- Apple Inc. v. Apex Beam Technologies LLCInstitutedPTAB · Nov 21, 2025 · IPR2025-00906 · APJ Justin T Arbes · IPR · Institution
The Board instituted IPR of claims 1–20 on all asserted grounds after finding a reasonable likelihood that claim 1 is unpatentable over 3GPP-38.213, 3GPP-38.213-CR, and 3GPP-38.212-CR.
RulingsInstitution decision- Skill levelSkill level petitioner adoptedOther
“2019),2 a person of ordinary skill in the art would have had “a bachelor’s degree in electrical engineering, computer engineering, computer science, or a similar field, along with two years of experience designing or developing wireless networks, including long-term evolution LTE/4G or 5G new radio (NR) cellular technology,” where “[a]dditional years of experience could substitute for an advanced-level degree (and vice versa).” Pet. 14 (citing Ex. 1003 ¶¶ 39–42). Patent Owner “utilizes Petitioner’s proposed level of skill in the art” for its Preliminary Response. Prelim. Resp. 7. Based on the record presented, including our review of the ’434 patent and the types of 2 Petitioner states that it “assumes for purposes of [its Petition] that the claims are entitled to the earliest claimed priority date—November 5, 2019.” Pet. 14; see Ex. 1001, code (60). problems and solutions described in the ’434 patent and cited prior art, we agree with Petitioner’s proposed definition of the level of ordinary skill in the art and apply it for purposes of this Decision.” slip op. at 10
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“C. Claim Interpretation We interpret each challenged claim using the same claim construction standard that would be used to construe the claim in a civil action under 35 U.S.C. 282(b), including construing the claim in accordance with the ordinary and customary meaning of such claim as understood by one of ordinary skill in the art and the prosecution history pertaining to the patent. 37 C.F.R. § 42.100(b). Petitioner argues that “no claim terms need be construed.” Pet. 10. Patent Owner does not propose interpretations of any claim terms in its Preliminary Response. We conclude that no express interpretation of any claim term is necessary to determine whether to institute an inter partes review in this proceeding, but encourage the parties to address various claim interpretation issues identified below during trial. See infra Section II.D.5; Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (“Because we need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy,’ we need not construe [a particular claim limitation] where the construction is not ‘material to the . . . dispute.’” (emphasis added) (citation omitted)).” slip op. at 11
- Novelty / Anticipation (§102) › Prior-art status of a reference › Printed publication / public accessibilityPrinted publication establishedInstituted
“Assessing the evidence of record collectively, however, we are persuaded that Petitioner has shown a reasonable likelihood that 3GPP-38.213-CR was publicly accessible from the ETSI email archive before November 5, 2019. Given his many years of experience with ETSI, in particular his responsibilities pertaining to management of documents like change requests, and as the “list owner” “responsible for managing and administrating” several email exploder lists, Mr. Rodermund appears to be well-qualified to testify to the matters in his declaration. See Ex. 1008 ¶¶ 7, 10–15, 49. He explains in detail how, based on his experience, emails sent to a 3GPP email exploder were accessible on the email archive immediately after being sent. Id. ¶¶ 44–60, 72–80. That explanation is supported by screenshots from various websites and other corroborating evidence. See Ex. 1008 ¶¶ 44–60, 72–80. The November 3, 2019, email with 3GPP-38.213-CR as an attachment is currently available to the public via the email archive, with no login, password, or membership required to access it. Id. ¶¶ 44, 74; see Kyocera, 545 F.3d at 1351 (“[ETSI] specifications themselves were visible to any member of the interested public without requesting them from an ETSI member. Further, ETSI did not impose restrictions on ETSI members to prevent them from disseminating information about the standard to non-members.”). The metadata for the file indicates that it was created and last modified one day before the email was sent. Ex. 1008 ¶ 76. And Mr. Rodermund discusses one example where a listserv email was uploaded to the archive just minutes after being sent. Id. ¶¶ 50–51. Although that example is from 2025 rather than 2019, it provides some support for his opinion that the same “near contemporaneous” timing would have been the case in 2019 as well. See id. ¶ 52. Immediately making emails like the one with the 3GPP-38.213-CR change request available on the email archive is consistent with 3GPP’s overall purpose of making standards documents available “so that engineers and other individuals would have ready access to them when developing and implementing cellular networks and devices.” See id. ¶ 35; Kyocera, 545 F.3d at 1351 (finding that the “primary purpose of the [standard at issue] was to develop a system interoperable across national borders,” which “made it crucial to grant access to any interested parties”); Cradlepoint, Inc. v. Sisvel Int’l S.A., IPR2020-01103, Paper 46 at 13–14 (PTAB Jan. 18, 2022) (finding, based on the preponderance of the evidence, that “testimony concerning [a 3GPP] email exploder and listserv provide further support for a conclusion of public accessibility because it tends to show that 3GPP was known beyond its members, that the meetings were widely publicized, and that 3GPP documents were, in general, widely available”). Finally, Mr. Rodermund explains in detail how a person of ordinary skill in the art could have accessed the email with 3GPP-38.213-CR, using the indexing of the email archive. See Ex. 1008 ¶¶ 49, 53–60. We are persuaded that Mr. Rodermund’s testimony and supporting evidence are sufficient at this stage. Patent Owner will have the opportunity to cross-examine Mr. Rodermund and explore the bases for his statements. And our ultimate determination of the weight to be given to his testimony will be based on the complete record at the end of trial. Based on the totality of the evidence currently in the record, Petitioner has established a reasonable likelihood that 3GPP-38.213-CR is a prior art printed publication under 35 U.S.C. § 102(a)(1).” slip op. at 20
- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“is that Petitioner has not shown sufficiently that 3GPP-38.213-CR and 3GPP-38.212-CR are prior art printed publications. Prelim. Resp. 2–10. We disagree on this record for the reasons explained above. See supra Section II.D.4. Patent Owner does not dispute Petitioner’s arguments regarding the limitations of claim 1 or Petitioner’s asserted motivation to combine the references. See Prelim. Resp. 2–10. Petitioner’s contentions are supported by the testimony of Dr. Mandayam and are persuasive based on the current record. See Pet. 14–48; Ex. 1003 ¶¶ 52–67, 81–113. Petitioner has shown a reasonable likelihood of prevailing on its assertion that claim 1 is unpatentable over 3GPP-38.213, 3GPP-38.213-CR, and 3GPP-38.212-CR. Accordingly, we institute review “on all of the challenged claims and on all grounds of unpatentability asserted for each claim.” See 37 C.F.R. § 42.108(a).” slip op. at 28
Claim construction§ 102 anticipationcites KSR · GrahamPatents in suitUS 10,965,434 - PTAB · Nov 10, 2025 · IPR2025-00878 · APJ Carl M Defranco · IPR · Institution
The Board instituted review of claims 1–3 and 11 after finding a reasonable likelihood that claim 1 is anticipated by Cleveland or obvious over Nakagawa.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“contentions, the cited portions of Cleveland, and the testimony of Clearwater’s expert), we find, preliminarily, that Cleveland discloses each claim element in the manner recited by claim 1. Thus, on the current record, Clearwater demonstrates a reasonable likelihood that challenged claim 1 is unpatentable as anticipated by Cleveland.” slip op. at 6
- Novelty / Anticipation (§102) › Prior-art status of a reference › Patents / published applications (effective date, provisional support)Reference is prior artDecided for petitioner
“5 Clearwater argues that Cleveland qualifies as prior art under 35 U.S.C. § 102(e)(1) “based on both its provisional and non-provisional filing dates.” Pet. 17. In support, Clearwater asserts that Cleveland’s provisional (Ex. 1006) is “virtually identical” to Cleveland itself (id. at 18) and submits claim charts to demonstrate that the Cleveland provisional provides written support for: (1) at least claim 1 of Cleveland (id. at 18–21); and (2) the subject matter relied upon in Cleveland (id. at 21–40 (citing Ex. 1006 throughout)). Based on our review of the Cleveland provisional, as well as Clearwater’s claim charts, we are persuaded that the current record demonstrates that Cleveland is prior art to the challenged patent. See Dynamic Drinkware, LLC v. Nat’l Graphics, Inc., 800 F.3d 1375, 1381 (Fed. Cir. 2015).” slip op. at 4
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Instituted
“satisfies each claim element as identified above in Section I.D, i.e., elements [1.pre]–[1.6]. See id. at 22–40. Clearwater also submits annotated Figure 3 of Cleveland, reproduced below, to further illustrate the specific laminate structure of Cleveland’s coffee cup. See id. at 39.” slip op. at 5
- Obviousness (§103) › Motivation to combine / reasonable expectation of successInstituted
“protective layers have “a coat weight of from 5 to 30 lbs/3000 ft2,” Clearwater submits the declaration of its expert, who explains that, because Nakagawa identifies the specific polymers and the thickness of the coat used for the plastic layers and one skilled in the art “would recognize that the disclosed polymers have a given density,” then “[w]ith these known parameters, the coat weight is easily calculated to be 23.04 lbs./ 3000 ft2 — falling squarely within the claimed range.” Pet. 53–54 (citing Ex. 1003 ¶¶ 132–133; Ex. 1008 ¶ 24; Ex. 1024, at 4). At this stage, we find that testimony credible and supported by the evidence presently of record. After reviewing the preliminary record (including Clearwater’s contentions, the cited portions of Nakagawa, and the testimony of Clearwater’s expert), we find, preliminarily, that Nakagawa discloses or otherwise suggests each claim element in the manner recited by claim 1. Thus, on the current record, Clearwater demonstrates a reasonable likelihood that challenged claim 1 is unpatentable as obvious over Nakagawa. We need not decide Clearwater’s challenge of the dependent claims based on Nakagawa alone nor its challenge of claims 1–3 based on Nakagawa and Tanner. Our analysis of these challenges, in our view, is best left for trial after full development of the record.” slip op. at 8
Claim construction§ 102 anticipation§ 103 obviousnesscites PhillipsPatents in suitUS 8,637,126 - PTAB · Oct 16, 2025 · IPR2025-00712 · APJ James A Tartal · IPR · Institution
The Board instituted inter partes review of claims 1, 3–9, 13, 17, 18, 23, 25, 26, 28, and 29 on all asserted grounds, finding a reasonable likelihood of prevailing on claim 1 over Walker.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“review. 35 U.S.C. § 314(b) (2018); 37 C.F.R. § 42.4(a) (2025). An inter partes review may not be instituted “unless . . . the information presented in the petition . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). Upon institution of inter partes review, the review proceeds “on all of the challenged claims and on all grounds of unpatentability asserted for each claim.” 37 C.F.R. § 42.108(a). Based on our consideration of the Petition, the Preliminary Response, and the evidence of record, we conclude that the information demonstrates a reasonable likelihood that Petitioner would prevail in showing the unpatentability of at least one of the Challenged Claims. Accordingly, we institute an inter partes review as to the Challenged Claims of the ’279 patent on all grounds asserted in the Petition.” slip op. at 2
- Novelty / Anticipation (§102) › Priority / effective filing date / continuation supportPriority date awardedOther
“application filed November 12, 2021, that asserts the benefit of a series of applications, the earliest of which was filed September 2, 2003. Ex. 1001, codes (22), (45), (60). Petitioner asserts that the Challenged Claims of the ’279 patent “are entitled to an effective filing date of no earlier than September 2, 2003,” consistent with the date of the earliest application identified by the ’279 patent.9 See Pet. 6. For purposes of our analysis on the current record, in this Decision we apply September 2, 2003, as the priority date of the Challenged Claims.” slip op. at 18
- Obviousness (§103) › Motivation to combine / reasonable expectation of successInstituted
“independent claim 1. Pet. 32–63. Petitioner relies on the testimony of Mr. Crevelt in support of its contentions with respect to claim 1. Ex. 1003 ¶¶ 234–286. Further, according to Petitioner, “[n]o findings regarding motivation to combine or reasonable expectation of success are necessary with a single reference ground,” but Walker “teaches that the features of the embodiments are options that can be combined.” Pet. 42 n.6 (citing Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1372–73 (Fed. Cir. 2019). At this stage, Patent Owner does not contest Petitioner’s proffered assertions about the” slip op. at 20
§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 11,393,279 - PTAB · Oct 16, 2025 · IPR2025-00708 · APJ James A Tartal · IPR · Institution
The Board instituted IPR on all challenged claims and grounds, finding a reasonable likelihood that claims 1, 3–5, 12, 13, 18–20, 22, 24–26, 29, 42, 44–47, and 50 are unpatentable over Walker and Schneier.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“We have authority to determine whether to institute an inter partes review. 35 U.S.C. § 314(b) (2018); 37 C.F.R. § 42.4(a) (2025). An inter partes review may not be instituted “unless . . . the information presented in the petition . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). Upon institution of inter partes review, the review proceeds “on all of the challenged claims and on all grounds of unpatentability asserted for each claim.” 37 C.F.R. § 42.108(a). Based on our consideration of the Petition, the Preliminary Response, and the evidence of record, we conclude that the information demonstrates a reasonable likelihood that Petitioner would prevail in showing the unpatentability of at least one of the Challenged Claims. Accordingly, we institute an inter partes review as to the Challenged Claims of the ’336 patent on all grounds asserted in the Petition.” slip op. at 2
- Skill levelSkill level board ownOther
“B. Level of Ordinary Skill in the Art At this stage of the proceeding, there is no evidentiary dispute about the level of ordinary skill in the art.8 Based on the testimony of Mr. Crevelt, we determine that a person of ordinary skill in the art would have had at least a bachelor’s degree in computer science or computer engineering, with at least three years of experience in game development. Pet. 14 (citing Ex. 1003 ¶¶ 62–65). Additional experience could substitute for less education, and additional education could likewise substitute for less experience. Id. We determine that the level of ordinary skill in the art 7 Petitioner states that it is not aware of secondary considerations that affect the obviousness arguments it presents. Pet. 66. Patent Owner has not offered objective evidence of nonobviousness at this stage of the proceeding. 8 Patent Owner “disagrees with the proposed level of skill” but asserts that “under any level of skill a [person of ordinary skill in the art] would not understand the asserted Grounds to raise any unpatentability issues.” Prelim. Resp. 8. Thus, Patent Owner does not present evidence or arguments in its Preliminary Response related to the level of ordinary skill in the art. competence reflected in the ’336 patent Specification and the asserted prior art references, based on our review of the limited record.” slip op. at 11
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“standard as would be used by a district court to construe a claim in a civil action involving the validity or infringement of a patent. 37 C.F.R. § 42.100(b). Under that standard, claim terms are given their ordinary and customary meaning, as would have been understood by a person of ordinary skill in the art at the time of the invention, in light of the language of the claims, the specification, and the prosecution history of record. Id.; see also Phillips v. AWH Corp., 415 F.3d 1303, 1312–19 (Fed. Cir. 2005) (en banc); Thorner v. Sony Comput. Entm’t Am. LLC, 669 F.3d 1362, 1365–66 (Fed. Cir. 2012). “The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’” Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (alteration in original) (quoting Vivid Techs., Inc. v. Am. Sci. Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). Petitioner argues that it is not necessary for us to provide an express construction for any claim term because the Petition “establishes the prior art meets each claim limitation under any reasonable construction.” Pet. 14–15. Patent Owner similarly submits that we “need not construe any terms at this stage, because under any reasonable construction of the claim terms, the prior art fails to disclose or suggest the claimed features.” Prelim. Resp. 8. At this stage of the proceeding, we do not need to expressly construe any claim terms to determine whether Petitioner showed a reasonable likelihood of prevailing as to its challenge of at least one challenged claim.” slip op. at 12
- Novelty / Anticipation (§102) › Priority / effective filing date / continuation supportPriority date awardedOther
“an application filed September 20, 2010, that asserts the benefit of an application filed September 2, 2003. Ex. 1001, codes (22), (45), (54), (62). Petitioner asserts that the Challenged Claims of the ’336 patent “are entitled to an effective filing date of no earlier than September 2, 2003,” consistent with the date of the earliest application identified by the ’336 patent.9 See Pet. 7. For purposes of our analysis on the current record, in this Decision we apply September 2, 2003, as the priority date of the Challenged Claims. Walker was filed on May 1, 2003, and refers back to a provisional application filed on May 6, 2002, but Walker was not published until January 1, 2004. Ex. 1006, codes (22), (43), (60). Thus, Petitioner fails to show on the current record how, under pre–AIA 35 U.S.C. § 102(a), Walker discloses an invention that was described in a printed publication in this country before the invention thereof by the Patent Owner, because Walker was published after the applied priority date of the Challenged Claims of the’336 patent.” slip op. at 17
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 8,529,336 - PTAB · Mar 24, 2025 · IPR2024-01235 · APJ Hubert C Lorin · IPR · Institution
The Board instituted IPR of claims 1–3, 6–11, and 14–16 on all proposed grounds after finding a reasonable likelihood of prevailing on the §103 ground over Mañosa and Patel.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“In an [inter partes review], the petitioner has the burden from the onset to show with particularity why the patent it challenges is unpatentable.” Harmonic Inc. v. Avid Tech., Inc., 815 F.3d 1356, 1363 (Fed. Cir. 2016), 815 F.3d at 1363 (citing 35 U.S.C. § 312(a)(3) (requiring inter partes review petitions to identify “with particularity . . . the evidence that supports the grounds for the challenge to each claim”)). This burden of persuasion never shifts to Patent Owner. See Dynamic Drinkware, LLC v. Nat’l Graphics, Inc., 800 F.3d 1375, 1378 (Fed. Cir. 2015) (discussing the burden of proof in inter partes review). slip op. at 8
- Novelty / Anticipation (§102) › Prior-art status of a reference › Printed publication / public accessibilityPrinted publication establishedPrinted publication not establishedMixed
“[T]here is no presumption in favor of institution or in favor of finding a reference to be a printed publication under § 42.108(c) or any other authority. . . . [T]he burden is on the petitioner to identify with particularity evidence sufficient to establish a reasonable likelihood that the reference was publicly accessible before the critical date of the challenged patent, and therefore that there is a reasonable likelihood that it qualifies as a printed publication.” slip op. at 20
- Claim Construction › Intrinsic evidence (Phillips canons) › Specification disavowal / 'present invention' languageDisclaimer not foundDecided for petitioner
“May” expresses a possibility. The Specification reflects this interpretation of “may” when it states that “[i]n one embodiment, the organic material is not lyotropic. Thus, the organic material may not be a phospholipid.” Ex. 1001, 8:27–28 (emphasis added). One of ordinary skill would understand from this that the organic material “may not be” a phospholipid if the organic material is not lyotropic. It follows that if the organic material is lyotropic, then the organic material may be a phospholipid. Reading the statement “[t]he organic material may not be . . . a phospholipid” (id. at 8:59–63) in light of the earlier stated possibility that the organic material may be a phospholipid if the organic material is lyotropic, one of ordinary skill in the art would interpret “may not be” as excluding phospholipids under some conditions, not under all conditions. Taking the Specification’s discussion about phospholipids as exemplifying the permissive nature of the word “may,” we are unpersuaded that in stating that “[t]he organic material may not be [PMMA], a polyvinylidene difluoride-containing polymer, such as [PVDF] or PVDF- TrFE-CTFE, or a phospholipid, such as [DHPE]’” (Ex. 1001, 8:59–63), the specification “contains a clear and unmistakable disavowal of the compounds PMMA, PVDF, PVDF-TrFE-CTFE, and DHPE” and “disclaims the listed compounds” from the “organic material” of the claims under all conditions, as Patent Owner argues. Prelim. Resp. 6–7. Moreover, the claims themselves limit the “organic material” only to the extent that it is “barocaloric cooling or heating agent” and can perform in the manner claimed. See Ex. 1001, claim 1, supra. As broadly worded, the claims do not exclude PMMA, PVDF, PVDF-TrFE-CTFE, and DHPE per se from the group of organic materials employed by the claimed method. Adopting Patent Owner’s construction would impermissibly import a limitation (i.e., not exclude PMMA, PVDF, PVDF-TrFE-CTFE, and DHPE) into the claims. For the reasons stated, at this stage of the proceeding, we agree with Petitioner’s broad construction of “organic material.” We do not adopt Patent Owner’s proposed construction whereby PMMA, PVDF, PVDF- TrFE-CTFE, and DHPE are excluded from the scope of the claim term “organic material.” The parties are invited to address this issue further during trial, if desired. slip op. at 11
- Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundInstituted
“Petitioner shows that (a) Mañosa (i.e., inorganic compounds such as Ni-Mn-In, Gd5Si2Ge2, and La-Fe-Co-Si) and (b) Patel (i.e., PVDF-TrFE- CTFE) teach materials exhibiting inverse BCEs. Pet. 59 (citing, inter alia, Ex. 1007, pages 4–8; Ex. 1009, 1, 4–5; Ex. 1004 ¶ 108). In our view, at this stage, Petitioner sufficiently shows (via the five reasons listed supra) why it would have been obvious to one of ordinary skill in the art to substitute the barocaloric cooling or heating agent of Patel for that taught in Mañosa, thereby reaching the claimed method with a reasonable expectation of success. Cf. KSR Int’l Co. v. Teleflex Inc., 550 U.S. 398, 416 (U.S., 2007) (“The Court recognized that when a patent claims a structure already known in the prior art that is altered by the mere substitution of one element for another known in the field, the combination must do more than yield a predictable result.”)” slip op. at 32
Claim construction§ 102 anticipation§ 103 obviousnesscites KSR · GrahamPatents in suitUS 11,230,656 - PTAB · Nov 22, 2024 · IPR2024-00687 · APJ Lisa L Tsang · IPR · Institution
The Board instituted IPR on claims 1–4 and 7–12, finding a reasonable likelihood that claims 1–4 and 9 are anticipated by Winkler.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“Institution of an inter partes review is authorized when “the information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a); see also 37 C.F.R. § 42.108. Upon consideration of the Petition and the Preliminary Response, we conclude that the information presented shows there is a reasonable likelihood that Petitioner would prevail in establishing the unpatentability of at least one challenged claim of the ’017 patent.” slip op. at 2
- Skill levelSkill level petitioner adoptedDecided for petitioner
“contends a person of ordinary skill in the art (“POSITA”) “would have had at least a bachelor’s degree in electrical engineering or a similar field and at least two years of experience working with electrical circuits or electrical connectors, including power connectors. Additional relevant work experience can compensate for less education, and vice versa.” Pet. 19 (citing Ex. 1003 ¶¶ 24–26). At this juncture, Patent Owner does not dispute the level of ordinary skill in the art. Prelim. Resp. 7. For purposes of this Decision, we adopt the level of ordinary skill in the art as articulated by Petitioner because, based on the current record, it is not disputed and is consistent with our review and understanding of the technology and descriptions in the ’017 patent and prior art of record. Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001). We note, however, that the open-ended language “at least” expands the range of education and experience indefinitely with no upper bound. Therefore, we do not adopt this aspect of Petitioner’s formulation.” slip op. at 9
- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner
“At this juncture, we preliminarily agree with Patent Owner’s proffered claim construction. In particular, we agree with Patent Owner’s argument that the insulating barriers would be unable to be configured to “block[] substantially all through-air arcing paths between the first and second electrical contacts,” as claimed, unless they were electrically insulating. See Ex. 1001, 4:36–44. Moreover, as Patent Owner avers, our interpretation of “insulating” as it applies to the first and second insulating barriers should be the same as for the first and second housings. See Digital Biometrics, 149 F.3d at 1345 (“whatever interpretation we assign [to a word used in a claim] should encompass both uses because the same word appearing in the same claim should be interpreted consistently” (citation omitted)). Although “a patent’s written description can set forth more than one definition of a claim term,” we do not discern that to be the case here. See Pitney Bowes, 182 F.3d at 1310. The portions of the Specification of the ’017 patent that Patent Owner cites use “insulating” and its associated tenses to mean suppressing electrical arcing and protecting from electrical burns, i.e., electrically insulating. See, e.g., Ex. 1001, code (57), 1:58–2:3, 2:42–44, 3:2–6, 3:30–40, 3:63–4:10, cited in Prelim. Resp. 12–14. Accordingly, for purposes of this Decision, we interpret “insulating” as recited in the claims to mean “electrically insulating.”” slip op. at 11
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Instituted
“Petitioner’s reliance on the modified Figure 2 diagram not explicitly shown in Winkler is not per se improper, so long as the skilled artisan would have reasonably understood that that is what Winkler discloses. See Acoustic Tech., Inc. v. Itron Networked Solutions, Inc., 949 F.3d 1366, 1373 (Fed. Cir. 2020) (“In an anticipation analysis, the dispositive question is whether a skilled artisan would ‘reasonably understand or infer’ from a prior art reference that every claim limitation is disclosed in that single reference. . . . Expert testimony may shed light on what a skilled artisan would reasonably understand or infer from a prior art reference.” (citations omitted)). Dr. Eldering testifies that the diagram was “created based on FIG. 2 of Winkler and developed by taking the components of each half of the connector and recreating them in a separated state.” Ex. 1003 ¶ 80. On the current record, Patent Owner does not dispute Dr. Eldering’s testimony or that Petitioner’s diagram reflects what the skilled artisan would have reasonably understood by looking at Figure 2 of Winkler. See generally Prelim. Resp.” slip op. at 26
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 8,808,017 - PTAB · Nov 7, 2024 · IPR2024-00884 · APJ Richard H Marschall · IPR · Institution
The Board instituted review of claims 1–15, finding a reasonable likelihood that claims 1–3, 6–11, 14, and 15 are obvious over Aker, Aker ’724, and Thomas.
RulingsInstitution decision- Skill levelSkill level petitioner adoptedDecided for petitioner
“Petitioner argues that one of ordinary skill in the art relating to the ’602 patent would have “a working knowledge of Doppler radar systems,” a “Bachelor of Science degree in an academic discipline emphasizing electrical, mechanical, instrumentation engineering or other disciplines related [to] measurement science,” and “specific training or at least one to two years of related work experience with Doppler radar systems.” Pet. 4 (citing Ex. 1003 ¶ 18). Petitioner asserts that one of ordinary skill could, alternatively, have a “Master of Science degree in electrical engineering with less than a year of related work experience in the same discipline.” Pet. 5 (citing Ex. 1003 ¶ 18). Patent Owner does not contest Petitioner’s proposal at this time. Prelim. Resp. 21–22. At this stage, and based on Petitioner’s undisputed contentions, we apply Petitioner’s proposed level of ordinary skill in the art.” slip op. at 7
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)Term construed petitioner constructionDecided for petitioner
“Based on this preliminary record, we agree with Petitioner that its first proposed construction more naturally follows from the claim language and specification. That construction reads the limitation as requiring a “a radar transceiver configured to transmit and receive radar beams” either “in a front zone . . . or in a rear zone,” but does not require a single transceiver configured to transmit and receive radar beams in both the front and rear zones. See Pet. 6. Based on this record, the specification supports this approach because it describes separate transceivers operating in the front zone and rear zone of the patrol vehicle. See Ex. 1001, 4:29–5:24; see also Fig. 2 (showing front radar transceiver 12 associated with first radar beam 42 and separately showing rear radar transceiver 14 associated with second radar bean 44).” slip op. at 9
- Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundInstituted
“Based on the current record, Petitioner sufficiently establishes for the purposes of institution that one of ordinary skill in the art would have been motivated to combine Aker, Aker ’724, and Thomas in the manner Petitioner proposes. See Pet. 9–13. Patent Owner’s arguments do not undermine Petitioner’s showing on these issues, based on the current record, for several reasons. First, Patent Owner premises its arguments on detailed assertions as to how one of ordinary skill in the art would interpret the teachings of the references, and then includes detailed calculations based on those teachings. See Prelim. Resp. 24–36. None of these assertions are supported by any testimony from one of ordinary skill in the art, and, on this record, amount to mere attorney argument. See id. For example, even if Patent Owner’s calculations are arithmetically correct, Patent Owner does not explain or provide evidence that a skilled artisan would gauge the accuracy of GPS for law enforcement based on Patent Owner’s asserted calculations and “baseline” assumptions. See id. at 28–29. While expert testimony is not required at any stage of these proceedings, Patent Owner’s arguments here fail to undermine Petitioner’s arguments and evidence, which include currently unrebutted testimony from one of ordinary skill in the art. See, e.g., Pet. 9–13 (citing Ex. 1003 ¶¶ 31–33, 35–40). Second, the specifics of Patent Owner’s arguments do not justify denial of institution, based on the current record. Patent Owner does not dispute that using GPS to determine the speed of a vehicle as Thomas teaches could be easily incorporated into Aker’s system. Instead, Patent Owner focuses almost entirely on the lack of accuracy when using the GPS approach. As Petitioner points out, the claims do not require a specific level of accuracy and appear to allow for some degree of inaccuracy. See Prelim. Reply 1–2. In addition, Patent Owner does not argue for a claim construction that requires a specific level of accuracy. Prelim. Resp. 17–21. Even if accuracy concerns militate against the proposed combination to some degree, Patent Owner does not assert, with probative evidence, that a specific level of accuracy must be achieved in this art and how the proposed combination fails to meet that standard such that use of GPS for speed readings would be rejected despite their ready availability. See id. at 24–36. These arguments, based on the current record, do not undermine Petitioner’s reasons for its proposed combination. Final resolution of these highly factual disputes based on interpretations of the references and the standards in the art are best resolved after further development during trial.” slip op. at 17
- Obviousness (§103) › Motivation to combine / reasonable expectation of success › Teaching awayTeaching away not foundDecided for petitioner
“Fourth, we are not persuaded by Patent Owner’s teaching away argument, based on the current record. See Prelim. Resp. 28–36. Patent Owner does not support its argument with citations to Aker disparaging the use of GPS to obtain speed, or the inaccuracy of such a system generally, or citations to Thomas disparaging the accuracy of its GPS approach or its suitability for use in a patrol car. See id. Instead, Patent Owner appears to argue that the Aker references disclose two methods for obtaining speed, show a preference for one method as more accurate, and Thomas’s GPS method provides no more accuracy than the method Aker disparages. See id. Patent Owner’s arguments rely on inferences drawn by one of ordinary skill in the art when reading the references and error calculations to determine the suitability of GPS-based speed readings. See id. While these arguments may ultimately prevail, they do not appear to reach the threshold of “teaching away” from Petitioner’s proposed combination. See In re Fulton, 391 F.3d 1195, 1201 (Fed. Cir. 2004) (“[T]he prior art’s mere disclosure of more than one alternative does not constitute a teaching away from any of these alternatives because such disclosure does not criticize, discredit, or otherwise discourage the solution claimed.”).” slip op. at 18
Claim construction§ 102 anticipation§ 103 obviousnesscites PhillipsPatents in suitUS 11,703,602 - PTAB · Oct 31, 2024 · IPR2024-00858 · APJ Carl M Defranco · IPR · Institution
The Board instituted review of claims 5–7 and 16–19, finding a reasonable likelihood that claims 5–7 and 16–19 are unpatentable over Samartgis and at least claims 5 and 19 over Leoncavallo.
RulingsInstitution decision- PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Denied
“U.S.C. § 314(a) due to the advanced state of the parallel district court action, and, in doing so, relies heavily on the district court’s scheduled trial date of September 22, 2025. See Prelim. Resp. 51, 54. While the district court’s scheduled trial date may be earlier than the Board’s projected deadline for a final written decision here, CamelBak’s reliance on that date is misplaced. The Office takes the position that a district court’s scheduled trial dates are “unreliable and often change” and that a more reliable indicator is the district court’s “median time-to-trial for civil actions,” which, in this case, would place the district court’s trial date after the projected deadline of any final written decision here. See Director Memorandum, Interim Procedure for Discretionary Denials in AIA-Post Grant Proceedings With Parallel District Court Litigation, U.S. PATENT AND TRADEMARK OFFICE (June 21, 2022) (“Director’s Interim Procedure”), at 8–9. Thus, CamelBak’s reliance 5 US D586,184 S, issued Feb. 10, 2009 (Ex. 1006, “Miller”). on the district court’s scheduled trial date has no bearing on whether we should discretionarily deny institution. Of greater relevance is Trove’s express stipulation not to pursue the same grounds in the district court action as advanced in the petition or any ground that relies on the prior art references cited in the petition. See Pet. 100. Although not exactly a Sotera stipulation, the Office nonetheless recognizes that such stipulations further mitigate concerns of potentially conflicting decisions and duplicative efforts between us and the district court. See Director’s Interim Procedure, at 7–8. Thus, given Trove’s stipulation and the fact that the district court’s median time-to-trial is after the projected deadline of our final written decision here, we will not discretionarily deny institution under § 314(a).” slip op. at 6
- PTAB / AIA Trials › Discretionary denial › §325(d) same art / argumentsDenied
“We disagree that Samartgis is the substantially the same as the corresponding design patent cited during prosecution, mainly because the design patent fails to show the closure retention mechanism that is clearly shown and described in Samartgis and goes to the very heart of Trove’s showing of anticipation and obviousness. Compare Ex. 1004, Figs. 3–5 (showing lug members 15, 16 and ramp sections 23, 25, 27), with Ex. 2001, Figs. 1–8 (omitting any depiction of lug members or ramp sections). Thus, Samartgis clearly was not considered. And, although Leoncavallo and Miller may arguably have been considered during prosecution, “[w]hen instituting . . . review, the Board will authorize the review to proceed on all of the challenged claims and on all grounds of unpatentability asserted for each claim.” 42 C.F.R. § 42.108(a). As such, we will not discretionarily deny institution under § 325(d). B. Level of Ordinary Skill in the Art” slip op. at 8
- Skill levelSkill level petitioner adoptedDecided for petitioner
“Trove proposes that one of ordinary skill in the art would have had: an undergraduate degree in mechanical engineering or equivalent coursework, and a year or more of experience in designing, prototyping, and/or manufacturing fluid containers or similar products . . . [and that] [m]ore work experience may substitute for a lower level of education, and vice versa. Pet. 17–18 (citing Ex. 1003 ¶¶ 25–30). CamelBak appears to agree. See Prelim. Resp. 16 (“Patent Owner assumes Petitioner has correctly stated the level of ordinary skill in the art and does not set forth its own definition.”). At this stage, we see no reason to depart from Trove’s proposed definition, as it appears reasonable and consistent with the asserted prior art and the ’252 patent.” slip op. at 8
- Claim Construction › Functional claiming / §112(f) means-plus-function › Whether §112(f) applies (Williamson, nonce words)Not reached
“At this stage, we do not see the need to resolve the § 112(f) issue in light of Trove’s express and unrebutted showing that the prior art teaches sufficiently analogous structure to that identified in the ’252 patent for performing the disputed functional limitations of the claimed “closure retention mechanism.” See Pet. 35 (asserting that “[Samartgis’s] lug members 15 and 16 also are at least equivalent to the structure identified in the specification (i.e., the two or more spaced-apart tabs on the handle)” because “[l]ike the opposed tabs of the ’252 patent, the lug members 15 and 16 are projections that extend from the inner surface of the handle to engage the closure.”). Indeed, at this stage, CamelBak chooses not to address Trove’s showing in this regard, instead arguing that “the construction of ‘closure retention mechanism’ is irrelevant because [Trove] fails to show lug members 15 and 16 are configured to meet other limitations of claims 5 and 19.” Prelim. Resp. 20 n.7. That said, to the extent either party believes it is necessary for final resolution of patentability, they should explore the § 112(f) issue further during the trial phase.” slip op. at 10
Claim construction§ 102 anticipationDiscretionary denialPatents in suitUS 8,905,252 - Jeisys Medical Inc. v. Serendia, LLCInstitutedPTAB · Aug 20, 2024 · IPR2024-00463 · APJ Carl M Defranco · IPR · Institution
The Board instituted IPR on claims 2–6, 8, 9, 13–16, and 18, finding a reasonable likelihood that at least claims 2, 8, and 13 are anticipated by Mehta.
RulingsInstitution decision- PTAB / AIA Trials › Discretionary denial › General Plastic (serial petitions)Denied
“Videndum clarified the Board’s application of the General Plastic/Valve framework. For instance, in Ford, the Director explained that “[u]nder existing Office policy and precedent, the Board does not recognize a ‘significant relationship’ between parties [i.e., serial petitioners] having different accused products that merely engage in court-ordered pretrial coordination.” Ford, at 9 (emphasis added). And, in Videndum, the Director further explained that where “the first and second petitioners are neither the same party, nor possess a significant relationship under Valve, General Plastic factor one necessarily outweighs the other General Plastic factors.” Videndum, at 6–7. Thus, per Ford and Videndum, we will not discretionarily deny a later petition in view of an earlier petition where the earlier and later petitioners are neither the same party nor have a significant relationship. After reviewing the record, we find that no significant relationship exists with Cartessa to justify application of the General Plastic/Valve framework. Contrary to Serendia’s assertions about the joint submissions of Jeisys and Cartessa in the parallel ITC proceeding (see Prelim. Resp. 8–10), the relevant facts and circumstances here are akin to those in Ford. More specifically, like the “court-ordered” coordination of the petitioners in Ford, the collaboration of Jeisys and Cartessa as co-respondents in the ITC proceeding was mandated by the rules of the ITC proceeding, and, thus,” slip op. at 8
- PTAB / AIA Trials › Discretionary denial › §325(d) same art / argumentsDenied
“We agree with Jeisys. Mehta is not substantially the same as Mehta ’705. What Mehta ’705 omits, but Mehta includes, is an embodiment comprising “graphical user interface 320” and “tissue characteristic indicator 350” that allows a user to monitor the needle’s “location” in the tissue so as to decide when the needle is placed at a “desired depth.” Ex. 1006, 32:46– 13 US 8,540,705 B2, issued Sep. 24, 2013 (Ex. 1011). 14 Advanced Bionics, LLC v. MED-EL Elektromedizinische Geräte GmbH, IPR2019-01469, Paper 6 (PTAB Feb. 13, 2020) (precedential). 33:29, Figs 10A–10F. Nowhere do we discern a similar embodiment in Mehta ’705. At best, Mehta ’705 discloses a “display screen” for displaying a “variety of information to the physician . . . such as treatment delivery settings, electrode impedance, electrode temperature, tissue temperature, treatment duration, power delivered, energy delivered, etc.” Ex. 1011 (Mehta ’705), 29:44–58, Figs. 10A, 10B. But, notably lacking from Mehta ’705 is any disclosure of determining the “depth” and “location” of the needle’s placement in the tissue, let alone means for doing so, which Mehta discusses at length and upon which Jeisys relies to meet the “desired distance” limitation. See Ex. 1006, 32:46–33:61; Pet. 27–28. Because Mehta includes disclosure relevant to the disputed “desired distance” limitation that is absent from Mehta ’705, Serendia fails to satisfy the first part of the Advanced Bionics framework. See Wolfspeed, Inc. v. The Tr. of Purdue Univ., IPR2022-00761, Paper 13, at 7–8 (PTAB Mar. 30, 2023) (Vidal, K.) (reference not “substantially the same prior art” when it includes disclosure relevant to unpatentability grounds not present in references previously before the Office). And to the extent Serendia makes a similar argument with respect to the asserted secondary references of Na, Lee, and Livneh, it is of no consequence given Serendia’s failed showing with respect to the primary reference of Mehta.15 Thus, we decline to exercise our discretion to deny institution under 35 U.S.C. § 325(d).” slip op. at 11
- Skill levelSkill level petitioner adoptedOther
“Jeisys proposes, and Serendia agrees, that we should adopt the level of ordinary skill in the art as defined in the parallel ITC proceeding, that is, (1) 7–10 years of experience with developing and/or using treatment systems for delivery of electromagnetic radiation energy to skin or other tissues, and (2) a related graduate engineering degree or M.D. . . . [and] may have worked as part of a multidisciplinary team and drawn upon not only his or her own skills, but also would have taken advantage of certain specialized skills of others on the team when solving a technical problem. Pet. 11 (citing Ex. 1005, at 14); Prelim. Resp. 33 (accepting Jeisys’s definition of the level of skill in the art). For purposes of this proceeding, we see no reason to depart from that definition, as it appears consistent with the level reflected in the asserted prior art.” slip op. at 13
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“We need not formally construe the “desired distance” limitation in order to resolve whether institution is appropriate. That is because, on the current record, the asserted prior art satisfies the “desired distance” limitation regardless of which parties’ proposed construction we adopt. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). Nonetheless, the parties are free to further explore the appropriate construction of “desired distance” at trial, in particular, whether the plain language of the claims limits their scope to extendable needles (as opposed to fixed needles), and whether construing the “desired distance” limitation as being based on a user’s selection improperly reads a preferred embodiment into the claims.” slip op. at 14
Claim construction§ 102 anticipation§ 103 obviousnessDiscretionary denialPatents in suitUS 10,869,812 - Lululemon USA Inc. v. Nike, Inc.InstitutedPTAB · Aug 9, 2024 · IPR2024-00460 · APJ Josiah C Cocks · IPR · Institution
The Board instituted IPR on claims 1–21 on all petition grounds, finding a reasonable likelihood that claims 1–8 and 12–18 are anticipated by Nishida.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“IV. CONCLUSION For the reasons set forth above, we conclude that Petitioner has shown a reasonable likelihood that it would prevail with respect to at least one of the challenged claims. At this stage of the proceeding, the Board has not made a final determination on the construction of any claim term or the patentability of any challenged claim V. ORDER In consideration of the foregoing, it is hereby: ORDERED that, pursuant to 35 U.S.C. § 314(a), inter partes review of claims 1–21 of the ’749 patent is instituted with respect to all grounds set forth in the Petition; and” slip op. at 27
- PTAB / AIA Trials › Discretionary denial › §325(d) same art / argumentsInstitution denied 325dDenied
“arguments that Nishida-US does not disclose the “simultaneously knitting” limitation of the claims of the ’749 patent constitutes “error.” Pet. 86. In our view, whether error or not, there is clear inconsistency on the record before us as to assessment of Nishida’s and Nishida-US’s teachings pertaining to the pertinent “simultaneously knitting” requirement. In that regard, as discussed above, in accounting for that requirement, the Petition unambiguously relies on disclosure in Nishida specifically stating that “when the strip of material (1) is manufactured, the patterns (2) of the uppers are produced, at the same time as the strip of material.” Pet. 25 (citing Ex. 1005, Abstract (emphasis added by Petitioner)). At the very least, there is a reasonable case to be made that such disclosure conveys that the material (1) and the patterns (2) are created simultaneously. The record is devoid of any indication that the Examiner considered or apprehended the extent of that disclosure.15 “[M]isapprehending or overlooking specific teachings of the relevant prior art where those teachings impact patentability of the challenged claims,” as seemingly occurred here, does not lend itself to a conclusion that the exercise of discretion to deny institution is appropriate. See Advanced Bionics, IPR2019-01469, Paper 6 at 8–9 n.9.” slip op. at 23
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Instituted
“account for limitation 1[a], on this record, is difficult to follow. Nishida makes clear that its shoe making method involves production of material web 1 by knitting and which is “provided with a single or a plurality of unwound web part(s) 2.” Ex. 1005, 5. Nishida’s disclosure also, at this time, appears unequivocal in describing that “patterns (2)” and web material 1 (or “strip of material (1)”) are manufactured or produced “at the same time.” Id. at code (57) (Abstract). Nishida also unambiguously describes its material web 1 as including “surface areas 1.1.” Id. at 7. As is evident from, for instance, Nishida’s Figure 2, surface areas 1.1 surround unwound web parts (or patterns) 2.” slip op. at 18
- Obviousness (§103) › Motivation to combine / reasonable expectation of successInstituted
“2. Proposed Ground of Obviousness Based on Nishida (Grounds 2 and 6) Petitioner contends that claims 9, 10, 19, and 20 would have been obvious to a person of ordinary skill in the art based on Nishida’s teachings taken with the general knowledge of a skilled artisan. Pet. 50–54. Petitioner supports its contention with citation to Dr. Brookstein’s testimony (Ex. 1003) as well as various record exhibits (e.g., Exs. 109, 1010, 1012, 1023). Id. Patent Owner does not challenge Petitioner recourse to a person of ordinary skill in the art’s general knowledge in accounting for claims 9, 10, 19, and 20. Rather, Patent Owner simply contends that the arguments it advanced in connection with Ground 1 also applies to Ground 2. As discussed above, at this time, we do not agree with Patent Owner’s arguments. Petitioner also contends that claims 11 and 21 would have been unpatentable over Nishida and Zuckerman (Ground 6). Pet. 81–84. Patent Owner also contends that the arguments it advances in conjunction with Ground 1 apply to Ground 6. Prelim. Resp. 37. We do not find those arguments availing. On the record before us, we determine that Petitioner has shown a reasonable likelihood of success in its patentability challenge to claims 9, 10, 19, and 20 based on Nishida (ground 2), and its challenge to claims 11 and 21 based on Nishida and Zuckerman (ground 6).” slip op. at 19
§ 102 anticipation§ 103 obviousnessDiscretionary denialcites Phillips · KSR · GrahamPatents in suitUS 8,266,749
Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.