  • PTAB · Feb 19, 2025 · IPR2024-00666 · APJ Stacey G White · IPR · Final written decision

    Claims 1–4 and 6–23 were not shown unpatentable because the asserted combinations did not establish the required determination that access occurred during a predetermined period.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Petitioner asserts that a person of ordinary skill in the art “would have possessed a bachelor’s degree in electrical engineering or computer science, and two years of work experience in the field of network-based computer systems, such as systems for sending and receiving information over local networks and wide area networks (such as the Internet or World Wide Web).” Pet. 5 (citing Ex. 1002 ¶¶ 10–14). Patent Owner does not challenge Petitioner’s description of the level of ordinary skill in the art. See Ex. 2001 ¶ 26 (adopting Petitioner’s proposed level of skill in the art for the purposes of this proceeding). We are persuaded that Petitioner’s description is consistent with the prior art and patent specification. Accordingly, we adopt Petitioner’s description.” slip op. at 8

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededDecided for petitioner

      “Petitioner “does not believe claim construction is necessary at this time.” Pet. 7. “Patent Owner does not contend that any terms in the challenged claims require express construction for purposes of evaluating the Petition’s invalidity grounds.” PO Resp. 7. We determine that no claim terms require express construction for purposes of this Decision. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999) (“[O]nly those terms need be construed that are in controversy, and only to the extent necessary to resolve the controversy.”)).” slip op. at 9

    • Novelty / Anticipation (§102) › Prior-art status of a reference › Patents / published applications (effective date, provisional support)Reference is prior artDecided for petitioner

      “date of Provisional Application No. 60/858,204 (Ex. 1004, “’204 Provisional”), and is prior art to the ’878 Patent under pre-AIA 35 U.S.C. § 102(e). Pet. 9. Petitioner asserts that the ’204 Provisional provides support for the disclosure of Baig and provides § 112 support for at least one claim in Baig. Id. Petitioner asserts that there are no material differences between Baig and the ’204 Provisional. Id. at 10 (citing Ex. 1002 ¶ 43 (citing Ex. 1005 (redline comparison of Ex. 1003 and Ex. 1004))). Petitioner further contends that the ’204 Provisional includes 17 claims that are identical to the claims in Baig, and, therefore, provides written description support for the corresponding claims in Baig. Id. Petitioner also asserts the ’204 Provisional provides enablement. Id. Patent Owner has not challenged the status of Baig as prior art. See PO Resp. Based on our review of the complete record, we find that Petitioner has shown sufficiently that Baig is entitled to the earlier effective filing date of the ’204 Provisional Application.” slip op. at 12

    • Obviousness (§103) › Graham factors (scope of art, differences, level of skill)Not shown unpatentableNot shown unpatentable

      “Patent Owner that the plain language of the claim requires there to be a determination that devices accessed the LAN during the predetermined period of time. The claim language recites that the determining of limitation (a) (which recites the determination of an association between the identifiers) is done using the stored association-detection information (which is alleged to be the cookies and session table of the cited art) “to determine” that the mobile devices have separately accessed the internet through a LAN “during a predetermined period of time.” See Ex. 1001, 24:29–49. Thus, we read this language to require that a determination be made that the required access occurred during a predetermined period of time. This reading of the claim language is accord with the opinion expressed by Petitioner’s expert, Mr. Schmandt, at his deposition.” slip op. at 17

    Patent outcomesUS 10,715,878 not shown unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites Graham
    Patents in suitUS 10,715,878
  • PTAB · Feb 19, 2025 · IPR2024-00701 · APJ Stacey G White · IPR · Final written decision

    Claims 1–4 and 6–23 were not shown unpatentable because the prior-art combinations did not establish a determination that devices accessed the Internet during a predetermined period.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Petitioner asserts that a person of ordinary skill in the art “would have possessed a bachelor’s degree in electrical engineering or computer science, and two years of work experience in the field of network-based computer systems, such as systems for sending and receiving information over local networks and wide area networks (such as the Internet or World Wide Web).” Pet. 5 (citing Ex. 1002 ¶¶ 10–14). Patent Owner does not challenge Petitioner’s description of the level of ordinary skill in the art. See Ex. 2001 ¶ 26 (adopting Petitioner’s proposed level of skill in the art for the purposes of this proceeding). We are persuaded that Petitioner’s description is consistent with the prior art and patent specification. Accordingly, we adopt Petitioner’s description.” slip op. at 8

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Petitioner “does not believe claim construction is necessary at this time.” Pet. 7. “Patent Owner does not contend that any terms in the challenged claims require express construction for purposes of evaluating the Petition’s invalidity grounds.” PO Resp. 7. We determine that no claim terms require express construction for purposes of this Decision. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999) (“[O]nly those terms need be construed that are in controversy, and only to the extent necessary to resolve the controversy.”)).” slip op. at 9

    • Novelty / Anticipation (§102) › Priority / effective filing date / continuation supportReference is prior artDecided for petitioner

      “date of Provisional Application No. 60/858,204 (Ex. 1004, “’204 Provisional”), and is prior art to the ’878 Patent under pre-AIA 35 U.S.C. § 102(e). Pet. 9. Petitioner asserts that the ’204 Provisional provides support for the disclosure of Baig and provides § 112 support for at least one claim in Baig. Id. Petitioner asserts that there are no material differences between Baig and the ’204 Provisional. Id. at 10 (citing Ex. 1002 ¶ 43 (citing Ex. 1005 (redline comparison of Ex. 1003 and Ex. 1004))). Petitioner further contends that the ’204 Provisional includes 17 claims that are identical to the claims in Baig, and, therefore, provides written description support for the corresponding claims in Baig. Id. Petitioner also asserts the ’204 Provisional provides enablement. Id. Patent Owner has not challenged the status of Baig as prior art. See PO Resp. Based on our review of the complete record, we find that Petitioner has shown sufficiently that Baig is entitled to the earlier effective filing date of the ’204 Provisional Application.” slip op. at 12

    • Obviousness (§103) › Graham factors (scope of art, differences, level of skill)Not shown unpatentableNot shown unpatentable

      “Patent Owner that the plain language of the claim requires there to be a determination that devices accessed the LAN during the predetermined period of time. The claim language recites that the determining of limitation (a) (which recites the determination of an association between the identifiers) is done using the stored association-detection information (which is alleged to be the cookies and session table of the cited art) “to determine” that the mobile devices have separately accessed the internet through a LAN “during a predetermined period of time.” See Ex. 1001, 24:29–49. Thus, we read this language to require that a determination be made that the required access occurred during a predetermined period of time. This reading of the claim language is accord with the opinion expressed by Petitioner’s expert, Mr. Schmandt, at his deposition. Q So is it your opinion that the – the limitation 1B requires that the system determines whether or not the accesses by the -- the two electronic devices occurred within a predetermined period of time? A Yes.” slip op. at 17

    Patent outcomesUS 10,715,878 not shown unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites Graham
    Patents in suitUS 10,715,878
  • PTAB · May 31, 2024 · IPR2023-00441 · APJ Gregg I Anderson · IPR · Final written decision

    Claims 1–15 and 17–18 were not shown unpatentable because the prior art did not disclose a “pre-set UE number” under the adopted construction.

    RulingsFinal written decision
    • Prior constructionPrior construction adoptedDecided for patent owner

      “We are not persuaded to maintain our preliminary construction. Indeed, as already noted, Petitioner does not argue for the preliminary construction. Neither does Petitioner question the validity of the reasons given for the District Court’s construction. Rather, Petitioner repeats its position that it “takes no position on the District Court’s construction” and Petitioner does not have any reason “as to why that construction is wrong or right.” Tr. 18:24–19:6. We do not see any reason to construe “pre-set UE number” contrary to what the District Court has determined. Indeed, we find the District Court’s analysis of the issue highly persuasive and adopt it as our own. And Petitioner has not provided any argument regarding construction of the term, simply taking no position on its correctness.” slip op. at 12

    • Claim Construction › Functional claiming / §112(f) means-plus-function › Whether §112(f) applies (Williamson, nonce words)§112(f) appliesDecided for patent owner

      “Petitioner has forfeited the indefiniteness argument. Regardless, we are given no reason to find construction of the two means-plus function terms impossible given the District Court determination. We agree that the scope of the terms is based on a means-plus function analysis. We are not persuaded that structure is not sufficiently described.” slip op. at 14

    • Strike new argumentNew argument disregardedDecided for patent owner

      “Patent Owner argues that this argument was not presented in the Petition and is too late and/or incorrect. Sur-reply 5. We agree with Patent Owner. Neither Patent Owner nor the Board were given any notice of this argument in the Petition. Regardless, we find no merit in Petitioner’s argument. Fundamentally, our jurisdiction regarding patentability is limited to Sections 102 and 103 of the Patent Act. 35 U.S.C. § 311(b). We do not find that claim 18 is so indefinite that a patentability determination is impossible. See Intel Corp. v. Qualcomm Inc., 21 F.4th 802, 812–813 (Fed. Circ. 2021) (claim construction obligation “does not mean that the Board must reach a determination of the patentability of a claim on the presented prior-art grounds if such a determination is rendered impossible because of the indefiniteness of an essential claim limitation.”). Indeed, the District Court determined that the corresponding structure is a processor programmed to either (1) descramble a Cyclic Redundancy Check (CRC) of Downlink Control Information (DCI) for scheduling the RAR according to a pre-set RA-RNTI or an RA-RNTI corresponding to the preamble, and receive the RAR, the RAR including at least one TCRNTI and/or at least one Uplink (UL) grant. Ex. 2008, 23 (quoting Ex. 1001, 2:66–3:4). (2) determine corresponding RA-RNTIs according to respective IDs and/or preambles, descramble a CRC of DCI for scheduling the RAR according to the corresponding RA-RNTIs, and receive corresponding RARs, the RAR including a TCRNTI and/or a UL grant allocated to the first UE or second UE.” slip op. at 13

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “Our construction of “pre-set UE number” is dispositive of this proceeding. See Section III.B.1 above. Petitioner agrees that both Li and Kim “don’t disclose that the message 3 includes a ‘pre-set number of UEs’” under our final construction of “pre-set UE number.” Pet. Reply 4; see also Tr. 7:20–22 (“Under [the District Court] construction, Li and Kim would not disclose Claim 1, at least Claim 1, of the ’430 patent”); 11:3–17 (Petitioner’s counsel arguing claim 18 is indefinite but agreeing neither claim 1 nor 18 have been shown unpatentable under the District Court construction of “preset UE number”). For the reasons set forth above, Petitioner has not shown a by a preponderance of the evidence that claims 1 and 18 are anticipated by Li.” slip op. at 18

    Patent outcomesUS 10,448,430 not shown unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 10,448,430
  • PTAB · Mar 29, 2024 · IPR2022-01598 · APJ Gregg I Anderson · IPR · Final written decision

    The Board held claims 1, 2, 6, 8–11, 15, 17, and 18 not shown unpatentable over Kannan because Kannan did not disclose the construed transmission blocks.

    RulingsFinal written decision
    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)Term construed board ownDecided for patent owner

      “We are not persuaded that “single entity” requires a separate construction or additional clarification, presumably by “testimonial evidence.” See Pet. Supp. Br. 4 n.1. Here, we need not determine the precise outer bounds of the term “transmission block,” including all the different types of single entities, because the Board is required to construe the claim to only the extent necessary to resolve the dispute. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (citing Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). The relevant context for understanding what is a single entity is the disclosures of Kannan and the ’443 patent regarding “code block,” “transport block,” and “transmission block.” Those are the “single entities” and are the focus of the dispute. For the preceding reasons we adopt our preliminary construction of “transmission blocks” as our final construction. No additional terms are in dispute that require construction.” slip op. at 16

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “invention of the ’443 patent “would have had an undergraduate degree in electrical engineering, computer engineering, computer science or a related field along with at least two years of work experience in the field of wireless communication technology.” Pet. 3–4 (citing Ex. 1003 ¶¶ 23–24). Patent Owner does not propose a level of ordinary skill and “takes no position with respect to Petitioner’s proposed level of ordinary skill in the art” because “it does not affect the ultimate analysis.” PO Resp. 11–12. For purposes of this Decision, we adopt Petitioner’s proposed level of ordinary skill because we are satisfied that it comports with the level of skill necessary to understand and implement the teachings of the ’443 patent. The proposed level of skill is consistent with the field of the invention as indicated by the cited prior art.” slip op. at 7

    • Expert testimonyPatent owner expert creditedPetitioner expert discountedDecided for patent owner

      “Kannan is based on the OSI model and describes control and data transmission on the MAC and PHY layers. Ex. 1006 ¶ 63. Kannan explains that “[w]ireless devices may exchange data using Medium Access Control (MAC) layer units known as transport blocks that may include a number of CBs.” Id. ¶ 8. Further, at the PHY layer, “a transport block may be divided into CBs.” Id. ¶ 52. Kannan continues to describe that “code blocks” “may be bundled into multiple bundles having a certain number of CBs.” Id. These parts of Kannan support the Akl Rebuttal Declaration conclusion’s regarding the OSI model in Kannan. Ex. 2007 ¶¶ 31–37, 49–50. Thus, we credit the Akl Rebuttal Declaration on this issue (id.) over Dr. Ding’s testimony (Ex. 1016 ¶ 13) because it is better supported by Kannan. Based on the preceding, we find that “code blocks” on the PHY layer are found only with “transport blocks” and are not a “separate entity.” See PO Supp. Br. 2.” slip op. at 21

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “Kannan is based on the OSI model and describes control and data transmission on the MAC and PHY layers. Ex. 1006 ¶ 63. Kannan explains that “[w]ireless devices may exchange data using Medium Access Control (MAC) layer units known as transport blocks that may include a number of CBs.” Id. ¶ 8. Further, at the PHY layer, “a transport block may be divided into CBs.” Id. ¶ 52. Kannan continues to describe that “code blocks” “may be bundled into multiple bundles having a certain number of CBs.” Id. These parts of Kannan support the Akl Rebuttal Declaration conclusion’s regarding the OSI model in Kannan. Ex. 2007 ¶¶ 31–37, 49–50. Thus, we credit the Akl Rebuttal Declaration on this issue (id.) over Dr. Ding’s testimony (Ex. 1016 ¶ 13) because it is better supported by Kannan. Based on the preceding, we find that “code blocks” on the PHY layer are found only with “transport blocks” and are not a “separate entity.” See PO Supp. Br. 2. Thus, Petitioner has not shown that claims 1, 8, 10, and 17 are unpatentable by a preponderance of the evidence.” slip op. at 21

    Patent outcomesUS 10,594,443 not shown unpatentable
    Claim construction§ 102 anticipationcites Phillips
    Patents in suitUS 10,594,443

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.