- PTAB · Nov 13, 2025 · IPR2025-00805 · APJ Eric C Jeschke · IPR · Institution
The Board instituted IPR on claims 1–24 and all asserted grounds, finding a reasonable likelihood that Petitioner would prevail on at least one challenged claim.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“review. See 35 U.S.C. § 314; 37 C.F.R. § 42.4(a) (2024) (“The Board institutes the trial on behalf of the Director.”). Inter partes review may not be instituted “unless . . . the information presented in the petition . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314. Upon consideration of the evidence and arguments in the record, for the reasons below, we determine that the information presented shows a reasonable likelihood that Petitioner would prevail with respect to at least one of the challenged claims. We thus institute inter partes review on all challenged claims on all asserted grounds. See SAS Inst. Inc. v. Iancu, 584 U.S. 357, 362–63, 369–70 (2018); 37 C.F.R. § 42.108(a) (“When instituting inter partes review, the Board will authorize the review to proceed on all of the challenged claims and on all grounds of unpatentability asserted for each claim.”).” slip op. at 2
- PTAB / AIA Trials › Discretionary denial › §325(d) same art / argumentsNot reached
“C. Patent Owner’s Arguments Under 35 U.S.C. § 325(d) In the Preliminary Response, Patent Owner contends that Petitioner’s unpatentability arguments presented in this proceeding were previously considered by the USPTO. See Prelim. Resp. 31–33. In her decision referring this matter to the Board, then-Acting Director Stewart rejected that argument. See Paper 20 at 2–3 (discussing why “Petitioner provides persuasive reasoning, supported by evidence, that discretionary denial under 35 U.S.C. § 325(d) is not appropriate”); see also Prelim. Resp. 31–33 (referring to and citing Patent Owner’s Discretionary Denial Brief (Paper 8)). We need not and do not address this issue further.” slip op. at 15
- Skill levelSkill level petitioner adoptedDecided for petitioner
“For purposes of this Decision, we adopt the definition of the level of ordinary skill in the art proposed by Petitioner. As to the inclusion of physics in Petitioner’s definition, Dr. Singhose (a professor of mechanical engineering) testifies as to why undergraduate mechanical engineering degree holders would have the requisite knowledge here, but does not testify that undergraduate physics degree holders would not. See Singhose Decl. ¶¶ 2, 27, 28. In addition, Patent Owner and Dr. Singhose require “a four-year degree in mechanical engineering or a closely related field,” but fail to identify what fields are “closely related.” See Prelim. Resp. 11; Singhose Decl. ¶ 27. Based on the Morse Declaration, we are persuaded at this stage that a hypothetical undergraduate physics degree holder would have adequate knowledge for one of ordinary skill in the art of the invention here. See Morse Decl. ¶ 31. As to the requisite years of experience proposed in the definitions— three for Petitioner versus “at least one” for Patent Owner—we note that Patent Owner’s definition is broader than, but includes, Petitioner’s definition. Moreover, for both the inclusion of physics and the years of experience issues, Patent Owner acknowledges that the arguments in the Preliminary Response “are not impacted based on which definition is applied.” Prelim. Resp. 12 (citing Singhose Decl. ¶¶ 30–34). Further, Patent Owner does not argue at this stage that Petitioner’s proposal for the level of ordinary skill leads to an improper understanding of how a skilled artisan would understand either the challenged patent or the prior art.” slip op. at 11
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“B. Claim Construction In inter partes reviews, the Board interprets claim language using the same claim construction standard that would be used in a civil action under 35 U.S.C. § 282(b), as described in Phillips v. AWH Corp., 415 F.3d 1303 (Fed. Cir. 2005) (en banc). See 37 C.F.R. § 42.100(b). Under that standard, we generally give claim terms their ordinary and customary meaning, as would be understood by a person of ordinary skill in the art at the time of the invention, in light of the language of the claims, the specification, and the prosecution history. See Phillips, 415 F.3d at 1313–14. Although extrinsic evidence, when available, may also be useful when construing claim terms under this standard, extrinsic evidence should be considered in the context of the intrinsic evidence. See id. at 1317–19. Petitioner does not propose express constructions for any claim terms. Pet. 12. Patent Owner also does not propose any express constructions. See Prelim. Resp. 12. On the current record, we need not construe explicitly any claim terms. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). As discussed below, however, the parties dispute the meaning of “gaseous fuel.” We address this issue below in the analysis of the challenge to claims 1–3, 5–9, and 18 based on Nakafushi and Olmr.” slip op. at 12
Claim construction§ 102 anticipation§ 103 obviousnessDiscretionary denialcites PhillipsPatents in suitUS 10,393,034 - PTAB · Oct 16, 2025 · IPR2025-00711 · APJ Linda E Horner · IPR · Institution
The Board instituted IPR on claims 1, 2, 4–7, 9, 11–13, 15, 19, 23, 24, and 29 based on a reasonable likelihood of success on the § 103 challenges.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“Under 35 U.S.C. § 314(a), an inter partes review may not be instituted unless the information presented in the petition and the preliminary response shows “there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” Upon consideration of the Petition and the Preliminary Response, and for the reasons explained below, we determine that Petitioner has shown a reasonable likelihood that it would prevail with respect to at least one of the challenged claims. Thus, we grant the Petition and institute an inter partes review of claims 1, 2, 4–7, 9, 11‒13, 15, 19, 23, 24, and 29 of the ’164 patent.” slip op. at 2
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“Cir. 2012). “The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’” Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (alteration in original) (quoting Vivid Techs., Inc. v. Am. Sci. Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). Petitioner argues that it is not necessary for us to provide an express construction for any claim term because the Petition “establishes the prior art meets each claim limitation under any reasonable construction.” Pet. 13. Patent Owner similarly submits that we “need not construe any terms at this stage, because under any reasonable construction of the claim terms, the prior art fails to disclose or suggest the claimed features.” Prelim. Resp. 9. At this stage of the proceeding, we do not need to expressly construe any claim terms to determine whether Petitioner showed a reasonable likelihood of prevailing as to its challenge of at least one challenged claim.” slip op. at 14
- Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundInstituted
“Kelly discloses that game processor 12 implements the functions of game unit 10 during a game process and includes several input and output functions (Ex. 1005, 9:15–18), including: The game processor controls the game apparatus by receiving inputs from a player, from other game apparatuses, from a server (described below), from a progressive bonus apparatus, and from other sources. The game processor also controls output signals to update the game process when appropriate. In addition, the game processor controls the redemption system of the present invention by calculating when prizes are awarded, calculating and updating prize lists and prize costs, and other functions, as described below. Ex. 1005, 9:18–27. As to the redemption system, Kelly discloses prize table 480 that is displayed to the operator. Ex. 1005, 34:64–65, Fig. 9a. In one embodiment, the operator can adjust prize characteristics for the game unit and any linked game units. Id. at 35:1–2. Kelly also discloses an alternative embodiment, however, in which selection of a specific prize from the table 480 can be based on random and/or statistical determination. Id. at 36:48–49. In this alternative embodiment, “random determination of whether a particular prize is to be awarded is also modified by statistical information to create a ‘best fit’ of prizes awarded according to the operator’s desired odds.” Id. at 36:63–66. awarded every 8,000 games, so if it is randomly determined that a third video console is to be awarded within, for example, the 3000th game, then a different prize, e.g., the next most valuable prize, can be awarded so that the desired odds are better met. Id. at 37:1–9. Thus, we find Petitioner has set forth sufficient evidence to show a reasonable likelihood that Kelly’s game processor can modify the variable parameters of the prizing structure to meet the mandated parameters of the desired odds, as called for in limitation [1.c.v].” slip op. at 23
- Novelty / Anticipation (§102) › Priority / effective filing date / continuation supportReference is prior artOther
“To remove Walker as prior art under §§ 102(a) and 102(e), Patent Owner must show either it reduced the invention to practice prior to Walker’s effective date, or that it invented prior to Walker’s effective date. In the case of the latter, Patent Owner must demonstrate conception prior to May 1, 2003, and reasonably continuous diligence throughout the entire critical period, which begins just prior to the Walker’s effective date and ends on the date of the invention’s actual or constructive reduction to practice. Patent Owner provides evidence purporting to show that it conceived of the invention prior to May 1, 2003. Patent Owner has not asserted that this evidence demonstrates actual reduction to practice, nor do we have sufficient evidence at this stage to make that determination. Further, Patent Owner’s earliest possible constructive reduction to practice (September 1, 2004) does not pre-date Walker’s effective date. Thus, at this stage, Patent Owner would need to show it invented prior to Walker’s effective date through evidence of conception and reasonable diligence to remove Walker as prior art. At this stage of the proceeding, without Patent Owner’s evidence of diligence, Patent Owner has not provided sufficient evidence to show that Petitioner fails to show a reasonable likelihood of prevailing in establishing that Walker is prior art. This issue of whether Walker is prior art to the ’164 patent will benefit from further development of the record during the trial proceeding.” slip op. at 31
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · GrahamPatents in suitUS 11,335,164 - PTAB · Oct 16, 2025 · IPR2025-00712 · APJ James A Tartal · IPR · Institution
The Board instituted inter partes review of claims 1, 3–9, 13, 17, 18, 23, 25, 26, 28, and 29 on all asserted grounds, finding a reasonable likelihood of prevailing on claim 1 over Walker.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“review. 35 U.S.C. § 314(b) (2018); 37 C.F.R. § 42.4(a) (2025). An inter partes review may not be instituted “unless . . . the information presented in the petition . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). Upon institution of inter partes review, the review proceeds “on all of the challenged claims and on all grounds of unpatentability asserted for each claim.” 37 C.F.R. § 42.108(a). Based on our consideration of the Petition, the Preliminary Response, and the evidence of record, we conclude that the information demonstrates a reasonable likelihood that Petitioner would prevail in showing the unpatentability of at least one of the Challenged Claims. Accordingly, we institute an inter partes review as to the Challenged Claims of the ’279 patent on all grounds asserted in the Petition.” slip op. at 2
- Novelty / Anticipation (§102) › Priority / effective filing date / continuation supportPriority date awardedOther
“application filed November 12, 2021, that asserts the benefit of a series of applications, the earliest of which was filed September 2, 2003. Ex. 1001, codes (22), (45), (60). Petitioner asserts that the Challenged Claims of the ’279 patent “are entitled to an effective filing date of no earlier than September 2, 2003,” consistent with the date of the earliest application identified by the ’279 patent.9 See Pet. 6. For purposes of our analysis on the current record, in this Decision we apply September 2, 2003, as the priority date of the Challenged Claims.” slip op. at 18
- Obviousness (§103) › Motivation to combine / reasonable expectation of successInstituted
“independent claim 1. Pet. 32–63. Petitioner relies on the testimony of Mr. Crevelt in support of its contentions with respect to claim 1. Ex. 1003 ¶¶ 234–286. Further, according to Petitioner, “[n]o findings regarding motivation to combine or reasonable expectation of success are necessary with a single reference ground,” but Walker “teaches that the features of the embodiments are options that can be combined.” Pet. 42 n.6 (citing Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1372–73 (Fed. Cir. 2019). At this stage, Patent Owner does not contest Petitioner’s proffered assertions about the” slip op. at 20
§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 11,393,279 - PTAB · Oct 16, 2025 · IPR2025-00708 · APJ James A Tartal · IPR · Institution
The Board instituted IPR on all challenged claims and grounds, finding a reasonable likelihood that claims 1, 3–5, 12, 13, 18–20, 22, 24–26, 29, 42, 44–47, and 50 are unpatentable over Walker and Schneier.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“We have authority to determine whether to institute an inter partes review. 35 U.S.C. § 314(b) (2018); 37 C.F.R. § 42.4(a) (2025). An inter partes review may not be instituted “unless . . . the information presented in the petition . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). Upon institution of inter partes review, the review proceeds “on all of the challenged claims and on all grounds of unpatentability asserted for each claim.” 37 C.F.R. § 42.108(a). Based on our consideration of the Petition, the Preliminary Response, and the evidence of record, we conclude that the information demonstrates a reasonable likelihood that Petitioner would prevail in showing the unpatentability of at least one of the Challenged Claims. Accordingly, we institute an inter partes review as to the Challenged Claims of the ’336 patent on all grounds asserted in the Petition.” slip op. at 2
- Skill levelSkill level board ownOther
“B. Level of Ordinary Skill in the Art At this stage of the proceeding, there is no evidentiary dispute about the level of ordinary skill in the art.8 Based on the testimony of Mr. Crevelt, we determine that a person of ordinary skill in the art would have had at least a bachelor’s degree in computer science or computer engineering, with at least three years of experience in game development. Pet. 14 (citing Ex. 1003 ¶¶ 62–65). Additional experience could substitute for less education, and additional education could likewise substitute for less experience. Id. We determine that the level of ordinary skill in the art 7 Petitioner states that it is not aware of secondary considerations that affect the obviousness arguments it presents. Pet. 66. Patent Owner has not offered objective evidence of nonobviousness at this stage of the proceeding. 8 Patent Owner “disagrees with the proposed level of skill” but asserts that “under any level of skill a [person of ordinary skill in the art] would not understand the asserted Grounds to raise any unpatentability issues.” Prelim. Resp. 8. Thus, Patent Owner does not present evidence or arguments in its Preliminary Response related to the level of ordinary skill in the art. competence reflected in the ’336 patent Specification and the asserted prior art references, based on our review of the limited record.” slip op. at 11
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“standard as would be used by a district court to construe a claim in a civil action involving the validity or infringement of a patent. 37 C.F.R. § 42.100(b). Under that standard, claim terms are given their ordinary and customary meaning, as would have been understood by a person of ordinary skill in the art at the time of the invention, in light of the language of the claims, the specification, and the prosecution history of record. Id.; see also Phillips v. AWH Corp., 415 F.3d 1303, 1312–19 (Fed. Cir. 2005) (en banc); Thorner v. Sony Comput. Entm’t Am. LLC, 669 F.3d 1362, 1365–66 (Fed. Cir. 2012). “The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’” Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (alteration in original) (quoting Vivid Techs., Inc. v. Am. Sci. Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). Petitioner argues that it is not necessary for us to provide an express construction for any claim term because the Petition “establishes the prior art meets each claim limitation under any reasonable construction.” Pet. 14–15. Patent Owner similarly submits that we “need not construe any terms at this stage, because under any reasonable construction of the claim terms, the prior art fails to disclose or suggest the claimed features.” Prelim. Resp. 8. At this stage of the proceeding, we do not need to expressly construe any claim terms to determine whether Petitioner showed a reasonable likelihood of prevailing as to its challenge of at least one challenged claim.” slip op. at 12
- Novelty / Anticipation (§102) › Priority / effective filing date / continuation supportPriority date awardedOther
“an application filed September 20, 2010, that asserts the benefit of an application filed September 2, 2003. Ex. 1001, codes (22), (45), (54), (62). Petitioner asserts that the Challenged Claims of the ’336 patent “are entitled to an effective filing date of no earlier than September 2, 2003,” consistent with the date of the earliest application identified by the ’336 patent.9 See Pet. 7. For purposes of our analysis on the current record, in this Decision we apply September 2, 2003, as the priority date of the Challenged Claims. Walker was filed on May 1, 2003, and refers back to a provisional application filed on May 6, 2002, but Walker was not published until January 1, 2004. Ex. 1006, codes (22), (43), (60). Thus, Petitioner fails to show on the current record how, under pre–AIA 35 U.S.C. § 102(a), Walker discloses an invention that was described in a printed publication in this country before the invention thereof by the Patent Owner, because Walker was published after the applied priority date of the Challenged Claims of the’336 patent.” slip op. at 17
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 8,529,336 - PTAB · Oct 8, 2025 · IPR2025-00629 · APJ Scott C Moore · IPR · Institution
The Board instituted IPR of claims 1–20 on all asserted grounds, finding a reasonable likelihood that claim 1 is obvious over Beard and Laufer.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“We may institute an inter partes review when “the information presented in the petition . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). If we institute an inter partes review, the trial must encompass all claims and grounds identified in the Petition. 37 C.F.R. § 42.108(a) (“When instituting inter partes review, the Board will authorize the review to proceed on all of the challenged claims and on all grounds of unpatentability asserted for each claim.”). For the reasons set forth below, we conclude that there is a reasonable likelihood that Petitioner will prevail in establishing the unpatentability of one or more claims of the ’711 Patent. We, therefore, institute inter partes review of claims 1–20 on the grounds identified in the Petition. B.” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“Petitioner contends that one of ordinary skill in the art would have had the following qualifications: [E]ither (1) a Bachelor of Science in Mechanical Engineering, Electrical Engineering, Aerospace engineering, or an equivalent field, as well as at least 2 years of academic or industry experience in the aerospace or avionics fields, or (2) at least four years of experience in any of the above industries. 1 The Leahy-Smith America Invents Act (“AIA”) included revisions to 35 U.S.C. §§ 102 and 103 that became effective on March 16, 2013. Because the applications from which the ’711 Patent claims priority were all filed after this date, the post-AIA version of §103 applies. See Ex. 1001, codes (60), (63). 2 U.S. Patent No. 9,769,387 B1, iss. Sept. 19, 2017 (Ex. 1009). 3 U.S. Patent App. Pub. No. 2017/0059692 A1, pub. Mar. 2, 2017 (Ex. 1010). 4 U.S. Patent App. Pub. No. 2012/0106800 A1, pub. May 3, 2012 (Ex. 1021). 5 U.S. Patent App. Pub. No. 2017/0161911 A1, pub. June 8, 2017 (Ex. 1007). 6 U.S. Patent App. Pub. No. 2013/0301905 A1, pub. Nov. 14, 2013 (Ex. 1024). 7 U.S. Patent App. Pub. No. 2012/0004844 A1, pub. Jan. 5, 2012 (Ex. 1025). 8 PCT App. Pub. No. WO 2017/123477 A1, pub. July 20, 2017 (Ex. 1022). 9 U.S. Patent App. Pub. No. 2017/0160751 A1, pub. June 8, 2017 (Ex. 1005). Pet. 8 (citing Ex. 1003 ¶¶ 50–54). Patent Owner does not presently dispute Petitioner’s proposed formulation. See generally Prelim. Resp. For purposes of this Decision, we adopt and apply Petitioner’s formulation regarding the level of ordinary skill in the art because it is (1) consistent with the ’711 Patent and the asserted prior art; and (2) it is supported by the testimony of Dr. Singhose. B.” slip op. at 6
- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITAPlain and ordinary meaningDecided for petitioner
“But the Detecting Limitations of claims 1, 19, and 20, merely require that a target be “detected.” The Detecting Limitations do not require that target detection be performed “aboard the reference UAV,” and claim 19 does not recite or require “machine learning.” Moreover, the Specification makes clear that the claims should not be limited to aspects of the disclosed embodiments, as Patent Owner proposes to do here. See, e.g., Ex. 1001, 2:56–59 (“The invention is described in connection with such embodiments, but the invention is not limited to any embodiment. The scope of the invention is limited only by the claims . . . .”) Patent Owner additionally fails to cite any lexicographic definition or clear and unambiguous disclaimer of claim scope sufficient to limit the claims in the manner it proposes. We, thus, are not persuaded that the Detecting Limitations require “applying aboard the reference UAV a machine learning model to the capture image for: (i) identifying a target in the captured image.”” slip op. at 8
- Disclosure Requirements (§112) › Written description (Ariad)Not entitled to earlier dateDecided for petitioner
“Priority Date of the Challenged Claims Petitioner contends that claims 1–20 of the ’711 Patent “should not have priority to the October 9, 2016 filing date of U.S. provisional [patent] application 62/405,972 due to a lack of written description support.” Pet. 3. Petitioner thus “assumes” a priority date of October 1, 2017 (the filing date of U.S. Provisional Patent Application No. 62/556,449) for purposes of this proceeding. Id. at n.2; see also Ex. 1003, code (60). Patent Owner does not presently dispute Petitioner’s contention that the ’711 Patent is not entitled to a priority date earlier than October 1, 2017. See generally Prelim. Resp. For purposes of this decision, we accept Petitioner’s undisputed contention that the ’711 Patent is not entitled to a priority date prior to 10 Any determination, no matter how designated in this Institution Decision (except our ultimate decision to institute), is preliminary and non-binding. Our Final Written Decision, based on a fully developed record of arguments and evidence, will state our binding determinations, findings, and conclusions. If a party disagrees with this preliminary construction, or any other determination set forth in this Institution Decision, that party should present its arguments at trial. The parties are reminded that any arguments not made during trial will be considered waived. Patent Owner is further reminded that arguments in the Preliminary Response are not preserved and will be considered waived at trial unless those arguments are re-raised in the Patent Owner Response. The parties are additionally reminded that arguments raised in subsequent briefing must be set forth in full in the briefs themselves, and may not be incorporated by reference from prior filings such as the Preliminary Response. See 37 C.F.R. § 42.6(a)(3). October 1, 2017.11 Accordingly, Petitioner has made a sufficient showing that all of the cited references qualify as prior art. See Pet. 4–6. D.” slip op. at 11
Claim construction§ 103 obviousness§ 112 disclosurecites Phillips · KSR · GrahamPatents in suitUS 10,514,711 - PTAB · Oct 8, 2025 · IPR2025-00525 · APJ Scott C Moore · IPR · Institution
The Board instituted review of claim 21 on all asserted grounds after finding a reasonable likelihood it is obvious over Beard.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“presented in the petition . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). If we institute an inter partes review, the trial must encompass all claims and grounds identified in the Petition. 37 C.F.R. § 42.108(a) (“When instituting inter partes review, the Board will authorize the review to proceed on all of the challenged claims and on all grounds of unpatentability asserted for each claim.”). For the reasons set forth below, we conclude that there is a reasonable likelihood that Petitioner will prevail in establishing the unpatentability of claim 21, the sole challenged claim. We, therefore, institute inter partes review of claim 21 on the grounds asserted in the Petition. B.” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“[E]ither (1) a Bachelor of Science in Mechanical Engineering, Electrical Engineering, Aerospace engineering, or an equivalent field, as well as at least 2 years of academic or industry experience in the aerospace, avionics, telecommunications, or electronic device manufacturing industry, or (2) at least four years of industry experience in any of the above industries. Pet. 21 (citing Ex. 1003 ¶ 47). Patent Owner does not presently dispute Petitioner’s proposed formulation. See generally Prelim. Resp. For 3 U.S. Patent App. Pub. No. US 2016/0253907 A1, published Sept. 1, 2016 (Ex. 1010). 4 PCT Pub. No. WO 2016/078093 A1, published May 26, 2016 (Ex. 1011). 5 PCT Pub. No. WO 2016/154949 A1, published Oct. 6, 2016 (Ex. 1012). 6 U.S. Pat. App. Pub. No. US 2016/0127890 A1, published May 5, 2016 (Ex. 1013). 7 PCT Pub. No. WO 2015/043123 A1, published Apr. 2, 2015 (Ex. 1014). purposes of this Decision, we adopt and apply Petitioner’s formulation regarding the level of ordinary skill in the art because it is (1) consistent with the ’959 Patent and the asserted prior art; and (2) it is supported by the testimony of Dr. Chowdhary. B.” slip op. at 5
- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed board ownDecided for patent owner
“But before describing the embodiments cited by Patent Owner, the Specification plainly states: “Any terms not expressly defined herein have their conventional meaning as commonly understood by those having skill in the relevant art(s).” Ex. 1001, 4:64–67. Thus, the Specification itself cautions against construing the claim terms such as “secure identifier” as limited to the scope of the disclosed embodiments. Here, Patent Owner has not cited any express definition of “secure identifier,” or identified any explicit disclaimer of claim scope that might justify narrowing the scope of this claim term to specific embodiments disclosed in the Specification. In the absence of such a definition or disclaimer, we are not persuaded that the scope of the claim term “secure identifier” should be limited to specific aspects of the preferred embodiments cited by Patent Owner. See Prelim. Resp. 7–14. On this record, and at this stage of the proceeding, we decline to adopt Patent Owner’s proposed construction and preliminarily construe “secure identifier” as “a credential that can be used to securely verify the identity of a device, such as an airborne object or ground-based transmitter.”8” slip op. at 10
- Disclosure Requirements (§112) › Written description (Ariad)Written description inadequateNot entitled to earlier dateDecided for petitioner
“’071 Application lack adequate written description support for the “secure identifier” claim limitation. For a patent claim to be entitled to the priority date of an earlier-filed application, the earlier application must provide complete written description support for the claim as required by 35 U.S.C. § 112(a). L.A. Biomedical Rsch. Inst. at Harbor-UCLA Med. Ctr. v. Eli Lilly & Co., 849 F.3d 1049, 1057 (Fed. Cir. 2017) (“L.A. Biomed”). To satisfy this requirement, the written description must “reasonably convey” to a person of ordinary skill in the art that the inventor had possession on the claimed priority date of each limitation of the later-claimed subject matter. L.A. Biomed, 849 F.3d at 1057. It is not enough that an earlier application’s disclosure “renders the later-claimed invention obvious;” as “the disclosure must describe the claimed invention with all its limitations.” L.A. Biomed, 849 F.3d at 1057. On this record, we agree with Petitioner that the ’153 Provisional and ’071 Application lack adequate written description support for the “secure identifier” limitation of claim 21. We have preliminarily construed “secure identifier” as “a credential that can be used to securely verify the identity of a device, such as an airborne object or ground-based transmitter.” See supra § II.B. As discussed above, the Specification of the ’959 Patent does not use the term “secure identifier,” but the Specification contains extensive discussion of the need for an identification credential that is secure (e.g., difficult for a bad actor to clone or impersonate). See, e.g., Ex. 1001, 1:56– 65 (discussing the need for a system that is difficult to “clone”), 10:20–49 (discussing the need “trust” between a drone and ground-based equipment, and the need for a way to verifying the drone’s credentials), 11:5–12:62 (disclosing the use of encryption and a rotating SSID to generate a secure identifier for a drone). None of the portions of the Specification cited above is present in the ’153 Provisional or the ’071 Application. See generally Ex. 1006, 1007. The ’153 Provisional and ’071 Application discuss the need for identifiers for low-altitude aircraft (see, e.g., Ex. 1006, 2; Ex. 1007, 9), but there is no discussion of any need for an identification credential to be secure or resistant to cloning or impersonation. See generally Ex. 1006, 1007. The ’153 Provisional and ’071 Application do not disclose the use of encryption, SSIDs (much less rotating SSIDs), or any other technologies for the purpose of verifying the authenticity of an identification credential. See generally id. Based on our review of the ’153 Provisional and ’071 Application, we preliminarily conclude that neither of these applications would have reasonably conveyed to a person of ordinary skill in the art that the inventor then had possession of the concept of the “secure identifier” that was later claimed in the ’959 Patent.” slip op. at 12
Claim construction§ 103 obviousness§ 112 disclosurecites Phillips · GrahamPatents in suitUS 10,713,959 - PTAB · Jun 11, 2025 · IPR2025-00261 · APJ Mitchell G Weatherly · IPR · Institution
Instituted IPR of claims 1–20 on all grounds after finding a reasonable likelihood that Haley anticipates claims 1, 7, 8, 17, and 20 and Haley with Lai renders the remaining claims obvious.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“Institution of an inter partes review is authorized by statute when “the information presented in the petition filed under section 311 and any response filed under section 313 shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). Based on our review of the record,1 we conclude that Petitioner is reasonably likely to prevail with respect to at least one of the challenged claims.” slip op. at 2
- Other 314aInstitution denied discretionary otherDenied
“Patent Owner argues that we should discretionarily deny the Petition based on alleged deficiencies in the Petition. Specifically, Patent Owner argues that “even if arguments as to a few claims might have been properly presented in the Petition, a decision to institute here would require the Board to address—for the first time and with no Petitioner input—critical claim construction issues affecting nearly every claim” in contravention of the requirements of 37 C.F.R. § 42.104(b)(3). Prelim. Resp. 33–35. For the reasons discussed above, we are not persuaded on the current record that Petitioner has violated 37 C.F.R. § 42.104(b)(3), or that critical and unresolved claim interpretation issues justifying discretionarily denying the Petition exist. We, therefore, decline to deny institution on this basis. E. Claims 1, 7, 8, 17, and 20: Anticipation by Haley” slip op. at 11
- Claim Construction › Functional claiming / §112(f) means-plus-function › Whether §112(f) applies (Williamson, nonce words)§112(f) appliesDecided for petitioner
“1. Lifter The Petition contends that the “lifter” limitation is a means-plus- function limitation, Pet. 7, which Patent Owner does not dispute, Prelim. Resp. 10–14. Patent Owner argues, however, that Petitioner has “fail[ed] to identify any structure in the ’007 Patent to perform the claimed function.” Prelim. Resp. 10. We disagree. Petitioner identifies the structures in the Specification corresponding to the “lifter” as follows: The “lifter” (“lifter member”) of the ’007 patent includes a rotatable cam lifter 100 (yellow below left), with pin 104, 106, and 108 (green) on its face surface that engage protrusions 92 (blue) on the driver member 90 (orange). ’007 patent, 9:36–52, 16:39–53, Fig. 12. The ’007 patent also discloses two-pin variants: lifter members 465 and 480 in Figs. 31, 33. ’007 patent, 32:23–38, 32:56–33:4. Pet. 17. This identification of corresponding structure is sufficient to satisfy 37 C.F.R. § 42.104(b)(3). We also note that at this stage of the proceeding, Patent Owner does not dispute that Petitioner has correctly identified the corresponding structure. The parties may further address the proper interpretation of “lifter” at trial.” slip op. at 7
- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed board ownDecided for petitioner
“gas pressure system” recited in the preamble of independent claims 1 and 17. Prelim. Resp. 21–22. Patent Owner further argues that Petitioner, through its comparison of claims 1 and 17 to Haley, improperly implies that the “gas pressure system” can be “limited to a distinct portion of a power tool.” Id. at 23. Patent Owner contends that such an interpretation is improper because the “gas pressure system” must refer to “the entire system,” because the “structure of the claims themselves . . . include[s] . . . every component of the tool.” Id. We disagree. The “gas pressure system” recited in the preambles of claims 1 and 17 expressly refers to a system that is “for a power tool” and thus does not necessarily refer to “the entire” tool or “every component of the tool.” Ex. 1001, 39:6 (claim 1), 40:51 (claim 17). Neither claim 1 nor claim 17 recites, for example, the lifter or driver, which are required elements of an “entire” tool. Id. at 39:6–22 (claim 1), 40:51–67 (claim 17). The lifter and driver are introduced in dependent claims 2 and 18. Id. at 39:23–30 (claim 2), 41:1–9 (claim 18). Still other necessary components of a tool, e.g., a motor and power source, are introduced in dependent claims 5 and 19. Id. at 39:40–42 (claim 5), 41:10–13 (claim 19). By contrast to claims 1 and 17, independent claims 9 and 14 recite a “portable fastener driving tool” and expressly recite many necessary components of such a tool including the driver, lifter, prime mover, and power source. Id. at 39:54 (claim 9), 40:20 (claim 14). Accordingly, we find that the “gas pressure system” of claims 1 and 17 broadly refers to a portion of a power tool rather than the “entire system” or “every component of the tool.” slip op. at 8
Claim construction§ 102 anticipation§ 103 obviousnessDiscretionary denialcites Phillips · KSRPatents in suitUS 11,034,007 - PTAB · Feb 20, 2025 · IPR2024-00996 · APJ Ken B Barrett · IPR · Institution
The Board instituted review of claims 13–18 on all asserted grounds, finding a reasonable likelihood of prevailing on at least one challenged claim.
RulingsInstitution decision- PTAB / AIA Trials › Discretionary denial › §325(d) same art / argumentsDenied
“inter partes review, “the Director may take into account whether, and reject the petition or request because, the same or substantially the same prior art or arguments previously were presented to the Office.” 35 U.S.C. § 325(d). The Board uses a two-part framework in determining whether to exercise its discretion under § 325(d), specifically: (1) whether the same or substantially the same art previously was presented to the Office or whether the same or substantially the same arguments previously were presented to the Office; and (2) if either condition of [the] first part of the framework is satisfied, whether the petitioner has demonstrated that the Office erred in a manner material to the patentability of challenged claims. Advanced Bionics, Paper 6 at 8. The art or arguments presented in the Petition are not “substantially the same” as those previously presented to the Office when there are differences between them that are material to the Office’s prior consideration of the art and arguments. Wolfspeed, Inc. v. Trs. of Purdue Univ., IPR2022-00761, Paper 13 at 7–8 (Vidal Mar. 30, 2023).” slip op. at 9
- Skill levelSkill level petitioner adoptedOther
“Petitioner contends that: [A] person of ordinary skill in the art at the time of the alleged invention (“POSITA”) would have had a bachelor’s degree or higher in electrical engineering, at least 3 years of experience designing or researching electronic circuits, and familiarity with power electronics and inductive power transfer circuits. Pet. 8 (citing Ex. 1003 ¶ 20). Patent Owner states that, “[f]or purposes of this preliminary response, Patent Owner adopts the Petitioner’s proposal.” Prelim. Resp. 17. Petitioner’s definition is consistent with the level of ordinary skill reflected in the prior art references of record. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001) (recognizing that the prior art itself may reflect an appropriate level of skill in the art). For purposes of this decision, we apply Petitioner’s definition of the person of ordinary skill in the art.” slip op. at 18
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“Petitioner contends that “[a]ll claim terms should be construed according to the Phillips standard,” and “[h]ere, given the remarkable overlap between the preferred embodiment of the ’461 patent and the prior art/predictable combinations articulated in Grounds 1A–3, Petitioners submit that no claim elements need a formal construction for purposes of resolving the controversy in this proceeding.” Pet. 8. Patent Owner states that, “[t]o simplify the issues before the Board, Patent Owner has not asserted any claim constructions in this preliminary response and adopts the Petitioner’s position that ‘[a]ll claim terms should be construed according to the Phillips standard.’” Prelim. Resp. 17 (quoting Pet. 8). On this record and for purposes of this decision, we determine that no” slip op. at 19
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Instituted
“At this preliminary stage of the proceeding, we do not agree with Patent Owner’s arguments. Patent Owner does not cite to evidence, such as expert testimony, to support its implied argument that Olson’s measured current is “fundamentally different” from the current received by the primary coil. See Prelim. Resp. 31–32. Petitioner’s declarant, Dr. Woods, on the other hand, testifies, inter alia, that “[t]he ‘[c]urrent measured by current measure block 226 is used in the calculation of power, which as depicted in FIG. 14, measures the ‘power in’ provided to transmit block 214/primary coil 54.” Ex. 1003 ¶ 37 (citing Ex. 1004 ¶¶ 74–75, Fig. 14) (first alteration added); see also, e.g., id. ¶ 42 (Dr. Woods testifying that the measured current to the power supply “is the current driving the external antenna 52, via the transmit block 214 and to the primary coil 54.” (citing Ex. 1004 ¶¶ 74–75, 112, Fig. 14)). Paragraph 75 of Olson, cited in support of that testimony, provides: “The power in is gauged by the power generated by charging unit 50 and is determined by multiplying the voltage of the internal voltage of charging unit 50, e.g., the voltage of a battery or batteries internal to charging unit 50, by the current driving external antenna 52.” Ex. 1004 ¶ 75 (emphasis added). We note that external antenna 52 includes primary coil 54. See, e.g., Fig. 14. Dr. Woods’ testimony is, at this stage, unrebutted. Patent Owner also argues that “Petitioner fails to provide any evidence regarding the function of Olson’s microprocessor 212 in relation to measuring input power,” and that, “[w]hile Olson describes a power calculation in paragraph [0075], Olson does not describe this power calculation as performed by microprocessor 212.” Prelim. Resp. 32 (citing Pet. 16; Ex. 1004 ¶ 72) (first alteration added). At this preliminary stage of the proceeding, we do not agree with Patent Owner’s arguments regarding the microprocessor. Although Patent Owner does not bear the burden to show patentability, we observe that Patent Owner does not suggest that there is another component in Olson’s external charging device that might perform the admittedly-disclosed power calculation. See Prelim. Resp. 32–33. Dr. Woods testifies that microprocessor 212 receives the measured current and the input voltage of the charging device, and, from those values, calculates power in. See Ex. 1003 ¶¶ 43–44 (citing, inter alia, Ex. 1004 ¶¶ 71–78, Fig. 14); see also Ex. 1004 ¶ 74, Fig. 14 (Olson stating that “[c]urrent measured by current measure block 226 is used in the calculation of power in along with the voltage of batteries 160,” and Figure 14 depicting the signal from measure block 226 as an input to microprocessor 212). Dr. Woods’ testimony is, at this stage, unrebutted.” slip op. at 26
Claim construction§ 102 anticipation§ 103 obviousnessDiscretionary denialcites Phillips · KSR · GrahamPatents in suitUS 8,626,461 - PTAB · Feb 20, 2025 · IPR2024-00995 · APJ Ken B Barrett · IPR · Institution
The Board instituted IPR on claims 1–6, 8, and 10–13 on all asserted grounds, finding a reasonable likelihood of success on at least one challenged claim.
RulingsInstitution decision- PTAB / AIA Trials › Discretionary denial › §325(d) same art / argumentsDecided for petitioner
“inter partes review, “the Director may take into account whether, and reject the petition or request because, the same or substantially the same prior art or arguments previously were presented to the Office.” 35 U.S.C. § 325(d). The Board uses a two-part framework in determining whether to exercise its discretion under § 325(d), specifically: (1) whether the same or substantially the same art previously was presented to the Office or whether the same or substantially the same arguments previously were presented to the Office; and (2) if either condition of [the] first part of the framework is satisfied, whether the petitioner has demonstrated that the Office erred in a manner material to the patentability of challenged claims. Advanced Bionics, Paper 6 at 8. The art or arguments presented in the Petition are not “substantially the same” as those previously presented to the Office when there are differences between them that are material to the Office’s prior consideration of the art and arguments. Wolfspeed, Inc. v. Trs. of Purdue Univ., IPR2022-00761, Paper 13 at 7–8 (Vidal Mar. 30, 2023).” slip op. at 11
- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“information presented in the petition . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). Having considered the arguments and evidence presented by Petitioner and Patent Owner, we determine that Petitioner has demonstrated a reasonable likelihood of prevailing on at least one of the challenged claims of the ’204 patent. Accordingly, we institute an inter partes review as to all the challenged claims of the ’204 patent on all the grounds of unpatentability set forth in the Petition.” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“may be considered, including the “type of problems encountered in the art; prior art solutions to those problems; rapidity with which innovations are made; sophistication of the technology; and educational level of active workers in the field.” In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995) (quoting Custom Accessories, Inc. v. Jeffrey–Allan Indus., Inc., 807 F.2d 955, 962 (Fed. Cir. 1986)).” slip op. at 19
- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed board ownDecided for petitioner
“different from the resonant frequency of the inductive couple.” Ex. 1001, 21:16–20. The Specification then states the following: “Preferably the transmission frequency is selected to lie within one of the near-linear regions 6, 8 [of Figure 6b] where the slope of the frequency-amplitude graph is less steep.” Id. at 21:20–23; see also id. at 21:56–59 (“Referring back to FIG. 6b, the frequency of transmission is selected to be in the approximately linear region 8 of the curve between a lower frequency value of fL and an upper frequency value of fU.”9); Pet. 8 (citing the same).” slip op. at 23
Claim construction§ 102 anticipation§ 103 obviousnessDiscretionary denialcites Phillips · KSR · GrahamPatents in suitUS 9,083,204 - PTAB · Nov 22, 2024 · PGR2024-00034 · APJ Patrick R Scanlon · PGR · Institution
Instituted PGR on claims 1–19 and all asserted grounds after finding at least one claim more likely than not unpatentable.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“We have authority to determine whether to institute a post-grant review. See 35 U.S.C. § 324 (2018); 37 C.F.R. § 42.4(a) (2022). To institute a post-grant review, we must determine that “the information presented in the petition . . . would demonstrate that it is more likely than not that at least 1 of the claims challenged in the petition is unpatentable.” 35 U.S.C. § 324(a). For the reasons set forth below, we determine that the information presented shows that it is more likely than not that Petitioner would prevail in establishing unpatentability of at least one challenged claim. Accordingly, we institute a post-grant review of the challenged claims on the grounds set forth in the Petition.” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“We note that the identification of a Ph.D. as an example of “more formal education” creates a vast range of education relative to a bachelor’s degree. Thus, we treat the identification of a Ph.D. just as it is—an example—and not a requirement. In this case, “more formal education” can be satisfied by a level of education less than a Ph.D (but greater than a bachelor’s degree). Based on our review of the record before us, we determine that Petitioner’s stated level of ordinary skill in the art is reasonable because it appears consistent with the evidence of record, definition, limited as discussed above, for the purposes of this Decision.” slip op. at 9
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“On the present record, we do not discern a need to construe explicitly any claim language because doing so would have no effect on our analyses below of Petitioner’s asserted grounds and will not assist in resolving the present controversy between the parties. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)).” slip op. at 10
- Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundInstituted
“would have understood Unger’s disclosure to “suggest the use of a torsion spring to facilitate attachment and detachment, because torsion springs are designed to impart this functionality.” Id. (citing Ex. 1002 ¶ 118). Petitioner also asserts that one of ordinary skill in the art would have “understood that there were a limited number of ways to impart the referenced resilient or flexible ‘manipulation,’” and “would have been motivated to look to various known solutions to impart the suggested functionality, including the torsional spring mechanism of Smith that is used in a similar hearing protection device application for a similar purpose as Unger’s mounting arms (to apply a clamping force).” Id. at 32 (citing Ex. 1002 ¶¶ 120–121).” slip op. at 17
Claim construction§ 103 obviousness§ 112 disclosurecites KSR · GrahamPatents in suitUS 11,736,855
Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.