  • PTAB · May 16, 2025 · IPR2024-00140 · APJ Christopher L Ogden · IPR · Final written decision

    Claims 1, 7–10, 12–16, 18, and 19 are unpatentable over the stated grounds; claims 4–6 were not shown unpatentable because the proposed multi-coil alignment lacked prior-art support.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Petitioner argues that a person of ordinary skill in the art “would have had . . . a bachelor’s degree in electrical engineering, microelectronics, or equivalent and . . . two to three years of industry or research experience in the field of wireless energy transfer,” and that “a higher level of education or skill might make up for less experience, and vice-versa.” Pet. 6 (citing Ex. 1003 ¶¶ 39–44). Patent Owner does not contest this. See PO Resp. Petitioner’s proposed articulation is supported by testimonial evidence and appears to be consistent with the types of problems and solutions in the ’654 patent. See Ex. 1001, 1:15–28. We adopt it for this decision.” slip op. at 7

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “We agree with Petitioner that the evidence does not suggest (and Patent Owner does not explicitly argue) that the terms “transmitting antenna” and “receiving” antenna depart from the ordinary and customary meanings of those terms. Pet. 1–2. However, for the reasons discussed below, the outcome of our decision would be the same whether we adopted Petitioner’s or Patent Owner’s proposed construction. Thus, we need not adopt either party’s proposed construction for this decision. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 9

    • Expert testimonyPetitioner expert creditedPatent owner expert discountedDecided for patent owner

      “spaced configuration are not confined to ferrite cores 32 and 3, and that at least a component of the flux lines will escape the cores. See Ex. 1032 ¶¶ 48–52; Ex. 1038 ¶ 54 Fig. 2. Indeed, the evidence suggests (and Dr. Horenstein acknowledges in his first declaration) that at least a component of flux will escape the core of even a traditional transformer. See Ex. 1032 ¶¶ 45–47; Ex. 1044, 6; Ex. 2001 ¶ 27. In his second declaration, Dr. Horenstein provides contrary testimony that in Odachi’s open configuration during alignment, cores 32 and 3 “act to confine or guide the magnetic flux lines, rather than radiate them into free space,” and “the flux lines would [not] leave the gap area and enter into the space distal to the magnetic circuit.” Ex. 2010 ¶ 69. But in view of Dr. Horenstein’s contrary position in his first declaration, and the lack of supporting evidence in his second, we do not find it credible. 37 C.F.R. § 42.65(a) (2022) (“Expert testimony that does not disclose the underlying facts or data on which the opinion is based is entitled to little or no weight.”); Apple Inc. v. MPH Techs. Oy, 28 F.4th 254 (Fed. Cir. 2022).” slip op. at 24

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)UnpatentableUnpatentable

      “(4) Analysis We are persuaded by Petitioner’s argument that during the alignment process in Odachi corresponding to claim 13, there is a “spaced distance between the primary inductive coupler [230] and the secondary inductive receptacle 2” which is “reduced gradually and electromagnetic induction occurs between the coupler to the receptacle when the former coupler comes close to the latter receptacle.” Ex. 1005, 6:1–6. Thus, prior to any contact or precise alignment between the two cores, “an electromotive force is induced in the secondary coil 4 and this induced force is increased with the decrease in the spaced distance.” Id. at 6:6–8. At least in that spaced configuration, the evidence of record suggests that primary coil 31 produces a near-field component of flux into free space (the air space between the coils where there is no intervening core material) that is intercepted by secondary coil 4 to effect resonant inductive coupling, and that secondary coil 4 intercepts and receives the near-field component of flux in free space that is generated by primary coil 31 to effect resonant inductive coupling. See Ex. 1032 ¶¶ 48–52, 55. Thus, we find that Odachi discloses a “transmitting antenna” (coil 31) and a “receiving antenna” (coil 4) under Patent Owner’s proposed construction. We would reach the same finding under Petitioner’s proposed broader construction because the evidence suggests that Odachi’s coils 31 and 4 would have been considered “antennas” under the parties’ uncontested definition of that term, which is “a device that radiates and/or receives radio waves.” See id. ¶¶ 43–47, 53–54; Ex. 1032 ¶ 15 (Dr. Allen agreeing with this definition of “antenna”); Ex. 2001 ¶ 25 (Dr. Horenstein agreeing with this definition of “antenna”)). In addition, Petitioner persuasively shows that the free space between Odachi’s coils in the spaced configuration includes the “near-field region,” which includes the induction field around primary coil 31. See Ex. 2006, 498; Ex. 1045, 5:4–7; Ex. 1032 ¶¶ 53–54). Dr. Horenstein’s testimony does not contradict this. Although he points out that there are separate terms for inductive, near, and far fields, he also acknowledges that “[t]he region of space closer to the antenna than the far field is the near-field region.” Ex. 2010 ¶ 37 (citing Ex. 2006, 275).8” slip op. at 22

    Patent outcomesUS 8,466,654 mixed
    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 8,466,654
  • PTAB · Feb 13, 2025 · IPR2024-01245 · APJ Thu A Dang · IPR · Institution

    The Board denied institution on claims 1, 3, 4, 5, 8, 10, and 12 under § 314(a), finding the Fintiv factors favored denial and the petition did not show compelling merits.

    RulingsInstitution decision
    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Institution denied fintivDenied

      “1. whether the court granted a stay or evidence exists that one may be granted if a proceeding is instituted; 2. proximity of the court’s trial date to the Board’s projected statutory deadline for a final written decision; 3. investment in the parallel proceeding by the court and the parties; 4. overlap between issues raised in the petition and in the parallel proceeding; 5. whether the petitioner and the defendant in the parallel proceeding are the same party; and 6. other circumstances that impact the Board’s exercise of discretion, including the merits. See Apple Inc. v. Fintiv, Inc., IPR2020-00019, Paper 11 at 6 (PTAB Mar. 20, 2020) (precedential) (“Fintiv factors”). “These factors relate to whether efficiency, fairness, and the merits support the exercise of authority to deny institution in view of an earlier trial date in the parallel proceeding.” Id. In evaluating the Fintiv factors, we take “a holistic view of whether efficiency and integrity of the system are best served by denying or instituting review,” recognizing that “there is some overlap among these factors” and that “[s]ome facts may be relevant to more than one factor.” Id.” slip op. at 9

    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “whether to institute an inter partes review. Applying the standard set forth in 35 U.S.C. § 314(a), we may not institute an inter partes review (also “IPR”) unless the information presented in the petition “shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” However, institution of inter partes review is discretionary. See Harmonic Inc. v. Avid Tech., Inc., 815 F.3d 1356, 1367 (Fed. Cir. 2016) (“[T]he PTO is permitted, but never compelled, to institute an IPR proceeding.”). For the reasons stated below, we exercise our discretion not to institute an inter partes review.” slip op. at 2

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successNot reached

      “Thus, although Petitioner contends that Njølstad implements a dynamically changeable frequency for each domain wherein a local “rate requirement can dynamically be configured” such that “the locally generated clock rate is just high enough to perform the actual processing task” at that rate (Pet. 31 (citing Ex. 1009 § IV.D)), such teaching merely supports Petitioner’s contention that the frequency is dynamically changeable at the local level (id.). However, as Patent Owner points out, such showing is not a compelling disclosure of the frequency generation being independent of the frequencies of the other domains, as required by the challenged claims. Prelim. Resp. 28–34. For the foregoing reasons, we conclude that Petitioner has not presented compelling merits that Njølstad teaches “the frequency being dynamically changeable independently of the frequencies of the clock signals generated for others of the plurality of domains” as recited in claim 1 and similarly recited in claim 8.” slip op. at 25

    • Novelty / Anticipation (§102) › Priority / effective filing date / continuation supportNot reached

      “However, Patent Owner argues that Iyer published after the invention to the ’443 patent was actually reduced to practice. Prelim. Resp. 27–28. In particular, Patent Owner provides evidentiary testimonies of Dr. Kaeli (Ex. 2001) and Mr. Albonesi (Ex. 2003) to support its contends the ’443 patent incorporates by reference a paper authored by the inventors and published in February 2002 (Ex. 2005), which demonstrates conception by providing a full written description of the claimed invention. Prelim. Resp. 6–16. According to Patent Owner, a simulation described in the paper embodied the invention in a tangible form, wherein the simulation described in the paper showed that the invention worked for its intended purpose. Id. at 16–19 (citing Exs. 2001, 2003, 2005). Similarly, Patent Owner contends that the application from which Soerensen issued was filed on August 29, 2002, which is after the invention date of the ’443 patent. Prelim. Resp. 35. According to Patent Owner, while Soerensen claims priority to the Soerensen Provisional Application (Ex. 1022), the passages from Soerensen relied on in the Petition are not entitled to the benefit of the filing date of the Soerensen Provisional Application because the subject matter was not disclosed in the manner provided by 35 U.S.C. § 112. Id. We recognize potential merits to Patent Owner’s position. That is, we do not find compelling Petitioner’s contention that the challenged claims would have been obvious Iyer or Soerensen.” slip op. at 31

    Claim construction§ 102 anticipation§ 103 obviousnessDiscretionary denialcites KSR · Graham
    Patents in suitUS 7,089,443
  • PTAB · Feb 13, 2025 · IPR2023-01182 · APJ Robert J Weinschenk · IPR · Final written decision

    Claim 16 was cancelled on Patent Owner’s motion; claim 17 was held unpatentable as obvious over Cook ’554 and over Lee and Cook ’523.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “B. Level of Ordinary Skill in the Art Petitioner argues that a person of ordinary skill in the art would have had “at least a bachelor’s degree in electrical engineering (or equivalent) and at least two to three years of industry or equivalent research experience in the field of wireless energy transfer.” Pet. 7–8 (citing Ex. 1003 ¶¶ 37–41). Petitioner’s description of the level of ordinary skill in the art is supported 1 The Leahy-Smith America Invents Act (“AIA”), Pub. L. No. 112-29, 125 Stat. 284, 287–88 (2011), amended 35 U.S.C. § 103. Based on the effective filing date of the ’719 patent, we apply the pre-AIA version of § 103. by the testimony of Petitioner’s declarant, Dr. Mark Allen. Ex. 1003 ¶¶ 37– 41. Patent Owner does not dispute Petitioner’s description. PO Resp. 14. We adopt Petitioner’s description for purposes of this Decision.” slip op. at 5

    • Claim Construction › Intrinsic evidence (Phillips canons) › Lexicography (patentee as own lexicographer)Term construed petitioner constructionDecided for petitioner

      “[i]t will be appreciated that a network of capacitors, as used herein, may in general refer to any circuit topology including one or more capacitors, including without limitation any of the circuits specifically disclosed herein using capacitors, or any other equivalent or different circuit structure(s), unless another meaning is explicitly provided or otherwise clear from the context. Id. at 52:32–38 (emphasis added). Thus, the ’719 patent expressly defines the phrase “a network of capacitors” as any circuit topology including one or more capacitors. Id.” slip op. at 7

    • Novelty / Anticipation (§102) › Prior-art status of a reference › Patents / published applications (effective date, provisional support)Reference is prior artDecided for petitioner

      “Patent Owner’s argument is unavailing. Even if Patent Owner is correct that elements E and F in Figure 4-12 of the Cook Provisional only represent the delivered power level (not the received power level), other portions of the Cook Provisional disclose tuning the resonant frequency of the resonant circuit based on the received power level. See Pet. Reply 5–6. In particular, the Cook Provisional states that “[t]he control system of the receiver is in charge of . . . antenna tuning control.” Ex. 1006, 31. The Cook Provisional also states that “[t]he receiver[’]s control system may determine the model parameters using specific measurements (e.g. antenna current and voltage, input power, etc.) and calibration routines.” Id. (emphasis added). Thus, the Cook Provisional discloses tuning the resonant frequency based on input power. Id.” slip op. at 10

    • PTAB / AIA Trials › Motions to amend / substitute claimsMotion to amend, grantedGranted

      “D. Motion to Amend Patent Owner’s non-contingent Motion to Amend requests that we cancel claim 16. Mot. Amend 1. Petitioner does not oppose Patent Owner’s request. Id. We grant Patent Owner’s unopposed request to cancel claim 16, and, as a result, we do not reach the asserted grounds for claim 16.” slip op. at 8

    Patent outcomesUS 8,461,719 unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites KSR · Graham
    Patents in suitUS 8,461,719
  • PTAB · Feb 11, 2025 · IPR2024-01143 · APJ St John Courtenay III · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–8 were unpatentable under any of its anticipation or obviousness grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024).” slip op. at 2

    • PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Not reached

      “Verizon Wireless, Ericsson Inc., and Nokia of America Corporation (collectively, “Petitioner”) filed a Petition (Paper 1, “Pet.”) requesting an inter partes review of claims 1–8 (“challenged claims”) of U.S. Patent No. 7,664,059 B2 (Ex. 1001, “the ’059 patent”). Innovative Sonic Limited (“Patent Owner”) filed a Preliminary Response (Paper 12, “Prelim. Resp.”). With our authorization, Petitioner filed a Preliminary Reply (Paper 13, “Prelim. Reply”) and Patent Owner filed a Preliminary Sur-reply (Paper 14, “Prelim. Sur-reply”), each of which is narrowly tailored to address Petitioner’s stipulation provided in response to Patent Owner’s arguments for discretionary denial under Apple Inc. v. Fintiv, Inc., IPR2020-00019, Paper 11 (PTAB Mar. 20, 2020) (Order Authorizing Supplemental Briefing on Discretionary Denial) (precedential), and the resulting impact of that stipulation.1” slip op. at 2

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable

      “the “[p]etition equates [3GPP-4.60-v860-Specification’s] variables ‘V(A)’ and ‘V(S)’ with the ’059 [p]atent specification’s ‘VT(A)’ and ‘VT(S)’, instead of mapping [3GPP-4.60-v860-Specification’s] variables to the claim language.” Prelim. Resp. 21-22 (citing Pet. 24–25 (citing Ex. 1002 ¶ 81)) (emphasis added). As noted above, anticipation of a patent claim requires a finding that the claim at issue “reads on” a prior art reference. See Atlas Powder, 190 F.3d at 1346. This requires Petitioner to read or “map” each limitation of claim 1 to the corresponding feature found in the 3GPP-4.60- v860-Specification. Petitioner has not done so here.” slip op. at 19

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successNot shown unpatentableMotivation not foundNot shown unpatentable

      “As an initial matter, the U.S. Court of Appeals for the Federal Circuit guides that, “[e]ven when obviousness is based on a single prior art reference, there must be a showing of a suggestion or motivation to modify the teachings of that reference.” In re Kotzab, 217 F.3d 1365, 1370 (Fed. Cir. 2000). But here, we note the evidence relied upon to support Petitioner’s proposed motivation to modify the 3GPP-4.60-v860- Specification is found in paragraphs 98–100 of Dr. Hass’s declaration (Ex. 1002), which merely repeat the identical language from pages 33–35 of the Petition. We thus find this declaration evidence unpersuasive because it is conclusory, and it does not set forth a suggestion or motivation to modify the 3GPP-4.60-v860-Specification. Ex. 1002 ¶¶ 98–100.” slip op. at 27

    Claim construction§ 102 anticipation§ 103 obviousnessDiscretionary denialcites Phillips · KSR · Graham
    Patents in suitUS 7,664,059
  • PTAB · Feb 6, 2025 · IPR2024-01224 · APJ Larry J Hume · IPR · Institution

    The Board denied institution because Petitioner did not show Dammann was prior art, defeating both obviousness grounds against claims 1-3, 7-11, 13-16, and 18.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “institute review. The standard for instituting an inter partes review is set forth in 35 U.S.C. § 314(a), which provides that an inter partes review may not be instituted unless “the information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least [one] of the claims challenged in the petition.” 35 U.S.C. § 314(a); see 37 C.F.R. § 42.4 (2024). Having reviewed the parties’ papers and the evidence of record, and applying those standards, we determine that Petitioner has not shown a reasonable likelihood it would prevail in establishing the unpatentability of at least one challenged claim. Therefore, we decline to institute an inter partes review of any of challenged claims 1–3, 7–11, 13–16, and 18 of the ’439 patent, based on the grounds raised in the Petition.” slip op. at 3

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “Supported by the testimony of Dr. Ding, Petitioner asserts the level of ordinary skill in the art corresponds to a person having “a bachelor’s degree in electrical engineering, computer engineering, or the equivalent, from an accredited program, and two or more years of experience with wireless communications networks.” Pet. 21 (citing Ex. 1003 ¶ 38). Petitioner contends that “[m]ore practical experience could qualify one not having the aforementioned education as a [person of ordinary skill in the art (POSITA)], while a higher level of education could offset lesser experience.” Id. See generally Prelim. Resp. We note that the open-ended “or more” language set forth by Petitioner expands the range of experience indefinitely with no upper bound. Therefore, we do not adopt this aspect of Petitioner’s formulation. Based on the record before us, and as modified above, we adopt Petitioner’s position as to the level of ordinary skill in the art at the time of the claimed invention, as articulated above. On this record, we are satisfied that Petitioner’s proposed definition, apart from the “or more” language, generally comports with the level of ordinary skill as reflected by the ‘439 patent and the asserted prior art. This definition also is supported by the testimony of Dr. Ding. See Ex. 1003 ¶ 38.” slip op. at 14

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “cyclically advancing the first OFDM packet by shifting the samples in a first direction” in claims 1 and 8. Pet. 22. According to Petitioner, “[d]uring the Underlying Litigation, Petitioner explained that this term should be construed to mean ‘cyclically advancing the first OFDM packet by shifting the samples in the direction of transmission.’ Patent Owner argued that the correct construction is plain and ordinary meaning.” Id. Petitioner contends “[t]he construction Petitioner presented during the Underlying Litigation is correct, because that construction is the plain and ordinary meaning,” but “the scope of the claims includes the prior art under any reasonable construction” so “the Board does not need to construe any claim term for purposes of evaluating whether the claims cover the prior art addressed in this Petition.” Id. Patent Owner takes no position on the meaning of any claim terms; however, Patent Owner indicates that the district court construed “cyclically advancing the first OFDM packet by shifting the samples in a first direction” as “cyclically advancing the first OFDM packet by shifting the samples in the direction of transmission” (i.e., Petitioner’s proposed construction). Prelim. Resp. 22 n.2 (citing Ex. 2005, 8; Ex. 2006, 25–26). We do not find it necessary to address the construction of any claim terms or phrases to decide whether Petitioner satisfies the “reasonable likelihood” standard for instituting trial. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (noting that “we need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))). slip op. at 16

    • Novelty / Anticipation (§102) › Prior-art status of a reference › Printed publication / public accessibilityPrinted publication not establishedNot shown unpatentable

      “As our reviewing court has held, “public accessibility” requires more than technical accessibility. Acceleration Bay, 908 F.3d at 773. “A reference is considered publicly accessible if it was ‘disseminated or skilled in the subject matter or art, exercising reasonable diligence, can locate it.’” Id. at 772. Because there is no evidence of record that Dammann was actually physically disseminated to the public, such as at the conference site, our inquiry is focused on whether an interested skilled artisan, using reasonable diligence, would have found Dammann on the “docenti.ing.unipi.it” website.” slip op. at 25

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR
    Patents in suitUS 7,623,439
  • PTAB · Feb 5, 2025 · IPR2023-01241 · APJ Christopher L Ogden · IPR · Final written decision

    Claims 10–13, 19, 21, 23, and 33 are unpatentable as obvious over Ueda, the SIP Standard, and the SDP Standard, with Cohee added for claims 11, 13, 19, and 23.

    RulingsFinal written decision
    • Skill levelSkill level petitioner adoptedOther

      “Petitioner argues that a person of ordinary skill in the art “would have had a bachelor’s degree, or equivalent, in electrical engineering, computer science, or a related field, and 2–3 years of experience researching, designing, or developing content delivery systems and related hardware, software, and firmware, or equivalent experience.” Pet. 4 (citing Ex. 1008 ¶¶ 36–40). Patent Owner does not dispute this. See PO Resp. 3 (citing Ex. 2001 ¶ 22). Because it is uncontested, supported by testimonial evidence, and appears consistent with the types of problems and solutions in the ’427 patent, we adopt the above articulation of the level of ordinary skill for this decision.” slip op. at 12

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededNot reached

      “We agree with Patent Owner that the term should be construed according to its ordinary and customary meaning, and that we need not construe the term explicitly because the meaning of the term is not relevant to the contested issues in the proceeding. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 13

    • Novelty / Anticipation (§102) › Priority / effective filing date / continuation supportReference is prior artDecided for petitioner

      “Having considered all the evidence of record relating to Mr. Taniguchi’s activities during the relevant time frame, we find that Patent Owner has not produced sufficient corroborating evidence to show that Mr. Taniguchi’s work on reducing to practice the claimed invention was reasonably continuous during the critical period between September 19, 2008 (the filing date of Ueda), and November 18, 2008 (the filing date of the Japanese patent application). Although there is corroborating evidence of diligence beginning on November 6, 2008, when Mr. Taniguchi transmitted a draft application to the Baba law firm, there is no evidence of any diligence prior to that date, other than Mr. Taniguchi’s own testimony. We do not agree with Patent Owner that the evidence of Mr. Taniguchi’s other activities for NEC, or research relating to IPTV, corroborate Mr. Taniguchi’s reduction to practice of the claimed invention. Although these activities may have something to do with the general subject matter of IPTV, Patent Owner has not shown any nexus between these activities and the challenged claims. See Naber, 567 F.2d at 385 (“It is well settled that, to satisfy the ‘reasonable diligence’ requirement . . . , the work relied on must ordinarily be directly related to reduction to practice of the invention . . . in issue.” (citing cases)). Although Mr. Taniguchi doubtlessly spent substantial time preparing the application he completed on November 6, 2008 (see Ex. 2017), there is no corroborating evidence that this work was reasonably continuous during the critical period. As far as the corroborating evidence attests, Mr. Taniguchi could have done no work on the draft until early November, or he could have worked on the draft briefly in August and put it aside until early November. Considering all the evidence as to Mr. Taniguchi’s activities, we find that Patent Owner has not met its burden of producing corroborating evidence that the named inventors of the ’427 patent exercised reasonably continuous diligence during the critical period when Ueda was filed until the constructive reduction to practice that occurred on November 18, 2008. Therefore, we determine, by a preponderance of the evidence, that Ueda is prior art to the challenged claims.” slip op. at 24

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundDecided for petitioner

      “In general, we disagree with Patent Owner that, in showing a reason to incorporate the SIP Standard’s teachings about proxy servers, Petitioner must necessarily show that Ueda’s system was deficient or inferior. A patent challenger “does not need to show that there was a known problem with the prior art system in order to articulate the required rational underpinning for the proposed combination.” Unwired Planet, LLC v. Google Inc., 841 F.3d 995, 1002–03 (Fed. Cir. 2016). Also, “when a patent claims a structure already known in the prior art that is altered by the mere substitution of one element for another known in the field, the combination must do more than yield a predictable result.” KSR, 550 U.S. at 416. For this reason and the specific reasons discussed below, we find Patent Owner’s arguments unpersuasive. The evidence of record suggests that it would have been within the ordinary skill in the art to modify Ueda’s system by replacing direct communication between content-providing device 150 and servers 191 or 192 with an indirect connection in the form of proxy servers using well-known, predictable techniques as described in the SIP Standard.” slip op. at 33

    Patent outcomesUS 9,769,427 unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 9,769,427
  • PTAB · Feb 5, 2025 · IPR2023-01240 · APJ Christopher L Ogden · IPR · Final written decision

    Claims 1–9, 14–18, 20, 22, 32, and 34–36 are unpatentable as obvious over Ueda, the SIP Standard, and the SDP Standard, with dependent claims 2, 3, 15, and 17 also relying on Cohee.

    RulingsFinal written decision
    • Novelty / Anticipation (§102) › Priority / effective filing date / continuation supportReference is prior artPriority date, deniedDecided for petitioner

      “Taniguchi’s activities during the relevant time frame, we find that Patent Owner has not produced sufficient corroborating evidence to show that Mr. Taniguchi’s work on reducing to practice the claimed invention was reasonably continuous during the critical period between September 19, 2008 (the filing date of Ueda), and November 18, 2008 (the filing date of the Japanese patent application). Although there is corroborating evidence of diligence beginning on November 6, 2008, when Mr. Taniguchi transmitted a draft application to the Baba law firm, there is no evidence of any diligence prior to that date, other than Mr. Taniguchi’s own testimony. We do not agree with Patent Owner that the evidence of Mr. Taniguchi’s other activities for NEC, or research relating to IPTV, corroborate Mr. Taniguchi’s reduction to practice of the claimed invention. Although these activities may have something to do with the general subject matter of IPTV, Patent Owner has not shown any nexus between these activities and the challenged claims. See Naber v. Cricchi, 567 F.2d at 385 (“It is well settled that, to satisfy the ‘reasonable diligence’ requirement . . . , the work relied on must ordinarily be directly related to reduction to practice of the invention . . . in issue.” (citing cases)). Although Mr. Taniguchi doubtlessly spent substantial time preparing the application he completed on November 6, 2008 (see Ex. 2017), there is no corroborating evidence that this work was reasonably continuous during the critical period. As far as the corroborating evidence attests, Mr. Taniguchi could have done no work on the draft until early November, or he could have worked on the draft briefly in August and put it aside until early November. Considering all the evidence as to Mr. Taniguchi’s activities, we find that Patent Owner has not met its burden of producing corroborating evidence that the named inventors of the ’427 patent exercised reasonably continuous diligence during the critical period when Ueda was filed until the” slip op. at 23

    • Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundDecided for petitioner

      “In general, we disagree with Patent Owner that, in showing a reason to incorporate the SIP Standard’s teachings about proxy servers, Petitioner must necessarily show that Ueda’s system was deficient or inferior. A patent challenger “does not need to show that there was a known problem with the prior art system in order to articulate the required rational underpinning for the proposed combination.” Unwired Planet, LLC v. Google Inc., 841 F.3d 995, 1002–03 (Fed. Cir. 2016). Also, “when a patent claims a structure already known in the prior art that is altered by the mere substitution of one element for another known in the field, the combination must do more than yield a predictable result.” KSR, 550 U.S. at 416. For this reason and the specific reasons discussed below, we find Patent Owner’s arguments unpersuasive. The evidence of record suggests that it would have been within the ordinary skill in the art to modify Ueda’s system by replacing direct communication between content-providing device 150 and servers 191 or 192 with an indirect connection in the form of proxy servers using well-known, predictable techniques as described in the SIP Standard.” slip op. at 32

    • Obviousness (§103) › Motivation to combine / reasonable expectation of success › Teaching awayTeaching away not foundDecided for petitioner

      “(4) Whether Ueda Teaches Away from Providing Play-list Information While Establishing a Connection Finally, Patent Owner argues that Ueda teaches away from providing “play-list information” at the same time as establishing a connection, because Ueda teaches successfully completing user authentication before transmitting the playlist. PO Resp. 52–53 (citing Ex. 1003 ¶¶ 56, 365, Fig. 25; Ex. 2001 ¶ 99). According to Patent Owner, “Petitioner’s argument fails to reconcile[] this ordering of Ueda, which would prevent implementation of the proposed combination with the SDP Standard, in which the playlist is transmitted as part of the ‘Session Initiation.’” Id. at 53 (citing Ex. 2001 ¶ 100). In its Reply, Petitioner argues that limitation 1g “does not require transmitting ‘play-list information’ ‘at the same time’ as authentication, but at a same time ‘the one or more connection control servers executes a process for guaranteeing a communication bandwidth . . . as a process for establishing the connection.’” Pet. Reply 23. Petitioner also argues that the ’427 patent also describes an authentication step before transmitting the play-list information. Id. (citing Ex. 1001, 12:56–13:13, 13:50–58, Fig. 4). We find Petitioner’s arguments persuasive, and we disagree with Patent Owner that claim 1 restricts the timing of user authentication. As Petitioner notes, user authentication occurs in the ’427 patent before the process of establishing a connection as depicted in Figure 5. See Ex. 1001, 12:36–55, Fig. 4 (user authentication occurs when user equipment 2 is powered-up); id. at 13:50–58 (SIP message A501, at the beginning of Figure 5, includes “user authentication success information”). But we find nothing in the claim language, itself, that requires any particular timing for authentication. Nor do we understand Petitioner’s motivation-to-combine argument to hinge on the timing of authentication. Thus, Ueda does not “criticize, discredit, or otherwise discourage” the claimed invention. In re Fulton, 391 F.3d 1195, 1201 (Fed. Cir. 2004).” slip op. at 58

    • Obviousness (§103) › Motivation to combine / reasonable expectation of success › HindsightDecided for petitioner

      “We find Petitioner’s arguments persuasive. Petitioner does not rely solely on the SDP Standard for teaching the sending of play-list information, but also relies on Ueda, which discloses sending a playlist including an identification of main content, commercial content, and an output sequence, as we discuss in more detail below in the context of limitation 1h. See infra Section III.D.3(g). Petitioner relies on the SIP and SDP Standards for teaching that Ueda’s playlist, as with other data describing a session, may be formatted and transmitted as payload within a standard SIP message, for example using SDP fields. Based on the evidence of record, we find it persuasive that a person of ordinary skill in the art would have recognized SDP as a known way to format play-list information, since SDP has specific fields to convey the features of a playlist such as metadata and links to the content. See Pet. 50–52. Petitioner’s arguments are not based on improper hindsight bias. Although Petitioner argues that the SDP Standard “can” or “could” be used to format Ueda’s playlist, the evidence suggests that doing so would merely be “[t]he combination of familiar elements according to known methods,” and that kind of combination “is likely to be obvious when it does no more than yield predictable results.” KSR, 550 U.S. at 416. The evidence shows that is the case here. As such, the Petition relies on the predictable combination of the prior art according to known methods and on various motivations to combine the references (see Supra Sections III.D.1–2), not on the ’427 patent itself, for teaching the combination.” slip op. at 57

    Patent outcomesUS 9,769,427 unpatentable
    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 9,769,427
  • PTAB · Feb 4, 2025 · IPR2024-01144 · APJ Michael R Zecher · IPR · Institution

    The Board denied institution because AT&T failed to show a reasonable likelihood that claims 1–22 were obvious over either Nokia and the 3GPP-Standard or Ericsson and the 3GPP-Standard.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied

      “§ 42.4(a), we may not institute an IPR unless the information presented in the Petition and any responses thereto shows “there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). Taking into account Innovative Sonic’s Preliminary Response, AT&T’s Preliminary Reply, and Innovative Sonic’s Preliminary Sur-reply, we conclude that the information 1 We do not reach whether we should exercise our discretion to deny the Petition under Fintiv because, as we explain below, we deny the Petition based on the merits. See infra Sections II.B.5 and II.C.1. presented in the Petition does not establish that there is a reasonable likelihood that AT&T would prevail in demonstrating at least one of claims 1–22 of the ’489 patent is unpatentable. We, therefore, deny AT&T’s Petition.” slip op. at 2

    • Skill levelSkill level petitioner adoptedOther

      “Relying on the testimony of Dr. Hansen, AT&T argues the following: [a]s of the earliest claimed priority date, a person of ordinary skill in the art at the time of the alleged invention of the ’489 patent . . . would have had a [Bachelor of Science] in Electrical Engineering or a related field with at least three years of experience designing, developing, and/or testing telecommunication systems. A [person of ordinary skill in the art] would also have familiarity with the wireless standards and well-known protocols for accessing wireless networks. More education may supplement practical experience or vice versa. Pet. 14 (citing Ex. 1002 ¶ 368). In the Preliminary Response, Innovative Sonic does not address AT&T’s assessment of the level of skill in the art. See Prelim. Resp. For purposes of this Decision, we adopt AT&T’s uncontested assessment of the level of skill in the art because it is consistent with the ’489 patent and the asserted prior art.” slip op. at 13

    • Expert testimonyPetitioner expert discountedDecided for patent owner

      “issue fares no better. With one exception, Dr. Hansen, relies on the same disclosures of the Update for 3GPP TS 36.331 v.9.4.0 to support his testimony, which, as we explain above, does not account for the plain language of the disputed limitation. Compare Pet. 26–27, 43, with Ex. 1002 ¶¶ 87–90. In addition, Dr. Hansen testifies that a person of ordinary skill in the art would have understood that “the E-UTRAN configuring the UE with one or more SCells would necessarily include the configuring of at least one SCell by a source eNB to a UE.” Ex. 1002 ¶ 91 (emphasis added). But neither AT&T nor Dr. Hansen establish inherency in its obviousness analysis. See PAR Pharm., Inc. v TWI Pharms., Inc., 773 F.3d 1186, 1194– 95 (Fed Cir. 2014) (recognizing that “inherency may supply a missing claim limitation in an obviousness analysis,” but limiting the doctrine of inherency “only when the limitation at issue is the ‘natural result’ of the combination of prior art elements” (quoting In re Oelrich, 666 F.2d 578, 581 (C.C.P.A. 1981)). Apart from the conclusory assertion above, Dr. Hansen does not identify sufficient evidentiary support demonstrating that the requirement identically recited in each of independent claims 1 and 12 of “configuring at least one SCell by a source eNB to a User Equipment (UE)” would have been the “natural result” flowing from the Update for 3GPP TS 36.331 v.9.4.0’s disclosure of the E-UTRAN configuring the UE with at least one SCell. PAR Pharm., 773 F.3d at 1195. Accordingly, we do not credit Dr. Hansen’s testimony that implicates the doctrine of inherency because it not supported by evidence of record.” slip op. at 17

    • Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther

      “In the Petition, AT&T contends that “the Board does not need to expressly construe any [claim] terms to resolve the arguments presented herein” because the asserted prior art “discloses all limitations under any plausible construction.” Pet. 14 (citing Ex. 1002 (Declaration of Dr. Christopher Hansen) ¶ 456). In the Preliminary Response, Innovative Sonic “agrees with [AT&T] that no [claim] term needs to be construed.” Prelim. Resp. 4 (citing Pet. 14). For purposes of this Decision, there is no readily discernible controversy between the parties that requires us to construe any claim terms at this time. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (noting that “we need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 10

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 9,237,489
  • PTAB · Jan 24, 2025 · IPR2024-01145 · APJ St John Courtenay III · IPR · Institution

    The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–3 and 7–11 were unpatentable on any of four proposed grounds.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied

      “presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024).” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “current record that enables us to determine the knowledge level of a person of ordinary skill in the art. Relying upon the testimony of its declarant Dr. Christopher Hansen, Petitioner argues the following: As of the earliest claimed priority date, a person of ordinary skill in the art at the time of the alleged invention of the ’559 Patent (“POSITA”) would have had a B.S. in Electrical Engineering or a related field with at least three years of experience designing, developing, and/or testing telecommunication systems. A” slip op. at 10

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner

      “In addition to the above information, it would be beneficial for the macro eNB to send a measurement gap configuration (as dis-cussed in 3GPP TS 36.331 V1.1.2.0) allocated for the UE to the Small cell eNB so that the Small cell eNB could take measure-ment gaps into consideration when scheduling resources to the UE. For example, the small cell eNB could avoid scheduling the UE during measurement gaps because the UE cannot transmit or receive any signal to/from the Small cell during the measurement gaps. Ex. 1001, 6:41–49 (emphasis added). We particularly note the literal written description support (in italics) in the ’559 Patent that mirrors the claim [1e] language: “so that the Small cell eNB could take measurement gaps into consideration when scheduling resources to the UE.” Id. at 6:45–46 (emphasis added). Moreover, as noted above, Figure 5 of the ’559 Patent depicts flow chart 500. Prelim. Resp. 3–4 (citing Ex. 1001, 6:65–7:3). And step 525 of Figure 5 affirmatively describes: “The second eNB receives the measurement gap configuration from the first eNB, and takes the measurement gap configuration into consideration when scheduling resources to the UE.” Id. at Fig. 5, step 525 (emphasis added).” slip op. at 14

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentable

      “cites to Advanced Display Systems Inc. v. Kent State University (212 F.3d 1272, 1281–1282 (Fed. Cir. 2000)), which sets forth the doctrine of incorporation by reference that provides a mechanism to include as a matter of law in one document the disclosure of another document. As explained by the court in Advanced Display Systems, the requirements for an effective incorporation by reference are as follows: To incorporate material by reference, the host document must identify with detailed particularity what specific material it in-corporates and clearly indicate where that material is found in the 10 We note Exhibit 1014 is the Declaration of Craig Bishop, a second declaration relied upon by Petitioner, that is generally directed to the nature, purpose, dates, and public accessibility of the 3GPP TS.331 Exhibits 1008, 1009, and 1015. See e.g., Ex. 1014 ¶¶ 65–67. This is in addition to Exhibit 1003, which is the Declaration of Dr. Hansen, for Petitioner. We have considered both declarations, to the extent relied upon by Petitioner. USPQ 144, 146 (CCPA 1973) (providing that incorporation by reference requires a statement “clearly identifying the subject matter which is incorporated and where it is to be found”); In re Saunders, . . . 444 F.2d 599, 602-03, 170 USPQ 213, 216-17 (CCPA 1971) (reasoning that a rejection for anticipation is ap-propriate only if one reference “expressly incorporates a particu-lar part” of another reference); National Latex Prods. Co. v. Sun Rubber Co., 274 F.2d 224, 230, 123 USPQ 279, 283 (6th Cir. 1959) (requiring a specific reference to material in an earlier ap-plication in order [to] have that material considered part of a later application). Advanced Display Systems, 212 F.3d at 1281–1282 (emphasis added). Here, we find Petitioner has not persuasively shown how Centonza expressly incorporates a particular part of the TS 36.331 reference by: (1) identifying with detailed particularity what specific material it incorporates, and (2) clearly indicating where that material is found in the TS 36.331 document. Pet. 33; Exhibits 1008, 1009.” slip op. at 22

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 9,560,559
  • PTAB · Nov 22, 2024 · IPR2024-00687 · APJ Lisa L Tsang · IPR · Institution

    The Board instituted IPR on claims 1–4 and 7–12, finding a reasonable likelihood that claims 1–4 and 9 are anticipated by Winkler.

    RulingsInstitution decision
    • PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted

      “Institution of an inter partes review is authorized when “the information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a); see also 37 C.F.R. § 42.108. Upon consideration of the Petition and the Preliminary Response, we conclude that the information presented shows there is a reasonable likelihood that Petitioner would prevail in establishing the unpatentability of at least one challenged claim of the ’017 patent.” slip op. at 2

    • Skill levelSkill level petitioner adoptedDecided for petitioner

      “contends a person of ordinary skill in the art (“POSITA”) “would have had at least a bachelor’s degree in electrical engineering or a similar field and at least two years of experience working with electrical circuits or electrical connectors, including power connectors. Additional relevant work experience can compensate for less education, and vice versa.” Pet. 19 (citing Ex. 1003 ¶¶ 24–26). At this juncture, Patent Owner does not dispute the level of ordinary skill in the art. Prelim. Resp. 7. For purposes of this Decision, we adopt the level of ordinary skill in the art as articulated by Petitioner because, based on the current record, it is not disputed and is consistent with our review and understanding of the technology and descriptions in the ’017 patent and prior art of record. Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001). We note, however, that the open-ended language “at least” expands the range of education and experience indefinitely with no upper bound. Therefore, we do not adopt this aspect of Petitioner’s formulation.” slip op. at 9

    • Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner

      “At this juncture, we preliminarily agree with Patent Owner’s proffered claim construction. In particular, we agree with Patent Owner’s argument that the insulating barriers would be unable to be configured to “block[] substantially all through-air arcing paths between the first and second electrical contacts,” as claimed, unless they were electrically insulating. See Ex. 1001, 4:36–44. Moreover, as Patent Owner avers, our interpretation of “insulating” as it applies to the first and second insulating barriers should be the same as for the first and second housings. See Digital Biometrics, 149 F.3d at 1345 (“whatever interpretation we assign [to a word used in a claim] should encompass both uses because the same word appearing in the same claim should be interpreted consistently” (citation omitted)). Although “a patent’s written description can set forth more than one definition of a claim term,” we do not discern that to be the case here. See Pitney Bowes, 182 F.3d at 1310. The portions of the Specification of the ’017 patent that Patent Owner cites use “insulating” and its associated tenses to mean suppressing electrical arcing and protecting from electrical burns, i.e., electrically insulating. See, e.g., Ex. 1001, code (57), 1:58–2:3, 2:42–44, 3:2–6, 3:30–40, 3:63–4:10, cited in Prelim. Resp. 12–14. Accordingly, for purposes of this Decision, we interpret “insulating” as recited in the claims to mean “electrically insulating.”” slip op. at 11

    • Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Instituted

      “Petitioner’s reliance on the modified Figure 2 diagram not explicitly shown in Winkler is not per se improper, so long as the skilled artisan would have reasonably understood that that is what Winkler discloses. See Acoustic Tech., Inc. v. Itron Networked Solutions, Inc., 949 F.3d 1366, 1373 (Fed. Cir. 2020) (“In an anticipation analysis, the dispositive question is whether a skilled artisan would ‘reasonably understand or infer’ from a prior art reference that every claim limitation is disclosed in that single reference. . . . Expert testimony may shed light on what a skilled artisan would reasonably understand or infer from a prior art reference.” (citations omitted)). Dr. Eldering testifies that the diagram was “created based on FIG. 2 of Winkler and developed by taking the components of each half of the connector and recreating them in a separated state.” Ex. 1003 ¶ 80. On the current record, Patent Owner does not dispute Dr. Eldering’s testimony or that Petitioner’s diagram reflects what the skilled artisan would have reasonably understood by looking at Figure 2 of Winkler. See generally Prelim. Resp.” slip op. at 26

    Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · Graham
    Patents in suitUS 8,808,017

Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.