- Tanklogix, LLC v. Sitepro, Inc.Institution deniedPTAB · Oct 10, 2025 · IPR2025-00652 · APJ Bart A Gerstenblith · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–23 and 25–30 were unpatentable over the asserted grounds.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied
“presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2
- Skill levelSkill level patent owner adoptedDecided for patent owner
“The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’403 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 12
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“The parties assert that each claim term should be construed in accordance with its plain and ordinary meaning. Pet. 10; Prelim. Resp. 4 (citing Ex. 2009 ¶ 73); see Ex. 1002 ¶ 22 (opining the same). And, in the respective claim construction sections of their briefs, the parties do not propose any claim terms for express construction. We agree with the parties that no claim terms require express construction to resolve the controversy before us. See Realtime Data, 912 F.3d at 1375.” slip op. at 13
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable
“We agree with Patent Owner that the Petition fails to demonstrate that Kahn discloses element [1.2] because the evidence cited does not disclose a “first computer system being configured to provide remote control of the first pump or first valve” (i.e., a fluid-handling device). Kahn is directed to providing access to fluid sensing data and analyzing and providing visual information on that data, but Petitioner has not identified any disclosure of the capability to remotely control fluid-handling devices. See, e.g., Ex. 1005, code (54), 1:27–36, 2:50–3:2. More specifically, Kahn’s disclosures that Petitioner relies on for allegedly teaching remote control are deficient. We discuss each. First, Petitioner points to the following, “[f]or instance, as illustrated in FIG. 1C, a fluid control device such as a valve 15A is located on the input side of a sen[s]or unit 110.” Ex. 1005, 8:19–21, cited in Pet. 13. This portion of Kahn, however, does not disclose remote control. Second, Petitioner cites to the following: Finally, or in addition to, the communication unit 112B can include on-site alerts such as optical (indicator lights), audible alerts (e.g., alarm sounds), tactile (e.g., vibration of the unit) or can be interfaced to an appropriate control valve for simply shutting off the supply of fluid upon the detection of emergency events, for instance. Pet. 13 (citing Ex. 1005, 10:62–67). We agree with Patent Owner that this portion of Kahn teaches on-site alerts and local control of the fluid-handling device. See Prelim. Resp. 7. This portion of Kahn does not disclose remote control.” slip op. at 18
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 11,294,403 - Tanklogix, LLC v. Sitepro, Inc.Institution deniedPTAB · Oct 10, 2025 · IPR2025-00651 · APJ Bart A Gerstenblith · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–3, 6, 7, and 9–20 were unpatentable over any asserted ground.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied
“presented in the petition . . . and any [preliminary] response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024). For the reasons given below, on this record Petitioner has not established a reasonable likelihood that it would prevail in showing the unpatentability of any of the Challenged Claims. Accordingly, we do not institute an inter partes review.” slip op. at 2
- Skill levelSkill level patent owner adoptedDecided for patent owner
“The parties’ proposed levels of ordinary skill in the art are similar, although Patent Owner proposes two years of experience along with a bachelor’s degree whereas Petitioner proposes “significant” experience. Patent Owner also proposes an alternative with more extensive experience in lieu of a bachelor’s degree. Although we find Petitioner’s proposed qualifications acceptable, we adopt Patent Owner’s proposed qualifications for the purposes of this Decision because they offer a wider range of qualifications that nonetheless comport with the level of ordinary skill necessary to understand and implement the teachings of the ’680 patent and the asserted prior art. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978). Our analysis and findings herein, however, do not turn on any differences in the parties’ proposed qualifications.” slip op. at 11
- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner
“target value” is part of a command that is sent from a computing device to a server and then to a controller. The controller then receives a measurement of the fluid by a sensor and determines whether the measurement satisfies the “target value.” If the measurement does not satisfy the “target value,” further operations are undertaken. The recited operation sequence makes clear that the plain and ordinary meaning of “target value” is not as Dr. Wooley opines because the particular operating condition that a device is in at a particular time is represented by the measurement taken by the sensor, 11 Some claim language less relevant to construing “target value” was omitted for ease of reference. which the controller then uses to determine whether the measurement satisfies the “target value.” Additionally, claim 1 recites that the “target value” is sent as part of a command to the controller. The “target value” is not sent to the controller from the sensor, as might be expected if the plain and ordinary meaning of “target value” were as Dr. Wooley opines. Petitioner and Dr. Wooley’s construction would also result in “target value” meaning effectively the same thing as the measurement of the fluid by the sensor, a concept that is separately recited in claim 1 and to which the “target value” is compared. The Specification of the ’680 patent does not support Petitioner’s understanding of the plain and ordinary meaning of “target value.” Although the Specification does not recite “target value,” it recites “target state,” and describes “target state” sufficiently to understand the plain and ordinary meaning of “target” as used in “target value” and “target state.” In particular, the ’680 patent explains that “[i]n some embodiments, the process 104 includes receiving, via a network interface, from a remote user device, (e.g., via a command-center server) a command to change a state of a fluid-handling device to a target state.” Ex. 1001, 11:48–51. This portion reflects that the command is seeking to change a state of a fluid-handling device to a target state. In other words, the “target value” or “target state” is not generally “the particular operating condition that a device is in at a particular time”; rather, it is a value or state that the fluid-handling device is desired to be in, as Patent Owner and Dr. Durham explain. Additionally, just as claim 1 recites a directional component for the “target value” to be sent to the controller in a command, so too does the Specification describe a “target state” as being sent in a command from a remote user device. Thus, the Specification clearly supports the plain and ordinary meaning proposed by Patent Owner and Dr. Durham and not the plain and ordinary meaning proposed by Petitioner and Dr. Wooley. slip op. at 14
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable
“time-stamped process data, report exception therein to the remote host, and extract and transmit time-stamped process data to the remote host.” Ex. 1005, Abst. (emphases added). Almadi explains that its remote field systems must include a plurality of controller units “to issue commands to, and gather and process data from a plurality of field devices, including remote systems and instruments, . . . [and] a database server for the storage of process data retrieved from the remote subsystems and instruments.” Id. at 2:22–30 (emphases added). Based on these disclosures, we agree with Patent Owner that Petitioner has not established that Almadi discloses element [1.4]. Specifically, the teachings from Almadi identified by Petitioner refer to process data, which is data retrieved from the remote subsystems/field devices. Thus, we understand that Almadi’s teaching—of using an Ethernet switch to transmit “process data”—describes transmitting data from the remote subsystems/field devices. See Ex. 1005, 3:13–17, cited in Pet. 15. But claim 1 and particularly element [1.4], recites “sending, with the server, the target value to the network address [which identifies a controller of the fluid-handling device13] via the network,” which is different than sending process data from the field devices to the remote host or database server for storage.” slip op. at 19
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 11,175,680 - PTAB · Feb 11, 2025 · IPR2024-01143 · APJ St John Courtenay III · IPR · Institution
The Board denied institution because Petitioner did not show a reasonable likelihood that claims 1–8 were unpatentable under any of its anticipation or obviousness grounds.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied
“presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a) (2024).” slip op. at 2
- PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Not reached
“Verizon Wireless, Ericsson Inc., and Nokia of America Corporation (collectively, “Petitioner”) filed a Petition (Paper 1, “Pet.”) requesting an inter partes review of claims 1–8 (“challenged claims”) of U.S. Patent No. 7,664,059 B2 (Ex. 1001, “the ’059 patent”). Innovative Sonic Limited (“Patent Owner”) filed a Preliminary Response (Paper 12, “Prelim. Resp.”). With our authorization, Petitioner filed a Preliminary Reply (Paper 13, “Prelim. Reply”) and Patent Owner filed a Preliminary Sur-reply (Paper 14, “Prelim. Sur-reply”), each of which is narrowly tailored to address Petitioner’s stipulation provided in response to Patent Owner’s arguments for discretionary denial under Apple Inc. v. Fintiv, Inc., IPR2020-00019, Paper 11 (PTAB Mar. 20, 2020) (Order Authorizing Supplemental Briefing on Discretionary Denial) (precedential), and the resulting impact of that stipulation.1” slip op. at 2
- Novelty / Anticipation (§102) › Anticipation standard (single reference, every element)Not shown unpatentableNot shown unpatentable
“the “[p]etition equates [3GPP-4.60-v860-Specification’s] variables ‘V(A)’ and ‘V(S)’ with the ’059 [p]atent specification’s ‘VT(A)’ and ‘VT(S)’, instead of mapping [3GPP-4.60-v860-Specification’s] variables to the claim language.” Prelim. Resp. 21-22 (citing Pet. 24–25 (citing Ex. 1002 ¶ 81)) (emphasis added). As noted above, anticipation of a patent claim requires a finding that the claim at issue “reads on” a prior art reference. See Atlas Powder, 190 F.3d at 1346. This requires Petitioner to read or “map” each limitation of claim 1 to the corresponding feature found in the 3GPP-4.60- v860-Specification. Petitioner has not done so here.” slip op. at 19
- Obviousness (§103) › Motivation to combine / reasonable expectation of successNot shown unpatentableMotivation not foundNot shown unpatentable
“As an initial matter, the U.S. Court of Appeals for the Federal Circuit guides that, “[e]ven when obviousness is based on a single prior art reference, there must be a showing of a suggestion or motivation to modify the teachings of that reference.” In re Kotzab, 217 F.3d 1365, 1370 (Fed. Cir. 2000). But here, we note the evidence relied upon to support Petitioner’s proposed motivation to modify the 3GPP-4.60-v860- Specification is found in paragraphs 98–100 of Dr. Hass’s declaration (Ex. 1002), which merely repeat the identical language from pages 33–35 of the Petition. We thus find this declaration evidence unpersuasive because it is conclusory, and it does not set forth a suggestion or motivation to modify the 3GPP-4.60-v860-Specification. Ex. 1002 ¶¶ 98–100.” slip op. at 27
Claim construction§ 102 anticipation§ 103 obviousnessDiscretionary denialcites Phillips · KSR · GrahamPatents in suitUS 7,664,059 - AT&T Services Inc. / T-Mobile USA, Inc. et al. v. Innovative Sonic Ltd.Institution deniedPTAB · Feb 4, 2025 · IPR2024-01144 · APJ Michael R Zecher · IPR · Institution
The Board denied institution because AT&T failed to show a reasonable likelihood that claims 1–22 were obvious over either Nokia and the 3GPP-Standard or Ericsson and the 3GPP-Standard.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied meritsDenied
“§ 42.4(a), we may not institute an IPR unless the information presented in the Petition and any responses thereto shows “there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a). Taking into account Innovative Sonic’s Preliminary Response, AT&T’s Preliminary Reply, and Innovative Sonic’s Preliminary Sur-reply, we conclude that the information 1 We do not reach whether we should exercise our discretion to deny the Petition under Fintiv because, as we explain below, we deny the Petition based on the merits. See infra Sections II.B.5 and II.C.1. presented in the Petition does not establish that there is a reasonable likelihood that AT&T would prevail in demonstrating at least one of claims 1–22 of the ’489 patent is unpatentable. We, therefore, deny AT&T’s Petition.” slip op. at 2
- Skill levelSkill level petitioner adoptedOther
“Relying on the testimony of Dr. Hansen, AT&T argues the following: [a]s of the earliest claimed priority date, a person of ordinary skill in the art at the time of the alleged invention of the ’489 patent . . . would have had a [Bachelor of Science] in Electrical Engineering or a related field with at least three years of experience designing, developing, and/or testing telecommunication systems. A [person of ordinary skill in the art] would also have familiarity with the wireless standards and well-known protocols for accessing wireless networks. More education may supplement practical experience or vice versa. Pet. 14 (citing Ex. 1002 ¶ 368). In the Preliminary Response, Innovative Sonic does not address AT&T’s assessment of the level of skill in the art. See Prelim. Resp. For purposes of this Decision, we adopt AT&T’s uncontested assessment of the level of skill in the art because it is consistent with the ’489 patent and the asserted prior art.” slip op. at 13
- Expert testimonyPetitioner expert discountedDecided for patent owner
“issue fares no better. With one exception, Dr. Hansen, relies on the same disclosures of the Update for 3GPP TS 36.331 v.9.4.0 to support his testimony, which, as we explain above, does not account for the plain language of the disputed limitation. Compare Pet. 26–27, 43, with Ex. 1002 ¶¶ 87–90. In addition, Dr. Hansen testifies that a person of ordinary skill in the art would have understood that “the E-UTRAN configuring the UE with one or more SCells would necessarily include the configuring of at least one SCell by a source eNB to a UE.” Ex. 1002 ¶ 91 (emphasis added). But neither AT&T nor Dr. Hansen establish inherency in its obviousness analysis. See PAR Pharm., Inc. v TWI Pharms., Inc., 773 F.3d 1186, 1194– 95 (Fed Cir. 2014) (recognizing that “inherency may supply a missing claim limitation in an obviousness analysis,” but limiting the doctrine of inherency “only when the limitation at issue is the ‘natural result’ of the combination of prior art elements” (quoting In re Oelrich, 666 F.2d 578, 581 (C.C.P.A. 1981)). Apart from the conclusory assertion above, Dr. Hansen does not identify sufficient evidentiary support demonstrating that the requirement identically recited in each of independent claims 1 and 12 of “configuring at least one SCell by a source eNB to a User Equipment (UE)” would have been the “natural result” flowing from the Update for 3GPP TS 36.331 v.9.4.0’s disclosure of the E-UTRAN configuring the UE with at least one SCell. PAR Pharm., 773 F.3d at 1195. Accordingly, we do not credit Dr. Hansen’s testimony that implicates the doctrine of inherency because it not supported by evidence of record.” slip op. at 17
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“In the Petition, AT&T contends that “the Board does not need to expressly construe any [claim] terms to resolve the arguments presented herein” because the asserted prior art “discloses all limitations under any plausible construction.” Pet. 14 (citing Ex. 1002 (Declaration of Dr. Christopher Hansen) ¶ 456). In the Preliminary Response, Innovative Sonic “agrees with [AT&T] that no [claim] term needs to be construed.” Prelim. Resp. 4 (citing Pet. 14). For purposes of this Decision, there is no readily discernible controversy between the parties that requires us to construe any claim terms at this time. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (noting that “we need only construe terms ‘that are in controversy, and only to the extent necessary to resolve the controversy’” (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 10
Claim construction§ 102 anticipation§ 103 obviousnesscites Phillips · KSR · GrahamPatents in suitUS 9,237,489 - PTAB · Jan 31, 2025 · IPR2024-00979 · APJ Lisa A Murray · IPR · Institution
The Board instituted inter partes review of claims 1–18 on all four asserted obviousness grounds, finding a reasonable likelihood that Dolan renders at least one challenged claim unpatentable.
RulingsInstitution decision- PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Denied
“As set forth in the Director’s Memorandum, Interim Procedure for Discretionary Denials in AIA Post-Grant Proceedings with Parallel District Court Litigation (dated June 21, 2022), at 7, available at https://www.uspto. gov/sites/default/files/documents/interim_proc_discretionary_denials_aia_ parallel_district_court_litigation_memo_20220621_.pdf, the PTAB will not discretionarily deny institution of an IPR . . . in view of parallel district court litigation where a petitioner stipulates not to pursue in a parallel district court proceeding the same grounds as in the petition or any grounds that could have reasonably been raised in the petition. Petitioner’s stipulation (Ex. 1018) satisfies the language from the Director’s Memorandum quoted above. Therefore, we need not analyze each Fintiv factor to reach the determination that we will not exercise our discretion to deny institution in view of the parallel Eastern District of Texas Litigation.” slip op. at 7
- PTAB / AIA Trials › Real party in interest / privityNot reached
“Electronics, America, Inc.; and Google LLC as real parties in interest. Pet. 57. Petitioner explains that “Google LLC is a subsidiary of XXVI Holdings Inc., which is a subsidiary of Alphabet Inc.” Id. at 57 n.10. Petitioner asserts that “XXVI Holdings Inc. and Alphabet Inc. are not real parties-in-interest to this proceeding.” Id. Patent Owner identifies Cerence Operating Co., a subsidiary of Cerence, Inc., as a real party in interest. Paper 5, 1. Patent Owner disagrees with Petitioner, contending that Alphabet Inc. is also a real party in interest. Id. At this stage of the proceeding, we need not determine whether Alphabet Inc. is a real party in interest to Petitioner since neither Petitioner nor Patent Owner has identified any effect that determination would have on the outcome of this proceeding. To the extent Patent Owner seeks to maintain this contention, it should raise the issue in its Patent Owner response.” slip op. at 3
- Skill levelSkill level petitioner adoptedDecided for petitioner
“Patent Owner does not currently take a position on the relevant level of ordinary skill in the art and believes that “the Board could assume Petitioner’s proposed level of ordinary skill for the purposes of deciding whether to institute.” Prelim. Resp. 3. At this stage of the proceeding and on the present record, we adopt Petitioner’s uncontested, proposed level of ordinary skill in the art, which we find consistent with the level of ordinary skill in the art reflected by the ’993 patent and the prior art of record. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978).” slip op. at 10
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)Plain and ordinary meaningOther
“Additionally, only terms that are in controversy need to be construed, and these need to be construed only to the extent necessary to resolve the controversy. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’”) (quoting Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)). At this time, neither party proposes a specific construction of any given claim term, instead requesting that the claims be given their plain and ordinary meaning. Pet. 10–11; Prelim. Resp. 5.” slip op. at 11
Claim construction§ 103 obviousnessDiscretionary denialcites Phillips · KSR · GrahamPatents in suitUS 8,081,993 - PTAB · Jan 28, 2025 · IPR2024-01048 · APJ Mary C Hoffman · IPR · Institution
The Board instituted IPR on all challenged claims and all four grounds, finding a reasonable likelihood that Apple would prevail on at least one claim.
RulingsInstitution decision- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“We begin our analysis with independent claim 1. Considering these factors, we preliminarily determine that Petitioner has shown a reasonable likelihood that claim 1 is unpatentable as obvious over Zhang, Fillebrown, and Pasanen, for the reasons explained below.” slip op. at 16
- Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation foundReasonable expectation foundInstituted
“Petitioner argues that limitation 1c is taught by the combination of Zhang with Fillebrown. Pet. 18. Petitioner identifies Zhang’s teaching of transmitting commands and media content from the mobile device to helper servers via a wireless network, WLAN. Pet. 16–18 (citing Ex. 1004, 3:25– 60, 4:1–8, 4:32–50, 7:1–14, 8:13–22; Ex. 1003 ¶¶ 103, 104, 114–118). Acknowledging that Zhang does not expressly teach an intermediate routing device, Petitioner identifies Fillebrown’s intermediate wireless router (wireless router 120) for providing network range extension by amplifying routed signals. Id. at 19–22 (citing Ex. 1005 ¶¶ 16, 34, 49, 51, 57, 61). Petitioner contends a POSITA would have been motivated to modify Zhang to route data via an intermediate wireless router pursuant to Fillebrown to provide network range extension, and that such a modification would have had a reasonable expectation of success because Zhang and Fillebrown teach the same network setup (i.e., WLAN using a wireless protocol/standard such as IEEE 802.11 or Home RF). Pet. 22–23 (citing Ex. 1003 ¶¶ 109–111)” slip op. at 20
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“The parties do not propose any express claim construction. Pet. 4; see generally Prelim Resp. We also determine that no express claim construction is necessary for our Decision, apart from that discussed in our below analysis. See Nidec Motor Corp. v. Zhongshan Broad Ocean Motor Co., 868 F.3d 1013, 1017 (Fed. Cir. 2017) (holding that only terms in controversy must be construed “and only to the extent necessary to resolve the controversy”) (citing Vivid Techs., Inc. v. Am. Sci. & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999)).” slip op. at 10
- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITAPlain and ordinary meaningDecided for petitioner
“We preliminarily disagree with Patent Owner. Although the claim lists step 1b before step 1d, method steps are not ordinarily construed to require a specific order of performance unless the claims or Specification directly or implicitly require that specific order. See Altiris, Inc. v. Symantec Corp., 318 F.3d 1363, 1369–70 (Fed. Cir. 2003). Nothing in the express claim language precludes performing step 1d before step 1b, as in Zhang. For example, the claim does not contain temporal terms, like “then” or “next,” nor does the claim otherwise specify that step 1b must precede step 1d. Although Patent Owner points out that a term of step 1d (i.e., the one more available devices) derives antecedent basis from text in step 1b (i.e., one more available devices), this alone does not directly or implicitly require performing step 1b before step 1d. Prelim Resp. 6–7 (citing Ex. 1002, 240, ’648 patent prosecution history). Nor does the Specification require performing the step of identifying devices as available before the step of wirelessly signaling those devices or even that the steps be mutually exclusive. For example, there are no statements that this step order is important, nor disclaimer of any other order, nor any prosecution history indicating a surrender of any other order. Moreover, according to the Specification, announcer 30, which is the component that identifies devices as available prior to the wirelessly signaling, is only “preferably provided.” Ex. 1001, 7:28–31. Even assuming Patent Owner were correct that step 1b must precede step 1d, Patent Owner’s position that device(s) must be identified as available does not appear to be commensurate with the claims. According to its plain meaning, limitation 1b does not appear to require identifying devices as available; the claim merely requires identifying “available devices.” See In re Self, 671 F.2d 1344, 1348 (CCPA 1982) (rejecting arguments “not based on limitations appearing in the claims”). In other words, the claim does not appear to require identifying (i.e., determining) whether devices are available but merely requires identifying devices that happen to be available. According to our preliminary understanding, Zhang’s mobile device 1) discovers (identifies) connected available and unavailable helper servers, and then 2) sends (wirelessly signals) service requests to compatible available and unavailable helper servers. Ex. 1004, 3:44–4:8, 6:51–7:13. Thus, Zhang identifies and then wirelessly signals available devices (Zhang also identifies and then wirelessly signals unavailable devices). As such, we preliminary determine that Zhang meets the claim language “identifying one or more available devices” and “wirelessly signaling the one or more available devices.”” slip op. at 18
Claim construction§ 103 obviousnessDiscretionary denialcites Phillips · KSR · GrahamPatents in suitUS 10,547,648 - PTAB · Jan 27, 2025 · IPR2024-01142 · APJ Josiah C Cocks · IPR · Institution
The Board denied institution on claims 5, 6, 8, 13, 14, 16, and 18 under § 314(a), concluding the Fintiv factors favored discretionary denial.
RulingsInstitution decision- PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Institution denied fintivDenied
“denial because district court is very likely to address patentability issues at trial before we would issue a final written decision. Factors 3 and 4 weigh marginally against discretionary denial. Factor 5 either weighs in favor of discretionary denial or is neutral, but even if it were neutral, factor 2 alone outweighs the marginal weight of factors 3 and 4. Based on our assessment, we determine that Fintiv Factors 1–5 favor exercising discretion to deny institution. With that determination in mind, we proceed to evaluate Fintiv Factor 6. G. Fintiv Factor 6: Other Circumstances that Impact the Board’s Exercise” slip op. at 18
- Obviousness (§103) › Motivation to combine / reasonable expectation of successMotivation not foundNot reached
“We further note that Petitioner’s general view that it would have been obvious to a person of ordinary skill in the art to modify Jung to arrive at the pertinent limitation is not well supported and somewhat circular. See Pet. 42–43. It is inadequately explained why a skilled artisan would have reasonably sought to modify Jung so that it then “expressly teaches” what is required by the claims, as is advanced by Petitioner. See id. at 42. It is a dubious proposition that simply seeking to account for the requirements of the challenged claims serves as suitable reasoning that would have prompted modification of the “express[] teach[ings]” of a reference.” slip op. at 25
- Skill levelSkill level petitioner adoptedDecided for petitioner
“[A] person of ordinary skill in the art at the time of the alleged invention of the ’868 patent (“POSITA”) would have had a B.S. in Electrical Engineering or a related field with at least three years of experience designing, developing, and/or testing telecommunication systems. Ex-1003, ¶ 48. A POSITA would also have familiarity with the wireless standards and well-known protocols for accessing wireless networks. Id. More education may supplement practical experience or vice versa. Id. Pet. 20–21. Patent Owner does not offer an assessment of its own, or dispute Petitioner’s proposed level of ordinary skill in the art. For this decision, we adopt Petitioner’s proposed level of ordinary skill.” slip op. at 19
- Claim Construction › Intrinsic evidence (Phillips canons) › Plain and ordinary meaning to a POSITATerm construed patent owner constructionDecided for patent owner
“proceeding. See Pet. 12. Patent Owner provides a construction of the phrase “to derive, based on a beam reference signal of the network beam, a UE beam,” which Patent Owner contends is not necessary to substantiate its arguments, but is offered to “elucidate[] the distinction between the ’868 Patent and the alleged prior art from the reasons” offered by Patent Owner in its Preliminary Response. PO Resp. 8. In particular, Patent Owner contends that the above-noted phrase means “selecting a UE beam from a plurality of candidate UE beams based on a beam reference signal of the network beam.” Id. Patent Owner explains the basis for its proposed construction of the relevant phrase through citation to content of the ’868 patent including Figures 21 and 22 of the patent along with description of those Figures. See Prelim. Resp. 8–10. In reviewing the basis for Patent Owner’s proposed claim construction, we conclude that the construction has ample and adequate support in the record before us. We determine that no other claim term need be addressed expressly See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 20
Claim construction§ 103 obviousnessDiscretionary denialcites Phillips · GrahamPatents in suitUS 10,887,868 - PTAB · Jan 27, 2025 · IPR2024-01121 · APJ Josiah C Cocks · IPR · Institution
The Board denied institution under Fintiv, finding that the parallel district court proceedings would likely address patentability before a final written decision and the merits were not compelling.
RulingsInstitution decision- PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Denied
“In Fintiv, the Board explained that “cases addressing earlier trial dates as a basis for denial under NHK Spring have sought to balance considerations such as system efficiency, fairness, and patent quality.” Fintiv, Paper 11 at 5. Fintiv sets forth six non-exclusive factors for determining “whether efficiency, fairness, and the merits support the exercise of authority to deny institution in view of an earlier trial date in the parallel proceeding.” Id. at 6. These factors consider the following: 1. whether the court granted a stay or evidence exists that one may be granted if a proceeding is instituted; 2. proximity of the court’s trial date to the Board’s projected statutory deadline for a final written decision; 3. investment in the parallel proceeding by the court and the parties; 4. overlap between issues raised in the petition and in the parallel proceeding; 5. whether the petitioner and the defendant in the parallel proceeding are the same party; and 6. other circumstances that impact the Board’s exercise of discretion, including the merits. Id. at 5–6. In evaluating these factors, “the Board takes a holistic view of whether efficiency and integrity of the system are best served by denying or instituting review.” Id. at 6.” slip op. at 8
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“2. Claim Construction In interpreting the claims of the ’402 patent, we “us[e] the same claim construction standard that would be used to construe the claim[s] in a civil action under 35 U.S.C. [§] 282(b).” See 37 C.F.R. § 42.100(b) (2020). The claim construction standard includes construing claims in accordance with the ordinary and customary meaning of such claims as would have been understood by one of ordinary skill in the art and the prosecution history pertaining to the patent. See id.; Phillips v. AWH Corp., 415 F.3d 1303, 1312–14 (Fed. Cir. 2005) (en banc). The parties each contend that resolution of this proceeding does not require that the meaning of any claim term be made explicit. See Pet. 15; Prelim. Resp. 8. We agree. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 18
- Skill levelSkill level petitioner adoptedOther
“1. Level of Ordinary Skill As part of our compelling-merits analysis, we consider the level of ordinary skill in the art. See Phillips v. AWH Corp., 415 F.3d 1303, 1312– 1313 (Fed. Cir. 2005) (en banc) (the level of ordinary skill is pertinent to claim construction); Graham v. John Deere Co. of Kan. City, 383 U.S. 1, 17–18 (1966) (the level of ordinary skill is one of the factors to consider when determining obviousness). Petitioner proposes the following: [A] person of ordinary skill in the art at the time of the alleged invention of the ’402 patent (“POSITA”) would have had a B.S. in Electrical Engineering or a related field with at least three years of experience designing, developing, and/or testing telecommunication systems. Ex-1003, ¶ 73. A POSITA would also have familiarity with the wireless standards and well-known protocols for accessing wireless networks. Id. More education may supplement practical experience or vice versa. Id. Pet. 21–22. Patent Owner does not offer an assessment of its own, or dispute Petitioner’s proposed level of ordinary skill in the art. For this decision, we adopt Petitioner’s proposed level of ordinary skill.” slip op. at 17
- BurdenNot reached
“outset, we note that the language of claims 1 and 12 is clear in reciting the presence of two distinct signals, i.e., a control signal and a reference signal, and that it is the control signal that “triggers” transmission of the reference signal. See Ex. 1001, 14:5–6, 60–62. Patent Owner credibly argues that the “two-step embodiment” of Figure 10 of the ’402 patent, and in particular steps 1005 and 1010, describe the control and reference signal transmissions that are encompassed by claims 1 and 12. See Prelim. Resp 8–10. Patent Owner also credibly argues that the Figure 10 embodiment is distinct from other disclosed embodiments, including the “single-step embodiment” of Figure 8. See id. at 10–11. Patent Owner further explains reasonably that the content of column 6 of the ’402 patent on which Petitioner relies has a more “natural reading” in distinguishing between separate transmission of a “control signal” that “triggers” separate transmission of a “reference signal” as described in connection with Figure 10 as juxtaposed with transmission of a “control channel,” which is distinct from a control signal, and a “reference signal” that may constitute a single transmission, as is described in conjunction with Figure 8. See id. at 16–17. It logically follows that if, as Patent Owner credibly argues, the claims of the ’402 patent do encompass the latter transmission scheme, rather than the former, then Petitioner’s reliance on Moon, as presented in its Petition, is insufficient to account for those claims. On this record, we need not decide whether Petitioner would likely prevail on the above-noted issues as Patent Owner raises sufficiently substantial arguments that the preliminary evidence, if unrebutted in trial, does not plainly lead to a conclusion that claim 1 is unpatentable by a preponderance of the evidence. Because, as noted above, Patent Owner has identified potentially dispositive gaps or flaws in Petitioner’s apprehension as to what is adequate in Moon’s disclosure to account for the claims of the ’402 patent, Petitioner’s proposed grounds cannot be said to rise to the level of a “compelling” meritorious challenge.” slip op. at 22
Claim constructionDiscretionary denialcites Phillips · GrahamPatents in suitUS 10,148,402 - PTAB · Dec 16, 2024 · IPR2024-00997 · APJ Christopher L Ogden · IPR · Institution
The Board denied institution of IPR challenging claims 1–10, exercising its discretion under § 314(a) because the Fintiv factors favored denial.
RulingsInstitution decision- PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Institution denied fintivDenied
“Based on the preliminary record, we can reasonably expect trial in the parallel district court proceedings to begin four to five months prior to the deadline for our final written decision, based on the scheduled trial date and the median time-to-trial statistics. See Fintiv Memo 8–9 & n.12 (approving the use of median time-to-trial statistics). Even if the proceedings are staggered, at least one of the proceedings would likely begin and conclude well before our decision, making it highly likely that there will be duplicate efforts in evaluating the challenged claims based on the prior art. Thus, we agree with Patent Owner that the second factor weighs substantially in favor of discretionary denial.” slip op. at 9
- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)Institution denied fintivInstitution denied
“and Trademark Office under 37 C.F.R. § 42.4(a), we may only institute an inter partes review when “the information presented in the petition . . . and any response . . . shows that there is a reasonable likelihood that the petitioner would prevail with respect to at least 1 of the claims challenged in the petition.” 35 U.S.C. § 314(a); see also 37 C.F.R. § 42.108(c). However, institution of inter partes review is discretionary. See Harmonic Inc. v. Avid” slip op. at 2
- Skill levelSkill level petitioner adoptedOther
“ordinary skill in the art. See Phillips v. AWH Corp., 415 F.3d 1303, 1312– 1313 (Fed. Cir. 2005) (en banc) (the level of ordinary skill is pertinent to claim construction); Graham v. John Deere Co. of Kan. City, 383 U.S. 1, 17–18 (1966) (the level of ordinary skill is one of the factors to consider when determining obviousness). For this decision, we adopt Petitioner’s proposed level of ordinary skill, which is “the equivalent of an undergraduate degree in Electrical Engineering, Computer Science, or Computer Engineering; familiarity with the relevant 3GPP standards as of this time; and at least two years of experience in design, development, and/or testing of cellular networks.” Pet. 15–16 (citing Ex. 1003 ¶¶ 43–44). Although Patent Owner argues for a higher level of ordinary skill (see Prelim. Resp. 7–8), our determination that the Petition lacks compelling merits would be the same under Patent Owner’s proposal.” slip op. at 15
- Claim Construction › Threshold & procedure › Whether a term needs construction (O2 Micro)No construction neededOther
“The parties argue that we need not address any claim-construction issues for our analysis, and we agree. See Pet. 15; Prelim. Resp. 25. See Realtime Data, LLC v. Iancu, 912 F.3d 1368, 1375 (Fed. Cir. 2019) (“The Board is required to construe ‘only those terms . . . that are in controversy, and only to the extent necessary to resolve the controversy.’” (quoting Vivid Techs., Inc. v. Am. Sci & Eng’g, Inc., 200 F.3d 795, 803 (Fed. Cir. 1999))).” slip op. at 16
Claim construction§ 103 obviousnessDiscretionary denialcites Phillips · GrahamPatents in suitUS 10,798,754 - PTAB · Nov 26, 2024 · IPR2024-00936 · APJ Bart A Gerstenblith · IPR · Institution
The Board instituted IPR on all challenged claims and grounds, finding a reasonable likelihood that claims 1, 5, 8, 9, 11–19, 23, 26, 27, and 29–36 are obvious over Tayloe, TI Datasheet, and Macnally.
RulingsInstitution decision- PTAB / AIA Trials › Discretionary denial › Fintiv (parallel litigation)Denied
“https://www.uspto.gov/sites/default/files/documents/interim_proc_discretion ary_denials_aia_parallel_district_court_litigation_memo_20220621_.pdf, the PTAB will not discretionarily deny institution of an IPR . . . in view of parallel district court litigation where a petitioner stipulates not to pursue in a parallel district court proceeding the same grounds as in the petition or any grounds that could have reasonably been raised in the petition. Petitioner’s stipulation (Ex. 1041) satisfies the language from the Director’s Memorandum quoted above. Therefore, we need not analyze each Fintiv factor to reach the determination that we will not exercise our discretion to deny institution in view of the parallel Western District of Texas Litigation.” slip op. at 11
- PTAB / AIA Trials › Institution threshold (reasonable likelihood / more likely than not)InstitutedInstituted
“Accordingly, on the present record at this stage of the proceeding and for the reasons discussed above, we find that Petitioner has shown a reasonable likelihood of establishing that one of ordinary skill in the art would have been motivated to combine the teachings of Tayloe, TI Datasheet, and Macnally with a reasonable expectation of success. Patent Owner is invited to elaborate further on its positions in future briefing with potential expert support.” slip op. at 35
- Skill levelSkill level petitioner adoptedDecided for petitioner
“person of ordinary skill in the art at the time of the invention would have had “at least a bachelor’s degree in electrical engineering or a related subject and two or more years of experience in the field of EM circuit design.” Pet. 6 (citing Ex. 1003 ¶¶ 68–71). Petitioner further proposes that “[l]ess work experience may be compensated by a higher level of education, such as a master’s degree.” Id. Patent Owner does not take a position, in the Preliminary Response, on the level of ordinary skill in the art. See generally Prelim. Resp. On the present record at this stage of the proceeding, we adopt Petitioner’s uncontested, proposed level of ordinary skill in the art, which we find consistent with the level of ordinary skill in the art reflected by the ’528 patent and the prior art of record. See Okajima v. Bourdeau, 261 F.3d 1350, 1355 (Fed. Cir. 2001); In re GPAC Inc., 57 F.3d 1573, 1579 (Fed. Cir. 1995); In re Oelrich, 579 F.2d 86, 91 (CCPA 1978).” slip op. at 12
- Prior constructionPrior construction adoptedTerm construed petitioner constructionDecided for petitioner
“their plain and ordinary meaning, with one exception. Pet. 3. Specifically, Petitioner asserts “storage element” or “energy storage element” are recited “interchangeably” in the claims and should each be construed to mean “an element of a system that stores non-negligible amounts of energy from an input EM signal,” which Petitioner notes was “determined by the Board and affirmed by the [U.S. Court of Appeals for the] Federal Circuit.” Id. (citing ParkerVision, Inc. v. Vidal, 88 F.4th 969, 976 (Fed. Cir. 2023) (holding “ParkerVision acted as its own lexicographer to define the term ‘storage element’” and “the Board’s construction of ‘storage element’ [(quoted above)] correctly tracks the lexicography provided by [ParkerVision]”) (citing U.S. Patent No. 6,061,551 (“the ’551 patent”), 66:55–67)). Petitioner contends that, like U.S. Patent No. 7,110,444 that was at issue in ParkerVision v. Vidal, the ’528 patent also incorporates the ’551 patent by reference. Pet. 4 (citing Ex. 1001, 1:30–34). And Petitioner notes that the ’528 patent “includes an identical disclosure to that deemed dispositive from the incorporated by reference ’551 patent.” Id. (citing Ex. 1001, 73:9–22 (which Petitioner contends defines “storage module”)). Further, Petitioner asserts “[n]o intrinsic evidence demands a different construction” because, even though claim 1 recites “system,” “energy,” and “transfer,” it does so “in isolation” and “does not recite ‘energy transfer system,’ let alone restrict the claimed ‘storage element’ to any energy transfer system.” Id. at 5 (also contending the file history of the ’528 patent does not support a different construction). Petitioner also contends “the proposed combinations teach the claimed ‘storage element’ or ‘energy storage element,’ even including the alleged condition of ‘low impedance load’ that purportedly ‘goes to the heart of what makes an element, a “storage” element.’” Id. Patent Owner does not take a position on claim construction in the Preliminary Response. See generally Prelim. Resp. On the present record at this stage of the proceeding, we agree with Petitioner, for the reasons discussed above, that “storage element” and “energy storage element” are used interchangeably in the claims and should be construed consistently with our prior construction of “storage element,” which, as noted above, was affirmed by the Federal Circuit, to mean “an element of a system that stores non-negligible amounts of energy from an input EM signal.” We need not construe any other claim terms expressly because there is no present controversy as to the meaning of any other claim terms in this proceeding. Realtime Data, 912 F.3d at 1375.” slip op. at 14
Claim construction§ 103 obviousnessDiscretionary denialcites Phillips · KSR · GrahamPatents in suitUS 9,118,528
Holdings, summaries, rulings, issues, outcomes, winners and claim constructions shown for a decision were generated by a large language model reading the opinion. They are a guide to the decision, not the decision. Confirm every one against the court's own text before relying on it. Outcomes read from the patent owner’s side. Party names are extracted from the decision and are missing on about 900 short Director denials and scans, which carry the trial number instead.