  • PTAB · Jan 22, 2026 · IPR2024-01158 · APJ Ken B Barrett · IPR · Final written decision

    Claims 1–5, 7–15, 17, and 18 are unpatentable: claims 1–4, 9–14, 17, and 18 as anticipated by Tateishi, and claims 5, 7, 8, and 15 as obvious over Tateishi.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “We discern no material difference between the parties’ definitions. Petitioner’s definition is consistent with the level of ordinary skill reflected in the prior art references of record. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (recognizing that the prior art itself may reflect an appropriate level of skill in the art). For purposes of this decision, we apply Petitioner’s definition of the person of ordinary skill in the art. We note, however, that were we to adopt Patent Owner’s assessment, the outcome of this Decision would be the same.” slip op. at 13

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed petitioner constructionDecided for petitioner

      “After considering the parties’ arguments and evidence, we determine that Patent Owner has not offered persuasive evidence that a person of ordinary skill in the art reading the claims in light of the Specification would understand the plain and ordinary meaning of “control signal” to be as narrow as Patent Owner proposes. We do not construe the claims such that the “control signal” must be the exclusively controlling factor of a component, as Patent Owner urges. Petitioner’s position, on the other hand, is consistent with the evidence of record. We construe “control signal” as having its plain and ordinary meaning, namely a signal configured to control a circuit component. D. The Asserted Anticipation of Claims 1–4, 9–14, 17, and 18 by Tateishi” slip op. at 24

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)UnpatentableUnpatentable

      “We determine that Petitioner has demonstrated by a preponderance of the evidence that Tateishi discloses the “control signal” recited in limitations 1B2 and 1D of independent claim 1.” slip op. at 37

    • BurdenNot shown unpatentable

      “based on the Tateishi application publication (Ex. 1007), that the Tateishi Patent (Ex. 1005) also anticipates claims 1–4, 9–14, 17, and 18. See Pet. 23–24 (“The Tateishi Patent is also prior art under (pre-AIA) §102(e)”; identifying Ground 1 as anticipation “under §102 by Tateishi and/or the Tateishi Patent”). However, we are unable to locate in the Petition or Petitioner’s Reply a discussion of or citation to the Tateishi Patent other than under the Petitioner’s heading “Identification of Challenge and Relief Requested” on pages 23 and 24 of the Petition. Cf. id. at i–x (Table of Contents identifying a section of the Petition discussing the Tateishi (Application) anticipation ground but not a section discussing a Tateishi Patent anticipation ground). Although the issued patent may be substantively identical to the published application, Petitioner does not assert that, and we decline to compare the documents to determine whether that is the case. In light of Petitioner’s silence on the alternative ground, Petitioner has not demonstrated by a preponderance of the evidence that the Tateishi Patent anticipates 1–4, 9–14, 17, and 18.” slip op. at 47

    Patent outcomesUS 9,041,377 unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 9,041,377
  • PTAB · Dec 16, 2025 · IPR2024-01098 · APJ Cynthia M Hardman · IPR · Final written decision

    Claims 1–6 are unpatentable as anticipated by or obvious over Kick and as obvious over Ackermann and Kaminski, with or without Hutchinson.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “(sometimes abbreviated herein as “POSITA”) would have had “(i) an associate’s or bachelor’s degree in mechanical, industrial or manufacturing engineering and (ii) at least two to three years of practical experience with designing or manufacturing mechanical products, such as food or beverage packaging. A POSITA could substitute additional education for industry experience and vice versa.” Pet. 15 (citing Ex. 1002 (Delson Decl.) ¶ 14).” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededDecided for petitioner

      “Petitioner asserts that no claim term requires an express construction. See Pet. 15. We agree and find it unnecessary to construe any claim term to resolve the issues in this case. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (noting that “we need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 13

    • Novelty / Anticipation (§102) › Priority / effective filing date / continuation supportPriority date, deniedDecided for petitioner

      “is no earlier than the February 25, 2020, filing date of the ’195 application. Petitioner demonstrates by a preponderance of the evidence that the volume limitations recited in independent claim 1 and dependent claims 2 and 6 lack adequate written description support in the ’934 application as filed. See Pet. 10–11. The specification, figures, and claims of the ’934 application as originally filed do not disclose any volume limitations. See Ex. 1004 (’934 prosecution history), 1–17. Instead, the volume limitations recited in the challenged claims find their first support in Figure 7, which was filed over one month after the ’934 application was filed. Compare id. at 1–17, with id. at 34–56. The addition of new matter during prosecution of a patent application is prohibited. See 35 U.S.C. § 132(a) (“No amendment shall introduce new matter into the disclosure of the invention.”); see also 37 C.F.R. § 1.121(f); Manual of Patent Examining Procedure § 608.04. Therefore, we agree with Petitioner that “the new matter improperly added during the prosecution of the ’934 application cannot be considered part of the disclosure of the original, April 19, 2010 application and/or relied upon for claiming priority in subsequent applications.” Pet. 9.” slip op. at 20

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)UnpatentableUnpatentable

      “obvious over Kick. Pet. 16–41. Kick published with the additional figures and disclosure the applicant submitted during prosecution of the ’934 application, and its detailed description and figures are the same as or similar to that of the ’904 patent. See id. at 16; compare Ex. 1007 (Kick), with Ex. 1001. Petitioner compares Kick to each limitation of the challenged claims. See Pet. 16–41. Based on the record before us, we find that Kick teaches or suggests each of the limitations of the challenged claims, for the reasons discussed in the Petition. See id. Accordingly, we determine that Petitioner has established by a preponderance of the evidence that Kick renders claims 1–6 of the ’904 patent unpatentable as anticipated and as obvious.” slip op. at 22

    Patent outcomesUS 11,738,904 unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites KSR · Graham
    Patents in suitUS 11,738,904
  • PTAB · Nov 18, 2025 · IPR2025-00782 · APJ Ken B Barrett · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that any challenged claim was unpatentable over the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “An inter partes review may not be instituted “unless . . . the information presented in the petition . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). Having considered the arguments and evidence presented by Petitioner and Patent Owner, we determine that Petitioner has not demonstrated a reasonable likelihood of prevailing on at least one of the challenged claims of the ’469 patent. Accordingly, we do not institute an inter partes review of the challenged claims.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Petitioner contends that: [A] POSITA would have had at least a bachelor’s degree in computer science, computer engineering, business information systems, software engineering, or systems engineering and at least two years of experience in computer networking or telecommunications. Ex.1002 ¶21; see also Ex.1001 (1:14-31). Additional education could substitute for professional experience. Ex.1002 ¶21. Significant work experience could substitute for formal education. Ex.1002 ¶21. Pet. 7–8. Patent Owner, at this stage, does not disagree or propose a different definition of the person of ordinary skill in the art. Petitioner’s definition is consistent with the level of ordinary skill reflected in the prior art references of record. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (recognizing that the prior art itself may reflect an appropriate level of skill in the art). For purposes of this decision, we apply Petitioner’s definition of the person of ordinary skill in the art.” slip op. at 9

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Petitioner states that it “do[es] not believe explicit construction is required to resolve this Petition.” Pet. 7. Patent Owner proposes constructions for “Internet,” “access the Internet,” “subscriber access website.” Prelim. Resp. 12–15. On this record and for purposes of this decision, we determine that no claim terms require express construction. D. Alleged Anticipation of Claims 1, 2, 10, 11, and 24–28 by Bruner and” slip op. at 10

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentable

      “We find Patent Owner’s argument to be persuasive. Petitioner does not explain adequately how Bruner discloses the positional requirement of a subscriber access unit being coupled between the satellite dish and the router. Accordingly, Petitioner has not shown sufficiently for purposes of institution that Bruner anticipates independent claim 24. Although, for the obviousness challenge, Petitioner contends that Clark discloses a wireless router (for limitation 24c), Petitioner relies solely on Bruner for the “between” limitation. See Pet. 17 (“Bruner and/or Bruner in view of Clark both disclose each limitation of claim 24c, including a router (e.g., Bruner’s ‘ADS’ and Clark’s ‘wireless router’)”); id. at 18–19 (the discussion of the “between” limitation 24d asserting that “Bruner discloses claim 24d,” with no mention of Clark). Furthermore, Petitioner merely asserts that both Bruner and Clark disclose a router. See id. at 17–18. Petitioner, however, does not indicate clearly which is used in the proposed combination, does not describe the configuration of a proposed combination or a proposed modification of Bruner’s system, and fails to set forth an adequate and persuasive reason with rational underpinning as to why a person of ordinary skill in the art would have modified Bruner’s system to arrive at the positional requirement of the subscription access unit being coupled between the satellite dish and a router. See id. at 13–14 (motivation section for this ground); id. at 18–19 (addressing the “between” limitation 24d). Accordingly, Petitioner has not shown a reasonable likelihood of prevailing on its challenge to independent claim 24 as obvious over Bruner in view of Clark.” slip op. at 14

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 7,324,469
  • PTAB · Oct 10, 2025 · IPR2025-00653 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution on all claims because the Petition did not show a reasonable likelihood that any challenged claim was unpatentable over the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “An inter partes review may be instituted only if “the information presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’504 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Additionally, only terms that are in controversy need to be construed, and these need be construed only to the extent necessary to resolve the controversy. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 9; Prelim. Resp. 4 (citing Ex. 2009 ¶ 72); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13

    • Expert testimonyPetitioner expert discountedDecided for patent owner

      “Ex. 1002 ¶ 47. As reflected above, Dr. Wooley’s testimony as to element [1.2] does not even assert that Cardamone discloses a tank, let alone one or more sensors disposed at a tank as recited in element [1.2]. Thus, Dr. Wooley’s testimony does not support Petitioner’s argument on this issue.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,726,504
  • PTAB · Oct 10, 2025 · IPR2025-00652 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–23 and 25–30 were unpatentable over the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’403 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 10; Prelim. Resp. 4 (citing Ex. 2009 ¶ 73); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses element [1.2] because the evidence cited does not disclose a “first computer system being configured to provide remote control of the first pump or first valve” (i.e., a fluid-handling device). Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but Petitioner has not identified any disclosure of the capability to remotely control fluid-handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, Kahn’s disclosures that Petitioner relies on for allegedly teaching remote control are deficient. We discuss each. First, Petitioner points to the following, “[f]or instance, as illustrated in FIG. 1C, a fluid control device such as a valve 15A is located on the input side of a sen[s]or unit 110.” Ex. 1005, 8:19–21, cited in Pet. 13. This portion of Kahn, however, does not disclose remote control. Second, Petitioner cites to the following: Finally, or in addition to, the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance. Pet. 13 (citing Ex. 1005, 10:62–67). We agree with Patent Owner that this portion of Kahn teaches on-site alerts and local control of the fluid-handling device. See Prelim. Resp. 7. This portion of Kahn does not disclose remote control.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,294,403
  • PTAB · Oct 10, 2025 · IPR2025-00651 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–3, 6, 7, and 9–20 were unpatentable over any asserted ground.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’680 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 11

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner

      “target value” is part of a command that is sent from a computing device to a server and then to a controller. The controller then receives a measurement of the fluid by a sensor and determines whether the measurement satisfies the “target value.” If the measurement does not satisfy the “target value,” further operations are undertaken. The recited operation sequence makes clear that the plain and ordinary meaning of “target value” is not as Dr. Wooley opines because the particular operating condition that a device is in at a particular time is represented by the measurement taken by the sensor, 11 Some claim language less relevant to construing “target value” was omitted for ease of reference. which the controller then uses to determine whether the measurement satisfies the “target value.” Additionally, claim 1 recites that the “target value” is sent as part of a command to the controller. The “target value” is not sent to the controller from the sensor, as might be expected if the plain and ordinary meaning of “target value” were as Dr. Wooley opines. Petitioner and Dr. Wooley’s construction would also result in “target value” meaning effectively the same thing as the measurement of the fluid by the sensor, a concept that is separately recited in claim 1 and to which the “target value” is compared. The Specification of the ’680 patent does not support Petitioner’s understanding of the plain and ordinary meaning of “target value.” Although the Specification does not recite “target value,” it recites “target state,” and describes “target state” sufficiently to understand the plain and ordinary meaning of “target” as used in “target value” and “target state.” In particular, the ’680 patent explains that “[i]n some embodiments, the process 104 includes receiving, via a network interface, from a remote user device, (e.g., via a command-center server) a command to change a state of a fluid-handling device to a target state.” Ex. 1001, 11:48–51. This portion reflects that the command is seeking to change a state of a fluid-handling device to a target state. In other words, the “target value” or “target state” is not generally “the particular operating condition that a device is in at a particular time”; rather, it is a value or state that the fluid-handling device is desired to be in, as Patent Owner and Dr. Durham explain. Additionally, just as claim 1 recites a directional component for the “target value” to be sent to the controller in a command, so too does the Specification describe a “target state” as being sent in a command from a remote user device. Thus, the Specification clearly supports the plain and ordinary meaning proposed by Patent Owner and Dr. Durham and not the plain and ordinary meaning proposed by Petitioner and Dr. Wooley. slip op. at 14

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “time-stamped process data, report exception therein to the remote host, and extract and transmit time-stamped process data to the remote host.” Ex. 1005, Abst. (emphases added). Almadi explains that its remote field systems must include a plurality of controller units “to issue commands to, and gather and process data from a plurality of field devices, including remote systems and instruments, . . . [and] a database server for the storage of process data retrieved from the remote subsystems and instruments.” Id. at 2:22–30 (emphases added). Based on these disclosures, we agree with Patent Owner that Petitioner has not established that Almadi discloses element [1.4]. Specifically, the teachings from Almadi identified by Petitioner refer to process data, which is data retrieved from the remote subsystems/field devices. Thus, we understand that Almadi’s teaching—of using an Ethernet switch to transmit “process data”—describes transmitting data from the remote subsystems/field devices. See Ex. 1005, 3:13–17, cited in Pet. 15. But claim 1 and particularly element [1.4], recites “sending, with the server, the target value to the network address [which identifies a controller of the fluid-handling device13] via the network,” which is different than sending process data from the field devices to the remote host or database server for storage.” slip op. at 19

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,175,680
  • Tanklogix, LLC v. SiteproInstitution denied
    PTAB · Oct 10, 2025 · IPR2025-00650 · APJ Sheila F Mcshane · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 18–32 and 34 were unpatentable over Kahn or Kahn and Gutierrez.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). Upon consideration of the Petition, the Preliminary Response, and the evidence of record, we determine that Petitioner has not established a reasonable likelihood of prevailing with respect to the unpatentability of at least one claim of the ’871 patent. Accordingly, for the reasons that follow, we decline to institute an inter partes review of claims 18–32 and 34 of the ’871 patent.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The respective proposed levels of qualifications for a person of ordinary skill in the art are similar, with Patent Owner proposing two years of experience compared to Petitioner proposing significant experience with remotely controlling fluid-handling devices, like SCADA systems. Patent Owner also proposes more extensive experience in lieu of educational experience. While we find Petitioner’s proposed qualifications to be acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of skill necessary to understand and implement the teachings of the ’871 patent and the asserted prior art. Our analysis and findings herein, however, do not turn on any differences in the qualifications adopted.” slip op. at 8

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “We determine that we need not expressly construe any claim terms to resolve the parties’ disputes on the current record. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 10

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “actuators and the remote control of fluid handling devices, including the receipt with the user-interface module of “a user command to actuate an actuator via a presented control interface” (limitation [18.7]) and “account authorized to send commands to remotely control fluid handling devices” (limitation [18.11]). We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses or teaches these limitations because the evidence does not provide support that there is remote control of fluid handling devices or the use of a user command on a control interface to send a command to a fluid handling device, for instance. Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but we do not discern that it teaches or discloses the capability to remotely control fluid handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, the Kahn disclosures that Petitioner repeatedly relies upon for allegedly teaching this control are deficient. See Ex. 1005, 10:62–67, 14:35– 15:2, 15:62–16:32; see also Pet. 12–14, 16–18. Kahn discloses that “the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance.” Ex. 1005, 10:62–67. Communication unit 112B is part of the local “sensor unit,” wherein the detection conditions determined by the sensor are communicated to remote devices by communication unit 112B. See id. at 3:31–33, 5:62–6:2, 6:27–35, 7:33–37, 13:7–12, Figs. 1A–1C. Kahn discloses that the sensor units, which include communication units 112B, can be located near shut-off valves and can communicate with distant locations. See id. at 11:1–13. There are no disclosures, however, in the above passages that there is remote control of fluid handling devices, that there is a user command on a control interface that actuates an actuator, or that there is a command sent to the facility actuators via a network connection, as required in limitations [18.5]–[18.7] and [18.9]–[18.12], respectively. Rather, the disclosure indicates that the communication unit 112B includes on-site alerts and that the local (non-remote) communication unit 112B can be interfaced with the control valve.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 10,488,871
  • PTAB · Sep 10, 2025 · IPR2025-00141 · APJ Ken B Barrett · IPR · Remand

    The Board instituted IPR of claims 1–21 on all asserted grounds after finding a reasonable likelihood of prevailing on the Nishida-based challenges.

    RulingsRemand decision
    • Director reviewDirector review, grantedGranted

      “partes review of U.S. Patent No. 8,266,749 B2 (“the ’749 patent,” Ex. 1001). Paper 1 (“Pet.”). The Petition challenges the patentability of claims 1–21 of the ’749 patent. Nike, Inc. (“Patent Owner”)2 filed a Preliminary Response to the Petition. Paper 6 (“Prelim. Resp.”). With our authorization, Petitioner filed a Reply to Patent Owner’s Preliminary Response (Paper 10) and Patent Owner filed a Sur-reply (Paper 13). We discretionarily denied institution under 35 U.S.C. § 325(d). Paper 20. Petitioner filed a request for Director Review of the Decision denying institution. Paper 21. Director Review was granted, the Decision denying institution of inter partes review was vacated, and the case was remanded to the Board. Id. at 4. Specifically, the case was “remanded to the Board with instructions to consider Petitioner’s Nishida grounds and to determine whether the Petition should be instituted.” Id. at 3–4.” slip op. at 2

    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “presented in the Petition and the Preliminary Response “shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). Having considered the arguments and evidence presented by Petitioner and Patent Owner, we determine that Petitioner has demonstrated a reasonable likelihood of prevailing on at least one of the challenged claims of the ’749” slip op. at 2

    • Expert testimonyPetitioner expert creditedPatent owner expert discountedDecided for petitioner

      “In support of Petitioner’s position, Dr. Adanur testifies that “Nishida discloses that the unfinished surface area 1.1 is part of the web 1 itself,” that Nishida discloses that the computer-controlled process can (using Nishida’s phrase) “put in” up to seven different textile fibers or yarns into the web of material in one operation, and that, “[t]hus, Nishida discloses simultaneously knitting its layouts 2 and tongue 40 (each a ‘textile element’) with the unfinished surface area 1.1 (a ‘surrounding textile structure’).” Ex. 1002 ¶ 216 (citing Ex. 1022, 2:12–20, 4:47–55, 5:45–49). For purposes of institution, we credit that testimony over the testimony of Dr. Pastore, because, on the current record, we regard Dr. Adanur’s testimony as more consistent with the evidence. This and the other related issues may be explored more fully during the trial.” slip op. at 23

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Petitioner contends that: A person of ordinary skill in the art (“POSITA”) in the field of the ’749 patent in March 2004 would have been someone with at least a few years of experience in knit materials and knitting methods and machines that can be used in making footwear, or a bachelor’s degree in textile-related sciences, engineering, or industrial product design, or equivalent academic or work experience, including in the footwear industry. EX1002, ¶68. Such a person of ordinary skill would have at least a general understanding of general construction processes and materials used in the manufacturing process of fabric-based articles. For individuals with a lower educational level, a person could still be of ordinary skill in the art provided that person’s working experience compensates for any such lower educational level, or vice versa. See id. Pet. 23–24. Patent Owner states that, “[f]or purposes of this Preliminary Response, Nike applies Skechers’ definition for a person of ordinary skill in the art.” Prelim. Resp. 14. Petitioner’s definition is consistent with the level of ordinary skill reflected in the prior art references of record. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (recognizing that the prior art itself may reflect an appropriate level of skill in the art). For purposes of this decision, we apply Petitioner’s definition of the person of ordinary skill in the art.” slip op. at 10

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 8,266,749
  • PTAB · Aug 19, 2025 · IPR2024-00388 · APJ Ken B Barrett · IPR · Final written decision

    Claims 1–20 were not shown unpatentable because Wang and Wang with AESO did not establish the claimed analysis, and Cooley did not disclose reducing current power consumption.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “the claims require a decision engine to perform those elements.” Tr. 48:17– 20. In light of this, we fail to understand the basis for Patent Owner’s objection to the characterization of the level of ordinary skill involving experience with “intelligent” techniques or devices that control grid electricity. We determine that Petitioner’s definition is consistent with the level of ordinary skill reflected in the Specification and the prior art references of record. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (recognizing that the prior art itself may reflect an appropriate level of skill in the art). We, therefore, apply Petitioner’s definition of the person of ordinary skill in the art. We note, however, that were we to adopt Patent Owner’s assessment, the outcome of this Decision would be the same.” slip op. at 11

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner

      “Patent Owner (PO Resp. 12, 49–50) points to the Specification’s list of “[e]xamples of power reduction actions.” Ex. 1001, 8:47–63. Patent Owner asserts that the list includes numerous examples of power reductions that occur in the present and one that takes place in the future—namely, “scheduling nonessential operations at a different time (e.g., nonessential software or hardware upgrades).” Ex. 1001, 8:61–62 (cited at PO Resp. 12, 50). We are persuaded by Patent Owner’s contention (PO Resp. 12) that the applicant, by including the term “current” in the claims, intentionally narrowed the claims to power consumption reductions that occur temporally in the present, rather than those that occur in the future. See Pet. Reply 6–7 (Petitioner asserting that Patent Owner’s position is “inconsistent with the specification’s examples,” but then arguing that the Specification does not support that position rather than pointing to any purported inconsistencies). Because the independent claims recite the term “current,” construing the term in the temporal sense is not, as Petitioner argues, importing into the claims an example from the Specification. See Pet. Reply 8.” slip op. at 13

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation not foundReasonable expectation not foundNot shown unpatentable

      “Given the interchangeable nature taught for various features of Wang’s embodiments, it would have been a routine and obvious matter for a POSA to combine aspects from Wang’s various embodiments (e.g., data acquisition, internal hardware, data analysis performed by the UMC receiver 400 and/or the display 200). Moreover, many of Wang’s embodiments–particularly of specific smart appliance types– include common components, thus further confirming combinability of aspects of the disclosed embodiments. A POSA would have had a reasonable expectation of success in combining features of the embodiments together. Id. at 77–78 (citing Ex. 1003 ¶¶ 201–203). We determine that these reasons are inadequate and too generic to satisfy Petitioner’s burden as they lack a clear explanation of what and how “aspects from Wang’s various embodiments” are proposed to be combined along with reasoning specific to that proposal. Petitioner, for example, does not explain adequately or persuasively why a person of ordinary skill in the art would have added a display that purportedly receives and analyzes data to a “smart appliance,” when that appliance already has an application processor that purportedly receives and analyzes the same data. It is not enough for Petitioner to allege that all of the elements of the challenged claims can be found somewhere in the various embodiments of Wang; Petitioner must also show that a person of ordinary skill in the art would have had a reason to combine the elements in the manner as arranged in the challenged claims. See KSR Int’l Co., 550 U.S. at 418 (“[A] patent composed of several elements is not proved obvious merely by demonstrating that each of its elements was, independently, known in the prior art. Although common sense directs one to look with care at a patent application that claims as innovation the combination of two known devices according to their established functions, it can be important to identify a reason that would have prompted a person of ordinary skill in the relevant field to combine the elements in the way the claimed new invention does.”). We find Petitioner has not shown an adequate reason to combine embodiments.” slip op. at 38

    • Obviousness (§103) › Motivation to combine / reasonable expectation of success › HindsightNot shown unpatentable

      “We determine that these reasons are inadequate and too generic to satisfy Petitioner’s burden as they lack a clear explanation of what and how “aspects from Wang’s various embodiments” are proposed to be combined along with reasoning specific to that proposal. Petitioner, for example, does not explain adequately or persuasively why a person of ordinary skill in the art would have added a display that purportedly receives and analyzes data to a “smart appliance,” when that appliance already has an application processor that purportedly receives and analyzes the same data. It is not enough for Petitioner to allege that all of the elements of the challenged claims can be found somewhere in the various embodiments of Wang; Petitioner must also show that a person of ordinary skill in the art would have had a reason to combine the elements in the manner as arranged in the challenged claims. See KSR Int’l Co., 550 U.S. at 418 (“[A] patent composed of several elements is not proved obvious merely by demonstrating that each of its elements was, independently, known in the prior art. Although common sense directs one to look with care at a patent application that claims as innovation the combination of two known devices according to their established functions, it can be important to identify a reason that would have prompted a person of ordinary skill in the relevant field to combine the elements in the way the claimed new invention does.”). We find Petitioner has not shown an adequate reason to combine embodiments.” slip op. at 38

    Patent outcomesUS 8,291,243 not shown unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 8,291,243
  • Lululemon USA Inc. v. Nike, Inc.All claims unpatentable
    PTAB · Aug 6, 2025 · IPR2024-00460 · APJ Ken B Barrett · IPR · Final written decision

    Claims 1–21 are unpatentable: claims 1–21 under Nishida grounds and claims 11 and 21 also over Nishida with Zuckerman; Zuckerman-only grounds fail for lack of a surrounding structure.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Petitioner contends that: A hypothetical person of ordinary skill in the art (“POSA”) would have had at least a bachelor’s degree in textile engineering, mechanical engineering, or similar technical degree and at least 3 years of experience working with knitted textiles for use in fabric-based articles, including apparel such as footwear. Ex.1003, ¶¶34-37. For individuals with different educational backgrounds, a person could still be of ordinary skill in the art provided that person’s additional experience compensates for any differences in that person’s education as stated above. Id., ¶37. Pet. 14–15. Patent Owner states that, “[f]or purposes of this proceeding, Nike applies lululemon’s proposed level of skill in the art.” PO Resp. 13. Petitioner’s definition is consistent with the level of ordinary skill reflected in the prior art references of record. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (recognizing that the prior art itself may reflect an appropriate level of skill in the art). For purposes of this decision, we apply Petitioner’s definition of the person of ordinary skill in the art.” slip op. at 9

    • Expert testimonyPetitioner expert creditedPatent owner expert discountedDecided for petitioner
    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)UnpatentableUnpatentable

      “Id. at 99:12–25. Dr. Brookstein stated during his deposition that he has “49 years of experience of teaching textile engineering.” Id. at 97:6–8. We credit Dr. Brookstein’s testimony over that of Dr. Pastore’s because it is consistent with the reference and based on decades of experience in the textile field. Nishida’s claim 1 states that, “during the production of the material web (1), [shoe patterns] . . . are produced by . . . a textile production method within the material web.” Ex. 1005, 9. We find that Nishida’s claim language discloses the recited, “simultaneously knitting a textile element with a surrounding textile structure.”” slip op. at 22

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “We find the District Court’s reasoning persuasive, and we, like the District Court, decline to adopt Petitioner’s overly broad proposed construction. However, for purposes of deciding the dispositive fact issue before us, we need not determine the precise boundaries of “surrounding textile structure,” for example whether it completely or mostly encircles the textile element, and if “mostly,” what percentage of encircling is required. See Pet. Reply 2 (Petitioner characterizing Patent Owner’s position as “mostly” means over 50%); id. at 4 (Petitioner impliedly arguing that the “surrounding” need not be complete, i.e., 100%); PO Sur-reply 3–4 (Patent Owner arguing that “Zuckerman’s textile structures . . . each abut only about 25% of the periphery of Zuckerman’s blank.”). We find that a person of ordinary skill in the art would not understand the portion of Zuckerman’s strip 13 in purple to surround the green blank 11 (textile element) under any reasonable construction of “surrounding textile structure.” Dr. Pastore testifies that “Zuckerman discloses two separate textile structures adjacent the blank—one on each side . . . they abut only two sides of Zuckerman’s blank, with each structure abutting only about a quarter of the blank’s periphery,” and opines that “a POSITA would not have understood these two separate structures, designated by purple in the figure above, to be a textile structure ‘surrounding’ the blank [shown in green].” Ex. 2003 ¶ 54. We find Dr. Pastore’s tesimony credible as it is consistent with Zuckerman’s Figure and with the plain and ordinary meaning of “surrounding” and with the Specification of the ’749 patent (particularly Figure 9). Dr. Brookstein’s testimony, on the other hand, is based on Petitioner’s overly broad proposed construction—that any part of a textile area that is not a textile element is “surrounding textile structure”—” slip op. at 44

    Patent outcomesUS 8,266,749 unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 8,266,749
Page 1 of 22
← Previous12345…Next →

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.