- PTAB · Dec 3, 2025 · IPR2025-01016 · APJ Arthur M Peslak · IPR · Institution
The Board instituted IPR on all challenged claims 1–13 and all petition grounds, finding a reasonable likelihood that Jurik anticipates at least one claim.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“determine whether to institute an inter partes review under 35 U.S.C. § 314(a). See 37 C.F.R § 42.4(a) (2024) (“The Board institutes the trial on behalf of the Director.”). Under 35 U.S.C. § 314(a), an inter partes review may not be instituted unless the information presented in the Petition shows “there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” Considering the Petition as well as all supporting evidence, we conclude that the information presented in the Petition establishes a reasonable likelihood that Petitioner would prevail in its challenge of at least one claim of the ’373 patent as unpatentable. Pursuant to 35 U.S.C. § 314, we hereby institute an inter partes review of all challenged claims of the ’373 patent on the grounds stated in the Petition.” slip op. at 2
- Skill levelSkill level petitioner adoptedOther
“[a] person of ordinary skill in the art (“POSITA”) at the time of the assumed effective filing date (March 30, 2023), would have had at least a B.S. degree in mechanical or electrical engineering and would have had at least two years of practical experience designing lighting systems. Alternatively, a POSITA would have at least two years of undergraduate training in a physical science (e.g., engineering or physics) and at least four years of practical experience designing lighting systems. Pet. 10 (citing Ex. 1004 ¶¶ 31–32). Patent Owner did not file a Preliminary Response. For the purposes of this Decision, we apply Petitioner’s currently uncontested definition except for the term “at least” because it may cause ambiguity resulting in potentially encompassing those with more than ordinary skill in the art. With that qualification, Petitioner’s proposal appears consistent with the problems addressed in the ’373 patent and the prior art.” slip op. at 10
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“Patent Owner did not file a Preliminary Response. We determine, at this stage of the proceeding, that we need not construe any claim terms to resolve the controversy before us. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))). The parties are free to address the construction of any claim term in subsequent authorized briefing during trial. If either party chooses to present claim construction arguments, the arguments should be in a separately delineated portion of the brief labelled accordingly.” slip op. at 11
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Instituted
“To establish anticipation under 35 U.S.C. § 102, each and every element in a claim, arranged as recited in the claim, must be found in a single prior art reference. Net MoneyIN, Inc. v. VeriSign, Inc., 545 F.3d 1359, 1369 (Fed. Cir. 2008); Karsten Mfg. Corp. v. Cleveland Golf Co., 242 F.3d 1376, 1383 (Fed. Cir. 2001). Each element of the challenged claim must be found, either expressly or inherently, in the single prior art reference. Verdegaal Bros., Inc. v. Union Oil Co. of Cal., 814 F.2d 628, 631 (Fed. Cir. 1987). However, this is not an ipsissimis verbis test, i.e., identity of terminology is not required. See In re Bond, 910 F.2d 831, 832 (Fed. Cir. 1990). When evaluating a prior art reference in the context of anticipation, the reference must be “considered together with the knowledge of one of ordinary skill in the pertinent art.” In re Paulsen, 30 F.3d 1475, 1480 (Fed. Cir. 1994) (citing In re Samour, 571 F.2d 559, 562 (CCPA 1978)).” slip op. at 8
Claim construction§ 102 anticipationcites Phillips · KSR · GrahamPatents in suitUS 11,988,373 - PTAB · Nov 18, 2025 · IPR2025-00782 · APJ Ken B Barrett · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood that any challenged claim was unpatentable over the asserted grounds.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“An inter partes review may not be instituted “unless . . . the information presented in the petition . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). Having considered the arguments and evidence presented by Petitioner and Patent Owner, we determine that Petitioner has not demonstrated a reasonable likelihood of prevailing on at least one of the challenged claims of the ’469 patent. Accordingly, we do not institute an inter partes review of the challenged claims.” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“Petitioner contends that: [A] POSITA would have had at least a bachelor’s degree in computer science, computer engineering, business information systems, software engineering, or systems engineering and at least two years of experience in computer networking or telecommunications. Ex.1002 ¶21; see also Ex.1001 (1:14-31). Additional education could substitute for professional experience. Ex.1002 ¶21. Significant work experience could substitute for formal education. Ex.1002 ¶21. Pet. 7–8. Patent Owner, at this stage, does not disagree or propose a different definition of the person of ordinary skill in the art. Petitioner’s definition is consistent with the level of ordinary skill reflected in the prior art references of record. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (recognizing that the prior art itself may reflect an appropriate level of skill in the art). For purposes of this decision, we apply Petitioner’s definition of the person of ordinary skill in the art.” slip op. at 9
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“Petitioner states that it “do[es] not believe explicit construction is required to resolve this Petition.” Pet. 7. Patent Owner proposes constructions for “Internet,” “access the Internet,” “subscriber access website.” Prelim. Resp. 12–15. On this record and for purposes of this decision, we determine that no claim terms require express construction. D. Alleged Anticipation of Claims 1, 2, 10, 11, and 24–28 by Bruner and” slip op. at 10
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentable
“We find Patent Owner’s argument to be persuasive. Petitioner does not explain adequately how Bruner discloses the positional requirement of a subscriber access unit being coupled between the satellite dish and the router. Accordingly, Petitioner has not shown sufficiently for purposes of institution that Bruner anticipates independent claim 24. Although, for the obviousness challenge, Petitioner contends that Clark discloses a wireless router (for limitation 24c), Petitioner relies solely on Bruner for the “between” limitation. See Pet. 17 (“Bruner and/or Bruner in view of Clark both disclose each limitation of claim 24c, including a router (e.g., Bruner’s ‘ADS’ and Clark’s ‘wireless router’)”); id. at 18–19 (the discussion of the “between” limitation 24d asserting that “Bruner discloses claim 24d,” with no mention of Clark). Furthermore, Petitioner merely asserts that both Bruner and Clark disclose a router. See id. at 17–18. Petitioner, however, does not indicate clearly which is used in the proposed combination, does not describe the configuration of a proposed combination or a proposed modification of Bruner’s system, and fails to set forth an adequate and persuasive reason with rational underpinning as to why a person of ordinary skill in the art would have modified Bruner’s system to arrive at the positional requirement of the subscription access unit being coupled between the satellite dish and a router. See id. at 13–14 (motivation section for this ground); id. at 18–19 (addressing the “between” limitation 24d). Accordingly, Petitioner has not shown a reasonable likelihood of prevailing on its challenge to independent claim 24 as obvious over Bruner in view of Clark.” slip op. at 14
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 7,324,469 - Tanklogix, LLC v. Sitepro, Inc.Institution deniedPTAB · Oct 10, 2025 · IPR2025-00653 · APJ Bart A Gerstenblith · IPR · Institution
The Board denied institution on all claims because the Petition did not show a reasonable likelihood that any challenged claim was unpatentable over the asserted grounds.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“An inter partes review may be instituted only if “the information presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2
- Skill levelSkill level patent owner adoptedDecided for patent owner
“The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’504 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“Additionally, only terms that are in controversy need to be construed, and these need be construed only to the extent necessary to resolve the controversy. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 9; Prelim. Resp. 4 (citing Ex. 2009 ¶ 72); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13
- Expert testimonyPetitioner expert discountedDecided for patent owner
“Ex. 1002 ¶ 47. As reflected above, Dr. Wooley’s testimony as to element [1.2] does not even assert that Cardamone discloses a tank, let alone one or more sensors disposed at a tank as recited in element [1.2]. Thus, Dr. Wooley’s testimony does not support Petitioner’s argument on this issue.” slip op. at 18
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 11,726,504 - Tanklogix, LLC v. Sitepro, Inc.Institution deniedPTAB · Oct 10, 2025 · IPR2025-00652 · APJ Bart A Gerstenblith · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–23 and 25–30 were unpatentable over the asserted grounds.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied
“presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2
- Skill levelSkill level patent owner adoptedDecided for patent owner
“The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’403 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 10; Prelim. Resp. 4 (citing Ex. 2009 ¶ 73); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable
“We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses element [1.2] because the evidence cited does not disclose a “first computer system being configured to provide remote control of the first pump or first valve” (i.e., a fluid-handling device). Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but Petitioner has not identified any disclosure of the capability to remotely control fluid-handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, Kahn’s disclosures that Petitioner relies on for allegedly teaching remote control are deficient. We discuss each. First, Petitioner points to the following, “[f]or instance, as illustrated in FIG. 1C, a fluid control device such as a valve 15A is located on the input side of a sen[s]or unit 110.” Ex. 1005, 8:19–21, cited in Pet. 13. This portion of Kahn, however, does not disclose remote control. Second, Petitioner cites to the following: Finally, or in addition to, the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance. Pet. 13 (citing Ex. 1005, 10:62–67). We agree with Patent Owner that this portion of Kahn teaches on-site alerts and local control of the fluid-handling device. See Prelim. Resp. 7. This portion of Kahn does not disclose remote control.” slip op. at 18
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 11,294,403 - Tanklogix, LLC v. Sitepro, Inc.Institution deniedPTAB · Oct 10, 2025 · IPR2025-00651 · APJ Bart A Gerstenblith · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–3, 6, 7, and 9–20 were unpatentable over any asserted ground.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied
“presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2
- Skill levelSkill level patent owner adoptedDecided for patent owner
“The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’680 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 11
- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner
“target value” is part of a command that is sent from a computing device to a server and then to a controller. The controller then receives a measurement of the fluid by a sensor and determines whether the measurement satisfies the “target value.” If the measurement does not satisfy the “target value,” further operations are undertaken. The recited operation sequence makes clear that the plain and ordinary meaning of “target value” is not as Dr. Wooley opines because the particular operating condition that a device is in at a particular time is represented by the measurement taken by the sensor, 11 Some claim language less relevant to construing “target value” was omitted for ease of reference. which the controller then uses to determine whether the measurement satisfies the “target value.” Additionally, claim 1 recites that the “target value” is sent as part of a command to the controller. The “target value” is not sent to the controller from the sensor, as might be expected if the plain and ordinary meaning of “target value” were as Dr. Wooley opines. Petitioner and Dr. Wooley’s construction would also result in “target value” meaning effectively the same thing as the measurement of the fluid by the sensor, a concept that is separately recited in claim 1 and to which the “target value” is compared. The Specification of the ’680 patent does not support Petitioner’s understanding of the plain and ordinary meaning of “target value.” Although the Specification does not recite “target value,” it recites “target state,” and describes “target state” sufficiently to understand the plain and ordinary meaning of “target” as used in “target value” and “target state.” In particular, the ’680 patent explains that “[i]n some embodiments, the process 104 includes receiving, via a network interface, from a remote user device, (e.g., via a command-center server) a command to change a state of a fluid-handling device to a target state.” Ex. 1001, 11:48–51. This portion reflects that the command is seeking to change a state of a fluid-handling device to a target state. In other words, the “target value” or “target state” is not generally “the particular operating condition that a device is in at a particular time”; rather, it is a value or state that the fluid-handling device is desired to be in, as Patent Owner and Dr. Durham explain. Additionally, just as claim 1 recites a directional component for the “target value” to be sent to the controller in a command, so too does the Specification describe a “target state” as being sent in a command from a remote user device. Thus, the Specification clearly supports the plain and ordinary meaning proposed by Patent Owner and Dr. Durham and not the plain and ordinary meaning proposed by Petitioner and Dr. Wooley. slip op. at 14
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable
“time-stamped process data, report exception therein to the remote host, and extract and transmit time-stamped process data to the remote host.” Ex. 1005, Abst. (emphases added). Almadi explains that its remote field systems must include a plurality of controller units “to issue commands to, and gather and process data from a plurality of field devices, including remote systems and instruments, . . . [and] a database server for the storage of process data retrieved from the remote subsystems and instruments.” Id. at 2:22–30 (emphases added). Based on these disclosures, we agree with Patent Owner that Petitioner has not established that Almadi discloses element [1.4]. Specifically, the teachings from Almadi identified by Petitioner refer to process data, which is data retrieved from the remote subsystems/field devices. Thus, we understand that Almadi’s teaching—of using an Ethernet switch to transmit “process data”—describes transmitting data from the remote subsystems/field devices. See Ex. 1005, 3:13–17, cited in Pet. 15. But claim 1 and particularly element [1.4], recites “sending, with the server, the target value to the network address [which identifies a controller of the fluid-handling device13] via the network,” which is different than sending process data from the field devices to the remote host or database server for storage.” slip op. at 19
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 11,175,680 - Tanklogix, LLC v. SiteproInstitution deniedPTAB · Oct 10, 2025 · IPR2025-00650 · APJ Sheila F Mcshane · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood that claims 18–32 and 34 were unpatentable over Kahn or Kahn and Gutierrez.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). Upon consideration of the Petition, the Preliminary Response, and the evidence of record, we determine that Petitioner has not established a reasonable likelihood of prevailing with respect to the unpatentability of at least one claim of the ’871 patent. Accordingly, for the reasons that follow, we decline to institute an inter partes review of claims 18–32 and 34 of the ’871 patent.” slip op. at 2
- Skill levelSkill level patent owner adoptedDecided for patent owner
“The respective proposed levels of qualifications for a person of ordinary skill in the art are similar, with Patent Owner proposing two years of experience compared to Petitioner proposing significant experience with remotely controlling fluid-handling devices, like SCADA systems. Patent Owner also proposes more extensive experience in lieu of educational experience. While we find Petitioner’s proposed qualifications to be acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of skill necessary to understand and implement the teachings of the ’871 patent and the asserted prior art. Our analysis and findings herein, however, do not turn on any differences in the qualifications adopted.” slip op. at 8
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“We determine that we need not expressly construe any claim terms to resolve the parties’ disputes on the current record. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 10
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable
“actuators and the remote control of fluid handling devices, including the receipt with the user-interface module of “a user command to actuate an actuator via a presented control interface” (limitation [18.7]) and “account authorized to send commands to remotely control fluid handling devices” (limitation [18.11]). We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses or teaches these limitations because the evidence does not provide support that there is remote control of fluid handling devices or the use of a user command on a control interface to send a command to a fluid handling device, for instance. Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but we do not discern that it teaches or discloses the capability to remotely control fluid handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, the Kahn disclosures that Petitioner repeatedly relies upon for allegedly teaching this control are deficient. See Ex. 1005, 10:62–67, 14:35– 15:2, 15:62–16:32; see also Pet. 12–14, 16–18. Kahn discloses that “the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance.” Ex. 1005, 10:62–67. Communication unit 112B is part of the local “sensor unit,” wherein the detection conditions determined by the sensor are communicated to remote devices by communication unit 112B. See id. at 3:31–33, 5:62–6:2, 6:27–35, 7:33–37, 13:7–12, Figs. 1A–1C. Kahn discloses that the sensor units, which include communication units 112B, can be located near shut-off valves and can communicate with distant locations. See id. at 11:1–13. There are no disclosures, however, in the above passages that there is remote control of fluid handling devices, that there is a user command on a control interface that actuates an actuator, or that there is a command sent to the facility actuators via a network connection, as required in limitations [18.5]–[18.7] and [18.9]–[18.12], respectively. Rather, the disclosure indicates that the communication unit 112B includes on-site alerts and that the local (non-remote) communication unit 112B can be interfaced with the control valve.” slip op. at 18
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 10,488,871 - Google LLC / Cellco Partnership D/B/A Verizon Wireless et al. v. Headwater Research LLCAll claims unpatentablePTAB · Oct 1, 2025 · IPR2024-00943 · APJ Scott B Howard · IPR · Final written decision
Claims 2–23, 26, 41–60, 63, 64, 91–152, and 155–171 are unpatentable; Rao anticipates some claims, and the stated Rao combinations render the remaining claims obvious.
RulingsFinal written decision- Skill levelSkill level petitioner adoptedDecided for petitioner
“Petitioner argues that a person having ordinary skill in the art “would have at least a bachelor’s degree in computer science, computer engineering, or a similar field, and approximately two years of industry or academic experience in a field related to computer software development and/or computer networking.” Pet. 2 (citing Ex. 1015 ¶¶ 50–52). Petitioner further argues that “[w]ork experience can substitute for education, and additional education can substitute for work experience.” Id. at 2–3 (citing Ex. 1015 ¶¶ 50–52). Because Petitioner’s proposed level of ordinary skill in the art is consistent with the field of the invention of the ’541 patent and not disputed by Patent Owner (see PO Resp.), we adopt Petitioner’s formulation of the person having ordinary skill in the art.” slip op. at 12
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached
“Petitioner states “[n]o terms require construction to resolve this Petition.” Pet. 3. Patent Owner does not propose any claim constructions. See PO Resp. For the purposes of this Decision, we need not expressly construe any claim terms. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (noting that “we need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 13
- Expert testimonyPetitioner expert creditedDecided for petitioner
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)UnpatentableNot shown unpatentableMixed
“preponderance of the evidence that claim 3 was anticipated by Rao.” slip op. at 25
Patent outcomesUS 8,589,541 unpatentableClaim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 8,589,541 - Google LLC / Cellco Partnership D/B/A Verizon Wireless et al. v. Headwater Research LLCAll claims unpatentablePTAB · Oct 1, 2025 · IPR2024-00942 · APJ Scott B Howard · IPR · Final written decision
Claims 2–23, 26, 41–60, 63, 64, 91–152, and 155–171 are unpatentable; Rao anticipates some claims, and Rao-based combinations render the others obvious.
RulingsFinal written decision- Skill levelSkill level petitioner adoptedDecided for petitioner
“Petitioner argues that a person having ordinary skill in the art “would have at least a bachelor’s degree in computer science, computer engineering, or a similar field, and approximately two years of industry or academic experience in a field related to computer software development and/or computer networking.” Pet. 2 (citing Ex. 1015 ¶¶ 50–52). Petitioner further argues that “[w]ork experience can substitute for education, and additional education can substitute for work experience.” Id. at 2–3 (citing Ex. 1015 ¶¶ 50–52). Because Petitioner’s proposed level of ordinary skill in the art is consistent with the field of the invention of the ’541 patent and not disputed by Patent Owner (see PO Resp.), we adopt Petitioner’s formulation of the person having ordinary skill in the art.” slip op. at 12
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“Petitioner states “[n]o terms require construction to resolve this Petition.” Pet. 3. Patent Owner does not propose any claim constructions. See PO Resp. For the purposes of this Decision, we need not expressly construe any claim terms. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (noting that “we need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 13
- Expert testimonyOther
“157, and 171 are anticipated by Rao. Pet. 1, 19–39, 42. Petitioner’s arguments are supported by citations to the prior art and the testimony of Dr. Wolfe. See id. We have reviewed Petitioner’s arguments and evidence, agree with them, and, therefore, adopt Petitioner’s arguments and evidence as our own.” slip op. at 26
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)UnpatentableNot shown unpatentableMixed
“anticipated by Rao. Pet. 1, 30–31, 33–42. We have reviewed Petitioner’s arguments for each of those dependent claims. See Pet. 30–31, 33–42. For each of those dependent claims, the Petition appears to only argue a theory of obvious. That is, the Petition never states that the additional limitation is disclosed by Rao. See id. For example, claim 26 depends from claim 1 and further recites “wherein the policy is based on a background service class.” Ex. 1001, 112:49–52. We reproduce Petitioner’s arguments directed to claim 26 below: Rao’s policies 520 may “define prioritization” for network packets “based on whether an application is running in the foreground or the background.” [Ex. 1002] ¶ 182; id. ¶¶ 38–43, 180, 182, 188–89, 193, Figs. 5A, 5B. Each packet “may be placed and arranged in a priority order respective to all other . . . packets to provide a packet by packet prioritization across all applications 338a-338n and . . . network packets.” Id. ¶ 191. It would have been obvious to determine and apply a policy assigning a specific priority to packets associated with background applications, supra [1e]-[1f], and Rao thus discloses or renders obvious assigning a priority to network communications based on whether they are characterized as background services (class of services associated with application(s) running in the background of client 105), EX-1015 ¶¶195-96; supra [1e], [1f]. Pet. 33–34. Although the Petition sets forth why the claim limitation would have been obvious, there is no discussion as to how the additional limitation of claim 26—policy based on background class—is disclosed in Rao. See id. Similar arguments are presented for the other claims. See Pet. 30–31, 35–42. Because the Petition does not sufficiently show how the additional limitations recited in claims 20, 26, 58, 64, 165, and 169 were disclosed by Rao, Petitioner has not shown by a preponderance of the evidence that claims 20, 26, 58, 64, 165, and 169 were anticipated by Rao.” slip op. at 28
Patent outcomesUS 8,589,541 unpatentableClaim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 8,589,541 - Lululemon USA Inc. v. Nike, Inc.Some claims unpatentablePTAB · May 21, 2025 · IPR2024-00159 · APJ Carl M Defranco · IPR · Final written decision
Claims 8, 9, 14, 15, and 19 are unpatentable over Minami; claims 1–3, 7, 16–18, and 20 were not shown unpatentable over Good or Munsing.
RulingsFinal written decision- Skill levelSkill level board ownOther
“lululemon contends, and Nike does not dispute, that a person skilled in the art in the relevant time frame would have had “at least a bachelor’s degree in mechanical engineering, textile engineering, or similar technical degree and at least 3 years of experience working with knitted textiles for use in fabric-based articles, including apparel such as footwear” and such person’s “additional experience compensates for any differences in that person’s education as stated above.” Pet. 13–14 (citing Ex.1003 ¶¶ 33–35); see also PO Resp. 14 (“For purposes of this proceeding, Nike applies lululemon’s proposed level of skill in the art.”). We find that lululemon’s proposed definition is consistent with the problems and solutions described in the ’046 patent and the prior art of record. Thus, we adopt the parties’ agreed-upon definition of the level of skill in the art.” slip op. at 6
- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed board ownDecided for patent owner
“We are not persuaded by lululemon’s attempt to equate the term “channel” in that passage with an open-periphery configuration. Nowhere does that passage indicate that the “channel” has an open-periphery. Instead, lululemon merely presumes, without support, that channels are open-periphery structures. More accurately, the terms “tunnel” and “channel” in the passage cited by lululemon are used synonymously. That is made clear by the overall context of the ’046 patent at issue, which is directed to how tubular rib structures 126 are formed by “first” and “second” curved portions 416 and 418 that are “knitted together” to define “hollow tube 112.” See Ex. 1001, 10:16–11:14, Figs. 4, 5 (emphasis added). In particular, the sentence cited by lululemon describes hollow tube 112 as being “disposed between” first and second curved portions 416 and 418, which Figures 4 and 5 of the ’046 patent clearly depict in a closed-periphery configuration. See id. at 10:66–11:3, Figs. 4, 5. Moreover, the very next sentence expressly describes that hollow tube 112 has “a generally cylindrical or elliptical shape” wherein “[t]he diameter of one hollow tube and the diameter of other hollow tubes may differ in some embodiments.” Id. at 11:3–14 (emphases added). We are not aware of any open-periphery channels being described as having a cylindrical or elliptical shape, nor are we aware of such a channel being described as having a diameter. Thus, lululemon’s proposed claim construction ignores the context surrounding the ’046 patent’s description of the tubular rib structures when it describes them as having the configuration of a tunnel or channel.” slip op. at 10
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable
“We agree with Nike, given our construction of the claimed “tubular structures.” As shown in annotated Figures 1, 3, and 4 of Good (reproduced below), Good discloses a sock 12 having rib portions 22 (red) and webbed areas 24 (green). See PO Resp. 19. lululemon contends that Good’s rib portions 22 meet the claimed “tubular structures” because each rib portion 22 “roll[s] substantially together in the relaxed condition” and “has the shape of a tube, namely an elongate hollow structure.” Pet. 29–30. In support, lululemon points to Good’s Figure 3 (reproduced below center) as allegedly showing the tubular shape of Good’s rib portions 22. Id. at 30. Annotated Figure 3 is a vertical cross-section of rib portions 22 (red) shown in Good’s Figure 1. But, as Nike correctly notes, Good’s rib portions 22 are “C-shaped knitted portions,” which when stretched, go from an essentially C-shaped configuration (Figure 3) to a relatively flat, linear configuration (Figure 4). PO Resp. 19–20 (citing Ex. 2006 ¶¶ 48–49). Nowhere does Good disclose that the ends of C-shaped rib portions 22 ever meet and remain in a closed periphery configuration to form a hollow tube per our construction of “tubular structures” (as discussed above in Section II.B). In at least this way, Good’s C-shaped rib portions 22 differ from the claimed “tubular structures.”7 Thus, we find that Good does not disclose or otherwise suggest the claimed “tubular structures,” as properly construed, meaning that lululemon fails to demonstrate, by a preponderance of the evidence, that Good either anticipates claims 1–3, 7, 16–18, and 20, or, alternatively, renders obvious claim 3.” slip op. at 16
- Expert testimonyPetitioner expert discountedDecided for patent owner
“In our Institution Decision, we said that Munsing lacks the claimed “tubular structures” because “nowhere does Munsing indicate that the rows of stitches or loops form a rib that is tubular-like, let alone one with a closed periphery.” Inst. Dec. 10–12. During the trial phase, lululemon’s expert likewise agreed, conceding (on cross-examination) that Munsing only discloses non-tubular structures. See Ex. 2007, 40:9–41:11 (“Q [by Patent Owner’s counsel]: So you agree that . . . Munsing only discloses a nontubular rib? A [by lululemon’s expert]: That’s what I said.”). Nowhere does lululemon rebut that admission by its own expert, despite Nike noting it explicitly as a reason for rejecting Ground 2. Compare PO Resp. 25–26 (noting the admission of lululemon’s expert), with Pet. Reply 1–26 (addressing only Grounds 1 and 3, while omitting any mention of Ground 2, which is based on Munsing). Nor does lululemon ever dispute the preliminary findings in our Institution Decision as to why Munsing is not an anticipatory reference. Compare Inst. Dec. 10–12, with Pet. Reply 1–22. Thus, lululemon fails to demonstrate, by a preponderance of the evidence, that Munsing anticipates challenged claims 1–3, 7, 17, 18, and 20.” slip op. at 18
Patent outcomesUS 9,375,046 mixedClaim construction§ 102 anticipation§ 103 obviousnessPatents in suitUS 9,375,046 - Google LLC / Cellco Partnership D/B/A Verizon Wireless et al. v. Headwater Research LLCInstitution deniedPTAB · Dec 4, 2024 · IPR2024-00944 · APJ Scott B Howard · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood that Rao anticipates or renders obvious claims 79 and 83.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“the information presented in the Petition does not demonstrate a reasonable likelihood that Petitioner would prevail in establishing the unpatentability of any of the challenged claims of the ’541 patent. IV. ORDER In consideration of the foregoing, it is hereby: ORDERED that the Petition is denied.” slip op. at 24
- BurdenNot shown unpatentable
“the Petition (Ex. 1002 ¶¶ 189–193 (cited by Pet. 22)) and see no discussion as to what causes policies 520 to be sent to filter 322. See Ex. 2001 ¶¶ 42–43 (Mr. de la Iglesia testifying to same). Although Rao describes how agent 326 sends policies to filter 322, Rao is silent as to what causes that transmission: In some embodiments, the agent 326 indicates the priority to the filter 322 for management of network packet queues 540a- 540n to apply the indicated priorities. The agent 326 may communicate the priority of network packets to the filter 322 by any suitable means and/or mechanism such as via an application programming interface (API), such an IOCTL interface, or any other type and/or form of interface known to those ordinarily skilled in the art. Ex. 1002 ¶ 190. That is, Rao is silent as to whether filter 322 requests the policies (as Petitioner argues) or agent 326 acts on its own to send the policies (see Prelim. Resp. 3–6; Ex. 2001 ¶¶ 34–40). And without the message being sent to the filter, there is nothing for the filter to intercept.” slip op. at 19
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable
“the Petition (Ex. 1002 ¶¶ 189–193 (cited by Pet. 22)) and see no discussion as to what causes policies 520 to be sent to filter 322. See Ex. 2001 ¶¶ 42–43 (Mr. de la Iglesia testifying to same). Although Rao describes how agent 326 sends policies to filter 322, Rao is silent as to what causes that transmission: In some embodiments, the agent 326 indicates the priority to the filter 322 for management of network packet queues 540a- 540n to apply the indicated priorities. The agent 326 may communicate the priority of network packets to the filter 322 by any suitable means and/or mechanism such as via an application programming interface (API), such an IOCTL interface, or any other type and/or form of interface known to those ordinarily skilled in the art. Ex. 1002 ¶ 190. That is, Rao is silent as to whether filter 322 requests the policies (as Petitioner argues) or agent 326 acts on its own to send the policies (see Prelim. Resp. 3–6; Ex. 2001 ¶¶ 34–40). And without the message being sent to the filter, there is nothing for the filter to intercept.” slip op. at 19
- Obviousness (§103) › Motivation to combine / reasonable expectation of successNot shown unpatentableMotivation not foundNot shown unpatentable
“Neither the Petition nor Dr. Wolfe’s testimony provide any discussion as to why a person having ordinary skill in the art would have modified Rao to teach the additional limitation recited in either claim 79 or 83. See Pet. 22–23; Ex. 1015 ¶¶ 252–257. This stands in contrast to other portions of the Petition where Petitioner clearly set forth both anticipation and conditional obviousness arguments, including a reason to modify Rao. See, e.g., Pet. 13–15 (arguing that Rao discloses limitation 1e or that a person having ordinary skill in the art “would . . . have been motivated” to modify Rao). Thus, although the Petition purports to argue that claims 79 and 83 are obvious,8 the Petition lacks sufficient argument setting forth the basis for such an obviousness argument. At most, there is a conclusory statement that claims 79 and 83 are obvious. See Pet. 6 (“Rao anticipates most of the limitations discussed under this Ground for the reasons provided below. Rao renders these same limitations obvious for the same reasons.”). That is not sufficient. Where, as here, claims are alleged to be unpatentable as obvious over the prior art, Petitioner cannot make its case solely through mere conclusory statements. In re Magnum Oil Tools Int’l, Ltd., 829 F.3d 1364, 1380 (Fed. Cir. 2016). Moreover, it is not our role to examine the prior art advanced by Petitioner and fill the gaps in Petitioner’s reasoning and factual assertions. Magnum Oil Tools, 829 F.3d at 1381 (“[W]e find no support for the PTO’s position that the Board is free to adopt arguments on behalf of petitioners that could have been, but were not, raised 8 See Pet. 1 (“Rao ‘anticipates and/or renders obvious’ claims” 1, 79, and 83), 6 (“Rao anticipates most of the limitations discussed under this Ground for the reasons provided below. Rao renders these same limitations obvious for the same reasons. Rao also renders obvious the remaining limitations discussed under this Ground.”); Pet. Prelim. Reply 1 (“Rao therefore discloses or renders obvious intercepting a stack API level request by its filter requesting priorities from the agent.”). by the petitioner during an IPR.”); see also SAS Institute Inc. v. Iancu, 138 S.Ct. 1348 (U.S. 2008) (“in an inter partes review the petitioner is master of its complaint”); 37 C.F.R. § 42.104(b)(4) (“The petition must specify where each element of the claim is found in the prior art patents or printed publications relied upon”). Because Petitioner has not offered any reason why a person having ordinary skill in the art would have made a modification to claims 79 and 83, Petitioner has not sufficiently shown that claims 79 and 83 would have been obvious. See Belden Inc. v. Berk-Tek LLC, 805 F.3d 1064, 1073 (Fed. Cir. 2015) (“[O]bviousness concerns whether a skilled artisan not only could have made but would have been motivated to make the combinations or modifications of [the] prior art to arrive at the claimed invention.”).” slip op. at 22
Claim construction§ 102 anticipation§ 103 obviousnessDiscretionary denialcites Phillips · KSR · GrahamPatents in suitUS 8,589,541
Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.