- Tanklogix, LLC v. Sitepro, Inc.Institution deniedPTAB · Oct 10, 2025 · IPR2025-00653 · APJ Bart A Gerstenblith · IPR · Institution
The Board denied institution on all claims because the Petition did not show a reasonable likelihood that any challenged claim was unpatentable over the asserted grounds.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“An inter partes review may be instituted only if “the information presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2
- Skill levelSkill level patent owner adoptedDecided for patent owner
“The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’504 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“Additionally, only terms that are in controversy need to be construed, and these need be construed only to the extent necessary to resolve the controversy. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 9; Prelim. Resp. 4 (citing Ex. 2009 ¶ 72); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13
- Expert testimonyPetitioner expert discountedDecided for patent owner
“Ex. 1002 ¶ 47. As reflected above, Dr. Wooley’s testimony as to element [1.2] does not even assert that Cardamone discloses a tank, let alone one or more sensors disposed at a tank as recited in element [1.2]. Thus, Dr. Wooley’s testimony does not support Petitioner’s argument on this issue.” slip op. at 18
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 11,726,504 - Tanklogix, LLC v. Sitepro, Inc.Institution deniedPTAB · Oct 10, 2025 · IPR2025-00652 · APJ Bart A Gerstenblith · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–23 and 25–30 were unpatentable over the asserted grounds.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied
“presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2
- Skill levelSkill level patent owner adoptedDecided for patent owner
“The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’403 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 10; Prelim. Resp. 4 (citing Ex. 2009 ¶ 73); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable
“We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses element [1.2] because the evidence cited does not disclose a “first computer system being configured to provide remote control of the first pump or first valve” (i.e., a fluid-handling device). Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but Petitioner has not identified any disclosure of the capability to remotely control fluid-handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, Kahn’s disclosures that Petitioner relies on for allegedly teaching remote control are deficient. We discuss each. First, Petitioner points to the following, “[f]or instance, as illustrated in FIG. 1C, a fluid control device such as a valve 15A is located on the input side of a sen[s]or unit 110.” Ex. 1005, 8:19–21, cited in Pet. 13. This portion of Kahn, however, does not disclose remote control. Second, Petitioner cites to the following: Finally, or in addition to, the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance. Pet. 13 (citing Ex. 1005, 10:62–67). We agree with Patent Owner that this portion of Kahn teaches on-site alerts and local control of the fluid-handling device. See Prelim. Resp. 7. This portion of Kahn does not disclose remote control.” slip op. at 18
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 11,294,403 - Tanklogix, LLC v. Sitepro, Inc.Institution deniedPTAB · Oct 10, 2025 · IPR2025-00651 · APJ Bart A Gerstenblith · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–3, 6, 7, and 9–20 were unpatentable over any asserted ground.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied
“presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2
- Skill levelSkill level patent owner adoptedDecided for patent owner
“The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’680 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 11
- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner
“target value” is part of a command that is sent from a computing device to a server and then to a controller. The controller then receives a measurement of the fluid by a sensor and determines whether the measurement satisfies the “target value.” If the measurement does not satisfy the “target value,” further operations are undertaken. The recited operation sequence makes clear that the plain and ordinary meaning of “target value” is not as Dr. Wooley opines because the particular operating condition that a device is in at a particular time is represented by the measurement taken by the sensor, 11 Some claim language less relevant to construing “target value” was omitted for ease of reference. which the controller then uses to determine whether the measurement satisfies the “target value.” Additionally, claim 1 recites that the “target value” is sent as part of a command to the controller. The “target value” is not sent to the controller from the sensor, as might be expected if the plain and ordinary meaning of “target value” were as Dr. Wooley opines. Petitioner and Dr. Wooley’s construction would also result in “target value” meaning effectively the same thing as the measurement of the fluid by the sensor, a concept that is separately recited in claim 1 and to which the “target value” is compared. The Specification of the ’680 patent does not support Petitioner’s understanding of the plain and ordinary meaning of “target value.” Although the Specification does not recite “target value,” it recites “target state,” and describes “target state” sufficiently to understand the plain and ordinary meaning of “target” as used in “target value” and “target state.” In particular, the ’680 patent explains that “[i]n some embodiments, the process 104 includes receiving, via a network interface, from a remote user device, (e.g., via a command-center server) a command to change a state of a fluid-handling device to a target state.” Ex. 1001, 11:48–51. This portion reflects that the command is seeking to change a state of a fluid-handling device to a target state. In other words, the “target value” or “target state” is not generally “the particular operating condition that a device is in at a particular time”; rather, it is a value or state that the fluid-handling device is desired to be in, as Patent Owner and Dr. Durham explain. Additionally, just as claim 1 recites a directional component for the “target value” to be sent to the controller in a command, so too does the Specification describe a “target state” as being sent in a command from a remote user device. Thus, the Specification clearly supports the plain and ordinary meaning proposed by Patent Owner and Dr. Durham and not the plain and ordinary meaning proposed by Petitioner and Dr. Wooley. slip op. at 14
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable
“time-stamped process data, report exception therein to the remote host, and extract and transmit time-stamped process data to the remote host.” Ex. 1005, Abst. (emphases added). Almadi explains that its remote field systems must include a plurality of controller units “to issue commands to, and gather and process data from a plurality of field devices, including remote systems and instruments, . . . [and] a database server for the storage of process data retrieved from the remote subsystems and instruments.” Id. at 2:22–30 (emphases added). Based on these disclosures, we agree with Patent Owner that Petitioner has not established that Almadi discloses element [1.4]. Specifically, the teachings from Almadi identified by Petitioner refer to process data, which is data retrieved from the remote subsystems/field devices. Thus, we understand that Almadi’s teaching—of using an Ethernet switch to transmit “process data”—describes transmitting data from the remote subsystems/field devices. See Ex. 1005, 3:13–17, cited in Pet. 15. But claim 1 and particularly element [1.4], recites “sending, with the server, the target value to the network address [which identifies a controller of the fluid-handling device13] via the network,” which is different than sending process data from the field devices to the remote host or database server for storage.” slip op. at 19
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 11,175,680 - Tanklogix, LLC v. SiteproInstitution deniedPTAB · Oct 10, 2025 · IPR2025-00650 · APJ Sheila F Mcshane · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood that claims 18–32 and 34 were unpatentable over Kahn or Kahn and Gutierrez.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). Upon consideration of the Petition, the Preliminary Response, and the evidence of record, we determine that Petitioner has not established a reasonable likelihood of prevailing with respect to the unpatentability of at least one claim of the ’871 patent. Accordingly, for the reasons that follow, we decline to institute an inter partes review of claims 18–32 and 34 of the ’871 patent.” slip op. at 2
- Skill levelSkill level patent owner adoptedDecided for patent owner
“The respective proposed levels of qualifications for a person of ordinary skill in the art are similar, with Patent Owner proposing two years of experience compared to Petitioner proposing significant experience with remotely controlling fluid-handling devices, like SCADA systems. Patent Owner also proposes more extensive experience in lieu of educational experience. While we find Petitioner’s proposed qualifications to be acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of skill necessary to understand and implement the teachings of the ’871 patent and the asserted prior art. Our analysis and findings herein, however, do not turn on any differences in the qualifications adopted.” slip op. at 8
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“We determine that we need not expressly construe any claim terms to resolve the parties’ disputes on the current record. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“[W]e need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 10
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable
“actuators and the remote control of fluid handling devices, including the receipt with the user-interface module of “a user command to actuate an actuator via a presented control interface” (limitation [18.7]) and “account authorized to send commands to remotely control fluid handling devices” (limitation [18.11]). We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses or teaches these limitations because the evidence does not provide support that there is remote control of fluid handling devices or the use of a user command on a control interface to send a command to a fluid handling device, for instance. Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but we do not discern that it teaches or discloses the capability to remotely control fluid handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, the Kahn disclosures that Petitioner repeatedly relies upon for allegedly teaching this control are deficient. See Ex. 1005, 10:62–67, 14:35– 15:2, 15:62–16:32; see also Pet. 12–14, 16–18. Kahn discloses that “the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance.” Ex. 1005, 10:62–67. Communication unit 112B is part of the local “sensor unit,” wherein the detection conditions determined by the sensor are communicated to remote devices by communication unit 112B. See id. at 3:31–33, 5:62–6:2, 6:27–35, 7:33–37, 13:7–12, Figs. 1A–1C. Kahn discloses that the sensor units, which include communication units 112B, can be located near shut-off valves and can communicate with distant locations. See id. at 11:1–13. There are no disclosures, however, in the above passages that there is remote control of fluid handling devices, that there is a user command on a control interface that actuates an actuator, or that there is a command sent to the facility actuators via a network connection, as required in limitations [18.5]–[18.7] and [18.9]–[18.12], respectively. Rather, the disclosure indicates that the communication unit 112B includes on-site alerts and that the local (non-remote) communication unit 112B can be interfaced with the control valve.” slip op. at 18
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 10,488,871 - PTAB · Apr 21, 2025 · IPR2024-01489 · APJ Barbara A Parvis · IPR · Institution
The Board instituted IPR on claims 1–30 on all asserted grounds, finding a reasonable likelihood that Cohen anticipates the challenged claims.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“To show anticipation under 35 U.S.C. § 102, each and every claim element, arranged as in the claim, must be found in a single prior art reference. Net MoneyIN, Inc. v. VeriSign, Inc., 545 F.3d 1359 (Fed. Cir. 2008); Verdegaal Bros., Inc. v. Union Oil Co. of Cal., 814 F.2d 628, 631 (Fed. Cir. 1987). Identity of terminology is not required for a claim element to be met directly by the prior art. In re Gleave, 560 F.3d 1331, 1334 (Fed. Cir. 2009); In re Bond, 910 F.2d 831, 832 (Fed. Cir. 1990) (citations omitted) (“[T]his is not an ‘ipsissimis verbis’ test.”). For anticipation, we take into account not only the specific teachings of the reference, but also the inferences which one skilled in the art would reasonably be expected to draw therefrom. In re Preda, 401 F.2d 825, 826 (CCPA 1968). B. Level of Ordinary Skill in the Art” slip op. at 13
- Parallel petitionsDecided for petitioner
“Wrinkl, Inc. v. Slack Technologies, LLC, No. 1:24-cv-00620 (D. Del. May 23, 2024). Pet. 1; Paper 4, 1. Patent Owner also states that a “second IPR was filed against the same patent in proceeding IPR2024-01490.” Paper 4, 1. Patent Owner does not argue that we should exercise discretion under 35 U.S.C. § 314(a) because Petitioner uses more than one petition to challenge the ’731 patent. challenges the alleged priority date of the ’731 patent (IPR2024-01489) (‘First Petition’) and the second petition assumes that the Patent Owner’s claimed priority date is valid, and addresses prior art references predating that priority date (IPR2024-01490) (‘Second Petition’).” Ex. 1019, 1. In accordance with the Consolidated Trial Practice Guide1 (“CTPG”), issued in November 2019, “there may be circumstances in which more than one petition may be necessary” including “when there is a dispute about priority date requiring arguments under multiple prior art references.” CTPG 59. Such is the case here. Patent Owner does not file any Preliminary Response or other paper disputing Petitioner’s use of two petitions to challenge the claims of the ’731 patent. Based on the record before us, we consider the merits of both petitions because Petitioner’s stated reasons for filing two petitions are consistent with the CTPG. See generally Ex. 1019 (citing CTPG, 59 (“the Board recognizes that there may be circumstances in which more than one petition may be necessary, including, for example, . . . when there is a dispute about priority date requiring arguments under multiple prior art references)). C. The ’731 Patent” slip op. at 2
- Disclosure Requirements (§112) › Written description (Ariad)Not entitled to earlier dateOther
“reasonable likelihood that it would prevail on a ground of unpatentability. 35 U.S.C. § 314(a); Harmonic Inc. v. Avid Tech., Inc., 815 F.3d 1356, 1363 (Fed. Cir. 2016) (citing 35 U.S.C. § 312(a)(3)) (“In an [inter partes review], the petitioner has the burden from the onset to show with particularity why the patent it challenges is unpatentable.”). Petitioner first must raise the issue of entitlement to a claimed priority date by “identifying, specifically, the features, claims, and ancestral application or applications allegedly lacking § 112 support for the claims based on the identified features.” Focal Therapeutics, Inc. v. Senorx, Inc., IPR2014-00116, Paper 8 at 9–10 (PTAB Apr. 22, 2014); Mission Integrated Techs., LLC v. Joshua Clemente, IPR2023-01285, Paper 16 at 18 (PTAB Feb. 23, 2024). Then, Patent Owner must make a sufficient showing of entitlement to earlier filing date(s), in a manner that is commensurate in scope with the specific points and contentions raised by the petitioner. See id.” slip op. at 11
- Skill levelSkill level petitioner adoptedOther
“two years of experience in the graphical user interface field” or, alternatively “a master’s degree in computer science (or similar discipline) and at least two years of similar experience.” Pet. 16 (citing Ex. 1003 ¶ 40). We find that “at least” in Petitioner’s formulation of the level of skill in the art is vague and open-ended. Otherwise, we preliminarily adopt Petitioner’s formulation of the level of skill in the art, which appears consistent with the specification and prior art presented. C. Claim Construction” slip op. at 14
Claim construction§ 102 anticipation§ 112 disclosureDiscretionary denialcites PhillipsPatents in suitUS 11,973,731 - Nokia Of America Corporation / Ericsson Inc. et al. v. General Access Solutions, Ltd.No claims unpatentablePTAB · Apr 14, 2025 · IPR2023-01416 · APJ Ken B Barrett · IPR · Final written decision
The Board held claims 1–15 and 18 not unpatentable; the petition failed to prove the asserted anticipation and obviousness grounds, including failure to establish WiMAX as prior art.
RulingsFinal written decision- Adverse judgmentAdverse judgmentOther
“filed with the Office a statutory disclaimer disclaiming method claims 16, 17, 19, and 20. See Ex. 2007; see also Tr. 33, 21:1–12 (Patent Owner’s counsel informing the Board that the disclaimer had been filed in the USPTO Patent Center, and Petitioner’s counsel having no objection to the filing of the disclaimer as an exhibit in this inter partes review); Tr. 34:19 1 Petitioner identifies Nokia of America Corporation, Ericsson Inc., and T-Mobile USA, Inc. as real parties in interest. Pet. 72. 2 Patent Owner identifies General Access Solutions, Ltd. as the real party in interest. Paper 6, 1. (Patent Owner’s counsel stating, “General Access has disclaimed method Claims 16, 17, 19, and 20.”). We treat disclaimed claims as if they never existed. See Facebook, Inc. v. SKKY, LLC, CBM2016-00091, Paper 12 at 8 (PTAB Sept. 28, 2017) (expanded panel) (precedential) (“The Federal Circuit has held consistently that claims disclaimed under § 253(a) should be treated as though they never existed.”) (citing, inter alia, Vectra Fitness, Inc. v. TWNK Corp., 162 F.3d 1379, 1383 (Fed. Cir. 1998) (“This court has interpreted the term ‘considered as part of the original patent’ in section 253 to mean that the patent is treated as though the disclaimed claims never existed.”); Guinn v. Kopf, 96 F.3d 1419, 1422 (Fed. Cir. 1996) (“A statutory disclaimer under 35 U.S.C. § 253 has the effect of canceling the claims from the patent and the patent is viewed as though the disclaimed claims had never existed in the patent.”)). Accordingly, the remaining claims challenged in this proceeding are apparatus claims 1–15 and method claim 18.” slip op. at 2
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable
“of both types of parameters to be stored in the same “device” is consistent with the claim language. The claim recites “a profile parameter storage device,” “said profile parameter storage device for storing [two parameter] values,” and refers to “the values stored at said profile parameter storage device.” Ex. 1001, 13:10–16. Accordingly, the claim language speaks of a single device for storing both types of parameters.12 And, Petitioner does” slip op. at 32
- Obviousness (§103) › Motivation to combine / reasonable expectation of successNot shown unpatentableNot shown unpatentable
“of both types of parameters to be stored in the same “device” is consistent with the claim language. The claim recites “a profile parameter storage device,” “said profile parameter storage device for storing [two parameter] values,” and refers to “the values stored at said profile parameter storage device.” Ex. 1001, 13:10–16. Accordingly, the claim language speaks of a single device for storing both types of parameters.12 And, Petitioner does” slip op. at 32
- Novelty / Anticipation (§102) › Prior-art status of a reference › Printed publication / public accessibilityPrinted publication not establishedNot shown unpatentable
“Id. “[A] work is not publicly accessible if the only people who know how to find it are the ones who created it.” Samsung Elecs. Co. v. Infobridge Pte. Ltd., 929 F.3d 1363, 1372 (Fed. Cir. 2019) (citing SRI Int’l, Inc. v. Internet Sec. Sys., Inc., 511 F.3d 1186, 1196 (Fed. Cir. 2008) Application of Bayer, 568 F.2d 1357 (CCPA 1978)). Accordingly, in this case, Petitioner must demonstrate by a preponderance of the evidence that the WiMAX exhibit was disseminated or otherwise made available to interested ordinary artisans outside of the group that created the document. Petitioner has failed to satisfy that burden.” slip op. at 48
Patent outcomesUS 6,947,477 not shown unpatentable§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 6,947,477 - Samsung Electronics Co., Ltd. v. Anonymous Media Research Holdings, LLCInstitution deniedPTAB · Mar 24, 2025 · IPR2024-01349 · APJ Frederick C Laney · IPR · Institution
The Board denied institution because claims 1–13 are entitled to the May 26, 2005 priority date, making the asserted references not prior art and the obviousness grounds unlikely to prevail.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied
“to show with particularity why the patent it challenges is unpatentable.” Harmonic Inc. v. Avid Tech., Inc., 815 F.3d 1356, 1363 (Fed. Cir. 2016); see also 35 U.S.C. § 312(a)(3) (requiring inter partes review petitions to identify “with particularity . . . the evidence that supports the grounds for the challenge to each claim”). This burden of persuasion never shifts to the patent owner. See Dynamic Drinkware, LLC v. Nat’l Graphics, Inc., 800 F.3d 1375, 1378 (Fed. Cir. 2015). Thus, if Petitioner has not satisfied the threshold reasonable likelihood standard for institution, then institution will be denied. See id. at 1378–1379.” slip op. at 8
- Disclosure Requirements (§112) › Written description (Ariad)Written description adequateEntitled to earlier dateDecided for patent owner
“disclosed in the manner provided by the first paragraph of section 112 of this title in an application previously filed in the United States . . . shall have the same effect, as to such invention, as though filed on the date of the prior application.” (emphasis added). “In essence, this means that in a chain of continuing applications, a claim in a later application receives the benefit of the filing date of an earlier application so long as the disclosure in the earlier application meets the requirements of 35 U.S.C. § 112, ¶ 1, including the written description requirement, with respect to that claim.” Technology Licensing Corp. v. Videotek, Inc., 545 F.3d 1316, 1326 (Fed. Cir. 2008). And to determine whether a parent application meets the written description requirement, “the disclosure must be considered as a whole, as the person of ordinary skill in the art would read it, to determine if it reasonably conveys possession” of the claimed invention. Allergan USA, Inc. v. MSN Labs. Private Ltd., 111 F.4th 1358, 1375 (Fed. Cir. 2024) (citation and emphasis omitted); see also Reiffin v. Microsoft Corp., 214 F.3d 1342, 1345–46 (Fed. Cir. 2000) (the purpose of the written description requirement “is to ensure that the scope of the right to exclude . . . does not overreach the scope of the inventor’s contribution to the field of art as described in the patent specification”).” slip op. at 9
- Obviousness (§103) › Graham factors (scope of art, differences, level of skill)Not reached
“A claim is unpatentable under 35 U.S.C. § 103(a) if the differences between the claimed subject matter and the prior art are such that the subject matter, as a whole, “would have been obvious at the time the invention was made to a person having ordinary skill in the art to which said subject matter pertains.” KSR Int’l Co. v. Teleflex Inc., 550 U.S. 398, 406 (2007). The question of obviousness is resolved on the basis of underlying factual differences between the claimed subject matter and the prior art; (3) the level of ordinary skill in the art; and (4) if presented, objective evidence of non-obviousness. See Graham v. John Deere Co., 383 U.S. 1, 17–18 (1966). As previously noted, the first factor regarding the scope of available prior art is the dispositive issue of this Petition, which is largely defined by the effective filing date of the challenged claims.” slip op. at 8
- PTAB / AIA Trials › Other PTAB motions (exclude, strike, seal, additional discovery, rehearing)Denied
“Because we determine that no inter partes review will be instituted on IPR2024-01350, we find it unnecessary to exercise exclusive jurisdiction over the ’849 patent. See Paper 9, 9. Therefore, Petitioner’s motion for the Board to exercise exclusive jurisdiction over the ’849 patent is denied. Petitioner further requests that all briefing in this proceeding be provided to the Certificates of Correction and Petitions branches for their consideration, citing Patent Owner’s “duties of candor and good faith.” Id. at 2, 10. However, in view of our determination not to institute review in this proceeding, we defer to the Certificates of Correction and Petitions branches to carry out their duly authorized duties. Honeywell Int’l Inc. v. Arkema Inc., 939 F.3d 1345, 1349 (Fed. Cir. 2019).” slip op. at 23
§ 103 obviousness§ 112 disclosurecites Phillips · KSR · GrahamPatents in suitUS 10,719,849 - Samsung Electronics Co., Ltd v. Anonymous Media Research Holdings, LLCInstitution deniedPTAB · Mar 21, 2025 · IPR2024-01350 · APJ Michael T Cygan · IPR · Institution
Institution was denied for claims 1–15 because Petitioner did not show the asserted references were prior art; the claims were supported by the ’330 application’s 2005 filing date.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsInstitution denied
“To prevail on its obviousness challenges, Petitioner must show that the ’848 patent is not entitled to the benefit of the ’330 application. This issue is dispositive because none of the references relied on by Petitioner qualify as prior art if the ’848 patent is entitled to the benefit of the May 26, 2005, filing date of the ’330 application. Pet. 6, 13. We start by explaining why Petitioner bears the burden of persuasion.” slip op. at 9
- BurdenDecided for patent owner
“1. The Burden of Persuasion “In an inter partes review . . ., the petitioner shall have the burden of proving a proposition of unpatentability by a preponderance of the evidence.” 35 U.S.C. § 316(e). That burden, termed the burden of persuasion, “is the ultimate burden assigned to a party who must prove something to a specified degree of certainty.” Dynamic Drinkware, LLC v. National Graphics, Inc., 800 F.3d 1375, 1378 (quoting Tech. Licensing Corp. v. Videotek, Inc., 545 F.3d 1316, 1326–27 (Fed. Cir. 2008)). That burden never shifts to the patentee. Id. at 1379. In order for an inter partes review to be instituted, “the information presented in the petition filed under section 311 and any response filed under section 313 [must] show[] that there is a reasonable likelihood that the petitioner would prevail.” 35 U.S.C. § 314(a).” slip op. at 9
- Disclosure Requirements (§112) › Written description (Ariad)Written description adequateEntitled to earlier dateDecided for patent owner
“d) Analysis Petitioner has not shown a reasonable likelihood that it would prevail in showing that its asserted references, including Steuer 750 which is a publication of the ’330 application, are prior art to the ’848 patent. Petitioner has not shown that the ’330 application fails to provide written description support for claim 1 of the ’848 patent, which recites “video data” samples and representations.” slip op. at 16
- Obviousness (§103) › Graham factors (scope of art, differences, level of skill)Not reached
“a chain of priority from the ’330 application to the ’848 patent contain at least the same disclosure as the ’330 application, Petitioner has not shown that the ’848 patent should not be given the benefit of the effective filing date of the ’330 application. The May 26, 2005 filing date of the ’330 application predates the December 1, 2005 publication date of Steuer 750, the August 13, 2013 issue date of Steuer 768, and the December 2, 2010 and May 27, 2010 publication and filing dates of Neumeier.10 Pet. 7; Ex. 1005, code (43); Ex. 1006, code (45); Ex. 1007, codes (43), (60).11 Therefore, Petitioner has not shown by a preponderance of the evidence that any of the asserted claims in the ’848 patent would have been obvious over the asserted combinations of Steuer 750, Steuer 768, and Neumeier.” slip op. at 22
Claim construction§ 103 obviousness§ 112 disclosurecites Phillips · KSR · GrahamPatents in suitUS 10,719,848 - PTAB · Mar 17, 2025 · IPR2024-01311 · APJ Sharon Fenick · IPR · Institution
The Board instituted IPR of claims 16–30 on all asserted grounds, finding a reasonable likelihood that Genius Sports would prevail on at least one challenged claim.
RulingsInstitution decision- PTAB / AIA Trials › Discretionary denial › §325(d) same art / argumentsDenied
“a petition that presents the same or substantially the same art or arguments as were previously presented to the Office. To evaluate arguments for discretionary denial under § 325(d), the Board uses a two-part framework: 4 The Leahy-Smith America Invents Act (“AIA”), Pub. L. No. 112-29, 125 Stat. 284 (2011), amended 35 U.S.C. § 103, effective March 16, 2013. Because the challenged claims of the ’218 patent have an apparent effective filing date after March 16, 2013, the AIA version of § 103 applies. Ex. 1009, codes (22), (60), (63). Our determinations and findings herein would not change if the pre-AIA provisions applied. (1) whether the same or substantially the same art previously was presented to the Office or whether the same or substantially the same arguments previously were presented to the Office; and (2) if either condition of first part of the framework is satisfied, whether the petitioner has demonstrated that the Office erred in a manner material to the patentability of challenged claims. If a condition in the first part of the framework is satisfied and the petitioner fails to make a showing of material error, the Director generally will exercise discretion not to institute inter partes review.” slip op. at 10
- Parallel petitionsInstituted
“The Consolidated Trial Practice Guide1 (“CTPG”), issued in November 2019, guides that “one petition should be sufficient to challenge the claims of a patent in most situations.” CTPG 59. In the instant proceeding, however, we agree with Petitioner’s arguments regarding filing two petitions. For example, we find that each petition challenges different claims and that Petitioner’s division of its challenges into two petitions is supported by the length and nature of the claims. We also agree that Petitioner’s assertion of the same art minimizes the burden on the Board and the parties. Patent Owner does not respond to Petitioner’s arguments that we should institute both petitions. See generally Prelim. Resp. Because we agree with Petitioner’s arguments with respect to the claims and the identity of the prior art used, we consider the merits of the instant petition.” slip op. at 4
- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“35 U.S.C. § 314 and 37 C.F.R. § 42.4. We may institute an inter partes review if “the information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314. Upon consideration of the contentions and the evidence of record at this preliminary stage, we determine that Petitioner has demonstrated a reasonable likelihood of prevailing on at least one of the challenged claims of the ’218 patent. Accordingly, we grant Petitioner’s request and institute an inter partes review of all challenged claims of the ’218 patent and with respect to all grounds set forth in the Petition.” slip op. at 2
- Skill levelSkill level patent owner adoptedDecided for patent owner
“B. Level of Ordinary Skill in the Art Petitioner asserts that a person of ordinary skill in the art would have had at least a bachelor’s degree, or equivalent, in electrical engineering, computer engineering, computer science, or a related field or an equivalent number of years of working experience, and one to two years of experience in networking environments, including at least some experience with live-streaming network architecture. Pet. 17–18 (citing Ex. 1001 ¶¶ 72–76). Petitioner additionally asserts that, “[a]dditional education or experience in related fields could compensate for deficits in the above qualifications.” Id. at 18. Patent Owner asserts: A person of ordinary skill in the art would have a bachelor’s degree in electrical engineering, computer engineering, computer science, or equivalent degree and, in addition, approximately two years of work experience with Internet video streaming, Internet communication, and related protocols. Prelim. Resp. 8 (citing Ex. 2001 ¶ 96). The parties have not addressed whether the differences in these definitions impact the unpatentability analysis before us. We preliminarily adopt Patent Owner’s formulation of the level of skill in the art, which is more specific and appears consistent with the specification and prior art presented, but on the present record we would reach the same determination under Petitioner’s formulation of the level of skill.” slip op. at 17
Claim construction§ 102 anticipation§ 103 obviousnessDiscretionary denialcites Phillips · GrahamPatents in suitUS 11,039,218 - Inductev, Inc. v. Witricity CorporationAll claims unpatentablePTAB · Feb 13, 2025 · IPR2023-01182 · APJ Robert J Weinschenk · IPR · Final written decision
Claim 16 was cancelled on Patent Owner’s motion; claim 17 was held unpatentable as obvious over Cook ’554 and over Lee and Cook ’523.
RulingsFinal written decision- Skill levelSkill level petitioner adoptedDecided for petitioner
“B. Level of Ordinary Skill in the Art Petitioner argues that a person of ordinary skill in the art would have had “at least a bachelor’s degree in electrical engineering (or equivalent) and at least two to three years of industry or equivalent research experience in the field of wireless energy transfer.” Pet. 7–8 (citing Ex. 1003 ¶¶ 37–41). Petitioner’s description of the level of ordinary skill in the art is supported 1 The Leahy-Smith America Invents Act (“AIA”), Pub. L. No. 112-29, 125 Stat. 284, 287–88 (2011), amended 35 U.S.C. § 103. Based on the effective filing date of the ’719 patent, we apply the pre-AIA version of § 103. by the testimony of Petitioner’s declarant, Dr. Mark Allen. Ex. 1003 ¶¶ 37– 41. Patent Owner does not dispute Petitioner’s description. PO Resp. 14. We adopt Petitioner’s description for purposes of this Decision.” slip op. at 5
- Claim Construction › Intrinsic evidence (Phillips canons) › Lexicography (patentee as own lexicographer)Term construed petitioner constructionDecided for petitioner
“[i]t will be appreciated that a network of capacitors, as used herein, may in general refer to any circuit topology including one or more capacitors, including without limitation any of the circuits specifically disclosed herein using capacitors, or any other equivalent or different circuit structure(s), unless another meaning is explicitly provided or otherwise clear from the context. Id. at 52:32–38 (emphasis added). Thus, the ’719 patent expressly defines the phrase “a network of capacitors” as any circuit topology including one or more capacitors. Id.” slip op. at 7
- Novelty / Anticipation (§102) › Prior-art status of a reference › Patents / published applications (effective date, provisional support)Reference is prior artDecided for petitioner
“Patent Owner’s argument is unavailing. Even if Patent Owner is correct that elements E and F in Figure 4-12 of the Cook Provisional only represent the delivered power level (not the received power level), other portions of the Cook Provisional disclose tuning the resonant frequency of the resonant circuit based on the received power level. See Pet. Reply 5–6. In particular, the Cook Provisional states that “[t]he control system of the receiver is in charge of . . . antenna tuning control.” Ex. 1006, 31. The Cook Provisional also states that “[t]he receiver[’]s control system may determine the model parameters using specific measurements (e.g. antenna current and voltage, input power, etc.) and calibration routines.” Id. (emphasis added). Thus, the Cook Provisional discloses tuning the resonant frequency based on input power. Id.” slip op. at 10
- PTAB / AIA Trials › Motions to amend / substitute claimsMotion to amend, grantedGranted
“D. Motion to Amend Patent Owner’s non-contingent Motion to Amend requests that we cancel claim 16. Mot. Amend 1. Petitioner does not oppose Patent Owner’s request. Id. We grant Patent Owner’s unopposed request to cancel claim 16, and, as a result, we do not reach the asserted grounds for claim 16.” slip op. at 8
Patent outcomesUS 8,461,719 unpatentableClaim construction§ 102 anticipation§ 103 obviousnesscites KSR · GrahamPatents in suitUS 8,461,719
Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.