- Apple Inc. v. Apex Beam Technologies LLCInstitutedPTAB · Nov 21, 2025 · IPR2025-00906 · APJ Justin T Arbes · IPR · Institution
The Board instituted IPR of claims 1–20 on all asserted grounds after finding a reasonable likelihood that claim 1 is unpatentable over 3GPP-38.213, 3GPP-38.213-CR, and 3GPP-38.212-CR.
RulingsInstitution decision- Skill levelSkill level petitioner adoptedOther
“2019),2 a person of ordinary skill in the art would have had “a bachelor’s degree in electrical engineering, computer engineering, computer science, or a similar field, along with two years of experience designing or developing wireless networks, including long-term evolution LTE/4G or 5G new radio (NR) cellular technology,” where “[a]dditional years of experience could substitute for an advanced-level degree (and vice versa).” Pet. 14 (citing Ex. 1003 ¶¶ 39–42). Patent Owner “utilizes Petitioner’s proposed level of skill in the art” for its Preliminary Response. Prelim. Resp. 7. Based on the record presented, including our review of the ’434 patent and the types of 2 Petitioner states that it “assumes for purposes of [its Petition] that the claims are entitled to the earliest claimed priority date—November 5, 2019.” Pet. 14; see Ex. 1001, code (60). problems and solutions described in the ’434 patent and cited prior art, we agree with Petitioner’s proposed definition of the level of ordinary skill in the art and apply it for purposes of this Decision.” slip op. at 10
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“C. Claim Interpretation We interpret each challenged claim using the same claim construction standard that would be used to construe the claim in a civil action under 35 U.S.C. 282(b), including construing the claim in accordance with the ordinary and customary meaning of such claim as understood by one of ordinary skill in the art and the prosecution history pertaining to the patent. 37 C.F.R. § 42.100(b). Petitioner argues that “no claim terms need be construed.” Pet. 10. Patent Owner does not propose interpretations of any claim terms in its Preliminary Response. We conclude that no express interpretation of any claim term is necessary to determine whether to institute an inter partes review in this proceeding, but encourage the parties to address various claim interpretation issues identified below during trial. See infra Section II.D.5; Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“Because we need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy,’ we need not construe [a particular claim limitation] where the construction is not ‘material to the . . . dispute.’” (emphasis added) (citation omitted)).” slip op. at 11
- Novelty / Anticipation (§102) › Prior-art status of a reference › Printed publication / public accessibilityPrinted publication establishedInstituted
“Assessing the evidence of record collectively, however, we are persuaded that Petitioner has shown a reasonable likelihood that 3GPP-38.213-CR was publicly accessible from the ETSI email archive before November 5, 2019. Given his many years of experience with ETSI, in particular his responsibilities pertaining to management of documents like change requests, and as the “list owner” “responsible for managing and administrating” several email exploder lists, Mr. Rodermund appears to be well-qualified to testify to the matters in his declaration. See Ex. 1008 ¶¶ 7, 10–15, 49. He explains in detail how, based on his experience, emails sent to a 3GPP email exploder were accessible on the email archive immediately after being sent. Id. ¶¶ 44–60, 72–80. That explanation is supported by screenshots from various websites and other corroborating evidence. See Ex. 1008 ¶¶ 44–60, 72–80. The November 3, 2019, email with 3GPP-38.213-CR as an attachment is currently available to the public via the email archive, with no login, password, or membership required to access it. Id. ¶¶ 44, 74; see Kyocera, 545 F.3d at 1351 (“[ETSI] specifications themselves were visible to any member of the interested public without requesting them from an ETSI member. Further, ETSI did not impose restrictions on ETSI members to prevent them from disseminating information about the standard to non-members.”). The metadata for the file indicates that it was created and last modified one day before the email was sent. Ex. 1008 ¶ 76. And Mr. Rodermund discusses one example where a listserv email was uploaded to the archive just minutes after being sent. Id. ¶¶ 50–51. Although that example is from 2025 rather than 2019, it provides some support for his opinion that the same “near contemporaneous” timing would have been the case in 2019 as well. See id. ¶ 52. Immediately making emails like the one with the 3GPP-38.213-CR change request available on the email archive is consistent with 3GPP’s overall purpose of making standards documents available “so that engineers and other individuals would have ready access to them when developing and implementing cellular networks and devices.” See id. ¶ 35; Kyocera, 545 F.3d at 1351 (finding that the “primary purpose of the [standard at issue] was to develop a system interoperable across national borders,” which “made it crucial to grant access to any interested parties”); Cradlepoint, Inc. v. Sisvel Int’l S.A., IPR2020-01103, Paper 46 at 13–14 (PTAB Jan. 18, 2022) (finding, based on the preponderance of the evidence, that “testimony concerning [a 3GPP] email exploder and listserv provide further support for a conclusion of public accessibility because it tends to show that 3GPP was known beyond its members, that the meetings were widely publicized, and that 3GPP documents were, in general, widely available”). Finally, Mr. Rodermund explains in detail how a person of ordinary skill in the art could have accessed the email with 3GPP-38.213-CR, using the indexing of the email archive. See Ex. 1008 ¶¶ 49, 53–60. We are persuaded that Mr. Rodermund’s testimony and supporting evidence are sufficient at this stage. Patent Owner will have the opportunity to cross-examine Mr. Rodermund and explore the bases for his statements. And our ultimate determination of the weight to be given to his testimony will be based on the complete record at the end of trial. Based on the totality of the evidence currently in the record, Petitioner has established a reasonable likelihood that 3GPP-38.213-CR is a prior art printed publication under 35 U.S.C. § 102(a)(1).” slip op. at 20
- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“is that Petitioner has not shown sufficiently that 3GPP-38.213-CR and 3GPP-38.212-CR are prior art printed publications. Prelim. Resp. 2–10. We disagree on this record for the reasons explained above. See supra Section II.D.4. Patent Owner does not dispute Petitioner’s arguments regarding the limitations of claim 1 or Petitioner’s asserted motivation to combine the references. See Prelim. Resp. 2–10. Petitioner’s contentions are supported by the testimony of Dr. Mandayam and are persuasive based on the current record. See Pet. 14–48; Ex. 1003 ¶¶ 52–67, 81–113. Petitioner has shown a reasonable likelihood of prevailing on its assertion that claim 1 is unpatentable over 3GPP-38.213, 3GPP-38.213-CR, and 3GPP-38.212-CR. Accordingly, we institute review “on all of the challenged claims and on all grounds of unpatentability asserted for each claim.” See 37 C.F.R. § 42.108(a).” slip op. at 28
Claim construction§ 102 anticipationcites KSR · GrahamPatents in suitUS 10,965,434 - PTAB · Oct 16, 2025 · IPR2025-00712 · APJ James A Tartal · IPR · Institution
The Board instituted inter partes review of claims 1, 3–9, 13, 17, 18, 23, 25, 26, 28, and 29 on all asserted grounds, finding a reasonable likelihood of prevailing on claim 1 over Walker.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“review. 35 U.S.C. § 314(b) (2018); 37 C.F.R. § 42.4(a) (2025). An inter partes review may not be instituted “unless . . . the information presented in the petition . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). Upon institution of inter partes review, the review proceeds “on all of the challenged claims and on all grounds of unpatentability asserted for each claim.” 37 C.F.R. § 42.108(a). Based on our consideration of the Petition, the Preliminary Response, and the evidence of record, we conclude that the information demonstrates a reasonable likelihood that Petitioner would prevail in showing the unpatentability of at least one of the Challenged Claims. Accordingly, we institute an inter partes review as to the Challenged Claims of the ’279 patent on all grounds asserted in the Petition.” slip op. at 2
- Novelty / Anticipation (§102) › Priority / effective filing date / continuation supportPriority date awardedOther
“application filed November 12, 2021, that asserts the benefit of a series of applications, the earliest of which was filed September 2, 2003. Ex. 1001, codes (22), (45), (60). Petitioner asserts that the Challenged Claims of the ’279 patent “are entitled to an effective filing date of no earlier than September 2, 2003,” consistent with the date of the earliest application identified by the ’279 patent.9 See Pet. 6. For purposes of our analysis on the current record, in this Decision we apply September 2, 2003, as the priority date of the Challenged Claims.” slip op. at 18
- Obviousness (§103) › Motivation to combine / reasonable expectation of successInstituted
“independent claim 1. Pet. 32–63. Petitioner relies on the testimony of Mr. Crevelt in support of its contentions with respect to claim 1. Ex. 1003 ¶¶ 234–286. Further, according to Petitioner, “[n]o findings regarding motivation to combine or reasonable expectation of success are necessary with a single reference ground,” but Walker “teaches that the features of the embodiments are options that can be combined.” Pet. 42 n.6 (citing Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1372–73 (Fed. Cir. 2019). At this stage, Patent Owner does not contest Petitioner’s proffered assertions about the” slip op. at 20
§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 11,393,279 - PTAB · Oct 16, 2025 · IPR2025-00708 · APJ James A Tartal · IPR · Institution
The Board instituted IPR on all challenged claims and grounds, finding a reasonable likelihood that claims 1, 3–5, 12, 13, 18–20, 22, 24–26, 29, 42, 44–47, and 50 are unpatentable over Walker and Schneier.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“We have authority to determine whether to institute an inter partes review. 35 U.S.C. § 314(b) (2018); 37 C.F.R. § 42.4(a) (2025). An inter partes review may not be instituted “unless . . . the information presented in the petition . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). Upon institution of inter partes review, the review proceeds “on all of the challenged claims and on all grounds of unpatentability asserted for each claim.” 37 C.F.R. § 42.108(a). Based on our consideration of the Petition, the Preliminary Response, and the evidence of record, we conclude that the information demonstrates a reasonable likelihood that Petitioner would prevail in showing the unpatentability of at least one of the Challenged Claims. Accordingly, we institute an inter partes review as to the Challenged Claims of the ’336 patent on all grounds asserted in the Petition.” slip op. at 2
- Skill levelSkill level board ownOther
“B. Level of Ordinary Skill in the Art At this stage of the proceeding, there is no evidentiary dispute about the level of ordinary skill in the art.8 Based on the testimony of Mr. Crevelt, we determine that a person of ordinary skill in the art would have had at least a bachelor’s degree in computer science or computer engineering, with at least three years of experience in game development. Pet. 14 (citing Ex. 1003 ¶¶ 62–65). Additional experience could substitute for less education, and additional education could likewise substitute for less experience. Id. We determine that the level of ordinary skill in the art 7 Petitioner states that it is not aware of secondary considerations that affect the obviousness arguments it presents. Pet. 66. Patent Owner has not offered objective evidence of nonobviousness at this stage of the proceeding. 8 Patent Owner “disagrees with the proposed level of skill” but asserts that “under any level of skill a [person of ordinary skill in the art] would not understand the asserted Grounds to raise any unpatentability issues.” Prelim. Resp. 8. Thus, Patent Owner does not present evidence or arguments in its Preliminary Response related to the level of ordinary skill in the art. competence reflected in the ’336 patent Specification and the asserted prior art references, based on our review of the limited record.” slip op. at 11
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“standard as would be used by a district court to construe a claim in a civil action involving the validity or infringement of a patent. 37 C.F.R. § 42.100(b). Under that standard, claim terms are given their ordinary and customary meaning, as would have been understood by a person of ordinary skill in the art at the time of the invention, in light of the language of the claims, the specification, and the prosecution history of record. Id.; see also Phillips v. AWH Corp., 415 F.3d 1303, 1312–19 (Fed. Cir. 2005) (en banc); Thorner v. Sony Comput. Entm’t Am. LLC, 669 F.3d 1362, 1365–66 (Fed. Cir. 2012). “The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’” Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (alteration in original) (quoting Vivid Techs., Inc. v. Am. Sci. Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). Petitioner argues that it is not necessary for us to provide an express construction for any claim term because the Petition “establishes the prior art meets each claim limitation under any reasonable construction.” Pet. 14–15. Patent Owner similarly submits that we “need not construe any terms at this stage, because under any reasonable construction of the claim terms, the prior art fails to disclose or suggest the claimed features.” Prelim. Resp. 8. At this stage of the proceeding, we do not need to expressly construe any claim terms to determine whether Petitioner showed a reasonable likelihood of prevailing as to its challenge of at least one challenged claim.” slip op. at 12
- Novelty / Anticipation (§102) › Priority / effective filing date / continuation supportPriority date awardedOther
“an application filed September 20, 2010, that asserts the benefit of an application filed September 2, 2003. Ex. 1001, codes (22), (45), (54), (62). Petitioner asserts that the Challenged Claims of the ’336 patent “are entitled to an effective filing date of no earlier than September 2, 2003,” consistent with the date of the earliest application identified by the ’336 patent.9 See Pet. 7. For purposes of our analysis on the current record, in this Decision we apply September 2, 2003, as the priority date of the Challenged Claims. Walker was filed on May 1, 2003, and refers back to a provisional application filed on May 6, 2002, but Walker was not published until January 1, 2004. Ex. 1006, codes (22), (43), (60). Thus, Petitioner fails to show on the current record how, under pre–AIA 35 U.S.C. § 102(a), Walker discloses an invention that was described in a printed publication in this country before the invention thereof by the Patent Owner, because Walker was published after the applied priority date of the Challenged Claims of the’336 patent.” slip op. at 17
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 8,529,336 - Tanklogix, LLC v. Sitepro, Inc.Institution deniedPTAB · Oct 10, 2025 · IPR2025-00653 · APJ Bart A Gerstenblith · IPR · Institution
The Board denied institution on all claims because the Petition did not show a reasonable likelihood that any challenged claim was unpatentable over the asserted grounds.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“An inter partes review may be instituted only if “the information presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2
- Skill levelSkill level patent owner adoptedDecided for patent owner
“The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’504 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“Additionally, only terms that are in controversy need to be construed, and these need be construed only to the extent necessary to resolve the controversy. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 9; Prelim. Resp. 4 (citing Ex. 2009 ¶ 72); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13
- Expert testimonyPetitioner expert discountedDecided for patent owner
“Ex. 1002 ¶ 47. As reflected above, Dr. Wooley’s testimony as to element [1.2] does not even assert that Cardamone discloses a tank, let alone one or more sensors disposed at a tank as recited in element [1.2]. Thus, Dr. Wooley’s testimony does not support Petitioner’s argument on this issue.” slip op. at 18
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 11,726,504 - Tanklogix, LLC v. Sitepro, Inc.Institution deniedPTAB · Oct 10, 2025 · IPR2025-00652 · APJ Bart A Gerstenblith · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–23 and 25–30 were unpatentable over the asserted grounds.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied
“presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2
- Skill levelSkill level patent owner adoptedDecided for patent owner
“The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’403 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 10; Prelim. Resp. 4 (citing Ex. 2009 ¶ 73); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable
“We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses element [1.2] because the evidence cited does not disclose a “first computer system being configured to provide remote control of the first pump or first valve” (i.e., a fluid-handling device). Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but Petitioner has not identified any disclosure of the capability to remotely control fluid-handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, Kahn’s disclosures that Petitioner relies on for allegedly teaching remote control are deficient. We discuss each. First, Petitioner points to the following, “[f]or instance, as illustrated in FIG. 1C, a fluid control device such as a valve 15A is located on the input side of a sen[s]or unit 110.” Ex. 1005, 8:19–21, cited in Pet. 13. This portion of Kahn, however, does not disclose remote control. Second, Petitioner cites to the following: Finally, or in addition to, the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance. Pet. 13 (citing Ex. 1005, 10:62–67). We agree with Patent Owner that this portion of Kahn teaches on-site alerts and local control of the fluid-handling device. See Prelim. Resp. 7. This portion of Kahn does not disclose remote control.” slip op. at 18
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 11,294,403 - Tanklogix, LLC v. SiteproInstitution deniedPTAB · Oct 10, 2025 · IPR2025-00650 · APJ Sheila F Mcshane · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood that claims 18–32 and 34 were unpatentable over Kahn or Kahn and Gutierrez.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). Upon consideration of the Petition, the Preliminary Response, and the evidence of record, we determine that Petitioner has not established a reasonable likelihood of prevailing with respect to the unpatentability of at least one claim of the ’871 patent. Accordingly, for the reasons that follow, we decline to institute an inter partes review of claims 18–32 and 34 of the ’871 patent.” slip op. at 2
- Skill levelSkill level patent owner adoptedDecided for patent owner
“The respective proposed levels of qualifications for a person of ordinary skill in the art are similar, with Patent Owner proposing two years of experience compared to Petitioner proposing significant experience with remotely controlling fluid-handling devices, like SCADA systems. Patent Owner also proposes more extensive experience in lieu of educational experience. While we find Petitioner’s proposed qualifications to be acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of skill necessary to understand and implement the teachings of the ’871 patent and the asserted prior art. Our analysis and findings herein, however, do not turn on any differences in the qualifications adopted.” slip op. at 8
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“We determine that we need not expressly construe any claim terms to resolve the parties’ disputes on the current record. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 10
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable
“actuators and the remote control of fluid handling devices, including the receipt with the user-interface module of “a user command to actuate an actuator via a presented control interface” (limitation [18.7]) and “account authorized to send commands to remotely control fluid handling devices” (limitation [18.11]). We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses or teaches these limitations because the evidence does not provide support that there is remote control of fluid handling devices or the use of a user command on a control interface to send a command to a fluid handling device, for instance. Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but we do not discern that it teaches or discloses the capability to remotely control fluid handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, the Kahn disclosures that Petitioner repeatedly relies upon for allegedly teaching this control are deficient. See Ex. 1005, 10:62–67, 14:35– 15:2, 15:62–16:32; see also Pet. 12–14, 16–18. Kahn discloses that “the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance.” Ex. 1005, 10:62–67. Communication unit 112B is part of the local “sensor unit,” wherein the detection conditions determined by the sensor are communicated to remote devices by communication unit 112B. See id. at 3:31–33, 5:62–6:2, 6:27–35, 7:33–37, 13:7–12, Figs. 1A–1C. Kahn discloses that the sensor units, which include communication units 112B, can be located near shut-off valves and can communicate with distant locations. See id. at 11:1–13. There are no disclosures, however, in the above passages that there is remote control of fluid handling devices, that there is a user command on a control interface that actuates an actuator, or that there is a command sent to the facility actuators via a network connection, as required in limitations [18.5]–[18.7] and [18.9]–[18.12], respectively. Rather, the disclosure indicates that the communication unit 112B includes on-site alerts and that the local (non-remote) communication unit 112B can be interfaced with the control valve.” slip op. at 18
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 10,488,871 - Bowmar Archery LLC v. Matthew FuttereNo claims unpatentablePTAB · Jun 30, 2025 · IPR2024-00401 · APJ Sean P O’Hanlon · IPR · Final written decision
Claims 1–4, 7, 9, 11, 12, 15, and 17 were not shown unpatentable under any asserted anticipation or obviousness ground.
RulingsFinal written decision- Skill levelSkill level petitioner adoptedDecided for petitioner
“The parties do not identify, and we do not discern, any material difference between the parties’ proposed definitions. For purposes of this decision and based on the record before us, we adopt Petitioner’s proposed definition of the level of ordinary skill. Also, we note that we would reach the same conclusions under either proposed standard.” slip op. at 9
- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed petitioner constructionDecided for petitioner
“1. Ferrule Petitioner argues that the ’177 patent “defines ‘ferrule’ as a ‘generally cylindrical body,’” which interpretation Petitioner asserts “is consistent with the ordinary meaning to [an ordinarily skilled artisan].” Pet. 19 (citing Ex. 1001, 2:53–55; Ex. 1019 ¶ 61). Patent Owner does not address Petitioner’s proposed interpretation of this claim term. See generally PO Resp. We adopt Petitioner’s uncontested interpretation of “ferrule.” 2. Blade Member Patent Owner argues that an ordinarily skilled artisan “would” slip op. at 10
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable
“As discussed in section II.C.2 above, we interpret a “blade member” to have a cutting surface. Petitioner does not support adequately its assertion that Lint’s barbs 19 have a cutting surface. Petitioner acknowledges that Lint discloses “barb 19,” but Petitioner merely labels the barbs as blade members in annotated versions of Lint Figure 2. Pet. 21–22, 24. Petitioner’s witness, Dr. Kuhn, provides substantially identical testimony, also failing to explain how Lint’s barbs have a cutting surface or perform a cutting function. See Ex. 1019 ¶¶ 68, 70. Such conclusory assertions fail to satisfy Petitioner’s burden of persuasion. To the contrary of Petitioner’s assertions, Lint discloses that its barbs do not perform a cutting function. Lint discloses that its barbs retract to the closed position upon impact with an animal. Ex. 1002, 2:62–67. Only when the arrowhead has “completely penetrated the flesh of an animal” does the spring urge the barbs into the extended position “to retain the arrowhead within the animal.” Id. at 2:67–70.6 Lint discloses that its barbs provide 6 During the hearing, Petitioner’s counsel argued that Lint’s disclosure of its barbs deploying “[a]fter the arrowhead 10 has completely penetrated the flesh of an animal” means the spring urges the barbs forward after the resistance to the removal of the arrow from an animal (id. at 1:53–57, 2:67–70), but Lint does not disclose its barbs as performing any cutting function. Thus, Lint’s barbs are not blade members with a cutting surface as we have interpreted the term above. Petitioner has failed to explain adequately how Lint discloses first and second blade members as recited in independent claims 1 and 11.” slip op. at 21
- Obviousness (§103) › Graham factors (scope of art, differences, level of skill)Not shown unpatentableNot shown unpatentable
“A claimed modification to the prior art may be an obvious design choice if the claimed structure performs the same function as in the prior art and it presents no novel or unexpected result over the prior art. See In re Kuhle, 526 F.2d 553, 555 (CCPA 1975) (finding that the use of the claimed feature “would be an obvious matter of design choice” when it “solves no stated problem” and “presents no novel or unexpected result” over the disclosed alternatives); Ex parte Maeda, Appeal No. 2010-009814, at 6–7 (PTAB Oct. 23, 2012) (informative) (“‘design choice’ may be appropriate where the applicant fails to set forth any reasons why the differences between the claimed invention and the prior art would result in a different function or give unexpected results” (citing In re Chu, 66 F.3d 292, 298–99 (Fed. Cir. 1995)). The ’177 patent explains that the purpose of the recited blade members is to maximize the cutting surface of the arrowhead through an animal’s soft flesh to increase the likelihood of a successful kill and minimize undue suffering of the animal. Ex. 1001, 1:26–30, 4:8–10, 4:21–24. The purpose of Lint’s barbs, on the other hand, is to resist removal of the arrow from an animal. Ex. 1002, 2:67–70. Indeed, Lint discloses that only when the arrowhead has “completely penetrated the flesh of an animal” does the spring urge the barbs into the extended position. Id. Thus, contrary to the conclusory assertions of Petitioner and Petitioner’s witness, Dr. Kuhn (see Pet. 49–51; Ex. 1019 ¶ 119), the recited blade members and Lint’s barbs perform vastly different functions. Neither Petitioner nor Dr. Kuhn explains adequately how the proposed modification to Lint’s barbs would be a mere matter of design choice. For at least the foregoing reasons, Petitioner’s first alternative” slip op. at 28
Patent outcomesUS 8,043,177 not shown unpatentableClaim construction§ 102 anticipation§ 103 obviousnesscites KSR · GrahamPatents in suitUS 8,043,177 - Bowmar Archery LLC v. Matthew FuttereInstitutedPTAB · Jul 2, 2024 · IPR2024-00401 · APJ Carl M Defranco · IPR · Institution
The Board instituted inter partes review on all challenged claims based on a reasonable likelihood that claim 11 is anticipated by Vandewater.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“first and second blade members towards the extended positions.” Ex. 1001, 6:40–41. For this claim limitation, Bowmar relies on Vandewater’s disclosure of “a retaining mechanism . . . such as a biasing element with a ball bearing or a spring wheel” that is used to “retain the blades in a centered position when in their deployed position.” Pet. 45 (citing Ex. 1003, 7:55–8:2). Bowmar also provides supporting testimony from its expert to show how one of ordinary skill in the art would have understood Vandewater’s teaching of the biasing element in conjunction with the blade members depicted in Figure 16. See id. at 46. Futtere responds by acknowledging Bowmar’s reference to “a generic paragraph in Vandewater in which a biasing member is discussed to deploy the blade members.” Prelim. Resp. 19 (emphasis added). Nonetheless, Futtere disputes Vandewater’s so-called “generic” disclosure because “Vandewater fails to provide any enablement of such an idea as the text fails to clarify and the figures . . . fail to disclose such an embodiment.” Id. We reject Futtere’s reasoning, as it amounts to conclusory attorney argument lacking in meaningful evidentiary support. On the other hand, Bowmar provides unrebutted expert testimony to support finding that Vandewater’s biasing member is part of the embodiments of Figures 7–10 and Figures 15–20 relied upon by Bowmar and that such biasing member is used “to deploy the blade members,” as admitted by Futtere. Thus, in the absence of rebuttal evidence from Futtere, we find that Bowmar adequately explains how Vandewater’s biasing element biases the blade members to a deployed, i.e., extended, position, thereby satisfying the “biasing” limitation of claim 11. c. Conclusion For at least the foregoing reasons, Bowmar demonstrates a reasonable likelihood of prevailing in showing that at least independent claim 11 is anticipated by Vandewater.” slip op. at 13
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“Bowmar does appear to dispute Futtere’s proposed construction of “blade member,” asserting that the plain and ordinary meaning of the term does not require that it have a sharp edge, as proposed by Futtere. See Pet. 49. As discussed below, the challenge on which we institute indisputably includes a “blade member” under Futtere’s proposed construction. Thus, we do not need to provide an express construction of “blade member” at this stage. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (alteration in original) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”)). The parties are free to further explore the meaning of this term at trial.” slip op. at 6
- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed petitioner constructionDecided for petitioner
“Bowmar proposes that the claim term “ferrule” should be construed as a “generally cylindrical body.” Pet. 19. Futtere responds with proposed constructions for two other claims terms, namely, that “blade member” be construed as “hav[ing] a cutting edge or flat sharp part” and that “biasing member” be construed as “a structure that pushes against another structure.” Prelim. Resp. 11 (citing Ex. 1001, 1:9–10, 3:35–44, 4:5–6, 4:21–24, 4:58–62; Ex. 1003, 3:37–38, 3:63–66; Ex. 2006). At the outset, we note that Futtere does not dispute Bowmar’s proposed construction of “ferrule” and, in turn, Bowmar does not dispute Futtere’s proposed construction of “biasing member.” See Prelim. Resp. 11; Pet. 46. Thus, for purposes of institution, we adopt the parties’ proposed constructions of those claim terms.” slip op. at 6
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Instituted
“We disagree with Futtere’s assertions. At the outset, we note that the claims merely require that the pivotal connection be located at the “forward end” of the blade members, not their forwardmost end. Vandewater’s Figures 7 and 10 clearly depict pivot connection 216 at the forward end of blade members 212 and 213. Under no circumstances do we discern how one skilled in the art would view those figures as depicting the pivot connection at a midpoint of the blades, as Futtere contends. And, without question, Bowmar relies on the embodiment of arrowhead 210, as shown in Figures 7–11, by referencing Vandewater’s disclosure of “[t]he pivot connection between blades 212 and 213 and body 214.” Pet. 39 (citing Ex. 1003, 7:33–39, Figs. 7–11). Moreover, Bowmar notes Vandewater’s disclosure that similar components of arrowhead 210 (the embodiment in Figures 7–11) may be applied to arrowhead 310 (the embodiment in Figures 15–20). See id. at 40 (citing 8:49–52). With that in mind, we find that Vandewater clearly contemplates embodiments of the arrowhead wherein a pivotal connection is located at the forward end of the blade members. See Blue Calypso, LLC v. Groupon, Inc., 815 F.3d 1331, 1343–44 (Fed. Cir. 2016) (holding that, although the anticipating prior art reference did not describe a specific example of a computer program that used two differently described functions, i.e., tools, together, “[the reference] did contemplate combining the disclosed functionalities.”). Futtere’s failure to address Vandewater’s express teaching of locating the pivot connection at the forward end of the blade members is fatal to its argument.” slip op. at 9
Claim construction§ 102 anticipationPatents in suitUS 8,043,177 - PTAB · May 28, 2024 · IPR2024-00085 · APJ Michael L Woods · IPR · Institution
The Board instituted IPR on claims 1, 2, 4, 5, 7–11, 13, and 15 on all asserted grounds, finding a reasonable likelihood that at least one challenged claim is unpatentable.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“Under 35 U.S.C. § 314 and 37 C.F.R. § 42.4(a), we have authority to institute an inter partes review if “the information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). After considering the Petition, the Preliminary Response, the Preliminary Reply, the Preliminary Sur-reply, and the evidence of record, we determine the information presented shows a reasonable likelihood that Petitioner would prevail in establishing the unpatentability of at least one of the Challenged Claims of the ’659 patent. Accordingly, we institute an inter partes review of the Challenged Claims on the grounds asserted in the Petition.” slip op. at 2
- PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Denied
“We disagree with Patent Owner. Our analysis under Fintiv is guided by the USPTO Director’s Memorandum issued on June 21, 2022, titled “Interim Procedure for Discretionary Denials in AIA Post Grant Proceedings with Parallel District Court Litigation.”8 The Director’s Memorandum explains that, when a petitioner makes a Sotera-type stipulation, “it mitigates concerns of potentially conflicting decisions and duplicative efforts between the district court and the PTAB” and “[w]ith such a stipulation, if an IPR or PGR is instituted, the grounds the PTAB resolves will differ from those present in 8 https://www.uspto.gov/sites/default/files/documents/interim_proc_discretio nary_denials_aia_parallel_district_court_litigation_memo_20220621_.pdf (“Director’s Memorandum”). the parallel district court litigation.” Director’s Memorandum 7 (citing Sotera, IPR2020-01019, Paper 12 at 18–19). Pursuant to the Director’s Memorandum, we “will not discretionarily deny institution of an IPR or PGR in view of parallel district court litigation where a petitioner stipulates not to pursue in a parallel district court proceeding the same grounds as in the petition or any grounds that could have reasonably been raised in the petition.” Id. Because Petitioner provides a Sotera-type stipulation, we do not exercise our discretion to deny institution under Fintiv.” slip op. at 8
- Skill levelSkill level patent owner adoptedDecided for patent owner
“Upon review of the prior art of record and the parties’ arguments, we adopt Patent Owner’s definition of the person of ordinary skill in the art for purposes of this Decision as it appears consistent with the prior art of record. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (holding that the prior art itself can reflect the appropriate level of ordinary skill in the art). Petitioner’s proposed definition appears overly restrictive, as it requires a graduate degree in a narrow field of engineering or equivalent experience. We find that a bachelor’s degree with the accompanying experience proposed by Patent Owner more closely aligns with the prior art of record and the ’659 patent. We note, however, there is some overlap in the proposed levels of ordinary skill in the art because Patent Owner’s proposal includes “at least” a bachelor’s degree, which would encompass Petitioner’s master’s degree as well. Prelim. Resp. 19. Nonetheless, our determination herein would be the same under either party’s definition.” slip op. at 9
- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed petitioner constructionDecided for petitioner
“We disagree with Patent Owner’s claim construction. By using the word “or,” the plain and ordinary meaning of “prone, kneeling, or standing” is that only one must be satisfied to meet the claim. See, e.g., SkinMedica, Inc. v. Histogen Inc., 727 F.3d 1187, 1199 (Fed. Cir. 2013) (“The disjunctive ‘or’ plainly designates that a series describes alternatives.”). Furthermore, and although claims are read in light of the specification, limitations in a specification are not read into a claim. In re van Geuns, 988 F.2d 1181, 1184 (Fed. Cir. 1993). Even if the Specification describes embodiments in which the user can begin in a prone position and then transition to a kneeling or standing position, as Patent Owner points out (see Prelim. Resp. 20), the claim does not recite the term “transitioning,” and we do not read the terms “each of” or “substantially flat surface” into this claim limitation. For example, the claim does not recite a “substantially flat” top surface and Patent Owner’s attempt to infer this structure into the claim is not supported under the law. See id. at 29–30. For purposes of this Decision, we agree with Petitioner and construe “prone, kneeling, or standing” in accordance with its plain and ordinary meaning as alternatives, and the prior art need only show one to satisfy this aspect of the claim.” slip op. at 12
Claim construction§ 102 anticipation§ 103 obviousnessDiscretionary denialcites Phillips · KSRPatents in suitUS 9,586,659 - PTAB · Apr 10, 2024 · PGR2024-00003 · APJ Scott A Daniels · PGR · Institution
Instituted PGR on claims 1–28 and all petition grounds; the Board found a reasonable likelihood that claims 1, 13, 15, 20, 22, and 24–25 are obvious over Emma, Butt, and Smith.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“review. 35 U.S.C. § 324(c) (2018); 37 C.F.R. § 42.4(a) (2023). A post-grant review may be instituted only if “the information presented in the petition . . . demonstrate[s] that it is more likely than not that at least 1 of the claims challenged in the petition is unpatentable.” 35 U.S.C. § 324(a) (2018). Having considered the arguments and evidence presented by Petitioner and Patent Owner, we determine, for the reasons set forth below, that Petitioner has demonstrated that it is more likely than not that at least one of the challenged claims is unpatentable based on the grounds presented. Therefore, we institute a post-grant review of the challenged claims.” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“would have had at least a bachelor’s degree in electrical engineering or computer engineering . . . [a]lternatively, a POSITA could have had a bachelor’s degree in mechanical engineering, industrial engineering, physics, or a related engineering or discipline, plus at least two years of experience working with control circuits, sensors, kitchen appliances, or similar fields. Pet. 14 (citing Ex. 1002 ¶ 50; Ex. 1023 ¶ 6). Patent Owner provides a similar level of ordinary skill in the art and states that “[t]he differences do not matter for purposes of this Petition.” Prelim. Resp. 4. On this record, Petitioner’s proposed level of ordinary skill in the art is consistent with our review and understanding of the technology and descriptions in the ’745 patent and the asserted prior art references. Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001). For purposes of this Decision, we rely on Petitioner’s proposed level of ordinary skill in the art.” slip op. at 10
- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITAPlain and ordinary meaningOther
“level of smoke” Neither Patent Owner nor Petitioner indicate that any claim terms require express construction. See Petition 13–14; Prelim. Resp 5. However, Petitioner contends that for the phrases “level of smoke” and “amount of smoke,” recited in claims 1, 15, and 24, it has “applie[d] what it understands Patent Owner contends is the meaning of this term in this Petition[,] and shows below the claims are invalid under Patent Owner’s construction.” Pet. 13–14 (citing Ex. 1009, 6). Patent Owner argues that it has “does not offer a special definition” and “asked the [district] court to give these terms their plain and ordinary meaning.” Prelim. Resp. 5, n 2. Patent Owner explains that a person of ordinary skill in the art “would similarly understand ‘level of smoke’ when read in the full context of the intrinsic record.” Id. For purposes of this Decision, reading the plain language of the claims in light of the specification, we understand “level of smoke,” or amount of smoke, in the claims generally as a predetermined level of smoke “indicative of a dangerous condition” as the specification of the ’745 patent explains. Ex. 1001, 15:48–49, see also id. at 16:1–2 (The ’745 patent describing “[t]he determination of a level of smoke corresponding to a dangerous condition.”). To the extent the parties disagree, they may expressly address this issue more directly in subsequent briefing. slip op. at 11
- Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundDecided for petitioner
“from Butt and Smith to Emma’s microwave oven. Pet. 24. Obviousness is not determined from the perspective of the inventors or authors of a single prior art reference. Rather, obviousness is determined from the perspective of a hypothetical person having ordinary skill in the art. It is only that hypothetical person who is presumed to be aware of all pertinent prior art. Standard Oil Co. v. American Cyanamid Co., 774 F.2d 448, 454 (Fed. Cir. 1985). Petitioner argues, for instance, that Butt teaches the fire safety aspects of “a controller for interrupting a supply of electricity to an appliance upon detection of a trigger, such as [s]moke.” Pet. 24 (quoting Ex. 1015,1:16– 18). Dr. Horenstein testifies that from a safety perspective, a person of ordinary skill in the art would have “combine[d] the additional kitchen-safety appliance features of Butt with the Emma microwave/refrigerator so as to enable the Emma microwave to shut down upon the detection of smoke, and to reenable the Emma microwave for a further cooking session when the smoke had cleared.” Ex. 1023 ¶ 124. Where Butt arguably discloses a smoke detector external to an appliance, Dr. Horenstein testifies that a person of ordinary skill in the art would have looked to “Smith to include the smoke sensor in operative connection with the microwave oven with the reset functionality disclosed by Butt for the added benefit of reusing the microwave oven.” Id. ¶ 127 (emphasis added).” slip op. at 38
Claim construction§ 102 anticipation§ 103 obviousness§ 112 disclosurecites PhillipsPatents in suitUS 11,674,745
Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.