- PTAB · Oct 23, 2023 · IPR2023-00698 · APJ Thomas L Giannetti · IPR · Institution
The Board instituted review of claims 7–11, 13, and 19–21 on all asserted grounds, finding a reasonable likelihood of prevailing for claims 11 and 13.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“Under 35 U.S.C. § 314(a), an inter partes review may not be instituted unless the information presented in the petition “shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” For the reasons stated below, we determine that Petitioner has established a reasonable likelihood that it would prevail with respect to at least one claim. We, therefore, institute inter partes review as to all of the challenged claims of the ’202 patent and all of the asserted grounds of unpatentability.” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“The two proposals are materially similar in the education requirement, but differ marginally in professional experience required (three versus five years). See supra. While we are persuaded, on the present record, that both Petitioner’s and Patent Owner’s proposals are consistent with the problems Petitioner’s proposal is a better reflection of the level of skill in the prior art, and we therefore adopt it for this decision. Our decision would not change, however, if we had applied Patent Owner’s proposed level of ordinary skill.” slip op. at 12
- BurdenMixed
“Figure 6 of Rauhala has been annotated by Patent Owner to show that the parallel connection (outlined in red) including resistors R1, R2. R3 and switches ka, kb is outside the signal path (highlighted in yellow) through differential amplifier 61. Prelim. Resp. 38. Petitioner identifies R1, R2, R3 and switches ka and kb as the claimed variable impedance. See, e.g., Pet. 39–41. The Petition (and the supporting Baker Declaration) do not explain adequately how, under this interpretation by Petitioner and its expert, Rauhala meets the adjusting an impedance “in the signal path” limitation. See Prelim. Resp. 39–41. For the reasons given, therefore, even if we were to disagree with Patent Owner’s construction of “impedance,” we agree with Patent Owner that Petitioner fails to demonstrate sufficiently that Rauhala meets the limitation in claims 7 and 19 requiring “dynamically adjusting one or more of an impedance . . . in the [receiver] signal path.” For the reasons given, we determine that Petitioner has demonstrated a reasonable likelihood of prevailing on its challenge to claims 11 and 13 as anticipated by Rauhala. We further determine that Petitioner has not demonstrated a reasonable likelihood of prevailing on its challenge to claims 7 and 19 as anticipated by Rauhala.” slip op. at 26
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Instituted
“We disagree. Noting in the language of the claims requires that these method steps be performed by separate components, or that these method steps “provide two different channel indications at once” (Prelim. Resp. 38), only that they be performed as stated in the claim. In that respect, this case is distinguished from In re Robertson, where the Federal Circuit determined that the “third fastening means” required by the claims was not inherently disclosed by the prior art. Robertson, 169 F.3d at 745 (“The [prior art] patent does not expressly include a third fastening means for disposal of the diaper, as claim 76 requires.”). In further contrast to this case, Robertson addressed mechanical elements of a product (fasteners for disposable diaper), not steps in a process. More pertinent to our facts is the Federal Circuit’s decision in Microsoft Corporation v. Uniloc, 2017 LLC, No. 2021- 2039, 2022 WL 11531235 (Fed. Cir. Oct. 20, 2022), that addresses steps in a method claim. Reversing the Board’s determination that a petitioner had 6 See Ex. 1001, 14:5–6 (claim 7), 14:41–42 (claim 11), 15:18–19 (claim 13), and 17:28–29 (claim 19). Circuit concluded that the Board had misconstrued the claims to require separate acts: We agree with [petitioner] that the Board misconstrued the claims to require that the comparing and determining step are performed by two separate acts in a certain order. Nothing in the intrinsic record requires such a narrow construction, and neither party presented this construction to the Board. Without any such evidence, we decline to impose such a narrow claim construction. Microsoft Corp., 2022 WL 11531235, at *3 (citation and footnote omitted). We find that at this stage, Petitioner has made a sufficient showing that this limitation is met by Rauhala. Pet. 31–33; Baker Decl. ¶¶ 111–114.” slip op. at 22
§ 102 anticipation§ 103 obviousnesscites GrahamPatents in suitUS 10,524,202 - PTAB · Oct 23, 2023 · IPR2023-00697 · APJ Barbara A Benoit · IPR · Institution
The Board instituted review of claims 1, 3, 4, and 8 on all asserted grounds, finding a reasonable likelihood that Rauhala anticipates at least one challenged claim.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“Applying the standard set forth in 35 U.S.C. § 314, which requires demonstration of a reasonable likelihood that Petitioner would prevail with respect to at least one challenged claim, we institute an inter partes review.” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“We are persuaded, on the present record, that both Petitioner’s and Patent Owner’s proposals are consistent with the problems and solutions in the ’825 patent and prior art of record. See In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001). On balance, Petitioner’s proposal of education plus a minimum of two years of experience is a better reflection of the level of skill in the prior art. For example, Rauhala presents functional block diagrams of signal strength information. See, e.g., Ex. 1004, Figs. 1–5, ¶¶ 15, 17, 19, 21. Similarly, Masaaki’s Figure 1 shows “a circuit block diagram of a reception unit 40 of a pager” according to an embodiment of the invention. Ex. 1005, 5:3–4. The block diagram shows various components, including an antenna, amplifiers, bandpass filters, a mixer, an oscillator, and a detection circuit. Id. at 5:5–8, Fig. 1. Accordingly, we adopt Petitioner’s definition of the level of ordinary skill for purposes of this Decision. Our decision, however, would not change if we had applied Patent Owner’s proposed level of ordinary skill.” slip op. at 9
- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed board ownDecided for petitioner
“strength indicator circuits 440 and 450, the written description unambiguously discloses that each circuit determines the cumulative signal level of the desired signal and the interfering signals. Neither circuit determines only the signal strength of the interferer signals, nor does a circuit determine only the signal strength of the desired signal. In other words, the written description does not support a limited reading of the claim language so as to require two separate circuits—one circuit for determining a a signal strength of the desired signal. Thus, based on this preliminary record, we do not construe the circuit limitation as requiring the wireless transceiver necessarily to have two circuits, one circuit for determining a signal strength of the interferer signal and a different circuit for determining a signal strength of the desired signal, because, under that reading of the claim, the only embodiment in the written description would not fall within the scope of the claim. It is well-established that “[s]uch an interpretation is rarely, if ever, correct and would require highly persuasive evidentiary support,” which is not present in this record as discussed below. Vitronics Corp. v. Conceptronic, Inc., 90 F.3d 1576, 1584 (Fed. Cir. 1996).” slip op. at 14
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Instituted
“As explained above, however, on this preliminary record, we do not interpret the circuit limitation to impose a timing requirement such that the determining has to occur at precisely the same time. Nor at this preliminary juncture do we read a precise timing requirement into the circuit limitation based on written description disclosure that the desired signal and the interferer signal are part of the received signal input spectrum. As explained above, for example, the written description describes a circuit providing a cumulative signal level corresponding to the sum of the desired and interfering signals. Ex. 1001, 6:59–67. As such, the written description describes making the determinations on two signals that are part of the received signal input spectrum. Patent Owner argues that Rauhala does not disclose “two determinations of two different signal strengths together.” Prelim. Resp. 40. We do not agree with Patent Owner on this preliminary record. Rauhala’s disclosure of providing control bits based on the comparisons of the signal strengths to respective thresholds, discussed above, also undermines Patent Owner’s argument that detector DET, which (i) provides one or the other and (ii) needs to be re-tuned to read the other signal, cannot anticipate the claim. Notably, for example, Rauhala discloses setting control bits based on comparisons of the respective signal strengths to thresholds: cM. Signal cA is 0 when signal RSS is greater than S4 and signal RSSn is at the same time smaller than Sn. Otherwise, signal cA is 1. Signal cA is taken to amplifiers Al and A2. Signal cM is 1 when signal RSS is not greater than S4 and signal RSSn is at the same time at least Sn. Ex. 1004 ¶ 17 (emphases added). Here Rauhala describes providing control signals based on the strength of both signals from the receive and neighboring channels, which undermines Patent Owner’s arguments.” slip op. at 25
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSRPatents in suitUS 10,129,825 - PTAB · Jul 21, 2023 · IPR2023-00466 · APJ Sharon Fenick · IPR · Institution
The Board instituted review of claims 7–9, 11, 15, 17, 18, 20, and 21 on all asserted grounds, finding a reasonable likelihood of unpatentability.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“An inter partes review may be instituted only if “the information presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2018). For the reasons below, Petitioner has established a reasonable likelihood that it would prevail in showing the unpatentability of at least one of the challenged claims. Accordingly, we institute an inter partes review of the challenged claims on all grounds raised in the Petition.” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“A person of ordinary skill in the art (“POSA”) would have had a bachelor’s degree in electrical engineering and a minimum of 3-4 years of industry experience in wireless communications networks and engineering, including some knowledge of or experience with distributed antenna systems. An individual with a master’s degree in electrical engineering would require less industry experience (e.g., 1-2 years). Pet. 19 (citing Ex. 1003 (Declaration of Dr. Anthony Acampora) ¶ 24). Patent Owner proposes substantially the same level of skill, but does not require the industry experience in wireless communications networks and engineering to include “some knowledge of or experience with [distributed antenna systems].” Prelim. Resp. 8–9 (citing Ex. 2001 (Declaration of Dr. Daniel Foty) ¶ 13); Ex. 1025, 9–10). For purposes of this Decision, we apply Petitioner’s definition of the level of ordinary skill in the art. Our decision would not be different if we adopted Patent Owner’s proposed level of skill.” slip op. at 11
- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed petitioner constructionDecided for petitioner
“On the present record and for the purpose of this Decision, we agree with Petitioner that the proper construction of “communications unit” encompasses multiple DRUs or antenna units. Although Patent Owner is correct that not every embodiment needs to be reflected in every claim, and indeed, some embodiments may not appear in any claim, we do not agree that there is evidence supporting Patent Owner’s argument that the construction of “communications unit” should be narrowed to the embodiment requiring only one DRU/antenna. The cited claims do not indicate that multiple units may not transmit at the sets of frequencies recited. Additionally, although Patent Owner cites claim 16 as requiring that each communications unit is a single DRU, if that were a correct reading of claim 16, it is not clear what the claim recitation would add, as it would not narrow the prior recitation of a “communications unit” from claim 15. Such interpretations are disfavored. See Cat Tech LLC v. TubeMaster, Inc., 528 F.3d 871, 885 (Fed. Cir. 2008) (refusing to adopt a claim construction that would render a claim limitation meaningless); Bicon, Inc. v. Straumann Co., 441 F.3d 945, 950 (Fed. Cir. 2006) (explaining that “claims are interpreted claim 16 uses the inclusive “comprises” in its recitations, which is an open-ended term and does not exclude the possibility of other DRUs in a communication unit. See Genentech, Inc. v. Chiron Corp., 112 F.3d 495, 501 (Fed. Cir. 1997) (“‘Comprising’ is a term of art used in claim language which means that the named elements are essential, but other elements may be added and still form a construct within the scope of the claim.”).” slip op. at 14
- Prior constructionPrior construction adoptedDecided for petitioner
“Additionally, with respect to claim 20, Petitioner argues that “the first frequency band” and “the second frequency band” recited in claim 20 lack antecedent bases and are indefinite. Pet. 42, 64. This issue was addressed in the Eastern District of Texas cases claim construction order that construed “the first frequency band and the second frequency band” as “the first frequency range and the second frequency range.” Ex. 1037, 19–20. For the purposes of this Decision, we agree with and adopt the reasoning and this determination is preliminary and for the purposes of this Decision; the parties may address it further in future briefing in accordance with our rules.” slip op. at 17
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 9,197,358 - PTAB · Apr 13, 2023 · IPR2022-01577 · APJ William V Saindon · IPR · Institution
The Board instituted IPR on claims 1–4 and 6–10 on all petitioned grounds, finding a reasonable likelihood that claim 1 was anticipated by the HDI 3000 Manual.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“review under 35 U.S.C. § 314(b) and 37 C.F.R. § 42.4(a) (2020). The standard for instituting an inter partes review is set forth in 35 U.S.C. § 314(a), which provides that an inter partes review may not be instituted unless “there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” For the reasons provided below, we determine Petitioner has satisfied the threshold requirement set forth in 35 U.S.C. § 314(a). Because Petitioner has demonstrated a reasonable likelihood that at least one claim of the ’157 patent is unpatentable, we institute an inter partes review of all challenged claims based on all grounds raised in the Petition. 37 C.F.R. § 42.08(a).” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“B. Level of Ordinary Skill in the Art Petitioner asserts that a person of ordinary skill in the art: would have a degree in electrical engineering, biomedical engineering, or a related discipline, along with relevant experience (at least 2–3 years for a Ph.D., 3–5 years for a Master’s, and 5+ years for a Bachelor’s) researching or developing ultrasound systems or other medical imaging devices. EX1008, ¶¶21–26. The POSA would have general knowledge of ultrasound systems and related technologies as of January 15, 2001. Id. Pet. 7–8. Patent Owner applies Petitioner’s definition for purposes of its Preliminary Response. Prelim. Resp. 5. We adopt the parties’ accepted definition for purposes of this Decision.” slip op. at 6
- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed board ownDecided for petitioner
“In this case, Patent Owner’s assertion that its proposed construction is “consistent with the specification” fails to articulate or apply the proper standard. For example, any interpretation whose scope is equal to or narrower than a proper construction would logically be consistent with that proper construction. Thus, Patent Owner could only establish that its proposed interpretation is equal to or narrower in scope than the proper interpretation. Comparing the claims to prior art using a claim construction potentially narrower than what is claimed would not be a fruitful exercise because the claim could read on the prior art but not on the unduly narrow interpretation. Cf. Brown v. 3M, 265 F.3d 1349, 1351 (Fed. Cir. 2001) (holding that a broad claim is anticipated by any narrow disclosure falling within the broad claim). Patent Owner’s assertion that its proposed construction is consistent with examples in the specification is also not persuasive, and no more persuasive than its prior implication that its proposed construction is not inconsistent with the specification. i4i Ltd. P’ship v. Microsoft Corp., 598 F.3d 831, 843–44 (Fed. Cir. 2010) (“[A] claim is not limited to the embodiments described in the specification unless the patentee has demonstrated a clear intention to limit the claim’s scope with words or expressions of manifest exclusion or restriction.” (internal quotation omitted)). Similar to the situation in i4i, Patent Owner here has failed to explain how the claim is clearly limited to the examples in the specification. Instead, we construe “information of object” to be an identification of the object to be studied in the ultrasound examination, based on its plain language in the context of the claimed ultrasound device. We are not apprised of any language, on this record, in the ’157 patent or prosecution history that otherwise constrains what types of “object” would be inspected by the claimed device. For example, there is no indication that the machine is less capable than other ultrasound machines in a way that limits its use to examinations of certain things in a body such as a liver or a heart, but not simpler things in a body such as blood vessels or more complex things such as a fetus. Accordingly, we see no reason to constrain “object” to something other than those things in a body that a person of ordinary skill in the art would investigate during an ultrasound examination.” slip op. at 7
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“It does not appear necessary at this time to specifically construe any other claim terms. Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)).” slip op. at 9
Claim construction§ 102 anticipationcites Phillips · KSRPatents in suitUS 6,901,157 - PTAB · Apr 13, 2023 · IPR2022-01576 · APJ William V Saindon · IPR · Institution
The Board instituted IPR on claims 1–3 on all petitioned grounds, finding a reasonable likelihood that claim 1 is unpatentable over Petruzzelli.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“review under 35 U.S.C. § 314(b) and 37 C.F.R. § 42.4(a) (2020). The standard for instituting an inter partes review is set forth in 35 U.S.C. § 314(a), which provides that an inter partes review may not be instituted unless “there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” For the reasons provided below, we determine Petitioner has satisfied the threshold requirement set forth in 35 U.S.C. § 314(a). Because Petitioner has demonstrated a reasonable likelihood that at least one claim of the ’985 patent is unpatentable, we institute an inter partes review of all challenged claims based on all grounds raised in the Petition. 37 C.F.R. § 42.08(a).” slip op. at 2
- Skill levelSkill level board ownDecided for petitioner
“B. Level of Ordinary Skill in the Art Petitioner asserts that a person of ordinary skill in the art: would have a degree in electrical engineering, computer science, or a related discipline, along with relevant experience (at least 1– 2 years for a Ph.D., 2–3 years for a Master’s, and 3+ years for a Bachelor’s) researching or developing graphical user interfaces (GUIs) for ultrasound systems or other medical imaging devices. EX1007, ¶¶14–19. The person would have general knowledge of GUIs for ultrasound systems or other medical imaging devices as of April 18, 2014. Id.” slip op. at 7
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“C. Claim Construction Petitioner asserts that no claim terms require construction at this stage. Pet. 15. Patent Owner does not offer any claim constructions, but does challenge Petitioner’s choice not to offer any claim constructions, and suggests that we should deny the Petition on that basis. Prelim. Resp. 75– 77. We find Patent Owner’s arguments unavailing. First, we note that the parties have not offered competing claim constructions, such that there is no specific claim construction issue between the parties at this time. Second, we note that we consider Petitioner’s interpretation of the claims sufficiently clear based on their application of the claims on the art. Thus, we are able to proceed without explicitly construing any claim terms, and we are not persuaded to deny on that basis. In view of the above, we do not construe any claim terms. Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)).” slip op. at 8
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Instituted
“To establish anticipation, every element and limitation of the claimed invention must be found in a single prior art reference, arranged as in the claim. Karsten Mfg. Corp. v. Cleveland Golf Co., 242 F.3d 1376, 1383 (Fed. Cir. 2001).” slip op. at 6
Claim construction§ 102 anticipation§ 103 obviousnesscites KSRPatents in suitUS 9,538,985 - PTAB · Apr 13, 2023 · IPR2022-01575 · APJ Frances L Ippolito · IPR · Institution
The Board instituted IPR on claims 1–6, 12, 13, and 15 on all petition grounds, finding a reasonable likelihood that claim 1 is anticipated and/or obvious over Halmann.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“unless the information presented in the Petition and any response thereto shows “there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” Considering the arguments presented in the parties’ briefs, we conclude that the information presented in the Petition establishes that there is a reasonable likelihood that Petitioner would prevail in challenging at least 1 of the claims 1–6, 12, 13, and 15 of the ’168 patent as unpatentable under the grounds presented in the Petition. Pursuant to § 314, we hereby institute an inter partes review.” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“For purposes of this Decision, we adopt Petitioner’s proposal as reasonable and consistent with the prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (the prior art may reflect an appropriate level of skill in the art).” slip op. at 8
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“Petitioner “does not believe any terms require construction at this stage.” Pet. 10. At this stage of the proceeding, Patent Owner has not yet filed a response. For purposes of this decision, we do not expressly construe any terms. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017)), cert. denied, 138 S. Ct. 1695 (April 30, 2018) (noting that “we need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy’”) (citing Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)).” slip op. at 9
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Instituted
“We have reviewed Petitioner’s evidence and argument, and find that Petitioner has sufficiently shown that Halmann discloses this limitation of claim 1 for the purposes of institution.” slip op. at 19
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 7,867,168 - PTAB · Mar 9, 2023 · IPR2022-01293 · APJ Sharon Fenick · IPR · Institution
The Board instituted IPR on claims 1–19 and all petition grounds, finding a reasonable likelihood of unpatentability based on Wu grounds and compelling merits despite Fintiv factors favoring denial.
RulingsInstitution decision- PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Denied
“f) Conclusion – Initial Fintiv Analysis We have considered the circumstances and facts before us in view of the first five Fintiv factors. Because our analysis is fact driven, no single factor is determinative of our conclusion. Considering these five Fintiv factors, we determine that they favor a discretionary denial. 2. Assessment of the Compelling Merits As we have found that the first five Fintiv factors favor discretionary denial, we proceed to assess whether the record shows that Petitioner has presented a compelling unpatentability challenge.” slip op. at 16
- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“An inter partes review may be instituted only if “the information presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2018). For the reasons below, Petitioner has established a reasonable likelihood that it would prevail in showing the unpatentability of at least one of the challenged claims. As discussed below, we have considered our whether to exercise our discretion to deny pursuant to 35 U.S.C. § 314(a) and determined not to exercise this discretion. Accordingly, we institute an inter partes review of the challenged claims on all grounds raised in the Petition.” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“Patent Owner’s definition appears generally consistent with Petitioner’s definition, with the exception of requiring 3 years or more (as systems. For the purpose of institution, we adopt Petitioner’s provided definition for the level of skill of a person of ordinary skill in the art as reasonable and consistent with the prior art, which does not encompass an open-ended (“at least 3 years”) amount of experience, and which is supported by the testimony of Dr. Acampora. We would reach the same conclusions if we were to remove the open-ended terminology from Patent Owner’s definition and adopt that.” slip op. at 20
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)Term construed board ownDecided for patent owner
“Thus, the record does not support Patent Owner’s proposed construction of “radio resources,” that requires the RF carriers, CDMA codes, TDMA time slots or other information defining and describing the way data is being transmitted cannot include the user payload data that is transmitted. 4. Our Partial Construction For our present purposes, we do not need to completely construe the term “radio resources.” Nidec Motor Corp., 868 F.3d at 1017. However, a partial construction is required, and for the reasons discussed above, for this Decision, we construe “radio resources” to encompass RF carriers, CDMA codes, and TDMA time slots, including those in which underlying data is transmitted.” slip op. at 26
Claim construction§ 102 anticipation§ 103 obviousnessDiscretionary denialcites KSR · GrahamPatents in suitUS 10,334,499 - Samsung Electronics Co., Ltd. / Taiwan Semiconductor Manufacturing Co. Ltd. v. Arbor Global Strategies LLCAll claims unpatentablePTAB · Nov 24, 2021 · IPR2020-01020 · APJ Karl D Easthom · IPR · Final written decision
The Board held claims 1, 5, and 7 anticipated by Alexander, and all challenged claims unpatentable as obvious over the stated combinations.
RulingsFinal written decision- Skill levelSkill level petitioner adoptedDecided for petitioner
“Patent Owner contends that “a person of ordinary skill in the art . . . would have had a Bachelor’s degree in Electrical Engineering or a related and either (1) two or more years of industry experience; and/or (2) an advanced degree in Electrical Engineering or related field.” PO Resp. 4–5 (citing Ex. 2015 ¶ 33). We adopt Petitioner’s proposed level of ordinary skill in the art as we did in the Institution Decision, which comports with the teachings of the ’035 patent and the asserted prior art. See Inst. Dec. 19. Patent Owner’s proposed level is slightly lower than Petitioner’s but it overlaps with Petitioner’s proposed level. Even if we adopted Patent Owner’s proposed level, the outcome would remain the same. C.” slip op. at 8
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“accordance with the ordinary and customary meaning of such claim as understood by one of ordinary skill in the art and the prosecution history pertaining to the patent.” 37 C.F.R. § 42.100(b) (2019). Under the same standard applied by district courts, claim terms acquire their plain and ordinary meaning as would have been understood by a person of ordinary skill in the art at the time of the invention and in the context of the entire patent disclosure. Phillips v. AWH Corp., 415 F.3d 1303, 1313 (Fed. Cir. 2005) (en banc). “There are only two exceptions to this general rule: 1) when a patentee sets out a definition and acts as his own lexicographer, or 2) when the patentee disavows the full scope of a claim term either in the specification or during prosecution.” Thorner v. Sony Comput. Entm’t Am. LLC, 669 F.3d 1362, 1365 (Fed. Cir. 2012). Based on the current record, no terms require explicit construction. See, e.g., Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy’. . . .” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))). D.” slip op. at 9
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)UnpatentableUnpatentable
“In other words, contrary to Patent Owner’s arguments, Alexander need not enable “wafer-thinning technology,” because challenged claims 1, 5, and 7 at issue here do not require that technology. Even so, the ’035 patent admits the “wafer-thinning technology” was known and “developed by Tru-Sci Technologies” prior to the invention. See Ex. 1001, 2:20–30; Prelim. Resp. 18–19 (citing Ex. 1001, 2:20–30; Ex. 2008); Bristol-Myers Squibb Co. v. Ben Venue Labs., Inc., 246 F.3d 1368, 1379 (Fed. Cir. 2001) (“Enablement of an anticipatory reference may be demonstrated by a later reference”). Accordingly, an artisan of ordinary skill reading Alexander 9 Patent Owner does not challenge this preliminary finding in its Response. After a full review of the record, we incorporate and adopt this finding as supported by a preponderance of the evidence. would have considered Alexander enabled for such known technology at the time of the invention.10” slip op. at 16
- Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundUnpatentable
“Contrary to these arguments, claim 9 does not recite or require a “stacked die hybrid,” “buffer cells,” any improvements in FPGA reconfiguration times, or a “3D IC.” Claim 9 recites a “reconfigurable computer system” in the preamble, but it does not even recite how the “memory” and “processor” functionally or structurally relate to the “first and second integrated circuit die elements” of the “processor module.” As indicated above, Alexander carries a presumption of enablement as a prior art reference. See Antor Media, 689 F.3d at 1288; Amgen, 314 F.3d at 1355. Alexander employs multi-chip module fabrication techniques “to establish electrical contacts between the interconnect substrate and pads on individual dies.” Ex. 1006, 4. As to obviousness, Petitioner relies on known systems that include a microprocessor, FPGA, and memory. Pet. 22–23 (citing “APA Figure 1”). Petitioner persuasively shows that an artisan of ordinary skill readily could have connected the known FPGA module in a processor and memory system as a substitute for a prior art FPGA, with the system performing as predicted, as evidenced by the block diagram wiring connections in admitted prior art Figure 1 of the ’035 patent, in order to save space and increase processing speed with a reasonable expectation of success. See Pet. 10–11, 21–25 (citing Ex. 1002 ¶¶ 85–93). Patent Owner also alleges thermal issues in Alexander render the claimed combination “inoperable.” PO Resp. 25–28. Again, however, Patent Owner relies on a module or stack of a “3D FPGA with other power hungry components, such as logic dies including microprocessors” to support its arguments. Id. at 27. This argument mischaracterizes the breadth of claims 9, 13, and 15, which do not require a stack that includes a 3D FPGA stack with a microprocessor and memory in that stack, as Petitioner shows and as outlined above. Based on the foregoing discussion, Petitioner shows persuasively that” slip op. at 25
Patent outcomesUS RE42,035 unpatentableClaim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham - Tricklestar LLC v. Embertec Pty Ltd.All claims unpatentablePTAB · Dec 20, 2017 · IPR2016-01336 · APJ Stacy B Margolies · IPR · Final written decision
Claims 1–4, 7, and 9 are unpatentable as anticipated by EP ’379; claims 5 and 6 are unpatentable as obvious over EP ’379 and EP ’752.
RulingsFinal written decision- Skill levelSkill level petitioner adoptedDecided for petitioner
“We determine that the level of ordinary skill proposed by Petitioner and Petitioner’s declarant is consistent with the challenged patent and the asserted prior art, and we therefore adopt that definition of the level of ordinary skill in the art for the purposes of the analysis below. See Ex. 1001, 1:14–15 (“The invention relates to aspects of the monitoring of electrical power supply to electrical equipment.”); Ex. 1002 ¶ 1 (“The present invention relates to a method and system to provide power saving for electronic devices while such devices are in the standby mode and are not in use, particularly for a setting accommodating multiple electronic devices especially in the end-user sector.”); Ex. 1003 ¶ 1 (“The present invention relates to an automatic means switch device used to disconnect a load from” slip op. at 9
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“We determine that we do not need to expressly construe “input” (claim 1), “electrical input” (claim 9), “sensor” (claims 1 and 9), and “alert device” (claim 5) to determine whether Petitioner has shown by a preponderance of the evidence that claims 1–7 and 9 are unpatentable.” slip op. at 11
- Novelty / Anticipation (§102) › Prior-art status of a reference › Patents / published applications (effective date, provisional support)Reference is prior artDecided for petitioner
“EP ’379 was published April 22, 2009. Ex. 1002, [43]. Because EP ’379 was published before the earliest possible invention date of record in this proceeding, Petitioner has shown by a preponderance of the evidence that EP ’379 is prior art to claims 1–4, 7, and 9 of the ’099 patent at least under 35 U.S.C. § 102(a).” slip op. at 16
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)UnpatentableUnpatentable
“Pet. 16. As illustrated above, Petitioner adds red ovals around what it contends, and with which we agree, correspond to the claimed sensor and microprocessor: infrared receiver unit 10 and microprocessor 12. Id. EP ’379 discloses that infrared receiver unit 10 is coupled to microprocessor 12 and that the infrared receiver unit monitors wireless output signals from a remote control. Ex. 1002, Fig. 3, ¶¶ 24, 26. Specifically, EP ’379 discloses that “the signals of the remote controls of electronic devices connected to the subject controller [are] sensed, identified, and interpreted by the controller.” Id. ¶ 23; see also id. ¶ 26 (stating that “the remote control signals controlling the devices connected to the controller can also be sensed by the controller”). According to EP ’379, “[t]he controller unit identifies as to which electronic device’s remote control the user has depressed by means of the signal receiver (10) on itself.” Id. ¶ 24. EP ’379 also discloses that the microprocessor terminates power supplied to the external electrical device based upon the absence of detection of signals from the remote control. Id. ¶ 26. EP ’379 states the following: The controller can be set to a predetermined time period in order to save power, and if no signal is received within this time period from a remote control of any device connected to it, the controller can turn OFF such devices in turn or at the same time according to a predetermined power saving rule. Id. EP ’379 adds an example of a user setting the automatic turn-off period to three hours. Id. Under this example, according to EP ’379, “if the user does not depress any key on any remote control of any electronic device connected to the controller, or if no signal is sensed by the controller within three hours, the controller may power off the electronic devices connected to itself in sequence according to an automatic turning-off rule.” Id. In sum, Petitioner shows by a preponderance of the evidence that claim 1 is unpatentable as anticipated by EP ’379.” slip op. at 20
Patent outcomesUS 9,106,099 unpatentableClaim construction§ 102 anticipation§ 103 obviousnesscites KSR · GrahamPatents in suitUS 9,106,099 - Nautilus Hyosung Inc. v. Diebold Nixdorf, Inc.All claims unpatentablePTAB · Aug 14, 2017 · CBM2016-00034 · APJ Barbara A Benoit · CBM · Final written decision
Claims 1–24 are unpatentable under § 101; claims 1–3 and 5 are also anticipated by Riach, and specified claims are obvious over combinations of Riach, Graf, Gustin, and Anderson.
RulingsFinal written decision- Patent Eligibility (§101) › Alice/Mayo step one — 'directed to'Step1 directed to exceptionUnpatentable
“For these reasons, we determine that claim 20—its focus and its” slip op. at 37
- Patent Eligibility (§101) › Alice/Mayo step two — inventive conceptStep2 no inventive conceptUnpatentable
“For the foregoing reasons, we conclude that claim 20 is directed to an” slip op. at 52
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)UnpatentableUnpatentable
“encompasses Riach’s process that copies a portion (but not all) of the original check image data to produce the required modified check image data. Accordingly, we agree that the portion of Riach on which Petitioner relies discloses step (b) of claim 1 that requires, among other limitations, the modified check image data not include at least some visual feature data included in the check image data. Pet. 30 (relying on Ex. 1008, 5:16–30, Figs. 4, 7).” slip op. at 73
- Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundUnpatentable
“several elements is not proved obvious merely by demonstrating that each of its elements was, independently, known in the prior art.” KSR, 550 U.S. at 418. Rather, “it can be important to identify a reason that would have prompted a person of ordinary skill in the relevant field to combine the elements in the way the claimed new invention does.” Apple, 839 F.3d at 1058 (quoting KSR, 550 U.S. at 418–19); see also KSR, 550 U.S. at 418 (“[T]here must be some articulated reasoning with some rational underpinning to support the legal conclusion of obviousness.”) (quoting In re Kahn, 441 F.3d 977, 988 (Fed. Cir. 2006)).” slip op. at 89
Patent outcomesUS 7,314,163 unpatentable§ 101 eligibility§ 102 anticipation§ 103 obviousnesscites Alice · Mayo · Bilski · Enfish · Electric Power · Phillips · GrahamPatents in suitUS 7,314,163
Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.