- PTAB · Feb 6, 2026 · IPR2025-00988 · APJ Terrence W Mcmillin · IPR · Institution
The Board instituted IPR on claims 1–14 and all petition grounds; it found a reasonable likelihood of success on the Josiam-based grounds, while the Bharadwaj grounds lacked established prior-art status.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“review. 35 U.S.C. § 314 (2018); 37 C.F.R. § 42.4(a) (2020) (“The Board institutes the trial on behalf of the Director.”). The standard for institution is set forth in 35 U.S.C. § 314(a), which provides that inter partes review may not be instituted unless “there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” After considering the Petition and the Preliminary Response, as well as the evidence of record, we institute an inter partes review as to claims 1–14 of the ’281 patent.3” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“Determining the level of ordinary skill in the art involves various factors, including the “type of problems encountered in the art; prior art solutions to those problems; rapidity with which innovations are made; sophistication of the technology; and educational level of active workers in the field.” In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995) (citation omitted). The prior art of record also reflects the level of ordinary skill in the art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001). For purposes of this institution decision, we adopt the assessment offered by Petitioner.11 It is not materially disputed by the Patent Owner and is consistent with the ’281 patent and the asserted prior art.” slip op. at 10
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached
“Petitioner asserts “that no formal claim constructions are necessary.” Pet. 3. “Patent Owner applies the plain and ordinary meaning of the challenged claims.” Prelim. Resp 11. At this stage, no need exists to expressly construe any claim terms to resolve any dispute between the parties.12 See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))). D.” slip op. at 11
- Novelty / Anticipation (§102) › Priority / effective filing date / continuation supportPriority date, deniedReference is prior artDecided for petitioner
“contention that either of the cited documents alone discloses all the elements of these limitations. And, the disclosure relied on in Exhibit 1007 is not alleged to be found in Exhibit 1009 and vice-versa. Patent Owner has not shown that any of the pre-May 14, 2016, Korean applications from which the ’281 claims priority includes disclosure of all the elements recited in limitations 1.9 and 8.6. At least at this stage, we determine that Petitioner has sufficiently shown, for the purpose of institution that Josiam is prior art.16 We credit the testimony of Dr. Buehrer cited in the Petition that none of the Korean applications to which the ’281 patent claims priority filed earlier than May 14, 2016, “explicitly, implicitly, or inherently discloses using both the bandwidth field of the HE-SIG-A and the resource unit allocation field of the HE-SIG-B to indicate channel puncturing information as the claim elements require. . . . At best, these documents discuss indicating unused channels using either HE-SIG-A or HE-SIGB fields—but not both.” Pet. 7 (citing Ex. 1003 (Buehrer Decl.) ¶¶ 90–91). Dr. Buehrer’s testimony has not been shown by Patent Owner to be inaccurate.” slip op. at 20
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSRPatents in suitUS 10,687,281 - Allstate Insurance Company v. Atos, LLCSome claims unpatentablePTAB · Jan 30, 2026 · IPR2021-01449 · APJ Jon M Jurgovan · IPR · Remand
Claims 3–5 are unpatentable; claims 1 and 2 are not shown unpatentable. Claims 3 and 4 are obvious over the applied grounds under the remand construction of “movement vector.”
RulingsRemand decision- RemandOther
“was incorrect, vacated the Final Written Decision as to claims 3 and 4, and remanded the case to the Board to determine the ordinary and customary meaning of “movement vector” and decide the outcome for claims 3 and 4 in accordance with that meaning. Atos, LLC v. Allstate Insurance Company, 2025 WL 1482404, at *5 (Fed. Cir. May 23, 2025); Paper 35 (“Federal Circuit Remand,” “Remand,” or “Fed. Cir. Remand”). Pursuant to the Federal Circuit’s instructions, the Board authorized the” slip op. at 3
- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed board ownDecided for patent owner
“considered individually and together, have well-understood, common meanings to ordinarily skilled artisans as of the invention date, reflected by the ’174 patent’s specification and other evidence of record noted above. Accordingly, we determine that the ordinary and customary meaning of “movement vector” is “a vector indicating movement of an object.” 3) “operation indicator” Petitioner” slip op. at 20
- Obviousness (§103) › Graham factors (scope of art, differences, level of skill)Not shown unpatentableNot shown unpatentable
“Dr. Kanellakopoulos’s explanation that angular momentum is not inherent to an object, and its computation requires an arbitrary choice of a point of origin that has no physical meaning in the context of vehicle motion, also supports Patent Owner’s position. Id. ¶ 71 (citing Ex. 2004, 262). Accordingly, Patent Owner’s argument, that angular momentum cannot be used to detect a vehicle turning, is persuasive. Id. We also find persuasive, as Dr. Kanellakopoulos explains, that Petitioner’s argument regarding the figure on Kleppner 234 is based on misinterpretation of the vectors in that figure. Id. ¶ 67 (explaining that Kleppner 233–234 does not depict a gravity vector).” slip op. at 35
- Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation not foundNot shown unpatentable
“Kleppner does not disclose a rotation vector, a person of ordinary skill would have used the knowledge of a rotation vector (because it is a term of art) alongside Kleppner’s teaching, to arrive at claim 1. See Pet. Reply 11. This argument does not satisfy Petitioner’s burden to provide articulated reasoning with some rational underpinning to support the conclusion of obviousness. See KSR, 550 U.S. at 419 (citing In re Kahn, 441 F.3d 977, 988 (Fed. Cir. 2006)). Petitioner does not explain which teaching of Kleppner a person of ordinary skill would have selected and combined with their knowledge of a rotation vector to yield the method of claim 1, or explain why a person of ordinary skill would have recognized based on Kleppner that estimating the angle between a rotation vector and gravity vector could be used to detect a vehicle turning. Nor does Petitioner respond to Patent Owner’s assertion that Kleppner provides no rationale for estimating an angle of alignment between a rotation vector and gravity vector as a way of detecting a vehicle turning. See Ex. 2001 ¶ 65.” slip op. at 35
Patent outcomesUS 9,846,174 mixedClaim construction§ 102 anticipation§ 103 obviousnesscites KSR · GrahamPatents in suitUS 9,846,174 - PTAB · Dec 10, 2025 · IPR2025-01069 · APJ Daniel J Galligan · IPR · Institution
The Board instituted IPR on claims 1–14 and all asserted grounds, finding a reasonable likelihood of prevailing based on Bharadwaj alone and Bharadwaj with Yu.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“institute review. Paper 11. The standard for instituting an inter partes review is set forth in 35 U.S.C. § 314(a), which provides that an inter partes review may not be instituted unless the information presented in the Petition and the Preliminary Response shows “there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” For the reasons explained below, we institute an inter partes review of all challenged claims on all grounds raised in the Petition.” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“To the extent Patent Owner contends that a person of ordinary skill in the art need not be defined as of the critical date, we disagree. Under Section 103, we must determine “if the differences between the claimed invention and the prior art are such that the claimed invention as a whole would have been obvious before the effective filing date of the claimed invention to a person having ordinary skill in the art to which the claimed invention pertains” (emphasis added). “Obviousness is determined from the vantage point of a hypothetical person having ordinary skill in the art to which the patent pertains.” In re Rouffet, 149 F.3d 1350, 1357 (Fed. Cir. 1998). Thus, we define the hypothetical person of ordinary skill in the art as of a time before the effective filing date. To the extent Patent Owner’s argument is that, to testify from the perspective of a person of ordinary skill in the art, one need not have been a person of ordinary skill in the art as of the critical date, we agree. Although one must at least possess ordinary skill in the art to testify from the perspective of a person of ordinary skill, [a]n expert need not have acquired that skill level prior to the time of the invention to be able to testify from the vantage point of a person of ordinary skill in the art. Rather, an expert can acquire the necessary skill level later and develop an understanding of what a person of ordinary skill knew at the time of the invention. Osseo Imaging, LLC v. Planmeca USA Inc., 116 F.4th 1335, 1341 (Fed. Cir. 2024). the uncontested assessment offered by Petitioner, which appears consistent with the ’077 patent and the asserted prior art, except that we delete the qualifier “at least” to eliminate vagueness as to the amount of experience.” slip op. at 6
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached
“C. Claim Construction The parties agree that no claim terms require express construction. Pet. 10; Prelim. Resp. 2–4. Patent Owner, however, notes that, in related district court litigation, Petitioner has asserted that some claims terms are indefinite. Patent Owner argues that the Petition should be denied because Petitioner has taken inconsistent claim construction positions between the district court and the Board. Paper 14 at 1–3 (citing Tesla, Inc. v. Intellectual Ventures II LLC, IPR2025-00340, Paper 18 at 4 (PTAB Nov. 5, 2025) (informative); Revvo Techs., Inc. v. Cerebrum Sensor Techs., Inc., IPR2025-00632, Paper 20 at 4–5 (PTAB Nov. 3, 2025) (precedential)). Petitioner responds that, in the related district court litigation, the parties have narrowed the claim construction disputes and that Petitioner accords the plain and ordinary meaning to claim terms and no longer asserts that any claim term of the ’077 patent is indefinite. Paper 15 (citing, inter alia, Ex. 1126 (Defendants’ Responsive Claim Construction Brief)). The evidence supports Petitioner’s position because, in the related district court litigation, the defendants agree with the plaintiff (Patent Owner) that certain phrases in the ’077 patent claims should be given their “[p]lain and ordinary meaning” and are “not indefinite.” Ex. 1126, 6 (native page 1). Thus, the record does not show inconsistent claim construction positions that warrant denial under PTAB precedent. See Revvo, Paper 20 at 5 (addressing a situation in which a petitioner advances “different claim construction positions” in district court and at the PTAB). See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 7
- Novelty / Anticipation (§102) › Prior-art status of a reference › Patents / published applications (effective date, provisional support)Reference is prior artDecided for petitioner
“We agree with Patent Owner that Bharadwaj includes subject matter that is not in Bharadwaj-Prov59, namely the change from adding the value Resp. 20; Ex. 1007 ¶ 51 (adding m); Ex. 1006 ¶ 50 (subtracting m); Prelim. Resp. 20. Petitioner, however, points out this change in the Petition and acknowledges that it is after the identified critical date of August 20, 2015. See Pet. 28. Thus, we do not understand Petitioner to be relying on Bharadwaj’s disclosure of subtracting m to determine length, as disclosed in the publication of the non-provisional application, as a prior art disclosure. We understand Petitioner to be relying on disclosures in Bharadwaj-Prov059 for prior art teachings for its obviousness contentions. Patent Owner does not appear to dispute that Bharadwaj-Prov59’s disclosures are prior art, arguing instead that it is improper to rely “on matters in Bharadwaj beyond ‘incorporation by reference’ of the Bharadwaj-Prov59.” See Prelim. Resp. 20–21. On this record, we determine that Bharadwaj-Prov59’s disclosures are prior art as of its June 2, 2015, filing date by virtue of its incorporation by reference into Bharadwaj, a published US patent application. Ex. 1006 ¶ 1; see Pet. 12–13.” slip op. at 8
Claim construction§ 102 anticipation§ 103 obviousnesscites KSR · GrahamPatents in suitUS 10,313,077 - PTAB · Nov 13, 2025 · IPR2025-00805 · APJ Eric C Jeschke · IPR · Institution
The Board instituted IPR on claims 1–24 and all asserted grounds, finding a reasonable likelihood that Petitioner would prevail on at least one challenged claim.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“review. See 35 U.S.C. § 314; 37 C.F.R. § 42.4(a) (2024) (“The Board institutes the trial on behalf of the Director.”). Inter partes review may not be instituted “unless . . . the information presented in the petition . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314. Upon consideration of the evidence and arguments in the record, for the reasons below, we determine that the information presented shows a reasonable likelihood that Petitioner would prevail with respect to at least one of the challenged claims. We thus institute inter partes review on all challenged claims on all asserted grounds. See SAS Inst. Inc. v. Iancu, 584 U.S. 357, 362–63, 369–70 (2018); 37 C.F.R. § 42.108(a) (“When instituting inter partes review, the Board will authorize the review to proceed on all of the challenged claims and on all grounds of unpatentability asserted for each claim.”).” slip op. at 2
- PTAB / AIA Trials › Discretionary denial › §325(d) same art / argumentsNot reached
“C. Patent Owner’s Arguments Under 35 U.S.C. § 325(d) In the Preliminary Response, Patent Owner contends that Petitioner’s unpatentability arguments presented in this proceeding were previously considered by the USPTO. See Prelim. Resp. 31–33. In her decision referring this matter to the Board, then-Acting Director Stewart rejected that argument. See Paper 20 at 2–3 (discussing why “Petitioner provides persuasive reasoning, supported by evidence, that discretionary denial under 35 U.S.C. § 325(d) is not appropriate”); see also Prelim. Resp. 31–33 (referring to and citing Patent Owner’s Discretionary Denial Brief (Paper 8)). We need not and do not address this issue further.” slip op. at 15
- Skill levelSkill level petitioner adoptedDecided for petitioner
“For purposes of this Decision, we adopt the definition of the level of ordinary skill in the art proposed by Petitioner. As to the inclusion of physics in Petitioner’s definition, Dr. Singhose (a professor of mechanical engineering) testifies as to why undergraduate mechanical engineering degree holders would have the requisite knowledge here, but does not testify that undergraduate physics degree holders would not. See Singhose Decl. ¶¶ 2, 27, 28. In addition, Patent Owner and Dr. Singhose require “a four-year degree in mechanical engineering or a closely related field,” but fail to identify what fields are “closely related.” See Prelim. Resp. 11; Singhose Decl. ¶ 27. Based on the Morse Declaration, we are persuaded at this stage that a hypothetical undergraduate physics degree holder would have adequate knowledge for one of ordinary skill in the art of the invention here. See Morse Decl. ¶ 31. As to the requisite years of experience proposed in the definitions— three for Petitioner versus “at least one” for Patent Owner—we note that Patent Owner’s definition is broader than, but includes, Petitioner’s definition. Moreover, for both the inclusion of physics and the years of experience issues, Patent Owner acknowledges that the arguments in the Preliminary Response “are not impacted based on which definition is applied.” Prelim. Resp. 12 (citing Singhose Decl. ¶¶ 30–34). Further, Patent Owner does not argue at this stage that Petitioner’s proposal for the level of ordinary skill leads to an improper understanding of how a skilled artisan would understand either the challenged patent or the prior art.” slip op. at 11
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“B. Claim Construction In inter partes reviews, the Board interprets claim language using the same claim construction standard that would be used in a civil action under 35 U.S.C. § 282(b), as described in Phillips v. AWH Corp., 415 F.3d 1303 (Fed. Cir. 2005) (en banc). See 37 C.F.R. § 42.100(b). Under that standard, we generally give claim terms their ordinary and customary meaning, as would be understood by a person of ordinary skill in the art at the time of the invention, in light of the language of the claims, the specification, and the prosecution history. See Phillips, 415 F.3d at 1313–14. Although extrinsic evidence, when available, may also be useful when construing claim terms under this standard, extrinsic evidence should be considered in the context of the intrinsic evidence. See id. at 1317–19. Petitioner does not propose express constructions for any claim terms. Pet. 12. Patent Owner also does not propose any express constructions. See Prelim. Resp. 12. On the current record, we need not construe explicitly any claim terms. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). As discussed below, however, the parties dispute the meaning of “gaseous fuel.” We address this issue below in the analysis of the challenge to claims 1–3, 5–9, and 18 based on Nakafushi and Olmr.” slip op. at 12
Claim construction§ 102 anticipation§ 103 obviousnessDiscretionary denialcites PhillipsPatents in suitUS 10,393,034 - PTAB · Nov 3, 2025 · IPR2025-00934 · APJ Terrence W Mcmillin · IPR · Institution
The Board instituted IPR on claims 1–9 and all asserted grounds, finding a reasonable likelihood that claims 1–9 are obvious over Bharadwaj and Sun.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“institute review. Paper 11. The standard for institution is set forth in 35 U.S.C. § 314(a), which provides that inter partes review may not be instituted unless “there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” After considering the Petition and the Preliminary Response, as well as the evidence of record, we institute an inter partes review as to claims 1–9 of the ’210 patent.” slip op. at 2
- Novelty / Anticipation (§102) › Prior-art status of a reference › Printed publication / public accessibilityPrinted publication establishedNot reached
“We are aware, however, that we must not confuse access with accessibility. See Samsung Elecs. Co. v. Infobridge Pte. Ltd., 929 F.3d 1363, 1374 (Fed. Cir. 2019) (“[A] petitioner need not establish that specific persons actually accessed or received a work to show that the work was publicly accessible.”). Dr. Hansen notes that the cover of 802.11ax_D1.0 grants permission to reproduce the document to others for consideration. Ex. 1026 ¶ 72; see Ex. 1004, 1 (“Permission is hereby granted for IEEE Standards Committee participants to reproduce this document for purposes of international standardization consideration.”). Dr. Hansen also testifies that meetings to discuss 802.11ax_D1.0 were open to the public. Ex. 1026 ¶ 58 (citing Appendix J to declaration). Thus, it appears, on the current record, that the purpose of 802.11ax_D1.0 was to promote dialogue with interested artisans, which indicates public accessibility. See Valve Corp. v. Ironburg Inventions Ltd., 8 F.4th 1364, 1374 (Fed. Cir. 2021) (“We have previously held that where a publication’s purpose is ‘dialogue with the intended audience,’ that purpose indicates public accessibility.” (citation omitted)). After having reviewed all the arguments and evidence presented by the parties, we would like to see further development of this issue during trial. The current record is not well-developed on this issue either factually or legally. With regard to the factual record, Patent Owner has not yet had the opportunity to depose Dr. Hansen or been given a full opportunity to marshal its own evidence on this issue. With regard to the law, we would like to see the parties apply the relevant case law to the developed facts as to the public accessibility and prior art status of 802.11ax_D1.0. We will determine, if necessary and appropriate, whether 802.11ax_D1.0 is prior art to the challenged claims of the ’210 patent based on the full record as developed during trial.” slip op. at 14
- Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundDecided for petitioner
“As an initial matter, Bharadwaj and Sun are both analogous art to the ’210 Patent in that that they are both concerned with the design of the PHY data unit for supporting MU-MIMO transmissions in the downlink. SAMSUNG-1003, ¶¶153- 158. . . . In addition, both Bharadwaj and Sun describe MU- MIMO downlink PHY data unit structures in the context of 802.11ax. SAMSUNG-1013, ¶[0064]; SAMSUNG-1015, ¶[0031]; SAMSUNG-1003, ¶¶153-158. . . . . [A] POSITA implementing Bharadwaj’s preamble designs would have been motivated to look to another reference, like Sun, for an understanding of the format of the user field that would support non-MU-MIMO allocations and the single-user transmission scenario. A POSITA would have combined the teachings of Bharadwaj with Sun to realize implementation details for the HE-SIG-A and HE-SIG-B fields of the HE MU PPDU to better support both MU-MIMO and non-MU-MIMO allocations. SAMSUNG-1003, ¶¶153-158. . . . . A POSITA would have found it obvious to look to Sun for modifying Bharadwaj to include the user field format for SU (non-MU-MIMO) allocation to complement Bharadwaj’s disclosure of the MU-MIMO user field format and to provide a more complete system that would allow HE MU PPDUs to support both MU-MIMO allocations for multiple users and non-MU-MIMO allocations for a single user. SAMSUNG- 1003, ¶¶153-158. The combination also would have been obvious and predictable for at least the following reasons: 1) both Bharadwaj and Sun describe designs for a PHY data unit (or PPDU) to support communications between an AP and a station within a high-efficiency Wi-Fi network, consistent with 802.11ax; 2) both Bharadwaj and Sun describe the PPDU design for supporting MU-MIMO downlink transmission as including HE- SIG-A and HE-SIG-B fields; and 3) Bharadwaj already describes the format for the user field for the MU-MIMO allocation, while also recognizing the single-user scenario, and the combination merely involves the addition to Bharadwaj of the user field format for the single-user allocation, as taught by Sun. SAMSUNG-1003, ¶¶153- 158. The combination is obvious also because elements of the combined system would each perform similar functions they had been known to perform in similar contexts outside the combination. SAMSUNG-1003, ¶¶153-158. . . . . A POSITA would have reasonably expected success implementing the combination, especially considering the substantially similar 802.11ax techniques described in each reference. SAMSUNG-1003, ¶¶153-158. Additionally, combining the teachings of Bharadwaj with Sun would have merely involved combining prior art elements according to known methods to yield predictable results. SAMSUNG-1003, ¶¶153-158.” slip op. at 31
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededDecided for petitioner
“Petitioner asserts that “no formal claim constructions are necessary.” Pet. 2. Patent Owner notes that “both parties have submitted terms for construction in the district court for this Patent” (Prelim. Resp. 6), but that “for purposes of [the] Preliminary Response, Patent Owner applies the plain and ordinary meaning of the challenged claims” (id. at 8). Accordingly, at this stage, no need exists to expressly construe any claim terms to resolve the parties’ disputes.9 See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 9
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 11,159,210 - PTAB · Oct 15, 2025 · IPR2025-00762 · APJ Scott B Howard · IPR · Institution
The Board instituted IPR on claims 1–5 and 8–12 on all asserted grounds, finding a reasonable likelihood that claim 1 would have been obvious over Koskinen.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“determine whether to institute an inter partes review. 35 U.S.C. § 314 (2024); 37 C.F.R. § 42.4(a) (2024). Inter partes review may not be instituted unless “the information presented in the petition filed under [35 U.S.C.] section 311 and any response filed under [35 U.S.C.] section 313 shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). “When instituting inter partes review, the Board will authorize the review to proceed on all of the challenged claims and on all grounds of unpatentability asserted for each claim.” 37 C.F.R. § 42.108(a). For the reasons set forth below, upon considering the briefing and the evidence of record, we determine that the information presented in the Petition establishes a reasonable likelihood that Petitioner will prevail with respect to at least one of the challenged claims. Accordingly, we institute inter partes review on all of the challenged claims based on all of the grounds identified in the Petition.” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“Petitioner argues that a person having ordinary skill in the art “would have had a bachelor’s degree in electrical engineering, computer engineering, computer science, or a related field and at least two years of practical experience with design or development of telecommunication and/or wireless communications systems, or the equivalent.” Pet. 7 (citing Ex. 1003 ¶¶ 19–21). Petitioner further argues that “[a]dditional education” slip op. at 8
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“For the purposes of this Decision, we need not expressly construe any claim terms.6 See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (noting that “we need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 10
- Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundInstituted
“Additionally, a person having ordinary skill in the art would have known and been familiar with information elements (IEs) that specified an RLC reordering timer value based on (1) general knowledge that IEs carried information in RRC messages and (2) that 3GPP TSs describe an IE carrying recording timer duration information for the RLC layer. See Ex. 1003 ¶ 151; Ex. 1014, 219–20. Accordingly, it would have been obvious to a person having ordinary skill in the art “that the PDCP timer information, which used similar variables as its RLC counterpart (Koskinen, ¶¶37-38), would also be carried in a PDCP configuration IE.” Ex. 1003 ¶ 151.” slip op. at 13
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 10,863,573 - Comcast Cable Communications, LLC v. Entropic Communications, LLCAll claims unpatentablePTAB · Oct 6, 2025 · IPR2024-00432 · APJ Frederick C Laney · IPR · Final written decision
Claims 1–20 are unpatentable: claims 1–3, 8, 9, 11–13, 18, and 19 as anticipated or obvious over Zhang; the remaining claims as obvious over the listed combinations.
RulingsFinal written decision- Expert testimonyOther
“and digital selector 240 disclosed by Zhang is “digital circuitry,” which is configured to receive a plurality of frequencies comprising a plurality of desired/undesired television channels from ADC 220 and to output the desired television channels to demodulators 250 as a digital datastream. Tr. 71:14–17 (PO Counsel: “There is no dispute that in both Zhang and the patent, an RF signal that has both desired and undesired channel comes in and what’s sent to demodulators are desired channels. Nobody is disputing that.”), 134:3–5 (PO Counsel: “The issue is not whether the black box 230- plus-240 is the digital circuitry. It is. The issue is not whether or not that overall circuitry selects channels. At some level, it does.”). In other words, Zhang teaches digital circuitry that is (1) capable of receiving a plurality of frequencies including desired/undesired television channels and (2) capable of distinguishing between the desired/undesired channels to output the desired television channels to a demodulator. We find these uncontested facts to be highly probative of Petitioner’s contention that, to a skilled artisan, Zhang suggests that its digital circuitry is capable of selecting the desired television channels from a digitized plurality of frequencies that include both desired/undesired television channels. This is because Zhang’s digital circuitry is able to take what is input originally as a digitized plurality of frequencies having both desired/undesired television channels and, using those frequencies, pick out the desired television channels that are subsequently output to a demodulator. Zhang teaches that “because only the selected channels are later demodulated” the disclosed digital circuitry is “much faster than traditional analog channel switching through RF tuners” and it “dissipates less heat because fewer resources are required when demodulating only the selected RF channels.” Ex. 1013 ¶ 28 (emphasis added).” slip op. at 22
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“ordinary and customary meaning to a POSITA.” Pet. 21. Although Petitioner proposes corresponding structure for the term “digital circuitry” recited in claim 1, it does so only “[t]o the extent” that term “is construed to be a means-plus-function term under 35 U.S.C. 112, paragraph 6.” Id. at 22. But Petitioner does not argue or suggest that “digital circuitry” should be construed as a means-plus-function term; nor does Petitioner make an argument to overcome the presumption that 35 U.S.C. § 112, paragraph 6, does not apply. See id. Patent Owner does not address claim construction. See generally PO Resp. Because neither party actually argues “digital circuitry” is a means-plus-function term, the presumption holds and we determine that no claim term requires express interpretation to resolve any controversy in this proceeding. See Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999).” slip op. at 8
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)UnpatentableUnpatentable
- Obviousness (§103) › Graham factors (scope of art, differences, level of skill)UnpatentableUnpatentable
Patent outcomesUS 9,210,362 unpatentableClaim construction§ 102 anticipation§ 103 obviousnesscites PhillipsPatents in suitUS 9,210,362 - Google LLC / Cellco Partnership D/B/A Verizon Wireless et al. v. Headwater Research LLCAll claims unpatentablePTAB · Oct 1, 2025 · IPR2024-00943 · APJ Scott B Howard · IPR · Final written decision
Claims 2–23, 26, 41–60, 63, 64, 91–152, and 155–171 are unpatentable; Rao anticipates some claims, and the stated Rao combinations render the remaining claims obvious.
RulingsFinal written decision- Skill levelSkill level petitioner adoptedDecided for petitioner
“Petitioner argues that a person having ordinary skill in the art “would have at least a bachelor’s degree in computer science, computer engineering, or a similar field, and approximately two years of industry or academic experience in a field related to computer software development and/or computer networking.” Pet. 2 (citing Ex. 1015 ¶¶ 50–52). Petitioner further argues that “[w]ork experience can substitute for education, and additional education can substitute for work experience.” Id. at 2–3 (citing Ex. 1015 ¶¶ 50–52). Because Petitioner’s proposed level of ordinary skill in the art is consistent with the field of the invention of the ’541 patent and not disputed by Patent Owner (see PO Resp.), we adopt Petitioner’s formulation of the person having ordinary skill in the art.” slip op. at 12
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached
“Petitioner states “[n]o terms require construction to resolve this Petition.” Pet. 3. Patent Owner does not propose any claim constructions. See PO Resp. For the purposes of this Decision, we need not expressly construe any claim terms. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (noting that “we need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 13
- Expert testimonyPetitioner expert creditedDecided for petitioner
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)UnpatentableNot shown unpatentableMixed
“preponderance of the evidence that claim 3 was anticipated by Rao.” slip op. at 25
Patent outcomesUS 8,589,541 unpatentableClaim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 8,589,541 - Google LLC / Cellco Partnership D/B/A Verizon Wireless et al. v. Headwater Research LLCAll claims unpatentablePTAB · Oct 1, 2025 · IPR2024-00942 · APJ Scott B Howard · IPR · Final written decision
Claims 2–23, 26, 41–60, 63, 64, 91–152, and 155–171 are unpatentable; Rao anticipates some claims, and Rao-based combinations render the others obvious.
RulingsFinal written decision- Skill levelSkill level petitioner adoptedDecided for petitioner
“Petitioner argues that a person having ordinary skill in the art “would have at least a bachelor’s degree in computer science, computer engineering, or a similar field, and approximately two years of industry or academic experience in a field related to computer software development and/or computer networking.” Pet. 2 (citing Ex. 1015 ¶¶ 50–52). Petitioner further argues that “[w]ork experience can substitute for education, and additional education can substitute for work experience.” Id. at 2–3 (citing Ex. 1015 ¶¶ 50–52). Because Petitioner’s proposed level of ordinary skill in the art is consistent with the field of the invention of the ’541 patent and not disputed by Patent Owner (see PO Resp.), we adopt Petitioner’s formulation of the person having ordinary skill in the art.” slip op. at 12
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“Petitioner states “[n]o terms require construction to resolve this Petition.” Pet. 3. Patent Owner does not propose any claim constructions. See PO Resp. For the purposes of this Decision, we need not expressly construe any claim terms. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (noting that “we need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 13
- Expert testimonyOther
“157, and 171 are anticipated by Rao. Pet. 1, 19–39, 42. Petitioner’s arguments are supported by citations to the prior art and the testimony of Dr. Wolfe. See id. We have reviewed Petitioner’s arguments and evidence, agree with them, and, therefore, adopt Petitioner’s arguments and evidence as our own.” slip op. at 26
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)UnpatentableNot shown unpatentableMixed
“anticipated by Rao. Pet. 1, 30–31, 33–42. We have reviewed Petitioner’s arguments for each of those dependent claims. See Pet. 30–31, 33–42. For each of those dependent claims, the Petition appears to only argue a theory of obvious. That is, the Petition never states that the additional limitation is disclosed by Rao. See id. For example, claim 26 depends from claim 1 and further recites “wherein the policy is based on a background service class.” Ex. 1001, 112:49–52. We reproduce Petitioner’s arguments directed to claim 26 below: Rao’s policies 520 may “define prioritization” for network packets “based on whether an application is running in the foreground or the background.” [Ex. 1002] ¶ 182; id. ¶¶ 38–43, 180, 182, 188–89, 193, Figs. 5A, 5B. Each packet “may be placed and arranged in a priority order respective to all other . . . packets to provide a packet by packet prioritization across all applications 338a-338n and . . . network packets.” Id. ¶ 191. It would have been obvious to determine and apply a policy assigning a specific priority to packets associated with background applications, supra [1e]-[1f], and Rao thus discloses or renders obvious assigning a priority to network communications based on whether they are characterized as background services (class of services associated with application(s) running in the background of client 105), EX-1015 ¶¶195-96; supra [1e], [1f]. Pet. 33–34. Although the Petition sets forth why the claim limitation would have been obvious, there is no discussion as to how the additional limitation of claim 26—policy based on background class—is disclosed in Rao. See id. Similar arguments are presented for the other claims. See Pet. 30–31, 35–42. Because the Petition does not sufficiently show how the additional limitations recited in claims 20, 26, 58, 64, 165, and 169 were disclosed by Rao, Petitioner has not shown by a preponderance of the evidence that claims 20, 26, 58, 64, 165, and 169 were anticipated by Rao.” slip op. at 28
Patent outcomesUS 8,589,541 unpatentableClaim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 8,589,541 - Comcast Cable Communications, LLC v. Entropic Communications, LLCAll claims unpatentablePTAB · Oct 1, 2025 · IPR2024-00438 · APJ Michelle N Wormmeester · IPR · Final written decision
Claims 1–76 are unpatentable: Zhang anticipates or renders some claims obvious, and the other challenged claims are obvious over combinations including Zhang.
RulingsFinal written decision- BurdenFwd all claims unpatentableUnpatentable
“IV. CONCLUSION For the reasons given, Petitioner has demonstrated by a preponderance of the evidence that claims 1–76 of the ’206 patent are unpatentable as follows.6” slip op. at 48
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“Petitioner asserts that “[a]ll claim terms herein should be given their ordinary and customary meaning to a POSITA.” Pet. 18. Patent Owner does not respond. See PO Resp. For purposes of this Decision, we determine that no claim term requires express interpretation to resolve any controversy in this proceeding. See Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999).” slip op. at 8
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)UnpatentableUnpatentable
“B. Asserted Challenges Based on Zhang Alone Petitioner asserts that claims 1, 3–7, 9, 11, 13, 15–19, 21, 23, 25, 27– 31, 33–35, 38, 40–44, and 46–48 of the ’206 patent are anticipated by Zhang. Pet. 19–45. Petitioner also asserts that these claims would have been obvious over Zhang. Id. Patent Owner disputes certain aspects of Petitioner’s analysis. PO Resp. 3–50. For the reasons explained below, we determine that Petitioner has demonstrated by a preponderance of the evidence that claims 1, 3–7, 9, 11, 13, 15–19, 21, 23, 25, 27–31, 33–35, 38, 40–44, and 46–48 are anticipated by Zhang or would have been obvious over Zhang.” slip op. at 8
- Obviousness (§103) › Motivation to combine / reasonable expectation of successUnpatentableMotivation foundUnpatentable
“system may include a digital video recorder (DVR).” Id. at 45–46 (citing Ex. 1052 ¶¶ 5, 43, 48, 60, 73, 98, 112, 118, 191, 197, 212, 281–285, 296, 546). According to Petitioner, “[a] POSITA would have been motivated to include Reisman’s DVR in Zhang’s STB to provide a more feature-filled and individualized user experience, which in the proposed combination still includes Zhang’s wideband front-end receiver components cited for performing Elements [25A]–[25E].” Id. at 46. Petitioner explains that “Reisman’s DVR improves user experience and flexibility by allowing timeshifted and on-demand viewing, and enabling replay and trick-play (fast forwarding, rewinding, and pausing) of live programming.” Id. (citing Ex. 1052 ¶¶ 191, 197, 212, 284); see also id. at 46–47 (asserting that “[a]dding Reisman’s DVR to Zhang’s system would have been nothing more [than] applying a known technique of integrating a DVR into a set-top box . . . to a known STB . . . that was ready for improvement to yield a predictable result” and that “[a] POSITA would have had a reasonable expectation of success”). Patent Owner does not specifically dispute Petitioner’s contentions in this regard. See PO Resp. Based on Petitioner’s argument and evidence (see Pet. 45–47), we find Petitioner’s proposed combination of Zhang and Reisman teaches all the limitations of claims 25 and 38. We also find that Petitioner’s proffered reasoning for combining Zhang and Reisman supports a legal conclusion of obviousness. See In re Kahn, 441 F.3d 977, 988 (Fed. Cir. 2006) (“[T]here must be some articulated reasoning with some rational underpinning to support the legal conclusion of obviousness.”).” slip op. at 40
Patent outcomesUS 11,399,206 unpatentableClaim construction§ 102 anticipation§ 103 obviousnesscites PhillipsPatents in suitUS 11,399,206
Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.