PTAB
Advanced fields
122 decisions · 553msnewest first
  • PTAB · Sep 23, 2026 · IPR2025-00878 · APJ Carl M Defranco · IPR · Final written decision

    Claims 1–3 and 11 are unpatentable as anticipated by Cleveland and obvious over Nakagawa and over Nakagawa combined with Tanner.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “would have at least a bachelor’s degree in mechanical or chemical engineering, materials science, polymer science, or equivalent coursework, at least a year of experience developing paper-based laminates involving the application of polymer coatings to a substrate, and the appropriate industry familiarity with biodegradability standards and degradability techniques [and] . . . [l]ess work experience may be compensated by a higher level of education, such as a master’s degree, and vice versa. Pet. 16 (citing Ex. 1003 ¶ 50). Clearwater’s definition is uncontested, and we apply that definition here, as it accords with the level of skill reflected in the asserted prior art and the problems addressed in the specification of the ’126 patent. C. Claim Construction” slip op. at 6

    • Expert testimonyPetitioner expert creditedDecided for petitioner

      “We have reviewed the cited testimony of Clearwater’s expert, including their calculations for arriving at a coat weight in Nakagawa that falls within the claimed range. See Ex. 1003 ¶¶ 132–33. We find that testimony, which is unrebutted, both credible and supported by the evidence of record. Thus, in light of Clearwater’s contentions, the cited portions of Nakagawa, and the unrebutted testimony of Clearwater’s expert, we are persuaded that Nakagawa discloses or otherwise suggests each and every element of claim 1. See Pet. 45–54, 60–64. Clearwater also persuades us that Cleveland discloses the additional subject matter of dependent claims 2, 3, and 11. See Pet. 64–66. Thus, we determine that Clearwater demonstrates that claims 1–3 and 11 are unpatentable as obvious over Nakagawa. F. Ground 3—Obviousness Over Nakagawa and Tanner” slip op. at 17

    • Novelty / Anticipation (§102) › Prior-art status of a reference › Patents / published applications (effective date, provisional support)Reference is prior artDecided for petitioner

      “qualifies as prior art under 35 U.S.C. § 102(e)(1) “based on both its provisional and non-provisional filing dates.” Inst. Dec. 4 n.5. We were persuaded by Clearwater’s proof that Cleveland’s provisional (Ex. 1006) is “virtually identical” to Cleveland itself (Ex. 1005) and that the provisional provides written description support for at least claim 1 of Cleveland. See Pet. 18–21 (citing Ex. 1006, 2–6, 9). We were also persuaded by Clearwater’s showing that the provisional provides written support for the subject matter relied upon in Cleveland. Id. at 21–40 (citing Ex. 1006, 1–9). We are still persuaded by Clearwater’s showing. Thus, we see no reason to disturb our earlier finding that Cleveland is prior art to the ’126 patent.” slip op. at 7

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)UnpatentableUnpatentable

      “protectant layers has “a coat weight of from 5 to 30 lbs/3000 ft2.” As noted by Clearwater, Cleveland discloses a total coat weight for layers 14 and 16 as falling within the claimed range. Pet. 32–34 (citing Ex. 1005 ¶ 32). In particular, Cleveland discloses that “the coextruded layer of copolyester (irrespective of which side of the substrate the layer is disposed) is of a total coat weight of between about 10 and about 40 lb/3000 ft2 in any combination of between about 80/20 to 20/80 parts by weight of Ecoflex to Biomax,” of which “a total coat weight of 25 lb/3000 ft2 is preferred.” Ex. 1005 ¶ 32. As disclosed, Cleveland’s total coat weight range of 10–40 lb/3000 ft2 falls almost entirely within the claimed range, and the preferred total coat weight of 25 lb/3000 ft2 falls squarely within the claimed range. Thus, Cleveland satisfies claim elements [1.3.2] and [1.5.2]. See Titanium Metals Corp. v. Banner, 778 F.2d 775, 782 (Fed. Cir. 1985) (“[W]hen, as by a recitation of ranges or otherwise, a claim covers several compositions, the claim is anticipated if one of them is in the prior art.”) (citation omitted). As such, we find that Clearwater adequately demonstrates that Cleveland discloses all the elements of claim 1. 4. Dependent Claims” slip op. at 12

    Patent outcomesUS 8,637,126 unpatentable
    § 102 anticipation§ 103 obviousnesscites Phillips
    Patents in suitUS 8,637,126
  • PTAB · Jan 14, 2026 · IPR2025-01191 · APJ Kara L Szpondowski · IPR · Institution

    The Board instituted IPR on claims 1–24 and all asserted grounds because the petition showed a reasonable likelihood of prevailing on at least one claim.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “Institution of an inter partes review is authorized when “the information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). Based on the current record, and for the reasons explained below, we determine that Petitioner has established a reasonable likelihood that it would prevail with respect to at least one challenged claim, and we institute an inter partes review.” slip op. at 2

    • PTAB / AIA Trials › Discretionary denial › §325(d) same art / argumentsNot reached

      “IV. PATENT OWNER’S 35 U.S.C. § 325(D) ARGUMENTS Patent Owner presents arguments directed to discretionary considerations under 35 U.S.C. § 325(d) and requests the Petition be denied based on these arguments. Prelim. Resp. 2–16. However, Patent Owner’s § 325(d) arguments are untimely under the “Interim Director Discretionary Process,”6 and, as such, will not be considered by the Board. See Section I.C. (“The . . . patent owner should not present discretionary considerations in the . . . Patent Owner Preliminary Response (POPR)”); Section I.E. (“[A] Board panel will issue a decision on institution addressing the merits and other non-discretionary considerations.”). 5 Available at https://www.uspto.gov/patents/ptab/trial-practice-guide#step1 6 https://www.uspto.gov/patents/ptab/interim-director-discretionary-process.” slip op. at 38

    • Novelty / Anticipation (§102) › Prior-art status of a reference › Printed publication / public accessibilityPrinted publication establishedDecided for petitioner

      “Petitioner bears the burden of establishing that Wang is a printed publication. Medtronic, 891 F.3d at 1380. The determination of whether a document is a “printed publication” “involves a case-by-case inquiry into the facts and circumstances surrounding the reference's disclosure to members of the public.” In re Klopfenstein, 380 F.3d 1345, 1350 (Fed. Cir. 2004). “[A]t the institution stage, the petition must identify, with particularity, evidence sufficient to establish a reasonable likelihood that the reference was publicly accessible before the critical date of the challenged patent and therefore that there is a reasonable likelihood that it qualifies as a printed publication.” Hulu, IPR2018-01039, Paper 29 at 13.” slip op. at 19

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Instituted

      “A claim is unpatentable as anticipated under 35 U.S.C. § 102 “if each and every limitation is found either expressly or inherently in a single prior art reference.” WhitServe, LLC v. Computer Packages, Inc., 694 F.3d 10, 21 (Fed. Cir. 2012) (quoting Celeritas Techs., Ltd. v. Rockwell Int’l Corp., 150 F.3d 1354, 1361 (Fed. Cir. 1998)). An anticipatory reference must also “disclose those elements ‘arranged as in the claim.’” Net MoneyIN, Inc. v. VeriSign, Inc., 545 F.3d 1359, 1369 (Fed. Cir. 2008) (quoting Connell v. Sears, Roebuck & Co., 722 F.2d 1542, 1548 (Fed. Cir. 1983)).” slip op. at 11

    Claim construction§ 102 anticipation§ 103 obviousnessDiscretionary denialcites KSR · Graham
    Patents in suitUS 10,822,165
  • PTAB · Oct 10, 2025 · IPR2025-00653 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution on all claims because the Petition did not show a reasonable likelihood that any challenged claim was unpatentable over the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “An inter partes review may be instituted only if “the information presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’504 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Additionally, only terms that are in controversy need to be construed, and these need be construed only to the extent necessary to resolve the controversy. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 9; Prelim. Resp. 4 (citing Ex. 2009 ¶ 72); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13

    • Expert testimonyPetitioner expert discountedDecided for patent owner

      “Ex. 1002 ¶ 47. As reflected above, Dr. Wooley’s testimony as to element [1.2] does not even assert that Cardamone discloses a tank, let alone one or more sensors disposed at a tank as recited in element [1.2]. Thus, Dr. Wooley’s testimony does not support Petitioner’s argument on this issue.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,726,504
  • PTAB · Oct 10, 2025 · IPR2025-00652 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–23 and 25–30 were unpatentable over the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’403 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 10; Prelim. Resp. 4 (citing Ex. 2009 ¶ 73); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses element [1.2] because the evidence cited does not disclose a “first computer system being configured to provide remote control of the first pump or first valve” (i.e., a fluid-handling device). Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but Petitioner has not identified any disclosure of the capability to remotely control fluid-handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, Kahn’s disclosures that Petitioner relies on for allegedly teaching remote control are deficient. We discuss each. First, Petitioner points to the following, “[f]or instance, as illustrated in FIG. 1C, a fluid control device such as a valve 15A is located on the input side of a sen[s]or unit 110.” Ex. 1005, 8:19–21, cited in Pet. 13. This portion of Kahn, however, does not disclose remote control. Second, Petitioner cites to the following: Finally, or in addition to, the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance. Pet. 13 (citing Ex. 1005, 10:62–67). We agree with Patent Owner that this portion of Kahn teaches on-site alerts and local control of the fluid-handling device. See Prelim. Resp. 7. This portion of Kahn does not disclose remote control.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,294,403
  • PTAB · Oct 10, 2025 · IPR2025-00651 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–3, 6, 7, and 9–20 were unpatentable over any asserted ground.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’680 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 11

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner

      “target value” is part of a command that is sent from a computing device to a server and then to a controller. The controller then receives a measurement of the fluid by a sensor and determines whether the measurement satisfies the “target value.” If the measurement does not satisfy the “target value,” further operations are undertaken. The recited operation sequence makes clear that the plain and ordinary meaning of “target value” is not as Dr. Wooley opines because the particular operating condition that a device is in at a particular time is represented by the measurement taken by the sensor, 11 Some claim language less relevant to construing “target value” was omitted for ease of reference. which the controller then uses to determine whether the measurement satisfies the “target value.” Additionally, claim 1 recites that the “target value” is sent as part of a command to the controller. The “target value” is not sent to the controller from the sensor, as might be expected if the plain and ordinary meaning of “target value” were as Dr. Wooley opines. Petitioner and Dr. Wooley’s construction would also result in “target value” meaning effectively the same thing as the measurement of the fluid by the sensor, a concept that is separately recited in claim 1 and to which the “target value” is compared. The Specification of the ’680 patent does not support Petitioner’s understanding of the plain and ordinary meaning of “target value.” Although the Specification does not recite “target value,” it recites “target state,” and describes “target state” sufficiently to understand the plain and ordinary meaning of “target” as used in “target value” and “target state.” In particular, the ’680 patent explains that “[i]n some embodiments, the process 104 includes receiving, via a network interface, from a remote user device, (e.g., via a command-center server) a command to change a state of a fluid-handling device to a target state.” Ex. 1001, 11:48–51. This portion reflects that the command is seeking to change a state of a fluid-handling device to a target state. In other words, the “target value” or “target state” is not generally “the particular operating condition that a device is in at a particular time”; rather, it is a value or state that the fluid-handling device is desired to be in, as Patent Owner and Dr. Durham explain. Additionally, just as claim 1 recites a directional component for the “target value” to be sent to the controller in a command, so too does the Specification describe a “target state” as being sent in a command from a remote user device. Thus, the Specification clearly supports the plain and ordinary meaning proposed by Patent Owner and Dr. Durham and not the plain and ordinary meaning proposed by Petitioner and Dr. Wooley. slip op. at 14

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “time-stamped process data, report exception therein to the remote host, and extract and transmit time-stamped process data to the remote host.” Ex. 1005, Abst. (emphases added). Almadi explains that its remote field systems must include a plurality of controller units “to issue commands to, and gather and process data from a plurality of field devices, including remote systems and instruments, . . . [and] a database server for the storage of process data retrieved from the remote subsystems and instruments.” Id. at 2:22–30 (emphases added). Based on these disclosures, we agree with Patent Owner that Petitioner has not established that Almadi discloses element [1.4]. Specifically, the teachings from Almadi identified by Petitioner refer to process data, which is data retrieved from the remote subsystems/field devices. Thus, we understand that Almadi’s teaching—of using an Ethernet switch to transmit “process data”—describes transmitting data from the remote subsystems/field devices. See Ex. 1005, 3:13–17, cited in Pet. 15. But claim 1 and particularly element [1.4], recites “sending, with the server, the target value to the network address [which identifies a controller of the fluid-handling device13] via the network,” which is different than sending process data from the field devices to the remote host or database server for storage.” slip op. at 19

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,175,680
  • Tanklogix, LLC v. SiteproInstitution denied
    PTAB · Oct 10, 2025 · IPR2025-00650 · APJ Sheila F Mcshane · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 18–32 and 34 were unpatentable over Kahn or Kahn and Gutierrez.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). Upon consideration of the Petition, the Preliminary Response, and the evidence of record, we determine that Petitioner has not established a reasonable likelihood of prevailing with respect to the unpatentability of at least one claim of the ’871 patent. Accordingly, for the reasons that follow, we decline to institute an inter partes review of claims 18–32 and 34 of the ’871 patent.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The respective proposed levels of qualifications for a person of ordinary skill in the art are similar, with Patent Owner proposing two years of experience compared to Petitioner proposing significant experience with remotely controlling fluid-handling devices, like SCADA systems. Patent Owner also proposes more extensive experience in lieu of educational experience. While we find Petitioner’s proposed qualifications to be acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of skill necessary to understand and implement the teachings of the ’871 patent and the asserted prior art. Our analysis and findings herein, however, do not turn on any differences in the qualifications adopted.” slip op. at 8

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “We determine that we need not expressly construe any claim terms to resolve the parties’ disputes on the current record. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 10

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “actuators and the remote control of fluid handling devices, including the receipt with the user-interface module of “a user command to actuate an actuator via a presented control interface” (limitation [18.7]) and “account authorized to send commands to remotely control fluid handling devices” (limitation [18.11]). We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses or teaches these limitations because the evidence does not provide support that there is remote control of fluid handling devices or the use of a user command on a control interface to send a command to a fluid handling device, for instance. Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but we do not discern that it teaches or discloses the capability to remotely control fluid handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, the Kahn disclosures that Petitioner repeatedly relies upon for allegedly teaching this control are deficient. See Ex. 1005, 10:62–67, 14:35– 15:2, 15:62–16:32; see also Pet. 12–14, 16–18. Kahn discloses that “the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance.” Ex. 1005, 10:62–67. Communication unit 112B is part of the local “sensor unit,” wherein the detection conditions determined by the sensor are communicated to remote devices by communication unit 112B. See id. at 3:31–33, 5:62–6:2, 6:27–35, 7:33–37, 13:7–12, Figs. 1A–1C. Kahn discloses that the sensor units, which include communication units 112B, can be located near shut-off valves and can communicate with distant locations. See id. at 11:1–13. There are no disclosures, however, in the above passages that there is remote control of fluid handling devices, that there is a user command on a control interface that actuates an actuator, or that there is a command sent to the facility actuators via a network connection, as required in limitations [18.5]–[18.7] and [18.9]–[18.12], respectively. Rather, the disclosure indicates that the communication unit 112B includes on-site alerts and that the local (non-remote) communication unit 112B can be interfaced with the control valve.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 10,488,871
  • PTAB · Jul 14, 2025 · IPR2024-00402 · APJ Mary C Hoffman · IPR · Final written decision

    The Board granted Patent Owner’s revised non-contingent motion to amend, canceling claims 1–4 and substituting claims 7 and 8, which Petitioner did not prove unpatentable.

    RulingsFinal written decision
    • PTAB / AIA Trials › Motions to amend / substitute claimsMotion to amend, grantedGranted

      “whether the motion to amend meets the statutory and regulatory requirements set forth in 35 U.S.C. § 316(d) and 37 C.F.R. § 42.121.” See Lectrosonics, Inc. v. Zaxcom, Inc., IPR2018-01129, Paper 15 at 4 (PTAB Feb. 25, 2019) (precedential). A “patent owner bears the burden of persuasion to show, by a preponderance of the evidence, that the motion to amend complies” with the applicable statutory and regulatory requirements. 37 C.F.R. § 42.121(d)(1). Specifically, a patent owner must demonstrate the following: (1) the amendment proposes a reasonable number of substitute claims; (2) the amendment responds to a ground of unpatentability involved in the trial; (3) the amendment does not seek to enlarge the scope of the claims of the patent; and (4) the amendment does not introduce new matter. See 35 U.S.C. § 316(d); 37 C.F.R. § 42.121(a)–(b). For the reasons explained below, Patent Owner satisfies its burden of persuasion to show that the amendments comply with the applicable statutory and regulatory requirements.” slip op. at 8

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “Both parties rely on expert testimony for their respective positions relating to the number of years of experience needed to attain ordinary skill, but neither expert cites supporting evidence for their testimony. See Ex. 1002 ¶ 33; Ex. 2002 ¶ 15. Our decision is the same regardless of whether the length of experience is two years or three. We find Patent Owner’s proposed “wireless communications” is more consistent with the ’958 patent than Petitioner’s proposed “telecommunication,” which encompasses a variety of technologies including, e.g., landline and wireless telephones, cable, and satellite. See Ex. 1001, 1:11–62 (describing the invention in terms of wireless communications). Accordingly, we adopt a modified version of Petitioner’s proffered level of ordinary skill in the art, substituting “wireless communications” for “telecommunication.” Neither party, moreover, indicates the overall result would change based on a different definition.” slip op. at 18

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner

      “We agree with Patent Owner that the recited second type SIBs exclude first type SIBs. The plain meaning of “first type” and “second type” indicates that the first type and second type are different in kind. RMTA 22 (App. A). Our interpretation is consistent with the Specification, which explains that second type SIBs exclude first type SIBs. As Patent Owner points out, the ’958 patent discloses “first type of system information (1TYP SIB) is . . . essential . . . for initial system access” and “second type of system information (2TYP SIB) is nonessential system information . . . defined as all other types of information, and thus excludes the [] information required for initial access.” Id. at 11–12 (citing Ex. 1001, 8:34– 46); see also Ex. 1001, Abstract (interchangeably using the terms second type and non-essential). Despite Petitioner’s argument that this disclosure is non-limiting and directed to a disclaimed example embodiment (Opp. 8–9), Petitioner could not identify any embodiment, among the approximately forty disclosed embodiments, describing something other than the first type SIB being essential information and the second type SIB being non-essential information. Tr. 22:18–26. Even the Petition acknowledges that “the ’958 Patent further classifies a second type of system information, the ‘non-essential’ SI, which is defined as all other types of information excluding that first type of information required for initial access.” Pet. 5. Furthermore, the prior art of record suggests that a person of ordinary skill would have understood second type SIBs exclude first type SIBs. See Ex. 1008 ¶ 48 (describing two categories of system information, “essential SI” and “Other SI”). Patent Owner’s expert also understood the recited first and second type SIBs as being mutually exclusive. See Ex. 1011, 49:10–13. For the above reasons, we do not agree with Petitioner that the recited second type SIB lacks any requirements, nor do we interpret claims 7 and 8 such that the first type SIB could be a second type SIB.” slip op. at 19

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “(d) Limitation 7h: Analysis We agree with Patent Owner that Petitioner’s arguments with respect to limitation 7h are insufficient because they fail to address the limitation as written and improperly incorporate previous arguments by reference. For example, Petitioner did not map the recited “group identifier” when opposing Patent Owner’s Revised Motion to Amend. See Opp. 16–17. In its Sur-reply, Petitioner contends that limitation 7h’s requirement of transmitting the group identifier was previously “set out in Patent Owner’s prior papers,” but does not refer to any specific papers or exhibits. Pet. Surreply 11–12. We decline to search for and piece together Petitioner’s arguments and evidence to develop a persuasive theory of unpatentability. See 37 C.F.R. section 42.6(a)(3). Petitioner similarly failed to address adequately where Lee discloses or suggests the recited “compressed format” and “plural parameters.” See Opp. 16–17. Aside from the above concerns, we also do not see sufficient explanation with respect to limitation 7h’s requirement that the transmitting by broadcast be based on a comparison of the value tag. Petitioner argues that, because Patent Owner does not dispute limitation 7g, “it would have been obvious to a POSITA to use the same value tag[] to determine the system information broadcast in Lee’s compressed format embodiment.” Pet. Sur-reply 12. This conclusory statement is not supported by any citations to evidence and was improperly introduced in the Sur-reply. Moreover, whether it was obvious to determine what system information is broadcast is not commensurate with the claim scope because limitation 7h requires that the broadcasting (not the broadcast content) be based on a comparison of the value tag. See supra III.B.4 and IV.B. Further, we are not persuaded that Lee’s transmitting by broadcast is” slip op. at 26

    Patent outcomesUS 10,841,958 not shown unpatentable
    Claim construction§ 102 anticipation§ 103 obviousness§ 112 disclosurecites Phillips · KSR · Graham · Nautilus
    Patents in suitUS 10,841,958
  • PTAB · May 16, 2025 · IPR2024-00093 · APJ Grace Karaffa Obermann · IPR · Final written decision

    Claims 1–9 were not proven unpatentable because the asserted references did not establish the claimed epitaxial layer or the required coverage of the trench sidewalls.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Petitioner defines a person of ordinary skill in the art as having “a Master’s degree in electrical engineering, and at least two years of relevant work experience in the field of integrated circuit design and manufacturing.” Pet. 13 (citing Ex. 1003 ¶¶ 32–37, 57). Patent Owner does not dispute Petitioner’s definition. PO Resp. 6. We adopt Petitioner’s proposed definition of the level of ordinary skill in the art because it is supported by unopposed declaration testimony and appears to be consistent with the disclosures of the ’634 patent and the asserted prior art references. See Ex. 1001, 1:6–2:33 (describing the invention and related art in terms of integrated circuit design and fabrication); see also Ex. 1006 ¶¶ 1–6 (Hirler); Ex. 1008 ¶¶ 1–37 (Kobayashi); Ex. 1009 ¶¶ 2–29 (Shiraishi). Neither party, moreover, indicates the overall result would change based on a different definition.” slip op. at 7

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed petitioner constructionDecided for petitioner

      “Petitioner argues that “the sidewalls of said trenches in said base layer are covered” should be construed to mean that “the entire sidewalls of” those trenches are covered. Pet. 18–19. We refer to this as “the sidewall limitation.” Petitioner shows persuasively that the disclosure and file history of the ’634 patent support its position on the sidewall limitation. Id. Patent Owner, for its part, observes that, after the filing of the Petition. two District Courts adopted the construction proposed by Petitioner.” PO Resp. 21 (citing Ex. 2010, 6–9; Ex. 2011, 23). Patent Owner also agrees to apply Petitioner’s construction for purposes of this proceeding. Id. We agree with Patent Owner that an express construction of the sidewall limitation is necessary to this Decision, id., and adopt Petitioner’s undisputed definition because it is supported by the record. No other claim term requires express construction for purposes of this Decision.” slip op. at 8

    • BurdenNot shown unpatentable

      “On this record, Petitioner fails to demonstrate that any claim is unpatentable under any ground asserted in the Petition. IV. CONCLUSION For the above reasons, we determine that Petitioner fails to establish by a preponderance of the evidence that claims 1–9 of the ’634 patent are unpatentable.” slip op. at 34

    • Expert testimonyPetitioner expert discountedPatent owner expert creditedDecided for patent owner

      “Alternatively, even if we set aside that timing issue, Dr. Liu’s bare opinion, advanced for the first time during cross-examination, that an epitaxial layer is “obvious” from Hirler’s disclosure is inadequate to support the challenges. Id. at 24–25. We accord little weight to Dr. Liu’s opinion because it is conclusory. See Xerox Corp. v. Bytemark, Inc., IPR2022-00624, Paper 9 at 15 (PTAB Aug. 24, 2022) (precedential). In any event, Petitioner does not meet, on this record, the “high standard” required to establish an inherent disclosure of an epitaxial layer in Hirler. PO Resp. 24.6 Dr. Liu opined for the first time during cross-examination “that it would have been impossible to create Hirler’s more lightly doped n- drift zone layer on top of its more heavily doped n+ substrate layer other than via epitaxy.” Id. at 25 (citing Ex. 2014, 164:16– 165:20). But Patent Owner effectively refutes that proposition with evidence that such a layer “could be created by counter-doping,” even if, as Dr. Liu contends, counter-doping may have been less ideal due to “disadvantageous mobility.” Id. (citing Ex. 2012 ¶ 133; Ex. 2014, 166:15–167:8).” slip op. at 11

    Patent outcomesUS 7,629,634 not shown unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 7,629,634
  • PTAB · Oct 11, 2024 · IPR2024-00730 · APJ John R Kenny · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 4, 5, 10, and 11 were anticipated or obvious over Lee or Zheng.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “The Petition, to justify institution of review, must demonstrate a reasonable likelihood that Petitioner would prevail with respect to at least one challenged claim. See 35 U.S.C. § 314(a) (2018). After considering the Petition, the Preliminary Response, and the evidence of record, we determine that the Petition has not met this standard. Therefore, we decline to institute an inter partes review.” slip op. at 2

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed board ownDecided for patent owner

      “capability to include one or both first CBs and second CBs within any one of the CBGs. Prelim. Resp. 9–10. The plain and ordinary meaning of the CB/CBG limitation, however, does not provide such a requirement. Instead, the plain and ordinary meaning of “each of the multiple CBs is included in any one of the multiple CBGs” simply requires that at least one CBG contain each CB. Although the description in the Specification of the configuration example of Figure 11(c) arguably describes the capacity of a system to include the first and second CBs in any one of CBGs, the Specification’s permissive language does not appear in the challenged claims. That description reads:” slip op. at 6

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “multiple CB/CBG limitation, we nevertheless find it necessary to construe the limitation. Upon review of the record, we construe the limitation as requiring that at least one CBG includes each of the multiple CBs. The plain meaning of “each of the multiple CBs is included in any one of the multiple CBGs” is that each CB is included in a CBG, which means that at least one CBG includes each of the multiple CBs. Further, the Specification supports construing the limitation to have this plain meaning. Figure 11 of the ’509 patent, shown below, provides a configuration example of CBGs (Ex. 1001, 23:7–8):” slip op. at 7

    • Obviousness (§103) › Graham factors (scope of art, differences, level of skill)Not shown unpatentableNot shown unpatentable

      “multiple CB/CBG limitation, we nevertheless find it necessary to construe the limitation. Upon review of the record, we construe the limitation as requiring that at least one CBG includes each of the multiple CBs. The plain meaning of “each of the multiple CBs is included in any one of the multiple CBGs” is that each CB is included in a CBG, which means that at least one CBG includes each of the multiple CBs. Further, the Specification supports construing the limitation to have this plain meaning. Figure 11 of the ’509 patent, shown below, provides a configuration example of CBGs (Ex. 1001, 23:7–8):” slip op. at 7

    Claim construction§ 102 anticipation§ 103 obviousness
    Patents in suitUS 11,196,509
  • PTAB · Oct 10, 2024 · IPR2024-00644 · APJ Christopher L Ogden · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 5, 7, and 8 were unpatentable over R2-1702708, which was not shown to be a prior-art printed publication.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “§ 42.4(a), we may only institute an inter partes review when “the information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a); see also 37 C.F.R. § 42.108(c) (2023). Applying that standard, we do not institute an inter partes review, for the reasons explained below.” slip op. at 2

    • Novelty / Anticipation (§102) › Prior-art status of a reference › Printed publication / public accessibilityPrinted publication not establishedNot shown unpatentable

      “ground that could be raised under section 102 or 103 and only on the basis of prior art consisting of patents or printed publications.” 35 U.S.C. § 311(b). If the petition relies on an alleged printed publication, “at the institution stage, the petition must identify, with particularity, evidence sufficient to establish a reasonable likelihood that the reference was publicly accessible before the critical date of the challenged patent and therefore that there is a reasonable likelihood that it qualifies as a printed publication.” Hulu, LLC v. Sound View Innovations, LLC, IPR2018-01039, Paper 29 at 13 (PTAB Dec. 20, 2019) (precedential).” slip op. at 9

    § 102 anticipation
    Patents in suitUS 11,134,400
Page 1 of 13
← Previous12345…Next →

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.