  • PTAB · Oct 10, 2025 · IPR2025-00652 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–23 and 25–30 were unpatentable over the asserted grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’403 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 10; Prelim. Resp. 4 (citing Ex. 2009 ¶ 73); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses element [1.2] because the evidence cited does not disclose a “first computer system being configured to provide remote control of the first pump or first valve” (i.e., a fluid-handling device). Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but Petitioner has not identified any disclosure of the capability to remotely control fluid-handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, Kahn’s disclosures that Petitioner relies on for allegedly teaching remote control are deficient. We discuss each. First, Petitioner points to the following, “[f]or instance, as illustrated in FIG. 1C, a fluid control device such as a valve 15A is located on the input side of a sen[s]or unit 110.” Ex. 1005, 8:19–21, cited in Pet. 13. This portion of Kahn, however, does not disclose remote control. Second, Petitioner cites to the following: Finally, or in addition to, the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance. Pet. 13 (citing Ex. 1005, 10:62–67). We agree with Patent Owner that this portion of Kahn teaches on-site alerts and local control of the fluid-handling device. See Prelim. Resp. 7. This portion of Kahn does not disclose remote control.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,294,403
  • PTAB · Oct 10, 2025 · IPR2025-00651 · APJ Bart A Gerstenblith · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–3, 6, 7, and 9–20 were unpatentable over any asserted ground.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’680 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 11

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner

      “target value” is part of a command that is sent from a computing device to a server and then to a controller. The controller then receives a measurement of the fluid by a sensor and determines whether the measurement satisfies the “target value.” If the measurement does not satisfy the “target value,” further operations are undertaken. The recited operation sequence makes clear that the plain and ordinary meaning of “target value” is not as Dr. Wooley opines because the particular operating condition that a device is in at a particular time is represented by the measurement taken by the sensor, 11 Some claim language less relevant to construing “target value” was omitted for ease of reference. which the controller then uses to determine whether the measurement satisfies the “target value.” Additionally, claim 1 recites that the “target value” is sent as part of a command to the controller. The “target value” is not sent to the controller from the sensor, as might be expected if the plain and ordinary meaning of “target value” were as Dr. Wooley opines. Petitioner and Dr. Wooley’s construction would also result in “target value” meaning effectively the same thing as the measurement of the fluid by the sensor, a concept that is separately recited in claim 1 and to which the “target value” is compared. The Specification of the ’680 patent does not support Petitioner’s understanding of the plain and ordinary meaning of “target value.” Although the Specification does not recite “target value,” it recites “target state,” and describes “target state” sufficiently to understand the plain and ordinary meaning of “target” as used in “target value” and “target state.” In particular, the ’680 patent explains that “[i]n some embodiments, the process 104 includes receiving, via a network interface, from a remote user device, (e.g., via a command-center server) a command to change a state of a fluid-handling device to a target state.” Ex. 1001, 11:48–51. This portion reflects that the command is seeking to change a state of a fluid-handling device to a target state. In other words, the “target value” or “target state” is not generally “the particular operating condition that a device is in at a particular time”; rather, it is a value or state that the fluid-handling device is desired to be in, as Patent Owner and Dr. Durham explain. Additionally, just as claim 1 recites a directional component for the “target value” to be sent to the controller in a command, so too does the Specification describe a “target state” as being sent in a command from a remote user device. Thus, the Specification clearly supports the plain and ordinary meaning proposed by Patent Owner and Dr. Durham and not the plain and ordinary meaning proposed by Petitioner and Dr. Wooley. slip op. at 14

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “time-stamped process data, report exception therein to the remote host, and extract and transmit time-stamped process data to the remote host.” Ex. 1005, Abst. (emphases added). Almadi explains that its remote field systems must include a plurality of controller units “to issue commands to, and gather and process data from a plurality of field devices, including remote systems and instruments, . . . [and] a database server for the storage of process data retrieved from the remote subsystems and instruments.” Id. at 2:22–30 (emphases added). Based on these disclosures, we agree with Patent Owner that Petitioner has not established that Almadi discloses element [1.4]. Specifically, the teachings from Almadi identified by Petitioner refer to process data, which is data retrieved from the remote subsystems/field devices. Thus, we understand that Almadi’s teaching—of using an Ethernet switch to transmit “process data”—describes transmitting data from the remote subsystems/field devices. See Ex. 1005, 3:13–17, cited in Pet. 15. But claim 1 and particularly element [1.4], recites “sending, with the server, the target value to the network address [which identifies a controller of the fluid-handling device13] via the network,” which is different than sending process data from the field devices to the remote host or database server for storage.” slip op. at 19

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 11,175,680
  • Tanklogix, LLC v. SiteproInstitution denied
    PTAB · Oct 10, 2025 · IPR2025-00650 · APJ Sheila F Mcshane · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 18–32 and 34 were unpatentable over Kahn or Kahn and Gutierrez.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). Upon consideration of the Petition, the Preliminary Response, and the evidence of record, we determine that Petitioner has not established a reasonable likelihood of prevailing with respect to the unpatentability of at least one claim of the ’871 patent. Accordingly, for the reasons that follow, we decline to institute an inter partes review of claims 18–32 and 34 of the ’871 patent.” slip op. at 2

    • Skill levelSkill level patent owner adoptedDecided for patent owner

      “The respective proposed levels of qualifications for a person of ordinary skill in the art are similar, with Patent Owner proposing two years of experience compared to Petitioner proposing significant experience with remotely controlling fluid-handling devices, like SCADA systems. Patent Owner also proposes more extensive experience in lieu of educational experience. While we find Petitioner’s proposed qualifications to be acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of skill necessary to understand and implement the teachings of the ’871 patent and the asserted prior art. Our analysis and findings herein, however, do not turn on any differences in the qualifications adopted.” slip op. at 8

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “We determine that we need not expressly construe any claim terms to resolve the parties’ disputes on the current record. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 10

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “actuators and the remote control of fluid handling devices, including the receipt with the user-interface module of “a user command to actuate an actuator via a presented control interface” (limitation [18.7]) and “account authorized to send commands to remotely control fluid handling devices” (limitation [18.11]). We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses or teaches these limitations because the evidence does not provide support that there is remote control of fluid handling devices or the use of a user command on a control interface to send a command to a fluid handling device, for instance. Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but we do not discern that it teaches or discloses the capability to remotely control fluid handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, the Kahn disclosures that Petitioner repeatedly relies upon for allegedly teaching this control are deficient. See Ex. 1005, 10:62–67, 14:35– 15:2, 15:62–16:32; see also Pet. 12–14, 16–18. Kahn discloses that “the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance.” Ex. 1005, 10:62–67. Communication unit 112B is part of the local “sensor unit,” wherein the detection conditions determined by the sensor are communicated to remote devices by communication unit 112B. See id. at 3:31–33, 5:62–6:2, 6:27–35, 7:33–37, 13:7–12, Figs. 1A–1C. Kahn discloses that the sensor units, which include communication units 112B, can be located near shut-off valves and can communicate with distant locations. See id. at 11:1–13. There are no disclosures, however, in the above passages that there is remote control of fluid handling devices, that there is a user command on a control interface that actuates an actuator, or that there is a command sent to the facility actuators via a network connection, as required in limitations [18.5]–[18.7] and [18.9]–[18.12], respectively. Rather, the disclosure indicates that the communication unit 112B includes on-site alerts and that the local (non-remote) communication unit 112B can be interfaced with the control valve.” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 10,488,871
  • PTAB · Jun 13, 2025 · IPR2024-00343 · APJ Charles J Boudreau · IPR · Final written decision

    Claims 1–7 are unpatentable as obvious over Rădulescu2004 and OCP; the Board did not reach the Weber-based grounds.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “include (1) the educational level of the inventor; (2) the type of problems encountered in the art; (3) prior-art solutions to those problems; (4) the rapidity with which innovations are made; (5) the sophistication of the technology; and (6) the educational level of workers active in the field. Envtl. Designs, Ltd. v. Union Oil Co., 713 F.2d 693, 696–97 (Fed. Cir. 1983). Not all factors may exist in every case, and one or more of these or other factors may predominate in a particular case. Id. These factors are not exhaustive, but merely a guide to determining the level of ordinary skill in the art. Daiichi Sankyo Co. v. Apotex, Inc., 501 F.3d 1254, 1256 (Fed. Cir. 2007). Moreover, the prior art itself may reflect an appropriate skill level. Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001).” slip op. at 13

    • Claim Construction › Functional claiming / §112(f) means-plus-function › Whether §112(f) applies (Williamson, nonce words)§112(f) appliesDecided for petitioner

      “35 U.S.C. § 112 ¶ 6 (2006). “[T]he use of the word ‘means’ in a claim element creates a rebuttable presumption that § 112, para. 6 applies.” Williamson v. Citrix Online, LLC, 792 F.3d 1339, 1348 (Fed. Cir. 2015) (en banc in relevant part); Personalized Media Commc’ns, LLC v. Int’l Trade Comm’n, 161 F.3d 696, 703–04 (Fed. Cir. 1998). “[This] presumption may be rebutted if the properly construed claim limitation itself recites sufficiently definite structure to perform the claimed function.” Kemco Sales, Inc. v. Control Papers Co., 208 F.3d 1352, 1361 (Fed. Cir. 2000).” slip op. at 16

    • Claim Construction › Functional claiming / §112(f) means-plus-function › Corresponding structure / algorithm (indefinite if none)Term construed patent owner constructionDecided for patent owner

      “Ex. 1001, 4:46–50. This passage indicates that the interconnect can be a network on a chip and the network on a chip can include wires and buses. That does not necessarily mean that the interconnect can be just wires or buses; rather, it discloses that the interconnect can include wires and buses. In context, the disclosure regarding wires and buses does not support construing the corresponding structure broadly enough to encompass just wires and buses. The networks that constitute the corresponding structure, however, could include networks with wires and buses. Therefore, we agree with Patent Owner that the corresponding structure for the interconnect means should not include a mere bus, switch, and point-to-point wire and instead find that the corresponding structure under 35 U.S.C. § 112 ¶ 6 is a network, which the ’052 patent describes as a multi-hop interconnection between modules separated by one or more network nodes. See Ex. 1001, 2:33–37. Because this structure corresponds to the construction of “interconnect means” proposed by Patent Owner and adopted by the district courts in the TI and Qualcomm litigations (see supra Section III.C.3.b), and we do not rely in our analysis below on a recourse to “equivalents thereto” as permitted by § 112 ¶ 6, we note that our ultimate conclusions on the unpatentability of the challenged claims would be the same if § 112 ¶ 6 did not apply. iii. Conclusion For the reasons stated above, we construe “interconnect means” to cover the structure described in the Specification corresponding to the specified functions of “coupling said plurality of processing modules (M, S)” in the context of claim 6 and “coupling said plurality of processing modules (M, S)” and “enabling a connection-based communication having a set of connection properties” in the context of claims 1 and 7—i.e., a “multi-hop interconnection between modules separated by one or more network nodes”—and equivalents thereof.” slip op. at 28

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “standard as would be used by a district court to construe a claim in a civil action involving the validity or infringement of a patent. 37 C.F.R. § 42.100(b). Under that standard, claim terms are given their ordinary and customary meaning, as would have been understood by a person of ordinary skill in the art at the time of the invention, in light of the language of the claims, the specification, and the prosecution history of record. Id.; Phillips v. AWH Corp., 415 F.3d 1303, 1312–19 (Fed. Cir. 2005) (en banc); Thorner v. Sony Comput. Entm’t Am. LLC, 669 F.3d 1362, 1365–66 (Fed. Cir. 2012). “The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’” Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (quoting Vivid Techs., Inc. v. Am. Sci. Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 15

    Patent outcomesUS 7,594,052 unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 7,594,052
  • PTAB · Nov 22, 2024 · IPR2024-00872 · APJ Michael J Strauss · IPR · Institution

    The Board denied institution for claims 1–20 because Petitioner did not show a reasonable likelihood of prevailing on any ground, relying on Johnson’s unproven status as a printed publication.

    RulingsInstitution decision
    • Skill levelSkill level board ownDecided for patent owner

      “Patent Owner does not contest Petitioner’s description with regard to the level of skill at this stage of the proceedings. Prelim. Resp. 12. As Petitioner’s unchallenged description of the level of ordinary skill appears appropriate to the subject matter of the ’344 patent and the cited prior art, we apply it for purposes of this Decision, albeit without the two instances of the phrase “at least,” which introduce ambiguity. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (acknowledging that the prior art may reflect an appropriate level of skill in the art).” slip op. at 8

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Neither party proposes express construction of any claim terms for our consideration. See Pet. 14 (“Petitioner submits that all claim terms in the ’344 Patent may be interpreted according to their plain and ordinary meaning.”); Prelim. Resp. 12 (“For purposes of this Preliminary Response only, Patent Owner agrees that claim construction is unnecessary.”). whether to institute inter partes review. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). At this stage, we do not see the need to construe any claim terms to resolve the issues in dispute.” slip op. at 8

    • Novelty / Anticipation (§102) › Prior-art status of a reference › Printed publication / public accessibilityPrinted publication not establishedNot shown unpatentable

      “of a document on a website archived by the Internet Archive. See Ex. 1018. That a person might have been able to download Johnson through public means is not evidence that Johnson was “made available to the extent that persons interested and ordinarily skilled in the subject matter or art exercising reasonable diligence, can locate it.” Bruckelmyer, 445 F.3d at 1378. The Frank-White Affidavit’s evidence of public accessibility amounts to little more than Johnson was available on the Internet by December 13, 2019. Pet. 15; Ex. 1018 ¶¶ 1–5, 7, Ex. B. However, because the Wayback Machine is only searchable by URL, as attested to in the Frank-White Affidavit, this does not suffice to support that one of ordinary skill in the art would have sought out the Read the Docs website and, once there, located Johnson without prior knowledge of Johnson and the URL at which Johnson was available. Accordingly, the Frank-White Affidavit alone is insufficient to prove public accessibility of Johnson.” slip op. at 20

    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “that Johnson qualifies as a prior art printed publication. All asserted grounds for unpatentability rely, at least in part, on the disclosure of Johnson. Accordingly, because the record does not persuasively support Johnson as a publicly accessible printed publication, we find that Petitioner has not established a reasonable likelihood of prevailing on any of its grounds of unpatentability. III. CONCLUSION After considering the evidence and arguments presented in the Petition and the Preliminary Response, we determine that Petitioner does not demonstrate a reasonable likelihood of prevailing with respect to any of the challenged claims, and thus, we do not institute an inter partes review. ORDER In consideration of the foregoing, it is hereby ORDERED that the Petition is denied as to all challenged claims, and no trial is instituted.” slip op. at 25

    Claim construction§ 102 anticipationcites Phillips
    Patents in suitUS 11,558,344
  • PTAB · Jun 21, 2024 · IPR2024-00343 · APJ John R Kenny · IPR · Institution

    The Board instituted IPR on claims 1–7 based on all asserted grounds, finding a reasonable likelihood of success on at least one claim and declining discretionary denial.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “The Petition, to justify institution of review, must demonstrate a reasonable likelihood that Petitioner would prevail with respect to at least one challenged claim. See 35 U.S.C. § 314(a) (2018). After considering the Petition, the Preliminary Response, the Preliminary Reply, the Preliminary Sur-reply, and the evidence of record, we determine that the Petition has met this standard. Further, we decline to discretionarily deny inter partes review. Therefore, we institute an inter partes review of claims 1–7 of the ’052 patent.” slip op. at 2

    • PTAB / AIA Trials › Discretionary denial › §325(d) same art / argumentsInstitution denied 325dDenied

      “The Board has set forth a two-part framework for this determination under § 325(d): (1) whether the same or substantially the same art previously was presented to the Office or whether the same or substantially the same arguments previously were presented to the Office; and (2) if either condition of [the] first part of the framework is satisfied, whether the petitioner has demonstrated that the Office erred in a manner material to the patentability of challenged claims.” slip op. at 45

    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Institution denied fintivDenied

      “B. Analysis The Interim Procedure instructs that “the PTAB will not discretionarily deny institution in view of parallel district court litigation where a petitioner presents a stipulation not to pursue in a parallel proceeding the same grounds or any grounds that could have reasonably been raised before the PTAB.”” slip op. at 52

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “In this proceeding, Patent Owner has not challenged Petitioner’s definition for an ordinarily skilled artisan. See generally Prelim. Resp. In the Qualcomm litigation, however, Patent Owner described a person of ordinary skill in the art as having: a Bachelor of Science (or equivalent) degree in electrical engineering, computer engineering, or a related field, and 2–3 years of work experience in very large-scale integrated (“VLSI”) systems, such as application-specific integrated circuits (“ASICs”), application-specific standard parts (“ASSPs”), system-on-chip (“SoC”), or field programmable gate arrays (“FPGAs”), and has an understanding of on-chip interconnection networks. Ex. 1017, 11. In this proceeding, Petitioner’s definition is uncontested and appears consistent with the level of skill reflected in the specification of the ’052 patent (“Specification”) and in the asserted prior-art references. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001). Thus, for purposes of this Decision, we adopt Petitioner’s definition. We note, however, that we would reach the same conclusions in this Decision if we were to adopt the definition that Patent Owner set forth in the Qualcomm litigation. To the extent the parties dispute the definition of an ordinarily skilled artisan during” slip op. at 10

    Claim construction§ 102 anticipation§ 103 obviousnessDiscretionary denial
    Patents in suitUS 7,594,052
  • PTAB · Dec 21, 2023 · IPR2023-01046 · APJ Jean R Homere · IPR · Institution

    The Board instituted IPR on claims 1–14 and 16–19 on all asserted grounds, finding a reasonable likelihood of success on the obviousness grounds based on Chalom and Aslan, with Grau or Pace for certain claims.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “the information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2018). We have authority, acting on the designation of the Director, to determine whether to institute an inter partes review under 35 U.S.C. § 314 and 37 C.F.R. § 42.4(a) (2023). Based on the current record, and for the reasons explained below, we determine that Petitioner has established a reasonable likelihood that it would prevail with respect to at least one challenged claim. Accordingly, we institute inter partes review. slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Patent Owner does not contest Petitioner’s proffered definition of the level of ordinary skill in the art, but offers a definition of its own. Prelim. Resp. 9. Patent Owner contends that a person having ordinary skill in the art at the time of the invention “would have had at least a bachelor’s or master’s degree in electrical engineering, computer engineering, electrical and computer engineering, computer science, or similar educational background; or equivalent on-the-job training, including approximately two to three years of experience in machine learning and/or pattern recognition.” Id. (citing Ex. 2001 ¶ 21). Patent Owner asserts that the “level of skill is approximate and more experience would compensate for less formal education and vice versa.” Id. (citing Ex. 2001 ¶ 21). We note that the differences between the parties’ descriptions are immaterial and find Petitioner’s description to be consistent with the problems and solutions disclosed in the ’985 patent and prior art of record, and adopt it as our own for purposes of this Decision, albeit without the two instances of “at least,” which introduce ambiguity. See, e.g., In re GPAC Inc., 57 F.3d at 1579 (approving the determination of the level of ordinary skill in the art by appeal to the references of record).” slip op. at 14

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededDecided for petitioner

      “Petitioner contends that it “applied plain and ordinary meanings of all terms and no express constructions are required here.” Pet. 5. Patent Owner “agrees with Petitioner that there are no claim terms that require construction for purposes of the Board’s decision on institution.” Prelim. Resp. 9. At this stage in the proceeding, and without further argument from the parties, we determine that we do not need to expressly construe any term for purposes of this Decision. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)) (only terms that are in controversy need to be construed, and then only to the extent necessary to determine whether to institute inter partes review). We note that this determination does not preclude the parties from arguing their proposed constructions of the claims during trial, as permitted by our rules and binding precedent. Indeed, the parties are hereby given notice that claim construction, in general, is an issue to be addressed at trial. A final determination as to claim construction will be made at the close of the proceeding, after any hearing, based on all the evidence of record.” slip op. at 16

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundInstituted

      “related fields, in that they disclose similar techniques of using machine learning for image processing (e.g., using image data to train MLAs to correct the gaze of a video-conferencing user). Pet. 41–42 (citing Ex. 1005, 3:21–32; Ex. 1007 ¶ 24). Petitioner also contends both “Chalom and Aslan are at least reasonably pertinent to a problem identified in the ’985 Patent of high accuracy MLAs often consuming more computational resources and being slower to run, as compared to efficient MLAs tending to provide less accurate predictions.” Id. at 42 (citing Ex. 1001, 16:24–30; Ex. 1007 ¶ 45). Thus, “Chalom and Aslan are at least reasonably pertinent to this efficiency- 4 It has been held that where the claimed subject matter involves more than the simple substitution of one known element for another or the mere application of a known technique to a piece of prior art ready for the improvement, a holding of obviousness must be based on “an apparent reason to combine the known elements in the fashion claimed.” KSR, 550 U.S. at 417–18. That is, “there must be some articulated reasoning with some rational underpinning to support the legal conclusion of obviousness.” Id. at 418 (quoting In re Kahn, 441 F.3d 977, 988 (Fed. Cir. 2006)). Such reasoning can be based on interrelated teachings of multiple patents, the effects of demands known to the design community or present in the marketplace, and the background knowledge possessed by a person having ordinary skill in the art. Id. at 417–18. versus accuracy problem. Id. (citing Ex. 1005, 1:16–25, 9:48–55, 10:40–60, Fig. 3; Ex. 1007 ¶ 45; Ex. 1001, 16:24–44, 17:14–17; Ex. 1003 ¶ 212). Petitioner shows sufficiently for institution that a POSITA would have been motivated to incorporate Aslan’s teacher-student architecture into Chalom’s image editing and training of its RFC to enhance the overall gains in efficiency and accuracy of the ensuing system. Id. at 42–44 (citing Ex. 1003 ¶¶ 213–222; Ex. 1007 ¶ 44). For purposes of institution, we find that Petitioner’s rationale, which is supported by the testimony of Dr. Karam, is a sufficient demonstration, at this stage, of a motivation to combine the references with a reasonable expectation of success. KSR, 550 U.S. at 417–18. However, we note that Patent Owner’s arguments may have some merit, and encourage the parties to further develop this issue at trial.” slip op. at 37

    Claim construction§ 102 anticipation§ 103 obviousnesscites KSR · Graham
    Patents in suitUS 10,740,985
  • PTAB · Dec 4, 2023 · IPR2022-00989 · APJ James A Tartal · IPR · Final written decision

    Claims 1, 2, 5–11, 13, and 15–30 are unpatentable as obvious over Sullivan995 and Sullivan460; anticipation was not shown, and the other obviousness ground was not reached.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “may be considered, including the “type of problems encountered in the art; prior art solutions to those problems; rapidity with which innovations are made; sophistication of the technology; and educational level of active workers in the field.” In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995). Petitioner contends that a person of ordinary skill in the art would have had “at least a bachelor’s degree in mechanical engineering, biomedical engineering, or a similar technical field, with at least two years of relevant product design experience” and “[a]dditional experience could substitute for less education, and additional education could likewise substitute for less experience.” Pet. 19 (citing Ex. 1003 ¶ 77). Petitioner further states that the “Petition does not turn on this precise definition, and the challenged claims would be unpatentable from the perspective of any reasonable person of ordinary skill in the art at the relevant time.” Id. (citing Ex. 1003 ¶ 78). Patent Owner does not dispute Petitioner’s definition of the person of ordinary skill in the art. PO Resp. 15–16. We find that the ’539 patent and the cited prior art references reflect the appropriate level of skill at the time of the claimed invention and that the level of appropriate skill reflected in these references and in the ’539 patent is consistent with the definition of a person of ordinary skill in the art proposed by Petitioner. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001).” slip op. at 12

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITAPlain and ordinary meaningDecided for petitioner

      “awake state” Claim 24 recites, in part, “to determine whether breathing patterns indicate an asleep state or an awake state.” Ex. 1001, 11:36–12:7; see also id. at 9:49–64 (claim 1 reciting “between an awake state and an asleep state”), 10:42–56 (claim 11 reciting “at least one of an awake state or an asleep state”). In regard to its allegations of obviousness, Petitioner’s arguments suggest an “awake state” ordinarily means when a patient is not asleep. Pet. 36–37, 42. By contrast, with regard to its allegations of anticipation, Petitioner argues that under Patent Owner’s “implied construction of ‘an awake state’ based on [Patent Owner’s] infringement allegations” in district court, “the patient is in an awake state when there is an absence of obstructions or other breathing patterns indicative of sleep.” Id. at 68–70 (citing, e.g., Ex. 1018 ¶¶ 2, 158, 159). Petitioner provides no further support for this “implied construction” purportedly taken from Patent Owner’s district court allegations. Id. Dr. Kirkness, in support of Petitioner, applied the plain meaning of all terms and phrases. See, e.g., Ex. 1003 ¶ 80. In regard to supporting Petitioner’s allegations of anticipation, Dr. Kirkness merely assumed Patent Owner’s purported district court claim construction “position to be true.” Ex. 1003 ¶ 253. In this proceeding Patent Owner does not propose an express meaning for “awake state.” See PO Resp. 29–33. More generally, Patent Owner states that the ’539 patent “teaches how to distinguish between an awake state and an asleep state.” Id. at 8. From the arguments of the Parties, we discern no dispute in this proceeding that a plain and ordinary meaning of an “awake state” is a state in which a patient is not asleep. See Ex. 1001, 3:1–5 (distinguishing between “a wake state” and “a sleep state”), 7:22–24 (describing an embodiment with a processing arrangement that “may determine whether the patient is in a sleep state or a wake state based on the breathing pattern”).8 We apply the plain and ordinary meaning of “awake state” in this proceeding and further determine that Petitioner has not shown by a preponderance of the evidence that an awake state means “an absence of obstructions or other breathing patterns indicative of sleep.” slip op. at 15

    • Claim Construction › Intrinsic evidence (Phillips canons) › Lexicography (patentee as own lexicographer)Plain and ordinary meaningDecided for petitioner

      “Next, we turn to the Specification. “While we read claims in view of the specification . . . we do not read limitations from the embodiments in the specification into the claims.” Hill-Rom Servs., 755 F. 3d at 1371 (citation omitted). “We depart from the plain and ordinary meaning of claim terms based on the specification in only two instances: lexicography and disavowal.” Id. In order for a patentee to act as its own lexicographer, the “patentee must ‘clearly set forth a definition of the disputed claim term other than its plain and ordinary meaning’” and “must ‘clearly express an intent’ to redefine the terms.” Bradium Tech., 923 F. 3d at 1044. In this case, Patent Owner does not argue that it disavowed the full scope of the plain and ordinary meaning of claim 24, nor does Patent Owner argue that it explicitly defined “analyzing the breathing patterns” in the Specification. See, e.g., PO Resp. 29–32. We determine that there is no disavowal nor any explicit lexicographic definition of “analyzing the breathing patterns” in the Specification. Patent Owner instead relies on an “implied lexicography” theory as to why we should construe the phrase as Patent Owner proposes. PO Sur-reply 2, 6–7 (citing, inter alia, AstraZeneca AB v. Mut. Pharm. Co., Inc., 384 F.3d 1333, 1339 (Fed. Cir. 2004)). We disagree.” slip op. at 27

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundDecided for petitioner

      “We disagree with Patent Owner’s arguments—that Petitioner fails to show any motivation to combine and that Sullivan460 is not enabled— merely because Dr. Kirkness indicated in a deposition that he did not know how a preset level is calculated from a sentence in Sullivan460. As Petitioner explains, enablement “is not a requirement to prove invalidity under §103.” Amgen, 314 F.3d at 1357 (under §103, “a reference need not be enabled; it qualifies as a prior art, regardless, for whatever is disclosed therein”). Moreover, we agree with Petitioner that the Challenged Claims do not require any preset level for a flow rate, and a person of ordinary skill “would have understood that a preset level is established from previously-acquired data or data from a previous window of time, such as an average level, for example, as taught in Sullivan995.” Pet. Reply 15 (citing Ex. 2014, 38:2–16; Ex. 1005, 17:3–27, Fig. 12). Patent Owner responds that Petitioner’s assertion is unsupported, and that “Petitioner is obligated to address this challenge, and failed to do so.” PO Sur-reply 18–19 (citing In re Morsa, 713 F.3d 104, 110 (Fed. Cir. 2013)). We find Petitioner’s arguments persuasive because they are supported by the asserted references. Sullivan995 discloses that the computing system may “calculate control values of patterns for each patient based on moving average values or such values or patterns will be pre-programmed into the computing system.” Ex. 1005, 17:14–18. According to Sullivan995, when “signals deviate from predetermined values or patterns the computer system generates a signal which is sent to the feedback speed controller on the blower motor.” Id. at 17:19–22. Based on this disclosure, and given that Sullivan460 incorporates Sullivan995 by reference, we agree with Petitioner that Sullivan460’s disclosure of detecting that the flow rate has fallen below a preset level would have informed a person of ordinary skill that this level was predetermined, so that “the controller 100 activates the nCPAP apparatus 90 to supply air to the patient 30 at a pressure which ameliorates or eliminates the upper airway flow limitation.”16 Ex. 1006, 10:17–21.” slip op. at 50

    Patent outcomesUS 9,427,539 unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 9,427,539
  • PTAB · Oct 2, 2023 · IPR2023-00569 · APJ Patrick R Scanlon · IPR · Institution

    The Board denied institution on all challenged claims because Petitioner did not show a reasonable likelihood of prevailing on any asserted AEM, IMU-Okabe, or IMU-Okabe-Li ground.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “We have authority to determine whether to institute an inter partes review. See 35 U.S.C. § 314 (2018); 37 C.F.R. § 42.4(a) (2022). To institute an inter partes review, we must determine that the information presented in the Petition shows “a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). For the reasons set forth below, we determine that Petitioner has not demonstrated a reasonable likelihood that it would prevail with respect to at least one challenged claim. Accordingly, we do not institute an inter partes review of any challenged claim on any asserted ground.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Petitioner contends that a person having ordinary skill in the art “would have had at least a bachelor’s degree in computer science, electrical engineering, or a related field, and at least one 1–2 years of experience in image processing and animation,” and “[l]ess education could have been compensated with more experience, and vice versa.” Pet. 5–6 (citing Ex. 1002 ¶¶ 27–29). Petitioner adds that one of ordinary skill in the art “would have also been familiar with existing systems for image processing and animation and understood how to implement such systems.” Id. at 6 (citing Ex. 1002 ¶¶ 27–29). Patent Owner does not address the level of ordinary skill in the art in its Preliminary Response. Based on our review of the record before us, we determine that Petitioner’s stated level of ordinary skill in the art is reasonable because it appears consistent with the evidence of record, including the asserted prior art. Accordingly, for the purposes of this Decision, we adopt Petitioner’s definition.” slip op. at 8

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Petitioner contends that all claim terms should be given their plain and ordinary meaning at this stage of the proceeding. Pet. 8 (citing Ex. 1002 ¶ 46). Patent Owner indicates that it proposes “construction for certain claim language below,” but it does not actually identify any claim language for construction, let alone provide any constructions. Prelim. Resp. 16–17. On the present record, we do not discern a need to construe explicitly any claim language because doing so would have no effect on our analyses below of Petitioner’s asserted grounds and will not assist in resolving the present controversy between the parties. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms that . . . are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)).” slip op. at 9

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “First, the disclosure of AEM that Petitioner relies on for teaching selecting certain pixels to be transparent or nontransparent pertains to “compositing,” i.e., creating a composite image from multiple images. Ex. 1003, 315–16. AEM states specifically: “To create a composite from multiple images, you can make parts of one or more of the images transparent so that other images can show through.” Id. at 315. Thus, each pixel in the composite image is either transparent or nontransparent such that every pixel is “selected” under Petitioner’s usage of the term “selecting.” The possibility that some of these pixels, in theory, could extend along a non-linear motion path of a Deform pin is mere happenstance—we are not directed to any disclosure in AEM of actually selecting a set of pixels (either transparent or nontransparent) that extend along a non-linear motion path. See In re Facebook, Inc., 743 F. App’x. 998, 1001–02 (Fed Cir. 2018) (deciding that an example in a prior art reference showing that it is possible for image elements to be contiguous is not sufficient to teach a claim limitation that requires contiguity). We are not persuaded on the record before us that AEM’s disclosure of designating pixels as transparent or nontransparent satisfies selecting a first set of pixels extending along a non-linear pathway.” slip op. at 12

    Claim construction§ 102 anticipation§ 103 obviousnesscites Graham
    Patents in suitUS 11,301,119
  • PTAB · Jun 20, 2023 · IPR2023-00152 · APJ Patrick R Scanlon · IPR · Institution

    The Board denied institution on all claims because Petitioner did not show a reasonable likelihood of prevailing on any asserted anticipation or obviousness ground.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “We have authority to determine whether to institute an inter partes review. See 35 U.S.C. § 314 (2018); 37 C.F.R. § 42.4(a) (2022). To institute an inter partes review, we must determine that the information presented in the Petition shows “a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). For the reasons set forth below, we determine that Petitioner has not demonstrated a reasonable likelihood that it would prevail with respect to at least one challenged claim. Accordingly, we do not institute an inter partes review of any challenged claim on any asserted ground.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Based on our review of the record before us, we determine that Petitioner’s stated level of ordinary skill in the art is reasonable because it appears consistent with the evidence of record, including the asserted prior art. Accordingly, for the purposes of this Decision, we adopt Petitioner’s definition.” slip op. at 7

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “Petitioner contends that all claim terms should be given their plain and ordinary meaning at this stage of the proceeding. Pet. 8 (citing Ex. 1002 ¶ 42). Patent Owner proposes claim constructions for “set of pixels,” “pixels that lie along a link/length of pathway between the starting point and the ending point,” and “in a loop.” Prelim. Resp. 17–28. On the present record, we do not discern a need to construe explicitly any claim language because doing so would have no effect on our analyses below of Petitioner’s asserted grounds and will not assist in resolving the present controversy between the parties. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms that . . . are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)).” slip op. at 8

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “First, the disclosure of AEM that Petitioner relies on for teaching selecting certain pixels to be transparent or nontransparent pertains to “compositing,” i.e., creating a composite image from multiple images. Ex. 1003, 315–16. AEM states specifically: “To create a composite from multiple images, you can make parts of one or more of the images transparent so that other images can show through.” Id. at 315. Thus, each pixel in the composite image is either transparent or nontransparent such that every pixel is “selected” under Petitioner’s usage of the term “selecting.” The possibility that some of these pixels, in theory, could extend along a non-linear motion path of a Deform pin is mere happenstance—we are not directed to any disclosure in AEM of actually selecting a set of pixels (either transparent or nontransparent) that extend along a non-linear motion path. See In re Facebook, Inc., 743 F. App’x. 998, 1001–02 (Fed Cir. 2018) (deciding that an example in a prior art reference showing that it is possible for image elements to be contiguous is not sufficient to teach a claim limitation that requires contiguity). We are not persuaded on the record before us that AEM’s disclosure of designating pixels as transparent or nontransparent satisfies selecting a first set of pixels extending along a nonlinear pathway. Second, Petitioner’s argument relies on AEM teaching that “AECS6 necessarily allows a user . . . to select any or all pixels of the layer to be nontransparent and thus included in the layer’s mesh to be moved and animated.” Pet. 21. We disagree, however, that AEM discloses selecting pixels to be nontransparent and including these pixels in a mesh to be moved and animated. That AECS6 arguably allows selected nontransparent pixels to be included in a mesh is not sufficient to establish that AEM discloses doing so. Petitioner contends that AECS6 and the screenshots of AECS6 created by Dr. Greenspun establish the background knowledge possessed by a person of ordinary skill in the art but does not explain adequately why AECS6’s alleged capability would cause one of ordinary skill in the art to understand AEM to teach selecting pixels of a layer to be nontransparent and including the selected pixels in the layer’s mesh. See Pet. 17 n.6 (quoting Qualcomm, 24 F.4th at 1376). Again, any pixels selected to be nontransparent being included in a mesh is mere happenstance.” slip op. at 11

    Claim construction§ 102 anticipation§ 103 obviousnesscites Graham
    Patents in suitUS 10,558,342
Page 1 of 6
← Previous12345…Next →

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.