often has simultaneous advantages and disadvantages, and this does not necessarily obviate motivation to combine”) (citing Winner Int’l Royalty Corp. v. Wang, 202 F.3d 1340, 1349 n.8 (Fed. Cir. 2000)); see also Intel Corp. v. Qualcomm Inc., 21 F.4th 784, 795 (Fed. Cir. 2021) (stating the same). We acknowledge that the combination comes with some disadvantages, including “add[ed] delay, reduce[d] efficiency, and . . . implementation complexities by converting a simple, direct communication exchange into an exchange that traverses multiple systems.” PO Resp. 52 (citing Ex. 2052 ¶ 163). But, “[t]he fact that the motivating benefit comes at the expense of another benefit, however, should not nullify its use as a basis to modify the disclosure of one reference with the teachings of another. Instead, the benefits, both lost and gained, should be weighed against one another.” Winner, 202 F.3d at 1349 n.8. Here, Szrek expressly teaches indirect communication as a possible implementation of its system and Petitioner’s combination—employing Llach’s third-party transaction processor as part of the indirect communication channel—offers the attractive benefit of allowing Szrek’s system to support different game providers, which would reduce some implementation costs even if it might increase other costs, e.g., by having to program certain components (e.g., the cash registers) differently. Specifically, we find that the ability to expand Szrek’s system to support different game providers provides advantages that outweigh the disadvantages discussed above in the circumstance where one desires a more robust and comprehensive system. See Pet. Reply 23 (noting three advantages of the combination— (1) “allow[ing] Szrek’s system to use ‘a centralized system for activating lottery tickets from different retailers and different locations,’” (2) “allow[ing] support for different game providers, such as different lottery companies,” “reduc[ing] implementation costs,” and (3) “allow[ing] Szrek’s system to ‘communicate with individual card” slip op. at 37
Patent outcomesUS 11,488,451 unpatentableClaim construction§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 11,488,451 - Samsung Electronics America, Inc. / Samsung Electronics Co., Ltd. v. Collision Communications, Inc.Institution deniedPTAB · Mar 21, 2025 · IPR2024-01250 · APJ Bart A Gerstenblith · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood of proving claims 1–5, 7, 9–16, or 20 unpatentable over the asserted grounds.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“An inter partes review may be instituted only if “the information presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2018). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“B. Level of Ordinary Skill in the Art Petitioner, supported by Dr. Min’s testimony, proposes that a person of ordinary skill in the art at the time of the invention would have had “at least a bachelor’s [degree] in [electrical engineering, computer engineering, or computer science], physics, or equivalent, and two years of experience with cellular telecommunications, radio-access network architectures, protocols and signal propagation in wireless networks.” Pet. 3 (citing Ex. 1003 ¶ 59). Dr. Min testifies that “[a]dditional education could substitute for professional experience and vice versa.” Ex. 1003 ¶ 59. Additionally, Petitioner contends that Dr. Min “exceeded this level of experience by the priority date.” Pet. 3 (citing Ex. 1010 (curriculum vitae of Dr. Min)). In its Preliminary Response, Patent Owner does not take a position on the relevant level of ordinary skill in the art. See generally Prelim. Resp. At this stage of the proceeding and on the present record, we adopt Petitioner’s uncontested proposed level of ordinary skill in the art, which we find consistent with the level of ordinary skill in the art reflected by the ’946 patent and the prior art of record. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978).” slip op. at 10
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached
“Neither party contends that any claim terms require an express construction to resolve the present controversy. Pet. 8 (“For purposes of this Petition only, Petitioner does not believe any terms require a formal construction.”); see generally Prelim. Resp. Nonetheless, Petitioner explains that the Petition is structured such that “Ground 1 is based on Patent Owner’s infringement contentions in the district court litigation, where the claimed ‘MUD module’ is generally mapped to multiple-input multiple-output (MIMO) receivers in a wireless network.” Pet. 2. Petitioner contends that “[u]nder this broad interpretation of a ‘MUD module,’ Walton’s MIMO receiver renders every challenged claim obvious.” Id. In contrast to Ground 1, the Petition states that “Ground 2 is based on the plain meaning of ‘MUD module,’ which is a component that detects, separates, and decodes signals from multiple users transmitting simultaneously over the same frequency band.” Id. Petitioner contends that, “[a]pplying the correct meaning of the term, Walton’s MIMO receiver does not necessarily comprise a MUD module.” Id. Therefore, Petitioner explains that “Ground 2 combines Walton with Learned, which expressly discloses [a] multi-user detector, and thus renders every challenged claim obvious in combination with Walton.” Id. at 2–3.7 In other words, the Petition presents Ground 1 and Grounds 2/3 as alternatives depending on the meaning of 7 Although not specifically relevant to claim construction, Petitioner explains that “Ground 3 further combines Walton and Learned with Quigley, to the extent Patent Owner argues Walton does not disclose providing a burst control input.” Pet. 3. “MUD module,” where Ground 1 is based on Petitioner’s understanding of Patent Owner’s interpretation of the term and Grounds 2 and 3 are based on Petitioner’s interpretation of the term as having its plain meaning. Petitioner further contends that “[e]very other claim term carries its ‘ordinary and customary meaning’ . . . .” Id. at 8. Although Petitioner presents a potential dispute regarding the meaning of “MUD module,” we need not construe this term expressly because the determination we reach herein does not depend on which meaning MUD module is applied. Accordingly, we do not construe any claim terms expressly because express constructions are not necessary to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 12
- PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Not reached
“IV. DISCRETIONARY DENIAL Patent Owners contends that the factors set forth in Apple Inc. v. Fintiv, Inc., IPR2020-00019, Paper 11 at 9 (PTAB Mar. 20, 2020) (precedential), weigh heavily in favor of discretionary denial. Prelim. Resp. 40–46; Paper 10. Petitioner disagrees. Pet. 74–77; Paper 9. In light of the conclusion reached above, we need not address the parties’ arguments regarding discretionary denial.” slip op. at 25
Claim construction§ 103 obviousnessDiscretionary denialcites Phillips · KSR · GrahamPatents in suitUS 8,089,946 - Samsung Electronics America, Inc. / Samsung Electronics Co., Ltd. v. Collision Communications, Inc.Institution deniedPTAB · Mar 21, 2025 · IPR2024-01248 · APJ Bart A Gerstenblith · IPR · Institution
The Board denied institution because the Petition did not show a reasonable likelihood of proving claims 1–11, 16, and 21 unpatentable over the asserted obviousness grounds.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2018). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“At this stage of the proceeding and on the present record, we adopt Petitioner’s uncontested proposed level of ordinary skill in the art, which we find consistent with the level of ordinary skill in the art reflected by the ’071 patent and the prior art of record. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978).” slip op. at 12
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“Neither party proposes a specific construction of any claim term, although Petitioner contends each term should be construed according to its plain and ordinary meaning. Pet. 16; see generally Prelim. Resp. Accordingly, we need not construe any claim terms expressly because the meaning of the terms is not in dispute and an express construction is not necessary to resolve the controversy before us.” slip op. at 13
- BurdenNot shown unpatentable
“We find the Petition lacking in particularity because it does not clearly identify what aspect of Jin is alleged to teach the unique signal parameters (or unique estimated signal parameters) recited in claim 1. See, e.g., 35 U.S.C. § 312(a)(3) (“A petition filed under section 311 may be considered only if — (3) the petition identifies, in writing and with particularity, . . . the evidence that supports the ground for the challenge to each claim . . . .”). First, as reflected above, the Petition asserts that something called a “unique pilot parameter” teaches the recited unique estimated signal parameters. But “unique pilot parameter” is not a term or phrase recited in Jin. See Prelim. Resp. 19 (arguing the same). So, when Petitioner states “Jin discloses that the base station uses the unique pilot parameter (i.e., ‘unique estimated signal parameters’) to ‘identify which user (i.e., mobile terminal) has transmitted the received data,’” it is not clear what element in Jin Petitioner intends to identify by the term “unique pilot parameter.” Dr. Min’s testimony does not help resolve the ambiguity in the Petition. In particular, Dr. Min also refers to a “unique pilot parameter (i.e., ‘unique signal parameter’) for each user.” Ex. 1003 ¶ 89. But, as noted above, Jin does not disclose an element referred to as a “pilot parameter” and it is not clear what element Dr. Min intended to identify in Jin.8” slip op. at 18
Claim construction§ 103 obviousnessDiscretionary denialcites Phillips · KSR · GrahamPatents in suitUS 9,814,071 - Amphenol Corp. v. PPC Broadband, Inc.All claims unpatentablePTAB · Feb 19, 2025 · IPR2023-01363 · APJ Jon B Tornquist · IPR · Final written decision
Claims 1, 2, and 10–13 are unpatentable as obvious over the stated combinations of Holmberg, Battey, Blankenship, and Cowen.
RulingsFinal written decision- Skill levelSkill level petitioner adoptedDecided for petitioner
“Petitioner contends a person of ordinary skill in the art “would have had at least a bachelor’s degree in electrical engineering, computer engineering, or a related field, and at least 1 year of experience related to communication networks or the equivalent.” Pet. 7. Petitioner further contends that “[a]dditional education could substitute for professional experience or significant experience in the field could substitute for formal education.” Id. at 7–8 (citing Ex. 1003 ¶¶ 29–31). Dr. Eldering agrees that one of ordinary skill in the art “would have had at least a bachelor’s degree in electrical engineering, computer engineering, or a related field, and at least one year of experience related to communication networks or the equivalent.” Ex. 2001 ¶ 24. According to Dr. Eldering, “[a] person with less relevant practical experience but with additional experience would also qualify.” Id. Patent Owner contends that” slip op. at 9
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached
“Although Patent Owner disagrees with Petitioner’s construction, it contends “the Board need not resolve this claim construction dispute because Petitioner’s proposed grounds 1-5 are all insufficient under either construction.” PO Resp. 19. Upon review of the parties’ arguments and the prior art of record, we determine that no claim terms require express construction for purposes of this decision. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). For example, we discuss below in Section III.G why we do not reach the claim construction issue presented by Petitioner.” slip op. at 11
- Expert testimonyPetitioner expert creditedDecided for petitioner
“We find that Holmberg expressly contemplates using its wall box within multi-dwelling units, notes that multi-dwelling wall boxes in the prior art were “typically provided” on every floor, and discloses that the multi-dwelling wall boxes would contain optical couplings for each resident on a given floor. Ex. 1004 ¶¶ 7, 34; Pet. Reply 8–10. In view of these disclosures, we credit the testimony of Dr. Kiaei that one of ordinary skill in the art would have sought to use Holmberg’s wall box in multi-dwelling units and would have seen a need to access the area behind spice tray 230 to connect and disconnect subscribers. Ex. 1003 ¶ 92; Ex. 1033 ¶¶ 7–8. Moreover, even if Holmberg were limited to mid-span locations and distributing drop cables, as opposed to distribution cables for individual subscribers, as asserted by Patent Owner, Patent Owner does not dispute that a technician would still need periodic access to the area behind splice tray 230 in these mid-span devices. Tr. 38:3–39:1 (counsel agreeing that one would need to access the area behind splice tray 230 in Holmberg, albeit in “rare occasions”); Ex. 1003 ¶¶ 90–92; Ex. 1033 ¶¶ 7–8. Thus, whether used in the manner contemplated by Petitioner or Patent Owner, Petitioner persuasively demonstrates that access to the space behind splice tray 230 in Holmberg would be necessary. With access behind splice tray 230 required, Petitioner persuasively demonstrates that one of ordinary skill in the art would have seen a benefit to replacing Holmberg’s fasteners or screws with a hinged connection, such as that disclosed in Battey, to allow easier access to the area behind the splice tray. Pet. 41 (citing Ex. 1005 ¶ 39 (disclosing that a rotatable splice tray or shelf would “provide[] full and convenient access to the splice tray”)). First, Petitioner and Dr. Kiaei persuasively demonstrate that once the fibers of Holmberg are routed from behind splice tray 230 and the distribution cables spooled on this tray, a technician could not reasonably access fiber optic cables stored behind splice tray 230 without releasing or opening splice tray 230. Pet. Reply 14–15 (citing Ex. 1023, 60:20–61:15); Ex. 1033 ¶¶ 31–32. Second, Petitioner persuasively demonstrates that without a hinged connection, the technician would have to either hold the splice tray of Holmberg with one hand while performing the necessary routing and splicing steps, two screws would need to remain in place (essentially replicating a hinge), or the tray would have to be left to dangle, supported only by the routed and spliced fibers. Pet. Reply 19–20.” slip op. at 22
- Strike new argumentNew argument consideredDecided for petitioner
“Allegedly New Arguments on Reply Patent Owner contends that Petitioner’s arguments regarding the benefits of a hinged connection when performing the splicing and routing steps should be dismissed or ignored because they were improperly raised for the first time on reply. Sur-reply 19–20. We disagree. The Petition asserts that one of ordinary skill in the art would have sought to add a hinged connection, such as that disclosed in Battey, in Holmberg and would have seen a benefit to so doing. Pet. 40–44. Petitioner did not change its proposed combination or its stated rationale in its Reply. Rather, in response to Patent Owner’s counter-arguments, Petitioner expands upon the benefits of its proposed combination, i.e., the substitution of a hinged connection in place of fasteners. Pet. Reply 15–21. This is permissible, as a reply may properly expand on or extend previously raised arguments relating to the motivation to make the proposed changes to the prior art. See Rembrandt Diagnostics, LP v. Alere, Inc., 76 F.4th 1376, 1385 (Fed. Cir. 2023) (explaining that the reply arguments properly relied on the same legal ground, the same prior art references, and same legal argument—the motivation to make the proposed changes to the prior art reference).” slip op. at 25
Patent outcomesUS 9,008,483 unpatentableClaim construction§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 9,008,483
Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.