- Reed Semiconductor Corp. v. Monolithic Power Systems, Inc.All claims unpatentablePTAB · Jan 22, 2026 · IPR2024-01158 · APJ Ken B Barrett · IPR · Final written decision
Claims 1–5, 7–15, 17, and 18 are unpatentable: claims 1–4, 9–14, 17, and 18 as anticipated by Tateishi, and claims 5, 7, 8, and 15 as obvious over Tateishi.
RulingsFinal written decision- Skill levelSkill level petitioner adoptedDecided for petitioner
“We discern no material difference between the parties’ definitions. Petitioner’s definition is consistent with the level of ordinary skill reflected in the prior art references of record. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (recognizing that the prior art itself may reflect an appropriate level of skill in the art). For purposes of this decision, we apply Petitioner’s definition of the person of ordinary skill in the art. We note, however, that were we to adopt Patent Owner’s assessment, the outcome of this Decision would be the same.” slip op. at 13
- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed petitioner constructionDecided for petitioner
“After considering the parties’ arguments and evidence, we determine that Patent Owner has not offered persuasive evidence that a person of ordinary skill in the art reading the claims in light of the Specification would understand the plain and ordinary meaning of “control signal” to be as narrow as Patent Owner proposes. We do not construe the claims such that the “control signal” must be the exclusively controlling factor of a component, as Patent Owner urges. Petitioner’s position, on the other hand, is consistent with the evidence of record. We construe “control signal” as having its plain and ordinary meaning, namely a signal configured to control a circuit component. D. The Asserted Anticipation of Claims 1–4, 9–14, 17, and 18 by Tateishi” slip op. at 24
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)UnpatentableUnpatentable
“We determine that Petitioner has demonstrated by a preponderance of the evidence that Tateishi discloses the “control signal” recited in limitations 1B2 and 1D of independent claim 1.” slip op. at 37
- BurdenNot shown unpatentable
“based on the Tateishi application publication (Ex. 1007), that the Tateishi Patent (Ex. 1005) also anticipates claims 1–4, 9–14, 17, and 18. See Pet. 23–24 (“The Tateishi Patent is also prior art under (pre-AIA) §102(e)”; identifying Ground 1 as anticipation “under §102 by Tateishi and/or the Tateishi Patent”). However, we are unable to locate in the Petition or Petitioner’s Reply a discussion of or citation to the Tateishi Patent other than under the Petitioner’s heading “Identification of Challenge and Relief Requested” on pages 23 and 24 of the Petition. Cf. id. at i–x (Table of Contents identifying a section of the Petition discussing the Tateishi (Application) anticipation ground but not a section discussing a Tateishi Patent anticipation ground). Although the issued patent may be substantively identical to the published application, Petitioner does not assert that, and we decline to compare the documents to determine whether that is the case. In light of Petitioner’s silence on the alternative ground, Petitioner has not demonstrated by a preponderance of the evidence that the Tateishi Patent anticipates 1–4, 9–14, 17, and 18.” slip op. at 47
Patent outcomesUS 9,041,377 unpatentableClaim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 9,041,377 - MPL Brands NV, Inc. v. Buzzballz, LLCAll claims unpatentablePTAB · Dec 16, 2025 · IPR2024-01098 · APJ Cynthia M Hardman · IPR · Final written decision
Claims 1–6 are unpatentable as anticipated by or obvious over Kick and as obvious over Ackermann and Kaminski, with or without Hutchinson.
RulingsFinal written decision- Skill levelSkill level petitioner adoptedDecided for petitioner
“(sometimes abbreviated herein as “POSITA”) would have had “(i) an associate’s or bachelor’s degree in mechanical, industrial or manufacturing engineering and (ii) at least two to three years of practical experience with designing or manufacturing mechanical products, such as food or beverage packaging. A POSITA could substitute additional education for industry experience and vice versa.” Pet. 15 (citing Ex. 1002 (Delson Decl.) ¶ 14).” slip op. at 12
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededDecided for petitioner
“Petitioner asserts that no claim term requires an express construction. See Pet. 15. We agree and find it unnecessary to construe any claim term to resolve the issues in this case. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (noting that “we need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 13
- Novelty / Anticipation (§102) › Priority / effective filing date / continuation supportPriority date, deniedDecided for petitioner
“is no earlier than the February 25, 2020, filing date of the ’195 application. Petitioner demonstrates by a preponderance of the evidence that the volume limitations recited in independent claim 1 and dependent claims 2 and 6 lack adequate written description support in the ’934 application as filed. See Pet. 10–11. The specification, figures, and claims of the ’934 application as originally filed do not disclose any volume limitations. See Ex. 1004 (’934 prosecution history), 1–17. Instead, the volume limitations recited in the challenged claims find their first support in Figure 7, which was filed over one month after the ’934 application was filed. Compare id. at 1–17, with id. at 34–56. The addition of new matter during prosecution of a patent application is prohibited. See 35 U.S.C. § 132(a) (“No amendment shall introduce new matter into the disclosure of the invention.”); see also 37 C.F.R. § 1.121(f); Manual of Patent Examining Procedure § 608.04. Therefore, we agree with Petitioner that “the new matter improperly added during the prosecution of the ’934 application cannot be considered part of the disclosure of the original, April 19, 2010 application and/or relied upon for claiming priority in subsequent applications.” Pet. 9.” slip op. at 20
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)UnpatentableUnpatentable
“obvious over Kick. Pet. 16–41. Kick published with the additional figures and disclosure the applicant submitted during prosecution of the ’934 application, and its detailed description and figures are the same as or similar to that of the ’904 patent. See id. at 16; compare Ex. 1007 (Kick), with Ex. 1001. Petitioner compares Kick to each limitation of the challenged claims. See Pet. 16–41. Based on the record before us, we find that Kick teaches or suggests each of the limitations of the challenged claims, for the reasons discussed in the Petition. See id. Accordingly, we determine that Petitioner has established by a preponderance of the evidence that Kick renders claims 1–6 of the ’904 patent unpatentable as anticipated and as obvious.” slip op. at 22
Patent outcomesUS 11,738,904 unpatentableClaim construction§ 102 anticipation§ 103 obviousnesscites KSR · GrahamPatents in suitUS 11,738,904 - Syngenta Crop Protection AG v. Inflexion Point Technologies, LLCInstitution deniedPTAB · Dec 1, 2025 · PGR2025-00045 · APJ Debra L Dennett · PGR · Institution
The Board denied institution because Petitioner did not show it was more likely than not that any challenged claim was unpatentable under the asserted grounds.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“We have authority to determine whether to institute a post-grant review under 35 U.S.C. § 324. Institution of a post-grant review is authorized by statute only when “the information presented in the petition . . . would demonstrate that it is more likely than not that at least 1 of the claims challenged in the petition is unpatentable.” 35 U.S.C. § 324(a). The burden is on Petitioner to show that the challenged patent is eligible for postgrant review. Mylan Pharms. Inc. v. Yeda Research & Dev. Co., PGR2016- 00010, Paper 9 at 10 (PTAB Aug. 15, 2016) (holding that the ultimate burden of persuasion remains with a petitioner to demonstrate that the challenged patent is eligible for post-grant review). Upon consideration of the Petition, Preliminary Response, and the cited evidence, we determine that Petitioner has not shown that it is more likely than not that any of the challenged claims are unpatentable. We thus determine to not institute a post-grant review of the ’027 patent based on the Petition.” slip op. at 2
- Skill levelSkill level petitioner adoptedOther
“a Bachelor of Science degree in Agricultural or Mechanical Engineering with 2–4 years of practical, applied experience in the field of agricultural machinery, including systems integration and fluid handling and sprayer control systems, or equivalent experience. Prelim. Resp. 12 (citing Ex. 2001, ¶ 59). Patent Owner states that the differences in the asserted levels of ordinary skill should not change the outcome of the Petition. Id. For the purposes of this decision, we adopt Petitioner’s definition, which appears consistent with the level of skill shown in the prior art references of record and the ’027 patent. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (explaining that specific findings regarding ordinary skill level are not required “where the prior art itself reflects an appropriate level and a need for testimony is not shown” (quoting Litton Indus. Prods., Inc. v. Solid State Sys. Corp., 755 F.2d 158, 163 (Fed. Cir. 1985))). Our analysis, however, would not change were we to adopt Patent Owner’s definition.” slip op. at 7
- Claim Construction › Intrinsic evidence (Phillips canons) › Lexicography (patentee as own lexicographer)Term construed board ownDecided for patent owner
“Patent Owner contends that claim construction is necessary for the “seed-applied substance” term because Petitioner allegedly ignores the teaching of the specification in evaluating the term. Prelim. Resp. 12. Patent Owner points to the specification, which defines a “seed-applied substance” as “includ[ing] any composition applied to seeds prior to the seeds being planted (e.g., when the seed comes in contact with the soil in a field).” Id. at 13 (quoting Ex. 1001, 7:45-48). Patent Owner contends that the term means “a substance that is applied directly to the seed before the seed comes into contact with the soil in a field.” Id. (citing Ex. 2001, ¶ 55). According to Patent Owner, Petitioner erroneously uses a definition that “allows the ‘seedapplied substance’ to be applied to the seed (and soil) as the seed lay planted in the soil.’” Id. For the purpose of addressing Petitioner’s grounds, we use the definition of “seed-applied substance” provided in the ’027 patent, i.e., “any composition applied to seeds prior to the seeds being planted (e.g., when the seed comes in contact with the soil in a field).” Vitronics Corp. v. Conceptronic, Inc., 90 F.3d 1576, 1582 (Fed. Cir. 1996) (“[A] patentee may choose to be his own lexicographer and use terms in a manner other than their ordinary meaning, as long as the special definition of the term is clearly stated in the patent specification or file history.”).” slip op. at 7
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable
“3. Analysis Our analysis of whether Wagers discloses the limitation “individually applying the desired application amount of the selected type of the seed-applied substance to each seed as it is being delivered to the soil” is dispositive of Petitioner’s challenge to claim 1 as anticipated.” slip op. at 10
Claim construction§ 102 anticipation§ 103 obviousness§ 112 disclosurecites GrahamPatents in suitUS 12,102,027 - PTAB · Nov 18, 2025 · IPR2025-00782 · APJ Ken B Barrett · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood that any challenged claim was unpatentable over the asserted grounds.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“An inter partes review may not be instituted “unless . . . the information presented in the petition . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). Having considered the arguments and evidence presented by Petitioner and Patent Owner, we determine that Petitioner has not demonstrated a reasonable likelihood of prevailing on at least one of the challenged claims of the ’469 patent. Accordingly, we do not institute an inter partes review of the challenged claims.” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“Petitioner contends that: [A] POSITA would have had at least a bachelor’s degree in computer science, computer engineering, business information systems, software engineering, or systems engineering and at least two years of experience in computer networking or telecommunications. Ex.1002 ¶21; see also Ex.1001 (1:14-31). Additional education could substitute for professional experience. Ex.1002 ¶21. Significant work experience could substitute for formal education. Ex.1002 ¶21. Pet. 7–8. Patent Owner, at this stage, does not disagree or propose a different definition of the person of ordinary skill in the art. Petitioner’s definition is consistent with the level of ordinary skill reflected in the prior art references of record. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (recognizing that the prior art itself may reflect an appropriate level of skill in the art). For purposes of this decision, we apply Petitioner’s definition of the person of ordinary skill in the art.” slip op. at 9
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“Petitioner states that it “do[es] not believe explicit construction is required to resolve this Petition.” Pet. 7. Patent Owner proposes constructions for “Internet,” “access the Internet,” “subscriber access website.” Prelim. Resp. 12–15. On this record and for purposes of this decision, we determine that no claim terms require express construction. D. Alleged Anticipation of Claims 1, 2, 10, 11, and 24–28 by Bruner and” slip op. at 10
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentable
“We find Patent Owner’s argument to be persuasive. Petitioner does not explain adequately how Bruner discloses the positional requirement of a subscriber access unit being coupled between the satellite dish and the router. Accordingly, Petitioner has not shown sufficiently for purposes of institution that Bruner anticipates independent claim 24. Although, for the obviousness challenge, Petitioner contends that Clark discloses a wireless router (for limitation 24c), Petitioner relies solely on Bruner for the “between” limitation. See Pet. 17 (“Bruner and/or Bruner in view of Clark both disclose each limitation of claim 24c, including a router (e.g., Bruner’s ‘ADS’ and Clark’s ‘wireless router’)”); id. at 18–19 (the discussion of the “between” limitation 24d asserting that “Bruner discloses claim 24d,” with no mention of Clark). Furthermore, Petitioner merely asserts that both Bruner and Clark disclose a router. See id. at 17–18. Petitioner, however, does not indicate clearly which is used in the proposed combination, does not describe the configuration of a proposed combination or a proposed modification of Bruner’s system, and fails to set forth an adequate and persuasive reason with rational underpinning as to why a person of ordinary skill in the art would have modified Bruner’s system to arrive at the positional requirement of the subscription access unit being coupled between the satellite dish and a router. See id. at 13–14 (motivation section for this ground); id. at 18–19 (addressing the “between” limitation 24d). Accordingly, Petitioner has not shown a reasonable likelihood of prevailing on its challenge to independent claim 24 as obvious over Bruner in view of Clark.” slip op. at 14
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 7,324,469 - PTAB · Nov 10, 2025 · IPR2025-00878 · APJ Carl M Defranco · IPR · Institution
The Board instituted review of claims 1–3 and 11 after finding a reasonable likelihood that claim 1 is anticipated by Cleveland or obvious over Nakagawa.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“contentions, the cited portions of Cleveland, and the testimony of Clearwater’s expert), we find, preliminarily, that Cleveland discloses each claim element in the manner recited by claim 1. Thus, on the current record, Clearwater demonstrates a reasonable likelihood that challenged claim 1 is unpatentable as anticipated by Cleveland.” slip op. at 6
- Novelty / Anticipation (§102) › Prior-art status of a reference › Patents / published applications (effective date, provisional support)Reference is prior artDecided for petitioner
“5 Clearwater argues that Cleveland qualifies as prior art under 35 U.S.C. § 102(e)(1) “based on both its provisional and non-provisional filing dates.” Pet. 17. In support, Clearwater asserts that Cleveland’s provisional (Ex. 1006) is “virtually identical” to Cleveland itself (id. at 18) and submits claim charts to demonstrate that the Cleveland provisional provides written support for: (1) at least claim 1 of Cleveland (id. at 18–21); and (2) the subject matter relied upon in Cleveland (id. at 21–40 (citing Ex. 1006 throughout)). Based on our review of the Cleveland provisional, as well as Clearwater’s claim charts, we are persuaded that the current record demonstrates that Cleveland is prior art to the challenged patent. See Dynamic Drinkware, LLC v. Nat’l Graphics, Inc., 800 F.3d 1375, 1381 (Fed. Cir. 2015).” slip op. at 4
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Instituted
“satisfies each claim element as identified above in Section I.D, i.e., elements [1.pre]–[1.6]. See id. at 22–40. Clearwater also submits annotated Figure 3 of Cleveland, reproduced below, to further illustrate the specific laminate structure of Cleveland’s coffee cup. See id. at 39.” slip op. at 5
- Obviousness (§103) › Motivation to combine / reasonable expectation of successInstituted
“protective layers have “a coat weight of from 5 to 30 lbs/3000 ft2,” Clearwater submits the declaration of its expert, who explains that, because Nakagawa identifies the specific polymers and the thickness of the coat used for the plastic layers and one skilled in the art “would recognize that the disclosed polymers have a given density,” then “[w]ith these known parameters, the coat weight is easily calculated to be 23.04 lbs./ 3000 ft2 — falling squarely within the claimed range.” Pet. 53–54 (citing Ex. 1003 ¶¶ 132–133; Ex. 1008 ¶ 24; Ex. 1024, at 4). At this stage, we find that testimony credible and supported by the evidence presently of record. After reviewing the preliminary record (including Clearwater’s contentions, the cited portions of Nakagawa, and the testimony of Clearwater’s expert), we find, preliminarily, that Nakagawa discloses or otherwise suggests each claim element in the manner recited by claim 1. Thus, on the current record, Clearwater demonstrates a reasonable likelihood that challenged claim 1 is unpatentable as obvious over Nakagawa. We need not decide Clearwater’s challenge of the dependent claims based on Nakagawa alone nor its challenge of claims 1–3 based on Nakagawa and Tanner. Our analysis of these challenges, in our view, is best left for trial after full development of the record.” slip op. at 8
Claim construction§ 102 anticipation§ 103 obviousnesscites PhillipsPatents in suitUS 8,637,126 - PTAB · Nov 3, 2025 · IPR2025-00827 · APJ Barry L Grossman · IPR · Institution
The Board instituted IPR on claims 1–5, 7–14, 16–19, 22–26, and 28–32, finding a reasonable likelihood that Renisch anticipates at least one challenged claim.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“We have considered Patent Owner’s arguments, but, on this record, are not persuaded. We recognize that Dr. Sonka provides a different opinion than Petitioner and Dr. Rosen. Dr. Sonka testifies that in his opinion “the distinctions between Renisch and claim 1 go beyond terminology.” Ex. 2014 ¶ 79. At this stage, in the absence of a full record, we need not record, it appears that Renisch discloses the elements of limitation [1(c)] at paragraphs 26–31, where it discloses obtaining a scanned 3D image of a fuller anatomy, i.e., a segmentation map, and then using a segmentation unit (76) to define the boundaries of anatomical structures of interest within that fuller anatomy, i.e., creating a plurality of segmentation masks, using a library, models, clustering, edge detection, region growing, neural networks, and/or an atlas of normal anatomical structures, and then identifying hot spots of interest within those anatomical structures of interest, and identifying organs with lesions and those without. Ex. 1005 ¶¶ 26–31. Based on the record before us and the specific disclosures in Renisch, as discussed in this Decision, we determine that Petitioner has met the “reasonable likelihood” standard necessary to institute an inter partes review proceeding. Although we address only Ground A and claims 1 and 10 herein for the purposes of institution, as noted above, we will address all asserted grounds and challenged claims in any final decision.” slip op. at 20
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co. Ltd., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). We do not perceive a need to construe any claim limitation at this time. This, however, does not preclude the parties from arguing proposed constructions of the claims during trial. Indeed, the parties are hereby given notice that any disputed claim construction, in general, should be addressed at trial and, if so, should be addressed clearly in a designated section of briefing rather than relegated to arguments on the merits of patentability. Claim construction, if necessary, will be determined at the close of the evidentiary record and after any hearing. slip op. at 15
- BurdenDecided for petitioner
“Compliance with the Particularity Requirements of 35 U.S.C. § 312(a)(3) Patent Owner asserts that the Petition fails to meet the particularity requirements of 35 U.S.C. § 312(a)(3). Prelim. Resp. 18–26. According to Patent Owner, “Petitioner’s excessive internal cross-referencing impermissibly forces the Board and Patent Owner to piece together scattered portions of the Petition (and exhibits).” Id. at 26. Patent Owner concludes that “the Petition fails to adequately map the references to the claim elements with particularity.” Id. We disagree. Using claims 1 and 10 as an example, Petitioner asserts: Claim 10 recites a “system for automatically processing 3D images” that is substantively identical to the “method for automatically processing 3D images” recited in claim 1, addressed above. Whereas claim 1 (the method claim) recites a series of steps, each performed “by a processor,” claim 10 (the system claim) recites a “processor” with stored instructions that perform the same steps recited in claim 1. Similarly, dependent claims 11–14, 16, and 26 are substantively identical to dependent claims 2–5, 7, and 19. Pet. 41–42. Claims 1 and 10 contain similar elements and limitations. Petitioner’s reference, for example, in the Petition’s analysis of claim 10, back to the analysis of claim 1 concerning nearly identical elements and limitations (id. at 42) is a matter of efficiency and is sufficiently clear for us to determine the basis for Petitioner’s challenges. We determine that the Petition does not violate the statutory requirement for particularity.” slip op. at 16
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Instituted
“We have considered Patent Owner’s arguments, but, on this record, are not persuaded. We recognize that Dr. Sonka provides a different opinion than Petitioner and Dr. Rosen. Dr. Sonka testifies that in his opinion “the distinctions between Renisch and claim 1 go beyond terminology.” Ex. 2014 ¶ 79. At this stage, in the absence of a full record, we need not record, it appears that Renisch discloses the elements of limitation [1(c)] at paragraphs 26–31, where it discloses obtaining a scanned 3D image of a fuller anatomy, i.e., a segmentation map, and then using a segmentation unit (76) to define the boundaries of anatomical structures of interest within that fuller anatomy, i.e., creating a plurality of segmentation masks, using a library, models, clustering, edge detection, region growing, neural networks, and/or an atlas of normal anatomical structures, and then identifying hot spots of interest within those anatomical structures of interest, and identifying organs with lesions and those without. Ex. 1005 ¶¶ 26–31. Based on the record before us and the specific disclosures in Renisch, as discussed in this Decision, we determine that Petitioner has met the “reasonable likelihood” standard necessary to institute an inter partes review proceeding. Although we address only Ground A and claims 1 and 10 herein for the purposes of institution, as noted above, we will address all asserted grounds and challenged claims in any final decision.” slip op. at 20
Claim construction§ 102 anticipationDiscretionary denialcites PhillipsPatents in suitUS 11,941,817 - Tanklogix, LLC v. Sitepro, Inc.Institution deniedPTAB · Oct 10, 2025 · IPR2025-00653 · APJ Bart A Gerstenblith · IPR · Institution
The Board denied institution on all claims because the Petition did not show a reasonable likelihood that any challenged claim was unpatentable over the asserted grounds.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“An inter partes review may be instituted only if “the information presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2
- Skill levelSkill level patent owner adoptedDecided for patent owner
“The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’504 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“Additionally, only terms that are in controversy need to be construed, and these need be construed only to the extent necessary to resolve the controversy. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 9; Prelim. Resp. 4 (citing Ex. 2009 ¶ 72); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13
- Expert testimonyPetitioner expert discountedDecided for patent owner
“Ex. 1002 ¶ 47. As reflected above, Dr. Wooley’s testimony as to element [1.2] does not even assert that Cardamone discloses a tank, let alone one or more sensors disposed at a tank as recited in element [1.2]. Thus, Dr. Wooley’s testimony does not support Petitioner’s argument on this issue.” slip op. at 18
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 11,726,504 - Tanklogix, LLC v. Sitepro, Inc.Institution deniedPTAB · Oct 10, 2025 · IPR2025-00652 · APJ Bart A Gerstenblith · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–23 and 25–30 were unpatentable over the asserted grounds.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied
“presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2
- Skill levelSkill level patent owner adoptedDecided for patent owner
“The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’403 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 10; Prelim. Resp. 4 (citing Ex. 2009 ¶ 73); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable
“We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses element [1.2] because the evidence cited does not disclose a “first computer system being configured to provide remote control of the first pump or first valve” (i.e., a fluid-handling device). Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but Petitioner has not identified any disclosure of the capability to remotely control fluid-handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, Kahn’s disclosures that Petitioner relies on for allegedly teaching remote control are deficient. We discuss each. First, Petitioner points to the following, “[f]or instance, as illustrated in FIG. 1C, a fluid control device such as a valve 15A is located on the input side of a sen[s]or unit 110.” Ex. 1005, 8:19–21, cited in Pet. 13. This portion of Kahn, however, does not disclose remote control. Second, Petitioner cites to the following: Finally, or in addition to, the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance. Pet. 13 (citing Ex. 1005, 10:62–67). We agree with Patent Owner that this portion of Kahn teaches on-site alerts and local control of the fluid-handling device. See Prelim. Resp. 7. This portion of Kahn does not disclose remote control.” slip op. at 18
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 11,294,403 - Tanklogix, LLC v. Sitepro, Inc.Institution deniedPTAB · Oct 10, 2025 · IPR2025-00651 · APJ Bart A Gerstenblith · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–3, 6, 7, and 9–20 were unpatentable over any asserted ground.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied
“presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2
- Skill levelSkill level patent owner adoptedDecided for patent owner
“The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’680 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 11
- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner
“target value” is part of a command that is sent from a computing device to a server and then to a controller. The controller then receives a measurement of the fluid by a sensor and determines whether the measurement satisfies the “target value.” If the measurement does not satisfy the “target value,” further operations are undertaken. The recited operation sequence makes clear that the plain and ordinary meaning of “target value” is not as Dr. Wooley opines because the particular operating condition that a device is in at a particular time is represented by the measurement taken by the sensor, 11 Some claim language less relevant to construing “target value” was omitted for ease of reference. which the controller then uses to determine whether the measurement satisfies the “target value.” Additionally, claim 1 recites that the “target value” is sent as part of a command to the controller. The “target value” is not sent to the controller from the sensor, as might be expected if the plain and ordinary meaning of “target value” were as Dr. Wooley opines. Petitioner and Dr. Wooley’s construction would also result in “target value” meaning effectively the same thing as the measurement of the fluid by the sensor, a concept that is separately recited in claim 1 and to which the “target value” is compared. The Specification of the ’680 patent does not support Petitioner’s understanding of the plain and ordinary meaning of “target value.” Although the Specification does not recite “target value,” it recites “target state,” and describes “target state” sufficiently to understand the plain and ordinary meaning of “target” as used in “target value” and “target state.” In particular, the ’680 patent explains that “[i]n some embodiments, the process 104 includes receiving, via a network interface, from a remote user device, (e.g., via a command-center server) a command to change a state of a fluid-handling device to a target state.” Ex. 1001, 11:48–51. This portion reflects that the command is seeking to change a state of a fluid-handling device to a target state. In other words, the “target value” or “target state” is not generally “the particular operating condition that a device is in at a particular time”; rather, it is a value or state that the fluid-handling device is desired to be in, as Patent Owner and Dr. Durham explain. Additionally, just as claim 1 recites a directional component for the “target value” to be sent to the controller in a command, so too does the Specification describe a “target state” as being sent in a command from a remote user device. Thus, the Specification clearly supports the plain and ordinary meaning proposed by Patent Owner and Dr. Durham and not the plain and ordinary meaning proposed by Petitioner and Dr. Wooley. slip op. at 14
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable
“time-stamped process data, report exception therein to the remote host, and extract and transmit time-stamped process data to the remote host.” Ex. 1005, Abst. (emphases added). Almadi explains that its remote field systems must include a plurality of controller units “to issue commands to, and gather and process data from a plurality of field devices, including remote systems and instruments, . . . [and] a database server for the storage of process data retrieved from the remote subsystems and instruments.” Id. at 2:22–30 (emphases added). Based on these disclosures, we agree with Patent Owner that Petitioner has not established that Almadi discloses element [1.4]. Specifically, the teachings from Almadi identified by Petitioner refer to process data, which is data retrieved from the remote subsystems/field devices. Thus, we understand that Almadi’s teaching—of using an Ethernet switch to transmit “process data”—describes transmitting data from the remote subsystems/field devices. See Ex. 1005, 3:13–17, cited in Pet. 15. But claim 1 and particularly element [1.4], recites “sending, with the server, the target value to the network address [which identifies a controller of the fluid-handling device13] via the network,” which is different than sending process data from the field devices to the remote host or database server for storage.” slip op. at 19
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 11,175,680 - Tanklogix, LLC v. SiteproInstitution deniedPTAB · Oct 10, 2025 · IPR2025-00650 · APJ Sheila F Mcshane · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood that claims 18–32 and 34 were unpatentable over Kahn or Kahn and Gutierrez.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). Upon consideration of the Petition, the Preliminary Response, and the evidence of record, we determine that Petitioner has not established a reasonable likelihood of prevailing with respect to the unpatentability of at least one claim of the ’871 patent. Accordingly, for the reasons that follow, we decline to institute an inter partes review of claims 18–32 and 34 of the ’871 patent.” slip op. at 2
- Skill levelSkill level patent owner adoptedDecided for patent owner
“The respective proposed levels of qualifications for a person of ordinary skill in the art are similar, with Patent Owner proposing two years of experience compared to Petitioner proposing significant experience with remotely controlling fluid-handling devices, like SCADA systems. Patent Owner also proposes more extensive experience in lieu of educational experience. While we find Petitioner’s proposed qualifications to be acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of skill necessary to understand and implement the teachings of the ’871 patent and the asserted prior art. Our analysis and findings herein, however, do not turn on any differences in the qualifications adopted.” slip op. at 8
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“We determine that we need not expressly construe any claim terms to resolve the parties’ disputes on the current record. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 10
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable
“actuators and the remote control of fluid handling devices, including the receipt with the user-interface module of “a user command to actuate an actuator via a presented control interface” (limitation [18.7]) and “account authorized to send commands to remotely control fluid handling devices” (limitation [18.11]). We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses or teaches these limitations because the evidence does not provide support that there is remote control of fluid handling devices or the use of a user command on a control interface to send a command to a fluid handling device, for instance. Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but we do not discern that it teaches or discloses the capability to remotely control fluid handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, the Kahn disclosures that Petitioner repeatedly relies upon for allegedly teaching this control are deficient. See Ex. 1005, 10:62–67, 14:35– 15:2, 15:62–16:32; see also Pet. 12–14, 16–18. Kahn discloses that “the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance.” Ex. 1005, 10:62–67. Communication unit 112B is part of the local “sensor unit,” wherein the detection conditions determined by the sensor are communicated to remote devices by communication unit 112B. See id. at 3:31–33, 5:62–6:2, 6:27–35, 7:33–37, 13:7–12, Figs. 1A–1C. Kahn discloses that the sensor units, which include communication units 112B, can be located near shut-off valves and can communicate with distant locations. See id. at 11:1–13. There are no disclosures, however, in the above passages that there is remote control of fluid handling devices, that there is a user command on a control interface that actuates an actuator, or that there is a command sent to the facility actuators via a network connection, as required in limitations [18.5]–[18.7] and [18.9]–[18.12], respectively. Rather, the disclosure indicates that the communication unit 112B includes on-site alerts and that the local (non-remote) communication unit 112B can be interfaced with the control valve.” slip op. at 18
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 10,488,871
Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.