PTAB
Advanced fields
2 decisions · 331msnewest first
  • PTAB · Sep 3, 2021 · IPR2020-01612 · APJ Bart A Gerstenblith · IPR · Rehearing

    The Board granted rehearing and instituted IPR on all petition grounds for claims 1–4, 6–9, 11, 12, and 15, finding a reasonable likelihood of prevailing.

    RulingsRehearing decision
    • RehearingRehearing, grantedGranted

      “II. STANDARD OF REVIEW A party requesting rehearing bears the burden of showing that the decision should be modified. 37 C.F.R. § 42.71(d). “The request must specifically identify all matters the party believes the Board misapprehended or overlooked, and the place where each matter was previously addressed in a motion, an opposition, or a reply.” Id. When rehearing a decision on a petition, we review the decision for an abuse of discretion. 37 C.F.R. § 42.71(c).” slip op. at 2

    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “preliminary stage, we determine that Petitioner demonstrates a reasonable likelihood of prevailing with respect to claim 1.” slip op. at 44

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “The only dispute pertaining to claim construction at this stage of the proceeding is whether the phrase “a process for creating said response message,” recited in claim 1, is governed by 35 U.S.C. § 112 ¶ 6.6 Petitioner 6 As noted above, Petitioner raises a second claim construction issue in its Rehearing Request. See Req. Reh’g 12–15 (asserting that the claims require only one instance of copying information from a formatted message to a response message based on which formatted message was received). Petitioner did not raise this issue in the Petition, Patent Owner has not had an contends that the phrase should be interpreted as a means-plus-function limitation, whereas Patent Owner contends that it should not. Compare Pet. 2–7 (advocating for a means-plus-function construction), with Prelim. Resp. 9–11 (advocating for an ordinary and customary meaning). At this stage of the proceeding, the dispute between the parties regarding the construction of this claim phrase does not impact our Decision. Accordingly, we need not construe expressly any claim terms for the purpose of this Decision.” slip op. at 17

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Instituted

      “VI. ANALYSIS Legal Standards – Anticipation “[A] claim is anticipated ‘if each and every limitation is found expressly or inherently in a single prior art reference.’” King Pharm., Inc. v. Eon Labs., Inc., 616 F.3d 1267, 1274 (Fed. Cir. 2010) (quoting Celeritas Techs., Ltd. v. Rockwell Int’l Corp., 150 F.3d 1354, 1361 (Fed. Cir. 1998)). Anticipation is a question of fact, In re Gleave, 560 F.3d 1331, 1334–35 (Fed. Cir. 2009), assessed from the perspective of one of ordinary skill in the art, see Dayco Prods., Inc. v. Total Containment, Inc., 329 F.3d 1358, 1368 (Fed. Cir. 2003) (“the dispositive question regarding anticipation [i]s whether one skilled in the art would reasonably understand or infer from the [prior art reference’s] teaching that every claim element was disclosed in that single reference” (alteration in original) (quotation omitted)).” slip op. at 18

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 6,925,308
  • PTAB · Jul 18, 2017 · IPR2016-01444 · APJ Patrick M Boucher · IPR · Rehearing

    Granted Blue Coat’s rehearing request and instituted review of claims 1, 4–6, 9, 12–14, 17, 24, 35, and 37; the petition showed a reasonable likelihood of prevailing on the asserted § 103 grounds.

    RulingsRehearing decision
    • RehearingRehearing, grantedGranted

      “reexamination proceeding. Of particular relevance, the reexamination concluded with a Reexamination Certificate issued on November 28, 2016, including a claim for the benefit of the November 8, 1996 filing date of U.S. Provisional Appl. No. 60/030,639 (“the ’639 provisional application”). Ex. 3006 at [60]. In denying the Petition, the Prior Decision noted that “Petitioner has taken no steps to explain or respond to the effect of these developments on its argument.” Dec. 7. This remains true. Nevertheless, we agree with Petitioner that our Prior Decision gave insufficient consideration to the Petition’s assertion that “U.S. Patent No. 7,613,926 [(“the ’926 patent”), i.e., an intermediate patent in the priority chain of the ’086 patent] fails to claim priority to the ’639 provisional application and instead the earliest priority document cited in the ’926 patent is [the ’194 patent].” Pet. 5 (citing Ex. 1012, col. 1, ll. 8–32); see Req. Reh’g 4–5, 6 n.4, 7–9. For a claim of a patent to be entitled to the effective filing date of an earlier filed application, each application in the priority chain must refer to the earlier filed application. Encyclopaedia Britannica, Inc. v. Alpine Elecs. of Am., Inc., 609 F.3d 1345, 1350–52 (Fed. Cir. 2010). Accordingly, we grant Petitioner’s Rehearing Request and proceed to the merits of the Petition.” slip op. at 8

    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedMixed

      “a formally defined safety policy” and allows checking “with certainty, that the proof is valid and hence the foreign code is safe to execute.” Ex. 1004, 107. Thus, Petitioner argues that one of ordinary skill in the art would reasonably understand Necula to teach that its proof-carrying code adds to the foreign code, consistent with the construction of “append” that we apply herein, and Petitioner articulates sufficient reasoning with rational underpinning to apply that teaching to Swimmer’s representation of DSP data. See Pet. 46–49. This is not an instance, for example, in which Petitioner relies on a characterization of the problem provided by the patent to derive its reasoning. Cf., e.g., Mintz v. Dietz & Watson, Inc., 679 F.3d 1372 (Fed. Cir. 2012). Indeed, Patent Owner’s contention that “the storage of the DSP in a database is one of the key features that distinguishes the ‘086 Patent over the prior art” dilutes the strength of its argument. The contrary positions of the parties’ declarants in their testimonial evidence creates a genuine issue of material fact, which we resolve in the light most favorable to Petitioner for purposes of this Decision. 37 C.F.R. § 42.108(c). Accordingly, we conclude that Petitioner has made a sufficient showing also with respect to these elements, and that Petitioner demonstrates a reasonable likelihood of prevailing on its challenge of claims 1 and 9. See infra Section II.E.10 (discussing limits in our weighing of Patent Owner’s Secondary Considerations evidence in this Preliminary Proceeding).” slip op. at 21

    • PTAB / AIA Trials › Real party in interest / privityRpi dispute resolved for petitionerDecided for petitioner

      “be considered under 35 U.S.C. § 312 because Petitioner has failed to name all real parties in interest, as required by the statute.” Prelim. Resp. 9. The parties agree that, on June 12, 2016, Symantec Corporation (“Symantec”) announced that it was acquiring Petitioner. Pet. 13; Prelim. Resp. 9. The Petition discloses that “[t]he transaction is expected to close in the third quarter of 2016,” and that “[a]s of the filing date of this petition the transaction has not been executed.” Pet. 13. The Petition further represents that “Symantec has not controlled or had the ability to control the filing of this petition, whether through funding or strategy.” Id. As noted above, Petitioner expressly identified Symantec as a real party in interest before any decision on institution of an inter partes review was made. Paper 8, 2. Patent Owner contends that “Symantec had control over the filing of the Petition during the period between the announcement of the acquisition and the closing of the acquisition,” which it asserts occurred on August 1, 2016. Prelim. Resp. 9. Patent Owner also contends that it “understands from the underlying litigation that ‘Blue Coat Systems, Inc.’ no longer exists 1 A petition to accept an unintentionally delayed claim of priority for the ’926 patent, claiming the benefit of U.S. Patent Appl. No. 08/790,097 which was filed January 29, 1997, was dismissed by the Office on June 13, 2017. Exs. 1027, 3007. A renewed petition was filed on June 16, 2017. Ex. 3008. At this time, the Office has not ruled on the renewed petition, and that pending petition accordingly does not affect our determination of the challenged claims’ effective filing date for purposes of this Decision. as an entity, or at least goes by ‘Blue Coat Systems LLC’ for at least the last two months.” Id. at 10. We have reviewed the evidence provided by Patent Owner and find it insufficient to support Patent Owner’s allegation that Petitioner has failed to comply with 35 U.S.C. § 312(a) or 37 C.F.R. § 42.8(a)(3). That evidence is, at best, suggestive regarding an issue that is not jurisdictional. Lumentum Holdings, Inc. v. Capella Photonics, Inc., Case IPR2015-00739, slip op. (PTAB Mar. 4, 2016) (Paper 38) (precedential).” slip op. at 9

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed petitioner constructionDecided for petitioner

      “1. “Downloadable” Every challenged independent claim recites a “Downloadable,” and Petitioner contends that “[t]he broadest reasonable interpretation of the term ‘downloadable’ includes ‘an executable application program, which is downloaded from a source computer and run on a destination computer.’” Pet. 15. Petitioner’s proposed construction parallels a statement made in the Specification of the ’194 patent. Ex. 1012, col. 1, ll. 44–47. Patent Owner “does not dispute” this proposed construction, which we adopt for purposes of this Decision. Prelim. Resp. 5. 2. “database” Challenged independent claim 42 recites “a database of Downloadable security profiles.” Petitioner contends that “[t]he broadest reasonable interpretation of the term ‘database’ includes ‘a collection of interrelated data organized according to a database schema to serve one or more applications.’” Pet. 15. Patent Owner also “does not dispute” this proposed construction, but argues that “the practical import of Petitioner’s proposed construction for the term ‘database,’ is that log files, such as Swimmer’s audit trail, do not fall within the scope of the claims.” Prelim. Resp. 5–6. That is, Patent Owner contends that “logging functionality is distinct from storing in a database, which allows DSP to be efficiently retrieved from the database,” as compared with the “record-keeping” functionality of an “event log.” Id. at 7. Patent Owner’s argument was considered by the panel in IPR2015- 01892, which concluded that, “[t]o the extent that construction would exclude a log file consisting of an ‘unstructured collection of data on a computer,’ . . . [an] unstructured log file would not be a database,” but the construction does not “necessarily exclude[] all log files from being databases.” 1892 Dec. 16 (emphasis in original). We agree with the reasoning expressed in the Final Written Decision of IPR2015-01892. Id. at 12–17. For purposes of this Decision, we adopt Petitioner’s proposed construction.” slip op. at 10

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips
    Patents in suitUS 8,079,086

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.