PTAB
Advanced fields
93 decisions · 456msnewest first
  • PTAB · Jul 27, 2026 · IPR2025-01570 · APJ Monica S Ullagaddi · IPR · Final written decision

    The majority held claims 1–19 not shown unpatentable: Wang did not anticipate claims 1–10, and Wang with Xiong did not render claims 11–19 obvious.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedOther

      “field of the ’690 Patent would have had at least (1) an undergraduate degree in electrical engineering, computer engineering, computer science, or a comparable field of study and (2) at least two years of experience with optical data communications or a comparable field of work.” Pet. 14 (citing Ex. 1003 ¶ 22). Petitioner also states that “[i]ndividuals having different educational backgrounds and supplemental experience might still be of ordinary skill in the art if such experience compensates for any deficiencies in education relative to the criteria stated above” and “[i]n some cases, additional education might be an acceptable substitute for some experience, or vice versa.” Id. Patent Owner does not dispute Petitioner’s characterization of the level of skill in the art. See e.g., PO Resp. 9. We adopt Petitioner’s unopposed definition of the level of ordinary skill in the art as it appears consistent with the disclosures of the ’690 patent and the prior art of record. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001).” slip op. at 7

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Patent is self-explanatory and would have been recognized by a [person of ordinary skill in the art] as having plain and ordinary meanings.” Pet. 10. “Petitioner submits that no special constructions are required” because “the claim terms appear understandable in the context of the disclosure provided by the specification of the ’690 Patent.” Id. (citing Ex. 1003 ¶ 58). Patent Owner “agrees that the claim terms should be given their plain and ordinary meaning as understood by a [person of ordinary skill in the art].” PO Resp. 10. After reviewing the arguments and evidence before us, we determine that we do not need to expressly construe any claim term to resolve any controversy in the proceeding. Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 8

    • BurdenNot shown unpatentable

      “Also relevant to our analysis is that this is an anticipation ground and Petitioner is required to show that the reference discloses not only the elements of the claimed invention, but also discloses those elements as arranged in the claim. Net MoneyIN, Inc. v. VeriSign, Inc., 545 F.3d 1359, 1371 (Fed. Cir. 2008). Although our Institution Decision concluded that Petitioner had demonstrated a reasonable likelihood of prevailing with respect to its anticipation challenge to independent claim 1 applying Wang (Inst. Dec. 6), at this stage of the proceeding we are required to evaluate Petitioner’s challenges under a higher standard, the preponderance of evidence standard. For the foregoing reasons, we are not persuaded that Petitioner sufficiently establishes that claim 1 is unpatentable under 35 U.S.C. § 102 as anticipated by Wang by a preponderance of the evidence.” slip op. at 13

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “Wang discloses that “the isolator 100 is bonded to the substrate by means of an adhesive” in which “[t]he adhesive is not only used to fix the isolator 100 to the substrate, but also fills a gap between the isolator 100 and the substrate to improve the installation accuracy of the isolator 100.” Ex. 1006 ¶ 41 (emphasis added). Petitioner does not explain how filling in a gap between the isolator 100 and a substrate necessarily results in “each of the plurality of optical isolators [being] disposed substantially in parallel relative to each other,” as recited in claim 1. The cited portion in paragraph 43 references Figures 5 and 6, which depict Embodiment 1 of Wang and are reproduced below. Figures 5 and 6 of Wang depict isolators 100, base 311, and baffles 312. Although paragraph 44 of Wang states that “[t]he substrate includes a base 311, and baffles 312 and isolators 100 sequentially disposed on the base 311,” Petitioner does not sufficiently persuade us how Wang’s disclosure “sequentially disposed” isolators necessarily discloses that the isolators are “disposed substantially in parallel relative to each other” as recited in independent claim 1. Ex. 1006 ¶ 44. Although the cited portion in Figure 6 of Wang apparently shows a possibly parallel arrangement of Petitioner cites to Dr. Kirk’s Declaration, but Dr. Kirk does not opine on why cited portions of Wang necessarily disclose or depict the claimed “disposed substantially in parallel relative to each other” requirement. Ex. 1003 ¶¶ 73, 74; Ex. 1006 ¶¶ 41, 43, Figs. 6, 8, 10. At best, Dr. Kirk testifies that “a POSITA would have understood that Wang anticipates Claim 1.” Ex. 1003 ¶ 75. Also relevant to our analysis is that this is an anticipation ground and Petitioner is required to show that the reference discloses not only the elements of the claimed invention, but also discloses those elements as arranged in the claim. Net MoneyIN, Inc. v. VeriSign, Inc., 545 F.3d 1359, 1371 (Fed. Cir. 2008). Although our Institution Decision concluded that Petitioner had demonstrated a reasonable likelihood of prevailing with respect to its anticipation challenge to independent claim 1 applying Wang (Inst. Dec. 6), at this stage of the proceeding we are required to evaluate Petitioner’s challenges under a higher standard, the preponderance of evidence standard.” slip op. at 12

    Patent outcomesUS 10,788,690 not shown unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 10,788,690
  • PTAB · Jul 27, 2026 · IPR2025-00437 · APJ Monica S Ullagaddi · IPR · Final written decision

    The majority held claims 1–19 not unpatentable: Wang did not establish anticipation of claims 1–10, and Wang with Xiong did not establish obviousness of claims 11–19.

    RulingsFinal written decision
    • BurdenNot shown unpatentable

      “Wang discloses that “the isolator 100 is bonded to the substrate by means of an adhesive” in which “[t]he adhesive is not only used to fix the isolator 100 to the substrate, but also fills a gap between the isolator 100 and the substrate to improve the installation accuracy of the isolator 100.” Ex. 1006 ¶ 41 (emphasis added). Petitioner does not explain how filling in a gap between the isolator 100 and a substrate necessarily results in “each of the plurality of optical isolators [being] disposed substantially in parallel relative to each other,” as recited in claim 1. The cited portion in paragraph 43 references Figures 5 and 6, which depict Embodiment 1 of Wang and are reproduced below. Figures 5 and 6 of Wang depict isolators 100, base 311, and baffles 312. Although paragraph 44 of Wang states that “[t]he substrate includes a base 311, and baffles 312 and isolators 100 sequentially disposed on the base 311,” Petitioner does not sufficiently persuade us how Wang’s disclosure “sequentially disposed” isolators necessarily discloses that the isolators are “disposed substantially in parallel relative to each other” as recited in independent claim 1. Ex. 1006 ¶ 44. Although the cited portion in Figure 6 of Wang apparently shows a possibly parallel arrangement of Petitioner cites to Dr. Kirk’s Declaration, but Dr. Kirk does not opine on why cited portions of Wang necessarily disclose or depict the claimed “disposed substantially in parallel relative to each other” requirement. Ex. 1003 ¶¶ 73, 74; Ex. 1006 ¶¶ 41, 43, Figs. 6, 8, 10. At best, Dr. Kirk testifies that “a POSITA would have understood that Wang anticipates Claim 1.” Ex. 1003 ¶ 75. Also relevant to our analysis is that this is an anticipation ground and Petitioner is required to show that the reference discloses not only the elements of the claimed invention, but also discloses those elements as arranged in the claim. Net MoneyIN, Inc. v. VeriSign, Inc., 545 F.3d 1359, 1371 (Fed. Cir. 2008). Although our Institution Decision concluded that Petitioner had demonstrated a reasonable likelihood of prevailing with respect to its anticipation challenge to independent claim 1 applying Wang (Inst. Dec. 6), at this stage of the proceeding we are required to evaluate Petitioner’s challenges under a higher standard, the preponderance of evidence standard.” slip op. at 12

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “Wang discloses that “the isolator 100 is bonded to the substrate by means of an adhesive” in which “[t]he adhesive is not only used to fix the isolator 100 to the substrate, but also fills a gap between the isolator 100 and the substrate to improve the installation accuracy of the isolator 100.” Ex. 1006 ¶ 41 (emphasis added). Petitioner does not explain how filling in a gap between the isolator 100 and a substrate necessarily results in “each of the plurality of optical isolators [being] disposed substantially in parallel relative to each other,” as recited in claim 1. The cited portion in paragraph 43 references Figures 5 and 6, which depict Embodiment 1 of Wang and are reproduced below. Figures 5 and 6 of Wang depict isolators 100, base 311, and baffles 312. Although paragraph 44 of Wang states that “[t]he substrate includes a base 311, and baffles 312 and isolators 100 sequentially disposed on the base 311,” Petitioner does not sufficiently persuade us how Wang’s disclosure “sequentially disposed” isolators necessarily discloses that the isolators are “disposed substantially in parallel relative to each other” as recited in independent claim 1. Ex. 1006 ¶ 44. Although the cited portion in Figure 6 of Wang apparently shows a possibly parallel arrangement of Petitioner cites to Dr. Kirk’s Declaration, but Dr. Kirk does not opine on why cited portions of Wang necessarily disclose or depict the claimed “disposed substantially in parallel relative to each other” requirement. Ex. 1003 ¶¶ 73, 74; Ex. 1006 ¶¶ 41, 43, Figs. 6, 8, 10. At best, Dr. Kirk testifies that “a POSITA would have understood that Wang anticipates Claim 1.” Ex. 1003 ¶ 75. Also relevant to our analysis is that this is an anticipation ground and Petitioner is required to show that the reference discloses not only the elements of the claimed invention, but also discloses those elements as arranged in the claim. Net MoneyIN, Inc. v. VeriSign, Inc., 545 F.3d 1359, 1371 (Fed. Cir. 2008). Although our Institution Decision concluded that Petitioner had demonstrated a reasonable likelihood of prevailing with respect to its anticipation challenge to independent claim 1 applying Wang (Inst. Dec. 6), at this stage of the proceeding we are required to evaluate Petitioner’s challenges under a higher standard, the preponderance of evidence standard. For the foregoing reasons, we are not persuaded that Petitioner” slip op. at 12

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successNot reached

      “challenge set forth in the Petition by citing the background of the ’690 patent and Dr. Willner’s deposition testimony and characterizing the same as “admissions” of Patent Owner in Petitioner’s Reply, such “evidence” did not form the basis of Appellant’s original position set forth in the Petition.6 Petitioner’s arguments that all of the components recited in claim 11 “were known in the prior art” or that Dr. Willner admitted the same are unpersuasive at least because the Petition did not set forth this position. Contrary to Petitioner’s arguments during the oral hearing, the Petition does not present challenges based on “Applicant Admitted Prior Art.” See generally Pet.” slip op. at 23

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “field of the ’690 Patent would have had at least (1) an undergraduate degree in electrical engineering, computer engineering, computer science, or a comparable field of study and (2) at least two years of experience with optical data communications or a comparable field of work.” Pet. 14 (citing Ex. 1003 ¶ 22). Petitioner also states that “[i]ndividuals having different educational backgrounds and supplemental experience might still be of ordinary skill in the art if such experience compensates for any deficiencies in education relative to the criteria stated above” and “[i]n some cases, additional education might be an acceptable substitute for some experience, or vice versa.” Id. Patent Owner does not dispute Petitioner’s characterization of the level of skill in the art. See e.g., PO Resp. 9. We adopt Petitioner’s unopposed definition of the level of ordinary skill in the art as it appears consistent with the disclosures of the ’690 patent and the prior art of record. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001).” slip op. at 7

    Patent outcomesUS 10,788,690 not shown unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 10,788,690
  • PTAB · Dec 19, 2025 · IPR2025-00434 · APJ Mitchell G Weatherly · IPR · Rehearing

    The Board denied Petitioner’s rehearing request, leaving institution denied because Shen and Soldano did not establish a reasonable likelihood of anticipating claims 1–7.

    RulingsRehearing decision
    • RehearingRehearing, deniedDenied

      “When rehearing a decision on petition, the Board will review the decision for an abuse of discretion. See 37 C.F.R. § 42.71(c). An abuse of discretion may be determined if a decision is based on an erroneous interpretation of law, if a factual finding is not supported by substantial evidence, or if the decision represents an unreasonable judgment in weighing relevant factors. See Arnold P’ship v. Dudas, 362 F.3d 1338, 1340 (Fed. Cir. 2004). The party challenging the decision has the burden of showing the decision should be modified, and the request for rehearing “must specifically identify all matters the party believes the Board misapprehended or overlooked, and the place where each matter was previously addressed” in its papers. 37 C.F.R. § 42.71(d).” slip op. at 2

    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “II. ANALYSIS In our Decision, we concluded that Petitioner had failed to carry its burden of demonstrating a reasonable likelihood of prevailing that either Shen or Soldano anticipated claims 1–7. Dec. 18, 26. Petitioner argues that we should institute review for three reasons. First, Petitioner argues that we abused our discretion by (a) “refusing” to interpret the scope of the claimed” slip op. at 2

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “Owner’s interpretation of “carrier” as meaning “one or more components for supporting ROSA components such as an AWG.” Dec. 9 (quoting Pet. 11). For our analysis of Petitioner’s challenges, we referred to this interpretation of “carrier” as Petitioner’s second alternative construction. Id. We also noted that Petitioner appeared to dispute Patent Owner’s interpretation when it argued that “carrier” should mean “a ceramic or silicon substrate.” Id. (quoting Pet. 10). We referred to this interpretation of “carrier” as the first alternative construction. Id. Rather than resolve this apparent dispute about the meaning of “carrier,” we found that both of Petitioner’s anticipation challenges failed under both interpretations of “carrier.” Id. at 10–26. Because we found that Petitioner had failed to carry its burden regardless of which interpretation of “carrier” applied, we found it unnecessary to resolve the dispute over that interpretation. Id. at 9–10. For the reasons expressed in Parts II.B–C below, we maintain our conclusion that Petitioner has failed to demonstrate a reasonable likelihood of proving that either Shen or Soldano anticipates any claim under either interpretation of “carrier.” Accordingly, Petitioner fails to demonstrate an abuse of discretion in our alleged “refusal” to interpret “carrier.”” slip op. at 3

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “Reh’g Req. 14. We cannot weigh Petitioner’s arguments based on its assertions about “caselaw” because Petitioner cited no cases to support its arguments. See id. Nevertheless, we infer that Petitioner intends its statements of “caselaw” to refer to the requirements to make out a case for anticipation. If so, Petitioner demonstrably miscasts what appear to be the legal principles for proving anticipation. As stated in our Decision: “A claim is anticipated only if each and every element as set forth in the claim is found, either expressly or inherently described, in a single prior art reference.” Verdegaal Bros., Inc. v. Union Oil Co. of California, 814 F.2d 628, 631 (Fed. Cir. 1987).” Dec. 7. Making a showing that a prior art reference anticipates a patent claim thus necessarily requires proof that a single reference “expressly or inherently” describes every element of that claim and with all elements being arranged in the reference as they are in the” slip op. at 7

    Claim construction§ 102 anticipation
    Patents in suitUS 10,379,301
  • PTAB · Oct 10, 2025 · IPR2025-00653 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution on all claims because the Petition did not show a reasonable likelihood that any challenged claim was unpatentable over the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “An inter partes review may be instituted only if “the information presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’504 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Additionally, only terms that are in controversy need to be construed, and these need be construed only to the extent necessary to resolve the controversy. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 9; Prelim. Resp. 4 (citing Ex. 2009 ¶ 72); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13

    • Expert testimonyPetitioner expert discountedDecided for patent owner

      “Ex. 1002 ¶ 47. As reflected above, Dr. Wooley’s testimony as to element [1.2] does not even assert that Cardamone discloses a tank, let alone one or more sensors disposed at a tank as recited in element [1.2]. Thus, Dr. Wooley’s testimony does not support Petitioner’s argument on this issue.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,726,504
  • PTAB · Oct 10, 2025 · IPR2025-00652 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–23 and 25–30 were unpatentable over the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’403 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 10; Prelim. Resp. 4 (citing Ex. 2009 ¶ 73); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses element [1.2] because the evidence cited does not disclose a “first computer system being configured to provide remote control of the first pump or first valve” (i.e., a fluid-handling device). Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but Petitioner has not identified any disclosure of the capability to remotely control fluid-handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, Kahn’s disclosures that Petitioner relies on for allegedly teaching remote control are deficient. We discuss each. First, Petitioner points to the following, “[f]or instance, as illustrated in FIG. 1C, a fluid control device such as a valve 15A is located on the input side of a sen[s]or unit 110.” Ex. 1005, 8:19–21, cited in Pet. 13. This portion of Kahn, however, does not disclose remote control. Second, Petitioner cites to the following: Finally, or in addition to, the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance. Pet. 13 (citing Ex. 1005, 10:62–67). We agree with Patent Owner that this portion of Kahn teaches on-site alerts and local control of the fluid-handling device. See Prelim. Resp. 7. This portion of Kahn does not disclose remote control.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,294,403
  • PTAB · Oct 10, 2025 · IPR2025-00651 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–3, 6, 7, and 9–20 were unpatentable over any asserted ground.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’680 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 11

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner

      “target value” is part of a command that is sent from a computing device to a server and then to a controller. The controller then receives a measurement of the fluid by a sensor and determines whether the measurement satisfies the “target value.” If the measurement does not satisfy the “target value,” further operations are undertaken. The recited operation sequence makes clear that the plain and ordinary meaning of “target value” is not as Dr. Wooley opines because the particular operating condition that a device is in at a particular time is represented by the measurement taken by the sensor, 11 Some claim language less relevant to construing “target value” was omitted for ease of reference. which the controller then uses to determine whether the measurement satisfies the “target value.” Additionally, claim 1 recites that the “target value” is sent as part of a command to the controller. The “target value” is not sent to the controller from the sensor, as might be expected if the plain and ordinary meaning of “target value” were as Dr. Wooley opines. Petitioner and Dr. Wooley’s construction would also result in “target value” meaning effectively the same thing as the measurement of the fluid by the sensor, a concept that is separately recited in claim 1 and to which the “target value” is compared. The Specification of the ’680 patent does not support Petitioner’s understanding of the plain and ordinary meaning of “target value.” Although the Specification does not recite “target value,” it recites “target state,” and describes “target state” sufficiently to understand the plain and ordinary meaning of “target” as used in “target value” and “target state.” In particular, the ’680 patent explains that “[i]n some embodiments, the process 104 includes receiving, via a network interface, from a remote user device, (e.g., via a command-center server) a command to change a state of a fluid-handling device to a target state.” Ex. 1001, 11:48–51. This portion reflects that the command is seeking to change a state of a fluid-handling device to a target state. In other words, the “target value” or “target state” is not generally “the particular operating condition that a device is in at a particular time”; rather, it is a value or state that the fluid-handling device is desired to be in, as Patent Owner and Dr. Durham explain. Additionally, just as claim 1 recites a directional component for the “target value” to be sent to the controller in a command, so too does the Specification describe a “target state” as being sent in a command from a remote user device. Thus, the Specification clearly supports the plain and ordinary meaning proposed by Patent Owner and Dr. Durham and not the plain and ordinary meaning proposed by Petitioner and Dr. Wooley. slip op. at 14

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “time-stamped process data, report exception therein to the remote host, and extract and transmit time-stamped process data to the remote host.” Ex. 1005, Abst. (emphases added). Almadi explains that its remote field systems must include a plurality of controller units “to issue commands to, and gather and process data from a plurality of field devices, including remote systems and instruments, . . . [and] a database server for the storage of process data retrieved from the remote subsystems and instruments.” Id. at 2:22–30 (emphases added). Based on these disclosures, we agree with Patent Owner that Petitioner has not established that Almadi discloses element [1.4]. Specifically, the teachings from Almadi identified by Petitioner refer to process data, which is data retrieved from the remote subsystems/field devices. Thus, we understand that Almadi’s teaching—of using an Ethernet switch to transmit “process data”—describes transmitting data from the remote subsystems/field devices. See Ex. 1005, 3:13–17, cited in Pet. 15. But claim 1 and particularly element [1.4], recites “sending, with the server, the target value to the network address [which identifies a controller of the fluid-handling device13] via the network,” which is different than sending process data from the field devices to the remote host or database server for storage.” slip op. at 19

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,175,680
  • Tanklogix, LLC v. SiteproInstitution denied
    PTAB · Oct 10, 2025 · IPR2025-00650 · APJ Sheila F Mcshane · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 18–32 and 34 were unpatentable over Kahn or Kahn and Gutierrez.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). Upon consideration of the Petition, the Preliminary Response, and the evidence of record, we determine that Petitioner has not established a reasonable likelihood of prevailing with respect to the unpatentability of at least one claim of the ’871 patent. Accordingly, for the reasons that follow, we decline to institute an inter partes review of claims 18–32 and 34 of the ’871 patent.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The respective proposed levels of qualifications for a person of ordinary skill in the art are similar, with Patent Owner proposing two years of experience compared to Petitioner proposing significant experience with remotely controlling fluid-handling devices, like SCADA systems. Patent Owner also proposes more extensive experience in lieu of educational experience. While we find Petitioner’s proposed qualifications to be acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of skill necessary to understand and implement the teachings of the ’871 patent and the asserted prior art. Our analysis and findings herein, however, do not turn on any differences in the qualifications adopted.” slip op. at 8

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “We determine that we need not expressly construe any claim terms to resolve the parties’ disputes on the current record. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 10

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “actuators and the remote control of fluid handling devices, including the receipt with the user-interface module of “a user command to actuate an actuator via a presented control interface” (limitation [18.7]) and “account authorized to send commands to remotely control fluid handling devices” (limitation [18.11]). We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses or teaches these limitations because the evidence does not provide support that there is remote control of fluid handling devices or the use of a user command on a control interface to send a command to a fluid handling device, for instance. Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but we do not discern that it teaches or discloses the capability to remotely control fluid handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, the Kahn disclosures that Petitioner repeatedly relies upon for allegedly teaching this control are deficient. See Ex. 1005, 10:62–67, 14:35– 15:2, 15:62–16:32; see also Pet. 12–14, 16–18. Kahn discloses that “the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance.” Ex. 1005, 10:62–67. Communication unit 112B is part of the local “sensor unit,” wherein the detection conditions determined by the sensor are communicated to remote devices by communication unit 112B. See id. at 3:31–33, 5:62–6:2, 6:27–35, 7:33–37, 13:7–12, Figs. 1A–1C. Kahn discloses that the sensor units, which include communication units 112B, can be located near shut-off valves and can communicate with distant locations. See id. at 11:1–13. There are no disclosures, however, in the above passages that there is remote control of fluid handling devices, that there is a user command on a control interface that actuates an actuator, or that there is a command sent to the facility actuators via a network connection, as required in limitations [18.5]–[18.7] and [18.9]–[18.12], respectively. Rather, the disclosure indicates that the communication unit 112B includes on-site alerts and that the local (non-remote) communication unit 112B can be interfaced with the control valve.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 10,488,871
  • PTAB · Sep 29, 2025 · IPR2021-00580 · APJ Monica S Ullagaddi · IPR · Remand

    On remand, the Board held claims 1–10 not shown unpatentable under the Sachs anticipation and obviousness grounds because Sachs did not disclose the required timer stopping, and the new theories were not considered.

    RulingsRemand decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Whether Mr. Bates is a Person of Ordinary Skill in the Art In the Final Written Decision, we adopted Petitioner’s definition because “there does not appear to be a dispute that needs to be resolved.” FWD 8. Here, where Mr. Bates’ qualifications are challenged, we have reviewed the complete record including the parties’ arguments on remand and we find that Mr. Bates does not meet the requirements for a person of ordinary skill in the art according to Petitioner’s definition for level of ordinary skill in the art, which we adopted (see FWD 8). Notably, the panel adopted Petitioner’s definition of the level of ordinary skill in the Institution Decision (Paper 16, 8), and neither party challenged that determination during the trial, although Patent Owner did offer its own definition (PO Resp. 9). Mr. Bates has one degree: “a bachelor’s degree in Business Management.” Ex. 2001 ¶ 7. A degree in Business Management is not “a degree in electrical engineering or a similar discipline.” Pet. 35 (emphasis added). Accordingly, we disregard the testimony of Mr. Bates in rendering our findings and conclusions in this Decision. We note that, even if we did consider Mr. Bates’s testimony, the findings and conclusions rendered in this Decision would not change.” slip op. at 12

    • Expert testimonyPatent owner expert discountedDecided for petitioner

      “cover for his lack of education.” Pet. Remand Br. 4. Patent Owner disagrees and argues, inter alia, that “Mr. Bates was a pioneer in the cellular telecommunications field with more than five decades of practical and teaching experience.” PO Remand Resp. 5 (citing Ex. 2001 ¶¶ 8–23) (emphasis omitted); see id. at 3–4, 6. Whether Mr. Bates is a Person of Ordinary Skill in the Art In the Final Written Decision, we adopted Petitioner’s definition because “there does not appear to be a dispute that needs to be resolved.” FWD 8. Here, where Mr. Bates’ qualifications are challenged, we have reviewed the complete record including the parties’ arguments on remand and we find that Mr. Bates does not meet the requirements for a person of ordinary skill in the art according to Petitioner’s definition for level of ordinary skill in the art, which we adopted (see FWD 8). Notably, the panel adopted Petitioner’s definition of the level of ordinary skill in the Institution Decision (Paper 16, 8), and neither party challenged that determination during the trial, although Patent Owner did offer its own definition (PO Resp. 9). Mr. Bates has one degree: “a bachelor’s degree in Business Management.” Ex. 2001 ¶ 7. A degree in Business Management is not “a degree in electrical engineering or a similar discipline.” Pet. 35 (emphasis added). Accordingly, we disregard the testimony of Mr. Bates in rendering our findings and conclusions in this Decision. We note that, even if we did consider Mr. Bates’s testimony, the findings and conclusions rendered in this Decision would not change.” slip op. at 12

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITAPlain and ordinary meaningDecided for patent owner

      “C. Claim Construction The Federal Circuit determined that “the plain and unambiguous language of claim 1 requires that a method, to come within the claim, must perform both limitations 1[c] and 1[d] where their preconditions apply.” Sierra Wireless, 130 F.4th at 1022. We interpret the claims and analyze Petitioner’s unpatentability arguments under the Federal Circuit’s determination.” slip op. at 13

    • Strike new argumentNew argument disregardedDecided for patent owner

      “Petitioner was on notice, when Patent Owner’s Response was filed at the latest, that claim 1 could be construed as unconditionally requiring both limitations 1[c] and 1[d]. Indeed, Petitioner contended that it had shown both limitations “in single references.” Pet. Reply 5. Petitioner now seeks to shift its unpatentability contentions for limitation 1[c] from Figure 5 of Sachs to Figures 6 and 7. Petitioner’s new reliance on Figures 6 and 7 of Sachs is “a meaningfully distinct contention” from its position in both the Petition and the Reply. See Ariosa Diagnostics v. Verinata Health, Inc., 805 F.3d 1359, 1367 (Fed. Cir. 2015). We therefore find that Petitioner impermissibly presents new theories of unpatentability on remand. 3. Independent Claim 1 We decline to address Petitioner’s new theories of unpatentability proposed on remand concerning Sachs’s Figure 7. See Pet. Remand Br. 15– 20. Although Petitioner cites pages 59–61 of the Petition as discussing Figure 7 of Sachs (see Pet. Remand Br. 15), the cited discussion concerns dependent claims 5 and 10, not independent claims 1 and 8.” slip op. at 17

    Patent outcomesUS 7,869,396 not shown unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites KSR · Graham
    Patents in suitUS 7,869,396
  • PTAB · Aug 26, 2025 · IPR2025-00437 · APJ Mitchell G Weatherly · IPR · Institution

    The Board instituted IPR of claims 1–19 on all grounds, finding a reasonable likelihood that Wang anticipates claim 1.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “Owner”) did not file a Preliminary Response on the merits of patentability. Institution of an inter partes review is authorized by statute when “the information presented in the petition filed under section 311 and any response filed under section 313 shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). Based on our review of the record,1 we conclude that Petitioner is reasonably likely to prevail with respect to at least one of the challenged claims.” slip op. at 2

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Instituted

      “A claim is anticipated only if each and every element as set forth in the claim is found, either expressly or inherently described, in a single prior art reference.” Verdegaal Bros., Inc. v. Union Oil Co. of Cal., 814 F.2d 628, 631 (Fed. Cir. 1987). slip op. at 5

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “35 U.S.C. § 282(b), including construing the claim in accordance with the ordinary and customary meaning of such claim as understood by one of ordinary skill in the art and the prosecution history pertaining to the patent.” 37 C.F.R. § 42.100(b). When applying that standard, we interpret the claim language as it would have been understood by one of ordinary skill in the art in light of the specification. Wasica Fin. GmbH v. Cont’l Auto. Sys., Inc., 853 F.3d 1272, 1279–80 (Fed. Cir. 2017). Thus, we give claim terms their ordinary and customary meaning as understood by an ordinarily skilled artisan. See Phillips v. AWH Corp., 415 F.3d 1303, 1312–13 (Fed. Cir. 2005) (en banc). Only terms that are in controversy need to be construed, and then only to the extent necessary to resolve the controversy. Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017). Petitioner contends that “no special constructions are required.” Pet. 10. We agree and do not expressly construe any claim term.” slip op. at 4

    Claim construction§ 102 anticipationcites Phillips
    Patents in suitUS 10,788,690
  • PTAB · Aug 26, 2025 · IPR2025-00436 · APJ Mitchell G Weatherly · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that Mizobuchi or Akashi anticipates any of claims 1–17.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “Institution of an inter partes review is authorized by statute when “the information presented in the petition filed under section 311 and any response filed under section 313 shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). Based on our review of the record, we conclude that Petitioner is reasonably likely to prevail with respect to at least one challenged claim.” slip op. at 2

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “All independent claims recite “a light engine driving circuit disposed on the substrate.” Ex. 1001, 9:59 (claim 1), 10:64 (claim 12), 12:7 (claim 15). Petitioner contends that “Mizobuchi discloses a light engine driving circuit disposed on the substrate that includes a clock data recovery (“CDR”) circuit and a power supply circuit.” See Pet. 19 (citing Ex. 1006, 3:57–4:18, 12:27–41, Figs. 2, 3A; Ex. 1003 ¶ 76 while addressing limitation 1d); see also id. at 26–28 (addressing claims 12 and 15 by cross-referencing showing for claim 1). Petitioner identifies the driving circuit on Mizobuchi’s “first circuit board” 2 in the annotated version of Mizobuchi’s Figure 2, reproduced below. See Pet. 19.” slip op. at 5

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Petitioner contends that the Board may find it necessary to interpret “feedthrough device,” “interconnect device,” and “opposing arrangement.” Pet. 8–11. Patent Owner responds to Petitioner’s proposed interpretations of these terms, but contends that the Board need not interpret them to determine whether to institute review. Prelim. Resp. 17–18. For reasons that become apparent below, we agree with Patent Owner and do not expressly construe these terms. B. Legal Standards” slip op. at 4

    Claim construction§ 102 anticipationcites Phillips
    Patents in suitUS 10,313,024
Page 1 of 10
← Previous12345…Next →

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.